Loading...
Arrêté concernant les réseaux d'eau et d'égouts - Modifiant l'arrêté - 2023-12-11BY-LAW NUMBER M-16 A LAW TO AMEND A BY-LAW RESPECTING WATER AND SEWERAGE ARRETE NO M-16 ARRETE MODIFIANT L'ARRETE CONCERNANT LE RESEAU D'EAU ET D'EGOUTS Be it enacted by the Common Council of Lors d'une rdunion du conseil communal, The City of Saint John as follows: The City of Saint John a d6cr&6 ce qui suit : A By-law of The City of Saint John entitled Par les prdsentes, 1'arretd de The City of "A By-law Respecting Water and Sewerage", Saint John intituld « Arretd concernant les rdseaux enacted on the 7th day of June, A.D. 2004, is hereby d'eau et d'dgouts » , d6cr6t6 le 7 juin 2004, est amended as follows: modifie comme suit: 1 Schedule "E" is repealed and replaced with Schedule "E" attached hereto. IN WITNESS WHEREOF The City of Saint John has caused the Corporate Common Seal of the said City to be affixed to this by-law the 1 i day of December, A.D. 2023 and signed by: -�,wp�1-11 Mayor Clerk / First Reading November 27, 2023 Second Reading - November 27, 2023 Third Reading - December 11, 2023 1 L'annexe « E » est abrogde et remplacde par I'annexe « E » ci-jointe. EN FOI DE QUOI The City of Saint John a fait apposer son sceau communal sur le prdsent arret6 le 11 decembre 2023, avec les signatures suivantes : de la municipalitd Premiere lecture - le 27 novembre 2023 Deuxi6me lecture - le 27 novembre 2023 Troisi6me lecture - le 11 decembre 2023 Schedule "E" Raw Industrial Water Customers and Rates Raw Water Infrastructure Rate per Rate Customer Cubic Stabilizing Metre ($) Reserve Bi- Monthl ($) 1. New This user draws its industrial raw water 0.9526 1,687 Brunswick through a 1500mm diameter concrete Power intake pipe running from Ludgate Lake across Route 1 to the Coleson Cove Screen Building located at coordinates N 7355170.56 and E 2522389.97 just off of Route 1.Once through the screen building water passes through approximately 5,000m of 600mm diameter transmission main to ultimately make its way to the Coleson Cove generating station located at 4077 King William Road. 2. Irving Pulp This user draws its industrial raw water 0.0835 67,023 and Paper through a 1800mm diameter intake pipe Limited and approximately 330m of 1800mm diameter concrete pressure pipe originating from Spruce Lake leading to the Spruce Lake Screen building. The screen building is located at coordinates N 7357823.16 and E 2525290.60 and is just to the right of the eastern shore of Spruce Lake. Once through the screen building water passes through the Spruce Lake Transmission main to ultimately make its way to the Irving Pulp and Paper Mill located at 408 Mill Road. The Spruce Lake transmission main consists of approximately 7,500 m of 1500mm diameter concrete pressure pipe owned by City of Saint John and approximately 1,000m of 1370mm diameter concrete pressure pipe owned by IPP. 3. Irving Paper This user draws its industrial raw water 0.0947 9,346 Inc. through a 1200mm diameter intake pipe originating from Latimer Lake leading to the Latimer Lake control valve chamber. Once through the control valve chamber, water passes through approximately 275m of 1500mm diameter reinforced concrete pipe to ultimately discharge into Eldersley brook. Eldersley Brook recharges the Silver Falls watershed. Irving Paper has a private intake, screen and chlorination building located at Silver falls. From there the water eventually makes its way to Irving Paper located at 435 Bayside Drive. 4. Irving Oil Multiple raw water transmission mains 0.2974 36,488 Limited deliver raw water from Latimer Lake to other transmission piping near the Lakewood Heights pump station for use by potable and industrial users. Irving Oil Limited draws its industrial raw water from two separate connections to the above mentioned transmission mains prior to their connection to the Loch Lomond Drinking Water Treatment Facility. The first raw water connection to the transmission system near the Lakewood Heights Pumping Station delivers raw water to a chamber located at Champlain Heights through approximately 2,500m of 600mm HDP6 relined cast iron raw water transmission main to ultimately make its way to the Irving Oil Refinery located at 340 Loch Lomond Road. The second connection to the above transmission systems is a 600mm PVC Raw water transmission main, approximately 3.000m delivers raw water along Hickey Road to a chamber located at Champlain Heights. From there raw water is delivered through approximately 450m of 500mm raw water transmission main along Commerce Drive to ultimately make its way to the Irving Oil Refinery located at 340 Loch Lomond Road. Notes: a) At between approximately 3 to 5 year intervals, the city will undertake industrial raw water rate studies for purposes of reassessing rates and rate structures. b) Rate Stabilizing Reserve will be reviewed annually as part of the yearly rate setting exercise with the intent of holding approximately 7 months of operating costs in the rate stabilizing reserve at any given time. Annexe « E Clients et tarifs de 1'eau industrielle brute Client d'eau Infrastructure Taux au La reserve de brute metre cube stabilisation ($) des tarifs Tari bimensuel($) 1. Energie Cet utilisateur puise son eau brute industrielle 0,9526 1,687 Nouveau- dans un tuyau de prise d'eau en b6ton de Brunswick 1 500 mm de diametre qui, traversant ]a route 1, va du lac Ludgate au batiment de d6grillage de Coleson Cove situd aux coordonn6es N 7355170.56 et E 2522389.97, a proximitd de la route 1. Une fois sortie du batiment de d6grillage, 1'eau circule dans environ 5 000 m de conduite principale de 600 mm de diametre pour finalement se rendre a la centrale de Coleson Cove, situee au 4077, chemin King William. 2. Irving Cet utilisateur puise son eau brute industrielle 0,0835 67,023 Pulp and dans un tuyau de prise d'eau de 1 800 mm de Paper diametre vers un tuyau sous pression en b6ton Limited de 1 800 mm de diametre d'une longueur de 330 m environ provenant du lac Spruce et menant au batiment de d6grillage du lac Spruce. Le batiment de d6grillage est situe aux coordonn6es N 7357823.16 et E 2525290.60, juste a droite de la rive est du lac Spruce. Une fois sortie du batiment de d6grillage,1'eau passe par la conduite principale du r6seau de transport du lac Spruce pour finalement se rendre a l'usine de pates et papiers Irving situee au 408, chemin Mill. La conduite principale de transport du lac Spruce est composee d'environ 7 500 m de conduite sous pression en b6ton de 1 500 mm de diametre appartenant a la ville de Saint John et d'environ 1 000 m de conduite sous pression en b6ton de 1 370 mm de diametre appartenant a IPP. 3. Irving Cet utilisateur puise son eau brute industrielle 0,0947 9,346 Paper Inc. dans un tuyau de prise d'eau de 1 200 mm de diametre provenant du lac Latimer et menant a la chambre de vannes de r6gulation du lac Latimer. Une fois sortie de la chambre de vannes de r6gulation,l'eau circule dans environ 275 m de tuyau en b6ton armd de 1 500 mm de diametre pour finalement s'dcouler dans le ruisseau Eldersley. Le ruisseau Eldersley recharge le bassin versant de Silver Falls. Irving Paper poss6de un batiment privd de prise d'eau, de ddgrillage et de chloration situe a Silver Falls. De 14,1'eau se rend dventuellement a l'usine d'Irving Paper, situee au 435 promenade Bayside. De multiples conduites principales de transport d'eau brute acheminent 1'eau brute du lac Latimer a d'autres conduites de transport situ6es pres de la station de pompage de Lakewood Heights pour etre utilisdes par des utilisateurs d'eau potable et industrielle. Irving Oil Limited tire son eau brute industrielle de deux raccordements distincts aux conduites de transport susmentionn6es avant leur raccordement a I'usine de traitement de 1'eau potable de Loch Lomond. Le premier raccordement d'eau brute au r6seau de transport pres de la station de pompage de Lakewood Heights achemine 1'eau brute a une chambre situ6e a Champlain Heights par l'interm6diaire d'environ 2 500 m de conduite de 600 mm en fonte revetue de PEHD pour finalement se rendre a la raffinerie Irving Oil situ6e au 340 chemin Loch Lomond. Le deuxieme raccordement aux systemes de transport ci-dessus est une conduite d'eau brute en PVC de 600 mm, d'une longueur d'environ 3 000 m, qui achemine 1'eau brute le long du chemin Hickey vers une chambre situ6e a Champlain Heights. De la, l'eau brute est achemine par une conduite principale de transport d'environ 450 m d'un diametre de 500 mm le long de la promenade Commerce jusqu'a la raffinerie Irving Oil situde au 340, chemin Loch Lomond. Notes: a) Tous les trois a cinq ans environ, la Ville entreprend des etudes sur les tarifs de Peau brute industrielle afin de reevaluer les tarifs et les structures tarifaires. b) La reserve de stabilisation des tarifs fait l'objet d'un examen annuel dans le cadre de 1'exercice annuel d'etablissement des tarifs, l'intention etant de conserver environ sept mois de frais d'exploitation dans la reserve de stabilisation des tarifs en tout temps.