Water and Sewerage By-law Amendment 2020-12-14 (2)BY-LAW NO. M-16
A LAW TO AMEND A BY-LAW
RESPECTING WATER AND SEWERAGE
ARRETE NO M-16
ARRETE MODIFIANT L'ARRETE
CONCERNANT LE RESEAU WEAU ET
D'EGOUTS
Be it enacted by the Common Council of The Lors d'une reunion du conseil municipal, The
City of Saint John as follows: City of Saint John a decrete ce qui suit :
A By-law of The City of Saint John entitled "A
By-law Respecting Water and Sewerage", enacted on the
7th day of June, A.D. 2004, is hereby amended as
follows:
1. Schedule "E" mentioned in sections 43 and 44 is
repealed, and Schedule "E" hereto annexed is
substituted.
IN WITNESS WHEREOF The City of Saint John has
caused the Corporate Common Seal of the said City to
be affixed to this by-law the 141h day of December,
A.D. 2020 signed by: r
First Reading - December 7, 2020
Second Reading - December 7, 2020
Third Reading - December 14, 2020
Par les presentes, 1'arrete de The City of Saint
John intitule « Arrete concernant les reseaux d'eau et
d'egouts » , decrete le 7 juin 2004, est modifie comme
suit:
1. L'annexe « E » mentionnes a ('articles 43 et 44
est abroge et remplace par I'annexe <c E » annexee aux.
presentes :
EN FOI DE QUOI, The City of Saint John a fait
apposer son sceau municipal sur le present arrete le 14
decembre 2020, avec les signatures suivantes :
Premiere Iecture - le 7 decembre 2020
Deuxieme lecture - le 7 decembre 2020
Troisieme lecture - le 14 decembre 2020
Schedule « E
Raw Industrial Water Customers and Rates
Raw Water
Infrastructure
Rate per
Rate
Special
Customer
Cubic
Stabilizing
Charge
Metre $
Reserve
Bi-
Bi-
Monthl $
Monthly$
1. New
This user draws its industrial raw water
0.3850
1,326
Brunswick
through a 1500mm diameter concrete
Power
intake pipe running from Ludgate Lake
across Route 1 to the Coleson Cove Screen
Building located at coordinates N
7355170.56 and E 2522389.97 just off of
Route 1.Once through the screen building
water passes through approximately
5,000m of 600mm diameter transmission
main to ultimately make its way to the
Coleson Cove generating station located
at 4077 King William Road.
2. Irving Pulp
This user draws its industrial raw water
0.0666
43,148
and Paper
through a 1800mm diameter intake pipe
Limited
and approximately 330m of 1800mm
diameter concrete pressure pipe originating
from Spruce Lake leading to the Spruce
Lake Screen building. The screen building
is located at coordinates N 7357823.16 and
E 2525290.60 and is just to the right of the
eastern shore of Spruce Lake. Once
through the screen building water passes
through the Spruce Lake Transmission
main to ultimately make its way to the
Irving Pulp and Paper Mill located at 408
Mill Road. The Spruce Lake transmission
main consists of approximately 7,500 m of
1500mm diameter concrete pressure pipe
owned by City of Saint John and
approximately 1,000m of 1370mm
diameter concrete pressure pipe owned by
IPP.
3. Irving Paper
This user draws its industrial raw water
0.0611
3,424
8,333
Inc.
through a 1200mm diameter intake pipe
originating from Latimer Lake leading to
the Latimer Lake control valve chamber.
Once through the control valve chamber,
water passes through approximately 275m
of 1500mm diameter reinforced concrete
pipe to ultimately discharge into Eldersley
brook. Eldersley Brook recharges the
Silver Falls watershed. Irving Paper has a
private intake, screen and chlorination
building located at Silver falls. From there
the water eventually makes its way to
Irving Paper located at 435 Bayside Drive.
4. Irving Oil
Multiple raw water transmission mains
0.2722
21,983
Limited
deliver raw water from Latimer Lake to
other transmission piping near the
Lakewood Heights pump station for use by
potable and industrial users. Irving Oil
Limited draws its industrial raw water from
two separate connections to the above
mentioned transmission mains prior to their
connection to the Loch Lomond Drinking
Water Treatment Facility.
The first raw water connection to the
transmission system near the Lakewood
Heights Pumping Station delivers raw
water to a chamber located at Champlain
Heights through approximately 2,500m of
600mm HDPE relined cast iron raw water
transmission main to ultimately make its
way to the Irving Oil Refinery located at
340 Loch Lomond Road. The second
connection to the above transmission
systems is a 600mm PVC Raw water
transmission main, approximately 3,000m
delivers raw water along Hickey Road to a
chamber located at Champlain Heights.
From there raw water is delivered through
approximately 450m of 500mm raw water
transmission main along Commerce Drive
to ultimately make its way to the Irving Oil
Refinery located at 340 Loch Lomond
Road.
Notes:
a) At between approximately 3 to 5 year intervals, the city will undertake
industrial raw water rate studies for purposes of reassessing rates and rate
structures.
b) Rate Stabilizing Reserve will be reviewed annually as part of the yearly rate
setting exercise with the intent of holding approximately 7 months of
operating costs in the rate stabilizing reserve at any given time.
c) For Irving Paper Inc. there is a fixed bi-monthly special charge included to
recover $50,000 in costs related to a preliminary design of a new water
connection. Cost to only be charged if the work proceeds.
Annexe « E »
Clients et tarifs de Peau industrielle brute
Client d'eau
Infrastructure
Taux au
La reserve de
Cout Special
brute
metre cube
stabilisation
$
des tarifs
Tari
Tari
bimensuel $
Bimensuel $
1. Energie
Cet utilisateur puise son eau brute industrielle
0,3850
1,326
Nouveau-
dans un tuyau de prise d'eau en beton de
Brunswick
1 500 mm de diametre qui, traversant la route 1,
va du lac Ludgate au batiment de d6grillage de
Coleson Cove situe aux coordonnees
N 7355170.56 et E 2522389.97, a proximite de
la route 1. Une fois sortie du batiment de
d6grillage, l'eau circule dans environ 5 000 m
de conduite principale de 600 mm de diametre
pour finalement se rendre a la centrale de
Coleson Cove, situee au 4077, chemin King
William.
2. Irving
Cet utilisateur puise son eau brute industrielle
0,0666
43,148
Pulp and
dans un tuyau de prise d'eau de 1 800 mm de
Paper
diametre vers un tuyau sous pression en beton
Limited
de 1 800 mm de diametre d'une longueur de
330 m environ provenant du lac Spruce et
menant au batiment de d6grillage du lac Spruce.
Le batiment de d6grillage est situe aux
coordonnees N 7357823.16 et E 2525290.60,
juste a droite de la rive est du lac Spruce. Une
fois sortie du batiment de d6grillage, Peau passe
par la conduite principale du reseau de transport
du lac Spruce pour finalement se rendre a
l'usine de pates et papiers Irving situde au 408,
chemin Mill. La conduite principale de
transport du lac Spruce est composee d'environ
7 500 m de conduite sous pression en beton de
1 500 mm de diametre appartenant a la ville de
Saint John et d'environ 1 000 m de conduite
sous pression en beton de 1 370 mm de
diametre appartenant a [PP.
3. Irving
Cet utilisateur puise son eau brute industrielle
0,0611
3,424
8,333
Paper Inc.
dans un tuyau de prise d'eau de 1 200 mm de
diametre provenant du lac Latimer et menant a
la chambre de vannes de regulation du lac
Latimer. Une fois sortie de la chambre de
vannes de regulation, 1'eau circule dans environ
275 m de tuyau en beton acme de 1 500 mm de
diam&re pour finalement s'dcouler dans le
ruisseau Eldersley. Le ruisseau Eldersley
recharge le bassin versant de Silver Falls. Irving
Paper possede un bitiment priv6 de prise d'eau,
de d6grillage et de chloration situ6 a Silver
Falls. De la, Peau se rend eventuellement a
Pusine d'Irving Paper, situ6e au 435 promenade
Bayside.
4. Irving Oil
De multiples conduites principales de transport
0,2722
21,983
Limited
d'eau brute acheminent 1'eau brute du lac
Latimer a d'autres conduites de transport
situ6es pres de la station de pompage de
Lakewood Heights pour etre utilisdes par des
utilisateurs d'eau potable et industrielle. Irving
Oil Limited tire son eau brute industrielle de
deux raccordements distincts aux conduites de
transport susmentionndes avant leur
raccordement a Pusine de traitement de Peau
potable de Loch Lomond.
Le premier raccordement d'eau brute au rdseau
de transport pres de la station de pompage de
Lakewood Heights achemine Peau brute a une
chambre situ6e i Champlain Heights par
1'intermddiaire d'environ 2 500 m de conduite
de 600 mm en fonte revetue de PEHD pour
finalement se rendre i la raffinerie Irving Oil
situde au 340 chemin Loch Lomond. Le
deuxieme raccordement aux systemes de
transport ci-dessus est une conduite d'eau brute
en PVC de 600 mm, d'une longueur d'environ
3 000 m, qui achemine Peau brute le long du
chemin Hickey vers une chambre situde a
Champlain Heights. De IA, Peau brute est
acheminee par une conduite principale de
transport d'environ 450 m d'un diam6tre de
500 mm le long de la promenade Commerce
jusqu'i la raffinerie Irving Oil situ6e au 340,
chemin Loch Lomond.
Notes :
a) Tons les trois a cinq ans environ, la Ville entreprend des Etudes sur les tarifs
de Peau brute industrielle afin de r66valuer les tarifs et les structures
tarifaires.
b) La reserve de stabilisation des tarifs fait l'objet d'un examen annuel daps le
cadre de 1'exercice annuel d'etablissement des tarifs, Pintention etant de
conserver environ sept mois de frais d'exploitation dans la reserve de
stabilisation des tarifs en tout temps.
c) Pour Irving Paper inc, it y a un frais fixe bi-mensuel qui a pour but de
recupirer un total de 50,000$ afin de rembourser la conception
preliminaire d'un nouveau raccordement d'eau. Ces couts seront seulement
appliques si Ia conception preliminaire a lieu.