2023-06-22 Growth Committee Agenda Packet - Open Session
Growth Committee Meeting
Open Session
June 6, 2023
MINUTES - OPEN SESSION GROWTH COMMITTEE MEETING
JUNE 6, 2023 12:00 P.M.
nd
2 FLOOR COMMON COUNCIL CHAMBER, CITY HALL
Present: Mayor Donna Noade Reardon
Deputy Mayor John MacKenzie
Councillor Joanna Killen
Councillor Brent Harris
Councillor Gerry Lowe
Also
Present: Chief Administrative Officer B. McGovern
Commissioner Growth and Community Services J. Hamilton
Director, Growth and Community Planning D. Dobbelsteyn
Administrative Officer R. Evans
Administrative Assistant A. MacLean
Administrative Assistant K. Tibbits
1. Meeting Called to Order
Councillor Killen called the Growth Committee open session meeting to order.
2. Approval of Minutes
2.1 Minutes of April 11, 2023
Moved by Mayor Noade Reardon, seconded by Councillor Harris:
RESOLVED that the minutes of April 11, 2023 be approved.
MOTION CARRIED.
3. Approval of Agenda
Moved by Councillor Harris, seconded by Mayor Noade Reardon:
RESOLVED that the agenda of June 6, 2023 be approved.
MOTION CARRIED.
4. Disclosures of Conflict of Interest
5. Consent Agenda
5.1 RESOLVED that the Summer Events 2023 Pre-Season report be received for information.
5.2 RESOLVED that as recommended in the submitted report entitled Review of the
Provisions governing the Procedure and Operation of the Saint John Substandard Properties
Appeal Committee, the Growth Committee recommends that Common Council approve the
Growth Committee Meeting
Open Session
June 6, 2023
Provisions Governing the Procedure and Operation of the Saint John Substandard Properties
Appeal Committee in the form attached to this report.
5.3 RESOLVED that the ABC Standard Reporting Template: Lord Beaverbrook Rink be received
for information.
Moved by Mayor Noade Reardon, seconded by Councillor Harris:
RESOLVED that the recommendation set out in each consent agenda item respectively be
adopted.
MOTION CARRIED.
6. Presentations / Delegations
6.1 City Market Strategic Plan (Draft)
(K. Hunt, FBM, and T. Mathisen, Quay North joined the meeting electronically)
D. Dobbelsteyn stated that the draft strategic plan for the City Market will guide the vision of the
City Market over the next 10 years.
Referring to the submitted presentation, Mr. Hunt and Mr. Mathiesen, consultants for the City
Market Strategic Plan, discussed engagement results from residents and stakeholders in
developing the draft plan, seven Strategic directions of the Plan, the vision, mission and core
values, and challenges and opportunities that were identified.
Moved by Mayor Noade Reardon, seconded by Deputy Mayor MacKenzie:
RESOLVED that the draft City Market Strategic Plan be received for information.
MOTION CARRIED.
(K. Hunt and T. Mathisen withdrew from the meeting)
6.2 ABC Year-End Review: Annual Presentations
6.2.1 Saint John Transit
I. MacKinnon, Director Transit and Fleet, and K. Loughery, Operations Manager, reviewed the
submitted presentation, discussed the 2022 annual report, and responded to questions.
Moved by Councillor Harris, seconded by Mayor Noade Reardon:
RESOLVED that the submitted presentation "Modernizing Transit Service Through Redesign: 2022
information.
MOTION CARRIED.
6.2.2 Saint John Trade and Convention Centre
K. Fergus, Director of Finance with the Trade and Convention Centre reviewed the submitted
presentation, discussed the 2022 annual report, and responded to questions.
Moved by Deputy Mayor MacKenzie, seconded by Councillor Harris:
RESOLVED that the
received for information.
MOTION CARRIED.
Growth Committee Meeting
Open Session
June 6, 2023
6.2.3 Canada Games Aquatic Centre
A. McLellan, General Manager Canada Games Aquatic Centre and A. Shanks incoming Chair
reviewed the submitted presentation, discussed the 2022 annual report, and responded to
questions.
Moved by Mayor Noade Reardon, seconded by Councillor Harris:
RESOLVED t Annual Report
MOTION CARRIED.
6.2.4 Saint John Free Public Library
L. Corscadden, Librarian, reviewed the submitted presentation, discussed the 2022 annual
report, and responded to questions.
Moved by Mayor Noade Reardon, seconded by Deputy Mayor MacKenzie:
information.
MOTION CARRIED.
Adjournment
Moved by Mayor Noade Reardon, seconded by Councillor Harris:
RESOLVED that the open session meeting of the Growth Committee be adjourned.
MOTION CARRIED.
The open session meeting of the Growth Committee held on June 6, 2023, was adjourned at 1:50
p.m.
DwhI /haaL99w9thw
M&C No.N/A
Report DateMay 30, 2023
Meeting DateJune 22, 2023
Service AreaGrowth and Community
Services
Chair KillenandMembers of Growth Committee
SUBJECT:Ethnocultural Small Grant Program
CLOSED SESSIONDISCUSSION REASON
This matter is to be discussed in Open Session ofGrowth Committee
OPEN SESSION RESOLUTION REQUIRED?
Yes, resolution and full report to be added to open session
AUTHORIZATION
Chief Administrative Officer
Primary AuthorCommissioner/Dept. Head
Jennifer WaldschutzJacqueline HamiltonBrent McGovern
RECOMMENDATION
That Common Council approve the Ethnocultural Small Grant Program Policyas
nd
presented to the GrowthCommittee on June 22, 2023, and direct staff to
implement the program.
EXECUTIVE SUMMARY
The City of Saint John is committed to fostering a welcoming, inclusive, and
opportunity-filled community. The 2022-2032 Succeed & Stay Immigration
Strategy set a goal of increasing the attraction, settlement, and retention of new
and existing immigrant populations, while enhancing the overall newcomer
experience in the region. In order to become a destination of choice for
newcomers in New Brunswick, and to achieve the targets set out in the strategy,
the citymust continue to support and champion its local ethnocultural
associations.
The Ethnocultural Small Grant Program was established as a pilot program in
2022 to support new and existing ethnocultural groups with incorporation,
growing their membership, and enhancing service delivery within the City of
Saint John.The program sawsignificant uptakein 2022,with the successful
distribution of13 grants.In alignment with the Immigration Strategy, it is
recommended that the program transition from a pilot to a permanent offering.
The budget envelope in 2023 for the Ethnocultural Small Grant Programis
$20,000 and is already accounted for in the 2023 operating budget.
PREVIOUS RESOLUTION
/ƚƒƒƚƓ /ƚǒƓĭźƌ wĻƭƚƌǒƷźƚƓͲ hĭƷƚĬĻƩ ЊБͲ ЋЉЋЊ
That Common Council approve the policy statement for the Ethnocultural Grant
Pilot Program.
STRATEGIC ALIGNMENT
Dwh
Enable population and business growth by focusing on key infrastructure
investments, strategic communications, service delivery, and partnerships to
achieve growth initiatives.
.9\[hbD
Enhance the quality of life and social well-being in a safe place to live; offering
recreation, arts,and cultural opportunitiesthat align with related plans.
The Ethnocultural Small Grant Program Policy also aligns with the 2022-2032
Succeed and Stay Immigration Strategy.
REPORT
The Ethnocultural Small Grant Program is designed to assist new and existing
ethnocultural groups in obtaining incorporation, and when incorporation has
been successfully attained, to support select initiatives that will further
strengthen member recruitment and newcomer retention. The program
provides financial assistance in the form of small grants for the establishment of
new ethnocultural groups, or further development of existing groups to increase
service delivery.
Well-established ethnocultural gro
proposition when appealing to new immigrants, and equally, have proven to be
monumental in settling those that already call Saint Johnhome. Having a diverse
varietyof ethnocultural groups will providebroader supporttomeetthe varying
needs of different demographics,while fostering aninclusivecommunity that
encourages, promotes,and celebratesmulticulturalism.
I
.
for leading the charge in Atlantic Canada.
The Ethnocultural Small Grant Program will act to further improve quality of life,
cultivate community pride, foster diversity and inclusion, grow and support the
newcomer population, and reinforce a welcoming brand for Saint John.
Given past success, the attraction and retention targets set out in the
Immigration Strategy, and a growing need for added newcomer services, staff
would like to suggest the program transitions from a pilot project to a
permanent offering.
SERVICE AND FINANCIAL OUTCOMES
The cost for the Ethnocultural Grant Program in 2023 is$20,000as isaccounted
for in the operating budget; it is recommended that this be a new and annual
permanent grant program of the City of Saint John.
Staff have also drafted the policy so there is no duplication with existing grant
programs offered by the City such as the Community Grant program, or the
Community Arts Funding Program.
INPUT FROM OTHER SERVICE AREASANDSTAKEHOLDERS
Staff engaged theFinance & Administrative Services in the creation of this Policy
and .Staff also consulted with the Saint
John Local Immigration Partnership, the newcomercommunity,and 48 existing
Ethnocultural Groupsin Saint John.
ATTACHMENTS
Ethnocultural Small Grant Policy_2023FINAL
Ethnocultural Small Grant Program PowerPoint 2023
DwhI /haaL99w9thw
Report DateJune 15, 2023
Meeting DateJune 22, 2023
Chair KillenandMembers of the Growth Committee
SUBJECT: Beautification Grant Program
OPEN OR CLOSED SESSION
This matter is to be discussed in open session.
AUTHORIZATION
Primary AuthorCommissionerChief Administrative Officer
Yeva MattsonJacqueline HamiltonJ. Brent McGovern
RECOMMENDATION
1.That Common Council receive and file the Urban Beautification Program
report.
2.That Common Council adopt the amended Urban Beautification Policyas
nd
presented to the Growth Committee on June 22, 2023.
EXECUTIVE SUMMARY
Sincethe Beautification Grant program was implemented in 2016, ithas
stimulated reinvestment in the Central Peninsulabyprovidingfinancial
assistance toproperty ownerslooking to improvetheoverallaesthetic of their
property. As a result ofCommon Councilcontinuously funding the program,the
grant has been able to facilitate $551,636of investmentinto beautifying the
Central Peninsula. Thisreinvestmenthas resulted in improvements in the overall
priority.
As the creation of a Neighbourhood Plan for the North End beginsandnew
Community Enhancement efforts have commenced, it is recommended that the
program be extendedto incorporate the Old North Endand Douglas Avenueas a
new neighbourhood of focus.As part of the Old North End Pilot Program,
incentives will remain available in the Central Peninsulafor a one-yeartransition
periodduring 2023. After the transition period,the program will leave the
Central Peninsula and fully transition into the North End. The Boundary Map for
the BeautificationGrant Program will be updated to align with thefinal
boundary established for the NorthEnd Neighbourhood Plan.
This report describes the proposed next steps for the Beautification Grant
Program.
- 2 -
PREVIOUS RESOLUTION
In late 2014, Council directed staff to pursue the development of an incentive
program that offered grants to increase reinvestment in the façades and front
yards of properties, that would result in a more desirable streetscape. The pilot
program occurred in the South End, Uptown, and Waterloo Village
neighbourhoods of the City, which implemented aspects of the goals and
objectives of the Municipal Plan and the Central Peninsula Secondary Plan.
In 2019, Council adopted amendments to the Beautification Grant Policy which
included eligibility of exterior painting for side yard façades where there is a gap
in the urban fabric, a simplified scoring system for projects, and included the City
Road area to greater align the eligibility boundary with the Central Peninsula
Secondary Plan.
the recommendations to
move forward with the Community Enhancement Project, Council directed staff
to amend the Beautification Grant Policy to migrate the Beautification Grant
Program to the North End for 2023.
STRATEGIC ALIGNMENT
Common Council adopted a set of Priorities for 2021-2026. Under
and Belong, priorities include promoting population growth and
community vibrancy through beautification.
REPORT
CONTEXT
The Central Peninsula was selected as the pilot area for the Beautification Grant
Program. It was recognized that reinvestment in the façades of homes and small
businesses, or the landscaping of front yards would quickly improve the
appearance of properties, increasing the attractiveness of streets. This direction
was anticipated through the adoption of the Municipal Plan, when Common
Council directed the uptown area be given consideration for a package of
incentives.
Since the launch of the Central Peninsula neighbourhood planning process in
2016, the focus has remained , but as attention moves to
neighbourhoods outside the City Centre, the transition of the Beautification
Grant Program will support the undertaking of new neighbourhood planning
efforts. The shift of the program to the Old North End and Douglas Avenue will
help create a smooth transition of focus to a new area of the City, while
providing a transition period that will enable Central Peninsula property owners
to access the program before it fully shifts to the new geography. The proposal
being presented represents a transition plan which will allow for an initial
expansion into the North End while establishing a transition away from the
Central Peninsula, which is scheduled to occur at the end of the 2023 calendar
year. The new proposed boundaries for the program are the Old North End and
- 3 -
Douglas Avenue, with the intention that the Beautification Grant boundary will
be updated to align with the final boundary established for the North End
Neighbourhood Plan.
BACKGROUND
The Beautification Grant Program was adopted as policy on March 21, 2016 and
continues to be in effect. The program primarily incentivized property owners
living on the peninsula to improve the façades and landscaping of their front
yards to create an enhanced public realm. A staff Committee met monthly to
award grants based on design criteria of materials and appearance. An approved
grant provided 35% of the cost of eligible work up to a maximum of $4,000, and
up to $6,000 for a corner lot. This program component was financed entirely
through an annual operating budget of $50,000.
ANALYSIS
The beautification program is intended primarily for homeowners and landlords
to create positive change in their neighbourhoods by improvements to façades
and the front yards of their properties. Overall, the program stimulated
improvements to 41 properties, leveraging $551,636 in investment, which
represented $95,781.59 in grant funding. Improvements were varied and
included exterior painting, replacement of windows and doors, repairs to
entryways, repointing of brick, and landscaping front yards. In conjunction with
the extension of the program boundary to the Old North End and Douglas
Avenue, staff are also proposing to expand the qualifying work and to update the
scoring system to align with the goals outlined by the Community Enhancement
Project.
By expanding the qualifying work and updating the scoring system, the
Beautification Grant will now prioritize funding for remediation of unsightly and
dilapidated conditions. As identified by the Community Enhancement Project,
financial benefits provided by incentives and grants can encourage owners to
-laws. By prioritizing
unsightly and dilapidated conditions, the grant will ensure Property By-law
Compliance staff are equipped with additional tools to achieve voluntary
compliance in their cases, leading to more positive outcomes for the community.
The Beautification Grant Program continues to have merit and has proven to
work well in the Central Peninsula. In 2023, Growth and Community
Development staff will endeavor to seamlessly expand the program into the Old
North End and Douglas Avenue while still allowing for applications from the
Central Peninsula to create a smooth transition rather than an abrupt shift. With
the high proportion of older homes on the Central Peninsula, the Old North End,
and Douglas Avenue falling outside of the Heritage Conservation Areas and not
having access to Heritage Grants, the Beautification Program is an important
means to support aesthetic improvements to the existing housing stock. Any
- 4 -
properties inside a Heritage Conservation Area are exempt and have been
removed from the boundaries of the Beautification Grant Program.
The new boundary of the Old North End and Douglas Avenue was chosen for the
transition period as it aligned with the Community Enhancement Project focus.
The number of properties in these two neighbourhoods, especially the Old North
End, that have Unsightly Premises cases, Dangerous & Vacant Buildings cases,
and Minimum Property Standards cases is much higher than other communities
in the North End making it a strong focus for Beautification efforts.
The stock of housing in these neighbourhoods is also amongst the oldest housing
stock in the North End of the City. The choice to initially focus on these two areas
of the North End, will allow for a directed focus that will support the Community
Enhancement Project and will allow for a more concentrated use of the limited
budget for the Beautification program. As 2023 serves as a transition year for the
program, the existing funding envelope will also be utilized in the Central
Peninsula. This transition plan will allow for a soft introduction of the program
into the North End while respecting the existing funding available.
It is also critical to note that PlanSJ identified Douglas Avenue and Main Street as
Character Corridors within the City. Character Corridors are noted for their
strong social and cultural value and often connect broader portions of the
re places identified
for investment in quality streetscaping, the public realm and urban design.
Incremental improvements to the existing building stock will help act as a
catalyst for high quality investment into not only these areas, but into the
surrounding neighbourhoods. By focusing on the neighbourhoods which are
anchored by these two Character Corridors, it allows the Grant Program to be
transitioned into the North End through alignment wi
Plan, in advance of the establishment of the North End Neighbourhood Plan
boundary.
IMPROVEMENTS TO THE PROGRAM
Amendments to the Beautification Policy have been attached to this report and
comprise the following:
1. Including maintenance projects and having explanatory language around
the term improvement
2. Allowing for certain forms of vinyl siding without point reduction, subject
to Zoning By-law requirements.
3. Including flankage façades adjacent to a vacant lot as eligible work.
4. Including language that would remove certain ineligibility criteria
provided the project has potential to catalyse other improvements
beyond the subject site, as deemed by the Application Evaluation
Committee.
- 5 -
5. Permit up to 100% of the cost of eligible materials for work done by the
applicant and not a contracting service, for any work done involving
exterior painting and the installation of any landscaping details.
CONCLUSION
Since the creation of the Urban Beautification Grant Program, the City has
developed new policies and programs focused on the enhancement of our
community. At the Municipal level, the City undertook the creation of the
Central Peninsula Secondary Plan, which was adopted in 2019, and is now
preparing for the development of a Neighbourhood Plan for the North End. The
principles of the Urban Beautification Grant Program focusing on reinvestment
in the streetscape to enhance the public realm continues to remain a critical
component in creating vibrant urban spaces. The program will continue to
achieve those principles while adding a new focus on facilitating compliance with
City By-laws.
As we look at the future of the Grant Program, the expansion of it into the Old
North End and Douglas Avenue will create new opportunities in an older, but
significant part of the City much as it did the for the Central Peninsula. With the
expansion and transition of the program, it will allow for the residents of the
Central Peninsula to access the incentives for a final year while also giving staff a
chance to assess the boundaries of the program moving forward. Continuing to
encourage reinvestment in the streetscape and public realm will complement
the development of the North End Neighbourhood Plan and will be a component
of the revitalization of one of notable neighbourhoods.
SERVICE AND FINANCIAL OUTCOMES
The Beautification Grant Program is an existing grant stream administered by
staff. The increase of the Beautification Grant allocation from $50,000 to
$60,000 (within the existing grant envelope) will help support the transition of
the program into the Old North End and Douglas Avenue. $30,000 will be
dedicated solely for projects in the Old North End and Douglas Avenue, with the
remaining funding being flexible for use in either the Central Peninsula or the
Old North End.
INPUT FROM OTHER SERVICE AREAS AND STAKEHOLDERS
The Urban Beautification Policy update was done in conjunction with the
Community Enhancement Project, to ensure that the grant program will support
the work being done associated with community compliance to City By-laws.
Consultation with Communications was undertaken to create an effective roll-
out strategy. The intention is
st
updated policy, is to launch the new Grant Program effective July 1. The roll-out
strategy will include website including updated information on
the Grant Program and a Public Service Announcement, social media posts, and
a poster to be placed in prominent community spaces within the Old North End.
- 6 -
Staff will work with our community stakeholders to help ensure the program is
promoted within the community. In addition, an important part of the roll-out
will be the creation of an informational handout that would be paired with the
grant application for use by the bylaw enforcement team and other key city
staff, which can be provided to tenants and landlords in the North End.
ATTACHMENTS
Attachment 1 Urban Beautification Policy
UrbanBeautificationPolicy
UrbanBeautificationPolicy PolicyCategory:Policy
PolicyNo.:16-77.2ImplementationProcedureNo.:
ApprovedorLastReviewedDate:June2023NextReviewDate:April2025
Area(s)thispolicyappliesto:FinancialincentivesOwnerService:
supportingdevelopmentintheOld North EndGrowthandCommunityServices
RelatedPolicy(ies):
UrbanDevelopmentIncentivesPolicy
RevisionHistory
December2017
March2019
June2023
Date Created: SeniorLeadership CouncilApprovalDate:Contact:
March 15, 2016Review Date:Commissionerof
GrowthandCommunity
Services
Urban Beautification Policy
UrbanBeautificationProgramOld North End Pilot
Overview
The purpose of the Urban Beautification Program Old North End Pilot is to provide incentives for
people living in the Old North End to invest in the beautification of the façades of their homes
and small businesses, or the landscaping of their front yards. Increased reinvestment in the
facades and front yards of properties coordinated with community enhancement and
enforcement will result in a more desirable streetscape. The Program prioritizes transformative
projects which seek to restore original character elements or use high quality materials and well
accepted design practice to revitalize facades. As part of the Old North End Pilot Program,
incentives will remain available in the Central Peninsula for a transition period.
A. Qualifying Criteria:
i. The project is located within the boundaries outlined in Schedule 1 or Schedule 2;
ii. Individual apartment-style condominium units will not be eligible for a grant;
iii. All work proposed as part of an Urban Beautification Program application must be
conducted on the first four storeys of the dwelling;
iv. Where required, all work must have an approved building permit in order to receive funding.
B. Eligible Work:
The following work will be eligible for a grant:
i. The front or flankage façade of a building;
ii. Exterior painting, including any entranceways, siding, trim, moldings, porches, decks or
other features of the exterior of the main building;
iii. Siding repair, or the replacement of any siding with new siding material;
iv. The repointing of existing brick on the exterior of the main building;
v. The repair and/or replacement of any architectural elements of the building that are
original to the design of the building, or are similar to the architectural style of the
building;
vi. The replacement or installing of any exterior windows or doors;
vii. The replacement, renovation or installation of exterior front steps, handrails or walkways;
viii. The installation of any landscaping details including, but not limited to, sod, shrubs, trees
and plant beds; and
ix. Notwithstanding section B(i), exterior painting to a side yard façade of a property may be
eligible where: (i) the adjacent lot is a vacant or surface parking lot and has a frontage
of at least 11 metres, or, (ii) the side yard is occupied by surface parking with a width of
least 11 metres.
x. Any additional work not identified below as ineligible work, which incorporates
decorative elements and contributes to the beautification of the property.
C. Ineligible Work:
The following work conducted to the subject property will not be eligible for a grant:
i. The renovation of any interior spaces;
Page | 2
Urban Beautification Policy
ii. Work that has been started prior to the submission of an application;
iii.Thereplacementorrepairoftheroof, with the exception of a roof that forms a significant part of
the front wall of the building and has significantly deteriorated (e.g. damaged mansard roof);
iv. Any work done to a driveway or any other parking area;
v. Any work done to a property located within a Heritage Conservation Area;
vi. Any work that consists of regular maintenance over restoration and does not have a
transformative effect that meets with the Goals of the Program as deemed by the Application
Evaluation Committee;
vii. Any work done to an existing or proposed detached garage;
viii. Any exterior improvements done to backyards, or areas not visible from the street front; and,
ix. Projects receiving any funding through the Urban Development Incentives Program are
not eligible.
D. Eligible Costs:
The following costs associated with the project will be eligible towards evaluation of
grant:
i. Official quotes from a contractor service
ii. Receipts from a licensed business
a. Must include proper description of the item, costs, taxes, location of business,
and date
E. Program Guidelines
i. Structure:
a. An approved grant will provide 35% of the cost of the eligible work completed, including
HST, to a
i. maximum of $4,000;
ii. Where a grant application is for both a front and flankage building
façade, an approved grant will provide 35% of the cost of eligible work
completed, including HST, to a maximum of $6,000.
b. Beautification Grants will be awarded to the applicants with the highest
scores, as determined by the Application Evaluation Committee, until the
funds have been exhausted.
i. Where a grant application is deducted points by the Application Evaluation
Committee, the overall value of the grant shall be reduced from 35% of the
cost of eligible work according to the following formula:
ii. !!>!
!!
!!!!!46&!!)2!!*!
!!!
iii. Any work undertaken on the exterior of the building or property within the
same year will be included as part of the application for the purposes of
determining the project score.
c. Any application that receives a score of zero or lower will not be eligible for a
i. Beautification Grant.
ii. Distribution of Funds:
a. The distribution of funds for an approved project will occur after a final
site inspection has been conducted and it has been determined by staff
that the approved work has been completed.
b. No project will receive more than the 35% of the submitted proposal.
c. The applicant must submit all accompanying receipts necessary to provide
Page | 3
Urban Beautification Policy
th
proof of eligible expenses prior to November 30.
d. Where an applicant performs the required work for a Beautification Grant
themselves, only the material costs will be eligible for reimbursement.
e. Where work is performed by a company owned by the applicant, the City of
Saint John may request formal documentation outlining both detailed material
and labour costs for the project.
iii. Undertaking painting and/or landscaping without a contractor/professional
a. Notwithstanding subsection D(ii)(d), an applicant may be reimbursed for
undertaking painting or landscaping work themselves, as described in subsections
B(ii) and B(viii).
b. The total reimbursement of material costs shall result in an adjustment to the
reimbursement of total material costs from 35% up to 100%, but no more than the
maximum grant amount ($4000 for interior lot, $6000 for corner lot).
c. Receipts submitted for reimbursement must adhere to subsection D.
a. Schedule:
i. The effective date of the program is January 30, 2023.
ii. The Application Evaluation Committee will meet three times during a year, if
required, for the purpose of reviewing and approving applications.
iii. The Application Evaluation Committee shall determine meeting dates,
application deadlines, and any other necessary deadlines for the Program,
subject to the approval of the Commissioner of Growth and Community
Planning.
iv. Conditionally approved grants shall be incomplete and the applicant will not be
eligible for any funding if work has not commenced within one month of the
approval date.
e. All work approved by the Committee for a Beautification Grant must be completed by
November 30 in the same year as the application. If the proposed work approved by the
Committee for a Beautification Grant is not completed by November 30, the project will be
deemed incomplete, and the applicant will not be eligible to receive any funding.
Page | 4
Urban Beautification Policy
v.
b. Application Evaluation Committee:
i. The role of the Application Evaluation Committee is to provide a technical evaluation
of applications in the context of the Beautification Grant Score Card (Schedule 3).
ii. The Application Evaluation Committee will consist of five technical staff members
from one or more of the following City of Saint John Departments: Growth and
Community Services, Finance and Administrative Services, and
Communications.
iii. The members of the Application Evaluation Committee will be determined by the
Commissioner of Growth and Community Services.
iv. The members of the Application Evaluation Committee may step down from their
role on the Committee, or be replaced, subject to the approval of the
Commissioner of Growth and Community Services.
Page | 5
Schedule 1 Beautification Grant Program Boundaries
Central Peninsula
Page | 6
Schedule2BeautificationGrantProgramBoundaries
Old North End
Page | 7
8
which
Page |
and
location
maintain
a
adequate
detailing
building.
in
loose
deteriorated;
materials.
original
irregular pattern of
installed
and disruption of
and/or storm
do not
removing
anresidential
a
cladding which is
style.
on
of
significant
and
without
windows
door
of
maintaining
pattern
exposed brick; undertakes work
that of intact, traditional buildings
replacing broken or boarded up
painting
existing vinyl siding that is
removal
proportion,
thereby
is
landscaping.
fenestration
irregular
The
PointsPoints
guns or hand scrapers and applying
of
replacement using high quality
Points and PointsPointsPoints
an
53 32
14 there 10
Minus Proposes to use vinyl siding unlesswhereproposes to covercreatesinconsistent withalong the same street.Minus Paintingcladding and/ordeteriorated paint from woodred heatprimer prior
new paint.Minus Installs Minus Removal of architecturallywithout Minus Replace with white vinyl windowswindows, unlesswindows;traditionalpatterns; The replacementfenestration,Minus
Removal
ofofofofof
of
NotNotNotNotNotNot
scopescopescopescopescope
scope
PointsPointsPointsPointsPointsPoints
0 withinproject.0 withinproject.0 withinproject.0 withinproject.0 withinproject.0 withinproject.
of
that
25%
items.
an
façade.
Card one
on
faded.
greater
box
of
new
trees;
theof
Low
façade
only
maintaining
of
repair
25%not previously
previous
applicable.
Score
PointsPointPoint
less
PointsPoint
2 Paintingthaneligiblewaspeeling orInstallstheNot 1 Use of contextuallyappropriate vinyl whilefenestration,proportion, and style.1 Shrubs;perennialgardens;grass;planters.
2 Minoror 1
or
Grant
lot.
lintels,
façadefaçade,
up.
façade.
in an
pattern.
Siding.
while
Cement;
fiberglass
vacant
trim,
thepattern using
details.
debris.
compatible
eligibleeligible
on
of
items
boarded
wood,
Shingle
as
window
windows
of an
more
OR
fenestration
unsightly
as
planters
or
Beautification
such
previous
Siding;
of
architectural
peeling or faded.
box
3 broken
such
25%
and other similar features.
the
of
of
Wood
perennial
grass;
detailremoval
materials include: Fiber
replace
one
clad wood windows.
replaces
to
brackets
Work;
andnew
previously
trees;
or
only
up
Schedule
accentuation
was
PointsPointsPointPointPointsPoints
4 AppropriateMasonry 4 Painting greater than 25% of anthat OR Painting greater than 25%with 2 Installsentryway that was previously 1 Installation or improvements toarchitecturalcornices,3
Maintains or restores fenestrationhigh quality materialsaluminium OR Proposesmaintaining or restoring 2 CleanDerelict vehicle removal.Shrubs;
Repairsgardens;
Wood
style.
details.
Work;
porch or
building
appropriate steps
the
entryway; installs
Masonry
removal.
architectural
of
matches
materials such as wood,
contextually
materials. Restoration must
while maintaining or restoring
Cement;vehicle
deteriorated façade. Replaces
existing).
that
a
(if
eligible façade that was previously
of
installs
quality
detailing to façade.
quality
design
Derelict
Siding
windows
accentuation
more
high
door;
planters.
or
Vinyl
with
debris.
using
box
ropriate
25%handrails); adds vestibule, covered
25
architectural
AND
of
Siding;
perennial
grass;
appropriate
aluminium clad wood windows.
pattern
out
unsightly
replaces
is
siding.ofnew
original
two of the following: restores original
trees;
Shingle
or
score
PointsPointsPointsPointsPointsPoints
6 asbestosAppropriate materials include: FiberSiding;5 Painting greater than 25% of anpeeling or faded 3 includecontextually(including paintedcanopy with an app 35 Proposes to replace
broken fenestrationfiberglass or 3 Removal AND Shrubs;gardens;
RepairsRestoring entryway using high Restores
Total
GROWTH COMMITTEEREPORT
Report DateJune 14, 2023
Meeting DateJune 22, 2023
Service AreaGrowth and Community
Services
Chair KillenandMembers of the Growth Committee
SUBJECT: Community Enhancement Project Update & Resource Proposal
OPEN OR CLOSED SESSION
This matter is to be discussed in Growth Committee Open Session.
AUTHORIZATION
Primary AuthorCommissioner/Dept. HeadChief Administrative Officer
BennPurintonJ Hamilton/ A PoffenrothJ. Brent McGovern
d
RECOMMENDATION
It is recommended that the Growth Committee recommend that Common Council
approve an expenditure of $215,000from the Community Services Reservefor
resources associated with a 15-month Community Enhancement Pilotprogram as
outlined in this report.
EXECUTIVE SUMMARY
At the direction of Common Council, the Community EnhancementProjectbegan
in 2022andwas aholisticone-yearreview of Cityprograms with a focus on
Property By-law Compliance.The project aimed to enhance the City's Property By-
law Compliance programs by identifying opportunities and developing
improvementstobetter executelong
term strategic goals.
This report provides anupdate on two initiatives from the project that were
approved by Common Council, thenew Unsightly Repair Program andthe
advocacy efforts regardingvacant buildings.Also includedisinformation on a
$215,000 resource proposalfrom the Community Services Reserve. The funds
would be usedtoincrease Property By-law Compliance resourcesthrough
additional staffto capitalize on areas of opportunitiesidentified by the project.
These opportunities includeenhancingMinimum Property Standards
Program and increasingthe capacity ofthe Dangerous and Vacant Building
Program,including efforts under the newUnsightly Repair Program.
- 2 -
PREVIOUS RESOLUTION
It is recommended that the Growth Committee:
1. Receive and file the attached report and presentation on the Community
Enhancement Project.
2. Recommend that Common Council aggressively pursue with the Province
of New Brunswick the following improvements outlined by the Community
Enhancement Project:
a. The ability to implement a Vacant Building Tax and/or a Vacant
Building Registry linked to the property tax system.
b. An improved Tax Sale process that better addresses abandonment.
3. Endorse a 1-year pilot of an Unsightly Repair Program conditional on
recommendation (2) being approved.
4. Direct staff to implement the enhanced programs and return to Growth
Committee with any additional resource requirements.
5. Recommend that Common Council direct staff to amend the Beautification
Grant Policy to migrate the Beautification Grant Program to the North End
for 2023.
STRATEGIC ALIGNMENT
The Grow priority focuses on both population and economic growth with the goal
-law Compliance Programs work to achieve that
goal by facilitating investment into residential buildings. This not only has a direct
impact on tax base growth, but it also allows for population growth by ensuring a
supply of safe housing.
The Belong priority focuses on enhancing quality of life, ensuring community
safety and cultivating community pride by providing our citizens with safe, clean
-law compliance programs
directly address those needs by addressing hazardous building conditions,
ensuring neighbourhood cleanliness and enforcing general community standards.
REPORT
Overview
This report will provide updates on two Community Enhancement Project
initiatives, the new Unsightly Repair Program and the Community Enhancement
Advocacy efforts. Following those updates, the report will provide detailed
information on a $215,000 resource proposal for a Community Enhancement
Pilot. The pilot would allocate additional resources to -law
- 3 -
Compliance programs that positively impact citizen quality of life, address public
safety concerns and foster vibrant neighborhoods. This aligns with Common
Council's Grow and Belong priorities and achieves objectives outlined in the City's
10-year Strategic Plan and Affordable Housing Action Plan. These outcomes satisfy
the evaluation criteria outlined in the Community Services Reserve Policy and
therefore funding the pilot through the Community Services Reserve is
recommended.
Unsightly Repair Program
The Unsightly Repair Program allows City staff to take enforcement measures
against vacant buildings with unsightly dilapidated conditions such as peeling
paint, broken windows and missing siding. When these conditions exist, a Notice
to Comply may be issued, providing the owner with time to correct them. If the
notice expires with no action from the owner, the City can take measures to repair
the unsightly dilapidated conditions and bill the costs to the owner. This program
was piloted at the start of 2023 after being developed under the Community
Enhancement Project. The goal of the pilot is to see at minimum three unsightly
vacant buildings repaired within the South and North End focus areas. In
preparation to achieve that target, Notices to Comply for repair have been issued
for three properties in the South and North ends of the City. Each Notice to Comply
is set to expire in August, which will allow City repair to take place in late August
or early September if approved by Common Council.
The Unsightly Repair Program is on pace to successfully meet 2023 targets, seeing
the completion of three repairs this year. Proactive measures are being taken to
ensure its continued success in 2024 with higher targets and increased capacity.
While there is additional progress to be made, the program has demonstrated
potential to drive compliance in vacant building cases and is anticipated to be a
key piece of the Dangerous and Vacant Building program moving forward.
Community Enhancement Advocacy
As part of the Community Enhancement Project, two areas of opportunity were
identified that require change at the Provincial level. Those opportunities are:
The ability to implement a Vacant Building Tax or Registry tied to tax; and
An Accelerated Property Tax Sale Process
In January 2023, Common Council approved undertaking provincial advocacy on
those two items. Since that time, staff has undertaken various engagements at the
provincial level and with other municipalities to progress these issues. Notable
progress has been made in advocating for these two important changes and both
items are in a promising state moving forward.
Resource Proposal Community Enhancement Pilot
- 4 -
The Community Enhancement Project identified two opportunities to achieve
better outcomes within the City Property By-law Compliance programs through
increased resources on a pilot basis. Those opportunities include enhancing the
Minimum Property Standards Program and dedicating additional capacity to
the Dangerous and Vacant Building Program with a focus on Unsightly Repair.
To enhance the Minimum Property Standards program, staff recommend using
additional resources to transition from a complaint-based program to a proactive
one that actively seeks out new cases in focus areas. Dedicating additional
capacity to new Dangerous and Vacant Building Program initiatives will resolve
more cases, primarily through repairs.
Enhanced Minimum Property Standards
The Minimum Property Standards Program enforces
maintenance and safety standards on residential rental buildings in Saint John.
These standards help to ensure the safety, health, and well-being of those who
live in and use the properties. To enhance the Minimum Property Standards
Program, staff recommend increasing resources within the program to transition
from the current complaint-based approach to a proactive approach. This will
allow the program to provide benefits to a significantly larger section of the
population.
The Minimum Property Standards program benefits the community by addressing
tenant safety issues, thereby improving quality of life. This has become especially
important in economic climate where tenants are faced with limited rental
options due to low vacancy rates. The program also enforces property
maintenance standards, maintaining the City older housing stock. This has
positive effects on housing affordability as noted by the
Action Plan. The Plan states that
opportunity to help meet housing needs over time. The Minimum Property
Standards Program provides the first opportunity for staff to intervene in
deterioration. Doing so can prevent vacancy, abandonment and demolition which
maintains the housing supply.
Enhancing the program will allow a significant number of buildings to be impacted
that currently go unaddressed under the complaint-based approach. To highlight
this, focus areas in the South-Central Peninsula, the North End and the Lower West
Side were analyzed. The analysis determined that of the 900 multi-unit buildings
between 3 and 12 units in those areas, only 315 (35%) had been inspected by the
Minimum Property Standards Program. There are about 585 buildings with 3 or
more units that have not been inspected since 2010, if at all. A vast majority of
these buildings are older stock built prior to 1970 and as a result require increased
- 5 -
maintenance.If increased resources were dedicated for an enhancedMinimum
Property Standards Program, these 585 buildings would be the primary targets.
Under the existing complaint-based approach, it could take 15-20 years to inspect
and resolve cases on all 585 of these buildings. Transitioning to a proactive
approach through additional resources would allow all 585 to be addressed within
6-7 years. This is still a significant length of time, but an improvement of over 100%
compared to the pace staff is currently able to work at. Furthermore, increasing
capacity within the program will drive voluntary compliance, as building owners
will take notice of increased efforts regarding Minimum Standards issues.
To summarize, the Minimum Property Standards Program works to ensure tenant
safety and maintain existing housing stock. By accomplishing this, the
program provides positive impacts on citizen quality of life and on housing
affordability. Dedicating additional resources to the program to transition to a
proactive approach will allow the program to achieve higher results. It is expected
that the program could target up to 80 resolved cases per year after a successful
pilot. This is an increase of approximately 80% from the current target of 45. By
achieving this transition, the program will provide positive impacts on a
significantly larger scale, capitalizing on its full potential.
Dangerous and Vacant Building Program Initiatives
Increasing capacity within the Dangerous and Vacant Building Program will allow
for increased focus on new initiatives developed under the Community
Enhancement Project, like the Unsightly Repair Program. If resources were added,
10 properties would be targeted for repair in 2024, up from the 2023 target of 3.
Furthermore, additional capacity would be placed on other early intervention
initiatives like the Developer Notification List, seeking out opportunities for
redevelopments by new owners. As a result of these increased efforts, it is
expected that 65 total resolved cases could be targeted after a successful pilot, up
from the current target of 50. This would benefit the City as a whole, allowing for
more growth, creating safe, livable neighbourhoods, and cultivating community
pride.
Resource Proposal Summary
To achieve enhanced outcomes on a pilot basis, additional staff members are
recommended. These staff members would be added for a 15-month term as part
of a Community Enhancement Pilot. If the pilot is successful, a recommendation
to sustain these resources long-term will be brought forward for consideration for
the 2025 budget. The cost of the 15-month pilot is $215,000 which is proposed to
Community Services Reserve. The cost to maintain
the resources long term is estimated to be $170,000 per year.
- 6 -
This pilot would enhance the Minimum Property Standards Program and increase
capacity within the Dangerous and Vacant Building Program. By transitioning the
Minimum Property Standards Program to a proactive approach through additional
resources, the City can achieve significant improvements in tenant safety, housing
quality, and affordability. Additionally, increasing the capacity of the Dangerous
and Vacant Building Program through these resources will result in more resolved
cases, leading to safer and more vibrant neighborhoods. By investing in these
community enhancement efforts, a lasting positive impact can be made on the
well-being and pride of citizens.
SERVICE AND FINANCIAL OUTCOMES
The proposed Community Enhancement Pilot would require additional staff to
. The pilot will also
increase capacity within the Dangerous and Vacant Building Program. By
increasing the level of service provided by these programs, the City will experience
safer, more vibrant neighborhoods and will see positive implications with respect
to housing affordability.
The 15-month pilot would cost $215,000, which is proposed to be funded through
Community Services Reserve.
INPUT FROM OTHER SERVICE AREAS AND STAKEHOLDERS
Communications has assisted in the ongoing Community Enhancement Advocacy
efforts.
ATTACHMENTS
Presentation
.
f Click here to enter text.
.
.
.
Resource Proposal
June 22, 2023
Community Enhancement Project Update &