Loading...
Water and Sewerage By-law Amendment 2022-05-02BY-LAW NUMBER M-16 A LAW TO AMEND A BY-LAW RESPECTING WATER AND SEWERAGE ARRETE NO M-16 ARRETE MODIFIANT L'ARRETE CONCERNANT LE RESEAU WEAU ET D'EGOUTS Be it enacted by the Common Council of Lors d'une reunion du conseil communal, The City of Saint John as follows: The City of Saint John a ddcrdtd ce qui suit : A By-law of The City of Saint John entitled "A By-law Respecting Water and Sewerage", enacted on the 7th day of June, A.D. 2004, is hereby amended as follows: 1 Schedule "E" is repealed and replaced with Schedule "E" attached hereto. IN WITNESS WHEREOF The City of Saint John has caused the Corporate Common Seal of the said City to be affixed to this by-law the 2nd day of May, A.D. 2022 and signed by: Par les presentes, 1'arrete de The City of Saint John intitule « Arretd concernant les reseaux d'eau et d'dgouts >>, decrete le 7 juin 2004, est modifie comme suit: L'annexe « E » est abrogde et remplacee par !'annexe « E > ci jointe. EN FOI DE QUOI The City of Saint John a fait apposer son sceau communal sur le present arrete le 2 mai 2022, avec les signatures suivantes : First Reading - April 19, 2022 Premiere lecture - le 19 avril 2022 Second Reading - April 19, 2022 Deuxidme lecture - le 19 avril 2022 Third Reading - May 2, 2022 Troisi6me lecture - le 2 mai 2022 Schedule "E" Raw Industrial Water Customers and Rates Raw Water Infrastructure Rate per Rate Customer Cubic Stabilizing Metre ($) Reserve Bi- Monthl ($) 1. New This user draws its industrial raw water 0.7145 1,329 Brunswick through a 1500mm diameter concrete Power intake pipe running from Ludgate Lake across Route 1 to the Coleson Cove Screen Building located at coordinates N 7355170.56 and E 2522389.97 just off of Route 1.Once through the screen building water passes through approximately 5,000m of 600mm diameter transmission main to ultimately make its way to the Coleson Cove generating station located at 4077 King William Road. 2. Irving Pulp This user draws its industrial raw water 0.0704 45,879 and Paper through a 1800mm diameter intake pipe Limited and approximately 330m of 1800mm diameter concrete pressure pipe originating from Spruce Lake leading to the Spruce Lake Screen building. The screen building is located at coordinates N 7357823.16 and E 2525290.60 and is just to the right of the eastern shore of Spruce Lake. Once through the screen building water passes through the Spruce Lake Transmission main to ultimately make its way to the Irving Pulp and Paper Mill located at 408 Mill Road. The Spruce Lake transmission main consists of approximately 7,500 m of 1500mm diameter concrete pressure pipe owned by City of Saint John and approximately 1,000m of 1370mm diameter concrete pressure pipe owned by IPP. 3. Irving Paper This user draws its industrial raw water 0.0677 31)587 Inc. through a 1200mm diameter intake pipe originating from Latimer Lake leading to the Latimer Lake control valve chamber. Once through the control valve chamber, water passes through approximately 275m of 1500mm diameter reinforced concrete pipe to ultimately discharge into Eldersley brook. Eldersley Brook recharges the Silver Falls watershed. Irving Paper has a private intake, screen and chlorination building located at Silver falls. From there the water eventually makes its way to Irving Paper located at 435 Bayside Drive. 4. Irving Oil Multiple raw water transmission mains 0.2755 25,067 Limited deliver raw water from Latimer Lake to other transmission piping near the Lakewood Heights pump station for use by potable and industrial users. Irving Oil Limited draws its industrial raw water from two separate connections to the above mentioned transmission mains prior to their connection to the Loch Lomond Drinking Water Treatment Facility. The first raw water connection to the transmission system near the Lakewood Heights Pumping Station delivers raw water to a chamber located at Champlain Heights through approximately 2,500m of 600mm HDPE relined cast iron raw water transmission main to ultimately make its way to the Irving Oil Refinery located at 340 Loch Lomond Road. The second connection to the above transmission systems is a 600mm PVC Raw water transmission main, approximately 3,000m delivers raw water along Hickey Road to a chamber located at Champlain Heights. From there raw water is delivered through approximately 450m of 500mm raw water transmission main along Commerce Drive to ultimately make its way to the Irving Oil Refinery located at 340 Loch Lomond Road. Notes: a) At between approximately 3 to 5 year intervals, the city will undertake industrial raw water rate studies for purposes of reassessing rates and rate structures. b) Rate Stabilizing Reserve will be reviewed annually as part of the yearly rate setting exercise with the intent of holding approximately 7 months of operating costs in the rate stabilizing reserve at any given time. Annexe « E Clients et tarifs de 1'eau industrielle brute Client d'eau Infrastructure Taux au La reserve de brute metre cube stabilisation ($) des tarifs Tari bimensuel($) 1. Energie Cet utilisateur puise son eau brute industrielle 0,7145 1,329 Nouveau- dans un tuyau de prise d'eau en b6ton de Brunswick 1 500 mm de diametre qui, traversant la route 1, va du lac Ludgate au batiment de degrillage de Coleson Cove situe aux coordonnees N 7355170.56 et E 2522389.97, a proximite de la route 1. Une fois sortie du batiment de degrillage, 1'eau circule dans environ 5 000 m de conduite principale de 600 mm de diametre pour finalement se rendre a la centrale de Coleson Cove, situee au 4077, chemin King William. 2. Irving Cet utilisateur puise son eau brute industrielle 0,0704 45,879 Pulp and dans un tuyau de prise d'eau de 1 800 mm de Paper diametre vers un tuyau sous pression en beton Limited de 1 800 mm de diametre d' une longueur de 330 m environ provenant du lac Spruce et menant au batiment de degrillage du lac Spruce. Le batiment de degrillage est situ6 aux coordonnees N 7357823.16 et E 2525290.60, juste a droite de la rive est du lac Spruce. Une fois sortie du batiment de degrillage, 1'eau passe par la conduite principale du r6seau de transport du lac Spruce pour finalement se rendre a I'usine de pates et papiers Irving situee au 408, chemin Mill. La conduite principale de transport du lac Spruce est compos6e d'environ 7 500 m de conduite sous pression en b6ton de 1 500 mm de diametre appartenant a ]a ville de Saint John et d'environ 1 000 m de conduite sous pression en b6ton de 1 370 mm de diametre appartenant a IPP. 3. Irving Cet utilisateur puise son eau brute industrielle 0,0677 3,587 Paper Inc. dans un tuyau de prise d'eau de 1200 mm de diametre provenant du lac Latimer et menant a la chambre de vannes de regulation du lac Latimer. Une fois sortie de la chambre de vannes de regulation,l'eau circule dans environ 275 m de tuyau en b6ton arm6 de 1 500 mm de diametre pour finalement s'6couler dans le ruisseau Eldersley. Le ruisseau Eldersley recharge le bassin versant de Silver Falls. Irving Paper possede un batiment prive de prise d'eau, de degrillage et de chloration situ6 a Silver Falls. De la, 1'eau se rend eventuellement a I'usine d'Irving Paper, situee au 435 promenade Bayside. 4. Irving Oil De multiples conduites principales de transport 0,2755 25,067 Limited d'eau brute acheminent 1'eau brute du lac Latimer a d'autres conduites de transport situees prils de la station de pompage de Lakewood Heights pour We utilisees par des utilisateurs d'eau potable et industrielle. Irving Oil Limited tire son eau brute industrielle de deux raccordements distincts aux conduites de transport susmentionndes avant leur raccordement a l'usine de traitement de 1'eau potable de Loch Lomond. Le premier raccordement d'eau brute au reseau de transport pr6s de la station de pompage de Lakewood Heights achemine 1'eau brute a une chambre situee a Champlain Heights par l'intermediaire d'environ 2 500 m de conduite de 600 mm en fonte rev6tue de PEHD pour finalement se rendre a la raffinerie Irving Oil situee au 340 chemin Loch Lomond. Le deuxi6me raccordement aux systi mes de transport ci-dessus est une conduite d'eau brute en PVC de 600 mm, d'une longueur d'environ 3 000 m, qui achemine 1'eau brute le long du chemin Hickey vers une chambre situee a Champlain Heights. De 1a, Peau brute est achemin6e par une conduite principale de transport d'environ 450 m d'un diametre de 500 mm le long de la promenade Commerce jusqu'a la raffinerie Irving Oil situee au 340, chemin Loch Lomond. Notes : a) Tous les trois a cinq ans environ, la Ville entreprend des etudes sur les tarifs de leau brute industrielle arm de reevaluer les tarifs et les structures tarifaires. b) La reserve de stabilisation des tarifs fait Pobjet d'un examen annuel dans le cadre de 1'exercice annuel d'etablissement des tarifs, l'intention etant de conserver environ sept moil de frais d'exploitation dans la reserve de stabilisation des tarifs en tout temps.