2026-06-01_Agenda Packet--Dossier de l'ordre du jour
/h b/L\[w9thw
M&C No.2026-106
Report DateMay 26, 2026
Meeting DateJune 01, 2026
Service AreaUtilities and Infrastructure
Services
HerWorship Mayor Donna Noade Reardon andMembers of Council
SUBJECT:Contract 2026-06: Rockwood Reservoir Rehabilitation
AUTHORIZATION
Primary AuthorDept. HeadChief Administrative Officer
Gerry MattssonMichael BakerIan Fogan
RECOMMENDATION
It is recommended that:Contract No. 2026-06: Rockwood Reservoir Rehabilitation
beawarded to the lowtenderer,Empirical Industrial Services Inc., at their
tendered priceof $1,235,196.83(including HST) as calculated based on estimated
quantities, andfurther that the Mayor andCity Clerk be authorized to execute the
necessary contract documents.
EXECUTIVE SUMMARY
The purpose of this report is to recommend that Council award Contract No.
2026-06: Rockwood Reservoir Rehabilitation project to the low tenderer.
PREVIOUS RESOLUTIONS
th
October 28, 2024: M&C 2024-287: 2025General and Utility Fund Capital
Budgets, approved.
st
December 1, 2025:M&C 2025-273: 2026General and Utility Fund Capital
Programs, approved.
REPORT
The 2025and 2026approved Water & Sewerage Utility Fund CapitalPrograms
includefundingfor water tank improvements. The existing water storage
reservoir in Rockwood Parkand its access road wereselected to be rehabilitated
with this approved funding. Due to scheduling issues involvingaccess to the NB
Power right-of-way approvaland site investigation, the access road improvements
portion of the workwill be completed separately from this tender.
- 2 -
TENDER RESULTS
st
Tenders closed on April 21, 2026, with the following results, including HST:
1. Empirical Industrial Services Inc. $ 1,235,196.83
2. Corrcoat Services Inc. $ 1,307,269.95
3. Kelson & Kelson Ltd. $ 1,462,358.30
4. Cimota inc. $ 1,511,449.60
5. MacDonald Applicators Limited $ 1,923,753.53
6. Landmark Municipal Services $ 2,210,875.00
The Engineers estimate for the work was $ 1,475,449.71.
ANALYSIS
The tender was reviewed by staff and was found to be formal in all respects.
Following staff completing reference checks, staff have verified that the low
tenderer has the necessary resources and ability to perform the work and
recommend acceptance of their tender.
FINANCIAL IMPLICATIONS
The Contract includes work that is charged against the 2025 & 2026 Water &
Sewerage Utility Fund Capital Programs. This project is funded entirely by the
Utility. The approved 2025 Utility Capital Program includes a project budget of
$125,000 for design services regarding the rehabilitation of an existing water tank.
The Rockwood Park tank was chosen to be designed with this funding. The 2026
Utility Capital Program included a funding amount of $1,200,000 for the
rehabilitation of the existing Rockwood Park Water Storage Tank including
upgrades to the existing access road.
During the design phase of the work, it was projected that there would be a
shortfall in Utility funding in order to construct the entire project therefore
$1,100,000 in surplus 2025 Utility Fund Capital Program funding was transferred
from the refurbishment of the Lakewood Heights Water Storage Tank project
(25WC21) to the Rockwood Water Storage Tank project (25WC23).
Assuming the award of the tank rehabilitation Contract to the low tenderer, an
analysis has been completed, which includes the estimated amount of work to be
performed by the Contractor and Others (i.e. design & inspection services).
The analysis is as follows:
Budget $2,425,000
Project Net Cost $1,354,436
Variance (Surplus) $1,070,564
- 3 -
The surplus funding noted above will be used to complete the required upgrades
to the existing access road to the Rockwood Park tank once all permits are
obtained and the design has been completed.
POLICY - TENDERING OF CONSTRUCTION CONTRACTS
This recommendation aligns with policy for the tendering of
construction contracts, adhering to the City's General Specifications and specific
project specifications.
STRATEGIC ALIGNMENT
This report aligns with Council's Priorities for GROW and PERFORM as the project
involves the complete rehabilitation of an existing water storage reservoir to
extend its useful service life and provide reliable water service to customers.
SERVICE AND FINANCIAL OUTCOMES
This project provides improvements that will benefit customers of the Utility. The
existing reservoir infrastructure requires rehabilitation. The rehabilitated
infrastructure will reduce the likelihood of future disruptions, addressing potential
failures in the existing infrastructure.
INPUT FROM OTHER SERVICE AREAS AND STAKEHOLDERS
Name of Service Area/Stakeholder Name of Staff Person
Supply Chain Management /ŷƩźƭ wƚĬĻƩƷƭ
Strategic Services (Finance) /Ʃğźŭ \[ğǝźŭƓĻ
Utilities and Infrastructure (Saint John YĻƓķğƌƌ ağƭƚƓ
Water)
This design was reviewed by Utilities and Infrastructure Operations staff.
The tendering process for this project was completed in accordance with the City's
Strategic Procurement Policy and Supply Chain Management supports the
recommendation being put forth.
ATTACHMENTS
N/A
/h b/L\[w9thw
M&C No.2026-133
Report DateMay 25, 2026
Meeting DateJune 01, 2026
Service AreaUtilities and Infrastructure
Services
HerWorship Mayor Donna Noade Reardon andMembers of Council
SUBJECT:/ƚƓƷƩğĭƷ ЋЉЋЎΏЊЌ\[ƚǞĻƩ /ƚǝĻ \[ƚƚƦ {ĻǞĻƩ wĻƓĻǞğƌ tŷğƭĻ Њ
AUTHORIZATION
Primary AuthorDept. HeadChief Administrative Officer
Michael BakerIan Fogan
RECOMMENDATION
It is recommended thatContract No. 2025-13: Lower Cove Loop Sewer Renewal
Phase 1beawarded to the lowtenderer,TerraEx Inc.,at theirtendered priceof
$4,967,770.00(including HST)as calculated based on estimated quantities, and
further that the Mayor and City Clerk be authorized to execute the necessary
contract documents.
EXECUTIVE SUMMARY
The purpose of this report is to recommend that Council award Contract No.
2025-13: Lower Cove Loop Sewer Renewal Phase 1 to the low tenderer.
PREVIOUS RESOLUTIONS
th
October 17, 2022: M&C 2022-317 2023 and 2024 General and Utility Fund
Capital Programs, approved.
th
October 15, 2024: M&C 2024-253 Disaster Mitigation and Adaptation Funding
Saint John Wastewater Flood Protection Project, approved.
st
December 1,2025: M&C 2025-273 -2026 General and Utility Capital Budget,
approved.
REPORT
The approved2023and 2026GeneralFund Capital Programsincludefundingfor
the designservices(both phases)and first phase of construction forthe renewal
and future separation of the existing combined seweron the Port Saint John
Lower Cove Loop terminalproperty.Theproject is partially funded through a
Disaster Mitigation and Adaptation Funding(DMAF)Agreement with the
- 2 -
Government of Canada which provides funding towards projects which mitigate
The
overall funding agreement is composed of three (3) projects, with a total eligible
cost of $14,615,500, which includes a Federal share of $5,083,652, and the City
share of $9,531,848.
A financial contribution of $1,345,720 (40%) by the federal government, and
$2,018,579 (60%) by the General Fund is allocated towards the 2026 phase of the
Lower Cove Loop Sewer Renewal project. The proposed work generally involves
the renewal of the existing corrugated steel combined sewer with a new concrete
sewer, new manholes, the reinstatement of existing storm infrastructure on the
Port property that will be disturbed during installation of the new sewer, and the
reinstatement of the asphalt surface.
TENDER RESULTS
th
Tenders closed on May 19, 2026, with the following results, including HST:
1. TerraEx Inc. $ 4,967,770.00
2 Debly Enterprises Ltd. $ 7,464,282.00
The Engineers estimate for the work was $4,565,015.25, including HST.
ANALYSIS
The tenders were reviewed by staff, and all were found to be formal in all respects.
Staff are of the opinion that the low tenderer has the necessary resources and
ability to perform the work and recommend acceptance of their tender.
FINANCIAL IMPLICATIONS
Assuming the award of the Contract to the low tenderer, an analysis has been
completed, which includes the estimated amount of work to be performed by the
Contractor and Others (i.e. engineering design and construction management
services).
The analysis is as follows:
Budget $ 3,788,219
Project Net Cost $ 4,941,308
Variance (Shortfall) - ($ 1,153,089)
The projected shortfall is within the General Fund Capital Program. In order to
address this shortfall, the overall DMAF funding program will be responsible for
40% of the project shortfall, which equates to $461,236 (Other Share). The Other
Share funding is being taken from other projects within the DMAF Funding
program scope of work with the intention that there will be surplus funding
available once those projects are designed and tendered. Staff will be tracking the
- 3 -
available Other share funding as the DMAF program projects are tendered and
awarded. The remaining General Fund Share of the shortfall is $691,854 and it will
be addressed by using the City Share funding from the Loch Lomond Road / Airport
Arterial roundabout project (26TC23). The Loch Lomond Road / Airport Arterial
roundabout project is not moving forward to construction at this time as currently
there is no supporting Other Share funding approved from the Province of New
Brunswick to construct this project. Current indications are Provincial funding
would not be available until at least 2029.
The pricing of this project includes a contingency in the amount of $599,150.00
(including HST) to account for any extra work that may be encountered
throughout construction.
It should be noted that it is expected that Phase II of this overall project will require
less funding for construction in 2027. Funding for construction was originally
allocated at 50% in 2026 and 50% in 2027. However, since the full design is
completed, it is now expected that more work will be completed in 2026 therefore
less funding will be required in 2027.
POLICY - TENDERING OF CONSTRUCTION CONTRACTS
This recommendation aligns with policy for the tendering of
construction contracts, adhering to the City's General Specifications and specific
project specifications.
STRATEGIC ALIGNMENT
This project aligns with Priorities for GREEN and PERFORM as the
project involves replacing sections of municipal combined sewers that are
currently in poor condition while leveraging Other Share funding. The work
supports future storm sewer and sanitary sewer separation plans for the area. In
addition, the project will aid in reducing Utility Fund operating costs through
reduced pumping and treatment costs by reducing the amount of ground water
and tidewater inflow entering the sanitary sewer system.
As the funding for this project is shared by the Federal government through DMAF
funding, the PERFORM Council priority is being met. Leveraging alternative
sources of financing for capital projects shows that the City is being fiscally
responsible.
SERVICE AND FINANCIAL OUTCOMES
The municipal infrastructure on the Lower Cove Loop terminal property is
currently in poor condition and requires replacement. This infrastructure renewal
effort reduces the likelihood of future service disruptions by addressing potential
failures of the existing infrastructure. The project also supports the future
separation of stormwater and sanitary sewer flows within the project limits,
The
- 4 -
project will also aid in reducing the General operational costs which result
from dealing with infrastructure that is beyond its useful life.
The City of Saint John General Specifications, along with the Contract Particular
Specifications, include provisions for price adjustments related to diesel fuel and
the NBDTI Asphalt Binder Price Index. These adjustments are triggered when the
base contract price for either diesel fuel or asphalt binder fluctuates by +/- 5%
during the construction period. Base prices for both diesel fuel and asphalt binder
are set at the time of tender. Current market conditions suggest there is upward
pressure on both variables, which could result in a higher cost for the City. It is
important to note that these adjustments are bidirectional. While increases in the
index or diesel fuel would result in additional payments to contractors, decreases
would result in cost reductions to the City of Saint John.
Staff will closely monitor project quantities, diesel fuel pricing and the asphalt
binder price index to ensure the total project cost falls within the approved
budget. At this point in time, it is expected that any additional costs related to
diesel fuel pricing and the asphalt binder price index will be paid for out of the
project contingency.
INPUT FROM OTHER SERVICE AREAS AND STAKEHOLDERS
Name of Service Area/Stakeholder Name of Staff Person
Supply Chain Management Chris Roberts
Strategic Services (Finance) Craig Lavigne
The project design was reviewed by Utilities and Infrastructure Services and Public
Works and Transportation Services as well as staff from Port Saint John.
The tendering process for this project was completed in accordance with the City's
Strategic Procurement Policy and Supply Chain Management supports the
recommendation being put forth.
Staff completed Indigenous Consultation as part of the funding requirements for
this project.
ATTACHMENTS
N/A
COMMON COUNCILREPORT
M&C No.2026-132
Report DateMay 25, 2026
Meeting DateJune 01, 2026
Service AreaUtilities and
Infrastructure Services
HerWorship Mayor Donna Noade ReardonandMembers of Common Council
SUBJECT: Municipal Operations Complex, 175 Rothesay Avenue Washroom
Upgrades
AUTHORIZATION
Primary AuthorDepartment HeadCity Administrative Office
* ²® " ±³®3 ¬¨± 9 ¬¬¨¤) &®¦
RECOMMENDATION
It is recommended that the contractfor the Washroom Upgradesat the
Municipal Operations Complexbe awarded tothe lowest tenderer, ICR
General ContractorsLimited,at the tendered price of$545,881+ $40,000
contingency +HST, for a total contract price of $673,763.15,and further that
the Mayor and City Clerk be authorized to execute the necessary contract
documents.
EXECUTIVE SUMMARY
The purpose of this report is to seek approval to award the
Washroom Upgrades at the Municipal Operations Complexto the lowest
compliant bidder.
PREVIOUS RESOLUTION
NA
STRATEGIC ALIGNMENT
The Washroom Upgradesat Municipal Operations Complexis clearly aligned
with the Councilinvest in sustainable City services and municipal
infrastructureas well as with the Asset Management Policy to minimize risk to the
Level of Service (LOS).
REPORT
The existing washroomsat the Municipal Operations Complex areover 40 years
oldand need immediate replacement. Additionally, the washroomsdo not meet
the current building codes and standards.
The scope of work consists of the following.
Provide all Labour, materials, equipment, accessories, etc., necessary to
complete the upgrade of the washroom upgrades at the Municipal
Operations Complex.
The following upgrade will result in the following benefits to the city:
Reduce the City Infrastructure deficit by over $600,000 through
investment in asset renewal.
Improve reliability of asset performance thus minimizing risks associated
with assets failure.
SERVICE AND FINANCIAL OUTCOMES
The total cost to complete the Washroom Upgradesat the Municipal
Operations Complex, 175 Rothesay Avenue, if awarded to the lowest bidder as
recommended, will be $610,991.86Including HST Rebateand $40,000.00
contingency.
The analysis is as follows:
City 2025 Capital Budget:$350,000.00
2026 2026 Capital Budget:$200,000.00
Project net costincluding HST Rebate:$610,991.86
Professional Fees:$47,971.56
Variance (Over Budget):$108,963.42
The $108,963.42over budgetwill be managed within the broader2025General
Fund Capital Program.
is $560,625.00+HST.
INPUT FROM OTHER SERVICE AREASAND STAKEHOLDERS
thth
A public tender call was issued on April 15, 2026,and closed on May 5, 2026.
four(4) companies responded to the tender call by submitting bids. The results
are as follows (including HST):
COMPANY NAMETENDER PRICE
ICR General Contractors Limited$627,763.15
Avondale Construction Limited $656,190.00
Eclipse Construction Services Ltd.$658,519.72
King Construction$718,750.00
Staff of Supply Chain Management and Facilities Management have reviewed the
tenders and have found them to be complete and formal in every regard.
Staff believe that the lowest compliant tenderer has the necessary resources and
expertise to perform the work and recommend acceptance of their tender.
Policy and Supply Chain Management supports the recommendation being put
forth.
ATTACHMENTS
N/A
/haahb /h b/L\[w9thw
M&C No.2026-113
Report DateMay 26, 2026
Meeting DateJune 01, 2026
Service AreaUtilities and
Infrastructure Services
Her Worship Mayor Donna Noade Reardon and Members of Common Council
SUBJECT:Canada Housing Infrastructure FundCharlotte Street
InfrastructureUpgrades(Project No. 19491)
AUTHORIZATION
Primary AuthorDept. HeadChief Administrative
Officer
Susan StevenMichael BakerIanFogan
RECOMMENDATION
That the City enter into the Agreement with the Province of New Brunswick (as
represented by the Regional Development Corporation) generally in the form
attached to this M&C 2026-113 for the purpose of receiving funding under the
Canada Housing Infrastructure Fund to complete design, construction and
construction management for the installation of watermain, sanitary sewer,
storm sewer (including a new stormwater outfall) as well as all required
reinstatement on Charlotte Street (from Broad Street to the new outfall
location) and that the Mayor and Clerk be authorized to execute the said
Agreement and any other documents ancillary thereto.
EXECUTIVE SUMMARY
The purpose of this report is to request that Common Council approve the
funding agreement between the City and the Regional Development
Corporation (RDC) for the Canada Housing Infrastructure Fund (CHIF)for the
Charlotte Street Infrastructure Upgrades project (Project No. 19491).
PREVIOUS RESOLUTION
st
December 1, 2025: M&C 2025-273 -2026 General and Utility Fund Capital
Budget, approved.
- 2 -
REPORT
RDC and Housing, Infrastructure and Communities Canada (HICC) have aligned
to distribute funding through the Canada-New Brunswick Agreement for the
Canada Housing Infrastructure Fund (CHIF). This program aims to accelerate
the construction and upgrading of housing-enabling drinking water,
wastewater, stormwater and solid waste infrastructure, directly supporting the
creation of new homes and increasing densification.
Through the CHIF program, RDC and HICC will reimburse the City for a portion
of the Charlotte Street
Infrastructure Upgrades project. This project involves renewing aging water
and sewer infrastructure on Charlotte Street (between Broad Street and the
Saint John Harbour). The project also includes separating combined sewers
through the installation of new dedicated sanitary and storm sewers and the
construction a new stormwater outfall discharging stormwater into the Saint
John Harbour.
The total cost of the project is estimated to be $12,518,792 (including HST),
with a total eligible estimated cost under this program of $11,352,476. The City
receives a HST rebate from the federal government through an agreement so
it is not included in this program.
The City has been approved for a financial contribution in the amount of
73.33% ($8,324,770) of the eligible expenditures (40% or $4,540,990 from HICC
and 33.33% or $3,783,780 from RDC) towards the services required to execute
the construction of the Charlotte Street Infrastructure Upgrades Project. As
per the attached agreement, the project must be completed, and all claims
received by RDC by March 31st, 2029.
STRATEGIC ALIGNMENT
and
PERFORM.
GROW this project includes upgrading infrastructure to aid in
allowing for growth in this drainage area in the South End.
GREEN by separating existing combined sewers and removing
stormwater from the sanitary sewer system, this project will help
reduce energy consumption by decreasing the amount of
stormwater being unnecessarily transported and treated.
- 3 -
BELONG this infrastructure upgrade project will aid in
accommodating proposed development in this area of the South
End, which will include affordable housing.
PERFORM by leveraging available funding through the CHIF
funding program , the City is demonstrating fiscal responsibility.
SERVICE AND FINANCIAL OUTCOMES
This project was approved within the 2026 General Fund and Utility Fund
Capital Programs. The estimated cost that was approved within the programs
was $12,451,740 when HST is included. The funding had been approved
however it was contingent on the City receiving the CHIF contribution. The
costs are split between the General Fund ($10,235,001) and the Utility Fund
($2,216,739).
It should be noted that, if cost overruns occur within the overall project under
the CHIF program, the City is responsible for 100% of the extra costs. Healthy
contingencies were applied to the funding submission when it was prepared in
an attempt to mitigate potential risks.
INPUT FROM OTHER SERVICE AREAS AND STAKEHOLDERS
Name of Service Area/Stakeholder Name of Staff Person
Corporate Services (GCO) Jacqueline Boucher
Strategic Services (Finance) Craig Lavigne
ATTACHMENTS
Appendix 1 - Canada - New Brunswick Agreement for the Canada Housing
Infrastructure Fund Contribution Agreement for The City of Saint John
Charlotte Street Infrastructure Upgrades (Project No. 19491)
PROCLAMATION
WHEREAS:The municipality of Saint John is committed to assisting
citizens with disabilities to participate fully in our
community; and
WHEREAS:Many persons living with disabilities face barriers in the
areas of employment, access to information, transportation,
housing, education, recreation, and other disability-related
supports; and
WHEREAS:We believe that more citizens with disabilities should have
the chance to access disability related supports to improve
their opportunities in New Brunswick, and
WHEREAS:WAccessibility Creates Full
Inclusion
NOW THEREFORE: I,Mayor Donna Noade Reardon, of Saint Johndo hereby
request the citizens of Saint John to join with our Council in recognizing persons
with disabilities and their role in our community by the observance of National
stth
AccessAbility / Disability Awareness Weekfrom May 31to June 6, 2026 in The
City of Saint John.
In witness whereof I have set my hand and affixed the official seal of the Mayor
of the City of Saint John.
2026
SmallCity,
Introductionto
Executive
BigHeart..
LeadershipTeam
June 1, 2026
Common Council
NewExecutiveStructureWhy?
Organizations evolve
Siloed -We have strong departments and talented people, but too often we operate
independently instead of collectively around organizational outcomes.
Council expectations, community expectations, service pressures, and organizational
complexity have all evolved.
The previous model did not position us as effectively as it needs to for the future.
The new model is intended to:
strengthen collaboration;
improve strategic coordination;
increase organizational accountability;
support better service integration;
and strengthen leadership capacity across the organization.
One that is better connected, more aligned and better positioned to support both employees
and the community we serve.
The expectation moving forward is that executive leaders think strategically and act
enterprise-wide first, department second.
This means:
shared accountability;
coordinated decision-making;
collective ownership of outcomes;
and stronger alignment across services.
Common
Legend
Council
Elected
Representatives
Support to
Executive Team
Chief
Administrative
Officer
Culture &
Performance
Clerk
Ian Fogan
Jon
Taylor
Principal
Strategist of
Transformation
Stephanie Hossack
Deputy CAO and
General Counsel &
Chief Financial
Chief Development
Chief Public
Chief Operating
Chief Corporate
Officer
and Community
Safety Officer
Officer
Officer
Strategic
Officer
Public Safety and
Service Delivery
People and Systems
Investments
Quality of Life
Legislative
Interim Kevin Loughery
Interim Stephanie Hossack
Amy Poffenroth
Kevin Fudge
Melanie Tompkins KC
Advancing the Strategic Plan
CITY OF SAINT JOHN
Recommendation
Common Council Receive and file.