Water & Sewer Bylaw amendment 2024-12-09BY-LAW NUMBER M-16
A LAW TO AMEND A BY-LAW
RESPECTING WATER AND SEWERAGE
ARRETE NO M-16
ARRETE MODIFIANT L'ARRETE
CONCERNANT LE RESEAU D'EAU ET
D'EGOUTS
Be it enacted by the Common Council of Lors d'une reunion du conseil communal,
The City of Saint John as follows: The City of Saint John a ddcrete cc qui suit :
A By-law of The City of Saint John entitled Par les prdsentes, I'arretd de The City of
"A By-law Respecting Water and Sewerage", Saint John intituld « Arretd concernant les rdseaux
enacted on the 7th day of June, A.D. 2004, is hereby d'eau et d'dgouts », decrdtd le 7 juin 2004, est
amended as follows: modifid comme suit:
1 Schedule "E" is repealed and replaced with
Schedule "E" attached hereto.
2 This amendment comes into force on
January I, 2025.
IN WITNESS WHEREOF The City of Saint John
has caused the Corporate Common Seal of the said
City to be affixed to this by-law the 9th day of
December, A.D. 2024 and 6--1 h.,-
First Reading November 25, 2024
Second Reading - November 25, 2024
Third Reading December 9, 2024
1 L'annexe « E » est abrogde et remplacde
par I'annexe « E » ci jointe.
2 La presente modification entre en vigueur
le I janvier, 2025.
EN FOI DE QUOI The City of Saint John a fait
apposer son sceau communal sur le present arrete
le 9 decembre 2024, avec les signatures suivantes :
Premiere lecture - le 25 novembre 2024
Deuxieme lecture - le 25 novembre 2024
Troisieme lecture - le 9 decembre 2024
Schedule "E"
Raw Industrial Water Customers and Rates
Raw Water
Infrastructure
Rate per
Rate
Customer
Cubic
Stabilizing
Metre ($)
Reserve
Bi-
Monthl ($)
1. New
This user draws its industrial raw water
0.5143
1,425
Brunswick
through a 1500mm diameter concrete
Power
intake pipe running from Ludgate Lake
across Route 1 to the Coleson Cove Screen
Building located at coordinates N
7355170.56 and E 2522389.97 just off of
Route I. Once through the screen building
water passes through approximately
5,000m of 600mm diameter transmission
main to ultimately make its way to the
Coleson Cove generating station located
at 4077 King William Road.
2. Irving Pulp
This user draws its industrial raw water
0.0904
70,383
and Paper
through a 1800mm diameter intake pipe
Limited
and approximately 330m of 1800mm
diameter concrete pressure pipe originating
from Spruce Lake leading to the Spruce
Lake Screen building. The screen building
is located at coordinates N 7357823.16 and
E 2525290.60 and is just to the right of the
eastern shore of Spruce Lake. Once
through the screen building water passes
through the Spruce Lake Transmission
main to ultimately make its way to the
Irving Pulp and Paper Mill located at 408
Mill Road. The Spruce Lake transmission
main consists of approximately 7,500 m of
1500mm diameter concrete pressure pipe
owned by City of Saint John and
approximately 1,000m of 1370mm
diameter concrete pressure pipe owned by
IPP.
3. Irving Paper
This user draws its industrial raw water
0.1074
14,821
Inc.
through a 1200mm diameter intake pipe
originating from Latimer Lake leading to
the Latimer Lake control valve chamber.
Once through the control valve chamber,
water passes through approximately 275m
of 1500mm diameter reinforced concrete
pipe to ultimately discharge into Eldersley
brook. Eldersley Brook recharges the
Silver Falls watershed. Irving Paper has a
private intake, screen and chlorination
building located at Silver falls. From there
the water eventually makes its way to
Irving Paper located at 435 Bayside Drive.
4. Irving Oil
Multiple raw water transmission mains
0.2530
42,379
Limited
deliver raw water from Latimer Lake to
other transmission piping near the
Lakewood Heights pump station for use by
potable and industrial users. Irving Oil
Limited draws its industrial raw water from
two separate connections to the above
mentioned transmission mains prior to their
connection to the Loch Lomond Drinking
Water Treatment Facility.
The first raw water connection to the
transmission system near the Lakewood
Heights Pumping Station delivers raw
water to a chamber located at Champlain
Heights through approximately 2,500m of
600mm HDPF relined cast iron raw water
transmission main to ultimately make its
way to the Irving Oil Refinery located at
340 Loch Lomond Road. The second
connection to the above transmission
systems is a 600mm PVC Raw water
transmission main, approximately 3,000m
delivers raw water along Hickey Road to a
chamber located at Champlain Heights.
From there raw water is delivered through
approximately 450m of 500mm raw water
transmission main along Commerce Drive
to ultimately make its way to the Irving Oil
Refinery located at 340 Loch Lomond
Road.
Notes:
a) Rate Stabilizing Reserve will be reviewed annually as part of the yearly
rate setting exercise with the intent of holding approximately 7 months of
operating costs in the rate stabilizing reserve at any given time.
Annexe « E
Clients et tarifs de 1'eau industrielle brute
Client d'eau
Infrastructure
Taux an
La reserve de
brute
metre cube
stabilisation
($)
des tarifs
Tan
bimensuel($)
1. Energie
Cet utilisateur puise son eau brute industrielle
0.5143
1,425
Nouveau-
dans un tuyau de prise d'eau en bdton de
Brunswick
1 500 mm de diametre qui, traversant la route 1,
va du lac Ludgate au batiment de ddgrillage de
Coleson Cove situe aux coordonndes
N 7355 I70,56 et E 2522389.97, a proximite de
la route 1. Une fois sortie du batiment de
degrillage, 1'eau circule dans environ 5 000 m
de conduite principale de 600 mm de diametre
pour finalement se rendre a la centrale de
Coleson Cove, situde au 4077, chemin King
William.
2. Irving
Cet utilisateur pulse son eau brute industrielle
0.0904
70,383
Pulp and
dans un tuyau de prise d'eau de 1 800 mm de
Paper
diametre vers un tuyau sous pression en beton
Limited
de 1 800 mm de diametre d'une longueur de
330 m environ provenant du lac Spruce et
menant au batiment de degrillage du lac Spruce.
Le batiment de degrillage est situd aux
coordonndes N 7357823.16 et E 2525290.60,
juste a droite de ]a rive est du lac Spruce. Une
fois sortie du batiment de degrillage, 1'eau passe
par la conduite principale du rdseau de transport
du lac Spruce pour finalement se rendre a
l'usine de pates et papiers Irving situde au 408,
chemin Mill. La conduite principale de
transport du lac Spruce est composee d'environ
7 500 m de conduite sous pression en bdton de
1 500 mm de diametre appartenant a la ville de
Saint John et d'environ 1 000 m de conduite
sous pression en baton de 1 370 mm de
diametre appartenant a IPP.
3. Irving
Cet utilisateur pulse son eau brute industrielle
0.1074
14,821
Paper Inc.
dans un tuyau de prise d'eau de 1 200 mm de
diametre provenant du lac Latimer et menant a
la chambre de vannes de regulation du lac
Latimer. Une fois sortie de la chambre de
vannes de regulation, Feau circule dans environ
275 m de tuyau en beton arms de 1 500 mm de
diametre pour finalement s'dcouler dans le
ruisseau Eldersley. Le ruisseau Eldersley
recharge le bassin versant de Silver Falls. Irving
Paper possede un batiment prive de prise d'eau,
de ddgrillage et de chloration situd a Silver
Falls. De la, Ceau se rend dventuellement a
l'usine d'Irving Paper, situde au 435 promenade
Bayside.
4. Irving Oil De multiples conduites principales de transport
Limited d'eau brute acheminent 1'eau brute du lac
Latimer a d'autres conduites de transport
situdes pres de la station de pompage de
Lakewood Heights pour etre utilisdes par des
milisateurs d'eau potable et industrielle. Irving
Oil Limited tire son eau brute industrielle de
deux raccordements distincts aux conduites de
transport susmentionndes avant leur
raccordement a Pusine de traitement de 1'eau
potable de Loch Lomond.
Le premier raccordement d'eau brute au rdseau
de transport pres de la station de pompage de
Lakewood Heights achemine Peau brute a une
chambre situde a Champlain Heights par
l'intermddiaire d'environ 2 500 m de conduite
de 600 mm en fonte revetue de PEHD pour
finalement se rendre a la raffinerie Irving Oil
situde au 340 chemin Loch Lomond. Le
deuxieme raccordement aux systemes de
transport ci-dessus est une conduite d'eau brute
en PVC de 600 mm, d'une longueur d'environ
3 000 m, qui achemine 1'eau brute le long du
chemin Hickey vers une chambre situde a
Champlain Heights. De la, 1'eau brute est
acheminde par une conduite principale de
transport d'environ 450 m d'un diametre de
500 mm le long de la promenade Commerce
jusqu'a la raffinerie Irving Oil situde au 340,
chemin Loch Lomond.
Notes :
a) La reserve de stabilisation des tarifs fait l'objet d'un examen annuel dans le
cadre de Pexercice annuel d'etablissement des tarifs, l'intention etant de
conserver environ sept mois de frais d'exploitation dans la reserve de
stabilisation des tarifs en tout temps.