2025-04-07_Agenda Packet--Dossier de l'ordre du jour
City of Saint John
Common Council Meeting
Monday, April 7, 2025
Committee of the Whole
1. Call to Order
Si vous avez besoin des services en français pour une réunion de Conseil communal, veuillez contacter le
bureau du greffier communal au 658-2862.
Each of the following items, either in whole or in part, is able to be discussed in private pursuant to the
provisions of subsection 68(1) of the Local Governance Act and Council / Committee will make a
decision(s) in that respect in Open Session:
nd
4:45 p.m., 2 Floor Boardroom, City Hall
1.1 Approval of Minutes 68(1)
1.2 Legal Matter 68(1)(f)
1.3 Financial Matter 68(1)(c)
1.4 Land Matter 68(1)(c,f)
1.5 Financial Matter 68(1)(c)
1.6 Land Matter 68(1)(d,f)
1.7 Financial Matter 68(1)(a,c)
1.8 Personal Matter 68(1)(b)
1.9 Legal Matter 68(1)(g)
Ville de Saint John
Séance du conseil communal
Lundi le 7 avril 2025
18 h
e
2 étage de la salle du conseil communal, Hôtel de ville
Nous utiliserons un moyen de communication électronique lors de cette séance. Le
public peut assister à la séance en personne à la salle du conseil ou la visionner sur le
site Web de la ville (www.saintjohn.ca) ou sur Rogers TV.
Comité plénier
1. Ouverture de la séance
Si vous souhaitez obtenir des services en français pour une séance du conseil communal,
veuillez communiquer avec le bureau du greffier communal au 658-2862.
privé en vertu des dispositions prévues au paragraphe 68 (1) de la \[ƚź ƭǒƩ ƌğ ŭƚǒǝĻƩƓğƓĭĻ
ƌƚĭğƌĻ. Le conseil/comité prendra une ou des décisions à cet égard au cours de la séance
publique :
e
16 h 45 Clôture du comité plénier Salle de conseil au 2 étage
1.1 Approbation du procèsverbal 68(1)
1.2 Question juridique 68(1)f)
1.3 Question financière 68(1)c)
1.4 Question foncière 68(1)d,f)
1.5 Question financière 68(1)c)
1.6 Question foncière 68(1)d,f)
1.7 Question financière 68(1)a,c)
1.8 Question personnelle 68(1)b)
1.9 Question juridique 68(1)g)
Séance ordinaire
1. Ouverture de la séance
1.1 Reconnaissance territoriale
1.2 Hymne national
2. Approbation du procèsverbal
2.1 Procèsverbal du 10 mars 2025
2.2 Procèsverbal du 24 mars 2025
5.1
Murray Jaye Walsh (la recommandation est dans le rapport)
5.2 Accord de subvention de Ressources naturelles Canada Programme
5.3 Fixation des dates des audiences publiques pour la modification du texte
de la zone industrielle moyenne, le rezonage du 6, avenue Douglas et
est dans le rapport)
5.4 Recommandation relative à
2025 (la recommandation est dans le rapport)
5.5 Accord sur le fonds de développement des collectivités : étude
énergétique du complexe communautaire polyvalent (la
recommandation est dans le rapport)
5.6 Acquisitions de servitudes sur la promenade McAllister (la
recommandation est dans le rapport)
5.7 Contrat 2024-03 : rue St. James (de la rue Charlotte à la rue Sydney)
reconstruction des rues (la recommandation est dans le rapport)
5.8 Contrat 2023-09 : amélioration des transports actifs pour la rue principale
(la recommandation est dans le rapport)
5.9 Contrat 2025-03 : Heather Way
recommandation est dans le rapport)
6. Commentaires présentés par les membres
7. Proclamation
7.1 Semaine nationale des télécommunicateurs de la sécurité publique du
13 au 19 avril 2025
7.2 Journée de la neutralité religieuse 15 avril 2025
7.3 17 avril 2025
8. Délégations et présentations
9. Audiences publiques
9.1 59 - 120 rue Carleton
10. Étude des arrêtés municipaux
10.1 801, chemin Loch Lomond
e
(3 lecture)
10.2 Centre de services de
e
crise (3 lecture)
10.3 Modification du règlement de zonage, rétractation des conditions de
59 et de
e
125, chemin Gault (3 lecture)
11. Interventions des membres du conseil
11.1 Avis de motion Audit interne du plan de gestion hivernale (conseiller
Sullivan)
12. Affaires municipales évoquées par les fonctionnaires municipaux
12.1 Mise à jour de ladministrateur en chef concernant certains projets
catalyseurs et la défense des intérêts (verbale)
12.2 Délais de pose des routes fraisées dans le cadre des contrats annuels de
13. Rapports déposés par les comités
13.1 Comité des finances : Plan financier à long terme du fonds des services
publics pour 2024-2034
14. Étude des sujets écartés
15. Correspondance générale
15.1 M. Elazab : Impôt foncier (recommandation : à recevoir pour information)
15.2 735242 NB Inc : Statut patrimonial du bien 239 rue King Est
(recommandation : demander au
15.3 K. Dunham : Obstruction de la ligne de vue de la route depuis les
propriétés voisines (recommandation
chef pour déterminer si la loi touchant les rues publiques de la ville de
cas)
16. Ordre du jour supplémentaire
17. Comité plénier
17.1 Logement pour tous Accord de contribution mis à jour
17.2 ès anticipé et prolongation de la date de clôture avenue
Taylor
17.3 Permis de construction pour le projet de musée de Nouveau-Brunswick
17.4 Accord de parrainage
18. Levée de la séance
COMMON COUNCIL / CONSEIL COMMUNAL
March 19, 2025 / le 19 mars 2025
MINUTES REGULAR MEETING
COMMON COUNCIL OF THE CITY OF SAINT JOHN
MARCH 19, 2025 AT 4:25 PM
MEETING CONDUCTED BY ELECTRONIC PARTICIPATION
An Electronic means of communication will be used at this meeting. The public may
attend the meeting in person in the Council Chamber or view the meeting on the
Website (www.saintjohn.ca) or on Rogers TV͵
Present: Mayor Donna Noade Reardon
Deputy Mayor John MacKenzie
Councillor-at-Large Gary Sullivan
Councillor-at-Large Brent Harris
Councillor Ward 1 Greg Norton
Councillor Ward 1 Joanna Killen
Councillor Ward 2 Barry Ogden
Councillor Ward 3 Gerry Lowe
Councillor Ward 3 Mariah Darling
Councillor Ward 4 Paula Radwan
Councillor Ward 4 Greg Stewart
Also Present:
Chief Administrative Officer B. McGovern
General Counsel M. Tompkins
Fire Chief R. Nichol
Commissioner Utilities & Infrastructure Services I. Fogan
Commissioner Public Works M. Hugenholtz
Commissioner Human Resources S. Hossack
Commissioner Growth & Community Services A. Poffenroth
Director Community Planning P. Nalavde
Director External Relations L. Kennedy
Project Manager Housing Accelerator Project C. Smith
City Clerk J. Taylor
1
COMMON COUNCIL / CONSEIL COMMUNAL
March 19, 2025 / le 19 mars 2025
1.Call to Order
2. Approval of Agenda
Moved by Deputy Mayor MacKenzie, seconded by Councillor Darling:
RESOLVED that the agenda of March 19, 2025 be approved.
MOTION CARRIED.
3. Disclosures of Conflict of Interest
4. Committee of the Whole
4.1 Amendment to City of Saint John Housing Accelerator Fund 2024-2026 Action
Plan CMHC Agreement #27,097,302
Moved by Deputy Mayor MacKenzie, seconded by Councillor Darling:
RESOLVED that as recommended by the Committee of the Whole, having met on March
19, 2025 Common Council approve the following:
1. That the City of Saint John approve the amendment to the Housing Accelerator
Fund Contribution Agreement with the Canada Mortgage and Housing
Corporation, generally in the form as presented to the Committee of Whole at its
March 19, 2025 meeting; and,
2. That the Mayor and Clerk be authorized to execute the said agreement and any
documents ancillary thereto.
MOTION CARRIED.
5. Adjournment
Moved by Councillor Lowe, seconded by Councillor Killen:
RESOLVED that the meeting of Common Council held on March 19, 2025, be adjourned.
MOTION CARRIED.
The Mayor declared the meeting adjourned at 4:27 p.m.
2
COMMON COUNCIL / CONSEIL COMMUNAL
March 24, 2025 / le 24 mars 2025
MINUTES REGULAR MEETING
COMMON COUNCIL OF THE CITY OF SAINT JOHN
MARCH 24, 2025 AT 6:00 PM
ND
2 FLOOR COMMON COUNCIL CHAMBER, CITY HALL
An Electronic means of communication will be used at this meeting. The public may
attend the meeting in person in the Council Chamber or view the meeting on the
Website (www.saintjohn.ca) or on Rogers TV͵
Present: Mayor Donna Noade Reardon
Deputy Mayor John MacKenzie
Councillor-at-Large Gary Sullivan
Councillor-at-Large Brent Harris
Councillor Ward 1 Greg Norton
Councillor Ward 2 Barry Ogden
Councillor Ward 3 Gerry Lowe
Councillor Ward 3 Mariah Darling
Councillor Ward 4 Paula Radwan
Councillor Ward 4 Greg Stewart
Absent: Councillor Ward 1 Joanna Killen
Also Present:
Chief Administrative Officer B. McGovern
General Counsel M. Tompkins
Director Financial Services J. Forgie
Fire Chief R. Nichol
Commissioner Utilities & Infrastructure Services I. Fogan
Commissioner Public Works M. Hugenholtz
Commissioner Human Resources S. Hossack
Commissioner Growth & Community Services A. Poffenroth
Director External Relations L. Kennedy
City Clerk J. Taylor
Administrative Assistant K. Tibbits
1. Call to Order
1
COMMON COUNCIL / CONSEIL COMMUNAL
March 24, 2025 / le 24 mars 2025
1.1 Land Acknowledgement
Councillor Norton read aloud the Land Acknowledgement and called for a moment of
reflection.
of Saint John/Menaquesk is situated is the traditional territory of the
Wolastoqiyik/Maliseet.The Wolastoqiyik/Maliseet along with their Indigenous Neighbours,
and
Friendship Treaties with the British Crown in the 1700s that protected their rights to lands
1.2 National Anthem
The Saint John Symphony Youth Orchestra performed O Canada by video.
2. Approval of Minutes
2.1 Minutes of March 10, 2025
Moved by Councillor Darling, seconded by Councillor Harris:
RESOLVED that the minutes of March 10, 2025 be approved.
MOTION CARRIED.
2.2 Minutes of March 13, 2025
Moved by Councillor Darling, seconded by Councillor Harris:
RESOLVED that the minutes of March 13, 2025 be approved.
MOTION CARRIED.
3. Approval of Agenda
Moved by Councillor Lowe, seconded by Deputy Mayor MacKenzie:
RESOLVED that the agenda of March 24, 2025 be approved with the addition of Item
9.3.1 Withdrawal of Application 0 Bayside Drive; 16.1 Department of Transportation &
Infrastructure: Simms Corner Redesign; 17.1 Agreement related to New Brunswick
Museum Project; 17.2 Consent to Sublet Reversing Falls Skywalk Inc. to Saint John
History and Nature Gallery Inc. and Haifa Haram; 17.3 2025 Update to Non-Union Terms
and Conditions; and 17.4 Sale of .14-acre lot at 311 Sandy Point Road.
MOTION CARRIED.
4. Disclosures of Conflict of Interest
5. Consent Agenda
5.1 RESOLVED that as recommended in the submitted report M&C 2025-073: Fleet
Replacement Procurement March 2025, Common Council award the purchase of two
2
COMMON COUNCIL / CONSEIL COMMUNAL
March 24, 2025 / le 24 mars 2025
(2) 66,000 Lb. GVWR Tandem Positive Displacement Combination Vacuum Jetter Trucks
at a total cost of $1,415,680.00 plus HST to FST Canada Inc. o/a Joe Johnson Equipment.
5.2 RESOLVED that as recommended in the submitted report M&C 2025-079:
Canadian Corps of Commissionaires NB & PEI Division 2025 Service Agreement, the City
enter into an Agreement for Security and Related Services with the Canadian Corp of
Commissionaires N.B. & P.E.I. Division, Inc. in the form attached to M&C No. 2025-079;
and that the Mayor and City Clerk be authorized to execute said Agreement and any
documents ancillary thereto.
5.3 RESOLVED that as recommended in the submitted report M&C 2025-087:
Cancelling the Public Hearings for 228 Germain Street and a Text Amendment for the
Medium Industrial Zone, Common Council cancel the public hearings scheduled for
Monday, April 7, 2025 at 6:30 p.m. for a Rezoning submitted by Bruce Wilkin Inc. for 228
Germain Street (PID 00003889); and a Zoning By-Law Text Amendment submitted by City
of Saint John to remove Scrap or Salvage Yard as a permitted use in the Medium Industrial
zone and to list existing operations in Schedule E: Exceptions, in the Council Chamber,
City Hall 2nd floor, 15 Market Square, Saint John, NB.
5.4 RESOLVED that as recommended in the submitted report M&C 2025-084: Green
and Inclusive Community Buildings (GICB) Program Grant Agreement, Common Council
approve Samir Yammine, Director of Asset Management and Environmental
Performance, be authorized to complete the necessary reporting as required under the
Green and Inclusive Communities Buildings Program for the Carnegie Building HVAC and
Lighting Upgrade, an Agreement between His Majesty the King in Right of Canada, as
represented by the Minister of Infrastructure and Communities and the City of Saint John
(M&C2023-123) and be authorized to execute all necessary Certificates of Compliance
associated with the Agreement.
5.5 RESOLVED that as recommended in the submitted report M&C 2025-074:
Contract No. 2024-09: Lancaster WWTF Aeration System Renewal Project, Council
approve of the allocation of capital reserve funding ($169,000) to the 2023 Utility Fund
Capital Budget for dredging at the Lancaster Lagoon (to be completed as part of the
Lancaster Lagoon Aeration System Renewal project). The funds are to be added from the
Reserve; and, that Contract No. 2024-09: Lancaster WWTF
Aeration System Renewal project be awarded to the low tenderer, TerraEx Inc., at their
tendered price of $7,142,305.00 (including HST) as calculated based on estimated
quantities, and further that the Mayor and City Clerk be authorized to execute the
necessary contract documents.
5.6 RESOLVED that as recommended in the submitted report M&C 2025-078: Contact
No. 2024-12: Charlotte Street Water, Sanitary and Storm Sewer Renewal and Street
Reconstruction, Council approve reallocating $37,006 of funding from the Shamrock Park
Sewer Separation Project (24TC10) to the Charlotte Street (St. James Street to Queen
Square North) Water, Sanitary and Storm Sewer Renewal and Street Reconstruction
project (Storm Component - 24TC16) to offset the projected General Fund City share
budget variance as outlined in this report; and, that Contract No. 2024-12: Charlotte Street
(St. James Street to Queen Square North) Water, Sanitary and Storm Sewer Renewal
and Street Reconstruction be awarded to the low tenderer, Galbraith Construction Ltd., at
their tendered price of $1,839,237.55 (including HST) as calculated based on estimated
3
COMMON COUNCIL / CONSEIL COMMUNAL
March 24, 2025 / le 24 mars 2025
quantities, and further that the Mayor and City Clerk be authorized to execute the
necessary contract documents.
5.7 RESOLVED that the submitted report M&C 2025-083: Public Information Session:
Heather Way Sanitary Sewer Installation be received for information.
5.8 RESOLVED that the submitted report entitled "Fundy Regional Service
Commission 2024- be received for information.
Moved by Deputy Mayor MacKenzie, seconded by Councillor Sullivan:
RESOLVED that the recommendation set out in each consent agenda item respectively,
be adopted.
MOTION CARRIED UNANIMOUSLY.
6. Members Comments
Members commented on various local events.
7. Proclamation
7.1 Mayor Noade Reardon declared March 26, 2025 as Purple Day in The City of Saint
John in an effort to raise awareness of epilepsy in Canada.
8. Delegations / Presentations
11.1 Selection of Deputy Mayor (Mayor Noade Reardon)
Moved by Mayor Noade Reardon, seconded by Councillor Ogden:
RESOLVED that staff be directed to prepare an -
law to allow the Mayor, at the first meeting of a new Council, to nominate a Councillor-
elect to serve as Deputy Mayor for a 4-year term.
Moved by Councillor Harris, seconded by Councillor Stewart:
RESOLVED that Item 11.1 Selection of Deputy Mayor be tabled until after the public
hearings have been completed.
MOTION CARRIED.
9. Public Hearings 6:30 p.m.
9.1 Proposed Zoning By-Law Text Amendment with Staff Presentation and Planning
stnd
Advisory Committee report Crisis Care Facility (1 and 2 Reading)
Commissioner Poffenroth introduced the proposed text amendment to the Zoning By-Law,
initiated by Growth and Community Services, to expand the range of zones that permit
Crisis Care Facility as a use. The amendment
permitted use in the Utility Service zone
revising the parking requirements to be at the discretion of the Development Officer.
4
COMMON COUNCIL / CONSEIL COMMUNAL
March 24, 2025 / le 24 mars 2025
Y. Mattson, Planner, Crisis Care Facility
Mayor Noade Reardon called the Public Hearing to Order.
The Mayor called for members of the public to speak against the amendment with no one
presenting.
The Mayor called for members of the public to speak in favour of the amendment with no
one presenting.
Mayor Noade Reardon closed the Public Hearing.
Moved by Councillor Stewart, seconded by Councillor Lowe:
RESOLVED that the by-law entitled ning By-Law of The City of
be amended by allowing the Crisis Care Use in the Utility Service (US) Zone
and editing the Parking and Definition sections of the Zoning By-Law, be read a first time.
MOTION CARRIED.
Read a first time by title, the by--Law of The
Moved by Councillor Harris, seconded by Councillor Darling:
RESOLVED that the by--Law of The City of
g the Crisis Care Use in the Utility Service (US) Zone
and editing the Parking and Definition sections of the Zoning By-Law, be read a second
time.
MOTION CARRIED.
Read a second time by title, the by--Law of
The
9.2 Proposed Zoning By-Amendment with Staff Presentation and Planning Advisory
stnd
Committee report 801 Loch Lomond Road (1 and 2 Reading)
Commissioner Poffenroth introduced the proposed Zoning By-Law Amendment to rezone
a parcel of land located at 801 Loch Lomond Road, from Business Park Commercial (CBP)
to Corridor Commercial (CC) to permit the development of an SPCA animal shelter.
T. Lewallen
Mayor Noade Reardon called the Public Hearing to Order.
The Mayor called for members of the public to speak against the amendment with no one
presenting.
The Mayor called for members of the public to speak in favour of the amendment with Rick
Turner, Hughes Surveys and Consultants, speaking on behalf of the applicant.
5
COMMON COUNCIL / CONSEIL COMMUNAL
March 24, 2025 / le 24 mars 2025
Mayor Noade Reardon closed the Public Hearing.
Councillor Radwan proposed that a Section 59 condition be added, stating that if
cremation services are offered in the future, that they occur only after 6pm. The motion
did not receive a seconder.
Moved by Councillor Darling, seconded by Councillor Lowe:
RESOLVED that the by--Law of The City of
amending Schedule "A", the Zoning Map of The City of Saint John, by rezoning
a parcel of land having an area of approximately 1.32 hectares, located at 801 Loch
Lomond Road, also identified as a portion of PID 00436659, from Business Park
Commercial (CBP) to Corridor Commercial (CC), be read a first time.
MOTION CARRIED.
Read a first time by title, the by--Law of The
Moved by Councillor Sullivan, seconded by Councillor Norton:
RESOLVED that the by--Law of The City of
amending Schedule "A", the Zoning Map of The City of Saint John, by rezoning
a parcel of land having an area of approximately 1.32 hectares, located at 801 Loch
Lomond Road, also identified as a portion of PID 00436659, from Business Park
Commercial (CBP) to Corridor Commercial (CC), be read a second time.
MOTION CARRIED.
Read a second time by title, the by--Law of
The City of Saint
9.3 Proposed Municipal Plan and Zoning By-Law Amendment with Staff Presentation
and Planning Advisory Committee report 0 Bayside Drive
9.3.1 Withdrawal of Application 0 Bayside Drive
Moved by Councillor Darling, seconded by Councillor Harris:
RESOLVED that the public hearing scheduled for 0 Bayside Drive, be cancelled.
MOTION CARRIED.
10. Consideration of By-Laws
11. Submissions by Council Members
Moved by Councillor Harris, seconded by Councillor Darling:
RESOLVED that Item 11. 1 Selection of Deputy Mayor, be lifted from the table.
MOTION CARRIED.
Councillor Sullivan called a point of order expressing concern on the length of the meeting,
if the Mayor responds to each Councillor comments individually.
6
COMMON COUNCIL / CONSEIL COMMUNAL
March 24, 2025 / le 24 mars 2025
Councillor Lowe moved an amendment to the original motion that the Mayor interview all
interested Councillors for the position of Deputy Mayor, prior to making a nomination. The
amended motion was seconded by Councillor Stewart.
MOTION CARRIED with Councillors Harris, Darling and Radwan voting nay.
Moved by Mayor Reardon, seconded by Councillor Lowe:
RESOLVED that -
law to allow the Mayor, after interviewing all interested Councillors, to nominate a
Councillor-elect to serve as Deputy Mayor for a 4-year term, at the first meeting of a new
Council.
MOTION CARRIED with Councillor Harris voting nay.
11.2 Employee Group Benefits Coverage for Council Members (Deputy Mayor
MacKenzie)
Moved by Deputy Mayor MacKenzie, seconded by Councillor Darling:
RESOLVED that the Chief Administrative Officer be directed to report back to Council with
members of Council.
MOTION CARRIED with Councillor Sullivan voting nay.
11.3 Speaking time for statutory public hearings (Councillor Ogden)
Moved by Councillor Ogden, seconded by Councillor Harris:
RESOLVED that staff be directed to report back to Council with a draft Procedural By-Law
amendment to set the time limit for individuals speaking at statutory public hearings to a
5-minute maximum.
Councillor Harris moved an amendment to the original motion to reduce the speaking time
to 5 minutes but permit proponents to allot their speaking time to another speaker, to a
total maximum of 15 minutes. The amended motion was seconded by Councillor Lowe.
MOTION DENIED with Deputy Mayor MacKenzie and Councillors Norton, Stewart,
Darling, Radwan and Sullivan voting nay.
Question taken on the original motion.
MOTION DENIED with Deputy Mayor MacKenzie and Councillors Norton, Sullivan,
Darling and Radwan voting nay.
11.4 Timelines for paving roads after milling is completed (Councillor Lowe)
Moved by Councillor Lowe, seconded by Councillor Sullivan:
RESOLVED that the Chief Administrative Officer be directed to report back to Council with
contract language that would require contractors to adhere to strict timelines for paving
ograms, to be applied once
the road milling process has been started on each street.
7
COMMON COUNCIL / CONSEIL COMMUNAL
March 24, 2025 / le 24 mars 2025
MOTION CARRIED.
12. Business Matters Municipal Officers
12.1 2025 Strategic Initiatives Plan
Chief Administrative Officer, B. McGovern reviewed the submitted presentation entitled
"
Moved by Councillor Sullivan, seconded by Councillor Ogden:
RESOLVED that the 2025 Strategic Initiatives Plan be received for information.
MOTION CARRIED.
12.2 Winter Plowing Results and Improvements
Winter Plowing Results
Moved by Councillor Sullivan, seconded by Councillor Norton:
RESOLVED that as recommended in the submitted report M&C 2025-082: Winter Plowing
Results and Improvements, the Chief Administrative Officer be directed to review sidewalk
service delivery options to improve achievement of sidewalk service objectives in the
Management Plan and make recommendations as part of the 2026 General
Operating Budget process.
MOTION CARRIED.
13. Committee Reports
!
14. Consideration of Issues Separated from Consent Agenda
15. General Correspondence
15.1 GBS/CIDP Foundation of Canada: Request for Proclamation GBS/CIDP
Awareness Month (Recommendation: Refer to Clerk to prepare proclamation)
Moved by Councillor Stewart, seconded by Councillor Sullivan:
RESOLVED that the request for a proclamation from GBS/CIDP Foundation of Canada
regarding GBS/CIDP Awareness Month be referred to the Clerk to prepare the
proclamation.
MOTION CARRIED.
15.2 NB Country Music Hall of Fame: Request to Present (Recommendation: Refer to
CAO to consult with Envision re sponsorship request)
Moved by Councillor Sullivan, seconded by Councillor Stewart:
RESOLVED that the request to present from NB Country Music Hall of Fame be referred
to the Chief Administrative Officer to consult with Envision Saint John regarding the
sponsorship request.
8
COMMON COUNCIL / CONSEIL COMMUNAL
March 24, 2025 / le 24 mars 2025
MOTION CARRIED.
15.3 J. Chandra: Request to Present re: Stone Church (Recommendation: Refer to
CAO to have staff advise the requestor of the City grants)
Moved by Deputy Mayor MacKenzie, seconded by Councillor Harris:
RESOLVED that the correspondence from J. Chandra regarding a request to present re:
Stone Church be referred to the Chief Administrative Officer to have staff advise the
requestor of the City grants.
MOTION CARRIED.
15.4 M. Elazab: Outdoor Play Area Ward 2 Millidgeville (Recommendation: Receive for
Information)
Moved by Councillor Sullivan, seconded by Councillor Darling:
RESOLVED that the correspondence from M. Elazab regarding an outdoor play area
Ward 2 Millidgeville, be received for information.
MOTION CARRIED.
15.5 C. Vachon: Community Concerns re: City Market (Recommendation: Direct the
CAO to provide an update on the implementation of City Market Strategic Plan to
Growth Committee)
Moved by Deputy Mayor MacKenzie, seconded by Councillor Stewart:
RESOLVED that the correspondence from C. Vachon: Community Concerns regarding
the City Market be directed to the Chief Administrative Officer to provide an update on the
implementation of the City Market Strategic Plan to the Growth Committee.
MOTION CARRIED.
15.6 J. McDonald: Letter of Concern Glen Falls Area (Recommendation: Direct the
CAO to report back with an update re Glen Falls flooding as part of the Courtenay
Bay Causeway raising project)
Moved by Councillor Stewart, seconded by Deputy Mayor MacKenzie:
RESOLVED that the letter of concern from J. McDonald regarding the Glen Falls
Area be directed to the Chief Administrative Officer to report back with an update on the
Glen Falls flooding as part of the Courtenay Bay Causeway raising project.
MOTION CARRIED.
16. Supplemental Agenda
16.1 Department of Transportation & Infrastructure: Simms Corner Redesign
Moved by Councillor Norton, seconded by Councillor Lowe:
RESOLVED that in response to the March 6th, 2025 letter to the Mayor from the Deputy
Minister of the Department of Transportation and Infrastructure ("DTI"), that DTI be invited
9
COMMON COUNCIL / CONSEIL COMMUNAL
March 24, 2025 / le 24 mars 2025
to the Council meeting of April 3, 2025 to provide Council with a briefing on the Simms
Corner redesign project.
MOTION CARRIED.
17. Committee of the Whole
17.1 Agreement related to New Brunswick Museum Project
Moved by Councillor Sullivan, seconded by Councillor Stewart:
RESOLVED that as recommended by the Committee of the Whole, having met on March
24, 2025, the City enter into an Assignment and Assumption Agreement generally in the
form as presented to Committee of the Whole at its March 24, 2025 meeting with the
Board of the New Brunswick Museum and the Province of New Brunswick as represented
by the Minister of Transportation and Infrastructure for the purpose of assigning the
obligations in the Option Agreement between the City and the Province dated June 20,
2024, related to PID 55222012, to the Board of the New Brunswick Museum; and that the
Mayor and Clerk be authorized to execute the said Assignment and Assumption
Agreement and any other document ancillary thereto.
MOTION CARRIED.
17.2 Consent to Sublet Reversing Falls Skywalk Inc. to Saint John History and Nature
Gallery Inc. and Haifa Haram
Moved by Deputy Mayor MacKenzie, seconded by Councillor Sullivan:
RESOLVED that as recommended by the Committee of the Whole, having met on March
24, 2025, the City consent to a sublease of the premises at 200 Bridge Road, Saint John
New Brunswick, identified as PID 55155485 (and known as the Reversing Falls
Restaurant site) under the terms and conditions contained in the Sublease presented to
Committee of the Whole at its March 24, 2025 meeting, and that the Mayor and Clerk be
sublease.
MOTION CARRIED.
17.3 2025 Update to Non-Union Terms and Conditions
Moved by Councillor Harris, seconded by Councillor Darling:
RESOLVED that as recommended by the Committee of the Whole, having met on March
24, 2025, Common Council adopt the recommendation brought forward from Committee
of the Whole to authorize the CAO to implement changes to the City of Saint John Terms
and Conditions of Employment for Non-Union Personnel as detailed in M&C 2025-086.
MOTION CARRIED.
17.4 Sale of .14-acre lot at 311 Sandy Point Road
Moved by Councillor Sullivan, seconded by Councillor Darling:
RESOLVED that as recommended by the Committee of the Whole, having met on March
24, 2025, Common Council approve the following:
10
COMMON COUNCIL / CONSEIL COMMUNAL
March 24, 2025 / le 24 mars 2025
1. That the City declare the property at 311 Sandy Point Rd (PID 00048900) surplus;
2. That the City enter into an Agreement of Purchase and Sale with Admiral Supply
Chain Management Professional Services Inc. generally in the form as presented
to Committee of the Whole at its meeting held March 10, 2025, and that the Mayor
and Clerk be authorized to execute the said Agreement of Purchase and Sale and
any other documents necessary to facilitate the transaction; and
3. That the net proceeds of the sale of the above transaction be deposited into the
General Fund Capital Reserve.
MOTION CARRIED.
18. Adjournment
Moved by Councillor Lowe, seconded by Councillor Darling:
RESOLVED that the meeting of Common Council held on March 24, 2025, be adjourned.
MOTION CARRIED.
The Mayor declared the meeting adjourned at 9:00 p.m.
11
/haahb /h b/L\[ w9thw
M&C No.2025-094
Report DateMarch 26, 2025
Meeting DateApril 07, 2025
Service AreaGrowth and Community
Services
HerWorship Mayor Donna Noade ReardonandMembers of Common Council
SUBJECT: Designation of a By-law Enforcement Officer
AUTHORIZATION
Primary AuthorCommissioner/Dept. HeadChief Administrative Officer
Benn PurintonA.Poffenroth/ C. McKielJ. Brent McGovern
RECOMMENDATION
It is recommended that Common Council adopt the attached resolution
appointing Murray Jaye Walshas a by-law enforcement officer for various City By-
laws.
EXECUTIVE SUMMARY
The purpose of this report is to designate Murray Jaye Walsh, Assistant Building
Inspector, as a by-law enforcement officer for the various by-laws which are
enforced by the Growth and Community Services department.
In doing so, Mr. Walshwill be authorized to:
Issue Orders to Comply and Notices to Comply with respect to
enforcement of by-laws that fall within the scope of the Local Governance
Act, the Community Planning Act and the Building Code Administration Act;
Lay informations in Provincial Court with respect to enforcement of by-
laws that fall within the scope of the Local Governance Act, the Community
Planning Act and the Building Code Administration Act; and
Conduct inspections pertaining to enforcement of by-laws that fall within
the scope of the Local Governance Act,the Community Planning Act and
the Building Code Administration Act.
PREVIOUS RESOLUTION
N/A
- 2 -
REPORT
Murray Jaye Walsh has been hired as an Assistant Building Inspector and is
working on the Minimum Property Standards Program. The program addresses
the standards governing the condition, occupancy and maintenance of residential
properties within the City and provides safeguards for the safety, health and
welfare of the occupants and users of these properties.
It is necessary to designate Mr. Walsh as a by-law enforcement officer by adopting
the attached resolution so that he may carry out his duties. By adopting the
attached resolution, Mr. Walsh will be authorized as a by-law enforcement officer
under the Saint John Unsightly Premises and Dangerous Buildings Structures By-
law, the Building By-law, the Zoning By-law and the Minimum Property Standards
By-law.
STRATEGIC ALIGNMENT
-priorities.
SERVICE AND FINANCIAL OUTCOMES
N/A
INPUT FROM OTHER SERVICE AREAS AND STAKEHOLDERS
General Counsel drafted the attached resolution.
ATTACHMENTS
Resolution appointing Murray Jaye Walsh as a by-law enforcement officer.
COMMON COUNCIL / CONSEIL COMMUNAL
April 7, 2025 / le 7 avril 2025
RESOLVED, that as recommended by the Chief Administrative Officer, the following
resolution be adopted:
1. WHEREAS the Common Council of The City of Saint John has enacted certain by-
laws pursuant to the authority of the Local Governance Act, S.N.B. 2017 c.18, and
Local Governance ActSaint John
Minimum Property Standards By-law, By-law Number M-14, and amendments
Saint John Minimum Property Standards By-law, and it may from
time to time be necessary to commence proceedings in the Provincial Court of the
Province of New Brunswick, when a person has violated or failed to comply with
the said By-law;
AND WHEREAS section 72 of the Local Governance Act provides that a
council may appoint by-law enforcement officers for the local government
and may determine their terms of office;
AND WHEREAS subsection 25(1) of the Saint John Minimum Property
Standards By-law provides that a by-law enforcement officer appointed by
council may notify the owner or occupier of premises, dwelling, dwelling
unit or structure by issuing an Order where the condition of the premises,
dwelling, dwelling unit or structure does not comply with said By-law;
AND WHEREAS subsection 150(1) of the Local Governance Act provides
that proceedings for breach of a by-law shall be commenced in the name
of the clerk of the local government or such other person as is designated
for that purpose by the council;
NOW THEREFORE BE IT RESOLVED, that Murray Jaye Walsh is
hereby appointed as a by-law enforcement officer with respect to
the enforcement of the Saint John Minimum Property Standards
By-law, effective immediately, and this appointment shall continue
until they cease to be an employee of the Growth and Community
Services department of The City of Saint John or until it is rescinded
by Common Council, whichever comes first;
AND BE IT FURTHER RESOLVED, that Murray Jaye Walsh is hereby
appointed and authorized to notify owners and occupiers where
the condition of the premises, dwellings, dwelling units or
structures does not comply with the Saint John Minimum Property
Standards By-law, effective immediately, and this appointment and
authorization shall continue until they cease to be an employee of
the Growth and Community Services department of The City of
Saint John or until it is rescinded by Common Council, whichever
comes first;
1
COMMON COUNCIL / CONSEIL COMMUNAL
April 7, 2025 / le 7 avril 2025
AND BE IT FURTHER RESOLVED, that Murray Jaye Walsh is hereby
designated and authorized to lay informations in the Provincial
Court of the Province of New Brunswick for breach of the Saint John
Minimum Property Standards By-law, effective immediately, and
this designation and authorization shall continue until they cease
to be an employee of the Growth and Community Services
department of The City of Saint John or until it is rescinded by
Common Council, whichever comes first.
2. WHEREAS the Common Council of The City of Saint John has enacted certain by-
laws pursuant to the authority of the Local Governance Act, S.N.B. 2017 c.18, and
Local Governance ActSaint John
Minimum Property Standards By-law, By-law Number M-14 and amendments
thereto Saint John Minimum Property Standards By-law, and it may from
time to time be necessary to make inspections for the administration and
enforcement of the By-law;
AND WHEREAS section 72 of the Local Governance Act provides that a
council may appoint by-law enforcement officers for the local government
and may determine their terms of office;
AND WHEREAS subsection 144(2) of the Local Governance Act provides
that a council may authorize by-law enforcement officers to enter the land,
building or other structure at any reasonable time, and carry out the
inspection after giving reasonable notice to the owner or occupant of the
land, building or other structure to be entered;
NOW THEREFORE BE IT RESOLVED, that Murray Jaye Walsh, by-law
enforcement officer, is hereby appointed as an inspection officer
and authorized to enter at all reasonable times upon any property
within the territorial boundaries of the City of Saint John for the
purpose of making any inspection that is necessary for the
administration and enforcement of the Saint John Minimum
Property Standards By- law which received first and second reading
by Common Council on September 10, 2018 and third reading on
September 24, 2018, being enacted upon approval by the Minister
of Local Government, and/or the Local Governance Act effective
immediately, and this authorization shall continue until they cease
to be an employee of the Growth and Community Services
department of The City of Saint John or until rescinded by Common
Council, whichever comes first.
2
COMMON COUNCIL / CONSEIL COMMUNAL
April 7, 2025 / le 7 avril 2025
3. WHEREAS the Common Council of The City of Saint John has enacted certain by-
laws pursuant to the authority of the Local Governance Act, S.N.B. 2017 c.18, and
Local Governance ActSaint John
Unsightly Premises and Dangerous Buildings and Structures By-law, By-law
Number M-Saint John Unsightly Premises and
Dangerous Buildings and Structures By-law, and it may from time to time be
necessary to commence proceedings in the Provincial Court of the Province of
New Brunswick, when a person has violated or failed to comply with the said By-
law;
AND WHEREAS section 72 of the Local Governance Act provides that a
council may appoint by-law enforcement officers for the local government
and may determine their terms of office;
AND WHEREAS subsections 132(1) and 132(2) of the Local Governance Act
provide that an officer appointed by council may notify the owner or
occupier of premises, a building or structure by notice in the form
prescribed by regulation when a condition exists pursuant to subsections
131(1), 131(2) or 131(3) of the said Act;
AND WHEREAS subsection 150(1) of the Local Governance Act provides
that proceedings for breach of a by-law shall be commenced in the name
of the clerk of the local government or such other person as is designated
for that purpose by the council;
NOW THEREFORE BE IT RESOLVED, that Murray Jaye Walsh is
hereby appointed as a by-law enforcement officer with respect to
the enforcement of the Saint John Unsightly Premises and
Dangerous Buildings and Structures By-law, effective immediately,
and this appointment shall continue until they cease to be an
employee of the Growth and Community Services department of
The City of Saint John or until it is rescinded by Common Council,
whichever comes first;
AND BE IT FURTHER RESOLVED, that Murray Jaye Walsh is hereby
appointed and authorized to notify owners and occupiers with
respect to premises, buildings or structures that are unsightly;
buildings or structures that are a hazard to the safety of the public
by reason of being vacant or unoccupied; buildings or structures
that are a hazard to the safety of the public by reason of
dilapidation or unsoundness of structural strength, as set out in the
Saint John Unsightly Premises and Dangerous Buildings and
Structures By-law, effective immediately, and this appointment
and authorization shall continue until they cease to be an employee
3
COMMON COUNCIL / CONSEIL COMMUNAL
April 7, 2025 / le 7 avril 2025
of the Growth and Community Services department of The City of
Saint John or until it is rescinded by Common Council, whichever
comes first;
AND BE IT FURTHER RESOLVED, that Murray Jaye Walsh is hereby
designated and authorized to lay informations in the Provincial
Court of the Province of New Brunswick for breach of the Saint John
Unsightly Premises and Dangerous Buildings and Structures By-law,
effective immediately, and this designation and authorization shall
continue until they cease to be an employee of the Growth and
Community Services department of The City of Saint John or until
it is rescinded by Common Council, whichever comes first.
4. WHEREAS the Common Council of The City of Saint John has enacted certain by-
laws pursuant to the authority of the Local Governance Act, S.N.B. 2017 c.18, and
Local Governance ActSaint John
Unsightly Premises and Dangerous Buildings and Structures By- law, By-law
Number M-30 and amendments thereto Saint John Unsightly Premises and
Dangerous Buildings and Structures By-law, and it may from time to time be
necessary to make inspections for the administration and enforcement of the By-
law;
AND WHEREAS section 72 of the Local Governance Act provides that a
council may appoint by-law enforcement officers for the local government
and may determine their terms of office;
AND WHEREAS subsection 144(2) of the Local Governance Act provides
that a council may authorize officers enter the land, building or other
structure at any reasonable time, and carry out the inspection after giving
reasonable notice to the owner or occupant of the land, building or other
structure to be entered;
NOW THEREFORE BE IT RESOLVED, that Murray Jaye Walsh, by-law
enforcement officer, is hereby appointed as an inspection officer
and authorized to enter at all reasonable times upon any property
within the territorial boundaries of the City of Saint John for the
purpose of making any inspection that is necessary for the
administration and enforcement of the Saint John Unsightly
Premises and Dangerous Buildings and Structures By-law which
received first and second reading by Common Council on May 22,
2018 and third reading on June 4, 2018, being enacted upon
approval by the Minister of Local Government, and/or the Local
Governance Act effective immediately, and this authorization shall
continue until they cease to be an employee of the Growth and
4
COMMON COUNCIL / CONSEIL COMMUNAL
April 7, 2025 / le 7 avril 2025
Community Services department of The City of Saint John or until
rescinded by Common Council, whichever comes first.
5. WHEREAS subsection 135(4) of the Local Governance Act, S.N.B. 2017 c.18, and
amendments thereto, provides that within thirty days after the terms of a notice
have been complied with or a debt due to a local government or due to the
Minister of Finance, as the case may be, is discharged, the local government shall
provide a certificate in the form prescribed by regulation which requires that the
corporate seal of the local government be affixed;
NOW THEREFORE BE IT RESOLVED, that Jonathan A. Taylor, City Clerk, is
hereby authorized to affix the corporate seal of The City of Saint John to a
Certificate of Discharge that is issued by Murray Jaye Walsh under the Saint
John Unsightly Premises and Dangerous Buildings and Structures By-law,
and such authorization shall continue until Jonathan A. Taylor ceases to be
the City Clerk of The City of Saint John or until it is rescinded by Common
Council, whichever comes first.
6. WHEREAS, the Common Council of The City of Saint John has enacted certain
bylaws pursuant to the authority of the Community Planning Act, S.N.B 2017, c.
Community Planning Act including The
Zoning By-law, By-law Number C.P. 110, including all amendments thereto, and it
may from time to time be necessary to commence proceedings in the Provincial
Court of the Province of New Brunswick, when a person has contravened or failed
to comply with these By-laws;
AND WHEREAS paragraph 137(a) of the Community Planning Act provides
that no person shall violate or fail to comply with a provision of a by-law
made under this Act;
AND WHEREAS section 139 of the Community Planning Act provides that
proceedings for an offence under this Act shall be commenced in the name
of the Minister or the clerk of the local government or any other person
who is designated for that purpose by the council;
NOW THEREFORE BE IT RESOLVED, that Murray Jaye Walsh is
hereby designated and authorized to lay informations in the
Provincial Court of the Province of New Brunswick for breach of The
Zoning By-law, effective immediately, and this appointment and
authorization shall continue until they cease to be an employee of
the Growth and Community Services department of The City of
Saint John or until it is rescinded by Common Council, whichever
comes first.
5
COMMON COUNCIL / CONSEIL COMMUNAL
April 7, 2025 / le 7 avril 2025
7. WHEREAS the Common Council of The City of Saint John has enacted a by-law
pursuant to the authority of the Building Code Administration Act, S.N.B. 2020, c.
Building Code Administration Act
Building By-law, By-law Number BC-Building
Bylaw
inspectors, deputy building inspectors and city inspectors for the administration
and enforcement of this By-law;
NOW THEREFORE BE IT RESOLVED, that Murray Jaye Walsh is hereby
appointed as a city inspector, effective immediately, and this appointment
shall continue until they cease to be an employee of the Growth and
Community Services department of The City of Saint John or until
rescinded by Common Council, whichever comes first.
8. WHEREAS the Common Council of The City of Saint John has enacted certain by-
laws pursuant to the authority of the Building Code Administration Act, S.N.B
2020, c. 8 Building Code Administration Act
including the Building By-law, By-law Number BC-1, and amendments thereto, and
it may from time to time be necessary to make orders for the administration of
these By-laws;
AND WHEREAS subsection 134(1) of the Building Code Administration Act
provides that a council may authorize persons to, when a development is
undertaken in violation of the Building Code Administration Act, a by-law
or regulation under the Building Code Administration Act, a by-law or
terms and conditions imposed on the development, order the cessation of
the development, alteration of such development so as to remove the
violation, or the doing of anything required to restore the land, building or
structure to its condition immediately prior to the undertaking of such
development;
NOW THEREFORE BE IT RESOLVED, that Murray Jaye Walsh is
hereby authorized to, when a development is undertaken in
violation of the Building Code Administration Act, the Building By-
law or the terms and conditions imposed on the development,
order the cessation of the development, alteration of such
development so as to remove the violation, or the doing of
anything required to restore the land, building or structure to its
condition immediately prior to the undertaking of such
development, effective immediately, and this authorization shall
continue until they cease to be an employee of Growth and
Community Services of The City of Saint John or until rescinded by
Common Council, whichever comes first.
6
COMMON COUNCIL / CONSEIL COMMUNAL
April 7, 2025 / le 7 avril 2025
9. WHEREAS the Common Council of The City of Saint John has enacted certain by-
laws pursuant to the authority of the Building Code Administration Act, S.N.B
2020, c. 8, and amendments thereto (the Building Code Administration Act
including the Building By-law, By-law Number BC-1, and amendments thereto, and
it may from time to time be necessary to commence proceedings in the Provincial
Court of the Province of New Brunswick, when a person has violated or failed to
comply with the said By-law;
AND WHEREAS paragraph 137(a) of the Building Code Administration Act
provides that no person shall violate or fail to comply with a provision of a
by-law made under this Act;
AND WHEREAS section 139 of the Building Code Administration Act
provides that proceedings for an offence under this Act shall be
commenced in the name of the Minister or the clerk of the local
government or any other person who is designated for that purpose by the
council;
NOW THEREFORE BE IT RESOLVED, that Murray Jaye Walsh is
hereby designated and authorized to lay informations in the
Provincial Court of the Province of New Brunswick for breach of the
Saint John Building By-law, effective immediately, and this
appointment and authorization shall continue until they cease to
be an employee of Growth and Community Services of The City of
Saint John or until it is rescinded by Common Council, whichever
comes first
7
COMMON COUNCIL REPORT
M&C No.2025-096
Report DateMarch 27, 2025
Meeting DateApril 07, 2025
Service AreaUtilities and
Infrastructure Services
HerWorship Mayor Donna Noade ReardonandMembers of Common Council
SUBJECT: NATURAL RESOURCESOFCANADA GRANT AGREEMENT-ENERGY
EFFCIENCY PROGRAM FOR MUNICIPAL AND WATER FACILITIES
AUTHORIZATION
Primary AuthorCommissioner/Dept. HeadChief Administrative Officer
Samir YammineIan FoganJ. Brent McGovern
RECOMMENDATION
It is recommended That the City enter into the Grant Agreementwith HIS MAJESTY
THE KING IN RIGHT OF CANADA, as represented by the Minister ofNatural
for the development and implementation of an Energy
EfficiencyProgram for the Municipal and Water Facilities, in the form as attached
to M&C No.2025-096; and that the Mayor and City Clerk be authorized to sign any
necessary documents.
EXECUTIVE SUMMARY
The purpose of to enter into the
Grant Agreement with HIS MAJESTY THE KING IN RIGHT OF CANADA, as
development and implementation of an Energy Efficiency Program for the
Municipal and Water Facilitiesin accordance with ISO50001 Standard.
PREVIOUS RESOLUTION
NA
REPORT
In October2024, City staff submitted a funding application to Natural Resources
, for the for the development and implementation of an Energy
Efficiency Program for the Municipal and Water Facilities.
The City received a notificationin March2025fromthe Minister of Natural
) that the application was successful, and the City of Saint
- 2 -
John had been approved for a grant in the amount of $163,000 (approximately
75% of the eligible cost) toward the proposed program.
The proposed Energy Efficiency Program will be developed, implemented, and
managed in accordance with ISO 50001 Standard.
ISO 50001 is an international standard for energy management systems (EnMS)
that provides a framework for organizations to establish, implement, maintain,
and improve their energy management processes, ultimately aiming to enhance
energy efficiency, reduce costs, and minimize environmental impact.
ISO 50001 provides a framework of requirements that help organizations to:
Develop a policy for more efficient use of energy.
Fix targets and objectives to meet the policy.
Use data to better understand and make decisions concerning energy use
and consumption.
Measure the results.
Review the effectiveness of the policy.
Continually improve energy management
The funding will be used toward performing the following scope of work:
Conduct ISO 500001 gap analysis to develop an implementation plan and
schedule to complete all tasks required by the city to meet the
requirements of ISO 50001.
Determine the scope of the energy management system, needs, and
expectations of the various departments.
Develop a planning program to implement the opportunities, achieve the
targets, collect the energy data, and establish energy performance
indicators.
Implement the proposed activities to achieve the energy targets and the
requirements of ISO 50001, including operation staff training, design,
installation of energy submeters, operational and planning and control,
entering energy data in the ENERGY STAR Portfolio Manager, etc.
Develop and implement a measurement and performance program, to
evaluate and optimize the energy performance of the various buildings.
Develop and implement an ongoing continuous improvement plan.
The proposed energy efficiency program will result in the following benefits:
Reduce operating and energy costs as well as improve energy performance
in buildings.
Enable the city to achieve its climate change mitigation targets.
Increase awareness of the benefits of energy management and energy
management standards among staff and community at large.
- 3 -
Reduce the city buildings Infrastructure deficit.
Establish the systems and processes necessary to continually improve
energy performance, productivity, and competitiveness.
Show the city is taking a leadership role in climate change management.
Provide the city with the opportunity to leverage federal funding toward
current/future city staff salaries. The grant agreement will cover 75% of
the salaries of internal employees up to $75,000 from April 1, 2025, to
March 31, 2026.
The Project must be fully completed by March 31, 2027. However, NRCan
contribution must be spent by March 31, 2026.
STRATEGIC ALIGNMENT
The proposed upgrade is clearly aligned with the following city plans, policies, and
priorities:
City of Saint John Corporate GHG and Energy Action plan to reduce GHG
emissions by 30% by 2025 and achieve carbon neutral by 2040.
2025 Strategic Initiatives Plan.
SERVICE AND FINANCIAL OUTCOMES
The total cost of the Pilot Project is $218,080.
The breakdown in funding for the proposed energy efficiency program is as
follows:
NRCan: $163,000. $75,000 will be used toward staff salaries
Operating Budgets: $ 55,080
INPUT FROM OTHER SERVICE AREAS AND STAKEHOLDERS
The City of Saint John Utilities and Infrastructure Services and General Counsel
have reviewed the attached Agreement and are satisfied with the
recommendations as they pertain to their respective areas of services.
ATTACHMENTS
DEPARTMENT OF NATURAL RESOURCES -ENERGY EFFICIENCY PROGRAM
NON-REPAYABLE CONTRIBUTION AGREEMENT
COMMON COUNCIL REPORT
M&C No.2025-102
Report DateApril 03, 2025
Meeting DateApril 07, 2025
Service AreaGrowth and Community
Services
HerWorship Mayor Donna Noade ReardonandMembers of Common Council
SUBJECT: SchedulingofPublic HearingDates fora Text Amendment tothe
Medium Industrial Zone, Rezoning of 6 Douglas Avenue and the
Spruce Lake Industrial Park Expansion
AUTHORIZATION
Primary AuthorCommissioner/Dept. HeadChief Administrative Officer
Jennifer KirchnerAmy Poffenroth/Pankaj J. Brent McGovern
Nalavde
RECOMMENDATION
RESOLVED That Common Council schedule public hearings on Monday, May 5,
2025 at 6:30 p.m. for:
Zoning By-Law Text Amendment
Submitted byCity of Saint John
For To remove Scrap or Salvage Yard as a permitted use in the
Medium Industrial zone and to list existing operations in
Schedule E: Exceptions
Rezoning
Submitted byJill Higgins
For 6 Douglas Avenue
PIDs00368910and 00368902
nd
Location: Council Chamber, City Hall 2floor, 15 Market Square, Saint John, NB.
RESOLVED That Common Council schedule a public hearing on Monday, May 12,
2025 at 5:15 p.m. for:
Municipal Plan Amendment, Zoning By-Law Amendment and Rezoning
Submitted byDillon Consulting
For King William Road Area
PIDs55243588, 55233456, 55237077, 55243596 (portion)
nd
Location: Council Chamber, City Hall 2floor, 15 Market Square, Saint John, NB.
- 2 -
EXECUTIVE SUMMARY
The purpose of this report is to advise Common Council of the need to schedule
Public Hearings for two Zoning By-Law amendment applications and to
recommend an appropriate public hearing date. The proposed public hearing date
is Monday, May 5, 2025.
Staff are also proposing a public hearing date for an application to amend the
Municipal Plan and the Zoning By-Law. The proposed public hearing date is for a
Special Meeting of Common Council to be held on Monday, May 12, 2025.
PREVIOUS RESOLUTION
At its meeting of August 3, 2004, Common Council resolved that:
1. the Commissioner of Planning and Development receive all applications
for amendments to the Zoning By-law and Section 39 \[now referred as
section 59\] resolutions/agreements and proceed to prepare the required
advertisements; and
2. when applications are received a report will be prepared recommending
the appropriate resolution setting the time and place for public hearings
and be referred to the Planning Advisory Committee as required by the
Community Planning Act.
REPORT
This report addresses the scheduling of Public Hearings for three separate
applications on two different dates. The first resolution involves the scheduling of
Public Hearings for two amendments to the Zoning By-Law. The Public Hearings
are proposed for May 5, 2025. Details of the application are outlined below and
will form part of the documentation at the public hearings.
Name of Proposed Reason
Applicant Amendment
City of Saint To remove Scrap or Salvage Yard To prevent the establishment of
John as a permitted use in the Medium new Scrap of Salvage Yards in
Industrial zone and to list existing the Medium Industrial zone.
operations in Schedule E:
Exceptions
Name of Location Existing Proposed Reason
Applicant Zone Zones
Jill Higgins 6 Douglas Neighbourhood Urban Centre To convert a
Avenue (PIDs Community Residential former church
00368910 Facility (CFN) (RC) into a multi-unit
and residential
00368902) building.
- 3 -
In response to the second motion above, this report indicates that a public hearing
be scheduled for May 12, 2025 at 5:15 pm to consider an application to amend
the Municipal Plan and Zoning By-Law. Details of the application are outlined
below and will form part of the documentation at the public hearing.
Name of Location Existing Proposed Reason
Applicant Land Use Land Use
Designations Designations
and Land Use
Zones
Dillon King William Designations: Designations: To facilitate the
Consulting Road (PIDS Park and Park and expansion of the
55243588, Natural Area, Natural Area Spruce Lake
55233456, Rural and Heavy Industrial Park.
55237077, Resource, Industrial
55243596 Heavy (within the
(portion) Industrial and Primary
Rural Development
Residential Area)
(outside the
Primary
Development
Area)
Zones: Zones:
Medium Spruce Lake
Industrial (IM), Industrial (SLI)
Rural (RU) and and Park (P)
Green Energy
(GE)
While the holding of public hearings for Municipal Plan and Zoning By-law
amendments are a legislative requirement of the Community Planning Act, it is
also a key component of a clear and consistent land development processes
envisioned in the One Stop Development Shop Program. These processes provide
transparency and predictability for the development community and City
residents.
STRATEGIC ALIGNMENT
The proposed Zoning By-Law Amendment falls within the Council Priority of
SERVICE AND FINANCIAL OUTCOMES
The scheduling of the public hearings will ensure that the proposed by-law
amendments satisfy the legislative and service requirements as mandated by the
Community Planning Act including the required Public Notification of the Public
Hearings.
- 4 -
INPUT FROM OTHER SERVICE AREAS AND STAKEHOLDERS
The proposed amendments are circulated to other City Service Areas and
external Agencies and Government Departments for feedback.
ATTACHMENTS
None
/haahb /h b/L\[ w9thw
M&C No.2025-091
Report DateMarch 24, 2025
Meeting DateApril 07, 2025
Service AreaPublic Works and
Transportation Services
HerWorship Mayor Donna Noade ReardonandMembers of Common Council
SUBJECT: ЋЉЋЎ ƩğŅŅźĭ tğźƓƷ tƩƚĭǒƩĻƒĻƓƷ wĻĭƚƒƒĻƓķğƷźƚƓ
AUTHORIZATION
Primary AuthorCommissioner/Dept. HeadChief Administrative Officer
Chris PhinneyMichael HugenholtzJ. Brent McGovern
RECOMMENDATION
hief Administrative Officer
recommends that Common Council authorize City staff to purchase Franklin Paint
Company traffic paint for the 2025 construction season from Stinson Equipment
Limited at a cost of $143,730.33 plus HST.
EXECUTIVE SUMMARY
remaining 20% will be purchased by a competitiveprocess with pre-qualified
to a previous council report, staff developed a Pavement Markings Durability and
Compatibility protocol whichprovides a framework for prequalifying other
manufacturerproducts. This framework was implemented in 2024 and has
resulted in prequalified vendors with products that meet compatibilityand
durability (ongoing) requirements towards allaying risks seen previously. As the
next phase in qualifying competitive products, 20% of the 2025 traffic paint will
be open to bid by those prequalified vendors (compatibility) which allows for a
larger test of alternative products towards a full competitive process in future
years.
PREVIOUS RESOLUTION
RESOLVED that as recommended in the submitted report M&C 2023-36: Traffic
Paint
authorize City staff to purchase Franklin Paint Company traffic paint for the 2023
construction season as a sole source procurement from Stinson Equipment
Limited at a cost of $166,358.94 plus HST.
- 2 -
REPORT
Annually, the City paints approximately 400 km of lines and 3300 traffic
markings. Yellow lines that divide space for two-way traffic, bike lane lines,
directional symbols and crosswalk lines are among the inventory that the City
renews annually.
The City procures traffic paint each year to refresh these lines and markings.
Authorization sought as part of this report would procure the paint needed for
the 2025 season.
{ƚƌĻ ƭƚǒƩĭĻ ǝĻƩƭǒƭ ğ ĭƚƒƦĻƷźƷźǝĻ ƦƩƚĭĻƭƭ
City staff have been recommending sole source procurement of traffic paint
since 2016 from a manufacturer with a proven track record. Prior to 2016, the
City had procured traffic paint from four different manufacturers through a
competitive process. Three of these four manufacturers ultimately did not meet
s specifications. One manufacturer did not meet the material
composition requirements, and the other two manufacturers provided product
that clumped during previous painting seasons causing damage to equipment
and excessive down time.
To contribute to public safety, it is important to refresh traffic lines and markings
as quickly as possible. Extended times when these traffic control devices remain
faded or risk that the annual program may not be completed due to delays by
non-conforming paint is a risk that may occur. Clumping issues with other paints
have caused extensive delays to the program in prior years.
The clumping of past traffic paints is also hard on the painting equipment,
requiring more frequent replacement of parts such as filters and pumps and
accelerated depreciation of these expensive assets. Additional staff time, both in
working with manufacturers/suppliers of non-conforming paint and in explaining
to the public delays to the painting program, is also an added cost. Additional
labour costs are required to finalize the annual program when delays occur.
Staff remain of the opinion these costs would far outweigh any savings resulting
from a lower-cost competitor product without fulsome testing of compatibility.
Tender specifications have been updated including more stringent material and
performance specifications, ability for the city to test the paint at its discretion
and penalty clauses for non-conformance with attempts to promote competition
Staff developed a framework for Pavement Markings Durability and
Compatibility. which was started in 2024, as a way to re-introduce qualified
additional traffic paint suppliers. Samples of traffic paint from three reputable
manufacturers as well as alternative thermoplastic products have been sourced
- 3 -
and applied to a test zone in a high traffic area on Rothesay Ave. Application in
the field ensures that the products are tested for compatibility with
equipment and durability, by being subjecting samples to the exact same traffic
volume, environmental factors and snow clearing methods.
As a result of the 2024 test, one additional paint supplier has been deemed
qualified \[Sherwin-Williams\]. Twenty percent (20%) of the remaining paint
required for the 2025 season will be procured through a competitive process
between the two qualified paint suppliers (Stinson and \[Sherwin-Williams\]).
Should \[Sherwin-Williams\] be the lowest bid for the remaining paint, limiting the
purchase to 20% of the 2025 requirements will provide contingency during the
year should issues with the paint arise.
ƚǞğƩķƭ ƩğŅŅźĭ \[źƓĻƭ ğƓķ ağƩƉźƓŭƭ ƷŷğƷ ƌğƭƷ ƌƚƓŭĻƩ
City staff are
alternatives to paint are being researched, the testing zone will be used to
evaluate those products as well.
City staff have committed to trial alternatives to paint. Tape, plastics that can be
melted to the road, alternate sprayable compounds, and even attempts to place
lines and markings below where plows and some traffic can wear them as easily
have all been trialed, including as recent as 2024. When the City procured its
paint truck, it was purchased with modular parts knowing different application
equipment would be needed if a future alternate sprayable compound were
procured. Considering such factors as material cost, productivity and the
requirement for specialized equipment, no feasible alternatives have been
identified to date. As with other municipalities in our region and across the
country, the application of water-based traffic paints such as that recommended
in this report continues to be the best option at this time.
STRATEGIC ALIGNMENT
This report best aligns with two Common Council priorities:
Perform striving for the best use of resources in completing the annual traffic
line and marking painting program and continuously assessing alternatives.
Move striving for a safe transportation system for all modes of transportation
via placing traffic control devices (lines and markings) and striving for
alternatives that last longer.
- 4 -
SERVICE AND FINANCIAL OUTCOMES
Procurement of the 2025 Traffic Paint at current quoted pricing is accounted for
within approved operating budgets.
INPUT FROM OTHER SERVICE AREAS AND STAKEHOLDERS
Input from the Supply Chain Management has been incorporated into this
report.
City staff previously received input from both the cities of Fredericton and
Moncton. The City of Fredericton has used Franklin Company paint for the last
ten years, including in 2025. In previous years, Fredericton used two different
other manufacturers (same from the list of those used by Saint John) with similar
negative results. The City of Moncton has also experienced issues with other
manufacturers. They commenced a sole source procurement of Franklin Paint
through Stinson Equipment Ltd., 2015 through 2025.
ATTACHMENTS
͵
COUNCILREPORT
M&C No.2025-098
Report DateMarch 31, 2025
Meeting DateApril 07, 2025
Service AreaUtilities and
Infrastructure Services
HerWorship Mayor Donna Noade ReardonandMembers of Common Council
SUBJECT: Community Development Fund Agreement: Multipurpose
Community Complex Energy Study.
AUTHORIZATION
Primary AuthorCommissioner/Dept. HeadChief Administrative
Officer
Samir YammineI an Fogan J. Brent McGovern
RECOMMENDATION
It is recommended that the City enter into an Agreement with the Regional
Development Corporation for funding under the Province of New Brunswick
Community Development Fund forthe following project:Multipurpose
Community Complex Energy Study,Project No. 17,975,in the form and upon the
terms and conditions as attached; and that the Mayorand CityClerk be authorized
to execute the said Agreementand date it retroactively to March 27, 2025.
EXECUTIVE SUMMARY
an Agreement
with the Regional Development Corporation for funding under the Province of
New Brunswick Community Development Fund forthe following project:
Multipurpose Community Complex Energy Study.
PREVIOUS RESOLUTIONS
M&C # 2025-056
REPORT
The City of Saint John has been approved for a financial contributionin the amount
of 40% oftheeligible expenditureor $132,000toward the Multipurpose
Community Complex Energy Study.
- 2 -
The main objectives of the study are:
Developing a technical and financial road map to construct a Net-Zero
community complex that will achieve community, environment, social,
economic and sustainability goals in alignment with current city plans.
Evaluating the potential to convert the existing Irving Oil Field House to
utilize low temperature heating water from the future adjacent East Saint
John Community Complex.
Developing various low carbon path scenarios to achieve the Net-Zero
carbon for the new building including the financial and technical aspects.
Developing a concept design of the new building including the connection
of the new heating/refrigeration plant to the current heating system of the
existing Irving Oil field house.
Plan ActSJ: Pathway to Net Zero is Saint John's strategy for achieving net-
zero emissions by 2050 as approved by the Council in January 2024.
The project will conduct a detailed financial analysis by taking into consideration
the life cycle cost of the proposed measures, impact on climate
mitigation/adaptation, level of service, financial and technical viability, etc.
The proposed study is 65% completed , with the final completion date is
expected to be May 31, 2025.
STRATEGIC ALIGNMENT
The proposed project is clearly aligned with the following City plans, policies,
programs, and practices:
City of Saint John Corporate GHG and Energy Action Plan to reduce GHG
emissions by 30% by 2025 and achieve carbon neutral by 2040.
City of Saint John Climate Change Action Plan.
City Council Priorities (2021-
- 3 -
SERVICE AND FINANCIAL OUTCOMES
The City of Saint John will receive a total financial contribution in the amount of
40% of the eligible expenditure or $132,000 from RDC toward the Multipurpose
Community Complex Energy Study.
The total cost of the Energy Study is approximately $396,160 including city staff
time to complete the work .
The breakdown in funding for the Energy Study is as follows:
Green Municipal Fund (GMF): $196,580
Regional Development Corporation (RDC) $132,000
Operating Budgets: $ 67,580
The successful completion and outcomes of the Energy Study will enable the city
in the future to leverage capital funding from various levels of government and
agencies toward the construction and implementation costs of the proposed
measures.
INPUT FROM OTHER SERVICE AREAS AND STAKEHOLDERS
The agreement has been reviewed by the General Counsel Office and no concerns
have been noted.
ATTACHMENT
1. Project No.: 17,975 - Agreement with the Regional Development
Corporation for funding under the Province of New Brunswick Community
Development Fund for the following projects: Multipurpose Community
Complex Energy Study.
COMMON COUNCIL REPORT
M&C No.2025-099
Report DateApril 01, 2025
Meeting DateApril 07, 2025
Service AreaPublic Works and
Transportation Services
HerWorship Mayor Donna Noade ReardonandMembers of Common Council
SUBJECT: McAllister Drive Easement Acquisitions
AUTHORIZATION
Primary AuthorCommissioner/Dept. HeadChief Administrative Officer
Barb CrawfordMichael Hugenholtz / Tim J. Brent McGovern
RECOMMENDATION
That the City enter into two easement agreements with Irving Oil Limited in the
form as attached to this M&C 2025-099, for the purpose of the City being
permitted to perform work in Majors Brooks, and that the Mayor and Clerk be
authorized to execute the said easement agreements and any other documents
ancillary thereto.
EXECUTIVE SUMMARY
Stormwater management and flooding response are critical year-round functions
of the Public Works & TransportationServices department. Majors Brook, a key
watercourse on the East Side, collects stormwater from several commercial and
residential areas and contributes to flooding in low-lying areas of Westmorland
Road and McAllister Drive during heavy rain events.
To enhance flood resilience and improve stormwater management, Majors Brook
requiresongoing maintenance. A portion of the brook flows through two
properties owned by Irving Oil Limited, where sediment accumulation and
overgrowth have reduced its capacity. In support of drainage improvements, the
2
property owner has agreed to grant the City easements (--3545 mand
2
--696 m) at no cost, allowing necessary maintenance and
emergency response activities.
PREVIOUS RESOLUTION
Not Applicable.
REPORT
Stormwater management and flooding response within the City is a major
function of the Public Works & Transportation Services department year-round.
Majors Brook is a mapped watercourse on the East side that collects stormwater
from Forest Hills, the Retail Drive and Commerce Drive areas as well as parts of
- 2 -
Rothesay Avenue. Majors Brook is tributary to March Creek, connecting to Marsh
Creek near the intersection of Ashburn Lake Road and Rothesay Avenue.
During many rain events, Majors Brook contributes to flooding on the East side,
specifically in the low-lying areas of Westmorland Road and McAllister Drive. As
part of an overall approach to mitigating effects of major weather events on the
East Side, Majors Brook is identified as a watercourse that will require ongoing
maintenance and upkeep.
A portion of Majors Brook is contained within two properties owed by Irving Oil
Limited at the intersection of McAllister Drive and Westmorland Road. Over time,
this portion of Majors Brook has silted and overgrown resulting in diminished flow
capacity. As part of overall drainage improvements in the area, the owner of PIDs
#55218747 and #55218739 is willing to grant the City easement and rights in and
22
through -+/- 3545 m -+/- 696 m, allowing
required maintenance and upkeep work to be done; now and in the future.
Two easement agreements are attached for
no charge to the City for these easements.
STRATEGIC ALIGNMENT
BELONG & PERFORM.
GREEN: Ļ ǝğƌǒĻ ƷŷĻ ĻƓǝźƩƚƓƒĻƓƷ͵
Securing this easement will enhance flood resilience, improve
stormwater management, and protect critical infrastructure, contributing
to environmental sustainability and climate adaptation.
BELONG: We value a welcoming community.
Proactive stormwater management helps safeguard properties, reduce
lane closures, and mitigate downstream impacts, ensuring safer more
resilient neighborhoods for residents.
PERFORM: Ļ ǝğƌǒĻ ƷŷĻ ĬĻƭƷ ǒƭĻ ƚŅ ƚǒƩ ƩĻƭƚǒƩĭĻƭ͵
Establishing this easement enables proactive maintenance and
emergency response, allowing for efficient debris removal, bank
stabilization, and infrastructure reinforcement, ultimately reducing long-
term costs and protecting municipal assets.
This initiative supports the City of Saint John's 10-Year Strategic Plan by
advancing sustainability, resilience, and responsible infrastructure management.
SERVICE AND FINANCIAL OUTCOMES
The proposed easements allow City forces rapid access during extreme weather
events, enabling crews to clear obstructions and manage water flow efficiently.
There is no cost to the City for the proposed easements.
- 3 -
INPUT FROM OTHER SERVICE AREAS AND STAKEHOLDERS
The easement documents were reviewed by General Counsel and Real Estate
who noted no concerns. The insurance requirements were reviewed by the
Insurance and Claims Coordinator.
ATTACHMENTS
9ğƭĻƒĻƓƷ tL5 ЎЎЋЊБАЌВͲ 9ğƭĻƒĻƓƷ tL5 ЎЎЋЊБАЍАͲ 5ƩğǞźƓŭ tƌğƓ ƚŅ {ǒƩǝĻǤ
{ŷƚǞźƓŭ 9ğƭĻƒĻƓƷƭ wĻƨǒźƩĻķ .Ǥ ŷĻ /źƷǤ ƚŅ {ğźƓƷ WƚŷƓ
Form 14
EASEMENT
Land Titles Act, S.N.B. 1981, c.L-1.1, s.24
Parcel Identifier
of Parcel Burdened
by Easement: PID 55218739
Grantor of Easement: Irving Oil Limited
10 King Square South
Saint John, NB
E2L 0G3
Grantee of Easement: The City of Saint John
P.O. Box 1971 Station Main
Saint John, NB
E2L 4L1
Description of Easement:
Purposes of Easement:
Diagram of Easement: See
The grantor grants to the grantee the described easement over or in the specified parcel for the specified
purposes.
Date: __________________________
Witness: Grantor of Easement:
Irving Oil Limited
_______________________________ ______________________________
Caleb Hunter John D. Laidlaw
A Commissioner of Oaths Chief Legal Officer
Being a Solicitor
________________________________ ______________________________
Caleb Hunter Darren Gillis
A Commissioner of Oaths Chief Marketing Officer
Being a Solicitor
Witness: Grantee of Easement:
The City of Saint John
1.
2.
Parcel Identification Number
3.
4.
5.
6.
7.
8.
9.
10.
(i)
(ii)
(iii)
Form 14
EASEMENT
Land Titles Act, S.N.B. 1981, c.L-1.1, s.24
Parcel Identifier
of Parcel Burdened
by Easement: PID 55218747
Grantor of Easement: Irving Oil Limited
10 King Square South
Saint John, NB
E2L 0G3
Grantee of Easement: The City of Saint John
P.O. Box 1971 Station Main
Saint John, NB
E2L 4L1
Description of Easement:
Purposes of Easement:
Diagram of Easement: See
The grantor grants to the grantee the described easement over or in the specified parcel for the specified
purposes.
Date: __________________________
Witness: Grantor of Easement:
Irving Oil Limited
_______________________________ ______________________________
Caleb Hunter John D. Laidlaw
A Commissioner of Oaths Chief Legal Officer
Being a Solicitor
________________________________ ______________________________
Caleb Hunter Darren Gillis
A Commissioner of Oaths Chief Marketing Officer
Being a Solicitor
Witness: Grantee of Easement:
The City of Saint John
1.
55218747
(i)
(ii)
(iii)
/h b/L\[w9thw
M&C No.2025-093
Report DateMarch 28, 2025
Meeting DateApril 07, 2025
Service AreaUtilities and Infrastructure
Services
HerWorship Mayor Donna Noade Reardon andMembers of Council
SUBJECT:Contract 2024-03: St. JamesStreet (CharlotteStreet to SydneyStreet)
Water and Sanitary Sewer Renewal and Street Reconstruction
AUTHORIZATION
Primary AuthorCommissioner/Dept. HeadChief Administrative Officer
Ian Fogan/J. Brent McGovern
Michael Baker
RECOMMENDATION
It is recommended thatContract No. 2024-03: St. JamesStreet (CharlotteStreet
to SydneyStreet) Water and Sanitary Sewer Renewal and Street Reconstruction
beawarded to the lowtenderer,TerraEx Inc., at theirtendered priceof
$662,112.50(includingHST) as calculated based on estimated quantities, and
further that the Mayor and City Clerk be authorized to execute the necessary
contract documents.
EXECUTIVE SUMMARY
The purpose of this report is to recommend that Council award Contract No.
2024-03: St. JamesStreet (CharlotteStreet to SydneyStreet) Water and Sanitary
Sewer Renewal and Street Reconstruction project to the low tenderer.
PREVIOUS RESOLUTIONS
th
October17, 2022: M&C 2022-3172023and 2024General and Utility Fund
Capital Budget, approved.
October 30, 2024: M&C 2023-238; Revised 2024 General and Utility Fund Capital
Programs, approved.
March 10, 2025: M&C 2025-065 Public Information SessionCarmarthen Street
(Mecklenburg Street to Orange Street) Street Reconstruction; Charlotte Street
(St. James Street to Queen Square North) Street Reconstruction; and St. James
Street (CharlotteStreet to Sydney Street) Street Reconstruction, received and
filed.
- 2 -
REPORT
The 2024 approved Water & Sewerage Utility Fund and General Fund Capital
Programs include funds for the reconstruction of St. James Street from Charlotte
Street to Sydney Street. The work on St. James Street includes the replacement
of the existing water main and sanitary sewer. The work also includes new
concrete curbs and sidewalk, grass median, roadway granular material, asphalt
pavement, trees, and street signage.
TENDER RESULTS
th
Tenders closed on March 19, 2025 with the following results, including HST:
1. TerraEx Inc. $ 662,112.50
2. Galbraith Construction Ltd. $ 702,726.48
3. L. Sanford and Sons Ltd. $ 733,640.63
4. Fairville Construction Ltd. $ 783,273.05
The Engineers estimate for the work was $701,908.25.
ANALYSIS
The tenders were reviewed by staff and they were all found to be formal in all
respects. Staff are of the opinion that the low tenderer has the necessary
resources and ability to perform the work and recommend acceptance of their
tender.
FINANCIAL IMPLICATIONS
The Contract includes work that is charged against the 2024 Water & Sewerage
Utility Fund and General Fund Capital Programs. This project is partially funded
by the Integrated Bilateral Funding program (Other Share). Assuming the award
of the Contract to the low tenderer, an analysis has been completed, which
includes the estimated amount of work to be performed by the Contractor and
Others.
The analysis below was established by considering the City Share funding included
in the approved 2024 Capital Program. In determining the overall budget for this
project, a breakdown of Other Share (73.33%) and City Share (26.67%) was used.
This allocation was determined by considering the City Share as 26.67% of the
overall budget.
The analysis is as follows:
Budget $ 1,080,002.00
Project Net Cost $ 672,767.12
Variance (Surplus) $ 407,234.88
- 3 -
The positive variance for this project is based on a projected surplus in the 2024
General Fund Capital Program of $305,392.49 (City Share & Other Share) as well
as a surplus of $101,842.39 (Utility Share & Other Share) in the 2024 Utility Fund
Capital Program.
POLICY - TENDERING OF CONSTRUCTION CONTRACTS
This recommendation aligns with policy for the tendering of
construction contracts, adhering to the City's General Specifications and specific
project specifications.
STRATEGIC ALIGNMENT
This report aligns with Council's Priorities for GROW, GREEN, MOVE and PERFORM
as the project involves reconstructing sections of a city street currently in poor
condition while leveraging Other Share funding. The work also supports the
construction of the new Central Peninsula School and Community Hub.
During the design phase of the work for this project, a review of the Central
Peninsula Secondary Plan (The Secondary Plan) was completed. The Secondary
Plan contains several Policies and Proposals relating to the Central Peninsula.
Throughout the engagement process in developing the Secondary Plan, more
street trees and greening was identified as a community priority. With respect to
St. James Street (Charlotte Street to Sydney Street), the Secondary Plan included
the priorities for more street trees and greening. There was also a noted desire
to improve pedestrian infrastructure.
The Secondary Plan contains the following Policies and Proposals relating to St.
James Street:
Policy:
SE-3 Reposition St. James Street as an important east-west corridor thereby
facilitating reinvestment
Proposals:
7. Promote the redevelopment of the St. John the Baptist/King Edward School
site as new residential development. Ensuring the development of the new
school and the implementation of the Secondary Plan are coordinated and
mutually supportive will be critical to the realization of the Vision.
11. Create an enhanced streetscape and public realm along St. James Street
to encourage investment and improve pedestrian conditions.
The reconstruction of St. James Street (Charlotte Street to Sydney Street) includes
the renewal of the water and sanitary sewer infrastructure. The street
reconstruction design achieves a more livable environment in the Southern
Peninsula. A few noteworthy improvements include:
/ǒƩĬ ĻǣƷĻƓƭźƚƓƭ Curb extensions on St. James Street at the Charlotte
Street and Sydney Street intersections were installed as part of separate
reconstruction projects completed in 2024. For this project, the existing
- 4 -
curb extensions will remain and new concrete curbing will be installed
between the extensions. The curb extensions improve pedestrian safety
by reducing the crossing distance for pedestrians as well as making
pedestrians about to cross St. James Street more visible to motorists.
hƓΏƭƷƩĻĻƷ ƦğƩƉźƓŭ The current alternate side on-street parking will be
maintained for the section of St. James Street from Charlotte Street to
Sydney Street until the new school has been constructed. Once the new
school has been constructed, staff intends to recommend that on-street
parking for this section of St. James Street be changed to allow for parking
on both sides of the street at the same time. This would provide on-street
parking for residents of the area as well as providing additional short-term
parking/drop-off space for the new school and community hub. To
accommodate the future change in on-street parking, this project has been
designed to allow for a parking lane on each side of the street as well as a
3.5m wide centre travel lane. It is s
at a later date with the recommended by-law changes.
.ğƩƩźĻƩ ŅƩĻĻ ƦğƩƉźƓŭ As part of the design for this project, four (4) barrier
free parking spaces have been allowed for on the south side of St. James
Street at the main entrance to the new school. These barrier free parking
spots will include access ramps complete with tactile warning surface
indicators and signage. These parking spots are not included as part of the
construction project in 2025 but will be installed once the new school has
been constructed and the necessary by-law changes have been approved
by Council. The delay in installation of the necessary infrastructure to
support these barrier free spaces is due to the requirements of the
construction of the new school building. It is anticipated that the south
side of St. James Street will need to be excavated from just behind the new
concrete curb to the southern edge of the right-of-way to allow for the
foundation of the new school to be constructed.
tĻķĻƭƷƩźğƓ ğĭĭĻƭƭ ƩğƒƦƭ Access ramps on St. James Street at the
Charlotte Street and Sydney Street intersections were installed as part of
separate reconstruction projects completed in 2024. For this project, the
existing access ramps will remain.
bĻǞ ƭźķĻǞğƌƉƭ The existing asphalt sidewalk on the north side of St.
James Street from Charlotte Street to Sydney Street will be replaced with
a new concrete sidewalk. The asphalt sidewalk on the south side of this
section of St. James Street will be removed and will be temporarily
reinstated as a gravel surface to allow for the construction of the new
school. It is anticipated that the south side of St. James Street will need to
be excavated from the edge of the right-of-way out to the back of the new
concrete curb to allow for the foundation of the new school to be
constructed. Once the new school has been built, a new concrete sidewalk
will be constructed on the south side of St. James Street.
\[ğƓķƭĭğƦĻ źƒƦƩƚǝĻƒĻƓƷƭ A new grass median and street trees will be
included on the north side of St. James Street between Charlotte Street
and Sydney Street. Following the construction of the school, locations
- 5 -
have been identified for additional trees to be planted on the south side of
St. James Street to enhance the area in front of the new school.
/ƚƚƩķźƓğƷźƚƓ ǞźƷŷ ƭĭŷƚƚƌ ĭƚƓƭƷƩǒĭƷźƚƓ As noted above, it is anticipated
that the construction of the new school will require a portion of the St.
James Street right-of-way on the south side to be excavated. For this
reason, staff have only included the installation of the new concrete curb
on the south side of St. James Street in the scope of this project. The area
behind the back of the curb on the south side will be reinstated with a
temporary gravel surface. Once the school has been completed, a new
concrete sidewalk, including the access ramps and tactile warning surface
indicators for the barrier free parking spots will be installed and street
trees will be planted.
SERVICE AND FINANCIAL OUTCOMES
The municipal infrastructure along St. James Street (Charlotte Street to Sydney
Street), is currently in poor condition and requires replacement. This
infrastructure renewal effort reduces the likelihood of future service disruptions
for residents, addressing potential failures in the existing infrastructure.
This project also provides for the opportunity to make several streetscape
enhancements that will improve the safety of this section of St. James Street for
all users of the transportation infrastructure, which is key given the proximity of
this project to the new school for the Southern Peninsula.
INPUT FROM OTHER SERVICE AREAS AND STAKEHOLDERS
This report was reviewed with Public Works and Transportation and Growth and
Community Services. The tendering process for this project was completed in
accordance with the City's Strategic Procurement Policy and Supply Chain
Management supports the recommendation being put forth.
Staff consulted with the Saint John Ability Advisory Committee on the planned
work on St. James Street from Charlotte Street to Sydney Street. A Public
Information Session for this project was also held on March 11, 2025.
ATTACHMENTS
N/A
COUNCILREPORT
M&C No.2025-103
Report DateApril 01, 2025
Meeting DateApril 07, 2025
Service AreaUtilities and Infrastructure
Services
HerWorship Mayor Donna Noade Reardon andMembers of Council
SUBJECT:Contract 2023-09: Main Street Active Transportation Improvements
AUTHORIZATION
Primary AuthorCommissioner/Dept. HeadChief Administrative Officer
Jill DeMerchantIan Fogan/J. Brent McGovern
Michael Baker
RECOMMENDATION
It is recommended thatContract No. 2023-09: Main Street Active Transportation
Improvementsbeawarded to the lowtenderer,Galbraith Construction Ltd., at
theirtendered priceof $3,447,145.13(includingHST) as calculated basedon
estimated quantities, andfurther that the Mayor and City Clerk be authorized to
execute the necessary contract documents.
EXECUTIVE SUMMARY
The purpose of this report is to recommend that Council award Contract No.
2023-09: Main Street ActiveTransportation Improvementsto the low tenderer.
PREVIOUS RESOLUTIONS
May 30, 2022: M&C 2022-191 Utility Fund (Revision I) and General Fund
(Revision II) 2022 Capital programs, approved.
May 30, 2022: M&C 2022-181 Main Street North Active Transportation
Conceptual Plan, approved.
October 17, 2022: M&C 2022-317 2023 and 2024 General and Utility Fund
Capital Budget, approved.
November 28, 2022: M&C 2022-341 -Engineering Services: Main Street Active
Transportation Improvements
April 17, 2023: M&C 2023-098 -2023 General Fund and Utility Fund Capital Budget
Update, approved.
- 2 -
January 13, 2025: M&C 2025-007 Community Development Fund Agreement:
Main Street Active Transportation Improvements, approved.
February 24, 2025: M&C 2024-045 Highway Usage Permit (HUP) Department of
Transportation and Infrastructure - Permit 202511R010009702 (City of Saint John
Route 100 (Main Street)), approved.
March 5, 2025: M&C 2025-047 Highway Usage Permit (HUP) Gateway Operations
Limited (City of Saint John Route 100 (Viaduct)), approved.
REPORT
The approved 2022 and 2023 General Fund Capital Programs include funding for
the Main Street Active Transportation Improvements project. The work will
extend between Union Street and Chesley Drive and will include the installation
of protected active transportation facilities, reconfiguration of intersections,
installation of new traffic signals, and accessibility improvements for pedestrians.
TENDER RESULTS
th
Tenders closed on March 19, 2025, with the following results, including HST:
1. Galbraith Construction Ltd. $ 3,447,145.13
2. Fairville Construction Ltd. $ 3,961,957.00
The Engineers estimate for the work was $2,717,162.50.
ANALYSIS
The tenders were reviewed by staff and they were all found to be formal in all
respects. Staff are of the opinion that the low tenderer has the necessary
resources and ability to perform the work and recommend acceptance of their
tender.
FINANCIAL IMPLICATIONS
The Contract includes work that is charged against the 2022 and 2023 General
Fund Capital Programs.
for this project is $435,000 of Canada Community Building Fund Funding (CCBF).
The 2023 General Fund Capital funding for this project is $1,565,000 of City Share
funding. In January 2025, Common Council approved the Regional Development
$495,000 toward the construction of the project.
- 3 -
Assuming the award of the Contract to the low tenderer, an analysis has been
completed, which includes the estimated amount of work to be performed by the
Contractor and Others (i.e. pre-purchase of traffic signal equipment, design and
inspection services, etc.).
The analysis is as follows:
Budget $ 2,495,000.00
Project Net Cost $ 3,823,382.10
Variance (shortfall) ($-1,328,382.10)
As indicated above the projected project shortfall is $1,328,383. It is proposed that
the shortfall be addressed through the 2019-2023 CCBF funding program. In order
to offset this funding shortfall, it is proposed that the Rodney Street (Market Place
West) to Watson Street project be deferred to a future capital program. Within
the 2021 & 2023 Capital Programs there is currently $2,228,750 of CCBF funding
assigned to the Rodney Street Project. If the project is deferred the remainder of
the funding will be reallocated to a priority project that fits within the CCBF
funding parameters. The Rodney Street Reconstruction project was chosen to be
deferred because through sewer modelling it was determined that underground
upgrades on this section of Rodeny Street would not improve the challenges with
existing storm and sanitary flows in the area. It was recommended by one of the
engineering consultants to complete an overall separation plan of the
drainage basin that includes Rodney Street to ensure that any City investment in
the area is
plan to propose this investigation and conceptual planning project in the draft
2026 Capital Programs.
This Contract includes an Enhanced Level of Service/Contractor Performance
Penalty Structure as the timeline for completion is time sensitive, based on the
fact that Main Street is a connection point between the North End and Southern
Peninsula therefore is considered critical in terms of completion. An Enhanced
Level of Service has been set at $2,000 per working day that the contractor
precedes the substantial completion date up to a maximum of $50,000. Should
the contractor not meet the project schedule as included in the tender
documents, a Penalty of $2,000 per working day from the time of the scheduled
substantial completion to the actual substantial completion will be applied. The
intent is the enhanced level of service will be funded through the project
contingency and/or the overall approved capital fund budget envelope.
POLICY - TENDERING OF CONSTRUCTION CONTRACTS
This recommendation aligns with policy for the tendering of
construction contracts, adhering to the City's General Specifications and specific
project specifications.
- 4 -
STRATEGIC ALIGNMENT
MOVE priority, connecting the Old North End and South-Central Peninsula
neighbourhoods, and beyond, with improved safe and accessible options for both
pedestrians and cyclists, with some enhancements for Transit.
This project also aligns with:
MoveSJ, that recommends a protected bike lane for Main Street North and
the Viaduct,
Central Peninsula Secondary Plan:
o IS 12: Encourage the Government of New Brunswick to develop a
short-term strategy to convert the two outside lanes of Main Street
to active transportation lanes, with a long-term vision of
implementing a road diet and redeveloping Main Street as a mixed
use corridor
o MS 2: Reconfigure Main Street to a complete street with transit and
active transportation amenities
The Main Street Active Transportation Improvements project achieves a more
livable environment along the Main Street corridor and provides an important
active transportation connection between the Old North End and the Central
Peninsula. A few noteworthy improvements include:
Protected Active Transportation Lanes Installation of a combination of
protected bike lanes and multi-use pathways along the corridor. These
lanes will be separated from vehicle traffic by a buffer space as well as
concrete barriers in order to create a physical separation for active
transportation users from motor vehicles.
Enhanced Traffic Control Features on the Viaduct Enhanced traffic
control features at the ramps along the Viaduct will be installed to reduce
speeds and create safer environments for pedestrians and cyclists. These
features include the realignment of these ramps so that their curves are
more abrupt and meet Main Street/the Viaduct at a sharper angle, the
installation of a Rectangular Rapid Flash Beacon crosswalk at the Highway
1 westbound ramp, and the installation of a set of traffic signals at the
Highway 1 eastbound ramp to minimize conflicts between
pedestrians/cyclists and vehicles.
Improved Pedestrian Areas The existing pedestrian infrastructure on
both sides of Main Street will be improved in some areas, including
widening of sidewalks and walking surfaces and the installation of Tactile
Warning Surface Indicators at pedestrian crossings. All crosswalks along
the corridor will be shortened to reduce the exposure of pedestrians to
motor vehicles.
Traffic Signal Upgrade Installation of new traffic signal equipment at the
intersection of Main Street and Metcalf Street. These traffic signals will
include vehicle detection, audible pedestrian signals, tactile warning
- 5 -
surface indicators, bike signals, and bike boxes to improve safety and level
of service for all users at the intersection.
Enhanced Green Spaces Removal of some of the existing asphalt along
the corridor to include more greenspace. Greenspaces will be added at
three of the six Viaduct ramps, along the center median near Portland
Street, as well as between the on-street parking areas along the section
from Chesley Drive and Metcalf Street.
Transit Stop Enhancements Enhancements to transit stops along the
corridor, which will involve the addition of transit lay-bys at several of the
existing transit stops on Main Street, including next to the Mercantile
building and on either side of Main Street near Portland Street.
SERVICE AND FINANCIAL OUTCOMES
The Main Street Active Transportation Project will improve access for all users of
the transportation infrastructure. The project will also allow for the installation of
protected bike lanes, enhanced pedestrian facilities and crossings, reconfiguration
of the ramps on the viaduct, roadway narrowing and a reduction in posted speed
limits.
INPUT FROM OTHER SERVICE AREAS AND STAKEHOLDERS
This report was reviewed with Public Works and Transportation. The tendering
process for this project was completed in accordance with the City's Strategic
Procurement Policy and Supply Chain Management supports the
recommendation being put forth.
ATTACHMENTS
N/A
/h b/L\[w9thw
M&C No.2025-095
Report DateMarch 31, 2025
Meeting DateApril 07, 2025
Service AreaUtilities and Infrastructure
Services
HerWorship Mayor Donna Noade Reardon andMembers of Council
SUBJECT:Contract 2025-03: Heather Way Sanitary Sewer Installation
AUTHORIZATION
Primary AuthorCommissioner/Dept. HeadChief Administrative Officer
Holly Young Ian Fogan/Michael BakerJ. Brent McGovern
RECOMMENDATION
It is recommended that:Contract No. 2023-05: Heather Way -Sanitary Sewer
Installation beawarded to the lowtenderer,Fairville Construction Ltd., at their
tendered priceof $821,744.00(including HST) as calculated based on estimated
quantities, andfurther that the Mayor and City Clerk be authorized to execute the
necessary contract documents.
EXECUTIVE SUMMARY
The purpose of this report is to recommend that Council award Contract No.
2025-03: Heather Way Sanitary Sewer Installation project to the low tenderer.
PREVIOUS RESOLUTIONS
th
October 28, 2024: M&C 2024-287:2025 General and Utility Fund Capital
Budgets, approved.
February 24, 2025: M&C 2025-058: 2024 2028 Capital Investment Plan for
Canada Community Building Fund (CCBF), approved.
REPORT
The 2025approved Water & Sewerage Utility Fund CapitalProgram includesfunds
for the installation of a new sanitary sewer on Heather Way, from Dunnett Drive
to the northern entrance of Boyaner Crescent. This work will support future
development in theadjacent area.
- 2 -
TENDER RESULTS
th
Tenders closed on March 26, 2025, with the following results, including HST:
1. Fairville Construction Ltd. $ 821,744.00
2. Galbraith Construction Ltd. $1,024,322.25
The Engineers estimate for the work was $ 791,740.50.
ANALYSIS
The tenders were reviewed by staff, and all were found to be formal in all respects.
Staff are of the opinion that the low tenderer has the necessary resources and
ability to perform the work and recommend acceptance of their tender.
FINANCIAL IMPLICATIONS
The Contract includes work that is charged against the 2025 Water & Sewerage
Utility Fund Capital Program. This project is funded entirely by the Canada
Community Building Fund (CCBF). The approved CCBF Capital Investment Plan
includes a budget for this project of $700,000. However, the approved 2025 Utility
Capital Program includes a project budget of $485,000. Since the Capital
Investment Plan for the CCBF program was completed after the 2025 Utility Fund
Capital Program a budget of $700,000 was used for project funding.
Assuming the award of the Contract to the low tenderer, an analysis has been
completed, which includes the estimated amount of work to be performed by the
Contractor and Others (i.e. design & inspection services).
The analysis is as follows:
Budget $ 700,000
Project Net Cost $ 835,978
Variance (Shortfall) -$ (135,978)
As noted above the overall projected project shortfall is $135,978. It is proposed
the shortfall be addressed within the overall 2024-2029 CCBF funding program.
The City earns interest yearly on this funding therefore it is expected that this
shortfall can be addressed within the overall 2024-2029 CCBF funding program.
POLICY - TENDERING OF CONSTRUCTION CONTRACTS
This recommendation aligns with policy for the tendering of
construction contracts, adhering to the City's General Specifications and specific
project specifications.
- 3 -
STRATEGIC ALIGNMENT
This report aligns with Council's Priorities for GROW and PERFORM as the project
involves installing a new sanitary sewer to support future development while
leveraging Other Share funding. Noteworthy for this project is that during
construction, traffic will be temporarily shifted to the northbound lanes to enable
more efficiency in the construction of the works. Once the work is complete and
the trench reinstated, the entirety of Heather Way (northbound and southbound
lanes that were not completed in 2024) will be resurfaced under a separate
project.
SERVICE AND FINANCIAL OUTCOMES
The existing municipal sanitary sewer infrastructure along Heather Way cannot
support future development. The installation of a new sanitary sewer will support
future development proposed for the area.
INPUT FROM OTHER SERVICE AREAS AND STAKEHOLDERS
This design was reviewed by SJ Water, and the Public Works and Transportation
Department.
Finance also reviewed the report to ensure the CCBF Funding requirements were
adhered to and the adjustment of funding for this project adhered to Capital
budget policy.
The tendering process for this project was completed in accordance with the City's
Strategic Procurement Policy and Supply Chain Management supports the
recommendation being put forth.
th
On March 25, 2025, staff hosted a Public Information Session for this project.
ATTACHMENTS
N/A
PROCLAMATION
WHEREAS:emergencies can occur at any time requiring police, fire or
emergency medical services; and
WHEREAS:when an emergency occurs, the prompt response of police
officers, firefighters and paramedics is critical to the
protection oflife and preservation of property; and
WHEREAS:the safety of our police officers, firefighters and paramedics
is dependent upon the quality and accuracy of information
obtained from citizens contacting the Public Safety
Communications Centre; and
WHEREAS:the Public Safety Communications Centreis the first link to
citizens seeking emergency services; and
WHEREAS:every year during the second week of April, the
telecommunications personnel in the public safety
community are honorednationally; and
WHEREAS:April 13-19, 2025,is recognized as National Public Safety
Telecommunicators Week; and
WHEREAS:National Public Safety Telecommunicators Week is a time to
celebrate and thank the Public Safety Communications
Centre Operators for theircompassion, understanding and
professionalism in their performance of duty serving the
public.
NOW THEREFORE: I,Mayor Donna Reardon, of Saint Johndo hereby
proclaim the week of April 13to April 19, 2025,as National Public Safety
TelecommunicatorsWeek, in honour of thosewhose diligence and
professionalism keep our city and citizens safe.
In witness whereof I have set my hand and affixed the official seal of the Mayor
of the City of Saint John.
PROCLAMATION
WHEREAS:April 15, 2025 marks the tenth anniversary of the Supreme Court of
Canada's decision in Mouvement laïque québécois v. Saguenay (City), 2015 2 S.C.R. 3,
which affirmed the principle of religious neutrality in public institutions; and
WHEREAS: The decision underscored the importance of maintaining a secular space
where individuals of all faiths and beliefs can coexist in harmony and mutual respect; and
WHEREAS: The City of Saint John is committed to upholding the values of equality,
diversity, and respect for all citizens, regardless of their religious beliefs or non-beliefs; and
WHEREAS:Recognizing "Religious Neutrality Day" provides an opportunity for our
community to reflect on the importance of religious neutrality and to promote awareness
and understanding among all residents; and
WHEREAS:This day serves as a reminder of our dedication to fostering a harmonious
and inclusive society where everyone feels welcome and respected.
NOW THEREFORE: I,Mayor Donna Noade Reardon, of Saint Johndo hereby proclaim
April 15, 2025as Religious Neutrality Dayin the City of Saint Johnand encourage all
residents to join in commemorating this important milestone and to participate in
educational events and discussions on the significance of religious neutrality in our society.
In witness whereof I have set my hand and affixed the official seal of the Mayor of the
City of Saint John.
PROCLAMATION
WHEREAS:On April 17th, the bleeding disorder community will be celebrating World
Hemophilia Day.The theme of this year is "Access for all: Women and
girls bleed too".
WHEREAS: Today women and girls with bleeding disorders are still under diagnosed
and underserved. The global bleeding disorder community has the power
and the responsibility to change this. Through recognition, treatment, and
care the quality of life for these women will improve and the bleeding
disorder community will become stronger.
WHEREAS: World Hemophilia Day 2025 is a call to action for governments, healthcare
providers and advocates worldwide to close the gaps in care for women
and girls with bleeding disorders. This year's theme highlights the
importance of equity in healthcare, shining a light on the strength,
resilience and contributions of women and girls with bleeding disorders.
Through global awareness efforts, we can break the stigma, improve
education and foster better outcomes for all.
WHEREAS:Together we can create a future where Treatment for all is a reality and
equity, care and empowerment define the lives of those living with
bleeding disorders. Let's join hands on April 17th, 2025 to ensure that
women and girls with bleeding disorders are not left behind.
NOW THEREFORE: I,Mayor Donna Noade Reardon, of Saint Johndo hereby proclaim
April 17, 2025 as World Hemophilia Dayin the City of Saint John.
In witness whereof I have set my hand and affixed the official seal of the Mayor of the
City of Saint John.
Staff Recommendation for Council Resolution
Property: 120 Carleton Street (PID 00037564)
Public Hearing: April 7, 2025
Item: Required: Recommendation
(Y/N)
Municipal Plan No
Amendment
Zoning By-Law No
Amendment
Recission of Yes That Common Council, pursuant to Section 59 of the
Previous s. 39/s. Community Planning Act, hereby rescind the resolution and
59 Conditions the conditions imposed on May 17, 1990 on the property
located at 120 Carleton Street, also identified as PID
00037564.
Section 59 No
Conditions
Section 59 No
Agreement
Section 131 No
Agreement
Other No
PLANNING ADVISORY COMMITTEE
March 19, 2025
Her Worship Mayor Donna Noade Reardon and
Members of Common Council
Your Worship and Councillors:
SUBJECT:ProposedSection 59 Amendment
120 CarletonStreet
On February24, 2025, Common Council referred the above matter to the
Planning Advisory Committee for a report and recommendation. The Committee
considered the attached report at its March18, 2025meeting.
Yeva Mattson, Plannerwith Growth and Community Services, appeared before
the Committee and provided an overview of the proposed Rezoning.
Margo Butler, the executivedirector of the John Howard Society,and Mark
Palmer, president of the John Howard Society Board, appeared as the applicants
to speak in favor of staff recommendation. They clarified there is a need for this
serviceand they hope to expand to better serve those wanting to re-enter Saint
John.
The committee inquired about the process when the transition house reaches full
capacity and individuals are unable to access services. The applicant clarified
that, in such cases, individuals must remain in the institution. They further
explained that dueto the overwhelming demand for services like theirs, the
province has resorted to flying people to Newfoundland because of the severe
lack of available space within the province.
RECOMMENDATION:
1.That Common Council rescind the conditions imposed on May 17, 1990
on the property located at 120 Carleton Street, also identified as PID
00037564.
Page 1of 2
Margo Butler120 Carleton StreetMarch19, 2025
Respectfully submitted,
Phil Comeau
Vice Chair
Attachments
Page 2 of 2
Date:March14, 2025
To:PlanningAdvisory Committee
From:Growth &Community Services
Meeting:March18, 2025
SUBJECT
Applicant:Margo Butler
Landowner:John Howard Residential Centre Inc.
Location:120 Carleton Street
PID:00037564
PlanDesignation:Primary Centre
Zoning:NeighbourhoodCommunity Facility (CFN)
Application Type:Section 59 Amendment
Jurisdiction:Common Council has requested the views of the Planning
Advisory Committee concerning proposed amendments to the
Section 59 conditions of the subject property. Council will consider
the Committee’srecommendation at a public hearing on Monday,
April10, 2025.
EXECUTIVE SUMMARY
The applicant is seeking anamendmentto existing Section 59 conditions imposed on the
propertyin 1990,which restricted the site to a group care facility for not more than 15 persons
and associated offices. The applicant is requesting this condition be rescinded toenable an
addition of 4 more beds.
Staff recommendsrescinding the Section 59 conditionto enable expansion of the existing use.
RECOMMENDATION
Page 1of 5
Margo Butler 120 Carleton Street March 14, 2025
That Common Council
DECISION HISTORY
On September 18,1978, 120 Carleton Street was rezoned from One & Two Family – 2 Storey &
2 or 3 Storey Multiple Residential (RM-1) to Neighbourhood Institutional (IL-1) and the use of
the site was restricted to a Community Residential Centre for not more than 10 men and the
John Howard Society’s offices. This condition was amended on May 17, 1990 to allow for 15
beds, to be used for men and women.
The existing Section 59 condition registered on the property is worded as “That the use of 120
Carleton Street be restricted to a group care facility for not more than fifteen (15) persons and
associated offices.”
ANALYSIS
Proposal
The applicant is proposing to incorporate an additional four residents within the existing building.
The rescinding of the Section 59 conditions is required to allow for this proposed expansion of
this established use.
Site and Neighbourhood
The subject property in located in the Central Peninsula at the edge of the Primary Centre, west
of the intersection of Carleton Street and Coburg Street. The property has an area of 300m² and
includes the existing John Howard Society building as well as 3 tandem parking stalls.
The immediate area surrounding the subject property is a mixture of residential, commercial,
and institutional uses, including the St. Joseph Hospital which is located 275 metres away. The
residential uses in the neighbourhood and in the broader Central Peninsula are largely zoned
Urban Centre Residential (RC), while the commercial uses are zoned Uptown Commercial
(CU).
The subject site is served by the City’s public and active transportation networks. The site is
served by Saint John transit, with a main transit hub being located 270 metres away at Kings
Square. This provides residents with transit connections to Fairville Boulevard, McAllister
Centre, the University and Regional Hospital, and the North End. In addition, sidewalks link the
property to the City’s broader pedestrian network.
Municipal Plan and Zoning
Municipal Plan and Central Peninsula Secondary Plan
The site is designated as Primary Centre in the Municipal Plan. There are two policies in this
designation that are relevant:
LU-13 Recognize the Uptown Primary Centre as the major business, office and retail
area within the City, featuring mixed-use development and intense activity. The Uptown
Page 2 of 5
Margo Butler 120 Carleton Street March 14, 2025
also contains uses which contribute to the City’s vitality and animation, such as cultural,
entertainment, residential and hospitality uses.
The rescinding of the Section 59 condition allows for the expansion of the existing use on this
site, which aligns with the Primary Centre’s role as a mixed-use area. The continued support of
this use will contribute to the social fabric of the Uptown, creating a more inclusive and diverse
community. While the policy encourages a mix of residential, cultural, and leisure uses,
supportive facilities address the need for supportive services and affordable housing.
Policy LU-19 Ensure the Uptown maintains a compact urban form. This will be achieved
by developing supportive land use regulations in the Zoning Bylaw to direct high intensity
mixed-use development to areas that can support it, while maintaining the character of
established lower intensity areas.
The site has operated as a Supportive Facility for over four decades, expanding its operation to
meet the growing needs of the community. The proposed rescinding of the Section 59
Conditions will allow for a marginal increase in the scale of use will maintaining the built form
and character.
The proposed development is also compatible with the vision established within the Central
Peninsula Secondary Plan, including:
- The existing building is of an appropriate height and massing for the neighbourhood.
- The proposed development protects the pedestrian street level experience by being of
an appropriate scale.
The proposal represents an opportunity to expand an existing supportive facility while retaining
the built form and character of the existing building. As this is an existing building, it conforms to
the neighbourhood context for scale, massing, and height. Any future changes to the building
would be limited by the size of the lot.
From the analysis of the proposed development for alignment with the Central Peninsula
Secondary Plan as well as the Municipal Plan Policies (Attachment 2), staff are of the opinion
that the proposed development achieves the intent of the Municipal Plan based on the
continued residential use.
Zoning
The Neighborhood Community Facility (CFN) Zone is designed to accommodate a range of
community-oriented facilities, such as arenas, community centres, elementary schools, and
recreational facilities that are complementary to surrounding residential neighbourhoods. It is
also designed to accommodate Supportive Facilities and Supportive Housing.
The John Howard Society, which has been operating the existing Supportive Facility for over
four decades is an appropriate use for the CFN zone and conforms to the intent of the zone.
Page 3 of 5
Margo Butler 120 Carleton Street March 14, 2025
With the removal of the condition limiting the number of beds, any expansion of the use would
need to meet current zoning standards.
Section 59 Conditions
The landowner is seeking approval to rescind the existing Section 59 conditions to allow for an
expanded resident count in the existing building at 120 Carleton Street.
Since the 1978 rezoning, Section 39/59 conditions have been imposed on the use of this parcel,
restricting the use and resident count. A subsequent amendment to these original conditions
enabled an increase to the maximum allowable beds. By removing the Section 59 condition, it
will provide flexibility and will enable the site’s development and use to be guided by the
standards established in the City’s Zoning By-Law.
Staff recommend the removal of the conditions, as the Zoning By-law standards and building
permit process provide sufficient direction for any future development of the site.
No issues were raised by the different service areas, and they are supportive of the proposed
removal of the Section 59 conditions.
Conclusion
The proposed increase to the resident count of an existing supportive facility represents an
incremental increase to an established land use. The use is permitted within the Neighbourhood
Community Facility (CFN) zone and has operated from this located for over four decades. Staff
are recommending the rescinding of the Section 59 condition.
ALTERNATIVES AND OTHER CONSIDERATIONS
No other alternatives were considered.
PUBLIC ENGAGEMENT
In accordance with the Committee’s Rules of Procedure, notification of the proposal was sent to
landowners within 100 metres of the subject property on March 4, 2025. The Public Notice for
the proposed Section 59 Amendment was posted on the City of Saint John website on March
10, 2025.
APPROVALS AND CONTACT
Manager Director
Jennifer Kirchner, RPP, MCIP
Pankaj Nalavde, RPP, MCIP
Contact: Yeva Mattson, RPP, MCIP
Telephone: (506) 721-8453
Email: yeva.mattson@saintjohn.ca
Application: 23-0334
APPENDIX
Map 1: Aerial Photography
Page 4 of 5
Margo Butler 120 Carleton Street March 14, 2025
Map 2: Future Land Use
Map 3: Zoning
Attachment 1: Site Photography
Attachment 2: Municipal Plan and Secondary Plan Policy Review
Submission 1: Site Plan
Page 5 of 5
ATTACHMENT 1: SITE PHOTOGRAPHY
Subject Site
Subject Site
Carleton Street
Carleton Street looking East (Subject
to the
ing
the need
.
es
existing use
contribut
with no exterior
address
y
expansion of the
s well as providing
, which will allow for
the
density increase
.
designation by
An increase to the resident count
to allow for
supportive facilit
hile still supporting the
in an existing building
ection 59 conditions will allow for an
helping to create a more inclusive and
supportive services a
with
the S
for over four decades.
and by
Primary Centre
.
density, w
on
options
Street
operati
the existing use of a
contains an existing building and use, which feature a
residential
resident increase can be accommodated through internal
Street
rescinding of the Section 59 conditions
aligns with the
Carleton
to the
use
120
–
more specialize housing with
nhanced density on the site.
120 Carleton The proposed Section 59 amendmentexisting social fabric of the Uptowndiverse community. While the policy encourages a mix of residential, cultural, and leisure uses, foraffordable
housing The proposed amendment to increase which has been in The subject site compact urban form of development. requires the eThe proposed renovations to the building. There are no
anticipated changes to the buildings exterior to support the additional residentsThe development is contained changes being required to support the proposed
use
-
Policy Review
use developments;
-
use development and intense activity.
-
ished lower intensity areas.
quality urban design standards for
-
and Central Peninsula Secondary Plan
entertainment, residential and hospitality uses.
use development to areas that can support it, while
-
Municipal Plan
13
19 20 23
-
---
secondary and private educational facilities; and
-
Policy LU
Municipal Plan Policy Recognize the Uptown Primary Centre as the major business, office and retail area within the City, featuring mixedThe Uptown also contains uses which contribute
to the City’s vitality and animation, such as cultural, Council shall encourage the following land uses to locate in the Uptown Primary Centre: a. Major concentrations of government
and other major office, financial, and professional services in the City; b. Major arts, culture, leisure and entertainment facilities; c. Medium & high density residential, particularly
in mixedd. Green space and public gathering places; e. Specialty retailing; f. Restaurant and related establishments, including bars; g. Visitor attractions that are not location dependent;
h. Posti. Public transit and active transportation hubs providing links to and from key destinations. Policy LU Ensure the Uptown maintains a compact urban form. This will be achieved
by developing supportive land use regulations in the Zoning Bylaw to direct high intensity mixedmaintaining the character of establ Policy LU Ensure new construction in the Uptown is
sensitive to its historic surroundings and neighbourhood context; however, modern expressions of architecture in the Uptown will also be encouraged. Policy LU Encourage the application
of highdevelopment within the Uptown Primary Centre by incorporating the Urban Design Principles, established in the Municipal Plan, which support mixedurban forms of development.
Attachment 2:
The
.
built form.
wall
that was
street
stablished
rise residential building
-
standing supportive facility providing specialized
-
he existing use will continue to operate from the
The existing built form will be able to accommodate the
Assessment
120 Carleton Street The site contains an existing lowconstructed in 1900. additional residents with no changes being proposed to the building will continue to form part of the eThe building
contains a long
and affordable housing. Tproperty.
provides access to an important
rise residential and institutional uses to
-
street parking to accommodate employees
-
income residential developments to support the
-
Design Characteristics
rise buildings to reinstate the traditional urban built form
scale mid
-
-
Waterloo Village neighbourhood, specifically along the Union
Low to midof the Street corridor.Increased mixedtransition to a complete neighbourhood, while mitigating gentrification.Existing and infill buildings along Union Street, Waterloo Street
and Prince Edward Street to retain active ground floor uses and upper floor residential uses.Civic spaces are reinforced and created to provide amenities for residents, employees and
visitors.Structured and onresidents and visitors.New, largeincorporate inbuilding parking.Health and other instructional buildings feature high quality entry plazas.Access to a naturalized
Marsh Creek civic space, while connecting to areas East of the Central Peninsula
Waterloo Village:
CPSP Policy2.3
City of Saint John
Growth & Community Development
PO Box 1971,
Saint John, NB
E2L4L1
March 16, 2025.
Dear Planning Advisory Committee,
My name is Cynthia Nedo and Colin Craig and we are the owners of a neighboring building at 66
Coburg. While I understand the intent to accommodate growing housing needs, I believe this
amendment could have negative consequences for our community. It has come to our attention
that 120 Carleton would like to allow 4 additional beds on top of the 15 people already on the
premises.
First, by allowing such an amendment, it seems counterintuitive. This proposal doesn't improve the
neighborhood or attract the right demographic to the area. In December 2024, the city of Saint John
worked very hard to move a homeless shelter from the exact same area. At the time, safety and
security of residents, tenants and businesses was a major concern vocalized to the city. Allowing
more beds of this nature, doesn't attract the right clientele, increases transiency and jeopardizes
the safety and security of the area.
Secondly,
is already challenging. Introducing more
frustration for current residents.
In conclusion, I understand the need for accommodating a growing population, I believe that the
proposed property amendment could have negative consequences. The proposal doesn't improve
the area, and I urge you to reconsider this amendment and explore alternative solutions to preserve
the character of our community. The forethought of the city for this area should be to create more
units of housing not piling more beds into one apartment building. Thank you for taking the time to
consider my concerns.
Best regards,
Cynthia Nedo and Colin Craig
Application for a Section 59 Amendment
Application is for a Section 59 Amendment to eliminate the resident cap.
PROPOSED SECTION 59 AMENDMENT
RE: 120 Carleton (PID 00037564)
Public Notice is hereby given that the Common Council of the City of Saint John intends to
consider amending The City of Saint John Zoning By-Law at its regular meeting to be held in the
Council Chambers on Monday April 7, 2025, at 6:30 p.m.
1. Amending the Section 59 conditions imposed on May 17, 1990 on the property located at
120 Carleton Street, also identified as PID 00037564, to remove the maximum bed count.
REASON FOR CHANGE:
To permit the development of additional beds in an existing building.
For details on how to inspect the amendment, or to register to participate, please contact the
Office of the City Clerk at commonclerk@saintjohn.ca. Written objections to the amendment
may be provided in writing and/or verbally at the Public Hearing to be held by Common Council.
To register for participation in the hearing, please
commonclerk@saintjohn.ca
If you require French services for a Common Council meeting, please contact the office of the
City Clerk.
Jonathan Taylor, City Clerk
(506) 658-2862
PROJET DE MODIFICATION DEL'ARTICLE 59
Objet : 120, rue Carleton
Par les présentes, un avis public est donné par lequel le conseil communal de la ville de Saint
John
réunion ordinaire qui se tiendra dans la salle du conseil le lundi 7 avril 2025 à 18 h 30, en
apportant les modifications suivantes :
1. Modification des conditions de l'article 59 imposées du 17 mai 1990 de la propriété
située au 120 rue Carleton, également identifiée comme NID 00037564, afin de
supprimer le nombre maximal d'lits.
INSERT PHOTO (this is just a note to make sure the photo goes here on the web
site, no need to actually insert it)
RAISON DE LA MODIFICATION:
Permettre le développement supplémentaires dans le bâtiment existant.
Souhaitez-vous plus de détails sur la façon d'inspecter la modification ou de vous inscrire pour
participer? Veuillez contacter le bureau du greffier commun à CommonClerk@saintjohn.ca. Les
objections écrites à la modification peuvent être fournies par écrit et/ou verbalement lors de
l'audience publique qui sera tenue par le conseil municipal. Pour vous inscrire à l'audience,
veuillez contacter le bureau du greffier municipal à l'avance à CommonClerk@saintjohn.ca
Si vous avez besoin des services en français pour une réunion de Conseil Communal, veuillez
contacter le bureau du greffier communal.
Jonathan Taylor, Greffier de la municipalité
(506) 658-2862
Staff Recommendation for Council Resolution
Property: 801 Loch Lomond Road (portion of PID 00436659)
stnd
Public Hearing, 1 and 2 Reading occurred on March 24, 2025
rd
3 Reading: April 7, 2025
Item: Required: Recommendation
(Y/N)
Municipal Plan No
Amendment
rd
Zoning By-Law Yes That Common Council give 3 reading to By-Law Number
Amendment C.P. 111-190 a Law to Amend The Zoning By-Law of the City
of Saint John.
Recission of No
Previous s. 39/s.
59 Conditions
Section 59 No
Conditions
Section 59 No
Agreement
Section 131 No
Agreement
Other No
BY-LAW NUMBER C.P. 111-190 ARRÊTÉ NO C.P. 111-190
A LAW TO AMEND THE ZONING BY-
LAW OF THE CITY OF SAINT JOHN ZONAGE DE THE CITY OF SAINT
JOHN
Be it enacted by The City of Saint John in
Lors d'une réunion du conseil communal,
Common Council convened, as follows:
The City of Saint John a décrété ce qui suit :
The Zoning By-law of The City of Saint John
L'arrêté sur le zonage de The City of Saint
enacted on the fifteenth day of December, A.D.
John, décrété le quinze (15) décembre 2014,
2014, is amended by:
est modifié par :
Amending Schedule "A", the Zoning Map of The
City of Saint John, by rezoning a piece of land
zonage de la ville de Saint John, permettant
having an area of approximately 1.32 hectares,
de modifier la désignation pour une parcelle
located at 801 Loch Lomond Road, also identified
de terrain d'une superficie d'environ 1.32
as a portion of PID 00436659, from Business hectares, situé au 801, chemin Loch
Lomond, également identifié comme une
Park Commercial (CBP) to Corridor
partie de NID 00436659, de la zone
Commercial (CC)
commerciale - à
zone commerciale de corridor (CC)
toutes les modifications sont indiquées sur le
all as shown on the plan attached hereto and
plan ci-joint et font partie du présent arrêté.
forming part of this by-law.
EN FOI DE QUOI, The City of Saint John a
IN WITNESS WHEREOF The City of Saint John
fait apposer son sceau communal sur le
has caused the Corporate Common Seal of the
présent arrêté le *** **** 2025, avec les
said City to be affixed to this by-law the ** day of
signatures suivantes:
****, A.D. 2025 and signed by:
____________________________________________
Mayor / Maire
__________________________________________ _
City Clerk / Greffier de la municipalité
First Reading - March 24, 2025 Première lecture - le 24 mars 2025
Second Reading - March 24, 2025 Deuxième lecture - le 24 mars 2025
Third Reading - Troisième lecture -
Staff Recommendation for Council Resolution
Crisis Care Facility Text Amendment
stnd
Public Hearing, 1 and 2 Reading occurred on March 24, 2025.
rd
3 Reading: April 7, 2025
Item: Required: Recommendation
(Y/N)
Municipal Plan No
Amendment
rd
Zoning By-Law Yes That Common Council give 3 reading to By-Law Number
Amendment C.P. 111-192 a Law to Amend The Zoning By-Law of the City
of Saint John.
Recission of No
Previous s. 39/s.
59 Conditions
Section 59 No
Conditions
Section 59 No
Agreement
Section 131 No
Agreement
Other No
BY-LAW NUMBER C.P. 111-192 ARRÊTÉ NO C.P. 111-192
A LAW TO AMEND THE ZONING BY-
LAW OF THE CITY OF SAINT JOHN ZONAGE DE THE CITY OF SAINT
JOHN
Lors dune réunion du conseil
Be it enacted by The City of Saint John in
Common Council convened, as follows:
communal, The City of Saint John a décrété
ce qui suit :
The Zoning By-law of The City of Saint John
LArrêté de zonage de The City of Saint John,
enacted on the fifteenth day of December,
décrété le 15 décembre 2014, est ainsi
modifié :
A.D. 2014, is amended by:
1. 1. 3.1 est modifié par
3.1 and replacing it suppression de la définition de
with the following: « centre pour personnes en état de
crise » et son remplacement par ce
qui suit :
Crisis Care Facilityan « centre pour personnes en état de
establishment that provides short-term crise » Établissement fournissant un
accommodation to a person in crisis hébergement à court terme aux
requiring immediate lodging and may personnes en situation de crise qui
involve supervision and personal support éprouvent un besoin immédiat
service. et où peuvent être
fournis des services de surveillance et
de soutien à la personne.
2. Deleting the 2. 4.2b) est
immediately following modifié par suppression des mots
in the Table at paragraph 4.2(b) « un par employé » immédiatement
and replacing them with: après « centre pour personnes en état
at the discretion of the Development de crise » et leur remplacement par
O. les mots : « à la discrétion d
».
3. Adding at section 12, the following words 3. L 12 est modifié par adjonction
in alphabetical order under the following en ordre alphabétique des mots
headings of Table 12-1: suivants sous les rubriques suivantes
du tableau 12-1 :
Usage Zone où permis
Use Zone Permitted
Centre pour personnes en état de
Crisis Care Facility US
crise US
4. La liste du paragraphe 12.6(1) est
4. Adding in alphabetical order to the list in
modifiée par adjonction en ordre
Subsection 12.6(1)
alphabétique des mots « centre pour
Facility;.
personnes en état de crise; ».
IN WITNESS WHEREOF The City of Saint John EN FOI DE QUOI, The City of Saint John a
has caused the Corporate Common Seal of the fait apposer son sceau communal sur le
said City to be affixed to this by-law the __ day of présent arrêté le __ ______ 2025, avec les
______, A.D. 2025 and signed by: signatures suivantes :
____________________________________________
Mayor / Maire
__________________________________________ _
City Clerk / Greffier de la municipalité
First Reading - March 24, 2025 Première lecture - le 24 mars 2025
Second Reading - March 24, 2025 Deuxième lecture - le 24 mars 2025
Third Reading - Troisième lecture -
Staff Recommendation for Council Resolution
Property: 125 Gault Road
stnd
Public Hearing, 1 and 2 Reading were completed on January 13, 2025
rd
3 Reading: April 7, 2025
Item: Required: Recommendation
(Y/N)
Municipal Plan No
Amendment
rd
Zoning By-Law Yes That Common Council give 3 reading to an Amendment to
Amendment the Zoning By-Law which rezones a parcel of land having an
approximate area of 4.5 hectares, located at 125 Gault Road,
also identified as a portion of PID Number 00403535, from
Low-Rise Residential (RL) to Mid-Rise Residential (RM).
Recission of Yes That Common Council rescind the Section 39 conditions
Previous s. 39/s. imposed on the December 5, 2011, rezoning of the property
59 Conditions located at 125 Gault Road, also identified as PID Number
00403535.
Section 59 Yes That Common Council, pursuant to the provisions of Section
Conditions 59 of the Community Planning Act, approximately 8.8
hectares, located at 125 Gault Road, also identified as PID
Number 00403535:
a) Driveways serving the portion of the site zoned
General Commercial (CG) shall be allowed exclusively
from Gault Road and not Manawagonish Road.
b) Driveways for corner lots at the Dantes Drive and
Gault Road intersection shall be prohibited from
accessing Gault Road.
c) That access to the site for construction purposes be
from Gault Road and not through the existing Monte
Cristo subdivision.
d) That cannabis retail be a prohibited land use within
the portion of the site zoned General Commercial
(CG).
e) That Common Council authorize the preparation and
execution of a Section 59 Agreement requiring the
Developer to install curb and sidewalk along the west
side of the Gault Road frontage of 65, 101, and 125
Gault Road (PIDs 55195671, 00403584, and 00403535)
and shall align with the following conditions:
I. The phased installation of the curb and sidewalk
be in general accordance with the limits
indicated on Schedule 1 - Concept Plan dated
March 31, 2025.
II. The City will provide to the Developer a fixed
and firm monetary contribution of $170,000.00
for area "A" and $30,000.00 for area "B" upon
completion of the work and review and
acceptance by the Chief City Engineer or their
designate for each portion of the work and
review of the satisfactory proof of expense and
payment by the Chief Financial Officer or their
designate. The reimbursement will be funded
through the General Capital Reserve Fund.
III. This work shall be completed by December 31,
2029.
Section 59 No That Common Council authorize the preparation and
Agreement execution of a Section 59 Agreement requiring the Developer
to install curb and sidewalk along the west side of the Gault
Road frontage of 65, 101, and 125 Gault Road (PIDs
55195671, 00403584, and 00403535) and shall align with the
following conditions:
a. The Developer will be required to complete the
design and construction of the new concrete
sidewalk and curb on the west side of Gault Road,
including any necessary storm sewer system
upgrades, all in general accordance with the limits
indicated on Schedule 1 - Concept Plan dated March
31, 2025.
b. The work will be split into two portions as indicated
on the said Concept Plan.
c. This work shall be completed by December 31, 2029.
d. The City would provide to the Developer a fixed and
firm monetary contribution of $170,000.00 for Area
"A" and $30,000.00 for Area "B" upon completion of
the work and review and acceptance by the Chief
City Engineer or their designate for each portion of
the work and review of the satisfactory proof of
expense and payment by the Chief Financial Officer
or their designate. The reimbursement will be
funded through the General Capital Reserve Fund.
e. The design and construction of all work shall comply
with the City of Saint John General Specifications
(2022) and the Storm Drainage Design Criteria
Manual (2016).
a. The rainfall intensity values used in the
stormwater analysis and drainage system
design shall be obtained from future climate
change projections published by
Environment and Climate Change Canada
(ECCC), using the following parameters:
i.
ii. CMIP6 data;
iii. Shared socioeconomic pathway
SSP5.85;
iv. 2071-2100 design horizon;
v. Median values.
b. Construction of the work shall not proceed
until the design has been reviewed and
accepted by the Chief City Engineer or their
designate.
f. Drainage easements in favour of the City of Saint
John will be required for any defined drainage
channels through private lands conveying runoff
discharged from the public right of way.
g. Standard Developers Agreement conditions for
submission of post-construction documents shall
apply to this work and will be associated with the
Phase 1A permit for Area "A" and Phase 2 permit for
Area "B".
h. Following completion of construction, a letter
stamped, signed, and dated by a professional
engineer shall be provided to the City certifying that
the stormwater management is in accordance with
the accepted design.
Section 131 No
Agreement
Subdivision Yes 1. That Common Council rescind its resolution of February
27, 2012, with respect to the assent to Land for Public
Purposes for the subject site.
2. That Common Council assent to the submitted
subdivision plan, in general accordance with the
submitted subdivision plan, with respect to the vesting of
Public Streets and any required Local Government
Services Easements and Municipal Drainage Easements.
3. That Common Council not assent to the proposed Land
for Public Purposes, but instead assent to money-in-lieu
of Land for Public Purposes in relation to the proposed
subdivision.
4. That Common Council authorize the preparation and
execution of one or more City/Developer Subdivision
Agreements to ensure the provision of the required work
and facilities, including any necessary temporary
turnarounds.
OMMON COUNCIL REPORT
M&C No.2025-068
Report DateApril 03, 2025
Meeting DateApril 07, 2025
Service AreaGrowth and
Community Services
Her Worship Mayor Donna Noade Reardon and Members of Common Council
SUBJECT: 125 Gault Road -Supplementary Council Report 4.1.25.docx
AUTHORIZATION
Primary AuthorCommissioner/Dept. HeadChief Administrative
Officer
Yeva MattsonAmy Poffenroth/Pankaj J. Brent McGovern
Nalavde
RECOMMENDATION
1.That Common Council rezone a parcel of land having an approximate area of 4.5
hectares, located at 125 Gault Road, also identified as a portion of PID Number
00403535, from Low-RiseResidential (RL) to Mid-Rise Residential (RM).
2.That Common Council rescind the Section 39 conditions imposed on the
December 5, 2011, rezoning of the property located at 125 Gault Road, also
identified as PID Number 00403535.
3.That Common Council, pursuant to the provisions of Section 59 of the
Community Planning Act, impose the following conditions on the parcel of land
having an area of approximately 8.8 hectares, located at 125 Gault Road, also
identified as PID Number 00403535:
a.Driveways serving the portion of the site zoned General Commercial (CG)
shall be allowed exclusively from Gault Road and not Manawagonish
Road.
b.Driveways for corner lots at the Dantes Drive and Gault Roadintersection
shall be prohibited from accessing Gault Road.
c.That access to the site for construction purposes be from Gault Road and
not through the existing Monte Cristo subdivision.
d.Prohibiting cannabis retail as a land use within the portion of the site
zoned General Commercial (CG).
e.That Common Council authorize the preparation and execution of one or
more City/Developer Subdivision Agreements to ensure the provision of
the required work and facilities, including:
i.That the Developer install curb and sidewalk along the west side of
the Gault Roadfrontage of 65, 101, and 125 Gault Road (PIDs
55195671, 00403584, and 00403535).
- 2 -
4. That Common Council rescind its resolution of February 27, 2012, with respect to
the assent to Land For Public Purposes for the subject site.
5. That Common Council assent to the submitted subdivision plan, in general
accordance with the submitted subdivision plan, with respect to the vesting of
Public Streets and any required Local Government Services Easements and
Municipal Drainage Easements.
6. That Common Council not assent to the proposed Land for Public Purposes, but
instead assent to money-in-lieu of Land for Public Purposes in relation to the
proposed subdivision.
7. That Common Council authorize the preparation and execution of one or more
City/Developer Subdivision Agreements to ensure the provision of the required
work and facilities, including any necessary temporary turnarounds and the
installation of curb and sidewalk by the developer along the west side of Gault
Road frontage of 65, 101, and 125 Gault Road (PIDs 55195671, 00403584, and
00403535). The Agreement shall incorporate the following items:
a. The Developer will be require to complete the design and construction of
the new concrete sidewalk and curb on the west side of Gault Road,
including any necessary storm sewer system upgrades, all in general
accordance with the limits indicated on Schedule 1 - Concept Plan dated
March 31, 2025.
b. The work will be split into two portions as indicated on the said Concept
Plan.
c. This work shall be completed by December 31, 2029.
d. The City would provide to the Developer a fixed and firm monetary
contribution of $170,000.00 for Area "A" and $30,000.00 for Area "B" upon
completion of the work and review and acceptance by the Chief City
Engineer or their designate for each portion of the work.
e. The design and construction of all work shall comply with the City of Saint
John General Specifications (2022) and the Storm Drainage Design
Criteria Manual (2016).
a. The rainfall intensity values used in the stormwater analysis and
drainage system design shall be obtained from future climate
change projections published by Environment and Climate Change
Canada (ECCC), using the following parameters:
i.
ii. CMIP6 data;
iii. Shared socioeconomic pathway SSP5.85;
- 3 -
iv. 2071-2100 design horizon;
v. Median values.
b. Construction of the work shall not proceed until the design has
been reviewed and accepted by the Chief City Engineer or their
designate.
f. Drainage easements in favour of the City of Saint John will be required for
any defined drainage channels through private lands conveying runoff
discharged from the public right of way.
g. Standard Developers Agreement conditions for submission of post-
construction documents shall apply to this work and will be associated
with the Phase 1A permit for Area "A" and Phase 2 permit for Area "B".
h. Following completion of construction, a letter stamped, signed, and dated
by a professional engineer shall be provided to the City certifying that the
stormwater management is in accordance with the accepted design.
EXECUTIVE SUMMARY
th
On January 13, 2025, staff presented the rezoning application to Common Council for
stnd
the public hearing where they gave 1 and 2 Reading to the rezoning. After the
completion of the application, staff reached out to the applicant to discuss the proposed
Gault Road sidewalk infrastructure. This included discussions on developing a possible
sidewalk on the east side of Gault Road and the potential for a cost sharing arrangement.
This report provides a summary of these discussions with the developer and outlines the
proposed agreement for the sidewalk construction.
PREVIOUS RESOLUTIONS
th
On December 10, 2024 staff presented the 125 Gault Road application to the Planning
Advisory Committee (PAC) for feedback and recommendation. The Committee approved
an amended Staff Recommendation with three nay votes. The amended recommendation
included the following elements:
An addition to the City/Developer Subdivision Agreement requiring the installation
of curb and sidewalk by the developer on the west side of Gault Road along the
frontage of 65, 101 and 125 Gault Road (PIDs 55195671, 00403584, and
00403535).
Additional Section 59 conditions requiring:
That access to the site for construction purposes be from Gault Road and
not through the existing Monte Cristo subdivision.
Prohibiting cannabis retail as a land use within the portion of the site zoned
General Commercial (CG).
- 4 -
City Administration are supportive of the proposed PAC amendments. As a separate
recommendation, the Committee recommended that Common Council direct City Staff to
investigate traffic calming and additional crosswalks along the section of Gault Road in
the vicinity of the development. Since the holding of the Public Hearing, staff have been
undertaking these investigations including the placement of sidewalks and the future
intersection redesign.
The Committee approved the proposed private streets and variances from the
rd
Subdivision By-Law conditional upon Common Council giving 3 Reading to the
new Public Street labelled as Mabel Cresent on the plans submitted with the application.
stnd
On January 13, 2025, Common Council gave 1 and 2 Reading to the staff
recommendation for the proposed Rezoning with four nay votes. The Section 59
rd
Conditions, as recommended by staff and PAC, are adopted after 3 Reading and are
stnd
not subject to a vote during the 1 and 2 Readings.
REPORT
At the January 13, 2025 meeting of Common Council, the rezoning application for 125
Gault Road was presented for consideration at a Public Hearing. After considering the
public feedback, Common Council voted in favour of staff recommendation regarding
the rezoning.
stnd
Section 59 Conditions are not subject to approval during 1 and 2 Reading in a
rd
rezoning application and are adopted after the completion of 3 Reading. Following the
Common Council Meeting, questions have emerged regarding PAC's recommendation
to include additional conditions associated with sidewalk construction on Gault Road.
The proposed condition was incorporated into the Common Council authorization for the
City/Developer Subdivision Agreements and pertains
install curb and sidewalk along the west side of the property at 125 Gault Road, as well
as along the frontages of 65 and 101 Gault Road (PIDs 55195671, 00403584, and
00403535). This would extend the existing pedestrian network to the intersection with
Manawagonish Road.
Infrastructure requirements are a component of land use approvals and can be
incorporated into development approvals as conditions on planning applications
including those for Rezonings and Subdivisions. These conditions are used to address
necessary upgrades to existing infrastructure or the development of new infrastructure
needed to support the proposed land use. These conditions can include financial
contributions to larger infrastructure improvements projects to be undertaken by the
City, such as redevelopment of an intersection, as well as projects which the developer
would undertake as a condition of their approvals, such as sidewalk development.
In February 2012, the Planning Advisory Committee considered a subdivision
application for this property which would have created up to 110 dwelling units. A
- 5 -
and sidewalk by the developer on the west side of Gault Road for the length of the
This condition was to improve pedestrian and cyclist safety in the area
and coincided with a similar condition requiring the developer of the Hitachi Crescent
subdivision to develop sidewalk along the east side of Gault Road. This historical
requirement underscorerequiring developer involvement in
improving pedestrian connectivity in the area to support new residential development.
Staff initiated discussions with the developer to explore the possibility of cost-sharing for
the sidewalk construction. A meeting was held to propose a collaborative solution in
which the developer would contribute funds to the City, enabling the City to carry out the
work on the eastern side of Gault Road, which would fill in the missing sidewalk
between Hitachi Crescent and Manawagonish Road.
The developer has indicated that sidewalks on the west side of Gault Road were
necessary to meet building code requirements for the proposed apartment complex.
Due to this, the developer was unwilling to negotiate a contribution towards the sidewalk
construction on the east side of Gault Road as they would still require sidewalks on a
portion of their development.
Subsequent meetings were held between the applicant and staff leading to a cost
sharing agreement for the development of the sidewalk along the west side of Gault
Road. The City shall contribute $200,000 towards the creation of the new sidewalk and
curb, as well as associated stormwater management, along the west frontage of Gault
Road in two phases. The included Gault Road Sidewalk Concept Plan March 25,
2025, outlines the proposed sidewalk location, as well as the proposed phasing of the
construction.
The developer shall be responsible for its construction. The City will release their
funding contribution to the developer after the sidewalk and associated work has been
completed and accepted by the Chief City reviewed for each of the two phases. The
developer will have until December 31, 2029 to complete this work.
In addition, the City is prioritizing the construction of a roundabout at the intersection of
Manawagonish Road and Gault Road, and the incorporation of necessary crosswalks to
connect the existing sidewalk on the east side of Gault Road with the sidewalk being
constructed as part of this development. This will ensure that the pedestrian network is
continuous and will enhance accessibility and safety for pedestrians.
In response to the results of the Traffic Impact Statement
regarding the safety of pedestrians when crossing Gault Road, the City plans to install a
crosswalk at the corner of 125 Gault Road, linking to the proposed development to the
existing sidewalk along Hitachi Crescent.
Conclusion
Staff has engaged with the developer to address the proposed sidewalk requirements
that were recommended by PAC. The developer will undertake the construction of the
- 6 -
required sidewalk, curb, and associated storm water management on the west side of
Gault Road, with a contribution of $200,000 being made by the City to cover
approximately half of the overall costs.
The City remains committed to ensuring pedestrian connectivity, especially in light of
the planned intersection improvements at Gault Road and Manawagonish Road. The
City will be installing crosswalks to ensure connections between the existing and
proposed sidewalk network which will enhance pedestrian safety.
Staff recommend that Common Council adopt the requirement for the installation of
curb and sidewalk by the developer along the west side of Gault Road frontage of 65,
101, and 125 Gault Road (PIDs 55195671, 00403584, and 00403535) which shall form
part of the City/Developer Subdivision Agreements.
STRATEGIC ALIGNMENT
and MOVE:
;
Achieve 3% annual property tax base growth and on-going work to increase the
target;
Connect neighbourhoods with safe, accessible, and integrated transportation
options.
The approach also aligns with the Municipal Plan through initiatives that target existing
neighborhoods, especially intensification areas, for opportunities to add density and
expanding housing options.
SERVICE AND FINANCIAL OUTCOMES
The holding of the public hearing and receiving advice and a recommendation from the
Planning Advisory Committee satisfies the legislative and service requirements as
mandated by the Community Planning Act.
INPUT FROM OTHER SERVICE AREAS AND STAKEHOLDERS
concurs with PAC recommendation for sidewalk.
ATTACHMENTS
Schedule 1 - Concept Plan dated March 31, 2025
BY-LAW NUMBER C.P. 111-188 ARRÊTÉ NO C.P. 111-188
A LAW TO AMEND THE ZONING BY- LAW ARRÊTÉ MODIFIANT DE
OF THE CITY OF SAINT JOHNZONAGE DE THE CITY OF SAINT JOHN
Be it enacted by The City of Saint
Lors d'une réunion du conseil
John in Common Council convened, as
communal, The City of Saint John a
follows:
décrété ce qui suit :
L'arrêté sur le zonage de The
The Zoning By-law of The City
City of Saint John, décrété le quinze (15)
of Saint John enacted on the fifteenth day of
décembre 2014, est modifié par :
December, A.D. 2014, is amended by:
1. Rezoning a parcel of land having an area of
1. Rezonage parcelle de terrain
approximately 4.4 hectares located at 125
Gault Road, also identified as a portion of hectares, située au 125 chemin
PID Number 00403535, from Low-Rise
Gault, également identifié comme
(RL) to Mid-Rise Residential (RM) une partie de NID 00403535, de
pursuant to a resolution adopted by Zone résidentielle immeubles
à Zone
Common Council under Section 59 of the
résidentielle Immeubles
Community Planning Act.
de hauteur moyenne
(RM) conformément à une résolution
adoptée par le conseil municipal en
- toutes les modifications sont
- all as shown on the plan attached
indiquées sur le plan ci-joint et font partie
hereto and forming part of this by-law.
du présent arrêté.
IN WITNESS WHEREOF The City of
EN FOI DE QUOI, The City of Saint John
Saint John has caused the Corporate
a fait apposer son sceau communal sur
Common Seal of the said City to be affixed to
le présent arrêté le X 2025, avec les
this by-law the X day of X, A.D. 2025 and
signatures suivantes :
signed by:
____________________________________________
Mayor/Maire
___________________________________________
City Clerk/Greffier communal
First Reading - January 13, 2025 Première lecture - le 13 janvier 2025
Second Reading - January 13, 2025 Deuxième lecture - le 13 janvier 2025
Third Reading - Troisième lecture -
COUNCIL NOTICE OF MOTION
Received DateMarch 31, 2025
Meeting DateApril 7, 2025
Open or ClosedOpen Session
Her Worship Mayor Donna Noade Reardon and Members of Common Council
SUBJECT: Internal Audit of Winter Management Plan
Primary AuthorInput from CouncilInput from Staff
Councillor SullivanCouncillor Norton
PROPOSED MOTION:
Council request that the finance committee add
its list of internal audits. Finance committee isasked to consider this request at their next meeting.
BACKGROUND INFORMATION:
This past meeting, council received an update on the state of our Winter Management Plan as we end the
winter of 2024/25. Concerns were expressed that despite our efforts the city would need to either change
expectations for the plowing of our streets and sidewalks or invest more money into the service.
The City of Saint John has added an internal audit service in recent years. This service has applied best-
practice techniques to investigate and recommend improvements to services both internal to the city and
supported ABC related services. Before either adjusting expectations orchanging the budget for the Winter
Management Plan we should apply this service to help identify possible opportunities that can support
improvement to the service.
STRATEGIC ALIGNMENT:
This aligns with the Council priorities of aƚǝĻ and tĻƩŅƚƩƒ
SERVICE AND FINANCIAL OUTCOMES:
Potential to improve the service without significant changes to budget
INPUT FROM OTHERS:
Greg Norton
ATTACHMENTS N/A
COUNCILREPORT
M&C No.2025-105
Report DateApril 02, 2025
Meeting DateApril 07, 2025
Service AreaUtilities and Infrastructure
Services
HerWorship Mayor Donna Noade Reardon andMembers of Council
SUBJECT:Timelines for Paving Milled Roadways under the Annual Asphalt
Resurfacing Contracts
AUTHORIZATION
Primary AuthorCommissioner/Dept. HeadChief Administrative Officer
Michael Baker Ian Fogan/Michael BakerJ. Brent McGovern
RECOMMENDATION
It is recommended that Council approve the implementation of paving timelines
andcorresponding liquidated damagesfor each streetto be resurfaced within the
Annual Asphalt Resurfacing Contracts as detailed in the Report.
EXECUTIVE SUMMARY
Staff are proposing to include prescribedasphalt paving timelines for each street
street would be included in the Contracts Particular Specifications,as this would
allow the flexibility of Staff to make adjustments to the timelinesbased on the
site-specificvariables of each street.
It is also proposed that the Asphalt Resurfacing Contracts include liquidated
damages of $2,000 per calendar day for each day, the work on an individual street
remains incomplete.The liquidateddamages would be accounted for on a per
street basis to ensure each timeline is being met.
It is expected that increased service levels will result in fewer streets being
resurfaced as part of the nnual Asphalt resurfacing program.In addition,
over time there
related to asphalt.
PREVIOUS RESOLUTION
Council Meeting 25-03-24 RESOLVED that the CAO be directed to report back to
Council with contract language that would require contractors to adhere to strict
- 2 -
Programs, to be applied once the road milling process has been started on each
street.
REPORT
Council recently requested that Staff provide a proposed plan to address paving
delays on City streets within the Annual Asphalt Resurfacing Program contracts.
An overall plan has been prepared and is being implemented within the 2025
Asphalt Resurfacing Program that is currently out to tender and is anticipated to
th
close on April 8, 2025. A second smaller asphalt resurfacing tender is currently
being prepared and expected to be tendered once bids are received and reviewed
for the first tender.
Current General Specification Requirements
Within SSpecifications there is text that
indicates HMA (Hot Mix Asphalt) resurfacing shall be completed within ten
(10) working days of completing the cold milling. The Contractor shall maintain
the site free of potholes, and in a condition providing for the safe flow of traffic
. The section goes
on to say, hould the Contractor not complete the HMA resurfacing within the
required timeline after completion of the cold milling, the City may have the work
The 10-working day (a day other than Saturday, Sunday or a statutory holiday)
timeline is noted in the current version of the General Specifications,
however there are some drawbacks to how the specification section is written
when it comes to enforcement on an Asphalt Resurfacing Contract.
The first issue is the 10-working days requirement is a one size fits all philosophy.
There are many variables that need to be considered when determining a
reasonable time frame for a Contractor to complete the asphalt paving work on a
street. Some of the variables that need to be considered when determining
reasonable timeframes for resurfacing a street are noted below:
the length of roadway being resurfaced;
the number of structure adjustments that are necessary;
any underground infrastructure repairs that need to be completed before
paving, and
is curb and sidewalk being installed or renewed.
Considering these variables Staff looked at contract language that could be added
to the Particular Specifications for the Asphalt Resurfacing Contract.
When preparing the Contract documents, Staff would review each street and
provide an estimated timeline for when the Contractor should have each street
resurfaced. Considerations as noted above would be reviewed for each individual
- 3 -
street. Generally, it is expected there would be common themes that would arise
from this review which would result in many of the streets having similar timelines
for milling and resurfacing. It is expected that the minimum timeline for standard
street resurfacing from the start of milling a street to the time it would be
resurfaced would be 16 calendar days. These would be streets that do not have a
lot of structures that need to be adjusted, no underground repairs required as well
as no curb and sidewalk to be installed.
As expected, the roadways that require a lot of structure adjustments or new
concrete curb and sidewalk to be installed would have an increased amount of
calendar days between the start of milling the street and asphalt paving being
completed. It is expected that a timeline for streets that fit in this category would
be between 23 and 30 calendar days.
Specifications as the timelines are project specific and should be included in the
Particular Specifications of each contract. This is recommended so that
adjustments to timelines can be made for site specific variables to ensure the
timelines proposed are realistic. For each contract, Staff would monitor how the
Contractor is doing in terms of meeting the timelines. Future contracts may have
their timelines adjusted based on past experience on the Asphalt Resurfacing
Contracts.
Having a timeline for each street that will be resurfaced will allow Staff to be more
accurate when informing the public when they should expect certain streets to be
resurfaced. An example of this would be if milling started on a roadway with
limited structure adjustments and no curb and sidewalk renewal, a citizen could
expect that the asphalt resurfacing would be completed within the next 16
calendar days.
It should be noted, however, that in some cases things happen during construction
that are unexpected and that results in a change of plan. Examples of this would
be infrastructure failure during milling operations, the scope of infrastructure
renewal increased and poor weather. These would mainly be items that arise
If delays are
experienced due to issues that arise that are beyond the Contractors control
additional calendar days may need to be added to the paving timeline at the
approval and discretion. For example, if bad weather causes delays, the
Contractor would need to request an extension and provide evidence to the
Engineer on why work could not be completed. If the Engineer agrees that the
delay was due to circumstances beyond the contractor's control (such as bad
weather), the schedule may be adjusted. However, there would be no automatic
extension of the schedule for delays due to weather unless explicitly granted by
the Engineer in writing, recognizing that some contract work may or may not be
affected by bad weather.
- 4 -
The second issue with the 10-working days requirement in the General
Specifications is there are no ramifications to the Contractor for missing the 10-
working day timeline except for the City taking the extraordinary step of having
the work completed by others This would result in
significant contractual issues between the City and the Contractor and likely
possible legal action.
To address the ramifications of not meeting the specified paving timeline in the
Asphalt Resurfacing Contracts, Staff are proposing $2,000 per day liquidated
damages for each calendar day, the work on an individual street remains
incomplete. These liquidated damages would be on top of the $1,000 per
calendar date noted in the General Specifications for late substantial completion
of the overall contract as a whole.
The $2,000 per calendar day liquidated damages is intended to be the pre-
estimate of the damages caused by the delay and extra expense to the City. The
expectation is that by having these liquidated damages cost per calendar day, it
will hold the Contractor accountable to timelines noted in each Asphalt
Resurfacing Contract as there will be financial ramifications to not completing the
work as per the terms of the Contract. These liquidated damages costs would be
deducted from the Contract progress payments as the project progresses so
that the damages are addressed in a timely manner and not just at the end of the
Contract.
Milling of Existing Asphalt Concrete
current General Specifications it indicates if a transverse vertical
joint is milled in the existing pavement to allow for transition between new and
old pavement, the Contractor shall promptly construct a temporary smooth ramp
with Hot Mix asphalt to a slope of 25:1. The cost of the Contractor completing this
is considered incidental to the work.
During the mass milling process
transition from full depth milling up to nothing over a distance to ensure it is
gradual slope for vehicle travelling over it. However, it should be noted that a
Contractor will need to mill a vertical edge just prior to paving which will result in
traffic needing to travel over the 40mm bump between the milled surface and the
existing asphalt. The intent would be to limit this time as much as possible before
the street is paved. Staff will be working with the successful Contractor of the 2025
Asphalt Resurfacing program to ensure this section of the General Specifications
is followed on all City streets being resurfaced in 2025.
STRATEGIC ALIGNMENT
This report aligns with Councils Priorities as adding these new milling and paving
timelines and liquidated damages to the Annual Asphalt Resurfacing Program
Contracts attempts to balance getting much needed construction work completed
- 5 -
in a timely manner but also attempting to limit the difficulties this construction
causes on the residents and businesses around the City.
SERVICE AND FINANCIAL OUTCOMES
It is expected that including these parameters as noted in the report into Asphalt
Resurfacing Program Contracts it will improve service delivery to residents and
businesses in the area of the resurfacing as time frames will start once the
Contractor begins milling a street. These parameters will also incentivize
Contractors to complete their City work before moving onto other projects they
may have for other jurisdictions.
It is expected that implementing timelines for milling and paving streets along with
liquidated damages when streets are not resurfaced on time will result in higher
costs for the City therefore impacting the number of streets that can be resurfaced
on an annual basis. Without corresponding increases to capital budgets related to
asphalt resurfacing, it is expected that over time less streets will be resurfaced,
more streets will deterioratePavement Condition Index (PCI) will
decrease infrastructure deficit related to asphalt will
increase.
At this point in time, it is unknown what the expected increase in costs will be as
Staff has no data available on these new measures. As noted above these timeline
and liquidated damages parameters are included within the 2025 Asphalt
Resurfacing Program Contact. Once Staff receive the bid(s) for this tender they will
be able to compare costs from this bids versus previous years bids. Any
increase will not be solely related to the adding timeline parameters as there may
be many variables on why prices may increase (i.e. inflation) however it will
provide Staff and Council with useful information for analysis so that Staff can
attempt to balance additional requirements with added cost.
Adding more requirements to Capital contracts typically increases the price that
the City receives from Contractors as it limits their flexibility when managing a
project. There is a delicate balance between allowing the Contractor to have as
much flexibility as possible, but also holding them accountable for project
deliverables and timelines. expectation is by following the plan noted above
it will achieve this balance. Council should also be aware that some Contractors
that have sub-contractors doing some of the work within the Asphalt Resurfacing
Contracts will have more challenges meeting the timelines as they are relying on
sub-contractors which they do not have sole control over. Contractors that can do
all the work within the prescribed scope of the Asphalt Resurfacing Contract will
be able to control schedules easier as it is all their resources doing the work.
INPUT FROM OTHER SERVICE AREAS AND STAKEHOLDERS
Couwas included
in Division 3 of the 2025 Asphalt Resurfacing Contract currently out to tender.
ATTACHMENT
͵
/haahb/h b/L\[w9thw
M&CNo.2025-101
Report DateMarch 31, 2025
MeetingDateApril 07, 2025
ServiceAreaSaint John Water
HerWorshipMayorDonnaNoadeReardonandCommonCouncil
SUBJECT:2024-2034UtilityFund Long Term Financial Plan
AUTHORIZATION
Primary AuthorCommissioner/Dept. Chief Administration Chair of Finance
HeadOfficer Committee
Craig LavigneIan Fogan J. Brent McGovernGary Sullivan
RECOMMENDATION
Beitresolvedthat:
Utility Fund (Saint John Water)2024-2034Long-
Financial Policies, FAS 005 -Capital
Budget Policy and FAS 006
EXECUTIVESUMMARY
The 10-year Long Term Financial Plan for Saint John Wateraddresses the key
financial opportunities and challenges facing the water utility.
The Finance Committee has provided oversight intothe strategy contained in the
LTFP, with the Committee providing direction with respect to:
GuidingPrinciples
FinancialStrategy&Policy
BaseGrowth &Alternative GrowthScenarios
FinancialTargets
- 2 -
The strategy within the Financial Plan is designed to achieve the objectives
-year strategic plan. The Finance
Committee have endorsed the 2024-2034 Long Term Financial Plan
and the Finance Committee recommends Common Council approve the plan.
PREVIOUS RESOLUTION
CźƓğƓĭĻ /ƚƒƒźƷƷĻĻ bƚǝĻƒĬĻƩ ЊБͲ ЋЉЋЍ
Term Financial Plan
CźƓğƓĭĻ /ƚƒƒźƷƷĻĻ ağƩĭŷ ЊВͲ ЋЉЋЎ
Recommend that Finance Committee app Long Term Financial
Plan and forward to Common Council for approval
Finance Committee approve Financial Policies FAS 005 Capital
Budget Policy and FAS 006
STRATEGIC ALIGNMENT
This initiative aligns with the Council priorities of t9wChwa by ensuring the City is
accountable for results in delivering public services by adhering to its plans,
policies, procedures, and best practices.
REPORT
Saint John Water Long-is the first comprehensive
long term financial plan in the water uhistory. The plan endorsed by the
Finance Committee puts in place a financial strategy that addressed the key
financial challenges faced by the utility.
The 10-year LTFP is intended to be a financial road map for ratepayers. Saint John
Water is faced with high debt load, a significant infrastructure deficit,
infrastructure pressure related to growth and rate pressures due to the fact rates
have not increased since 2019.
Financial Principles for Saint John Water consider the need to be Sustainable,
increase Flexibility, decrease Vulnerability and consider Environmental issues.
Considerations built into the plan include affordability for rate payers, debt
targets, addressing critical infrastructure needs and promoting growth. The plan
also sets out targets for the implementation of Universal metering for all rate
payers.
- 3 -
The LTFP includes guiding principles, a comprehensive financial assessment of the
challenges and opportunities, a suite of best practice financial policies,
and the establishment of long-term financial targets. The LTFP is a roadmap to
achieve financial sustainability, financial flexibility, and lower financial
vulnerability.
Rooted in best practices, the suite of Council approved Financial Policies
performance. This includes policies previously approved and two amended
policies to be approved:
1. FAS-001 Asset Management Policy
2. FAS-003 Reserves Policy
3. FAS-004 Operating Budget Policy
4. FAS-005 Capital Budget Policy (Amended to be approved by Common Council)
5. FAS-006 Debt Management Policy (Amended to be approved by Common Council)
6. FAS-020 Long Term Financial Plan Policy
7. FAS-021 Budget Monitoring Policy
SERVICE AND FINANCIAL OUTCOMES
This plan will set out the financial roadmap for Council, ratepayers and staff.
INPUT FROM OTHER SERVICE AREAS AND STAKEHOLDERS
Input into this plan has been received from the Finance Committee and staff members.
ATTACHMENTS
Appendix 1 Saint John Water Long Term Financial Plan 2024-2034
Appendix 2 - Long Term Financial Plan Utility Fund Presentation November 18, 2024
Appendix 3 - Long Term Financial Plan Utility Fund Presentation March 19, 2025
Appendix 4 - FAS 005 Capital Budget Policy
Appendix 5 - FAS 006 Debt Management Policy
-
.
.
Asset
4
residential
. The study
s
, the
see
during the ohn Water Long
J
the feasibility study Financial Plan
is
.
Saint
based charge
-
Ten Year
4
, the
’s
Pathway to Net Zero
, rate structure and affordability
:
203
s
-
etering. This project would
4
ActSJ
m
Strategic Plan
including:
, year
202
-
major transformational action
niversal
10
u
aligns with
and Common Council’s Priorities. The Plan also uses
cost component
to
by the City of Saint John
from a flat rate to consumption
for links to Associated City Plans
ut
B
Policy
moving
the move
Large infrastructure deficitRate affordability and billing structureSize and geography of the system
Financial modelling for the plan was conducted by Hemson Consulting.
1.2.3.
It should be noted that aregardingcustomers would also addressSeveral challenges or obstacles have been considered development of this plan Alignment with other City Plans In addition
to the City’s Term Financial PlanManagement policies as set o See Appendix Note:
.
s
all
–
”for
tility
u
Common Council
potable (drinking)
,
for
for the next ten years. It
ustainable
s“Strengthen the
“
:
universal metering
| TEN YEAR FINANCIAL PLAN
is a living document created
Utility
activities
he
t
regarding
year Strategic Plan
for
-
”
10
’s
sets out the following actions:
capital budget to support strategic infrastructure
lots.
.
s
d
meet the present and future economic, social needs of today’s
City of Saint John
he Utility’s financial and operating
includes a discussion and analysis of the financial environment,
t
and defines financial strategies and targets
Structure theinvestmentSeek external funding for future utility infrastructure investmentUndertake a feasibility study residential customers.Seek legislative changes to implement a water
service levy on vacant and service
, year Strategic Plan
service and infrastructure.
-SAINT JOHN WATER
10
Saint John Water Long Term Financial Plan
s part of the
About this Plan The to guide will ensure that Saint John Water operates as a meaning it will ratepayers without compromising the ability of future generations to meet their own needs.This
planidentifies challenges and opportunities, details financial principles and policieswater and wastewater services.Financial Principles The City of Saint John Finance Committee has
adopted four financial principles to guide the plan: long term sustainability, increased flexibility, reduced vulnerability, and environmental responsibility.Common Council’s Goals
for the Plan Aidentified the following objective competitiveness of the water utility in comparison to municipalities with similar The
-
has
he debt
its
7
associated with
s
However, t
.
4
the operating budget is
and the balance for longbeen additional funding
in the overall sewerage
,
also
due to cost
.
lines
4
)
focus on debt reduction
through
has
very little reduction in
ly $6 million per lane kilometer.
e
the
million
tility with approximately 19,100
203
u
-
. There
and support efforts to drive fiscal
4
,
Project. There has been a focus on debt for the year ending 202
achieving
annually
of combined sewer
202
of government over the last several years, but even
million
s
m
k
75
millionhe Utility is
t
5
eficit.
large infrastructure deficit being funded strictly from the
d
2,875,000
6
timated to be approximat
$
a key growth centre for the City
the
(with no additional borrowing since 2017
,
combined terra cotta sewers dating back to 1872 in the Central
he Utility’s debt was over $107
from other level
t
ing
that funding
Safe Clean Drinking Water
nfrastructure
The City has some of the oldest wastewater infrastructure in the country, includPeninsulaThe City of Saint John has a critical need to upgrade wastewater infrastructure in order to improve
environmental performance, increase wastewater and storm capacitysustainability and tax base growth. With approximately system, renewal of this system to optimize environmental performance
and growth opportunities would not be feasible without funding assistance from the federal and provincial governments. The cost of replacing combined sewers is es 4. Long Term Debt
In 2017 the reductionterm debt is balance is a significant burden for a customers.The challenge with the high debt and resulted inoperating budget. The capital being funded approximately
$5.securedwith i
,
it is
into
,
million
in order
assets is 5
The City’s
($1
-
however
re sustainable
;
the urban core
current funding
in. An infrastructure
per year versus $21
in Saint John has an
available.
With
per year is required to
As Canada’s first
infrastructure deficit
eport was prepared in
eport
.
r
s
condition
| TEN YEAR FINANCIAL PLAN
Saint John Water
se areas mo
money
thousand
o
building
Fair
million
(SOTI)
of funding
to
deficit will not improve.
at
value of
$370
which target density
was the SOTI r
,
apartment
repairs, and the
Very Good
assets
unit
million gap in achieving sustainable funding.
-
he Infrastructure
its
5
and
t replacement
annual investments in infrastructure.
83(in 2024 dollars)
f poor to very poor condition.
$2
o
can handle any new growth in residential units.
-
in
million per year, th
are
million
development.
Utility’s 5
assets are in
%
1
estimated 35
-
the City
for
10
2024 State
% of
2024
that 80
in new water and sewerage revenue. This also doesn’t take
,
the City’s growth objectives
the millions of dollars in infrastructure that the Utility needs
SAINT JOHN WATER
The
billion.
)
.
extensive evaluation of
Large Infrastructure Deficit
01
.
4.
Without additional large commercial customers, particularly those that use water in manufacturing, any amount of new revenue generated is small compared to the For example, a newly built
estimated annual property tax revenue of $230thousandaccountto ensure 3 Infrastructure is the facilities, equipment and systems needed to collect, store treat and deliver water and
wastewater serviceincorporated city, the City of Saint John has a legacy of aging infrastructure. A strategic approach is needed to optimize City assets, improve environmental performance
and drive growth. Outdated infrastructure is a barrier to realizing and priority suburban growth areas to make thand attractive Saint John Water is currently facing a based on the deficit
is essentially the difference between the funding required for replacement, maintenance first 2019$Generallyestimated that 11available of $Approximately $achieve sustainability. Compared
to the current funding of $10per year, there is a $20
.
a
8
annual basis
-
and increased costs
water consumption.
4
regardless of the amount of water
their
203
-
including maintenance, electricity and
,
4
is the same
202
billed according to
are
residential customers have their water meters read every
-
non
rate structure, the total bill
Flat Rate Billing
.
6 Currently, residential customers with fewer than three dwelling units in Saint John are charged for water and sewer services on a flat rate basis. Under flat consumed in each unit.
Flat rate water bills are sent on a semiIn contrast, two months and Flat rate billing often results in excess water useassociated with water treatmentchemicals.
,
.
)
of
and
.
of
km²
5
etering
.4 km
no dams
m5
it is critical
130.7
,
(
niversal
size and cost
u
orcemain, 7
Fredericton has 3
FrederictonFredericton has
of f
.
| TEN YEAR FINANCIAL PLAN
limited fundingwhile
,The Utility is endeavouring to
ed by two treatment plants
..
wastewater treatment plants.
and
, 50.4 km cost and environmental
the size of
sewer
stations
funding
that of Fredericton and Moncton
than the infrastructure in those other
and is serv
sewer
torm
difference means the s
such
address
Saint John is geographically a much larger city
is double of
. ) large volume
to
2
That
anitary
.
)
of s
without
km²
325.2 km
dams and one treatment plant
315.96 km
(
wastewater pumping
significantly larger
and
.
2
141.2 nfrastructure
I
(
14 dams in its system315.5 km
13
and Moncton have one wastewater treatment plant each.
ewer
achievable
inability to borrow more money
s
combined sewers
Saint John
the
SAINT JOHN WATER
comparing Saint John to other cities like Fredericton and Moncton
he Utility continue to seek and secure funding from other levels of
he infrastructure in Saint John is significantly larger, older, and much
t
Size of the System
ombined
Due tothat government. Major transformational initiatives such as will not be 5. Whencritics generally focus on ratesand tmore costly to operate and maintain cities. In fact, and
Monctoninfrastructure is Wastewater Treatment Saint John currently has three Fredericton Saint John has 7Moncton has Drinking Water Treatment Saint John hasMoncton has threeand one
water treatment plant. Underground Saint John has cseparateconsiderations.
11
4
203
-
4
202
..
-
)
s
).
will
can
rate
first
s
leaks
)
rather s
(
starting
2%metering
,
as it
ratepayers
”
the
ending on the
etering
to meter rates by
m
helps detect
to cost savings and
water consumption
two percent (ing
lifeline rate
“
niversal
a
water.
lead
u | TEN YEAR FINANCIAL PLAN
time
-–
on water consumption
d
base
dential customers
a 30% reduction in
. A reduction in water consumption
he Utility to implement changes within it
t
and distribute
is a discounted rate to ensure ratepayer
the same amount regardless of consumption
determine rates for the universal metering
identifies
etering will allow better distribution of costs
pay
the implementation of
services, regardless of how much they use.block
for most resi
to treat
m
key strategys
Zero
-
for the implementation of
That means all flat rate billing customers pay the same
promotes responsible water usage,
rate
s
, as charges will be
-
the financial challenges being faced by many
cost
would be determined at that time of the next study.
of a few municipalities in the country that still uses a flat
,
first
e
For context, the net additional revenue needed to carry out niversal
with
u
, and optimizes water distribution
plan callall ratepayers
etering will also allow The
(
conservation.
transformational project will require at least 50% funding from
m
ratepayers
reduced
is
Pathway to Net
their basic water needs at a rate that is deemed to be affordable
Th
SAINT JOHN WATER
:
having
Utility’s
Universal Metering Saint John is onrate billing structure.amount for their water The in 2028, with conversion 2031. other sources. the metering program would be equal to a oneincrease
under the existing rate structure scenario. However, as program will impact different user groups and customers pindividual volume of water consumed, the true rate impacts, with the
additional costsThe move to between than Universal rates to assist The Utility will investigate rate block. meetA study will begin in 2026 to program.Water metering alsomore quicklyimproved
ActSJ per capita by 2040 as a result in
term debt
-
14
he Utility remains in
T
The Debt Management
003)
-was created. This policy
he Utility Fund
5% of the Operating Budget
T
1
the money to cover said
Operating budget after 2026 003)
s
4
-
(FAS
rating or maintenance costs. The
ay
d
203
nd ope
-
n order to ensure
I
4
ainy
r
006)
-
never to fu
202
–
The following are stipulations.
(FAS
sets out the acceptable conditions for the use of debt in
oney for a
m
isely
006)
-
w
The Debt Service Ratio shall not exceed Debt shall not exceed 100% of the
Borrow While it would be great to be able to pay cash for everything, the reality is that at some point or another debt will become a fact of life, especially when it comes to large
ticket items such as houses or cars. Policy (FAS addition to debt limits, targets and capacity. It stipulates that longwill only be issued to finance projects approved in the Capital
Budget and the Capital Investment Plan other key limits and targets are as follows:Key Performance Indicators of Debt Limits of Debt Service Ratio:Total Debt Outstanding as a Percentage
of Operating Budget:Save your Everyone knows that surprises happen. There will always be unforeseen expenses that will come up and sometimeexpenses will not be available. compliance
with the Debt Management and Operating Budget policies, an Operating and Capital Reserves Policy (FAS allows the Utility to set aside money to use for future operating expenses and
capital expenditures.
4)
ustainable
s
00
-
ouncil to help
be directed to
C
was established to
(FAS
004)
ake-
inancial vulnerability. It is
| TEN YEAR FINANCIAL PLAN
m
expenditure
It will also ensure that Council’s
key financial values:
six
term financial plan is to have a road map to
-
oney than you
a long
m
the ability to meet the present and future economic
s by applying
ore
ensure that Saint John Water operates as a “
m
developing
goal
The Operating Budget Policy (FAS
time revenues should only be used for onetime expenses
-
ese
he Utility are met.
oney will go to funding their minimum payments. That is why it is
t
pend
a defined set of goals.
Maintain a structurally balanced budget: Recurring operating expenses should be covered by recurring operating revenuesOperating revenues above required operating and capital reservesOne
s
, meaning it has
”
SAINT JOHN WATER
social needs of today’s ratepayers without compromising the ability of
tility
Policies The purpose of achieveThis road map willuandfuture generations to meet their own needs.goals for A number of best practice policies have been adopted by achieve th Don’t If
every year a person uses credit cards to pay for things that they need, but can’t afford, they will dig themselves a financial hole that will be very difficult to get out of. Every
year, their debt levels will get higher and a larger portion of their mimportant to only spend the money you have made, thereby living within your means. strengthen financial sustainability
and reduce fsummarized as follows:
15
urniture
f
renewal and 10% for new
4
021)
-
personnel budgets are managed
is a policy that enhances accuracy,
-
of the City advises that the capital
203
021)
(FAS
--
005)
-4
responsibility and asset management.
policy. The policy enhances fiscal responsibility
202
the
efore you buy new living room
b
oof
r
MandatoryRiskPriority of CouncilPositive Financial ImpactDiscretionary
005)
-
Capital Budget Policy (FAS
Budget Monitoring Policy (FAS
Fix the (FAS The budget for the Utility shall comprise of 90% capital capital. It also prescribes the priority in which capital money is spent each year, specifying that capital projects
will be completed in the following order:This means that given the limited available money to spend, the leaky roof will need to be replaced before new living room furniture can be
purchased. The Capital budget policy follows four key principles and strategies: affordability, ownership, fiscal Keep track of your money The accountability, and control by ensuring
budget allocations are managed and adhered to according to and financial flexibility by integrating budget monitoring practices with the Utility’s reserve fund and debt management strategies.
The policy ensures personnel and nonseparately, annual operating revenues and expenditures match forecasts, financial controls to ensure resources are funded and spent in a fiscally
prudent manner.
Asset
001)
-
| TEN YEAR FINANCIAL PLAN
(FAS
roperty
p
was created. The specific objectives of the
s
001)
-
iabilities
apital renewal
l
are of your
c
c
time operating expenses which are greater than $100,000 that
-
ood
Major unanticipated eventsMajor Future Oneare not part of the operating budgetInfrastructure deficitInvestment growth opportunities Improve the reliability of customer service by maintaining
clearly defined levels of service by maintain assets in good conditionImprove the decisions related to the management of the Utility’s assetsImprove the transparency and accountability
of community investments in the management of the Utility’s assets.Improve the management of the Utility’s exposure to risks of reduced service deliveryFacilitate the leveraging of
partnerships and infrastructure funding from external sources.
g
SAINT JOHN WATER
Reserves are meant to provide for:Take When you own a car, you know that routine maintenance such as changing the oil and rotating the tires will help extend the life of your vehicle
as well as minimize the operating expenses in the long run. Also, once the car gets old, there is an optimal time to replace it before the maintenance charges become too high. City
assets are very similar and for that reason, an Management Policy (FAS Asset Management Policy are to:
and
billable
18
inch
15,700
density residential)
-
year Strategic Plan
-
.
are less than 1
ohn 10
J
4
per year in potable consumption
3
Saint John
from 2024 to 2029
of meters
203
-
Growth Scenario
Industrial, Commercial, Institutional
4
oped using the current state of the Utility
l
currently has approximately
2.2 million m
-
pay a flat fixed charge (low
378/year
202
About 65%
that
$
o
based on growth in
users
Household
unit metered accounts are billed based on meter size
industrial customers
-
dditional 2.1
Saint John WaterwaterAn additional 3,300multiAn afrom 25 new residential customers per yearGrowth in line with City of Saint Billable residential fixed connections to increase by 2.14%
or an average of
d two scenarios
Growth Assumptions Over the Planning Period Modeling for the plan was devean Current State of the UtilityConservative Alternate Household Growth Scenario
Year Asset
-
debt considered in the
| TEN YEAR FINANCIAL PLAN
per annum (2024) for 20
and wastewater
)
s 2024 budget and adjusted to account for the
’
5 million
potable
operating costs
drinking (
I Report = $3
T
Based on the Cityeffects of inflation Annual debt payments (existing and projected)Only calculationsPension expenses come offline in Q1 2028 Post 2024 is based on a similar level of
activity to 2024 plus inflation.SONeeds for potable system.
Full recovery of Full recovery of annual capital needs Contribution to Reserve for future Asset Replacement
SAINT JOHN WATER
1.2.3.
Full Cost Recovery Approach
ebt
d
19
ost to
c
10% of Operating
--
4
203
-
4
202
onservative growth scenario
c
(Hemson)
ervice
Figure 1: s
is
%
0
7
($146
is
growth
2
203
2034
-
. -
% ($54 million)
focuses on
1
Utility
Plan
he
t
| TEN YEAR FINANCIAL PLAN
General Fund
conservative household
the
Term Financial
ture renewal from 2024
-
to Debt Service
extreme risk assets is 1
reserves and pay as you go
2032 Long
-
023
of funding from other levels of government)
etering implementation to start by 2028
m
funded by the Utility)
that are credible and attainable for
million
10% of Operating Cost
:
42
% future infrastructure requirements funded by the Utility
John Water 2
:
25 new residential customers per yearAdditional revenues over expenditure requirements directed to operating and capital Inflation of goods and services of 2.30% in 2024, then 2.15%
annuallyFlat rate to remain stable at $1,428 per year until 2026. There will be gradual increases of 1% to 2% per year until new billing structure introducedWage and benefits to align
with Infrastructure deficit to remain stable during term of planUniversal Universal metering project assumes 50% funding from other sources 30millionUnfunded share of remainingUnfunded
share of all infrastruc($3
SAINT JOHN WATER
Saint
Conservative Household Growth Scenario Assumption Theopportunities The following has been assumed within the scenario
20
4
203
-
4
202
ncludes potable water and
rate revenues include: fire
i
| TEN YEAR FINANCIAL PLAN
-
Non
10% of Operating cost to debt service. (Hemson)
--
This forecast
Growth Scenario
xcludes industrial water.
It e
year conservative forecast meets all of the financial targets.
-
SAINT JOHN WATER
Figure 2: conservative growth scenario
Conservative Household The 10Specifically, the budget is balanced, the total debt load has been reduced, and infrastructure deficit is maintained. wastewater. protection levy, carryover
surplus, etc.
21
10% of Operating cost to debt
4
--
203
-
4
growth scenario
202
alternative
:
3
Figure service (Hemson)
%
80
63
19.5
2
% ($
directed to 203
2034 is
4
City of Saint -
-
the
| TEN YEAR FINANCIAL PLAN
General Fund
the
rowth in line with
g
to Debt Service
:
etering implementation to start by 2028
etering project assumes 50% funding from other sources
m
m
million of funding from other levels of government)
10% of Operating Cost
new residential customers per year
% future infrastructure requirements funded by the Utility ($1
308
year Strategic Plan
378Additional revenues over expenditure requirements operating and capital reserves and pay as you goInflation of goods and services of 2.30% in 2024, then 2.15% annuallyFlat rate to
remain stable at $1,428 per year until 2026. There will be gradual increases of 1% to 2% per year until new billing structure is introducedWage and benefits to align with Infrastructure
deficit to remain stable during term of planUniversal Universal 37million funded by the Utility)Unfunded share of remaining extreme risk assets is million)Unfunded share of all infrastructure
renewal from 2024($
-
SAINT JOHN WATER
Alternative Growth Scenario Case Assumption: The following has been assumed withJohn 10
22
4
203
-
4
202
| TEN YEAR FINANCIAL PLAN
10% of Operating cost to debt service (Hemson)
--
ncludes potable water and wastewater. It
rate revenues include: fire protection levy,
-
meets all of the financial targets. Specifically,
Non
growth scenario
alternative
:
4
year alternate forecast
-
SAINT JOHN WATER
Figure
Alternative Growth Scenario Case The 10the budget is balanced, the total debt load has been reduced, and unfunded infrastructure deficit declines. It iexcludes industrial water. carryover
surplus, etc.
27
4
203
-
4
202
Treatment
Facility
Wastewater
Treatment
Facility
City
Millidgeville
he
t
Length
Manholes
Greenwood
Facility,
Treatment
Sewer
Length
Facility,
Length
Combined
Throughout
Length
&
Basins
Sewer
Treatment
SewerForcemain
Wastewater
Sewers
Stations
Catch
Treatment
SanitaryII
Lift
SanitarySanitaryCombinedStorm
Both
Lancaster
Wastewater
Heights
Manholes& Type
| TEN YEAR FINANCIAL PLAN
I
WideWideWideWide
Description CityCityCityIncludesWastewaterEasternFacility,Morna Description CityStormType
Inventory
kmkm
kmkm
32
Assets
72
854651119473
49.975.4
Statistics 318.3 Statistics 329.8
Infrastructure
Assets
(Low
(High
System
Length
Facilities
Facilities
System
Combined)
Sewer
&
Length
Stations
SAINT JOHN WATER
Length
Length
LiftTreatment
Wastewater Treatment Storm
Sewer
(Sanitary
Saint John Water
SewerForcemain
SewersManholes
Basins
Asset
Primary SanitarySanitaryCombinedManholesWastewaterWastewaterVolume)WastewaterVolume) Primary Asset StormStormCatch
28
plan includes a
n
a
l
P
l, the
a
i
c
n
a 4
n
i
F
m
203
r
e
-
T
-
4
g
n
o
L
202
n
h
o
strong fiscal management.
J
t
n
i
a
a suite of best practice financial policies, the establishment of
S
f
o
y
t
i
term financial targets, and a financial health scorecard that measures
C
-
e
dopted by Common Council in December 2019
h
T Acomprehensive financial assessment of the City’s challenges and opportunities,longresults and ensures
-
Grow, Green,
ActSJ Pathway to
–
term.
veloped to align with 001) was adopted by
Priorities
e-
2026
-
| TEN YEAR FINANCIAL PLAN
term Financial Plan, PlanSJ, and
-
n shall adopt and apply recognized
the climate crisis and its commitment to
were developed through several workshop
term Financial Plan was d
-
er Long
t
zero emissions in the city by 2050.
-
ences the following City plans.
r
SAINT JOHN WATER
Zero, is the City’s response to
-
year Strategic Plan
-
Appendix B: Associated City Plans and The Saint John Waand refe 10 This plan serves as a management tool to improve the City’s performance and align with existing plans, including the
LongMoveSJ.ActSJ The City of Saint John's Community Energy Action Plan Nettransition to net City of Saint John Asset Management Policy The City of Saint John Asset Management Policy
(FASCommon Council in 2018. It confirms support for implementing asset management practices to ensure sustainable delivery of services, with the following statement: The City of Saint
Johasset management practices in support of delivering services to its customers reflecting the vision presented in the City' s Municipal Plan, PlanSJ, and related strategic plans.Council
Priorities Saint John Common Council priorities for 2021Belong, Move, and Performsettings using input from an online public survey and guided by several municipal strategic plans including
Plan SJ, Play SJ, Move SJ, and the Longterm Financial Plan.
29
4
203
-
4
202
fter
A
2034)
-
(2024
| TEN YEAR FINANCIAL PLAN
metered Customers
-
Rate for Non
Flat
:
C
SAINT JOHN WATER
AppendixUniversal Metering Program Implementation
30
4
203
-
4
202
Planning Period
| TEN YEAR FINANCIAL PLAN
Financial Forecast over the
:
D
SAINT JOHN WATER
Appendix
City of Saint John
Capital Budget Policy
Title: Capital Budget Policy
Subject: Capital Budget Policy Category: Finance and Administrative Services
Policy No.: FAS- 005 M&C Report No.: 2022-279
Effective Date: September 6, 2022 Next Review Date: 2023
Area(s) this policy applies to: Cross Corporate Office Responsible for review of this Policy:
Finance and Administrative Services
Related Instruments: Policy Sponsors:
Chief Financial Officer
FAS-001 Asset Management Policy
FAS-002 Investment Management Policy
FAS-003 Reserves Policy
FAS-004 Operating Budget Policy
FAS-006 Debt Management Policy
Document Pages:
This document consists of 7 pages.
Revision History:
Common Clerk's Annotation for Official Record
Date of Passage of Current Framework: September 6, 2022
I certify that this Policy was adopted by Common Council as indicated
above.
________________________ September 13, 2022
Common Clerk Date
Date Created: Date Updated: Common Council Approval Contact:
12-March-2025 Strategic Services
1
City of Saint John
Capital Budget Policy
TABLE OF CONTENTS
1. POLICY STATEMENT ........................................................................................................ 3
2. PRINCIPALS AND STRATEGIES ......................................................................................... 3
3. CAPITAL PRIORITIZATION ................................................................................................ 4
4. CARRY OVER OF PREVIOUS YEAR APPROVED CAPITAL BUDGET .................................... 5
5. INTER-GOVERNMENTAL CAPITAL GRANTS ..................................................................... 5
6. CAPITAL BUDGET SHORTFALLS AND SURPLUSES ........................................................... 5
7. APPENDIX GROWTH RELATED INVESTMENTS COST SHARING FORMULA ......... 5
2
City of Saint John
Capital Budget Policy
1. POLICY STATEMENT
1.1. This Policy applies to budgeting by the Municipality for capital funds.
1.2. Each council shall adopt a Capital Budget for each calendar year.
1.3. Capital budget shall align with the Council approved Long Term Financial Plan which
includes a 5 Year Capital Investment Plan and a 10 Year Debt Plan.
1.4. Finance Committee will review the 5-year Capital Investment Plan Annually and
recommend any major amendments to the Plan to Council for approval.
1.5. The Capital Budget Policy supports the City to achieve its current and future goals in
a fiscally responsible and sustainable manner.
1.6. Capital Budget Investment decisions shall be evidence based and conform with the
Asset Management Policy.
1.7. The Capital Budget Policy shall comply with all relevant provisions of the Local
Governance Act and all other applicable legislation.
2. PRINCIPALS AND STRATEGIES
2.1 Affordability - Capital Budget shall reflect the level of infrastructure investment
required to achieve agreed upon service and taxation objectives in the Council
approved Long Term Financial Plan.
2.2 Ownership - Only City owned assets, which meet the definition of asset pursuant to
Generally Accepted Accounting Principles, shall be funded in the Capital Budget.
Funding agreements prior to the approved Capital Budget Policy Council approval
date are exempted from the policy.
2.3 Fiscal Responsibility - The City shall reduce its reliance on debt and address the
infrastructure deficit by increasingly funding Reserves and Pay-As-You-Go to fund
infrastructure renewal.
2.4 Asset Management - The Capital Budget shall consider the full life-cycle cost based
on asset management best practices and adhere to the Asset Management Policy.
3
City of Saint John
Capital Budget Policy
3. CAPITAL PRIORITIZATION
3.1 To strategically manage the City's debt and infrastructure deficit, the General Fund
Capital Budget shall comprise of 80% Capital Renewal and 20% for New Capital and
shall align with the City's Long Term Financial Plan and the City's Strategic Plan. The
Utility Fund shall comprise of 90% Capital Renewal and 10% for New Capital.
3.2 For the purpose of this policy, Capital Renewal is defined as assets that are at the
end of its useful life and contribute to the City's infrastructure deficit.
3.3 As a pre-requisite to share Capital Investments between the General Fund and Utility
Fund, the proposed investment must have a primary purpose to grow the tax base
(asset management secondary as existing infrastructure is not at the end of its useful
life), the project must have a positive business case with a payback period of 10 years
or less, the business case be approved by the Finance Committee and be approved
in the Capital Budget to qualify for cost sharing in accordance with the Capital
Budget Policy.
If the project meets the above criteria, the cost of the growth capital investment
shall be allocated between the General Fund and Utility Fund in accordance with
each funds proportionate share of net present value of net revenue generated by
each fund as per the formula set forth in Appendix A of this policy.
3.4 Proposed Capital Budget Projects will be prioritized in the following order.
a. Mandatory - Must be completed due to legal or regulatory requirements.
b. Risk - Required to mitigate liability associated with health and safety, mitigate liability
or to mitigate sudden asset failure.
c. Priority of Council - As stipulated in the 5 Year Capital Investment Plan (Long Term
Financial Plan) and supported by evidence-based asset management
recommendations and are part of the City's strategic plans.
d. Positive Financial Impact - The Capital request not included in the 5-year Capital
Investment Plan but can be supported by a business case that demonstrates a
positive financial impact for taxpayers - would require a Council approved
adjustment to the Capital Investment Plan and Capital Budget.
e. Discretionary - New asset which aim to increase or enhance service level to the
residents and taxpayers. Requires amendment to the Long-Term Financial Plan, the
City strategic plans, and supported by a business case.
4
City of Saint John
Capital Budget Policy
4. CARRY OVER OF PREVIOUS YEAR APPROVED CAPITAL BUDGET
Approved capital budget projects must be started by the end of the second year after approval.
5. INTER-GOVERNMENTAL CAPITAL GRANTS
Inter-Governmental capital grants shall only be pursued for Capital projects in line with
Council priorities, the approved Capital Budget, and the approved 5 Year Capital Investment
Plan.
6. CAPITAL BUDGET SHORTFALLS AND SURPLUSES
6.1 Common Council must approve any adjustments to the Capital Budget for additional
funding to cover Capital
authority level.
6.2 Capital Budget surpluses that exceed the authority level,
where budgeted Capital funds exceed actual capital, shall be, with Council approval.
a. Realized as savings resulting in reduced debt financing.
b. Used to offset deficits in other approved Capital Budget shortfalls.
c. Leveraged to address the infrastructure deficits identified in the Asset
Management Plan and the 5 Year Capital Investment Plan.
7. APPENDIX GROWTH RELATED INVESTMENTS COST SHARING FORMULA
Assumption:
Life of the Project is capped equal to number of years of debt amortization period.
Formulas:
1) Cost Allocation:
General Fund = C * (NPVNGFR / (NPVNGFR + NPVNUFR))
Utility Fund = C * (NPVNUFR / (NPVNGFR + NPVNUFR))
2)
3)
5
City of Saint John
Capital Budget Policy
Where:
NPVNGFR = Net Present Value of Net General Fund Revenue
NPVNUFR = Net Present Value of Net Utility Fund Revenue
NGFR = PT + BP -IC - EX
NGFR = Net General Fund Revenue
PT = Property Tax Revenue to General Fund
BP = Building Permit Fees Revenue
IC = Incentives Given for The Project
EX = Other Project Specific Expenses
NUFR = WR EX + NI
NUFR = Net Utility Fund Revenue
WR = Water Billing Revenue (Fixed/Metered)
EX = Other project specific expenses
NI = Net Investment = New Utility Infrastructure Investment less Current
Depreciated Value of Infrastructure
I = Current Borrowing Rate
C = Cost of the Project
N = Life of Project
NPV = Net Present Value of Net Revenue/Cost
NGFR1 = Net General Fund Revenue in year 1, NGFR2 = Net General Fund Revenue in year 2 and
so on up to life of the project
NUFR1 = Net Utility Fund Revenue in year 1, NUFR2 = Net Utility Fund Revenue in year 2 and so
on up to life of the project
6
City of Saint John
Capital Budget Policy
Example:
7
City of Saint John
Debt Management Policy
Title: Debt Management Policy
Subject: General Fund Debt Management Category: Finance and Administrative Services
Policy
Policy No.: FAS- 006 M&C Report No.: 2019-167
Effective Date: Next Review Date:
Area(s) this policy applies to: Cross Corporate Office Responsible for review of this Policy:
Finance and Administrative Services
Related Instruments: Policy Sponsors:
Chief Financial Officer
FAS-001 Asset Management Policy
FAS-002 Investment Management Policy
FAS-003 Reserves Policy
FAS-004 Operating Budget Policy
FAS-005 Capital Budget Policy
Document Pages:
This document consists of 9 pages.
Revision History:
Common Clerk's Annotation for Official Record
Date of Passage of Current Framework: July 8, 2019
I certify that this Policy was adopted by Common Council as indicated
above.
________________________ July 10, 2019
Common Clerk Date
Date Created: Date Updated: Common Council Approval Contact:
July 8, 2019 March 12, 2025 Date: July 8, 2019 Strategic Services
1
City of Saint John
Debt Management Policy
TABLE OF CONTENTS
1. POLICY STATEMENT ........................................................................................................ 3
2. DEFINITIONS .................................................................................................................... 3
3. ACCEPTABLE PURPOSES FOR DEBT ................................................................................. 4
4. DEBT LIMIT CITY OF SAINT JOHN ................................................................................. 5
5. DEBT LIMIT SAINT JOHN WATER .................................................................................. 6
6. DEBT ISSUANCE ............................................................................................................... 7
7. INTERNAL BORROWING .................................................................................................. 7
8. PAY AS YOU GO ............................................................................................................... 7
9. REPORTING ..................................................................................................................... 8
10. RESPONSIBILITIES .......................................................................................................... 8
2
City of Saint John
Debt Management Policy
1. POLICY STATEMENT
1.1. The Debt Management Policy also applies to Saint John Water (Utility);
1.2. The Debt Management Policy is established to ensure that all debt is issued
prudently and cost effectively in accordance with the Long Term Financial Plans of
the City and Saint John Water;
1.3. The Debt Management policy objectives are as follows:
The Organization obtains debt financing only when necessary;
The Organization manages debt such that future financial flexibility is
maintained;
The Organization strategically issues debt based on sound financial planning.
1.4. The Capital Investment Plan (CIP) is essential to intelligent planning of debt issuance
by prioritizing potential capital investment and potential sources of financing.
1.5. The organizations debt issuance and management procedures will comply with the
following legislation where applicable:
Province of New Brunswick Local Governance Act
Province of New Brunswick Municipal Capital Borrowing Act
Province of New Brunswick Municipal Debentures Act
Province of New Brunswick Control of Municipalities Act
Province of New Brunswick Financial Corporation Act
2. DEFINITIONS
Sustainability - means meeting the needs of the present without compromising the
ability of future generations to meet their own needs.
Long Term Debt - means financing with a term over 10-30 years with municipal bonds
through the Municipal Finance Corporation or capital leasing as defined by the Public
Sector Accounting Standards.
Inter-Generational Equity - means distributing the costs associated with capital
investments across the generations which will be enjoying the benefits of the capital
assets built today.
Debt Term - the period of time during which debt payments are made. At the end of
the debt term, the loan is paid in full.
3
City of Saint John
Debt Management Policy
Internal Financing - means financing for capital purchases from reserve funds as permitted
in FAS-003 Reserves Policy.
Pay-As-You Go Financing- means the use of operating funds for capital purchases as
opposed to using debt or reserves.
Organization the term is used to include the City and Saint John Water as one entity for
the purpose of the policy unless specified otherwise.
3. ACCEPTABLE CONDITIONS FOR USE OF DEBT
3.1 The Organization will issue long-term debt solely for the purpose of financing the
projects approved in the Capital Budget and the Capital Investment Plan (CIP);
3.2 Long term debt shall not be used to fund operating or maintenance costs or
used as a tool balance the operating budget;
3.3 The Long Term Debt amortization period shall not exceed the life of the asset it is
financing;
3.4 The Organization shall promote a balanced approach between maintaining an
affordable debt level, maintaining infrastructure and accommodating growth by:
3.4.1 Utilizing this Policy in conjunction with the Asset Management Plan,FAS- 005
Capital Budget Policy, FAS-004 Operating Budget Policy and FAS-003 Reserves
Policy.
3.4.2 Integrating debt issuance with the Capital Budgeting process todetermine
the necessity, priority, and viability of the capital project.
3.4.3 Considering the Long Term Financial Plan and analyzing the tolerance or
capacity to absorb and manage new debt given future priorities.
3.5 Debt will be structured to fairly distribute the costs over time, taking into
consideration inter-generational equity.
3.6 The Organization may also issue debt on behalf of an Agency, Board or Commissions
(ABC) under its control pursuant to Generally Accepted Accounting Principles to
further the public purposes of the City. The City shall take appropriate steps to
confirm the financial feasibility of the project, the financial solvency of the ABC, and
4
City of Saint John
Debt Management Policy
that the issuance of such debt is consistent with the policies set forth herein;
3.7 This Policy does not apply for the use of Short Term debt instruments.
4. DEBT LIMITS AND DEBT CAPACITY GENERAL FUND
4.1 The New Brunswick Local Governance Act stipulates that:
4.1.1 A local government shall not, in any one year, borrow for its current operations
any money in excess of the sum represented by 4% of the budget of that local
government for that year or $15K, whichever is greater.
4.1.1 A local government shall not, in any one year, borrow for capital expenditures
any money in excess of the sum represented by 2% of the assessed value ofreal
property in that local government.
4.1.2 The total amount of money borrowed by a local government for capital
expenditures shall not exceed 6% of the assessed value of real property inthe
local government.
4.2 The City's capacity to issue debt is directly related to Taxpayer's ability to service the
payments required on the debt. Three key performance indicators will be
benchmarked and measured, and the following debt limits shall be applicable:
4.2.1 Debt per Capita: This measurement can provide elected officials with a trend
of overall debt outstanding by measuring how much debt the City has per
citizen. General Fund Debt per Capita shall not exceed $1600;
4.2.2 Debt Service Ratio: This measurement allows elected officials to be aware of
the amount of the current year's annual operating budget which is devoted to
servicing debt. The General Fund Debt Service Ratio shall not exceed 12%;
4.2.3 Total Debt Outstanding as a Percentage of Operating Budget: This
measurement identifies the percentage of annual operating revenues that
would be required to extinguish the City's outstanding debt. The General Fund
Total Debt Outstanding as a Percentage of Operating Budget shall not exceed
70%;
4.3 Additional debt is only permissible when existing debt is within these limits, the limits
will be reviewed and updated on an annual basis;
5
City of Saint John
Debt Management Policy
4.4 The City's General Fund target Debt Per Capita is $750 by 2032, the City's Debt Service
Ratio Target is 6.5% by the year 2032 and the City's General Fund Target Debt
Outstanding as a Percentage of Operating Budget is 30% by 2032.
4.5 Long Term Debt Term shall be in accordance with the Debt Management Plan.
5. DEBT LIMITS AND DEBT CAPACITY SAINT JOHN WATER
5.1 The New Brunswick Local Governance Act stipulates that:
5.1.1 A local government may borrow temporarily in each year for current
expenditures in respect of the operation of a generation facility a sum or sums
of money not exceeding 50% of the budgeted revenue for that year.
5.2 The capacity to issue debt is directly related to ratepayers ability to service
the payments required on the debt. Two key performance indicators will be
benchmarked and measured, and the following debt limits shall be applicable:
5.2.1 Debt Service Ratio: This measurement allows elected officials to be aware of
the amount of the current year's annual operating budget which is devoted to
servicing debt. The Utilities Fund Debt Service Ratio shall not exceed 15%.
5.2.2 Total Debt Outstanding as a Percentage of Operating Budget: This
measurement identifies the percentage of annual operating revenues that
would be required to extinguish the Saint John Water's outstanding debt.The
Utility Fund Total Debt Outstanding as a Percentage of Operating Budgetshall
be reduced to 100% by the year 2026 and shall not exceed by 100% then after
unless there is a business case to substantiate the increase.
5.3 Additional debt is only permissible when existing debt is within these limits, the limits
will be reviewed and updated on an annual basis;
5.4 Long Term Debt Term shall be in accordance with the Debt Management Plan.
6
City of Saint John
Debt Management Policy
6. DEBT ISSUANCE
6.1 A resolution of Council is required for all new debt issues.
6.2 The debt issuance process generally follows the steps below:
6.2.1 Notice of motion: Council gives notice of intent to borrow after 30 days
from the day of Council resolution;
6.2.2 After expiration of 30 days, Council authorizes staff to issue and sell to the
New Brunswick Municipal Finance Corporation debentures at such terms and
conditions recommended by the Corporation;
6.2.3 Application form filled out and submitted to the New Brunswick Municipal
Finance Corporation;
6.2.4 New Brunswick Municipal Finance Corporation advises the City of theactual
bond issue; and
6.2.5 Staff reports back to Council regarding terms of the issue, coupon rate, price,
average yield and settlement date.
6.3 Debt is structured to fairly distribute the costs over time, taking into consideration
intergenerational equity;
7. INTERNAL FINANCING
7.1 The Organization may use reserves as a source of funds for the internal financing of
capital projects as approved by Council. Any borrowing from reserve funds shall
comply with Policy FAS-003 Reserves Policy.
8. PAY-AS-YOU-GO FINANCING
8.1 The Organization will seek to gradually increase pay-as-you-go as an option for
financing capital over time. Factors which favor pay-go financing include:
8.1.1 Asset Renewal Projects;
8.1.2 Assets with a useful life that is less than 10 years - for example,IT
equipment and road maintenance;
8.1.3 Situations where additional debt could adversely impact the
7
City of Saint John
Debt Management Policy
financial health;
8.1.4 Situations where market conditions favour the use of cash rather than debt
(for example, escalating interest rates)
9. REPORTING
9.1. The total debt outstanding, and total annual debt service payments will be
reported in the annual consolidated financial Statements;
9.2. Key performance indicators for debt will be measured and tracked in the
Annual Financial Health Report Card;
9.3. Long-term debt will be forecasted over the long term in a Debt Management Plan
based on the Capital Investment Plan as part of the Long-Term
Financial Plan.
10. ROLES AND RESPONSIBILTIES
10.1 Council shall:
10.1.1 Approve the Debt Management Policy;
10.1.2 Approve new debt issues; and
10.1.3 Approve budgets sufficient to provide for the timely payment of principal
and interest on all debt.
10.2 Finance Committee shall:
10.2.1 Review borrowing requirements for alignment with the Long Term Financial
Plans; and
10.2.2 Recommend to Council the approval of new debt management plan.
10.3 The Chief Financial Officer shall:
10.3.1 Review the policy annually in consideration to meeting the City's and
debt management goals and submit required changes to the
Finance Committee for recommendation to Common Council consideration
and approval.
10.3.2 Assume primary responsibility for the debt management process;
8
City of Saint John
Debt Management Policy
10.3.3 Determine the Ci available debt capacity and alignment with
Long Term Financial Plans;
10.3.4 Provide for the issuance of debt at appropriate intervals and in reasonable
amounts as required to fund approved capital expenditures;
10.3.5 Submit to Finance Committee and Council, all recommendations to issue
debt; and
10.3.6 Ensure compliance with the principles and mandatory requirements
contained in this policy.
9
CƩƚƒʹaƚŷğƒĻķ 9ƌğǩğĬ ѡƒĻƌğǩğĬĬθŭƒğźƌ͵ĭƚƒѢ
{ĻƓƷʹ ĻķƓĻƭķğǤͲ ağƩĭŷ ЊВͲ ЋЉЋЎ БʹЎЋ ta
ƚʹ /ƚƒƒƚƓ /ƌĻƩƉ ѡĭƚƒƒƚƓĭƌĻƩƉθƭğźƓƷƆƚŷƓ͵ĭğѢͳ IğƩƩźƭͲ .ƩĻƓƷ ѡĬƩĻƓƷ͵ŷğƩƩźƭθƭğźƓƷƆƚŷƓ͵ĭğѢͳ {ǒƌƌźǝğƓͲ
DğƩǤ ѡŭğƩǤ͵ƭǒƌƌźǝğƓθƭğźƓƷƆƚŷƓ͵ĭğѢͳ hŭķĻƓͲ .ğƩƩǤ ѡĬğƩƩǤ͵ƚŭķĻƓθƭğźƓƷƆƚŷƓ͵ĭğѢͳ ağĭYĻƓǩźĻͲ WƚŷƓ
ѡƆƚŷƓ͵ƒğĭƉĻƓǩźĻθƭğźƓƷƆƚŷƓ͵ĭğѢͳ wğķǞğƓͲ tğǒƌğ ѡƦğǒƌğ͵ƩğķǞğƓθƭğźƓƷƆƚŷƓ͵ĭğѢͳ 5ğƩƌźƓŭͲ ağƩźğŷ
ѡağƩźğŷ͵5ğƩƌźƓŭθƭğźƓƷƆƚŷƓ͵ĭğѢͳ \[ƚǞĻͲ DĻƩƩǤ ѡŭĻƩƩǤ͵ƌƚǞĻθƭğźƓƷƆƚŷƓ͵ĭğѢ
{ǒĬƆĻĭƷʹ ŷǤ tƩƚƦĻƩƷǤ ğǣ {ŷƚǒƌķ ĬĻ ƩĻķǒĭĻķ źƓ {ğźƓƷ WƚŷƓ b.
Some people who received this message don't often get email from melazabb@gmail.com. Learn why this is
important
\[ External Email Alert\] **Please note that this message is from an
external sender. If it appears to be sent from a Saint John employee,
please forward the email to spamsample@saintjohn.ca or contact the IT
Service Desk.**
Hello All,
I Hope you can review this analysis and include this report on your agenda.I
recently made this analysis on the Property tax in Saint John which is already
the highest in Canada and wanted to share some facts with the council.I think
there are other alternative solutions which can help relief the residents in Saint
John and bring the tax down like other cities in Canada.In the below examples
I shared many solutions where you can tax business and also set the tax
based on income .Also based on the analysis I found that this is
preventing many growth opportunities and made Saint John population
decline by 3.4 from 2016 to 2021.I believe after covid is over recently the
population is shrinking again hence people are going back to office and
leaving saint john specially they came here because the low cost of living.
Regards
Mo
Property Tax Reduction in Saint John, NB
A Comparative Analysis with Canadian Cities and Alternative
Strategies
This presentation provides a comprehensive analysis of Saint John's property tax structure,
compares it with other Canadian cities, examines potential impacts of tax reduction, and offers
strategic alternatives for implementing tax reduction while maintaining fiscal responsibility.
Table of Contents
1. Current Tax Structure in Saint John
2. Comparison with Other Canadian Cities
3. Potential Impacts of Tax Reduction
4. Alternative Reduction Strategies
5. Recommendations
Section 1: Current Tax Structure in Saint John
Property Tax Rates
Current property tax rate: $1.55 per $100 of assessed property value (1.58% as of 2024)
Saint John has the second-highest property tax rate among 24 major Canadian cities
Recent history: Saint John has cut its property tax rate by 4.3% over the last two years to
offset rising property assessments
Business Tax Structure
Businesses in New Brunswick are subject to a municipal tax rate equal to 1.5 times the
residential tax rate plus a provincial tax rate
This results in non-residential properties paying about 3 times as much property tax per
$100 of assessment as homeowners
Non-residential property taxes in New Brunswick are among the highest in Canada
Current Challenges
High tax rates may be deterring business investment and population growth
Saint John's population decreased by 3.4% from 2016 to 2021
High property tax burden on residents and businesses compared to other Canadian cities
Need to balance tax relief with maintaining essential municipal services
Section 2: Comparison with Other Canadian Cities
Property Tax Rates Across Canada (2024)
Saint John (1.58%) has the second-highest property tax rate among 24 major Canadian
cities
Only Sault Ste. Marie (1.79%) has a higher rate
Halifax, a regional competitor, has a significantly lower rate (1.11%)
British Columbia cities have the lowest rates: Greater Vancouver (0.30%), Abbotsford
(0.40%)
Tax Burden Comparison
A homeowner in Saint John pays $15,800 in property taxes on a $1M home
A homeowner in Vancouver pays only $2,968 for the same value home (more than 5
times less)
A homeowner in Halifax pays $11,100 on a $1M home (30% less than Saint John)
Regional Comparison (Tax Rates for Rental Properties)
City Tax Rate for Rental Properties
Saint John 2.14%
Quispamsis 1.84%
Fredericton 1.89%
Moncton 1.98%
Halifax 1.10%
Competitive Position
Saint John's high tax rates create a competitive disadvantage for attracting:
New residents
Business investment
Real estate development
Cities with lower tax rates have generally seen stronger population and economic growth
Section 3: Potential Impacts of Tax Reduction
Economic Benefits
Business Growth
Lower property tax rates could make Saint John more competitive for business
investment
Removing a significant barrier to business growth and expansion
Potential to create new jobs and economic opportunities
Housing Market Effects
Lower property taxes could increase housing affordability
Potential to stimulate the real estate market and construction industry
Could attract new residents, addressing the population decrease of 3.4% (2016-2021)
Competitive Position
Reducing rates could help Saint John compete with Halifax and other cities for regional
investment
Improved ability to attract and retain businesses and residents
Enhanced reputation as a business-friendly community
Municipal Budget Considerations
Revenue Impacts
Property taxes account for a significant portion of municipal revenue
Any reduction would require careful fiscal planning:
Finding offsetting revenue sources
Identifying potential service efficiencies
Phased implementation to allow budget adjustments
Budget Flexibility Challenges
Tax limitations can create budget challenges for local governments
Reduced revenue could limit ability to respond to economic downturns or emergencies
May affect infrastructure maintenance and essential services
Long-term Fiscal Stability
Need to balance tax reduction with maintaining fiscal stability
Potential need for diversification of revenue sources
Consideration of phased implementation to allow for adjustment
Lessons from Other Cities
Texas Cities: Used state revenue surplus to offset local revenue losses
Philadelphia: Targeted tax relief prevented displacement of vulnerable homeowners
Well-designed levy limits: Can provide relief without distorting property markets
Section 4: Alternative Reduction Strategies
Alternative 1: Gradual Reduction Strategy
Phased reduction over 5 years (0.05% annually)
From current 1.58% to target 1.33%
Allows budget adjustments and minimizes service disruptions
Provides predictable tax relief for residents and businesses
Follows successful model of Saint John's recent 4.3% reduction over two years
Alternative 2: Targeted Relief Program
Circuit breaker program for low-income residents
Relief increases as income decreases
Protection for those spending >5% of income on property taxes
Business tax incentives for new businesses
50% reduction in first year
Graduated increases over 5 years
First-time homebuyer relief (25% reduction for first three years)
Alternative 3: Differential Rate Structure
Different rates based on property type, value, or location
Residential Tiered Rates:
Under $300,000: 1.40%
$300,000-$600,000: 1.55%
Over $600,000: 1.70%
Commercial Tiered Rates and Strategic Development Zones
Progressive structure aligning with ability to pay
Alternative 4: Tax Base Diversification
Introduce alternative revenue sources while reducing property taxes
User fees for non-essential services
Tourism levy (3% hotel tax)
Municipal services fee
Property tax reduction of 0.15% (to 1.43%)
Alternative 5: Hybrid Approach
Immediate 0.08% reduction (to 1.50%)
Targeted relief for vulnerable residents
Business incentives (40% reduction for first two years)
Limited user fees for enhanced services
Gradual further reduction (0.03% annually for three years)
Section 5: Recommendations
Recommended Approach: Hybrid Strategy
Key Components
Immediate Relief: 0.08% reduction in first year (to 1.50%)
Targeted Support: Circuit breaker program for low-income residents and seniors
Business Development: 40% reduction for first two years for new businesses
Revenue Diversification: Limited user fees for specific enhanced services
Gradual Further Reduction: 0.03% annual reduction for three additional years (to
1.41%)
Rationale for Recommendation
Provides immediate visible relief while ensuring fiscal stability
Addresses needs of most vulnerable residents
Encourages business development and economic growth
Creates more sustainable tax structure long-term
Balances competitiveness with fiscal responsibility
Implementation Roadmap
Year 1 (2025-2026)
Implement initial 0.08% rate reduction
Design and launch circuit breaker program
Introduce business incentive program
Begin efficiency review of municipal operations
Year 2 (2026-2027)
Implement 0.03% additional rate reduction
Evaluate impact of first-year measures
Introduce limited user fees for enhanced services
Continue efficiency improvements
Years 3-4 (2027-2029)
Continue with planned 0.03% annual reductions
Adjust programs based on economic impact analysis
Expand successful initiatives
Success Metrics
Improved competitive position relative to other Canadian cities
Increased business investment and job creation
Population growth and retention
Maintained or improved municipal service levels
Long-term fiscal sustainability
Conclusion
Saint John's high property tax rates present a significant competitive disadvantage
Strategic tax reduction can stimulate economic growth and population retention
A balanced approach combining immediate relief, targeted support, and gradual reduction
offers the best path forward
Success requires ongoing monitoring, adjustment, and commitment to fiscal
responsibility
CƩƚƒʹ/źƷǤ ƚŅ {ğźƓƷ WƚŷƓͲ bĻǞ .ƩǒƓƭǞźĭƉ ѡǞĻĬŅƚƩƒΏƓƚƩĻƦƌǤθƭğźƓƷƆƚŷƓ͵ĭğѢ
{ĻƓƷʹ CƩźķğǤͲ ağƩĭŷ ЋБͲ ЋЉЋЎ ЍʹЌЉ ta
ƚʹ /ƚƒƒƚƓ /ƌĻƩƉ ѡĭƚƒƒƚƓĭƌĻƩƉθƭğźƓƷƆƚŷƓ͵ĭğѢ
{ǒĬƆĻĭƷʹ ĻĬŅƚƩƒ ƭǒĬƒźƭƭźƚƓ ŅƩƚƒʹ wĻƨǒĻƭƷ Ʒƚ tƩĻƭĻƓƷ Ʒƚ /ƚǒƓĭźƌ CƚƩƒ
\[ External Email Alert\] **Please note that this message is from an
external sender. If it appears to be sent from a Saint John employee,
please forward the email to spamsample@saintjohn.ca or contact the IT
Service Desk.**
Submitted on Fri, 03/28/2025 - 16:30
Submitted by: Anonymous
Submitted values are:
About Person/Group Presenting
First Name:
vishalbhai
Last Name:
shah
Name of Organization/Group (where applicable):
735242 NB INC.
Address:
saint john , New Brunswick. E2L 1H4
Canada
Day Time Phone Number:
Email
If you do NOT wish to have your personal information (address, phone number,
email) become part of the public record, please check this box.
Yes
About your Request
Topic of Presentation:
heritage status of property
Purpose for Presentation (what is the ask of Council):
I want city will remove heritage status from my property at 239 King street east.
Background Information:
Because of it is heritage status I cannot change outside wall and attic window. it will
create lots of damage and heat loss to the building. so I want to add vinyl siding and
new better window.
also other property beside my property in street are no longer under heritage status.
I can not show everything in one image so I am not uploading any Image
Are you making a request for funding?
No
CƩƚƒʹ/źƷǤ ƚŅ {ğźƓƷ WƚŷƓͲ bĻǞ .ƩǒƓƭǞźĭƉ ѡǞĻĬŅƚƩƒΏƓƚƩĻƦƌǤθƭğźƓƷƆƚŷƓ͵ĭğѢ
{ĻƓƷʹ {ǒƓķğǤͲ ağƩĭŷ ЌЉͲ ЋЉЋЎ ЊʹЋЋ ta
ƚʹ /ƚƒƒƚƓ /ƌĻƩƉ ѡĭƚƒƒƚƓĭƌĻƩƉθƭğźƓƷƆƚŷƓ͵ĭğѢ
{ǒĬƆĻĭƷʹ ĻĬŅƚƩƒ ƭǒĬƒźƭƭźƚƓ ŅƩƚƒʹ {ǒĬƒźƭƭźƚƓ Ʒƚ /ƚǒƓĭźƌ CƚƩƒ
\[ External Email Alert\] **Please note that this message is from an
external sender. If it appears to be sent from a Saint John employee,
please forward the email to spamsample@saintjohn.ca or contact the IT
Service Desk.**
Submitted on Sun, 03/30/2025 - 13:21
Submitted by: Anonymous
Submitted values are:
About Person/Group Submitting
First name
Kyle
Last name
Dunham
Mailing Address
Loch Lomond Rd
Saint john. E2N1A5
Telephone
Email
If you do not wish to have your personal information (address, phone number,
email) become part of the public record, please check this box.
Yes
About your Submission
Topic of submission
Road line of sight obstruction from neighboring properties added to the by law
Purpose for submission (what is the ask of council):
I would like/ask that an addition to the property by law be added to restrict/forbid
neighbors from erecting physical structures or creating natural obstructions that would
restrict or make difficult neighbors to see oncoming traffic coming out of their drive way
and force existing obstructions to be taken down.
Executive summary
My neighbor has erected a election sign that blocks a large portion of my view of
oncoming cars. My driveway comes up at a slight slope and the cars that are oncoming
come at me from my left/drivers side where their sign is. The sign itself is not massive
but the angle of the road corner to my left/ drivers side and the distance of the structure
from my sloped driveway it obstructs a large portion of my view.
I have tried talking to the police to have it removed as it's a danger to me coming out of
my driveway, the police told me my neighbor can do whatever they want on their
property and the officer said and i quote "they can put a tree if they wanted as well"
implying they can block my view any way they see fit. I asked the officer what happens
if i get into an accident because i can't see the oncoming car and he told me and i quite
"you will have to be diligent" The officer was quite rude and cared nothing of my safety
concerns.
This is not a political matter in the sense it's a election sign it's a matter of my safety
leaving my driveway. I even told the officer the small signs in my neighbors driveway
are fine it's just the bigger one obstructs a large view of oncoming vehs.
I also believe an amendment like this would be largely beneficial to the community as a
whole as fences, snow banks and ect can block peoples view.
M&C No.2025-104
Report DateApril 02, 2025
Meeting DateApril 07, 2025
Service AreaGeneral Counsel
SUBJECT: Early Access Agreement and Closing Date Extension –Taylor Avenue
EXECUTIVE SUMMARY OF COMMITTEE OF THE WHOLE REPORT FOR OPEN
SESSION OF COUNCIL
In July 2024, the Cityagreed to sell land off Taylor Avenue to the New Brunswick
Housing Corporation (NBHC) for a transitional housing facility called Somerset
ACRES. The initial closing date was set for November 2024but theclosing date
had to be extended to accommodate the due diligence and the timeline for
preparation and registration of the Subdivision Plan.NBHC began operating the
facility priorthe closing of the transaction. This ledto aneed for an amended
early access agreementthat permitsthe use of the site as atransitional housing
facilityprior to the closing of the transaction.The purpose of this report is to seek
authorityfor the City to enterintoanearly access agreement with NBHC and
direct the General Counsel to extend the closing date to accommodate the
timelines related to the preparation and registration of the Subdivision Plan.
COUNCIL RESOLUTION
That the City enter into anEarly Access Agreement with the New Brunswick
Housing Corporation generally in the form as presented to Committee of the
Whole at its meeting held April 7, 2025, for the purpose of permitting the
continued operation of the transitional housing facility known as Somerset ACRES,
on City-owned landprior to the closing of the land transaction; and that the Mayor
and Clerk be authorized to execute the said Early Access Agreement and any other
documents ancillary thereto
M&C No.2025-97
Report DateMarch 31, 2025
Meeting DateApril 07, 2025
Service AreaGeneral Counsel
SUBJECT: Construction License for New Brunswick Museum Project
EXECUTIVE SUMMARY OF COMMITTEE OF THE WHOLE REPORT FOR OPEN
SESSION OF COUNCIL
The Board of the New Brunswick Museum (“the Board”) has askedthe City to
grant it a temporary construction license during theconstruction of theexpansion
to the museum. Thelicensed area is situated over a small portion of the City’s
Riverview Park, containing an area of approximately 916 square metres,
immediately adjacent tothe museum. Staff are recommending that the City grant
permission to the Board to use the licensed area for a two-year term to facilitate
construction of the museum expansion project.
COUNCIL RESOLUTION
1.That the City enter into the Construction License Agreement generally in
the form as presented to Committee of the Whole at its meeting held April
7, 2025,with the Board of the New Brunswick Museum for the purpose of
permitting temporary construction activities on the City-owned property
identified as PID 55222129; and
2.That the Mayor and Clerk be authorized to sign the Construction License
Agreement and any other documents ancillary thereto.
M&C No.2025-081
Report DateMarch 31, 2025
Meeting DateApril 07, 2025
Service AreaGrowth and Community
Development Services
SUBJECT: Sponsorship Agreement
EXECUTIVE SUMMARY OF COMMITTEE OF THE WHOLE REPORT FOR OPEN
SESSION OF COUNCIL
Saputo wishes to enter into a sponsorship agreement with the City of Saint John
with details to be announced by the parties at a future date.
.
COUNCIL RESOLUTION
That the City enter into a Sponsorship Agreement with Saputo Inc., generally in
the form as attached to M&C 2025-081 and further that the Mayor and City
Clerk be authorized to execute the agreement and any other documents
necessary to affect the transaction.