Pages
1. Call to Order
2. Approval of Agenda
3. Disclosures of Conflict of Interest
4. Consent Agenda
4.1. Fundy Quay — Infrastructure Funding Agreements (Recommendation in Report) 2 - 67
4.2. City Market Tower Lease with Envision Saint John (Recommendation in 68 - 86
Report)
4.3. Low Carbon Economy Fund (LCEF) Amending Agreement — Municipal 87 - 94
Buildings Energy Retrofit Project (Recommendation in Report)
4.4. Low Carbon Economy Fund (LCEF) Amending Agreement — District Energy 95 - 102
System (DES) Project (Recommendation in Report)
4.5. Statement of Work Agreement with Ricoh Canada Inc. (Recommendation in 103 - 112
Report)
5. Consideration of Issues Separated from Consent Agenda
6. Committee of the Whole
6.1. Recommended Appointments to Committees
7. Consideration of By-laws
113 - 113
7.1. Weight Restriction By -Law Amendment on Wentworth Street (3rd Reading) 114 - 122
8. Public Hearings - 6:30 p.m.
8.1. Proposed Municipal Plan Amendment and Zoning ByLaw Amendment — 2100 123 - 452
Sandy Point Road (Ethos Ridge) Supplementary Report (1st and 2nd Reading)
9. Adjournment
2
u
City of Saint John
Common Council Meeting
Monday, March 29, 2021
Committee of the Whole
1. Call to Order
Si vous avez besoin des services en frangais pour une reunion de Conseil communal, veuillez contacter le
bureau du greffier communal au 658-2862.
Each of the following items, either in whole or in part, is able to be discussed in private pursuant to the
provisions of subsection 68(1) of the Local Governance Act and Council / Committee will make a
decision(s) in that respect in Open Session:
5:45 p.m., Meeting Conducted through Electronic Participation
1.1 Personnel Matter 68(1)(j)
1.2 Nominating Committee 68(1)(b)
COMMON COUNCIL REPORT
M&C No.
2021-087
Report Date
March 24, 2021
Meeting Date
March 29, 2021
Service Area
Utilities and
Infrastructure Services
His Worship Mayor Don Darling and Members of Common Council
SUBJECT. Fundy Quay — Infrastructure Funding Agreements
AUTHORIZATION
Primary Author
Commissioner/Dept. Head
City Manager
Jeffrey Cyr
J. Brent McGovern
John Collin
RECOMMENDATION
1. It is recommended that the City enter into Agreement with the Regional
Development Corporation for funding under the Canada — New Brunswick
Integrated Bilateral Agreement for Investing in Canada Infrastructure
Program for the project entitled "Harbour Passage (Phase 1) - Loyalist
Plaza and Pedway Connection" in the form as presented to Council at its
March 29, 2021 meeting; and that the Mayor and Common Clerk be
authorized to execute the said Agreement.
2. It is recommended that the City enter into Agreement with the Regional
Development Corporation for funding under the Canada — New Brunswick
Integrated Bilateral Agreement for Investing in Canada Infrastructure
Program for the project entitled "Fundy Quay — Harbour Passage Phase 2"
in the form as presented to Council at its March 29, 2021 meeting; and that
the Mayor and Common Clerk be authorized to execute the said
Agreement.
EXECUTIVE SUMMARY
The overall infrastructure funding package for the Fundy Quay project is
comprised of a series of funding agreements with both the Provincial and Federal
Governments, with a total value of just over $18.4 Million. The purpose of this
report is to bring forward two infrastructure funding agreements for the Fundy
Quay project which in addition to previously approved funding agreements
represent more than 95% of the Fundy Quay infrastructure funding package.
PREVIOUS RESOLUTION
At its March 22" d meeting, Common Council approved the following motion:
1. It is recommended that the City accept the offer by the Regional
Development Corporation for funding from the Community Development
1
-2-
Fund for the project entitled "Fundy Quay — Infill" as presented to Council
at its March 22, 2021 meeting and that the Mayor and Common Clerk be
authorized to execute the said offer.
2. It is recommended that the City accept the offer by the Regional
Development Corporation for the project entitled "City of Saint John —
Infrastructure" as presented to Council at its March 22, 2021 meeting and
that the Mayor and Common Clerk be authorized to execute the said offer.
REPORT
The Fundy Quay property represents one of the highest profile development
opportunities on the Atlantic Canadian Coast and the single greatest opportunity
to realize the transformation of Saint John's urban waterfront. A re -imagined
Fundy Quay will serve to enhance the Saint John urban experience through a mix
of uses such as retail and commercial space and services, specialty shops and
boutiques, residential condominiums and apartments, hospitality, entertainment,
cultural uses, green spaces, cafes, and transportation systems that will truly make
the site a vibrant catalyst for future waterfront activity.
As one of Saint John's three catalytic projects, Envision Saint John is providing
project leadership and management support for the Fundy Quay project, a
transformational waterfront development project for the City of Saint John.
Background
In spring of 2019, Develop Saint John (now Envision Saint John) embarked upon a
new strategy to pursue the development of the Fundy Quay property. The revised
strategy was to secure a developer to undertake a phased approach to the build
out of the site, while municipal infrastructure projects would address key barriers
and strategic infrastructure needs for the area. The municipal investment would
be recovered through the enhanced value of the property, Federal and Provincial
infrastructure funding, and property tax growth from the development.
Early in the process, DevelopSJ (now Envision Saint John) put out a call for
expressions of interest for the development of the property and submitted a
funding application through the Investing in Canada Infrastructure Program (ICIP).
Since this time, an agreement was signed with Fundy Quay Developments Inc. (a
subsidiary of the Elias Management Group) for the development of the property
and in June of 2020, Provincial cabinet approved the infrastructure applications
and initiated the submission for Final Federal approvals.
With the formal announcement of the Provincial and Federal infrastructure
funding on February 19th, the Fundy Quay project was formally launched at
Common Council at its February 22"d meeting.
9
-3-
Tri-lateral Infrastructure Funding Agreements
The overall infrastructure funding package for the Fundy Quay project is
comprised of a series of funding agreements with both the Provincial and Federal
Governments with a total value of $18.4 Million. Currently, the City has executed
a funding agreement with the Federal government under the Disaster Mitigation
and Adaptation Fund (DMAF), valued at $3.27 Million. At its previous meeting on
March 22"d, Common Council approved two provincial funding agreements with a
value of roughly $3,865,000 Million in funding. This report brings forward the two
remaining formal funding agreements for Council approval and execution,
representing an additional $10,448,750 in Federal and Provincial infrastructure
funding. The remaining $825,000 is to be provided by the Province in the form
offsetting funding to other municipal projects through its Community
Development Fund. The table below outlines the funding contributions and
associated funding agreements.
Fundy Quay Tri-Lateral Funding Breakdown
Agreement(s)
Total Cost
Total Federal
Provincial
Municipal
Soil Remediation
N/A
$4,121,000
$0
$0
$4,121,000
Infill
GNB Community
$2,500,000
$0
$625,000
$1,875,000
Development Fund
Infrastructure Canada
Harbour Passage
Integrated Bilateral
Phase 1, Loyalist
Agreement
$9,995,000
$7,996,000
$0
$1,999,000
Plaza, and Pedway
Contribution
Agreement
Infrastructure Canada
Integrated Bilateral
Harbour Passage
Agreement
$2,675,000
$1,070,000
$1,382,750
$222,250
Extension, Phase 2
Contribution
Agreement
DMAF Agreement
(Executed)
Dividend Agreement
with the Elias
Seawall Repair
Management Group
$g 175,000
$3,270,000
$3,240,000
$1,665,000
(Executed)
Dividend Agreement
with the Province of
New Brunswick
(Executed)
Offsetting
Community
Applications being
Development Fund
prepared for
$0
$0
$825,000
($825,000)
Contribution to SJ
submission & approval
Ca ital Budget
Total
$27,466,000
$12,336,000
$6,072,750
$9,057,250
0
-4-
Harbour Passage (Phase 1), Loyalist Plaza and Pedway Connection: This funding
agreement is through the Investing in Canada Infrastructure Program's Covid-19
Resiliency Stream. The value of this agreement contribution is $7,996,000 and covers 80%
of the cost of this project component. The agreement requires that construction begin by
September 30th, 2021 and be completed by December 31', 2021. It was noted in the
previous Council report that the entirety of this project cannot be completed within this
timeframe and an extension will be required. It is noteworthy that at this time, the
Province has advised the project team that formal requests have been made by all
Provinces across Canada for the Federal Government to extend the timeline for the
funding. The schedule challenges faced by the City in this agreement are being felt by
communities across the country and there is significant pressure on the Federal
Government to provide an extension.
If an extension is not provided by the Federal Government for Harbour Passage (Phase 1)
funding agreement, the City does face the risk of default under section 16.3 of the
agreement. The Province has provided verbal assurances to the City that the program
does not claw back funding spent, however, they do have the authority (they may do so)
within the agreement however this would be an impact to all municipalities in the same
situation across Canada who have funding under this program and hence the reason the
Provinces are united in requesting a deadline extension. The risk is considered to be very
low. At the request of City officials, amendments have been made by the Province to
Section 4 of these agreements to reduce the risk to the City. It is noteworthy that this
section does still require repayment should the project be cancelled. If components of
the project cannot be moved forward on -time, the resolution for the City would be at the
discretion of the Province through the negotiation of a scope change request for the
project, allowing the City to avoid cancellation of the project. While the City has received
verbal assurance from Provincial staff that they would be supportive of scope change
requests associated with an inability to complete the project or specific components, this
is still a risk exposure for the City should Provincial positions change. The City's
architectural and engineering consultants are preparing strategies into the design and
tendering of this project to manage this risk. This could include delaying some tenders or
not tendering any of the construction work for this project without having received the
extension.
One additional schedule challenge for the City is the completing of required consultations
with Aboriginal groups in New Brunswick. Seven communities have been identified under
the City's duty to consult and consultations were initiated in early March. The agreement
prohibits the City from initiating construction activities until these consultations are
completed, posing a schedule risk for the City.
Staff at both the City and Envision Saint John continue to work with the Provincial and
Federal governments on an extension of the funding timeline. Additionally, a risk
management and phasing strategy is being prepared by the City's architectural and
engineering consultants to manage the risk associated with this aggressive timeline.
5
SIE
Fundy Quay -Harbour Passage Phase 2: This funding agreement is through the Investing
in Canada Infrastructure Program's Community, Culture and Recreation stream. The value
of this agreement contribution is $2,452,750 and covers 91.7% of the cost of this project
component. The City has received a signed copy of this agreement; however, a minor
amendment had been requested to provisions of the agreement. The Province has agreed
to make these amendments. Initiation of project work must begin within 60 days of
executing the agreement and the final payments may be no later than March 31, 2024.
Neither of these requirements are perceived as project risks.
This funding agreement also has the requirement to consult with Aboriginal groups in
New Brunswick as noted above under the Harbour Passage Phase 1 funding agreement.
The agreement prohibits the City from initiating construction activities until these
consultations are completed, posing a schedule risk for the City.
With the approval of the two funding agreements on March 22" d and the additional two
funding agreements attached, the City will have legally secured 95% of the Fundy Quay
infrastructure funding package. Staff continue to work towards securing the final
$825,000 in offsetting project contributions from the Provinces Community Development
Fund however this is being done on a project basis for projects within the City's revised
and approved 2021 General Fund Capital Program.
STRATEGIC ALIGNMENT
The development of the Fundy Quay is aligned with Council's priorities of Fiscal
Responsibility, Growth and Prosperity, and Vibrant Safe City and it is one of Saint
John's three catalytic projects. It is also a strategic Growth Concept identified in
the City's Central Peninsula Neighbourhood Plan.
F��:��/C���►►�/►7d/►%►J effilY41501►j115416ul*7
The Fundy Quay public space improvements are part of a broader project to
transform Saint John's urban waterfront, with an agreement for private sector
development on the Fundy Quay site, creating a strong business case for the
project. The Ground Lease with Fundy is based on a maximum value of $6.45M
and will generate initial lease payments of $250,000 annually until purchased. The
development of the site is anticipated to generate $21VI - $3M in annual property
tax revenue at full build out and securing the development has been instrumental
in the approval of additional federal and provincial infrastructure investments.
INPUT FROM OTHER SERVICE AREAS AND STAKEHOLDERS
The attached agreements have been reviewed by the City's General Counsel
office.
n
-6-
ATTACHMENTS
1. Agreement with the Regional Development Corporation for funding under
the Canada — New Brunswick Integrated Bilateral Agreement for Investing
in Canada Infrastructure Program for the project entitled "Harbour
Passage (Phase 1) - Loyalist Plaza and Pedway Connection"
2. Agreement with the Regional Development Corporation for funding under
the Canada — New Brunswick Integrated Bilateral Agreement for Investing
in Canada Infrastructure Program for the project entitled "Fundy Quay —
Harbour Passage Phase 2"
7
Canaaa'
New ANouveau
Brunswick
INTEGRATED BILATERAL, AGREEMENT CONTRIBUTION AGREEMENT
This Agreement is made as of the date of last signature.
BETWEEN: HER MAJESTY THE QUEEN IN RIGHT OF THE PROVINCE OF NEW BRUNSWICK,
as represented by the Minister of Regional Development Corporation ("New
Brunswick")
AND: CITY OF SAINT JOHN
in the Province of New BRUNSWICK ("Recipient")
Individually referred to as a "Party" and collectively referred to as the "Parties".
WHEREAS CANADA AND NEW BRUNSWICK entered into a funding agreement, the Canada — New
Brunswick Integrated Bilateral Agreement for the Investing in Canada Infrastructure Program,
effective March 18, 2018, to establish the terms and conditions whereby Canada will provide
funding to New Brunswick for Projects;
AND WHEREAS Canada agrees to deliver up to a maximum of $673,217,568 to New Brunswick in
four key areas: public transit; green infrastructure; community, culture and recreation
infrastructure; and rural and northern communities infrastructure;
AND WHEREAS New Brunswick agrees to enter into Agreements with Recipients forfunding, namely
the present Integrated Bilateral Agreement Contribution Agreement (Agreement);
AND WHEREAS this Agreement is made pursuant to the Canada - New Brunswick Integrated
Bilateral Agreement for the Investing in Canada Infrastructure Program and therefore all relevant
provisions of that Funding Agreement shall apply;
NOW THEREFORE, in accordance with the mutual covenants and agreements herein, the Parties
agree as follows:
1. PURPOSE
The purpose of this Agreement is to establish the terms and conditions whereby New
Brunswick will provide funding to the Recipient for the Project described in Schedule A.
Page 1 of 27
n.
2. ANNEXES AND SCHEDULES
The following schedules are attached to, and form part of this Agreement:
Schedule A — Project Description
Schedule B — Eligible and Ineligible Expenditures
Schedule C —Communications Protocol
Schedule D — Detailed Claim Form (Document to follow)
Schedule E — Progress Report Form (Document to follow)
Schedule F — Completion Documents (Documents to follow)
- F.1 Declaration of Substantial Completion
- F.2 Project Completion Form
3. INTERPRETATION
3.1 DEFINITIONS
In addition to the terms and conditions defined in the recitals and elsewhere in this
Agreement, a capitalized term has the meaning given to it in this section.
"Agreement" means this Integrated Bilateral Agreement Contribution Agreement and all
schedules, as may be amended from time to time.
"Agreement End Date" means the date at which the final payment is made to the
Recipient which will, in any case, be no later than March 315t, 2022.
"Asset" means any real or personal property or immovable or movable asset, acquired,
purchased, constructed, rehabilitated or improved, in whole or in part, with contribution
funding provided by New Brunswick under the terms and conditions of this Agreement.
"Asset Disposal Period" means the period ending five (5) years after a Project is
Substantially Completed.
"Canada" means the Government of Canada, as represented by the President of the
Queen's Privy Council for Canada, Minister of Infrastructure, Communities and
Intergovernmental Affairs.
"Communications Activity" or "Communications Activities" means, but is not limited to,
public or media events or ceremonies including key milestone events, news releases,
reports, web and social media products or postings, blogs, news conferences. Public
notices, physical and digital signs, publications, success stories and vignettes, photos,
videos, multi -media content, advertising campaigns, awareness campaigns, editorials,
multi -media products and all related communication materials underthis Agreement.
"Contract" means an agreement between the Recipient and a Third Party whereby the
latter agrees to supply a product or service to a Project in return for financial
consideration.
Page 2 of 27
9
"Effective Date" means the date of last signature of this Agreement.
"Eligible Expenditures" means those costs incurred and paid that are eligible for
reimbursement by New Brunswick, with funds from New Brunswick and Canada, as set
out in Schedule B that have been approved as part of a Project approval.
"Fiscal Year" means the period beginning April V of a calendar year and ending on March
315Y of the following calendar year.
"IBA Funding Agreement" means the Integrated Bilateral Agreement far the Investing in
Canada Infrastructure Program, which sets out the roles and responsibilities of Canada and
New Brunswick for the delivery of the program, including attached Schedules.
"Incurred" means an event or transaction has taken place for which an obligation to pay
exists, even if an invoice has not been received, such that the underlying evidence
indicates there is little or no discretion to avoid the obligation. The value of the obligation
is to be calculated in accordance with recognized Canadian accounting standards.
"Joint Communications" means events, news releases, and signage that relate to this
Agreement and are collaboratively developed and approved by Canada, New Brunswick
and, where applicable, the Ultimate Recipient, and are not operational in nature.
"Oversight Committee" means the committee established under the IBA Funding
Agreement consisting of representatives from Canada and New Brunswick.
"Person" means, without limitation, a person, New Brunswick, an Ultimate Recipient, a
Third Party, a corporation, or any other legal entity, and their officers, servants,
employees or agents.
"Project" or "Projects" means the project approved by New Brunswick and Canada under
the IBA Funding Agreement as described in Schedule A.
"Substantial Completion" or "Substantially Completed" means, when referring to a
Project, that the Project can be used for the purpose for which it was intended.
3.2 ENTIRE AGREEMENT
This Agreement comprises the entire agreement between the Parties. No prior document,
negotiation, provision, undertaking or agreement in relation to the subject of the Agreement
has legal effect, unless incorporated by reference into this Agreement. No representation or
warranty express, implied or otherwise, is made by New Brunswick to the Recipient except
as expressly set out in this Agreement.
3.3 DURATION OF AGREEMENT
This Agreement will be effective as of the Effective Date and will terminate on the
Agreement End Date.
Page 3 of 27
10
4. OBLIGATIONS OF THE PARTIES
4.1 COMMITMENTS BY NEW BRUNSWICK
a) New Brunswick agrees to provide funding from Canada and New Brunswick to the
Recipient in accordance with Schedule A.
b) Subject to paragraph 4.2 c) the Parties agree that New Brunswick's role is limited to
providing funding to Projects and that New Brunswick and Canada will have no
involvement in the implementation of any Project or its operation. New Brunswick
and Canada are neither a decision -maker nor an administrator of the Project.
4.2 COMMITMENTS BY THE RECIPIENT
a) The Recipient agrees to advance the Project, claim only for Eligible Expenditures in a
diligent and timely manner, and is responsible for any unapproved expenditures and
cost overruns.
b) The Recipient will be responsible for the costs of producing and installing federal and
provincial program signs. Signage costs are an Eligible Expenditure.
c) If the Project is cancelled, the Recipient agrees to return any previous payments to
New Brunswick within thirty (30) days of written notification to that effect.
d) The Recipient shall allow any authorized representative of New Brunswick or Canada
reasonable access to the project site to assess the Project's progress, to review all
records and accounts maintained and to carry out the evaluation process required for
the implementation of the IBA Funding Agreement. The Recipient shall provide all
records and accounts as requested by New Brunswick.
e) The Recipient agrees to bear all operating expenditures of the Project.
f) Construction must begin by September 30th, 2021
g) Project must be substantially completed by December 315t, 2021, or by December
315t, 2022 if located in a remote community (Remote community defined as being
located 25km outside either Fredericton, Moncton, or Saint John with a population of
5,000 or less)
Page 4 of 27
11
4.3 APPROPRIATIONS
Notwithstanding New Brunswick's obligation to make any payment under this
Agreement, this obligation does not arise if, at the time when a payment under this
Agreement becomes due, the Legislature of New Brunswick or the Parliament of Canada
has not passed an appropriation that is sufficient and constitutes lawful authority for
making the payment. New Brunswick and Canada may reduce or terminate any payment
under this Agreement in response to the reduction of appropriations or departmental
funding levels in respect of transfer payments, the program under which this Agreement
was made or otherwise, as evidenced by any appropriation act of the provincial or federal
Crown's main or supplementary estimates expenditures. New Brunswick and Canada will
not be liable for any direct, indirect, consequential, exemplary or punitive damages,
regardless of the form of action, whether in contract, tort or otherwise, arising from any
such reduction or termination of funding.
5. FISCAL YEAR BUDGETING
a) The amount of contribution funding payable by New Brunswick and Canada each
Fiscal Year is set out in Schedule A.
b) If the actual amount payable by New Brunswick and Canada in respect of any Fiscal
Year is less than the estimated maximum amounts in Schedule A, the Recipient may
request that New Brunswick and Canada re -allocate the difference between the two
amounts to a subsequent Fiscal Year. Subject to Section 4 (Appropriations), New
Brunswick and Canada agrees to make reasonable efforts to accommodate the
Recipient's request. The Recipient acknowledges that requests for re -allocation of
New Brunswick and Canada's contribution funding to a Project will require
appropriation adjustments or provincial and federal Crown approvals.
c) In the event that any requested re -allocation of New Brunswick and Canada's
contribution funding to a Project is not approved, the amount of New Brunswick and
Canada's contribution payable in accordance with Schedule A may be reduced by the
amount of the requested re -allocation. If the contribution payable by New Brunswick
and Canada in accordance with Schedule A is so reduced, the Parties agree to review
the effects of such reduction on the overall implementation of the Project and to
adjust the terms and conditions of this Agreement as appropriate.
6. PROJECT IMPLEMENTATION
6.1 The Recipient shall not change the Project scope, timing or location without the prior
written approval of New Brunswick. The Recipient will promptly inform New Brunswick
should the project be cancelled.
Page 5 of 27
12
6.2 Progress reports (as set out in Schedule E) for all approved projects under the Covid-19
Resilient Infrastructure Stream (CVRIS) will need to be submitted to INFC, at a minimum,
on a quarterly basis (May 15th, August 15th, November 15th and February 151h).
6.3 The Recipient will be responsible for arranging the engineering design, calling of public
tenders, and awarding of the contract to the successful bidder, and overall management
of the contract. The Recipient will award and manage all contracts in accordance with
their relevant policies and procedures and, if applicable, in accordance with the
Agreement on Internal Trade and applicable international and interprovincial trade
agreements, and all other applicable laws, including the Procurement Act, SNB 2012, c.20.
If New Brunswick determines that a Contract is awarded in a manner that is not in
compliance with the foregoing, upon notification to the Recipient, New Brunswick may
consider the expenditures associated with the Contract to be ineligible.
6.4 The Recipient agrees to ensure that the Project work shall be carried out in accordance
with all federal, provincial, or municipal (local government) rules, regulations and laws
governing such work and in accordance with the best general practices then current at
the time of construction of the project. In addition, the Project must also:
Meet or exceed any applicable energy efficiency standards for buildings outlined
in the Pan -Canadian Framework on Clean Growth and Climate Change.
- Meet or exceed the requirement of the highest published accessibility standard in
a jurisdiction, in addition to applicable provincial building codes and relevant
municipal by-laws.
6.5 The Recipient consents to the participation of New Brunswick or its representative at all
public tender openings if requested by New Brunswick.
6.6 New Brunswick reserves the right to request additional information for review and
approval purposes, including assessment of risks, or to make a determination as per
Sections 8 (Environmental Assessment and Licensing) and 9 (Aboriginal Consultation).
6.7 Repair, restoration or replacement of propertythat was required to be removed, altered,
damaged or destroyed in the course of carrying out the Project will be performed to bring
the property to its pre-existing condition, meaning the same condition that the property
was in at the time of the removal, alteration, damage, or destruction. Except as may be
required by law, the work and materials required to bring the property to its pre-existing
condition shall not exceed the quality or quantity as originally existed. Eligible
Expenditures will not include any expenditures for enhancements or improvements.
7. ASSETS
7.1 DISPOSAL Of ASSETS
a) Unless otherwise agreed to by New Brunswick, the Recipient agrees to retain title and
Page 6 of 27
13
ownership of an Asset for the Asset Disposal Period.
bj If at any time within the Asset Disposal Period, the Recipient sells, leases, or otherwise
disposes of, directly or indirectly, any Asset purchased, acquired, constructed,
rehabilitated or renovated, in whole or in part, under this Agreement, other than to
Canada, New Brunswick, a Local Government, or with New Brunswick's written
consent, the Recipient may be required to reimburse New Brunswick any funds
received from New Brunswick and Canada for the Project and will notify New
Brunswick in writing within ninety (90) business days of the transaction.
7.2 REVENUE FROM ASSETS
The Recipient acknowledges that New Brunswick and Canada's contributions to a Project
is meant to accrue to the public benefit. The Recipient will notify New Brunswick in
writing within ninety (90) business days of the end of a Fiscal Year if any Asset owned by
a for -profit Recipient is used in such a way that, in the Fiscal Year, revenues are generated
from it that exceed its operating expenses. New Brunswick and Canada may require the
Recipient to immediately pay to New Brunswick and Canada a portion of the excess in the
same portion as the total cost of the Asset. This obligation will only apply during the Asset
Disposal Period.
7.3 REPAYABLE CONTRIBUTIONS
Any funding provided to a Recipient that is a private sector body intended to allow the
business to generate profits or to increase the value of the business, will be repayable to
New Brunswick and Canada.
8. ENVIRONMENTAL ASSESSMENT AND LICENSING
8.1 The Project may be subject to, among others, New Brunswick Regulation 87-83
Environmental Impact Assessment Regulation —Clean Environment Act. That Regulation
contains a list of undertakings found in Schedule A of the Regulation, which are required
to be registered and screened to determine whether a full Environmental Impact
Assessment is warranted. If the project requires registration, a determination on the
project must be obtained from the Minister of Environment and Local Government prior
to any site work on the Project beginning.
8.2 The Project may also be subject to, among others, Canadian Environmental Assessment
Act (2012). This Act contains a list of physical activities found in Regulations Designating
Physical Activities of the Act, which are required to be a designated project for an
environmental assessment. If the Project is a designated project under the Canadian
Environmental Assessment Act (2012), a decision statement must be obtained prior to
any site work on the Project beginning.
Page 7 of 27
14
8.3 If the Project requires registration under New Brunswick Regulation 87-83
Environmental Impact Assessment Regulation — Clean Environment Act and/or is deemed to be
a designated project under the Canadian Environmental Assessment Act (2012), no site
preparation, vegetation removal or construction will occur for a Project and no funds will be
advanced to a recipient for expenditures related to construction work until New Brunswick and
Canada are satisfied that all requirements under this act, other applicable federal
environmental assessment legislation that is or may come into force during the term of this
Agreement, and other applicable agreements between Canada and Aboriginal groups are met
and continue to be met.
8.4 The Recipient will obtain all necessary licenses, permits, and approvals required for the
Project by applicable legislation, regulations and by-laws be they Federal, Provincial or
Municipal.
9. ABORIGINAL CONSULTATION
9.1 Funding for the Project is conditional upon New Brunswick and Canada being satisfied
that obligations with respect to the legal duty to consult, and if applicable, requirement
to accommodate Aboriginal groups are met.
9.2 No site preparation, vegetation removal or construction will occur for a Project and New
Brunswick and Canada has no obligation to pay any Eligible Expenditures that are capital
costs, as determined by New Brunswick and Canada, until New Brunswick and Canada are
satisfied that any legal duty to consult, and where appropriate, to accommodate
Aboriginal groups or other federal consultation requirement has been met and continues
to be met. If required, New Brunswick and Canada must be satisfied that for each Project:
a) Aboriginal groups have been notified and, if applicable, consulted;
b) If applicable, a summary of consultation or engagement activities has been
provided, including a list of Aboriginal groups consulted, concerns raised, and how
each of the concerns have been addressed, or if not addressed, an explanation as
to why not;
c) Accommodation measures, where appropriate, are being carried out by the
Recipient and these costs may be considered Eligible Expenditures; and
d) Any other information has been provided that New Brunswick and Canada may
deem appropriate.
9.3 The Recipient will comply with all obligations (i) under Applicable Law; (ii) as required by
regulatory bodies having jurisdiction overthe subject matter of the project; and (iii) under
Page 8 of 27
15
common law, to engage in Aboriginal consultation and consider Aboriginal interests.
10. CLAIMS AND PAYMENT
10.1 Each claim for reimbursement of Eligible Expenditures shall be submitted on forms herein
provided in Schedule D. Claims will include copies of invoices along with all supporting
documents, proof of payment of each invoice submitted for reimbursement, and such
other documents as may be requested by New Brunswick.
10.2 When any otherfederal or provincial assistance is given or is to be given in respect of the
Project which was not taken into consideration in the original application, the
contribution hereunder may be reduced by a corresponding amount.
10.3 New Brunswick reserves the right to withhold any or all reimbursements of Eligible
Expenditures until completion documents provided in Schedule F are completed and
returned to New Brunswick by the Recipient,
10.4 New Brunswick will not pay interest for failing to make a payment under this Agreement.
10.5 New Brunswick will not pay capital costs for a Project until the requirements under
Section 8 (Environmental Assessment and Licensing) and Section 9 (Aboriginal
Consultation), if applicable, are, in New Brunswick's opinion, satisfied to the extent
possible at the date the claim is submitted to New Brunswick.
10.6 No claim for reimbursement shall be paid by New Brunswick unless it is received on or
before January 315Y of the year following the Fiscal Year in which the Eligible Expenditure
is incurred and, in all circumstances, no later than March 315Y, 2022.
1.1. REPORTING
The Recipient will provide to New Brunswick at minimum on a quarterly basis a Project
progress report in a format acceptable to New Brunswick and in accordance with
Schedule E (Progress Report Form); and will submit, in a format acceptable to New
Brunswick, a final project report in accordance with Schedule F (Completion Documents).
12. RETENTION OF CONTRIBUTION
There will be no retention of contribution for this project.
13. AUDITS
The Recipient agrees to allow New Brunswick reasonable and timely access to all its
Page 9 of 27
16
documentation, records and accounts and those of their respective agents or third Parties
related to the Project, and all other relevant information and documentation requested
by New Brunswick, or their designated representatives, for the purposes of audit,
evaluation, and ensuring compliance with this Agreement.
14. RECORD KEEPING
The Recipient will keep proper and accurate financial accounts and records, including but
not limited to its contracts, invoices, statements, receipts, and vouchers in respect of the
Project, for at least seven (7) years after the IBA Funding Agreement End Date and will
provide New Brunswick and their designated representatives with reasonable and timely
access to documentation for the purposes of audit, evaluation, and ensuring compliance
with this Agreement.
15. DISPUTE RESOLUTION
a) The Parties will keep each other informed of any issue that could be contentious.
b) If a contentious issue arises, the Oversight Committee will examine it and will, in good
faith, attempt to resolve the contentious issue as soon as possible, and, in any event,
within thirty (30) business days from the receipt of notice of such contentious issue.
Where the Oversight Committee cannot agree on a resolution, the matter will be
referred to the Parties for resolution. The Parties will provide a decision within ninety
(90) business days from the date of referral to the Parties.
c) Where the Parties cannot agree on a resolution, the Parties may explore any
alternative dispute resolution mechanisms available to them to resolve the
contentious issue.
d) Any payments related to any contentious issue raised by either Party may be
suspended by New Brunswick together with the obligations related to such issue,
pending resolution.
e) The Parties agree that nothing in this section will affect, alter or modify the rights of
New Brunswick to terminate this Agreement.
16. DEFAULT
16.1 EVENTS OF DEFAULT
The following event constitutes the "Event of Default" under this Agreement:
a) The Recipient has not complied with one ore more of the terms and conditions of this
Agreement.
Page 10 of 27
17
16.2 DECLARATION OF DEFAULT
New Brunswick may declare default if:
a) The Event of Default occurs;
b) New Brunswick gives notice to the Recipient of the event, which in New Brunswick's
opinion constitutes an Event of Default; and
c) The Recipient has failed, within thirty (30) business days of receipt of the notice, either
to remedy the Event of Default or to notify and demonstrate to the satisfaction of
New Brunswick that it has taken such steps as are necessary to remedy the Event of
Default.
16.3 REMEDIES ON DEFAULT
In the event that New Brunswick declares default, New Brunswick may exercise one or
more of the following remedies, without limiting any remedy available to it by law:
a) Suspend or terminate any obligation by New Brunswick to contribute or to continue
to contribute funding to the Project, including any obligation to pay an amount owing
prior to the date of such suspension or termination;
b) Require the Recipient to reimburse New Brunswick all or part of the contribution paid
by New Brunswick to the Recipient; or
c) Terminate this Agreement.
17. LIMITATION OF LIABILITY
In no event will New Brunswick or Canada, its officers, servants, employees or agents be
held liable for any damages in contract, tort (including negligence) or otherwise, for:
a) any injury to any Person, including, but not limited to, death, economic loss or
infringement of rights;
b) any damage to or loss or destruction of property of any Person; or
c) any obligation of any Person, including, but not limited to, any obligation arising from
a loan, capital lease or other long-term obligation
in relation to this Agreement or the Project.
Page 11 of 27
in
18. INDEMNIFICATION
The Recipient will at all times indemnify and save harmless New Brunswick and Canada,
its officers, servants, employees, or agents, from and against all actions, claims, demands,
losses, costs, damages, suits or other proceedings, whether in contract, tort (including
negligence) or otherwise, by whomsoever brought or prosecuted in any manner based
upon or occasioned by:
a) any injury to any Person, including, but not limited to, death, economic loss or any
infringement of rights;
b) any damage to or loss or destruction of property of any Person; or
c) any obligation of any Person, including, but not limited to, any obligation arising from
a loan, capital lease or other long-term obligation
in relation to this Agreement or the Project, except to the extent to which such actions,
by claims, demands, losses, costs, damages, suits or other proceedings are caused by the
negligence or breach of this Agreement by an officer, servant, employee or agent of New
Brunswick or Canada in the performance or his or her duties.
19. COMMUNICATIONS
19.1 No public announcement of an activity related to the Project shall be made by the
Recipient without the prior written consent of New Brunswick.
19.2 The Parties shall comply with the communications guideline set out in Schedule C referred
to as the Communications Protocol.
20. GENERAL
20.1 SURVIVAL
Any provision in this Agreement which imposes an obligation after the termination or
expiration of this Agreement, shall survive the termination or expiration of this
Agreement.
20.2 NO AGENCY, PARTNERSHIP, JOINT VENTURE, ETC.
a) No provision of this Agreement and no action by the Parties will establish or be
deemed to establish a partnership, joint venture, principal -agent relationship or
employer -employee relationship in any way or for any purpose whatsoever between
New Brunswick and the Recipient or between New Brunswick and any third party.
Page 12 of 27
19
b) The Recipient will not represent itself, including in any agreement with a third party,
as a partner, employee or agent of New Brunswick.
20.3 ACCOUNTING PRINCIPLES
All accounting terms will have the meanings assigned to them, all calculations will be
made and all financial data to be submitted will be prepared, in accordance with the
public sector accounting standards in effect in Canada.
20.4 COUNTERPART SIGNATURE
This Agreement may be signed in counterpart, and the signed copies will, when attached,
constitute an original Agreement.
20.5 SEVERABILITY
If for any reason a provision of this Agreement that is not a fundamental term of this
Agreement between the Parties is found to be or becomes invalid or unenforceable, in
whole or in part, and if both Parties agree, it will be deemed to be severable and will be
deleted from this Agreement, but all the other terms and conditions of this Agreement
will continue to be valid and enforceable.
20.6 AMENDMENTS
This Agreement may be amended from time to time on written agreement of the Parties.
20.7 WAIVER
A Party may waive any of its rights under this Agreement only in writing. Any tolerance
or indulgence demonstrated by the Party will not constitute a waiver.
Page 13 of 27
20
20.8 FORCE MAJEURE
If any of the obligations within this Agreement is prevented, restricted or interfered with
by reason of earthquake, fire, flood or other casualty or due to strikes, riot, storms,
explosions, acts of God, war, terrorism, or a similar occurrence or condition beyond the
reasonable control of the Parties, the Party so affected shall, upon giving prompt notice
to the other Parties, be excused from such performance during such prevention,
restriction or interference, and any failure or delay resulting therefrom shall not be
considered a breach of this Agreement.
21. OTHER
21.1 New Brunswick and the Recipient acknowledge that the financial contribution by Canada
underthis Agreement and, in consideration of that contribution and notwithstanding that
Canada is not a signatory to this Agreement, the Parties agree that the terms of this
Agreement applicable to or with respect to Canada, are for her sole benefit.
21.2 Nothing in this Agreement is to be construed as authorizing one Party to contract for or
to incur any obligation on behalf of the other or to act as an agent for the other. Nothing
in this Agreement is to be construed as authorizing the Recipient or any third Party to
contract for or to incur any obligation on behalf of either Party or to act as an agent for
either Party.
21.3 If there is a conflict between this Agreement and the IBA Funding Agreement, the
provisions of the IBA Funding Agreement will apply.
21.4 The Recipient will ensure that no current or former public servant or public office holder
to whom any post -employment, ethics and conflict of interest legislation, guidelines,
codes or policies of Canada or New Brunswick applies will derive direct benefit from the
Project's funding, unless the provision or receipt of such benefits is in compliance with
such legislation, guidelines, policies or codes.
21.5 This Agreement is subject to the provincial Right to Information and Protection of Privacy
Act as well as the federal Access to Information Act and the Privacy Act.
21.6 In the event of a breach of any of the terms and conditions of this Agreement by the
Recipient, no further contributions shall be made by New Brunswick and all previous
payments shall be returned to New Brunswick within thirty (30) days of written
notification to that effect.
22. NOTICE
Any notice provided under this Agreement may be delivered in person, sent by email,
facsimile or mail, addressed to:
Page 14 of 27
21
For New Brunswick:
Regional Development Corporation
P.O. Box 6000
Fredericton, NB E3B 5H1
Phone: 506-453-2277
Fax: 506-453-7988
Email: IBA-EBI@gnb.ca
or such other address, email or facsimile number, or addressed to such other person as New
Brunswick may, from time to time, designated in writing to the Recipient; and
City of Saint John
P.O. Box 1971
15 Market Square
Saint John, NB E2L 41-1
Phone: (506) 648-3713
Email: cityclerk@saintjohn.ca
Or such other address, email or facsimile number, or addressed to such other person as the
Recipient may, from time to time, designate in writing to New Brunswick.
Such notice will be deemed to have been received, if sent by mail or email, when receipt is
acknowledged by the other Party; by facsimile, when transmitted and receipt is confirmed;
and in person, when delivered.
23. COMPLIANCE WITH LAWS
The Recipient will comply with all applicable laws, regulations, all requirements of
regulatory bodies having jurisdiction over the subject matter of the Project and any
common law obligations to consult with, and where appropriate, will engage in Aboriginal
consultation and consider Aboriginal interests.
24. GOVERNING LAW
This Agreement is governed by the laws applicable in the Province of New Brunswick.
25. SUCCESSORS AND ASSIGNS
This Agreement is binding upon the Parties and their respective successors and assigns.
Page 15 of 27
22
SIGNATURES
REGIONAL DEVELOPMENT CORPORATION
SOCIETE DE DEVELOPPEMENT REGIONAL
Original signed by:
Cake Libby
President
Date
City of Saint John
I/We hereby confirm that I/we have the authority to bind the CITY OF SAINT JOHN
Original signed by:
Don Darling
Mayor
Jonathan Taylor
Common Clerk
Date
Date
Page 16 of 27
23
SCHEDULE A — PROJECT DESCRIPTION
RECIPIENT: City of Saint John PROJECT NUMBER: 13347
PROJECT TITLE: Harbour Passage (Phase 1) — Loyalist Plaza and Pedway Connection
COVID-19 RESILIENT INFRASTRUCTURE STREAM (CVRIS):
In response to the significant health and socio-economic challenges brought on by the COVID-
19 pandemic, Infrastructure Canada (1NFC) has implemented a number of time -limited changes
to the existing Investing in Canada Infrastructure Program (ICIP). The COVID-19 Resilience
stream will support pandemic recovery efforts by rapidly advancing the project approval
process to allow for work to get underway.
Funding will come from transfers of up to 10% of the original allocations under the Public
Transit, Green Infrastructure, Community, Culture and Recreation Infrastructure, and Rural and
Northern Communities Infrastructure streams.
PROJECT DESCRIPTION
Of the 5 kilometers of waterfront in the City of Saint John's Central Peninsula neighborhood,
more than 90% of it is currently inaccessible. This project will extend the City's waterfront
boardwalk and harbor passage system, effectively doubling the amount of accessible waterfront
in Uptown Saint John. This key transportation and recreational infrastructure will improve
connections from the waterfront to the rest of the harbour passage trail system, enhancing
linkages between the City's Central Peninsula, the North End and the West Side. The harbour trail
extension will encompass a roughly 30-foot-wide public space system along the edge of the
Fundy Quay property and the Market Square boardwalk, spanning roughly 750 metres in total
length and roughly 10,000 square meters in area. Phase 1 will encompass 350 metres of trail and
approximately 7,000 square metres in area and will establish a new southern section of the trail
along Fundy Quay, rehabilitate the deteriorating downtown boardwalk system and reroute the
existing trail system at Loyalist Plaza to integrate with new sections. The trail system will include
ancillary public spaces at Loyalist Plaza to provide public amenities and to encourage usage of
the trail system, including amenity space along Market Square, the central destination of the trail
system.
ELIGIBLE PROJECT EXPENDITURES:
The Canada — New Brunswick Integrated Bilateral Agreement for the Investing in Canada
Infrastructure Program shall contribute a financial incentive of 80% of the aforementioned eligible
project expenditures of $ 9,995,000 being an amount not exceeding $ 7,996,000. Subject to this
Agreement, the Recipient shall be responsible for contributing at least 20% of the Eligible
Expenditures of the project implemented under this Agreement.
Page 17 of 27
24
Expenditure overruns will not be considered as Eligible Expenditures and will be the responsibility
of the Recipient. No contribution shall be made under the Canada — New Brunswick Integrated
Bilateral Agreement for the Investing in Canada Infrastructure Program with respect to any
expenditure incurred other than the eligible project expenditures.
FINANCING OF PROJECT:
Funding Source
Fiscal Year
2020-2021
Fiscal Year
2021-2022
Totals
Funding
Percentage
Canada
$200,000
$7,796,000
$7,996,000
80%
New Brunswick
$0
$0
$0
0 %
PReient
$50,000
$1,949,000
$1,999,000
20
$250,000
$9,745,000
$9,995,000
100.00%
New Brunswick will reimburse 80% (80% Canada and 0% New Brunswick) of eligible costs on each
claim submitted for reimbursement up to the total approved contributions.
FEDERAL ENVIRONMENTAL AND/OR IMPACT ASSESSMENT REQUIREMENTS: No.
FEDERAL INDIGINOUS CONSULTATION/NOTIFICATION REQUIREMENTS: Yes. The Infrastructure
Canada letter specifyingthe requirements will be shared with the Recipient.
ADDITIONAL CONDITION:
a) The Recipient will demonstrate to New Brunswick's satisfaction that all funding to
complete the Project has been secured, prior to New Brunswick paying eligible costs.
b) Unless otherwise agreed to by New Brunswick, the Recipient agrees to retain title and
ownership of an Asset for the Asset Disposal Period.
c) For your project to be eligible for funding, construction must start before September
301h, 2021 and must be substantially complete by December 315t, 2021. Costs incurred
after December 315t 2021 will not be eligible for reimbursement.
The Project may not proceed with construction until Canada and New Brunswick can confirm that
the obligations for environmental assessment, Aboriginal consultation and every additional
condition have been met.
FORCASTED CONSTRUCTION START DATE (YYYY/MM/DD): 2021/02/22
FORCASTED CONSTRUCTION END DATE (YYYY/MM/DD): 2021/12/31
PROJECT CATEGORY OUTCOMES/BENEFITS that will need to be quantified:
Category: Active Transportation
Sub -Assets: Foot paths and foot bridges
Page 18 of 27
25
SCHEDULE B —ELIGIBLE AND INELIGIBLE EXPENDITURES
ELIGIBLE EXPENDITURES
Eligible Expenditures will include the following:
a) All costs considered by New Brunswick and Canada to be direct and necessary for the
successful implementation of an eligible Project, excluding those explicitly identified in the
Ineligible Expenditures section below, and which may include capital costs, design and
planning, and costs related to meeting specific program requirements, including completing
climate lens assessments and creating community employment benefit plans; and
b) The incremental costs of employees of a Recipient may be included as Eligible Expenditures
for a Project under the following conditions:
- The Recipient is able to demonstrate that it is not economically feasible to tender a
Contract; and
- The arrangement is approved in advance and in writing by New Brunswick and Canada,
INELIGIBLE EXPENDITURES
Ineligible expenditures will include the following:
a) Costs incurred before November 291h, 2020 and any and all expenditures related to contracts
signed prior to Project approval, except for expenditures associated with completing climate
lens assessments;
b) Costs incurred after December 315t, 2021
c) Costs incurred for cancelled Projects;
d) Costs of relocating entire communities;
e) Land acquisition;
f) Leasing and, buildings and other facilities; leasing equipment other than equipment directly
related to the construction of the Project; real estate fees and related costs;
g) Any overhead costs, including salaries and other employment benefits of any employees of
the Recipient, any director indirect operating or administrative costs of Recipients, and more
specifically any costs related to planning, engineering, architecture, supervision,
management and other activities normally carried out by the Recipient's staff, except in
Page 19 of 27
26
accordance with Section b) of Eligible Expenditures;
h) Financing charges, legal fees, and loan interest payments, including those related to
easements (e.g. surveys);
i) Any goods and services costs which are received through donations or in kind;
j) Provincial sales tax, goods and services tax, or harmonized safes tax for which the Recipient
is eligible for a rebate, and any other costs eligible for rebates;
k) Costs associated with operating expenses and regularly scheduled maintenance work;
1) Costs related to furnishing and non -fixed assets which are not essential for the operation of
the Asset/Project; and
m) All capital costs, including site preparation and construction costs, until New Brunswick and
Canada has confirmed that environmental assessment and Aboriginal consultation
obligations as required under Section 8 (Environmental Assessment and Licensing) and 9
(Aboriginal Consultation) have been met and continue to be met.
SCHEDULE C—COMMUNICATIONS PROTOCOL
1. Purpose
a) This communications protocol outlines the roles and responsibilities of each of the
Parties to this Agreement, as well as those of Canada, with respect to communication
activities related to the Project.
b) This communications protocol will guide the planning, development and
implementation of all Communications Activities to ensure clear, consistent and
coordinated communications to the Canadian public.
c) The provisions of this communications protocol apply to all Communications Activities
related to the Agreement and any Projects funded under the Agreement. Such
Communications Activities may include, but are not limited to, public or media events,
news releases, reports, wen and social media products or postings, blogs, project signs,
digital signs, publications, success stories and vignettes, photo compilations, videos,
advertising campaigns, awareness campaigns, editorials, and multi -media products.
2. Guiding Principles
a) The Parties recognize the importance of managing the delivery of coherent
Communications Activities based on the principle of transparent and open discussion
and collaboration.
Page 20 of 27
27
b) Communications Activities undertaken in accordance with this communications protocol
should ensure that Canadians are informed of infrastructure investments made to help
improve their quality of life and that they receive consistent information about funded
Projects and their benefits.
c) The Communications Activities undertaken jointly by Canada, New Brunswick and the
Recipient shall recognize the funding of all Parties to the Project.
3. Governance
a) The Oversight Committee shall be responsible for monitoring the implementation of this
communications protocol.
b) New Brunswick is responsible for communication the requirements and responsibilities
outlined in this communications protocol to the Recipient and for ensuring their
compliance.
c) New Brunswick shall communicate to the Recipient any deficiencies and/or corrective
actions identified by Canada or by the Oversight Committee.
4. Joint Communications
a) Canada, New Brunswick and the Recipient will have Joint Communications about the
funding of the Project.
b) Joint Communications under the Agreement should not occur without the prior
knowledge and agreement of all Parties, where applicable.
c) All Joint Communications material will be approved by Canada and New Brunswick prior
to release, and will recognize the funding of all Parties.
d) Each of the Parties may request Joint Communications to communicate to Canadians
about the progress or completion of the Project. The requestor will provide at least 15
business days' notice to the other Parties. if the communications activity is an event, it
will take place at a mutually agreed date and location.
e) The requestor of the Joint Communications will provide an equal opportunity for the
other Parties to participate and choose their own designated representative (in the case
of an event).
f) New Brunswick or the Recipient will be responsible for providing onsite communications
and logistics support. Any related costs are eligible for cost -sharing in accordance with
the formula outlined in the funding agreement.
g) Canada and New Brunswick have an obligation to communicate in English and French.
Joint Communications products must be bilingual and include the Canada and New
Brunswick wordmark and other Parties' logos. Canada and New Brunswick will provide
the translation and final approval on products.
h) The conduct of all Joint Communications will follow the Table of Precedence for Canada.
5. Individual Communications
Page 21 of 27
a) Notwithstanding Section 4 of this communications protocol (Joint Communications),
Canada and New Brunswick retain the right to meet its obligations to communicate
information to Canadians about the Agreement and the use of funds through their own
Communications Activities.
b) Canada, New Brunswick and the Recipient may each include general program messaging
and examples of projects funded through the Agreement in their own Communications
Activities. The authoring Party will not unreasonably restrict the use of such products or
messaging by the other Parties, and if web or social media based, from linking to it.
c) Canada, New Brunswick or the Recipient may issue digital communications to
communicate progress of the Project.
d) Where a web site or web page is created to promote or communicate progress on a
funded Project, it must recognize federal and provincial funding through the use of a
digital sign or through the use of the Canada wordmark and the following wordings, "This
project is funded in part by the Government of Canada". The Canada wordmark or
digital sign must link to Infrastructure Canada's website, at www.infrastructure.ga.ca.
Canada will provide and publish guidelines for how this recognition is to appear. The
Recipient will also recognize the funding of New Brunswick in a similar manner.
e) The Recipient will be required to send a minimum of one photograph to each of the
Parties of the construction in progress, or of the completed project, for use in social
media and other digital individual Communications Activities. Sendingthe photos will
constitute permission to use and transfer of copyright. Photographs are to be sent to
INFC. hotos canada.ca along with project name and location.
6. Operational Communications
a) The Recipient is solely responsible for operational communications with respect to
Projects, including but not limited to: calls for tender, or construction and public safety
notices. Operational communications as described above are not subject to the federal
official language policy.
b) Canada does not need to be informed on operational communications. However, such
products should include, where appropriate, the following statement, "This project is
funded in part by the Government of Canada". As appropriate, operational
communications will also recognize the funding of New Brunswick is a similar manner.
7. Media Relations
a) Canada and New Brunswick will share information promptly with the other Party should
significant media inquiries be received or emerging media or stakeholder issues arise to
a Project or the overall fund.
8. Signage
a) Canada, New Brunswick or the Recipient may request a sign recognizing their funding
contribution to the Project.
Page 22 of 27
29
b) Where a physical sign is to be installed, unless otherwise agreed upon by Canada, it will be
the Recipient that will produce and install a joint physical sign that recognizes funding of
each Party at each Project site in accordance with current federal signage guidelines.
c) The joint sign design, content and installation guidelines will be provided by Canada.
d) The recognition of funding contributions of each Party and the Recipient will be of equal
prominence and visibility.
e) Digital signage may also be used in addition or in place of a physical sign in cases where a
physical sign would not be appropriate due to project type, scope, location or duration.
f) Where the Recipient decides to install a permanent plaque or other suitable marker with
respect to a Project, it must recognize the federal and provincial contributions and be
approved by Canada and New Brunswick.
g) The Recipient agrees to inform New Brunswick of sign installations through the Project
progress reports referenced in Section 11(Reporting) of this Agreement.
h) Where a physical sign is being installed, signage should be installed at each Project site one
(1) month prior to the start of construction, be visible for the duration of that Project, and
remain in place until one (1) month after construction is completed and the infrastructure is
fully operational or opened for public use.
i) Signage should be installed in a prominent and visible location that takes into consideration
pedestrian and traffic safety and visibility.
9. Advertising Campaigns
a) Recognizing that advertising can be an effective means of communicating with the public,
Canada and New Brunswick may, at their own cost, organize an advertising or public
information campaign related to the Agreement or eligible Project. However, such a
campaign will respect the provisions of this Agreement. In the event of such a campaign,
the sponsoring Party or Recipient will inform the other Parties or of its intention no less than
twenty-one (21) working days prior to the campaign launch.
Page 23 of 27
30
SCHEDULE D — DETAILED CLAIM FORM
Digital version to be sent at a later date
Page 24 of 27
31
SCHEDULE E - PROGRESS REPORT
Digital version to be sent at a later date
Page 25 of 27
32
SCHEDULE (F.1)
DECLARATION OF SUBSTANTIAL COMPLETION
Pursuant to the Agreement entered into between the Province, represented by the Minister responsible for
the Regional Development Corporation, and City of Saint John, I , a licensed
professional or an acceptable equivalent approved by the Province including the President or legal head of
the Ultimate Recipient, do solemnly declare as follows:
1, That I am the
knowledge of the matters set forth in this affidavit;
(title, organization), and as such have
2. That the work identified as Project 13347 as described in Schedule A in the above- mentioned
Agreement has been substantially completed on the day of 20.
3. That the work:
a. Was carried out by (the prime contractor). Between the dates
of (start date) and (completion date);
b. Was supervised and inspected by qualified staff;
c. Conforms with the plans, specifications and other documentation for the work; and
d. Conforms with applicable environmental legislation, and appropriate mitigation measures
have been implemented.
Declared at
(date),
Signature
(City), in the Province of New Brunswick this day of
Page 26 of 27
33
SCHEDULE (F.2) - PROJECT COMPLETION REPORT
Digital version to be sent at a later date
Page 27 of 27
34
35
Canada
New%77Nouveau
kunswiak
INTEGRATED BILATERAL AGREEMENT CONTRIBUTION AGREEMENT
This Agreement is made as of the date of last signature.
BETWEEN: HER MAJESTY THE QUEEN IN RIGHT OF THE PROVINCE OF NEW BRUNSWICK,
as represented by the Minister of Regional Development Corporation ("New
Brunswick")
AND: CITY OF SAINT JOHN
in the Province of New Brunswick ("Recipient")
Individually referred to as a "Party" and collectively referred to as the "Parties".
WHEREAS CANADA AND NEW BRUNSWICK entered into a funding agreement, the Canada — New
Brunswick Integrated Bilateral Agreement for the Investing in Canada Infrastructure Program,
effective March 18, 2018, to establish the terms and conditions whereby Canada will provide
funding to New Brunswick for Projects;
AND WHEREAS Canada agrees to deliver up to a maximum of $673,217,568 to New Brunswick in
four key areas: public transit; green infrastructure; community, culture and recreation
infrastructure; and rural and northern communities infrastructure;
AND WHEREAS New Brunswick agrees to enter into Agreements with Recipients for funding, namely
the present Integrated Bilateral Agreement Contribution Agreement (Agreement);
AND WHEREAS this Agreement is made pursuant to the Canada - New Brunswick Integrated
Bilateral Agreement far the investing in Canada Infrastructure Program and therefore all relevant
provisions of that Funding Agreement shall apply;
NOW 'THEREFORE, in accordance with the mutual covenants and agreements herein, the Parties
agree as follows:
1. PURPOSE
The purpose of this Agreement is to establish the terms and conditions whereby New
Brunswick will provide funding to the Recipient for the Project described in Schedule A.
Page 1 of 32
36
2. ANNEXES AND SCHEDULES
The following schedules are attached to, and form part of this Agreement:
Schedule A— Project Description
Schedule B -- Eligible and Ineligible Expenditures
Schedule C—Communications Protocol
Schedule D — Detailed Claim Form
Schedule E — Progress Report Form
Schedule F —Completion Documents
- F.1 Declaration of Substantial Completion
- F.2 Project Completion Form
3. INTERPRETATION
3.1 DEFINITIONS
In addition to the terms and conditions defined in the recitals and elsewhere in this
Agreement, a capitalized term has the meaning given to it in this section.
"Agreement" means this Integrated Bilateral Agreement Contribution Agreement and all
schedules, as may be amended from time to time.
"Agreement End Date" means the date at which the final payment is made to the
Recipient which will, in any case, be no later than March 31, 2024.
"Asset" means any real or personal property or immovable or movable asset, acquired,
purchased, constructed, rehabilitated or improved, in whole or in part, with contribution
funding provided by New Brunswick under the terms and conditions of this Agreement.
"Asset Disposal Period" means the period ending five (5) years after a Project is
Substantially Completed.
"Canada" means the Government of Canada, as represented by the President of the
Queen's Privy Council for Canada, Minister of Infrastructure, Communities and
Intergovernmental Affairs.
"Communications Activity" or "Communications Activities" means, but is not limited to,
public or media events or ceremonies including key milestone events, news releases,
reports, web and social media products or postings, biogs, news conferences. Public
notices, physical and digital signs, publications, success stories and vignettes, photos,
videos, multi -media content, advertising campaigns, awareness campaigns, editorials,
multi -media products and all related communication materials under this Agreement.
"Contract" means an agreement between the Recipient and a Third Party whereby the
latter agrees to supply a product or service to a Project in return for financial
consideration.
Page 2 of 32
37
"Effective Date" means the date of last signature of this Agreement.
"Eligible Expenditures" means those costs incurred and paid that are eligible for
reimbursement by New Brunswick, with funds from New Brunswick and Canada, as set
out in Schedule B that have been approved as park of a Project approval.
"Fiscal Year" means the period beginning April 11t of a calendar year and ending on March
315t of the following calendar year.
"IBA Funding Agreement" means the Integrated Bilateral Agreement for the Investing in
Canada Infrastructure Program, which sets out the roles and responsibilities of Canada and
New Brunswick for the delivery of the program, including attached Schedules.
"Incurred" means an event or transaction has taken place for which an obligation to pay
exists, even if an invoice has not been received, such that the underlying evidence
indicates there is little or no discretion to avoid the obligation. The value of the obligation
is to be calculated in accordance with recognized Canadian accounting standards.
"Joint Communications" means events, news releases, and signage that relate to this
Agreement and are collaboratively developed and approved by Canada, New Brunswick
and, where applicable, the Ultimate Recipient, and are not operational in nature.
"Oversight Committee" means the committee established under the IBA Funding
Agreement consisting of representatives from Canada and New Brunswick.
"Person" means, without limitation, a person, New Brunswick, an Ultimate Recipient, a
Third Party, a corporation, or any other legal entity, and their officers, servants,
employees or agents.
"Project" or "Projects" means the project approved by New Brunswick and Canada under
the IBA Funding Agreement as described in Schedule A.
"Substantial Completion" or "Substantially Completed" means, when referring to a
Project, that the Project can be used for the purpose for which it was intended.
3.2 ENTIRE AGREEMENT
This Agreement comprises the entire agreement between the Parties. No prior document,
negotiation, provision, undertaking or agreement in relation to the subject of the Agreement
has legal effect, unless incorporated by reference into this Agreement. No representation or
warranty express, implied or otherwise, is made by New Brunswick to the Recipient except
as expressly set out in this Agreement.
3.3 DURATION OF AGREEMENT
This Agreement will be effective as of the Effective Date and will terminate on the
Agreement End Date.
Page 3 of 32
KN
4. OBLIGATIONS OF THE PARTIES
4.1 COMMITMENTS BY NEW BRUNSWICK
a) New Brunswick agrees to provide funding from Canada and New Brunswick to the
Recipient in accordance with Schedule A.
b) Subject to paragraph 4.2 c) the Parties agree that New Brunswick's role is limited to
providing funding to Projects and that New Brunswick and Canada will have no
involvement in the implementation of any Project or its operation. New Brunswick
and Canada are neither a decision -maker nor an administrator of the Project.
4.2 COMMITMENTS BY THE RECIPIENT
a} The Recipient agrees to advance the Project, claim only for Eligible Expenditures in a
diligent and timely manner, and is responsible for any unapproved expenditures and
cost overruns.
b) The Recipient will be responsible for the costs of producing and installing federal and
provincial program signs. Signage costs are an Eligible Expenditure.
c) If the Project is cancelled, the Recipient agrees to return any previous payments to
New Brunswick within thirty (30) days of written notification to that effect.
d) The Recipient shall allow any authorized representative of New Brunswick or Canada
reasonable access to the project site to assess the Project's progress, to review all
records and accounts maintained and to carry out the evaluation process required for
the implementation of the IBA Funding Agreement. The Recipient shall provide all
records and accounts as requested by New Brunswick.
e) The Recipient agrees to bear all operating expenditures of the Project.
f) If the Project total estimated Eligible Expenditures exceeds ten million dollars
($10,000,000), the Recipient will report on community employment benefits provided
to at least three (3) target groups (apprentices, Indigenous peoples, women, persons
with disabilities, veterans, youth, new Canadians, or small -medium-sized enterprises
and social enterprises).
Page 4 of 32
39
4.3 APPROPRIATIONS
Notwithstanding New Brunswick's obligation to make any payment under this
Agreement, this obligation does not arise if, at the time when a payment under this
Agreement becomes due, the Legislature of New Brunswick or the Parliament of Canada
has not passed an appropriation that is sufficient and constitutes lawful authority for
making the payment. New Brunswick and Canada may reduce or terminate any payment
under this Agreement in response to the reduction of appropriations or departmental
funding levels in respect of transfer payments, the program under which this Agreement
was made or otherwise, as evidenced by any appropriation act of the provincial or federal
Crown's main or supplementary estimates expenditures. New Brunswick and Canada will
not be liable for any direct, indirect, consequential, exemplary or punitive damages,
regardless of the form of action, whether in contract, tort or otherwise, arising from any
such reduction or termination of funding.
5. FISCAL YEAR BUDGETING
a) The amount of contribution funding payable by New Brunswick and Canada each
Fiscal Year is set out in Schedule A.
b) If the actual amount payable by New Brunswick and Canada in respect of any Fiscal
Year is less than the estimated maximum amounts in Schedule A, the Recipient may
request that New Brunswick and Canada re -allocate the difference between the two
amounts to a subsequent Fiscal Year. Subject to Section 4 (Appropriations), New
Brunswick and Canada agrees to make reasonable efforts to accommodate the
Recipient's request. The Recipient acknowledges that requests for re -allocation of
New Brunswick and Canada's contribution funding to a Project will require
appropriation adjustments or provincial and federal Crown approvals.
c) In the event that any requested re -allocation of New Brunswick and Canada's
contribution funding to a Project is not approved, the amount of New Brunswick and
Canada's contribution payable in accordance with Schedule A may be reduced by the
amount of the requested re -allocation. If the contribution payable by New Brunswick
and Canada in accordance with Schedule A is so reduced, the Parties agree to review
the effects of such reduction on the overall implementation of the Project and to
adjust the terms and conditions of this Agreement as appropriate.
6. PROJECT IMPLEMENTATION
6.1 The Recipient shall not change the Project scope, timing or location without the prior
written approval of New Brunswick. The Recipient will promptly inform New Brunswick
should the project be cancelled.
Page 5 of 32
all
6.2 For the duration of the Project, the Recipient will provide New Brunswick with progress
report forms as set out in Schedule E, updated every year on May 15 and November 15.
6.3 The Recipient will be responsible for arranging the engineering design, calling of public
tenders, and awarding of the contract to the successful bidder, and overall management
of the contract. The Recipient will award and manage all contracts in accordance with
their relevant policies and procedures and, if applicable, in accordance with the
Agreement on Internal Trade and applicable international and interprovincial trade
agreements, and all other applicable laws, including the ProcurementAct, SNB 2012, c.20.
If New Brunswick determines that a Contract is awarded in a manner that is not in
compliance with the foregoing, upon notification to the Recipient, New Brunswick may
consider the expenditures associated with the Contract to be ineligible.
6.4 The Recipient agrees to ensure that the Project work shall be carried out in accordance
with all federal, provincial, or municipal (local government) rules, regulations and laws
governing such work and in accordance with the best general practices then current at
the time of construction of the project. In addition, the Project must also:
- Meet or exceed any applicable energy efficiency standards for buildings outlined
in the Pan -Canadian Framework on Clean Growth and Climate Change.
Meet or exceed the requirement of the highest published accessibility standard in
a jurisdiction, in addition to applicable provincial building codes and relevant
municipal by-laws.
6.5 The Recipient consents to the participation of New Brunswick or its representative at all
public tender openings if requested by New Brunswick.
6.6 New Brunswick reserves the right to request additional information for review and
approval purposes, including assessment of risks, or to make a determination as per
Sections S (Environmental Assessment and Licensing) and 9 (Aboriginal Consultation).
6.7 Repair, restoration or replacement of property that was required to be removed, altered,
damaged or destroyed in the course of carrying out the Project will be performed to bring
the property to its pre-existing condition, meaning the same condition that the property
was in at the time of the removal, alteration, damage, or destruction. Except as may be
required by law, the work and materials required to bring the property to its pre-existing
condition shall not exceed the quality or quantity as originally existed. Eligible
Expenditures will not include any expenditures for enhancements or improvements.
7. ASSETS
7.1 DISPOSAL OF ASSETS
a) Unless otherwise agreed to by New Brunswick, the Recipient agrees to retain title and
ownership of an Asset for the Asset Disposal Period.
Page 6 of 32
41
b) if at anytime within the Asset Disposal Period, the Recipient sells, leases, or otherwise
disposes of, directly or indirectly, any Asset purchased, acquired, constructed,
rehabilitated or renovated, in whole or in part, under this Agreement, other than to
Canada, New Brunswick, a Local Government, or with New Brunswick's written
consent, the Recipient may be required to reimburse New Brunswick any funds
received from New Brunswick and Canada for the Project and will notify New
Brunswick in writing within ninety (90) business days of the transaction.
7.2 REVENUE FROM ASSETS
The Recipient acknowledges that New Brunswick and Canada's contributions to a Project
is meant to accrue to the public benefit. The Recipient will notify New Brunswick in
writing within ninety (90) business days of the end of a Fiscal Year if any Asset owned by
a for -profit Recipient is used in such a way that, in the Fiscal Year, revenues are generated
from it that exceed its operating expenses. New Brunswick and Canada may require the
Recipient to immediately payto New Brunswick and Canada a portion of the excess in the
same portion as the total cost of the Asset. This obligation will only apply during the Asset
Disposal Period.
7.3 REPAYABLE CONTRIBUTIONS
Any funding provided to a Recipient that is a private sector body intended to allow the
business to generate profits or to increase the value of the business, will be repayable to
New Brunswick and Canada.
8. ENVIRONMENTAL ASSESSMENT AND LICENSING
8.1 The Project may be subject to, among others, New Brunswick Regulation 87-83
Environmental impact Assessment Regulation —Clean Environment Act. That Regulation
contains a list of undertakings found in Schedule A of the Regulation, which are required
to be registered and screened to determine whether a full Environmental Impact
Assessment is warranted. If the project requires registration, a determination on the
project must be obtained from the Minister of Environment and Local Government prior
to any site work on the Project beginning.
8.2 The Project may also be subject to, among others, Canadian Environmental Assessment
Act (2012). This Act contains a list of physical activities found in Regulations Designating
Physical Activities of the Act, which are required to be a designated project for an
environmental assessment. If the Project is a designated project under the Canadian
Environmental Assessment Act (2012), a decision statement must be obtained prior to
any site work on the Project beginning.
Page 7 of 32
42
8.3 if the Project requires registration under New Brunswick Regulation 87-83 Environmental
Impact Assessment Regulation -- Clean Environment Act and/or is deemed to be a
designated project under the Canadian Environmental Assessment Act (2012), no site
preparation, vegetation removal or construction will occur for a Project and no funds will
be advanced to a recipient for expenditures related to construction work until New
Brunswick and Canada are satisfied that all requirements under this act, other applicable
federal environmental assessment legislation that is or may come into force during the
term of this Agreement, and other applicable agreements between Canada and Aboriginal
groups are met and continue to be met.
8.4 The Recipient will obtain all necessary licenses, permits, and approvals required for the
Project by applicable legislation, regulations and by-laws be they Federal, Provincial or
Municipal.
9. ABORIGINAL CONSULTATION
9.1 Funding for the Project is conditional upon New Brunswick and Canada being satisfied
that obligations with respect to the legal duty to consult, and if applicable, requirement
to accommodate Aboriginal groups are met.
9.2 No site preparation, vegetation removal or construction will occur for a Project and New
Brunswick and Canada has no obligation to pay any Eligible Expenditures that are capital
costs, as determined by New Brunswick and Canada, until New Brunswick and Canada are
satisfied that any legal duty to consult, and where appropriate, to accommodate
Aboriginal groups or other federal consultation requirement has been met and continues
to be met. If required, New Brunswick and Canada must be satisfied that for each Project:
a) Aboriginal groups have been notified and, if applicable, consulted;
b) If applicable, a summary of consultation or engagement activities has been
provided, including a list of Aboriginal groups consulted, concerns raised, and how
each of the concerns have been addressed, or if not addressed, an explanation as
to why not;
c) Accommodation measures, where appropriate, are being carried out by the
Recipient and these costs may be considered Eligible Expenditures; and
d) Any other information has been provided that New Brunswick and Canada may
deem appropriate.
9.3 The Recipient will comply with all obligations (i) under Applicable Law; (ii) as required by
regulatory bodies having jurisdiction overthe subject matter of the project; and (iii) under
common law, to engage in Aboriginal consultation and consider Aboriginal interests.
Page 8 of 32
43
10. CLAIMS AND PAYMENT
10.1 Each claim for reimbursement of Eligible Expenditures shall be submitted on forms herein
provided in Schedule D. Claims will include copies of invoices along with all supporting
documents, proof of payment of each invoice submitted for reimbursement, and such
other documents as may be requested by New Brunswick.
10.2 When any other federal or provincial assistance is given or is to be given in respect of the
Project which was not taken into consideration in the original application, the
contribution hereunder may be reduced by a corresponding amount.
10.3 New Brunswick reserves the right to withhold any or all reimbursements of Eligible
Expenditures until completion documents provided in Schedule F are completed and
returned to New Brunswick by the Recipient.
10.4 New Brunswick will not pay interest for failing to make a payment under this Agreement.
10.5 New Brunswick will not pay capital costs for a Project until the requirements under
Section 8 (Environmental Assessment and Licensing) and Section 9 (Aboriginal
Consultation), if applicable, are, in New Brunswick's opinion, satisfied to the extent
possible at the date the claim is submitted to New Brunswick.
10.6 No claim for reimbursement shall be paid by New Brunswick unless it is received on or
before January 3111 of the year following the Fiscal Year in which the Eligible Expenditure
is incurred and in all circumstances, no later than March 31, 2024.
11. REPORTING
The Recipient will provide to New Brunswick at minimum on a semi-annual basis a Project
progress report in a format acceptable to New Brunswick and in accordance with
Schedule E (Progress Report Form); and will submit, in a format acceptable to New
Brunswick, a final project report in accordance with Schedule F (Completion Documents).
12. RETENTION OF CONTRIBUTION
New Brunswick will retain a minimum of fifteen percent (15%) of its contribution funding
for this Project under this Agreement. The amount retained by New Brunswick will be
released by New Brunswick when:
a) The Recipient fulfils all of its obligations for the Project under this Agreement;
b) The Recipient submits an attestation, from a delegated official and in a format
acceptable to New Brunswick, that the Project has been Substantially Completed and
contribution funding under this Agreement has been spent on Eligible Expenditures;
Page 9 of 32
and
c) The Parties jointly carry out a final reconciliation of all claims and payments in respect
of this Agreement and make any required adjustments.
13. AUDITS
The Recipient agrees to allow New Brunswick reasonable and timely access to all its
documentation, records and accounts and those of their respective agents orthird Parties
related to the Project, and all other relevant information and documentation requested
by New Brunswick, or their designated representatives, for the purposes of audit,
evaluation, and ensuring compliance with this Agreement.
14. RECORD KEEPING
The Recipient will keep proper and accurate financial accounts and records, including but
not limited to its contracts, invoices, statements, receipts, and vouchers in respect of the
Project, for at least seven (7) years after the IBA Funding Agreement End Date and will
provide New Brunswick and their designated representatives with reasonable and timely
access to documentation forthe purposes of audit, evaluation, and ensuring compliance
with this Agreement.
15. DISPUTE RESOLUTION
a) The Parties will keep each other informed of any issue that could be contentious.
b) If a contentious issue arises, the Oversight Committee will examine it and will, in good
faith, attempt to resolve the contentious issue as soon as possible, and, in any event,
within thirty (30) business days from the receipt of notice of such contentious issue.
Where the Oversight Committee cannot agree on a resolution, the matter will be
referred to the Parties for resolution. The Parties will provide a decision within ninety
(90) business days from the date of referral to the Parties.
c) Where the Parties cannot agree on a resolution, the Parties may explore any
alternative dispute resolution mechanisms available to them to resolve the
contentious issue.
d) Any payments related to any contentious issue raised by either Party may be
suspended by New Brunswick together with the obligations related to such issue,
pending resolution.
e) The Parties agree that nothing in this section will affect, alter or modify the rights of
New Brunswick to terminate this Agreement.
Page 10 of 32
45
16. DEFAULT
16.1 EVENTS OF DEFAULT
The following event constitutes the "Event of Default" under this Agreement:
a) The Recipient has not complied -with one ore more of the terms and conditions of this
Agreement.
16.2 DECLARATION OF DEFAULT
New Brunswick may declare default if:
a) The Event of Default occurs;
b) New Brunswick gives notice to the Recipient of the event, which in New Brunswick's
opinion constitutes an Event of Default; and
c) The Recipient has failed, within thirty (30) business days of receipt of the notice, either
to remedy the Event of Default or to notify and demonstrate to the satisfaction of
New Brunswick that it has taken such steps as are necessary to remedy the Event of
Default.
16.3 REMEDIES ON DEFAULT
In the event that New Brunswick declares default, New Brunswick may exercise one or
more of the following remedies, without limiting any remedy available to it by law:
a) Suspend or terminate any obligation by New Brunswick to contribute or to continue
to contribute funding to the Project, including any obligation to pay an amount owing
prior to the date of such suspension or termination;
b) Require the Recipient to reimburse New Brunswick all or part of the contribution paid
by New Brunswick to the Recipient; or
c) Terminate this Agreement.
17. LIMITATION OF LIABILITY
In no event will New Brunswick or Canada, its officers, servants, employees or agents be
held liable for any damages in contract, tort (including negligence) or otherwise, for:
a) any injury to any Person, including, but not limited to, death, economic loss or
infringement of rights;
Page 11 of 32
M.
b) any damage to or loss or destruction of property of any Person; or
c) any obligation of any Person, including, but not limited to, any obligation arising from
a loan, capital lease or other long-term obligation
in relation to this Agreement or the Project.
18. INDEMNIFICATION
The Recipient will at all times indemnify and save harmless New Brunswick and Canada,
its officers, servants, employees, or agents, from and against all actions, claims, demands,
losses, costs, damages, suits or other proceedings, whether in contract, tort (including
negligence) or otherwise, by whomsoever brought or prosecuted in any manner based
upon or occasioned by:
a) any injury to any Person, including, but not limited to, death, economic loss or any
infringement of rights;
b) any damage to or loss or destruction of property of any Person; or
c) any obligation of any Person, including, but not limited to, any obligation arising from
a loan, capital lease or other long-term obligation
in relation to this Agreement or the Project, except to the extent to which such actions,
by claims, demands, losses, costs, damages, suits or other proceedings are caused by the
negligence or breach of this Agreement by an officer, servant, employee or agent of New
Brunswick or Canada in the performance or his or her duties.
19. COMMUNICATIONS
19.1 No public announcement of an activity related to the Project shall be made by the
Recipient without the prior written consent of New Brunswick.
19.2 The Parties shall comply with the communications guideline set out in Schedule C referred
to as the Communications Protocol.
20. GENERAL
20.1 SURVIVAL
Any provision in this Agreement which imposes an obligation after the termination or
expiration of this Agreement, shall survive the termination or expiration of this
Agreement.
Page 12 of 32
47
20.2 NO AGENCY, PARTNERSHIP, JOINT VENTURE, ETC.
a) No provision of this Agreement and no action by the Parties will establish or be
deemed to establish a partnership, joint venture, principal -agent relationship or
employer -employee relationship in any way or for any purpose whatsoever between
New Brunswick and the Recipient or between New Brunswick and any third party.
b) The Recipient will not represent itself, including in any agreement with a third party,
as a partner, employee or agent of New Brunswick.
20.3 ACCOUNTING PRINCIPLES
All accounting terms will have the meanings assigned to them, all calculations will be
made and all financial data to be submitted will be prepared, in accordance with the
public sector accounting standards in effect in Canada.
20.4 COUNTERPART SIGNATURE
This Agreement may be signed in counterpart, and the signed copies will, when attached,
constitute an original Agreement.
20.5 SEVERABILITY
If for any reason a provision of this Agreement that is not a fundamental term of this
Agreement between the Parties is found to be or becomes invalid or unenforceable, in
whole or in part, and if both Parties agree, it will be deemed to be severable and will be
deleted from this Agreement, but all the other terms and conditions of this Agreement
will continue to be valid and enforceable.
20.6 AMENDMENTS
This Agreement may be amended from time to time on written agreement of the Parties.
20.7 WAIVER
A Party may waive any of its rights under this Agreement only in writing. Any tolerance
or indulgence demonstrated by the Party will not constitute a waiver.
Page 13 of 32
20.8 FORCE MAJEURE
If any of the obligations within this Agreement is prevented, restricted or interfered with
by reason of earthquake, fire, flood or other casualty or due to strikes, riot, storms,
explosions, acts of God, war, terrorism, or a similar occurrence or condition beyond the
reasonable control of the Parties, the Party so affected shall, upon giving prompt notice
to the other Parties, be excused from such performance during such prevention,
restriction or interference, and any failure or delay resulting therefrom shall not be
considered a breach of this Agreement.
21. OTHER
21.1 New Brunswick and the Recipient acknowledge that the financial contribution by Canada
underthis Agreement and, in consideration of that contribution and notwithstanding that
Canada is not a signatory to this Agreement, the Parties agree that the terms of this
Agreement applicable to or with respect to Canada, are for her sole benefit.
21.2 Nothing in this Agreement is to be construed as authorizing one Party to contract for or
to incur any obligation on behalf of the other or to act as an agent for the other. Nothing
in this Agreement is to be construed as authorizing the Recipient or any third Party to
contract for or to incur any obligation on behalf of either Party or to act as an agent for
either Party.
21.3 If there is a conflict between this Agreement and the IBA Funding Agreement, the
provisions of the IBA Funding Agreement will apply.
21.4 The Recipient will ensure that no current or former public servant or public office holder
to whom any post -employment, ethics and conflict of interest legislation, guidelines,
codes or policies of Canada or New Brunswick applies will derive direct benefit from the
Project's funding, unless the provision or receipt of such benefits is in compliance with
such legislation, guidelines, policies or codes.
21.5 This Agreement is subject to the provincial Right to Information and Protection of Privacy
Act as well as the federal Access to Information Act and the Privacy Act.
21.5 In the event of a breach of any of the terms and conditions of this Agreement by the
Recipient, no further contributions shall be made by New Brunswick and all previous
payments shall be returned to New Brunswick within thirty (30) days of written
notification to that effect.
22. NOTICE
Any notice provided under this Agreement may be delivered in person, sent by email,
facsimile or mail, addressed to:
Page 14 of 32
For New Brunswick:
Regional Development Corporation
P.O. Box 6000
Fredericton, NB E3B 5H1
Phone: (506) 453-2277
Fax: (506) 453-7988
Email: IBA-EBI@gnb.ca
or such other address, email or facsimile number, or addressed to such other person as New
Brunswick may, from time to time, designated in writing to the Recipient; and
City of Saint John
Common Clerk
P.O. Box 1971
15 Market Square
Saint John, NB E2L 41-1
Phone: (506) 658-2862
Email: cityclerk@saintjohn.ca
Or such other address, email or facsimile number, or addressed to such other person as the
Recipient may, from time to time, designate in writing to New Brunswick.
Such notice will be deemed to have been received, if sent by mail or email, when receipt is
acknowledged by the other Party; by facsimile, when transmitted and receipt is confirmed;
and in person, when delivered.
23. COMPLIANCE WITH LAWS
The Recipient will comply with all applicable laws, regulations, all requirements of
regulatory bodies having jurisdiction over the subject matter of the Project and any
common law obligations to consult with, and where appropriate, will engage in Aboriginal
consultation and consider Aboriginal interests.
24. GOVERNING LAW
This Agreement is governed by the laws applicable in the Province of New Brunswick.
25. SUCCESSORS AND ASSIGNS
This Agreement is binding upon the Parties and their respective successors and assigns.
Page 15 of 32
50
SIGNATURES
REGIONAL DEVELOPMENT CORPORATION
SOCIETE DE DEVELOPPEMENT REGIONAL
Original signed by:
Cad Libby
President
CITY OF SAINT JOHN
Date
I/We hereby confirm that I/we have the authority to bind the CITY OF SAINTJOHN
Original signed by:
Don Darling
Mayor
Jonathan Taylor
Common Clerk
Date
Date
Page 16 of 32
51
SCHEDULE A — PROJECT DESCRIPTION
RECIPIENT: City of Saint John PROJECT NUMBER: 13823
PROJECT TITLE: Fundy Quay— Harbour Passage Phase 2
PROJECT DESCRIPTION:
Of the 5 kilometers of waterfront in the City of Saint John's Central Peninsula neighborhood, more
than 90% of it is currently inaccessible. This project will extend the City's waterfront boardwalk and
harbor passage system, effectively doubling the amount of accessible waterfront in Uptown Saint
John. This key transportation and recreational infrastructure will improve connections from the
waterfront to the rest of the harbour passage trail system, enhancing linkages between the City's
Central Peninsula, the North End and the West Side. The harbour trail extension will encompass a
30-foot-wide public space system alongthe edge of the Fundy Quay property and the Market Square
boardwalk, spanning roughly 750 metres in total length and roughly 10,000 square meters in area.
Phase 2 of the Harbour Passage extension will formally connect loyalist plaza to the southern
extension along Fundy Quay with an additional 350 metres of new trail along the perimeter of Fundy
Quay. The trail system will include ancillary public spaces at Loyalist Plaza to provide public amenities
and to encourage usage of the trail system. The project will consist of the creation of a new walkway,
associated green spaces, park furniture, lighting, and complementary sculpture and other similar
components to support programming and use of the trail.
ELIGIBLE PROJECT EXPENDITURES:
The Canada — New Brunswick Integrated Bilateral Agreement for the Investing in Canada
Infrastructure Program shall contribute a financial incentive of 40% of the aforementioned eligible
project expenditures of $2,675,000. being an amount not exceeding $1,070,000. Subject to this
Agreement, the Recipient shall be responsible for contributing at least 8.3% of the Eligible
Expenditures of the project implemented under this Agreement.
Expenditure overruns will not be considered as Eligible Expenditures and will be the responsibility
of the Recipient. No contribution shall be made under the Canada — New Brunswick Integrated
Bilateral Agreement for the Investing in Canada Infrastructure Program with respect to any
expenditure incurred other than the eligible project expenditures.
Page 17 of 32
52
FINANCING OF PROJECT:
Funding
Source
Fiscal Year
2020-2021
Fiscal Year
2021-2022
Fiscal Year
2022-2023
Totals
Funding
Percentage
Canada
$40,000
$495,000
$535,000
$1,070,000
40%
New
Brunswick
$51,692
$639,683
$691,375
$1,382,750
0
51.70
Recipient
$8,308
$102,817
$111,125
$222,250
8.3%
Total
$100,000
$1,237,500
$1,337,500
$2,675,000
100%
New Brunswick will reimburse 91.7% (40% Canada and 51.7% New Brunswick) of eligible costs on
each claim submitted for reimbursement up to the total approved contributions.
ENVIRONMENTAL ASSESSMENT REQUIREMENTS: No.
ABORIGINAL CONSULTATION OBLIGATIONS: Yes. The Infrastructure Canada letter specifying the
requirements will be shared with the Recipient.
ADDITIONAL CONDITION:
The Recipient will demonstrate to New Brunswick's satisfaction that all funding to complete the
Project has been secured, prior to New Brunswick paying eligible costs.
The Project may not proceed with construction until Canada and New Brunswick can confirm that
the obligations for environmental assessment, Aboriginal consultation and every additional
condition have been met.
FORCASTED CONSTRUCTION START DATE (YYYY/MM/DD): 2021/02/15
FORCASTED CONSTRUCTION END DATE (YYYY/MM/DD): 2023/08/31
PROJECT CATEGORY OUTCOMES/BENEFITS that will need to be quantified:
Community, Culture and Recreation
• Improved access to and/or increased quality of community, cultural and/or recreational
infrastructure
SCHEDULE B — ELIGIBLE AND INELIGIBLE EXPENDITURES
ELIGIBLE EXPENDITURES
Eligible Expenditures will include the following:
Page 18 of 32
53
a) All costs considered by New Brunswick and Canada to be direct and necessary for the
successful implementation of an eligible Project, excluding those explicitly identified in the
Ineligible Expenditures section below, and which may include capital costs, design and
planning, and costs related to meeting specific program requirements, including completing
climate lens assessments and creating community employment benefit plans; and
b) The incremental costs of employees of a Recipient may be included as Eligible Expenditures
for a Project under the following conditions:
- The Recipient is able to demonstrate that it is not economically feasible to tender a
Contract; and
- The arrangement is approved in advance and in writing by New Brunswick and Canada.
INELIGIBLE EXPENDITURES
Ineligible expenditures will include the following:
a) Costs incurred before Project approval and any and all expenditures related to contracts
signed priorto Project approval, except for expenditures associated with completing climate
lens assessments;
b) Costs incurred for cancelled Projects;
c) Costs of relocating entire communities;
d) Land acquisition;
e) Leasing and, buildings and other facilities; leasing equipment other than equipment directly
related to the construction of the Project; real estate fees and related costs;
f) Any overhead costs, including salaries and other employment benefits of any employees of
the Recipient, any direct or indirect operating or administrative costs of Recipients, and more
specifically any costs related to planning, engineering, architecture, supervision,
management and other activities normally carried out by the Recipient's staff, except in
accordance with Section b) of Eligible Expenditures;
g) Financing charges, legal fees, and loan interest payments, including those related to
easements (e.g. surveys);
h) Any goods and services costs which are received through donations or in kind;
i) Provincial sales tax, goods and services tax, or harmonized sales tax for which the Recipient
is eligible for a rebate, and any other costs eligible for rebates;
Page 19 of 32
54
j) Costs associated with operating expenses and regularly scheduled maintenance work;
k) Costs related to furnishing and non -fixed assets which are not essential for the operation of
the Asset/Project; and
1) All capital costs, including site preparation and construction costs, until New Brunswick and
Canada has confirmed that environmental assessment and Aboriginal consultation
obligations as required under Section 8 (Environmental Assessment and Licensing) and 9
(Aboriginal Consultation) have been met and continue to be met.
SCHEDULE C—COMMUNICATIONS PROTOCOL
1. Purpose
a) This communications protocol outlines the roles and responsibilities of each of the
Parties to this Agreement, as well as those of Canada, with respect to communication
activities related to the Project.
b) This communications protocol will guide the planning, development and
implementation of all Communications Activities to ensure clear, consistent and
coordinated communications to the Canadian public.
c) The provisions of this communications protocol apply to all Communications Activities
related to the Agreement and any Projects funded under the Agreement. Such
Communications Activities may include, but are not limited to, public or media events,
news releases, reports, wen and social media products or postings, blogs, project signs,
digital signs, publications, success stories and vignettes, photo compilations, videos,
advertising campaigns, awareness campaigns, editorials, and multi -media products.
2. Guiding Principles
a) The Parties recognize the importance of managing the delivery of coherent
Communications Activities based on the principle of transparent and open discussion
and collaboration.
b) Communications Activities undertaken in accordance with this communications protocol
should ensure that Canadians are informed of infrastructure investments made to help
improve their quality of life and that they receive consistent information about funded
Projects and their benefits.
c) The Communications Activities undertaken jointly by Canada, New Brunswick and the
Recipient shall recognize the funding of all Parties to the Project.
3. Governance
a) The Oversight Committee shall be responsible for monitoring the implementation of this
communications protocol.
b) New Brunswick is responsible for communication the requirements and responsibilities
Page 20 of 32
55
outlined in this communications protocol to the Recipient and for ensuring their
compliance.
c) New Brunswick shall communicate to the Recipient any deficiencies and/or corrective
actions identified by Canada or by the Oversight Committee.
4. Joint Communications
a) Canada, New Brunswick and the Recipient will have Joint Communications about the
funding of the Project.
b) Joint Communications under the Agreement should not occur without the prior
knowledge and agreement of all Parties, where applicable.
c) All Joint Communications material will be approved by Canada and New Brunswick prior
to release, and will recognize the funding of all Parties.
d) Each of the Parties may request Joint Communications to communicate to Canadians
about the progress or completion of the Project. The requestor will provide at least 15
business days' notice to the other Parties. if the communications activity is an event, it
will take place at a mutually agreed date and location.
e) The requestor of the Joint Communications will provide an equal opportunity for the
other Parties to participate and choose their own designated representative (in the case
of an event).
f) New Brunswick or the Recipient will be responsible for providing onsite communications
and logistics support. Any related costs are eligible for cost -sharing in accordance with
the formula outlined in the funding agreement.
g) Canada and New Brunswick have an obligation to communicate in English and French.
Joint Communications products must be bilingual and include the Canada and New
Brunswick wordmark and other Parties' logos. Canada and New Brunswick will provide
the translation and final approval on products.
h) The conduct of all Joint Communications will follow the Table of Precedence far Canada.
S. Individual Communications
a) Notwithstanding Section 4 of this communications protocol (Joint Communications),
Canada and New Brunswick retain the right to meet its obligations to communicate
information to Canadians about the Agreement and the use of funds through their own
Communications Activities.
b) Canada, New Brunswick and the Recipient may each include general program messaging
and examples of projects funded through the Agreement in their own Communications
Activities. The authoring Party will not unreasonably restrict the use of such products or
messaging by the other Parties, and if web or social media based, from linking to it.
c) Canada, New Brunswick or the Recipient may issue digital communications to
communicate progress of the Project.
d) Where a web site or web page is created to promote or communicate progress on a
funded Project, it must recognize federal and provincial funding through the use of a
Page 21 of 32
56
digital signor through the use of the Canada wordmark and the following wordings, "This
project is funded in part by the Government of Canada". The Canada wordmark or
digital sign must linkto Infrastructure Canada's website, at www.infrastructure.ga.ca.
Canada will provide and publish guidelines for how this recognition is to appear. The
Recipient will also recognize the funding of New Brunswick in a similar manner.
e) The Recipient will be required to send a minimum of one photograph to each of the
Parties of the construction in progress, or of the completed project, for use in social
media and other digital individual Communications Activities. Sendingthe photos will
constitute permission to use and transfer of copyright. Photographs are to be sent to
INFC.photos@canada.ca along with project name and location.
6. Operational Communications
a) The Recipient is solely responsible for operational communications with respect to
Projects, including but not limited to: calls for tender, or construction and public safety
notices. Operational communications as described above are not subject to the federal
official language policy.
b) Canada does not need to be informed on operational communications. However, such
products should include, where appropriate, the following statement, "This project is
funded in part by the Government of Canada". As appropriate, operational
communications will also recognize the funding of New Brunswick is a similar manner.
7. Media Relations
a) Canada and New Brunswick will share information promptly with the other Party should
significant media inquiries be received or emerging media or stakeholder issues arise to
a Project or the overall fund.
8. 5ignage
a) Canada, New Brunswick or the Recipient may request a sign recognizing their funding
contribution to the Project.
b) Where a physical sign is to be installed, unless otherwise agreed upon by Canada, it will be
the Recipient that will produce and install a joint physical sign that recognizes funding of
each Party at each Project site in accordance with current federal signage guidelines.
c) The joint sign design, content and installation guidelines will be provided by Canada.
d) The recognition of funding contributions of each Party and the Recipient will be of equal
prominence and visibility.
e) Digital signage may also be used in addition or in place of a physical sign in cases where a
physical sign would not be appropriate due to project type, scope, location or duration.
f) Where the Recipient decides to install a permanent plaque or other suitable marker with
respect to a Project, it must recognize the federal and provincial contributions and be
approved by Canada and New Brunswick.
Page 22 of 32
57
g) The Recipient agrees to inform New Brunswick of sign installations through the Project
progress reports referenced in Section 11(Reporting) of this Agreement.
h) Where a physical sign is being installed, signage should be installed at each Project site one
(1) month prior to the start of construction, be visible for the duration of that Project, and
remain in place until one (1) month after construction is completed and the infrastructure is
fully operational or opened for public use.
i) Signage should be installed in a prominent and visible location that takes into consideration
pedestrian and traffic safety and visibility.
9. Advertising Campaigns
a) Recognizing that advertising can be an effective means of communicating with the public,
Canada and New Brunswick may, at their own cost, organize an advertising or public
information campaign related to the Agreement or eligible Project. However, such a
campaign will respect the provisions of this Agreement. In the event of such a campaign,
the sponsoring Party or Recipient will inform the other Parties or of its intention no less than
twenty-one (21) working days prior to the campaign launch.
Page 23 of 32
Bruns ick
SCHEDULE D - DETAILED CLAIM FORM
Regional Development Corporation
P.o, Box 6000, Fredericton, New Brunswick E36 5M1
Community Development Fund
Claim No:
Final Claim:
List all eligible project costs with invoices and cheque numbers an this form. Include a copy of each invoice and proof of
payment Failure to record and support each cost will cause a delay in processing_
Project Number: 13823
Project Name: City of Saint Joh n4nfrastructu re
Description of costs
Name of Supplier
Cheque
No.
Cheque Amount
Invoice
Total
HST
Total
Eligible & supported costs (total -HST refund)
% of HST refunded by Canada Revenue Aoencv
71.43% - municipaky 11 22-33% - university ❑ 50% - non-profit oFgarrzatkm ❑ 100% -other El 0% - none
The undersigned hereby certifies that:
a. the invoices above represent eligible project costs that have been paid in full and the work completed; and
b. no other public financial assistance has been received or is to be received for the part of the project against which this
reimbursement is claimed.
Signature Print Name Date
Title Company Telephone
Eligible & supported costs I
Less: previous advance
Add: current advance
CITYSJ
Vendor
I� —
122320-14-14-14-14 l
122320-14-14
Payment request
For office use only
Claim Reviewer
Project Officer
Payment Authority
9193
account
Page 24 of 32
Date
Date
Claim Auditor
59
SCHEDULE E - PROGRESS REPORT
To be completed by the Ultimate Recipient
The Ultimate Recipient submits a Progress Report to the Regional Development Corporation every year on
May 95 and November 95 for the duration of the project. This form should be signed by an authorized
official designated in the Integrated Bilateral Agreement Contribution Agreement, with the contact
information identified at the bottom of this form.
Name of Ultimate Recipient:
Project Number. -
Project Title:
Reporting Period:
Status of Project
Scheduled project start date:
Indicate scheduled project start date.
Actual project start date:
Please indicate the actual start date, which may have changed from
the scheduled (forecasted) date.
The start date for the project should reflect the date the project
began incurring eligible expenditures, which could be related to
planning, design and procurement or an RFP process that was
launched to secure a project manager, rather than construction start
date or project announcement date. An exception would be cost
related to a project announcement, which is eligible and may occur
prior to the actual project start date.
Project status:
Please choose from the project phases listed below:
❑ Not started
❑ Design
❑ Planning/Procurement
❑ Construction
❑ Complete
❑ On hold
❑ Cancelled
Scheduled date of substantial
Indicate scheduled substantial completion date.
completion:
Actual date of substantial
Indicate substantial completion date,
completion:
Page 25 of 32
e
Summary of work conducted
Briefly describe the progress achieved. Attach a few high -resolution
during reporting period:
digital photographs to demonstrate progress.
Summary of work remaining:
Progress tracker:
Project completion percentage.
Is the project on schedule? (yes !
If not on schedule or the project schedule has been modified, please
no)
explain.
Is the project on budget?
Is total spending on the project expected to equal the forecasted
(yes I no)
total cost submitted on the initial application?
If the project is not on budget, provide an estimate of the percentage
(%) amount the project is under or over budget and a description of
any planned corrective actions.
Is spending in line with the
If not, provide updated forecasts funding, by fiscal year(s) and
annual funding profile outlined in
explain the reason(s) for changes in the annual profile.
the Integrated Bilateral
Agreement Contribution
Agreement or previous Progress
Report? es 1 no
Is project on -track to achieve
If project substantially completed, confirm the actual results.
expected results? es 1 no
Fundina and Expenditure Status
Total amount of expenditures
State the total amount of expenditures incurred for the project
incurred by the Ultimate
(including ineligible costs) during the reporting period.
Recipient during the reporting
period:
Total amount of expenditures
State the total amount of expenditures incurred for the project
incurred by the Ultimate
(including ineligible costs) since project approval. This amount must
Reci ient to date:
include the expenditures incurred for this reporting eriod.
Total amount of eligible
State the total eligible expenditures incurred by the Ultimate
expenditures incurred by the
Recipient for the reporting period.
Ultimate Recipient during the
reporting period:
Total amount of eligible
State the total amount of eligible expenditures incurred since project
expenditures incurred by the
approval. This amount must include the eligible expenditures
Ultimate Recipient to date:
incurred for this reporting quarter.
Page 26 of 32
61
Communications
Summary of communication Provide details, including dates and links to any related public
activities undertaken during the announcements and press releases.
reporting period:
Please ensure you inform The Regional Development Corporation
about all communication activities.
Is project signage installed? (yes Please attach picture for confirmation.
/no
Other
Key overall project risks and This section should be completed with an overview of key project
mitigation strategies: risks and mitigation strategies identified and updated throughout the
project if any new risks are identified. Blank entries or NIA should
not be used; instead, this section should provide the Ultimate
Recipient's assessment even if a project is considered low risk.
Reporting should include the status of all key risks, though this
information may not require updating each reporting period.
Examples of key risks which may be covered include schedule risk,
scope risk, budget risk etc.
Key issues identified during Has anything affected your project's progress during this reporting
reporting period: quarter (e.g,, weather, procurement complications, redesign,
contracting issues, funding not approved at requested level or not
delivered, loss of key personnel, etc.) that may impact your project's
implementation, including the Project Start and Substantial
Completion dates?
If yes, please provide details, including the length of the delays and
any corrective measures taken to minimize the impact on project
implementation.
Contact information
Prepared by:
Please indicate name of authorized official.
Title:
Telephone:
Email:
Date: -mm-dd
Page 27 of 32
62
SCHEDULE (F.1)
DECLARATION OF SUBSTANTIAL COMPLETION
Pursuant to the Agreement entered into between the Province, represented by the Minister responsible for
the Regional Development Corporation, and City of Saint John, I , a licensed
professional or an acceptable equivalent approved by the Province including the President or legal head of
the Ultimate Recipient, do solemnly declare as follows:
1. That I am the
knowledge of the matters set forth in this affidavit;
(title, organization), and as such have
2. That the work identified as Project # 13823 as described in Schedule A in the above- mentioned
Agreement has been substantially completed on the day of 20.
3. That the work:
a. Was carried out by
a
of (start date) and
Was supervised and inspected by qualified staff;
(the prime contractor). Between the dates
(completion date);
c. Conforms with the plans, specifications and other documentation for the work; and
d. Conforms with applicable environmental legislation, and appropriate mitigation measures
have been implemented.
Declared at
(date).
Signature
(City), in the Province of New Brunswick this day of
Page 28 of 32
63
SCHEDULE (F.2) - PROJECT COMPLETION REPORT
To be completed by the Ultimate Recipient
Ultimate Recipients are required to submit a PCR directly to The Regional Development Corporation no later than 90
days after the date of substantial completion of their project. This form must be signed by an Authorized Official of the
Ultimate Recipient with the contact information identified at the end of this form.
Please send completed form via email to IBA-EBI@gnb.ca
Ultimate Recipient Identification
Name of Ultimate recipient: Community:
Project Number: Project Title:
Section A: Final information on the project status, expenditures, funding status and communication activities
A.1 Project Status
Scheduled project start date
Actual project start date (YYYY-MM-DD)
Scheduled date of substantial completion
Date of actual substantial completion (YYYY-MM-DD)
Summary of completed project:
Attach along with this form, a maximum of three high resolution digital photographs to substantiate the project work completed
Page 29 of 32
X
A.2 Expenditure and Funding Status
Total amount of expenditures incurred by the Ultimate Recipient from actual project start date to substantial completion
Provide total spending on the project from project start date to the substantial completion date. Some projects may achieve
substantial completion before the program end. Include a breakdown of expenditures for eligible and ineligible costs
according to the following cost categories.
Amount ($)
Capital Costs
Engineering & Environmental Planning & Reviews
Sub -total Eligible Costs
Ineligible Costs (Specify):
Total Costs (Eligible and Ineligible)
A.3 Communications
Summary of final communication activities undertaken or upcoming
Provide details, include dates and links, of any related public announcements and press releases (complete or upcoming).
Ensure the Ultimate Recipient informs the Regional Development Corporation about all communication activities.
Page 30 of 32
65
Section B: Information on the Project Outcomes
Project Outcomes
Select all the project outcomes that apply to the project. The selections below should match the information in the application
form.
Green Infrastructure Outcomes
Increased capacity to manage more renewable energy
Increased access to clean energy transportation
Increased energy efficiency of buildings
Increased generation of clean energy
Increased structural capacity and/or increased natural capacity to adapt to climate change impacts, natural
disasters and/or extreme weather events.
Increased capacity to treat and/or manage wastewater and storm water
Increased access to potable water
Increased capacity to reduce and/or remediate soil and/or air pollutants.
Community, Culture and Recreation Outcomes
Improved access to andlor increased quality of cultural, recreational and/or community infrastructure for E
Canadians, including Indiqenous peoples and vulnerable populations. j
Rural & Northern Outcomes
Improved food security
Improved and/or more reliable road, air and for marine infrastructure
Improved broadband connectivity
More efficient and/or reliable energy
Improved education and/or health facilities
(specific to the Truth and Reconciliation Commission's Calls to Action
Public Transit Outcomes
Improved capacity of public transit infrastructure
Improved quality and/or safety of existing or future transit systems
Improved access to a public transits stem
Page 31 of 32
Section B2 Project Outcomes
Confirm that the project outcomes described in the original application were achieved and how they were achieved. Based on
the information in the application describe any changes to the identified project outcomes. Indicate and explain if specific
outcomes were not achieved or if additional outcomes not originally identified.
Section C: Other
Substantial Completion
Attach a copy of the Solemn Declaration of Substantial Completion signed by an authorized representative of the Ultimate
Recipient
Has the Solemn Declaration of Substantial Completion been completed?
Overview of issues Identified during project
Provide an overview of the project's progress from start to substantial completion and identify any issues faced by the project.
Provide details, as appropriate, regarding measures taken to minimize the impact of delays in completion date, changes in
project scope and any other impacts on project implementation.
Section D: Attestation/Sig nature
I, the undersigned, hereby understand and agree with the following:
1. All the documentation submitted through this application process is subject to the provisions of the Access to
Information Act. Any financial, commercial, scientific or technical information provided in this documentation will be
treated in accordance with the Access to Information Act. Information provided may be disclosed for the purpose of
program review, statistical purposes and program or performance reporting.
2. The information provided in this close-out report is to the recipient's best knowledge and belief, accurate and
complete.
Prepared by (Name of Authorized
Title:
!Name of Ultimate Recipient:
Official)
Telephone:
Email:
Signature
Date:
Page 32 of 32
67
COUNCIL REPORT
M&C No.
2021-093
Report Date
March 23, 2021
Meeting Date
March 29, 2021
Service Area
Growth and
Community Services
His Worship Mayor Don Darling and Members of Common Council
SUBJECT: City Market Tower Lease with Envision Saint John
OPEN OR CLOSED SESSION
This matter is to be discussed in open session of Common Council.
AUTHORIZATION
Primary Author
Commissioner/Dept. Head
City Manager
David Dobbelsteyn l
Curtis Langille
Jacqueline Hamilton
Melanie Tompkins
John Collin
RECOMMENDATION
BE IT RESOLVED that the City enter into a Lease for office space in the City
Market Tower with the New Regional Economic Development Agency for
Greater Saint John doing business as Envision Saint John: The Regional
Growth Agency under the terms and conditions as set out in the Lease
submitted with M&C 2021-093 and
FURTHER BE IT RESOLVED that the Mayor and City Clerk be authorized to
execute any necessary documents.
EXECUTIVE SUMMARY
The Economic Development Agencies of DevelopSJ, DiscoverSJ have merged into
the new Regional Economic Development Agency of Greater Saint John as of Jan
1, 2021. Prior to the merger, the staff of Discover SJ and Develop SJ had offices in
the 3rd floor of the City Market Tower. In order to facilitate a smooth merger, the
new agency is requesting to enter into a lease with the City on a month -to -month
basis in order to maintain use of those existing office spaces for their staff. This
lease will generate $6,168 in revenue for the City monthly.
IRAN
REPORT
In preparation for the winddown of DevelopSJ and DiscoverSJ and their effective
merger into the New Regional Economic Development Agency of Greater Saint
John (NREDAGSJ), now known as Envision Saint John, the new agency requested
to lease the office space those agencies were using prior to Jan 1, 2021 in order to
maintain consistency and allow a quicker start-up of the new agency.
Prior to the merger, the City of Saint John was the only municipal funder for both
DevelopSJ and Discover SJ. The City provided IT support to these agencies and
effectively fully subsidized their office space. In the case of DevelopSJ, they were
charged $45,000 annually to use office space on the third floor of the City Market
tower, which was subsidized by a revenue transfer from the City. DiscoverSJ was
not charged rent for their office on the third floor of the Market tower, and it was
in essence an additional subsidy the City provided to that agency.
As part of the realignment of Envision Saint John, the surrounding municipalities
committed to sharing the costs of economic development as indicated in the
prospectus.
In light of this funding consensus, City staff entered into negotiations with Envision
Saint John for the lease of the offices that were used by DevelopSJ and DiscoverSJ.
The lease attached to this report has been agreed upon by both parties.
The City will be charging $20 per square foot for the leasable space. This cost is
inclusive of CAM charges and utilities and excludes HST. Phones, and IT services
will be the agency's own responsibility. As the agency is funded by the City and
other municipalities, the cost reflects a cost recovery option for the City rather
than a fair market rate.
The term of the lease is for one year but is effectively month -to -month. As they
are still in the process of standing up operations and determining functional
requirements, Envision Saint John has requested the option to terminate the lease
early in the event they no longer have need of the space at the Market tower or
find a venue that can host all their staff under one roof. City staff are supportive
of including this option in the lease as it is an additional way the City can support
the new agency and staff through this early transition.
At least in the interim, this lease provides stability to the new agency, and
additional revenue to the City. The City just completed major upgrades to the
Market tower, and charging rent is one of the means of cost recovery for the City.
-3-
PREVIOUS RESOLUTION
N/A
STRATEGIC ALIGNMENT
Growth and Prosperity:
The City is looking for ways to generate revenue to increase fiscal sustainability;
leasing quality office space generates value for taxpayers. There are also
additional synergies of having Economic Development Staff in the same building
as the City's Growth and Community Planning team.
SERVICE AND FINANCIAL OUTCOMES
This Lease will generate revenue of $6,168.33 plus HST per month beginning April
1, 2021. The Agency will be billed an overholding amount of $11,250 for the
months of January through March — the amount that would have been previously
charged to Develop Saint John for that same time period.
In the event that the New Agency ends the lease early, City staff will immediately
explore options for fully maximizing the use of that space in a way that provides
the good value for taxpayers.
INPUT FROM OTHER SERVICE AREAS AND STAKEHOLDERS
Growth and Community Services, Asset and Energy Management, Finance, and
the City Manager's office provided input into the preparation of this report and
Real Estate and City's General Counsel Office helped with the drafting and
preparation of the Lease Agreement.
ATTACHMENT
Lease - New Regional Economic Development Agency for Greater Saint John dba
Envision Saint John: The Regional Growth Agency
70
Form A19
LEASE
Standard Forms of Conveyances Act, S.N.B. 1980, c. S-12, s.2
The parties to this lease are:
THE CITY OF SAINT JOHN, having its City Hall at 15
Market Square, Saint John, New Brunswick, a body
corporate by Royal Charter, confirmed and amended by Acts
of the Legislative Assembly of the Province of New
Brunswick (hereinafter referred to as the "Lessor")
- and —
NEW REGIONAL ECONOMIC DEVELOPMENT AGENCY
FOR GREATER SAINT JOHN doing business as
ENVISION SAINT JOHN: THE REGIONAL GROWTH
AGENCY, a duly incorporated company under the Canada
Not -for -profit Corporations Act, S.C. 2009, c.23, having its
head office at 47 Charlotte Street, Saint John, New
Brunswick, E2L 2H7 (hereinafter referred to as the
"Lessee")
The Lessor leases to the Lessee the premises described in Schedule "A" attached hereto on the
following conditions:
Duration: One (1) year (the "Term")
Date of Commencement: April 1, 2021.
Date of Termination: March 31, 2022.
Rent: The annual rent payable for the Office Space during the Term shall
be $74,020.00 plus HST.
Payment Dates: Rent shall be paid in equal monthly installments of $6,168.33 plus
HST on the first day of each and every month during the Term,
commencing on April 1, 2021.
Place of Payment: Cashier's Office of the City of Saint John or any other office
substituted by the Lessor in lieu thereof.
This lease contains the covenants and conditions which are attached and set out in:
a) the Leases Regulation —Standard Forms of Conveyances Act and set out in Schedule
"B" attached hereto; and
b) Schedule "C" attached hereto.
DATED the day of
SIGNED, SEALED & DELIVERED
In the presence of:
2021.
THE CITY OF SAINT JOHN
Mayor
City Clerk
Common Council Resolution:
71
NEW REGIONAL ECONOMIC DEVELOPMENT
AGENCY FOR GREATER SAINT JOHN doing
business as ENVISION SAINT JOHN:
THE REGIONAL GROWTH AGENCY
Per:
And:
72
SCHEDULE"A"
That portion of the third floor of the property bearing PID number 00039420, having civic
address 47 Charlotte Street, in the City of Saint John and Province of New Brunswick, also
known as City Market Tower (the "Site") specifically, the 3701 square foot area highlighted
in yellow on the Schedule "A-1" attached hereto and forming part hereof (the "Office
Space").
The Lessee shall have the nonexclusive right to use in common with others entitled thereto
the common areas included in the Building (the "Common Areas"), such as:
a) bathrooms
b) boardrooms located on the 4th floor;
c) elevators;
d) public hallways; and
e) public stairwells.
Collectively, the "Leased Premises".
73
11
16
17
18
22
25
28
29
30
33
39
40
42
SCHEDULE"B"
The Lessee shall pay rent.
The Lessee shall not assign or sublet without the Lessor's consent.
The Lessee shall comply with all laws.
The Lessee shall deliver vacant possession upon termination of the lease.
The Lessee shall pay occupancy taxes.
The Lessee shall conduct his business in a reputable manner.
The Lessor promises to the Lessee quiet enjoyment of the premises.
The Lessor shall provide fire and other insurance.
The Lessor shall pay real property taxes and local improvements.
The Lessee has an insurable interest in improvements made by him.
The Lessee may install signs with the Lessor's consent.
All disputes are to be settled by arbitration.
All Lessee's insurance policies shall contain a waiver of subrogation.
74
SCHEDULE"C"
ARTICLE I
RENT PAST DUE
1.01 Rent Past Due
If the Lessee fails to pay, when the same is due and payable, rent or other amount payable
by the Lessee under this Lease, such unpaid amounts shall bear interest from the due date thereof
to the date of payment, compounded monthly at the rate equal to four (4) percentage points in
excess of the Prime Rate.
ARTICLE II
TAXES
2.01 HST Payable by Lessee
The Lessee shall pay to the Lessor all HST on rent and any other HST imposed by the
applicable legislation on the Lessor or Lessee with respect to this Lease, in the manner and at the
times required by the applicable legislation. Such amounts are not consideration for the rental of
space or the provision by the Lessor of any service under this Lease, but shall be deemed to be
rent and the Lessor shall have all of the same remedies for and rights of recovery of such amounts
as it has for recovery of rent under this Lease. If a deposit is forfeited to the Lessor, or an amount
becomes payable to the Lessor due to a default or as consideration for a modification of this
Lease, and the applicable legislation deems a part of the deposit or amount to include HST, the
deposit or amount will be increased and the increase paid by the Lessee so that the Lessor will
receive the full amount of the forfeited deposit or other amount payable without encroachment by
any deemed HST portion.
ARTICLE III
CONDUCT OF BUSINESS BY LESSEE
3.01 Use of Leased Premises
The Leased Premises shall be used for the sole and direct purpose of supporting economic
development in Greater Saint John and continuing and advancing the Lessee's role as a non-
profit organization providing services related to economic development. In connection with the
business to be conducted by the Lessee on the Leased Premises, the Lessee will not change the
advertised name of the business to be operated in the Leased Premises without the prior written
consent of the Lessor.
ARTICLE IV
FIXTURES, ALTERATIONS AND REPAIRS
4.01 Installations by the Lessee
All equipment, fixtures and improvements installed by the Lessee in the Leased Premises
shall be new or completely reconditioned. The Lessee shall not make any alterations, additions
or improvements or install or cause to be installed any trade fixtures, exterior signs, floor covering,
interior or exterior lighting, plumbing fixtures, shades or awnings or make any changes to the
Leased Premises without first obtaining the Lessor's written approval and consent. The Lessee
shall present to the Lessor plans and specifications in form, content and such detail as the Lessor
may reasonably require for such work at the time approval is sought. The Lessee covenants that
any work that may be done in respect of the Leased Premises by or on behalf of the Lessee shall
be done in such a manner as not to conflict or interfere with any work being done or about to be
done by the Lessor in or about the Site and the Lessee shall obtain all requisite permits, licenses
and inspections in respect of any such work done by or on the Lessee's behalf. Notwithstanding
anything herein contained, the Lessee shall make no alterations, additions or improvements that
are of a structural nature or that would lessen the value of the Leased Premises or the buildings
in which they are located.
4.02 Surrender of Leased Premises
The Lessee will leave the Leased Premises in good repair, reasonable wear and tear only
excepted. Without limiting the generality of the foregoing, at the expiration or earlier termination
of the Term the Lessee shall surrender the Leased Premises in the same condition as the Leased
75
Schedule "C"
Premises were in upon delivery of possession thereto under this Lease, reasonable wear and tear
only excepted, and shall surrender all keys for the Leased Premises to the Lessor at the place
then fixed for the payment of rent and shall inform the Lessor of all combinations on locks, safes
and vaults, if any, in the Leased Premises. Should the Lessee fail to remove its fixtures and
personal property, such fixtures and personal property shall be deemed to be abandoned by the
Lessee and may be appropriated, sold or otherwise disposed of by the Lessor without notice or
obligation to compensate the Lessee or to account therefor. The Lessee's obligations to observe
or perform this covenant shall survive the expiration or earlier termination of the Term of this
Lease.
4.03 Lessee to Discharge all Liens
The Lessee will ensure that no construction or other lien or charge, or notice thereof, is
registered or filed against:
a) the Lessee's interest in the Leased Premises or any of the leasehold improvements in
the Leased Premises.
by any person claiming by, through, under or against the Lessee or its contractors or
subcontractors. If such a lien or charge or notice thereof is registered or filed and the Lessee fails
to discharge it within five (5) days after written notice from the Lessor, the Lessor may discharge
it by paying the amount claimed to be due into court or directly to the claimant and the Lessee will
pay to the Lessor as additional rent on demand all costs (including legal fees) incurred by the
Lessor in connection therewith, together with an administrative overhead charge of fifteen percent
(15%) thereon.
4.04 Maintenance and Repair by the Lessor
The Lessor shall, subject to the other provisions of this Lease, maintain and repair or cause
to be maintained and repaired, the structures in which the Leased Premises are located, including
without limitation, the foundations, exterior weather walls, subfloor, roof, bearing walls and
structural columns and beams. If, however, the Lessor is required to maintain or repair any
structural portions or any other portion of the Leased Premises by reason of the negligent acts or
omissions of the Lessee, its employees, agents, invitees, suppliers, agents and suppliers,
licensees, concessionaires or subtenants, the Lessee shall pay on demand as additional rent, the
Lessor's costs for making such maintenance or repairs, together with an administrative fee of
fifteen percent (15%) of such costs.
4.05 Lessor's Right to Enter Leased Premises
a) It is not a re-entry or a breach of quiet enjoyment if the Lessor or its authorized
representatives enter the Leased Premises at reasonable times to:
examine them;
ii. make permitted or required repairs, alterations, improvements or additions to the
Leased Premises (including the pipes, conduits, wiring, ducts, columns and
other installations in the Leased Premises).
b) At any time during the Term, the Lessor, its agents, servants and employees may
exhibit the Leased Premises to prospective purchasers or tenants during the Term of
this Lease with 24 hours notice, the Lessor may exhibit the Leased Premises to
prospective tenants and place upon the Site the usual notice "To Let" which notice the
Lessee shall permit to remain where placed without molestation;
c) If the Lessee shall not be personally present to open and permit an entry into the
Leased Premises, at any time, when for any reason an entry therein shall be
necessary or permissible, the Lessor or the Lessor's agents may enter the same by a
master key, or may forcibly enter the same, without rendering the Lessor or such
agents liable therefor, and without in any manner affecting the obligations and
covenants of this Lease;
d) Nothing in this Section contained, however, shall be deemed or construed to impose
upon the Lessor any obligation, responsibility or liability whatsoever for the care,
76
Schedule "C"
maintenance or repair of the Site or any part thereof, except as otherwise in this Lease
specifically provided.
ARTICLE V
INSURANCE AND INDEMNITY
5.01 Lessee's Insurance
a) The Lessee shall throughout the Term, at its own cost and expense, take out and keep
in full force and effect the following insurance:
All-risk insurance upon property owned by the Lessee or for which the Lessee
is legally liable and which is located upon the Leased Premises in an amount of
not less than the full replacement cost thereof;
ii. Comprehensive General Liability with minimum limits of at least Two Million
Dollars ($2,000,000.00) or such higher limits as the Lessor may reasonably
require from time to time. This policy shall include:
a. The City of Saint John added as an Additional Insured;
b. Inclusive limits for bodily injury and property damage;
C. Personal injury liability;
d. Lessee's Legal Liability;
e. Contractual Liability with respect to this Lease;
f. Premises, Property and Operations;
g. Completed Operations;
h. A Cross Liability Clause;
A Thirty (30) days written notice of Cancellation shall be given to the
Lessor.
iii. The Lessee shall also provide any other form of insurance as the Lessee or the
Lessor may reasonably require from time to time in form, in amounts and for
insurance risks against which a prudent tenant would insure.
b) All policies shall be taken out with reputable and recognized insurers acceptable to
the Lessor and shall be in a form satisfactory from time to time to the Lessor. The
Lessee agrees that certificates of insurance of each such insurance policy will be
delivered to the Lessor as soon as practicable after the placing of the required
insurance. All policies shall contain an undertaking by the insurers to notify the Lessor
in writing not less than thirty (30) days prior to any material change, cancellation or
termination thereof;
c) The Lessee agrees that if the Lessee fails to take out or keep in force any such
insurance referred to in this Section 5.01, or should any such insurance not be
approved by the Lessor and should the Lessee not rectify the situation immediately
after written notice by the Lessor to the Lessee, the Lessor has the right without
assuming any obligation in connection therewith to effect such insurance at the sole
cost of the Lessee and all outlays by the Lessor shall be immediately paid by the
Lessee to the Lessor as additional rent without prejudice to any other rights and
remedies of the Lessor under this Lease.
5.02 Increase in Insurance Premium
77
Schedule "C"
The Lessee will not allow or cause anything to occur in the Leased Premises which shall
cause any increase of premium for any insurance on the Leased Premises or the structures in
which the Leased Premises are located above the rate for the least hazardous type of occupancy
legally permitted in the Leased Premises. If the Lessee is in default under this Section 5.02, the
Lessee shall pay any resulting additional premium on any insurance policies taken out or
maintained by the Lessor, or if any insurance policy upon the Leased Premises or the structures
in which the Leased Premises are located shall be cancelled or refused to be renewed by an
insurer by reason of the use or occupation of the Leased Premises or any part thereof or the acts
or omissions of the Lessee, the Lessee shall forthwith remedy or rectify such use or occupation
upon request to do so in writing by the Lessor, and if the Lessee shall fail to do so within twenty-
four (24) hours of such written request, the Lessor shall have the right to enter the Leased
Premises and rectify the situation, without liability to the Lessee for any loss or damage
occasioned by such entry and rectification, or shall be entitled to hold the Lessee liable for any
damage or loss resulting from such cancellation or refusal, or the Lessor may at its option
determine this Lease forthwith by leaving upon the Leased Premises notice in writing of its
intention to do so, and thereupon rent and any other payments for which the Lessee is liable under
this Lease shall be apportioned and paid in full to the date of such determination of the Lease, and
together with an amount equal to the rent payable for a period of one (1) year as liquidated
damages, and the Lessee shall immediately deliver up possession of the Leased Premises. A
schedule issued by the organization making the insurance rate on the Leased Premises, showing
the various components of such rate, shall be conclusive evidence of the several items and
charges which make the fire insurance rate of the Leased Premises. Bills for such additional
premiums shall be rendered by the Lessor to the Lessee at such times as the Lessor may elect
and shall be due from and payable by the Lessee when rendered, and the amount thereof shall
be deemed to be and be paid as additional rent.
5.03 Loss or Damage
The Lessor shall not be liable for any death or injury arising from or out of any occurrence
in, upon, at or relating to the Site, or damage to property of the Lessee or of others located on the
Leased Premises, nor shall it be responsible for any loss of or damage to any property of the
Lessee or others from any cause whatsoever, except any such death, injury, loss or damage
results from the negligence of the Lessor, its agents, servants or employees or other persons for
whom the Lessor is in law responsible. Without limiting the generality of the foregoing, the Lessor
shall not be liable for any injury or damage to persons or property resulting from fire, explosion,
falling plaster, steam, gas, electricity, water, rain, flood, snow or leaks from any part of the Leased
Premises or from the pipes, appliances, plumbing works, roof or subsurface of any floor or ceiling
or from the street or any other place or other tenants or persons in the structure in which the
Leased Premises are located or by occupants of adjacent property thereto, or the public, or caused
by construction or by any private, public or quasi -public work. All property of the Lessee kept or
stored on the Leased Premises shall be so kept or stored at the risk of the Lessee only and the
Lessee shall indemnify the Lessor and save it harmless from any claims arising out of any
damages to the same, including, without limitation, any subrogation claims by the Lessor's
insurers. In no event shall the Lessor be liable for any injury to the Lessee, its servants, agents,
employees, customers and invitees or for any injury or damage to the Leased Premises or to any
property of the Lessee, or to any property of any other person, firm or corporation on or about the
Leased Premises caused by an interruption, suspension or failure in the supply of any utilities to
the Leased Premises.
5.04 Indemnification of the Lessor
The Lessee will indemnify the Lessor, and save harmless from and against any and all
claims, actions, damages, liability and expense in connection with loss of life, personal injury
and/or damage to property arising from or out of any occurrence in, upon or at the Leased
Premises, the occupancy or use by the Lessee of the Leased Premises or any part thereof, or
occasioned wholly or in part by any act or omission of the Lessee, its agents, contractors,
employees, servants, licensees, or concessionaires or invitees. In case the Lessor shall, without
fault on its part, be made a party to any litigation commenced by or against the Lessee, then the
Lessee shall protect and hold it harmless and shall pay all costs, expenses and solicitors' and
counsel fees on a solicitor and client basis incurred or paid by them in connection with such
litigation.
ARTICLE VI
DAMAGE AND DESTRUCTION
6.01 Total or Partial Destruction of Leased Premises
Schedule "C"
If, during the Term, the Leased Premises are totally or partially destroyed or damaged by
any cause in respect of which the Lessor is insured, the following provisions shall have effect:
a) If the Leased Premises are rendered partially unfit for occupancy by the Lessee, rent
shall abate in part only, in the proportion that the part of the Leased Premises rendered
unfit for occupancy by the Lessee bears to the whole of the Leased Premises or if the
Leased Premises are rendered wholly unfit for occupancy by the Lessee the rent
hereby reserved shall be suspended in either event until the day following a
reasonable period (taking into account the extent of the Lessee's restoration) following
completion of the Lessor's restoration;
b) Notwithstanding the provisions of subparagraph (a), if the Leased Premises in the
opinion of the Lessor shall be incapable of being rebuilt and/or repaired or restored
with reasonable diligence within 180 days of the happening of such destruction or
damage, or if the Lessor determines in good faith that such rebuilding, repairing or
restoring is not advisable, then the Lessor may at its option terminate this Lease by
notice in writing to the Lessee given within thirty (30) days of the date of such
destruction or damage and in the event of such notice being so given this Lease shall
cease and become null and void from the date of such destruction or damage and the
Lessee shall immediately surrender the Leased Premises and all interest therein to
the Lessor and the rent shall be apportioned and shall be payable by the Lessee only
to the date of such destruction or damage and the Lessor may re-enter and repossess
the Leased Premises discharged of this Lease;
If the Leased Premises are capable of being rebuilt and/or repaired or restored within 180 days of
the happening of such damage or destruction and the Lessor chooses to do so, or if within the
period of thirty (30) days referred to in Section 6.01(b) the Lessor shall not give notice terminating
this Lease, the Lessor shall with reasonable promptitude proceed to rebuild and/or repair or
restore the Leased Premises to the extent of the Lessor's repair obligations under the Lease and
the Lessee shall immediately upon substantial completion of the Lessor's work and, within a
reasonable period determined by the Lessor (given the extent of the Lessee's restoration)
complete the restoration of the Leased Premises.
The determination made in good faith by the Lessor shall bind the parties as to the (i) extent to
which the Leased Premises are unfit for occupancy; (ii) whether it is advisable to rebuild, repair or
restore the Leased Premises or any part thereof; (iii) time required to rebuild and/or repair or
restore the Leased Premises; and (iv) due completion of repairs.
ARTICLE VII
DEFAULT OF LESSEE
7.01 Right to Re -Enter
When
a) the Lessee shall be in default in the payment of any rent whether lawfully demanded
or not and such default shall continue for a period of five (5) consecutive days; or
b) the Lessee shall be in default of any of its covenants, obligations or agreements under
this Lease or of any term or condition of this Lease (other than its covenant to pay
rent) and such default shall continue for a period of fifteen (15) consecutive days or
such longer or shorter period as the Lessor, acting reasonably, determines after five
(5) days written notice by the Lessor to the Lessee specifying with reasonable
particularity the nature of such default and requiring the same to be remedied;
then and in any of such cases the then current month's rent, together with the rent for the three
(3) months next ensuing shall immediately become due and payable, and at the option of the
Lessor, the Term shall become forfeited and void, and the Lessor may without notice or any form
of legal process whatsoever forthwith re-enter upon the Leased Premises or any part thereof in
the name of the whole and repossess and enjoy the same as of its former estate, anything
contained in any statute or law to the contrary notwithstanding, provided however, that such
forfeiture shall be wholly without prejudice to the right of the Lessor to recover arrears of rent or
damages for any antecedent default by the Lessee of its covenants, obligations or agreements
79
Schedule "C"
under this Lease or any term or condition of this Lease and provided further that notwithstanding
any such forfeiture the Lessor may subsequently recover from the Lessee damages for loss of
rent suffered by reason of this Lease having been prematurely determined. In addition, the Lessor
shall have the right to remove and sell the Lessee's goods and chattels and trade fixtures and
apply the proceeds thereof to rent due under the Lease.
7.02 Right to Re -Let
Should the Lessor elect to re-enter, as herein provided, or should it take possession
pursuant to legal proceedings or pursuant to any notice provided for by law, it may either terminate
this Lease or it may from time to time without terminating this Lease, make such alterations and
repairs as may be necessary in order to re -let the Leased Premises, and re -let the Leased
Premises or any part thereof as agent for the Lessee for such term or terms (which may be for a
term extending beyond the Term of this Lease) and at such rental or rentals and upon such other
terms and conditions as the Lessor in its sole discretion may deem advisable; upon each re -letting
all rentals received by the Lessor from such re -letting shall be applied; first, to the payment of any
indebtedness other than rent due hereunder from the Lessee to the Lessor; second, to the
repayment of any reasonable costs and expenses of such re -letting, including brokerage fees and
solicitors' fees and of costs of such alterations and repairs; third, to the payment of rent due as
the same may become due and payable hereunder. If such rent received from such re -letting
during any month be less than that to be paid during that month by the Lessee hereunder, the
Lessee shall pay any such deficiency to the Lessor. Such deficiency shall be calculated and paid
monthly. No such re-entry or taking possession of the Leased Premises by the Lessor shall be
construed as an election on its part to terminate this Lease unless a written notice of such intention
be given to the Lessee or unless the termination thereof be decreed by a court of competent
jurisdiction. Notwithstanding any such re -letting without termination, the Lessor may at any time
thereafter elect to terminate this Lease for such previous breach. Should the Lessor at any time
terminate this Lease for any breach, in addition to any other remedies it may have, it may recover
from the Lessee all damages it may incur by reason of such breach, including the cost of
recovering the Leased Premises, and including the worth at the time of such termination of the
excess, if any, of the amount of rent and charges equivalent to rent reserved in this Lease for the
remainder of the Term hereof over the then reasonable rental value of the Leased Premises for
the remainder of the Term hereof, all of which amounts shall be immediately due and payable
from the Lessee to the Lessor.
7.03 Legal Expenses
In case suit shall be brought for recovery of possession of the Leased Premises, for the
recovery of rent or any other amount due under the provisions of this Lease, or because of the
breach of any other covenant herein contained on the part of the Lessee to be kept or performed
and a breach shall be established, the Lessee shall pay to the Lessor all expenses incurred
therefor, including reasonable solicitors' and counsel fees on a solicitor and client basis.
7.04 Bankruptcy
The Lessee covenants and agrees that if the Term or any of the goods and chattels of the
Lessee on the Leased Premises shall be at any time during the Term seized or taken in execution
or attachment by any creditor of the Lessee or if a receiver, interim receiver or receiver and
manager is appointed for the assets or business of the Lessee or if the Lessee shall make any
assignment for the benefit of creditors or any bulk sale or, becoming bankrupt or insolvent, shall
take the benefit of any Act now or hereafter in force for bankrupt or insolvent debtors or if any
order shall be made for the winding up of the Lessee, or if the Leased Premises shall without the
written consent of the Lessor become and remain vacant for a period of fifteen (15) days, or be
used by any other persons than such as are entitled to use them under the terms of this Lease, or
if the Lessee shall without the written consent of the Lessor abandon or attempt to abandon the
Leased Premises or to sell or dispose of goods or chattels of the Lessee or to remove them or
any of them from the Leased Premises so that there would not in the event of such abandonment,
sale or disposal be sufficient goods on the Leased Premises subject to distress to satisfy the rent
above due or accruing due, then and in every such case the then current month's rent and the
next ensuring three (3) months' rent shall immediately become due and be paid and the Lessor
may re-enter and take possession of the Leased premises as though the Lessee or the servants
of the Lessee or any other occupant of the Leased Premises were holding over after the expiration
of the Term and the Term shall, at the option of the Lessor, immediately without any notice or
opportunity for cure provided to the Lessee, become forfeited and determined, and in every one
of the cases above such accelerated rent shall be recoverable by the Lessor in the same manner
as the rent hereby reserved and if rent were in arrears and the said option shall be deemed to
have been exercised if the Lessor or its agents given notice to the Lessee as provided for herein.
:1
Schedule "C"
7.05 Lessor May Perform Lessee's Covenants
If the Lessee shall fail to perform any of its covenants or obligations under or in respect of
this Lease, the Lessor may from time to time at its discretion, perform or cause to be performed
any such covenants or obligations, or any part thereof, and for such purpose may do such things
upon or in respect of the Leased Premises or any part thereof as the Lessor may consider requisite
or necessary.
All expenses incurred and expenditures made by or on behalf of the Lessor under this Section,
together with an administrative fee equal to fifteen (15%) percent thereon, shall be forthwith paid
by the Lessee to the Lessor on demand as additional rent.
7.06 Waiver of Exemptions from Distress
Despite any applicable Act, legislation or any legal or equitable rule of law: (a) none of the
inventory, furniture, equipment or other property at any time owned by the Lessee is exempt from
distress; and (b) no lack of compliance with any requirement concerning the day of the week, time
of day or night, method of entry, giving of notice, appraising of goods, or anything else, will render
any distress unlawful where the Lessee owes arrears of rent at the time of the distress.
7.07 Remedies Cumulative
No reference to nor exercise of any specific right or remedy by the Lessor will prejudice or
preclude the Lessor from exercising or invoking any other remedy in respect thereof, whether
allowed at law or expressly provided for in this Lease. No such remedy will be exclusive or
dependent upon any other such remedy, but the Lessor may from time to time exercise any one
or more of such remedies independently or in combination.
ARTICLE VIII
OPTION TO TERMINATE
8. 01 Option to Terminate
The Lessor hereby gives to the Lessee an option to terminate this Lease at any time
provided that the Lessee gives written notice to the Lessor of its intention to terminate this Lease
which notice must be given to the Lessor not later than thirty (30) days prior to the intended date
of termination of the Lease.
ARTICLE IX
MISCELLANEOUS
9.01 Overholding
If the Lessee remains in possession of the Leased Premises after the end of the Term and
without the execution and delivery of a new lease, there shall be no tacit renewal of this Lease
and the Term hereby granted, and the Lessee shall be deemed to be occupying the Leased
Premises as a Lessee from month to month at monthly rent payable in advance on the first day of
each month equal to the sum of one and one half (1'/2) times the rent payable during the last month
of the Term and otherwise upon the same terms and conditions as are set forth in this Lease,
except as to duration of Term, and any right of renewal mutatis mutandis.
9.02 Successors
This Lease applies to the successors and assigns of the Lessor and the heirs, executors,
administrators and permitted successors and permitted assigns of the Lessee. If there is more
than one party named as Lessee, they are jointly and severally liable under this Lease.
9.03 Waiver
Failure by the Lessor to require performance of any term, covenant or condition herein
contained shall not be deemed to be a waiver of such term, covenant or condition or of any
subsequent breach of the same or of any other term, covenant or condition herein contained. The
subsequent acceptance of rent hereunder by the Lessor shall not be deemed to be a waiver of
any preceding breach of the Lessee of any term, covenant or condition of this Lease, other than
the failure of the Lessee to pay the particular rent so accepted, regardless of the Lessor's
knowledge of such preceding breach at the time of acceptance of such rent. No covenant, term
Schedule "C"
or condition of this Lease shall be deemed to have been waived by the Lessor, unless such waiver
be in writing by the Lessor.
9.04 Accord and Satisfaction
No payment by the Lessee or receipt by the Lessor of a lesser amount than the monthly
rent herein stipulated shall be deemed to be other than on account of the earliest stipulated rent,
nor shall any endorsement or statement or any cheque or any letter accompanying any cheque or
payment as rent be deemed an accord and satisfaction, and the Lessor may accept such cheque
or payment without prejudice to the Lessor's right to recover the balance of such rent or pursue
any other remedy in this Lease provided.
9.05 Entire Agreement
This Lease sets forth all the covenants, promises, agreements, conditions and
understandings between the Lessor and the Lessee concerning the Leased Premises and there
are no covenants, promises, agreements, conditions or representations, either oral or written,
between them other than are herein and in the said schedules set forth. Except as herein
otherwise provided, no subsequent alteration, amendment, change or addition to this Lease shall
be binding upon the Lessor or the Lessee unless reduced to writing and signed by them.
9.06 No Partnership
The Lessor does not, in any way or for any purpose, become a partner of the Lessee in
the conduct of its business, or otherwise, or joint venturer or a member of a joint enterprise with
the Lessee.
9.07 Force Majeure
In the event that either party hereto shall be delayed or hindered in or prevented from the
performance of any act required hereunder by reason of strikes, lock -outs, labour troubles, inability
to procure materials, failure of power, restrictive governmental laws or regulations, riots,
insurrection, war, pandemic, quarantine or other reason of a like nature not the fault of the party
delayed in performing work or doing acts required under the terms of this Lease, then performance
of such act shall be excused for the period of the delay and the period for the performance of any
such act shall be extended for a period equivalent to the period of such delay. Notwithstanding
anything herein contained, the provisions of this Section shall not operate to excuse the Lessee
from the prompt payment of rent, additional rent or any other payments required by the terms of
this Lease, nor entitle the Lessee to compensation for any inconvenience, nuisance or discomfort
thereby occasioned.
9.08 Notices
Any notice herein provided or permitted to be given by the Lessee to the Lessor shall be
sufficiently given if delivered personally to the City Clerk, or if transmitted by telecopier or if mailed
in Canada, registered and postage prepaid, addressed to the Lessor at: C/O The City Clerk, The
City of Saint John, P. O. Box 1971, 15 Market Square, Saint John, New Brunswick, E2L 41-1, with
a copy to Real Estate Services, The City of Saint John, P. O. Box 1971, 15 Market Square, Saint
John, New Brunswick, E2L 4L1, and any notice herein provided or permitted to be given by the
Lessor to the Lessee shall be sufficiently given if delivered personally to the party being given
such notice or to a responsible employee of the party being given such notice, or if transmitted by
telecopier or if mailed in Canada, registered and postage prepaid, addressed to the Lessee at 47
Charlotte Street, Saint John, New Brunswick, Attention: Chief Executive Officer. Any such notice
given as aforesaid shall be conclusively deemed to have been given on the day on which such
notice is delivered or transmitted or on the third day that there is postal delivery following the day
on which such notice is mailed, as the case may be. Either party may at any time give notice in
writing to the other of any change of address of the party given such notice and from and after the
giving of such notice the address therein specified shall be deemed to include any request,
statement or other writing in this Lease provided or permitted to be given by the Lessor to the
Lessee or by the Lessee to the Lessor. If there is more than one party named as Lessee, notice
to one shall be deemed sufficient as notice to all.
9.09 Place for Payment of Rent
The Lessee shall pay the rent to the Cashier's Office, City Hall, P. O. Box 1971, 15 Market
Square, Saint John, New Brunswick, E2L 41_1 or such other location of which the Lessor gives
notice in writing to the Lessee.
Schedule "C"
9.10 Approval in Writing
Wherever the Lessor's consent is required to be given hereunder or wherever the Lessor
must approve any act or performance by the Lessee, such consent or approval, as the case may
be, shall be given in writing by the Lessor before same and shall be deemed to be effective.
9.11 Governing Law
The Lease is to be governed by and construed according to the laws of the Province of
New Brunswick.
9.12 Captions and Section Numbers
The captions, section numbers and article numbers appearing in this Lease are inserted
only as a matter of convenience and in no way define, limit, construe or describe the scope or
intent of such sections or articles or of this Lease, nor in any way affect this Lease.
9.13 Partial Invalidity
If any term, covenant or condition of this Lease or the application thereof to any person or
circumstance shall, to any extent, be invalid or unenforceable, the remainder of this Lease and/or
the application of such term, covenant or condition to persons or circumstances other than those
as to which it is held invalid or unenforceable, shall not be affected thereby and each term,
covenant or condition of this Lease shall be separately valid and enforceable to the fullest extent
permitted by law.
9.14 No Option
The submission of this Lease for examination does not constitute a reservation of or option
for the Leased Premises and this Lease becomes effective as a Lease only upon execution and
delivery thereof by the Lessor and the Lessee.
9.15 Time To Be of the Essence
Time shall be of the essence of this Lease.
9.16 Riders and Schedules
Schedules attached hereto form part of this Lease
Form 45
AFFIDAVIT OF CORPORATE EXECUTION
Land Titles Act, S.N.B. 1981, c.L-1.1, s.55
Deponent: Jonathan A. Taylor
The City of Saint John
P.O. Box 1971
Saint John, NB E21- 41-1
Office Held by Deponent:
Corporation:
Other Officer Who Executed
the Instrument:
Office Held by Other Officer
Who Executed the Instrument:
Place of Execution:
Date of Execution:
City Clerk
The City of Saint John
W. Donald (Don) Darling
The City of Saint John
P.O. Box 1971
Saint John, NB E21- 41-1
Mayor
City of Saint John
I, Jonathan A. Taylor, the deponent, make oath and say:
2021
1. That I hold the office specified in the corporation specified above, and am authorized
to make this affidavit and have personal knowledge of the matters hereinafter deposed
to;
2. That the attached instrument was executed by me and the other officer specified
above, as the officers duly authorized to execute the instrument on behalf of the
corporation;
3. That the seal of the corporation was affixed to the instrument by order of the Common
Council of (The) City of Saint John;
4. That the instrument was executed at the place and on the date specified above; and
5. That the corporation has no shareholders.
SWORN TO at the City of Saint John,
in the County of Saint John, Province
of New Brunswick, on the day of
, 2021
Before me:
Commissioner of Oaths
Being a Solicitor
Jonathan A. Taylor
01
Form 45
AFFIDAVIT OF CORPORATE EXECUTION
Land Titles Act, S.N.B. 1981, c. L-1.1, s. 55
Deponent:
Office Held by Deponent:
Other Deponent:
Office Held by Other Deponent:
Corporation: NEW REGIONAL ECONOMIC DEVELOPMENT
AGENCY FOR GREATER SAIN JOHN
doing business as ENVISION SAINT JOHN:
THE REGIONAL GROWTH AGENCY
Place of Execution: Saint John, New Brunswick
Date of Execution: 2021
I, , the deponent, make oath and say:
1. That I hold the office specified in the corporation specified above, and am authorized
to make this affidavit and have personal knowledge of the matters hereinafter deposed
to;
2. That the attached instrument was executed by me and the other officer specified
above as the officers duly authorized to execute the instrument on behalf of the
corporation;
3. That the seal of the corporation specified above was affixed to the instrument;
4. That the instrument was executed at the place and on the date specified above; and
5. That the corporation has no shareholders.
SWORN TO at the City of Saint John,
in the County of Saint John, Province
of New Brunswick, on the day of
, 2021
Before me:
Commissioner of Oaths
Being a Solicitor
99
Schedule A-1—Office Space Premises —January 13, 2021
M
LEM
oatnn�]oira
4..r i o_ov.�m �eua'wu�orawmw
.J woxax�mN.n�dm
O ]l�4Ma]]IS�9�'P0.Nr I
i � bAl�n mn[m/r�a
]u]4fno4dh�uw61�111GR]aw[fanwL
3 A�R"M WA£M4JII�JIIO�N�L11E� WIILOK WLM
ibYl�ll![�]wII1�k�Yi1 W]A
i.11rYY]YT�[Lx10(V OL dM1tlliq�d alxe�cwy]
•T�]NYP� L#FYI�RILi iRYPPRd9119�M
� awo-so]ewner,•m]a�sw.]unaa
COMMON COUNCIL REPORT
M&C No.
2021-090
Report Date
March 24, 2021
Meeting Date
March 29, 2021
Service Area
Utilities and
Infrastructure Services
His Worship Mayor Don Darling and Members of Common Council
SUBJECT: Low Carbon Economy Fund (LCEF) Amending Agreement — Municipal
Buildings Energy Retrofit Project
AUTHORIZATION
Primary Author
Commissioner/Dept. Head
City Manager
Samir Yammine
J. Brent McGovern
I John Collin
RECOMMENDATION
It is recommended that Common Council approve the Amending Agreement
under the Low Carbon Economy Fund for the Municipal Buildings Energy Retrofit
Project in the form and upon the terms and conditions as attached; and that the
Mayor and Common Council be authorized to execute the said Amending
Agreement.
I�:���►j�PI�1►luluGli7
The purpose of this report is to seek Common Council's approval of the Amending
Agreement. The proposed Amending Agreement consists of changes to the
Project's fiscal year breakdown i.e., Schedule B.2, B.3 and B.4 of the funding
agreement. The Amending Agreement must be signed prior to March 31, 2021 to
allow the City to submit claims for funding.
PREVIOUS RESOLUTION
M&C 2019-312. It is recommended that the City enter into the Grant Agreement
with Her Majesty the Queen in Right of Canada, as represented by the Minister of
the Environment who is responsible for the Environment and Climate Change
Canada under the Low Carbon Economy Fund for the Municipal Buildings Deep
Energy Retrofit in the form and upon the terms and conditions as attached; and
that the Mayor and Common Clerk be authorized to execute the said Agreement.
99
-2-
STRATEGIC ALIGNMENT
The Municipal Energy Retrofit Project is clearly aligned with the following City
plans, policies, Council Priorities, programs, and practices:
1- City of Saint John Corporate GHG and Energy Action plan to reduce GHG
emissions by 30% by 2025 and achieve carbon neutral by 2040.
2- City of Saint John Asset Management Policy objectives to apply risk -based
decision and life -cycle costing principles to prioritize capital investment, identify
alternative measures, facilitate the leveraging of infrastructure funding from
external sources, and improve the reliability of customer service.
3. City of Saint John Capital Investment Policy
INPUT FROM OTHER SERVICE AREAS AND STAKEHOLDERS
The City of Saint John Utilities and Infrastructure Services and Legal Departments
have reviewed the attached Amending Agreement and are satisfied with the
recommendation as they pertain to their respective areas of services.
ATTACHMENTS
Low Carbon Economy Fund Amending Agreement- Municipal Buildings Energy
Retrofit Project.
EXECUTION COPY
AMENDING AGREEMENT
TO THE CHALLENGE FUND FUNDING AGREEMENT REGARDING
MUNICIPAL RETROFIT PROJECT
This Amending Agreement is made as of the date of last signature,
BETWEEN: HER MAJESTY THE QUEEN IN RIGHT OF CANADA, as represented by
the Minister of the Environment who is responsible for Environment and
Climate Change Canada ("Canada" or the "Minister"),
AND THE CITY OF SAINT JOHN, incorporated by Royal Charter as confirmed
and amended from time to time by the Acts of the Legislative Assembly of
New Brunswick ("Recipient"),
Individually referred to as a "Party" and collectively referred to as the "Parties".
WHEREAS the Parties concluded the Challenge Fund Funding Agreement Regarding Municipal
Retrofit Project, effective December 5, 2019 (the "Original Agreement");
AND WHEREAS the Parties desire to amend the Original Agreement, in accordance with
subsection 39 of the Original Agreement;
NOW THEREFORE, the Parties agree to the following amendment made to the Original
Agreement:
Capitalized terms used herein have the same meaning given to them in the Original
Agreement.
2. Delete Section 40 of the Original Agreement and insert the following Section 40 in its place:
"40. COUNTERPARTS AND ELECTRONIC SIGNATURES
This Agreement may be signed in multiple counterparts, each of which so signed and
delivered shall be deemed to be an original and all of which counterparts taken together shall
constitute one Agreement. The counterparts of this Agreement and all other documents that
are signed in connection herewith may be signed by electronic signature by any of the
Parties and delivered by "pdf" or other similar attachment to an email to the other party and
the receiving Party may rely on the receipt of the electronically signed and delivered
document as if the original had been received."
EXECUTION COPY
3. Delete SCHEDULE B.2: PROJECT BUDGET of the Original Agreement and insert in its
place the following SCHEDULE B.2: PROJECT BUDGET:
SCHEDULE B.2: PROJECT BUDGET
Project name Municipal Retrofit Project
Total costs of the Project
Total Eligible Expenditures of the Project
Total Ineligible Expenditures of the Project
Recipient's contribution towards Eligible Expenditures
Canada's maximum contribution towards Eligible Expenditures
I
'
$5,494,930
100%
$5,367,200
98%
$127,730
2%
$3,220,320
60%
$2,146,880
40%
EXPENDITURES / FISCAL YEAR BREAKDOWN
FUNDING TOTAL
REQUEST 2019-2020 2020-2021 2021-2022 2022-2023
Total Project expenditures
Total Eligible $5,367,200 $0
Expenditures
Total Ineligible $127,730 $0
Expenditures
Total of All $5,494,930 $0
Expenditures
Canada's contribution pertaining to each Fiscal Year
Uncapped Eligible $2,042,880 $0
Expenditures
Eligible planning $104,000 $0
expenditures
(capped at 5% of
Canada's
contribution)
Eligible $0 $0
incremental
employee
expenditures
(capped at 2% of
Canada's
contribution)
Eligible travel $0
$0
expenditures
(capped at 5% of
Canada's
contribution)
$0
Total Canada's $2,146,880
contribution
toward Eligible
Expenditures
pertaining to each
Fiscal Year
$851,9301 $4,515,270I $0
$01 $127,730I $0
$851,930 1 $4,643,000 1 $0
$290,772 I $1,752,108 1 $0
$50,000 1 $54,000 1 $0
$0 I $0 1 $0
$0 I $0 I $0
$340,772 1 $1,806,108 1 $0
2
90
EXECUTION COPY
4. Delete SCHEDULE B.3: FISCAL YEAR BREAKDOWN of the Original Agreement and insert in its place the following SCHEDULE B.3: FISCAL YEAR BREAKDOWN:
SCHEDULE B.3: FISCAL YEAR BREAKDOWN
PROJECT NAME
Municipal Retrofit Project
SOURCES OF FUNDING
Canada
Recipient
Total: Canada's contribution
Total: Recipient's contribution
Estimated Eligible Contribution by Fiscal Year
TOTAL
2019-2020
2020-2021
2021-2022
2022-2023
$2,146,880
$0
$340,772
$1,806,108
$0
$3,220,320
$0
$511,158
$2,709,162
$1,806,108
$0
$0
$2,146,880 $0
$340,772
$3,220,320
$0
$2,709,162
$0
$511,158
3
91
EXECUTION COPY
5. Delete SCHEDULE BA: SUMMARY OF PROJECT COMPONENTS AND ASSOCIATED COSTS of the Original Agreement and insert in its place the following SCHEDULE
13.4: SUMMARY OF PROJECT COMPONENTS AND ASSOCIATED COSTS:
SCHEDULE 13.4: SUMMARY OF PROJECT COMPONENTS AND ASSOCIATED COSTS
Canada's
Name of Project
Description
Total
Start Date End Date
Total
Ineligible
Recipient's
Total Eligible Contribution Maximum
Contribution
Component
Project Cost
Expenditures
Expenditures to Eligible
to Eligible
Expenditures
Expenditures
Project Packaging
Costs of planning and assessment
Effective Date
Jun 23, 2020
$18,865
$1,365
$17,500
$10,500
$7,000
• Hire energy consultant to perform
assessment and evaluation of energy
consuming systems across targeted
buildings
Team Assembly
Costs of planning and assessment
Effective Date
Jun 23, 2020
$18,865
$1,365
$17,500
$10,500
$7,000
• Assemble project team to evaluate
energy conservation measures for
implementation
Consultant
Consultant Design Fees
Effective Date
Mar 31, 2022
$350,000
$125,000
$225,000
$135,000
$90,000
• Implementation of measures
Water Facilities &
Contractors costs (purchase & installation
Dec 1, 2019
Mar 31, 2022
$642,200
$0
$642,200
$385,320
$256,880
Municipal Garages
including measurement and verification,
reporting, GHG emissions and energy saving
calculations, construction management and
commissioning etc.
Fire Halls & Office
Contractors costs (purchase & installation
Dec 1, 2019
Mar 31, 2022
$740,000
$0
$740,000
$444,000
$296,000
Buildings
including measurement and verification,
reporting, GHG emissions and energy saving
calculations, construction management and
commissioning etc.)
Arenas & Leisure Service
Contractors costs (purchase & installation
Dec 1, 2019
Mar 31, 2022
$2,210,000
$0
$2,210,000
$1,326,000
$884,000
Buildings
including measurement and verification,
reporting, GHG emissions and energy saving
calculations, construction management and
commissioning etc.
4
92
EXECUTION COPY
Community Centres &
Contractors costs (purchase & installation,
Dec 1, 2019
Mar 31, 2022
$615,000
$0
$615,000
$369,000
$246,000
Exterior LED Lighting
including measurement and verification,
reporting, GHG emissions and energy saving
calculations, construction management and
commissioning etc.
Market Square
Contractors costs (purchase & installation
Dec 1, 2019
Mar 31, 2022
$900,000
$0
$900,000
$540,000
$360,000
including measurement and verification,
reporting, GHG emissions and energy saving
calculations, construction management and
commissioning etc.)
. TOTAL
$5,494,930
$127,730
$5,367,200
$3,220,320I
$2,146,880
93
EXECUTION COPY
6. Each Party represents and warrants that it has the full power and authority to enter into this
Amending Agreement and has taken all necessary actions to authorize the execution of the
Amending Agreement.
7. All other provisions of the Original Agreement remain in full force and effect, unamended.
IN WITNESS WHEREOF the Parties' duly authorized representatives have executed this
Agreement:
HER MAJESTY THE QUEEN IN RIGHT
OFCANADA
FkN e s e it g f)ir7itally signed
Director General by Fleming, Jesse
Programs Direc'.oraQate: 2021.03.24
g
J e s s e 16:36:34-04'00'
Date
THE CITY OF SAINT JOHN
Per: Don Darling
Mayor
Date
Per: Jonathan Taylor
Common Clerk
Date
Common Council Resolution Date
01
I:
COMMON COUNCIL REPORT
M&C No.
2021-091
Report Date
March 24, 2021
Meeting Date
March 29, 2021
Service Area
Utilities and
Infrastructure Services
His Worship Mayor Don Darling and Members of Common Council
SUBJECT. Low Carbon Economy Fund (LCEF) Amending Agreement — District
Energy System (DES) Project
AUTHORIZATION
Primary Author
Commissioner/Dept. Head
City Manager
Samir Yammine
J. Brent McGovern
I John Collin
RECOMMENDATION
It is recommended that Common Council approve the Amending Agreement
under the Low Carbon Economy Fund for the District Energy System (DES) Project
in the form and upon the terms and conditions as attached; and that the Mayor
and Common Council be authorized to execute the said Amending Agreement.
EXECUTIVE SUMMARY
The purpose of this report is to seek Common Council's approval of the Amending
Agreement. The proposed Amending Agreement consist of changes to the
Project's fiscal year breakdown i.e., Schedule B.2, B.3 and B.4 of the funding
agreement. The Amending Agreement must be signed prior to March 31, 2021 to
allow the City to submit claims for funding.
M&C 2019-313. It is recommended that the City enter into the Grant Agreement
with Her Majesty the Queen in Right of Canada, as represented by the Minister of
the Environment who is responsible for the Environment and Climate Change
Canada under the Low Carbon Economy Fund for the District Energy System (DES)
Project in the form and upon the terms and conditions as attached; and that the
Mayor and Common Clerk be authorized to execute the said Agreement.
STRATEGIC ALIGNMENT
The District Energy System (DES) Project is clearly aligned with the following City
plans, policies, Council Priorities, programs, and practices:
95
-2-
1- City of Saint John Corporate GHG and Energy Action plan to reduce GHG
emissions by 30% by 2025 and achieve carbon neutral by 2040.
2- City of Saint John Asset Management Policy objectives to apply risk -based
decision and life -cycle costing principles to prioritize capital investment, identify
alternative measures, facilitate the leveraging of infrastructure funding from
external sources, and improve the reliability of customer service.
3. City of Saint John Capital Investment Policy.
INPUT FROM OTHER SERVICE AREAS AND STAKEHOLDERS
The City of Saint John Utilities and Infrastructure Services and Legal Departments
have reviewed the attached Amending Agreement and are satisfied with the
recommendation as they pertain to their respective areas of services.
ATTACHMENTS
Low Carbon Economy Fund Amending Agreement- District Energy System (DES)
Project.
0
EXECUTION COPY
AMENDING AGREEMENT
TO THE CHALLENGE FUND FUNDING AGREEMENT REGARDING
DISTRICT ENERGY SYSTEM PROJECT
This Amending Agreement is made as of the date of last signature,
BETWEEN: HER MAJESTY THE QUEEN IN RIGHT OF CANADA, as represented by
the Minister of the Environment who is responsible for Environment and
Climate Change Canada ("Canada" or the "Minister"),
AND THE CITY OF SAINT JOHN, incorporated by Royal Charter as confirmed
and amended from time to time by the Acts of the Legislative Assembly of
New Brunswick ("Recipient"),
Individually referred to as a "Party" and collectively referred to as the "Parties".
WHEREAS the Parties concluded the Challenge Fund Funding Agreement Regarding District
Energy System Project, effective December 5, 2019 (the "Original Agreement");
AND WHEREAS the Parties desire to amend the Original Agreement, in accordance with
subsection 39 of the Original Agreement;
NOW THEREFORE, the Parties agree to the following amendment made to the Original
Agreement:
Capitalized terms used herein have the same meaning given to them in the Original
Agreement.
2. Delete Section 40 of the Original Agreement and insert the following Section 40 in its place:
"40. COUNTERPARTS AND ELECTRONIC SIGNATURES
This Agreement may be signed in multiple counterparts, each of which so signed and
delivered shall be deemed to be an original and all of which counterparts taken together shall
constitute one Agreement. The counterparts of this Agreement and all other documents that
are signed in connection herewith may be signed by electronic signature by any of the
Parties and delivered by "pdf" or other similar attachment to an email to the other party and
the receiving Party may rely on the receipt of the electronically signed and delivered
document as if the original had been received."
97
EXECUTION COPY
3. Delete SCHEDULE B.2: PROJECT BUDGET of the Original Agreement and insert in its
place the following SCHEDULE B.2: PROJECT BUDGET:
SCHEDULE B.2: PROJECT BUDGET
Project name District Energy System
I
Total costs of the Project
$4,879,900
100%'
Total Eligible Expenditures of the Project
$4,667,729
95.65%
Total Ineligible Expenditures of the Project
$212,171
4.35%
Recipient's contribution towards Eligible Expenditures
$2,800,637
60%
Canada's maximum contribution towards Eligible Expenditures
$1,867,092
40%
EXPENDITURES / FISCAL YEAR BREAKDOWN
FUNDING TOTAL
REQUEST 2019-2020 2020-2021 2021-2022 2022-2023
Total Project expenditures
Total Eligible $4,667,729 $0
Expenditures
Total Ineligible $212,171 $0
Expenditures
Total of All $4,879,900 $0
Expenditures
Canada's contribution pertaining to each Fiscal Year
Uncapped Eligible $1,778,400 $0
Expenditures
Eligible planning $88,692 $0
expenditures
(capped at 5% of
Canada's
contribution)
Eligible $0 $0
incremental
employee
expenditures
(capped at 2% of
Canada's
contribution)
Eligible travel $0
$0
expenditures
(capped at 5% of
Canada's
contribution)
$0
Total Canada's $1,867,092
contribution
toward Eligible
Expenditures
pertaining to each
Fiscal Year
$681,225 1 $3,986,504 I $0
$0 1 $212,171 1 $0
$681,225 1 $4,198,675 1 $0
$263,226 1 $1,515,174 1 $0
$9,264 1 $79,428 1 $0
$0 I $0 1 $0
$0 I $0 I $0
$272,490 1 $1,594,602 1 $0
K:
EXECUTION COPY
4. Delete SCHEDULE B.3: FISCAL YEAR BREAKDOWN of the Original Agreement and insert in its place the following SCHEDULE B.3: FISCAL YEAR BREAKDOWN:
SCHEDULE B.3: FISCAL YEAR BREAKDOWN
PROJECT NAME
District Energy System
SOURCES OF FUNDING
Canada
Recipient
Total: Canada's contribution
Total: Recipient's contribution
Estimated Eligible Contribution by Fiscal Year
TOTAL 1
$1,867,092
$2,800,637
2019-2020
$0
$0
2020-2021
$272,490
$408,735
2021-2022
2022-2023
$1,594,602
$0
$2,391,902
$0
F$2$1,867,092
,800,637
$0
$0
$272,490
$1,594,602
$2,391,902
$0
$0
$408,735
3
99
EXECUTION COPY
5. Delete SCHEDULE BA: SUMMARY OF PROJECT COMPONENTS AND ASSOCIATED COSTS of the Original Agreement and insert in its place the following SCHEDULE
BA: SUMMARY OF PROJECT COMPONENTS AND ASSOCIATED COSTS:
SCHEDULE BA: SUMMARY OF PROJECT COMPONENTS AND ASSOCIATED COSTS
Recipient's
Canada's
Name of Project
Description
Total
Start Date End Date
Total Total Eligible
Ineligible
Contribution
Maximum
Contribution
Component
Project Cost
Expenditures
Expenditures
to Eligible
to Eligible
Expenditures
Expenditures
$7,546
Planning, design, and
Costs of planning and assessment related to Project
Effective Date
Jun 23, 2021
$18,866
$1
$18,865
$11,319
tender
Packaging
I
I
Costs of planning and assessment related to Team
Effective Date
Jun 23, 2021
$18,865
$0
$18,865
$11,319
$7,546
Assembly
I
Civil Engineering Contract - Consultant design &
Effective Date
Jun 23, 2021
$169,787
$110,287
$59,500
$35,700
$23,800
I
construction administration fees
Mechanical and Electrical Engineering Contract -
Effective Date
Jun 23, 2021
$226,383
$101,883
$124,500
$74,700
$49,800
Consultant design & construction administration fees
I
Installation of central
Isolation of Thermal Storage Cells from Main Loop (HX
Dec 1, 2019
Oct 28, 2021
$650,000
$0
$650,000
$390,000
$260,000
plant
+ Pumps) - Contractors costs (purchase & installation
including measurement and verification, reporting,
GHG emissions and energy saving calculations,
construction management and commissioning etc.
Heat Recovery Chillers - Contractors costs (purchase
Dec 1, 2019
Oct 28, 2021
$1,279,789
$0
$1,279,789
$767,873
$511,916
& installation including measurement and verification,
reporting, GHG emissions and energy saving
calculations, construction management and
commissioning etc.)
Condenser Water Pumps and Accessories for Geo-
Dec 1, 2019
Oct 28, 2021
$200,000
$0
$200,000
$120,000
$80,000
I
exchange - Contractors costs (purchase & installation)
Cold and Hot Water Mains - Contractors costs
Dec 1, 2019
Oct 28, 2021
$500,000
$0
$500,000
$300,000
$200,000
(purchase & installation)
Electrical and Controls - Contractors costs (purchase &
Dec 1, 2019
Oct 28, 2021
$200,000
$0
$200,000
$120,000
$80,000
I
installation)
I
4
100
EXECUTION COPY
Connection of DES to
Connection of the Canada Games Aquatic Centre -
Sept 1, 2020
Mar 31, 2022
$1,016,210
$0
$1,016,210
$609,726
$406,484
buildings
Contractors costs (purchase & installation including
measurement and verification, reporting, GHG
emissions and energy saving calculations, construction
management and commissioning etc.
Connection of the Genesis - Contractors costs
Sept 1, 2020
Mar 31, 2022
$200,000
$0
$200,000
$120,000
$80,000
I
(purchase & installation)
Connection of the Market Square - Contractors costs
Sept 1, 2020
Mar 31, 2022
$150,000
$0
$150,000
$90,000
$60,000
I
(purchase & installation)
Connection of the Hilton Hotel - Contractors costs
Sept 1, 2020
Mar 31, 2022
$250,000
$0
$250,000
$150,000
$100,000
I
(purchase & installation)
. TOTAL
1 $4,879,900
1 $212,171
$4,667,729
$2,800,637
1 $1,867,092
101
EXECUTION COPY
6. Each Party represents and warrants that it has the full power and authority to enter into this
Amending Agreement and has taken all necessary actions to authorize the execution of the
Amending Agreement.
7. All other provisions of the Original Agreement remain in full force and effect, unamended.
IN WITNESS WHEREOF the Parties' duly authorized representatives have executed this
Agreement:
HER MAJESTY THE QUEEN IN RIGHT
OFCANADA
Ftal1 FV: V �i_si�neCL
Director Genera. y Fleming, Jesse
Pro rams Dire,;torlDate: 2021.03.24
g
J e s s e 16:00:44-04'00'
Date
THE CITY OF SAINT JOHN
Per: Don Darling
Mayor
Date
Per: Jonathan Taylor
Common Clerk
Date
Common Council Resolution Date
102
COMMON COUNCIL REPORT
M&C No.
2021-088
Report Date
March 25, 2021
Meeting Date
March 29, 2021
Service Area
Strategic Services
His Worship Mayor Don Darling and Members of Common Council
SUBJECT. Statement of Work Agreement with Ricoh Canada Inc.
AUTHORIZATION
Primary Author
Commissioner/Dept. Head
City Manager
Stephanie Rackley-Roach
Kevin Fudge
John Collin
RECOMMENDATION
The City Manager recommends that Mayor and City Clerk be authorized to execute
the Statement of Work ("SOW") between Ricoh Canada Inc. ("Ricoh") and the City of Saint
John ("Customer") for professional services to restore Laserfiche RIO ("Laserfiche").
EXECUTIVE SUMMARY
As a result of the cyberattack on November 13, 2020, the City is currently in the process
of completing software application and data restores to ensure the cost-effective delivery
of public service. Laserfiche RIO ("Laserfiche") is an application that supports records
management and workflow processes in the delivery of several public services. The City
needs to engage Ricoh Canada Inc. ("Ricoh"), the third -party vendor for Laserfiche, for
the installation and configuration of the software and the weblink to provide secure
access as appropriate. The cost of the engagement for the scope of work outlined in the
Statement of Work ("SOW") is $14,900 plus HST.
N/A
REPORT
Many software applications with their related data need to be restored to support cost-
effective service delivery due to the cyberattack the City experienced on November 13,
2020. The City's Laserfiche application supports nearly all service areas in the City as it
is our official records management system. All public and final records are stored in
Laserfiche. This application is also used to support development service offerings in the
One Stop Development Shop.
The City's information technology resources can complete a portion of the work in
terms of network, server, and data recovery requirements. Professional services are
103
-2-
required from Ricoh, the third -party vendor for Laserfiche. The primary activities
include installation and configuration of Laserfiche RIO and Laserfiche Weblink to
provide public and employee access to the document repository as appropriate.
The City currently has an agreement with Ricoh for Laserfiche licensing and support.
The City will continue to leverage the licensing already in place.
STRATEGIC ALIGNMENT
Recovery of the Laserfiche application supports quality delivery of service to our citizens.
It ensures a more efficient way to store, manage and access records and carry out work
process that support service delivery.
SERVICE AND FINANCIAL OUTCOMES
This is a Fixed Fee engagement in the amount of $14,900 plus HST. Fees are for
professional services only in accordance with the scope of work outlined in the SOW,
and do not include the cost of hardware, software, or hardware/software technical
support. This software application restoration work is part of the recovery efforts
resulting from the cyberattack. The City will claim recovery of these costs under the
City's relevant insurance policies. Any portion of the costs that are not recovered under
insurance will be funded through the appropriate reserve or operating budget.
INPUT FROM OTHER SERVICE AREAS AND STAKEHOLDERS
General Counsel Office has reviewed the SOW and determined in consultation with the
CIO that practical risks associated with the terms and conditions of the SOW, if any, are
appropriately mitigated; the SOW as provided is satisfactory to both Ricoh and the City.
ATTACHMENTS
Ricoh — Statement of Work
104
RICOH
imagine. change.
Customer Information
Customer
City of Saint John
SOW #:
20210324_VDC_CityofSaintJohn
Name:
LFRIO
Billing
15 Market Place, PO Box 1971, Saint John,
Address:
NB, E21_4L1
Customer #:
304000353
Megan Thompson
Date:
03/24/2021
Customer
(506) 658-4455
Contact:
mega n.thompson@saintjohn.ca
David Cox
Account
Ryan Backman
Prepared By
Solutions Integrator
Manager
Ricoh Canada
Statement of Work
This Statement of Work ("SOW") is made and entered into as of 2021/3/24(the "Effective Date")
BETWEEN: Ricoh Canada Inc.
("Ricoh")
AND: City of Saint John
("Customer")
This SOW describes certain professional services ("Services") which will be performed by Ricoh in
connection with the implementation of the project described in this SOW (the "project").
Ricoh will allocate and schedule resources only after this SOW has been signed.
Section 1- Project— General
Ricoh has developed this SOW on the basis of the technical information provided by Customer to Ricoh.
To the extent this information is not accurate, Ricoh will provide change order(s) to document any
changes, including adjustments to the fees if applicable.
The scope of Services, and the associated fees, are also based on the following key dependencies and key
assumptions. In the event an assumption changes or is not correct, or in event a dependency is not met,
the scope of Services will change, the project may be delayed, and Ricoh will issue a change order:
Customer will assign a dedicated internal project manager with full decision -making authority,
and Customer will coordinate reasonably available its technical personnel, managers, and other
employees necessary to facilitate Ricoh's performance of the Services.
Customer will provide Ricoh with such access to its facilities, networks, software, and systems as
may be reasonably necessary for Ricoh to perform the Services. Where Ricoh requires on-line or
remote access to Customer's systems in order to provide the Services, Customer shall provide
appropriate communication software and/or establish dedicated connections with Ricoh.
105 Ricoh Canada Inc. I Statement of Work
RICOH
imagine. change_
Customer agrees that if access to Customer's systems requires a separate agreement, such
agreement is subject to the limits of liability of this SOW and Customer will be responsible for any
applicable fees.
3. Customer will provide Ricoh with timely feedback on the Services and the project overall.
4. Customer will resolve, in a timely fashion, any infrastructure, network, communication or other
issues that may arise during the course of the project, to the extent any such issues are outside
of the control of Ricoh.
5. Customer will ensure that all facilities, networks, software, equipment, and systems are fully
configured, operational and available prior to the commencement of the Services.
6. A milestone must be successfully completed prior to the project moving to the next phase.
7. All Services will be delivered remotely by Ricoh's technical resources. If, in the course of delivering
the Services, Ricoh determines that remote delivery will not be possible due to limitations in the
Customer's environment, or if Customer requests that Services be delivered at the Customer
location(s), on -site fees will apply.
8. Services will be provided during normal business hours (9:00 am to 5:00 pm) Monday through
Friday excluding Ricoh recognized holidays. If Services are requested outside of these hours,
overtime rates will apply.
9. Documentation and training provided to Customer will use Ricoh's template forms and
methodology. The Services do not include customization of documentation or training materials.
In the event of changes, the project will move ahead only after all applicable change orders are approved
and executed and after Customer has made any changes to its infrastructure as detailed in the change
order(s), if applicable. Until the change order(s) are signed, Ricoh will place the project on hold in order
to conserve the resource budget.
Section 2 — Project and Services Description
Project Objective
The client's on premise Laserfiche RIO system is currently down due to a hack that took place on the City
of Saint John's IT infrastructure. The on premise Laserfiche server was affected. The City of Saint John
would like to create new servers on the internal network to be used for Laserfiche RIO using backups of
existing Laserfiche data. The Laserfiche server will be on an internal server and Laserfiche Weblink/Mobile
will be installed on a server located in the City of Saint John's DMZ for external access.
Project Requirements and Deliverables
1. Existing Backups of Laserfiche
The City of Saint John will provide complete backups of the Laserfiche databases and volume files for all
repositories contained in the on premise Laserfiche system. The backups of the database and volume
need to be from the same time period (backups taken of both at or around the same time). It is
recommended that the City of Saint John's IT department use the Laserfiche Volume Consistency Checker
(support for the consistency checker included below) to confirm data integrity.
Ricoh Canada Inc. I Statement of Work
106
RICOH
imagine. change_
Databases:
• The City of Saint John is to setup and restore all backup Laserfiche databases to a new Full SQL
server dedicated Laserfiche instance.
• A SQL user can be created in the Laserfiche SQL instance to be used for Laserfiche to
communicate with the databases in this instance. Using an SQL user, we can limit the account
to just that instance. The user must be able to log in to the SQL Server and create databases by
granting the dbcreator fixed server role. If you do not want to add the server service user to any
fixed server roles, you can create the database manually and grant the user account full access
to the database by making that user the database owner. This will grant the server service user
access to the Laserfiche database without granting the ability to create other databases.
Alternatively, an AD service user account can also be used.
Laserfiche Volumes (repositories):
• The City of Saint John is to migrate the Laserfiche volume files from backup to a directory/folder
on a defined data drive then added as a mapped drive on the Laserfiche server. This drive size
will need to be large enough to contain all volume files and allow for growth as the Laserfiche
system is used.
• After all, Laserfiche repositories are restored, if the City of Saint John deems a repository is no
longer needed it can be removed from the system.
2. Laserfiche Server
Domain Requirements
• The new Laserfiche VM will need to be connected to the City of Saint John's domain
o This is required to allow for Windows Authentication to work when end user's login to
Laserfiche.
Laserfiche VM System Recommendations —ALL Laserfiche Server Products except Weblink and Mobile
• Processor Type (CPU): 4 cores or more
• Memory: 16 GB RAM or more
• Operating system: Windows Server 2019, all updates completed
• Drive Allocation:
o C:\ drive minimum 125 GB for OS and Application Install
o D:\ data drive to contain the Laserfiche volume files, the size depends on how large the
volume is and all volume files should go here.
Laserfiche Weblink/Mobile VM System Recommendations — Only Weblink/Mobile components
• Processor Type (CPU): 4 cores or more
• Memory: 8 GB RAM or more
• Operating system: Windows Server 2019, all updates completed
• Drive Allocation:
o C:\ drive minimum 100 GB for OS and Application Install
• This VM should be able to communicate with the Laserfiche server VM.
• Azure gateway configured with external URL and Valid SSL certificate verified by a root
authority for use when accessed from external sources.
Ricoh Canada Inc. I Statement of Work
107
RICOH
imagine. change_
Full SQL Server
• The SQL instance that will contain Laserfiche databases should be a Full SQL instance
• The SQL instance, used only for Laserfiche, is highly recommended to have dedicated resources.
• Restored databases should be left the same name as they were before.
SQL Server Instance Recommendations — dedicated to the Laserfiche Instance
• Processor Type (CPU): 4 cores or more
• Memory: 16 GB RAM or more
• Drive Allocation:
o No Laserfiche volumes will be stored on this VM and will be located on the Laserfiche
server's data drive listed above.
3. Ricoh Deliverables
• Technical Design and Consulting
a. Ricoh will provide support and consulting that will assist in providing detail of what the
implementation of Laserfiche on the City of Saint John VMs should look like
• SOW Activities
a. All activities regarding creation of SOW, approval, review, pre -signature, and completion
signature
• Installation and Configuration of Laserfiche RIO
a. The City of Saint John has an existing Laserfiche RIO license and will be used for the new
Laserfiche RIO server
b. Support the use of the Laserfiche Volume consistency checker to confirm integrity of the
Laserfiche data.
c. Install, configure and license Laserfiche RIO on the client's provided VM server —The same
version of Laserfiche will be installed to aid in recovery time.
d. Attach/configure and smoke test all provided backups of the Laserfiche repositories.
e. Install and configure Laserfiche workflow to use the backup of the workflow database.
f. Smoke test provided backups of workflow to determine if time is required to troubleshoot
the functionality of the workflows.
• Installation and Configuration of Laserfiche Weblink
a. Install, license, and configure Laserfiche Weblink on the client provided server in the DMZ.
b. Review what user is to be used as the Weblink autologin user.
c. Review what the autologin user can view in the repository.
d. Customizing the look and feel of Weblink is not in scope but the City of Saint John can
customize as they feel fit with the Weblink Designer.
• Admin Knowledge Share
a. City of Saint John Laserfiche Admins to be provided a knowledge transfer pertaining to
the new Laserfiche implementation.
• As -Built Documentation
a. Ricoh to provide a As -Built technical document showing details of the new Laserfiche
implementation.
• Project Coordination/Communication
a. Coordination tasks related to timelines and tasks to be complete.
Ricoh Canada Inc. I Statement of Work
108
RICOH
imagine. change_
4. Extra Optional Support Option
The City of Saint John may request additional payable time from Ricoh Canada to assist via a Block of Time
SOW where time can be drawn down from a prepaid total amount of hours (not included in this fixed fee
SOW). Some workflows created on the Laserfiche workflow server are workflows that were developed
and created by the City of Saint John staff.
Workflow Troubleshooting and Weblink Design Customization
• The City of Saint John has the option to request a separate Block of Time SOW that would
consist of a minimum of 10hrs at $200/hr. whereby the time can be drawn down from and be
consumed, once consumed more time can be requested.
o This time can be used to troubleshoot workflow issues that might arise after the
Laserfiche system is up and running again.
o To help with Weblink Design customization
o General support issues
Note: Acceptance of Milestones/Deliverables
Ricoh will notify the Customer when any SOW deliverable or milestone has been achieved
("Achievement Notice").
Customer will be deemed to have fully accepted the achievement of the deliverable or milestone unless
Customer provides Ricoh with written notice of any deficiencies within five (5) business days of the date
of the Achievement Notice.
In addition, any acceptance or deemed acceptance shall be deemed to represent the Customer's
acceptance of the earlier deliverables or milestones.
Ricoh Canada Inc. I Statement of Work
109
RICOH
imagine. change_
Section 3 - Pricing / Financial Scope (for Fixed Fee)
The following fees are payable for the Services described in this SOW. The total fee payable is based on
the total hours allocated to the Services, each as described below.
Services Tasks
Notes
Technical Design and Consulting
Consulting regarding existing backups of data,
server requirements, etc.
SOW Activities
All activities regarding SOW creation, review
and sign -off
Installation, Licensing and Configuration of
Laserfiche app server implementation tasks
Laserfiche RIO on the client's provided server
Installation and Configuration of Laserfiche
Weblink will be install on a separate VM than
Weblink
Laserfiche and located in a DMZ
Admin Knowledge Share
knowledge transfer pertaining to the new
Laserfiche implementation
As -Built Documentation
Document showing details of the Laserfiche
implementation
Project Coordination/Communication
Communication and coordination throughout
the project
This is a Fixed Fee engagement. In consideration of the Services, Customer shall pay Ricoh the fees in the
amounts and at the rates set forth as follows:
The total fees shall be $14900.00 not including taxes ("Fees"). Fees are for professional services only, and
do not include the cost of hardware, software, hardware/software technical support or the optional Block
of Time.
The purchase or lease of any hardware or software is independent from this SOW and therefore not
contingent on Customer's acceptance of the Services performed.
Payment Schedule
100% invoiced upon execution of this SOW.
The Fees set out in this SOW are not refundable.
Customer shall pay all amounts payable to Ricoh hereunder within thirty (30) days of the date of the
invoice submitted by Ricoh. Ricoh may suspend or terminate Services for non-payment.
Section 4 — General Terms & Conditions
To the extent Ricoh and Customer have entered into a separate agreement governing the supply of
professional services by Ricoh to Customer, which agreement is still in force between the parties, the
terms and conditions of such separate agreement shall govern the supply of Services under this SOW. The
Ricoh Canada Inc. I Statement of Work
110
RICOH
imagine. change_
following terms and conditions shall apply to the extent no such separate agreement is in place between
the parties:
a) Services. Customer has engaged Ricoh to perform the Services described in this SOW. Changes to
the scope of the Services shall be made only in a written change order signed by both parties.
Ricoh shall have no obligation to commence work in connection with any requested change order
until the fee and/or schedule impact of the change and all other applicable terms are agreed upon
by both parties in writing. Ricoh shall provide the Services on a remote basis unless otherwise
agreed.
b) Service Fees. In consideration of the Services, Customer shall pay Ricoh the Service fees in the
amounts and at the rates set forth in this SOW. Customer shall pay all amounts payable to Ricoh
hereunder within thirty (30) days of the date of the invoice submitted by Ricoh. Interest shall
accrue on any late payments at a rate of 12% per annum, or the highest rate allowable by law if
lower. If Ricoh undertakes collection or enforcement efforts, Customer shall be liable for all costs
thereof, including, without limitation, reasonable attorneys' fees. Ricoh may suspend or terminate
Services for non-payment. Customer shall be responsible for payment of any applicable taxes
arising in connection with the transactions contemplated hereby (other than with respect to the
income of Ricoh).
c) Limitation of Liability. Ricoh shall perform the Services in a professional manner. This warranty
shall be for 30 days following the completion of the applicable Services. Ricoh shall make available
to Customer any warranties made to Ricoh by third party manufacturers of the software, tools
and/or products utilized by Ricoh in connection with the Services hereunder, to the extent
transferable and without recourse. Estimated delivery and/or service schedules contained in this
SOW are non -binding estimates. EXCEPT AS EXPRESSLY SET FORTH HEREIN, RICOH MAKES NO
WARRANTIES, EXPRESS OR IMPLIED, INCLUDING WARRANTIES OF MERCHANTABILITY OR FITNESS
FOR A PARTICULAR PURPOSE, IN CONNECTION WITH THIS SOW AND THE TRANSACTIONS
CONTEMPLATED HEREBY. IN NO EVENT SHALL RICOH BE LIABLE TO CUSTOMER FOR ANY
INDIRECT, SPECIAL OR CONSEQUENTIAL DAMAGES OR LOST PROFITS ARISING OUT OF OR
RELATED TO THIS SOW OR THE PERFORMANCE OR BREACH HEREOF, EVEN IF RICOH HAS BEEN
ADVISED OF THE POSSIBILITY THEREOF. RICOH'S LIABILITY TO CUSTOMER HEREUNDER, IF ANY,
SHALL IN NO EVENT EXCEED THE TOTAL OF THE FEES PAID TO RICOH HEREUNDER BY CUSTOMER.
IN NO EVENT SHALL RICOH BE LIABLE TO CUSTOMER FOR ANY DAMAGES RESULTING FROM OR
RELATED TO (A) ANY FAILURE OF SOFTWARE, INCLUDING, BUT NOT LIMITED TO, LOSS OF DATA
OR (B) DELAY OF DELIVERY OF SERVICES UNDER THIS SOW. RICOH ASSUMES NO OBLIGATION TO
PROVIDE OR INSTALL ANY ANTI -VIRUS OR SIMILAR SOFTWARE, AND THE SCOPE OF SERVICES
CONTEMPLATED HEREBY DOES NOT INCLUDE ANY SUCH SERVICES.
d) Confidentiality / Non -Solicitation / Intellectual Property. Except for purposes of this SOW, Ricoh
shall not use or disclose any proprietary or confidential Customer data derived from the Services
hereunder; provided, however, that Ricoh may use general statistics relating to the Service
engagement so long as it does not disclose the identity of Customer or make any reference to any
information from which the identity of Customer may be reasonably ascertained. Customer
agrees that during the term of the Services and for a period of one (1) year after termination
thereof, it shall not directly or indirectly solicit, hire, or otherwise retain as an employee or
independent contractor any employee of Ricoh that is or was involved with or part of the Services.
Intellectual property rights arising from the Services provided hereunder shall remain the
property of Ricoh. Without limiting the foregoing, nothing contained in this SOW shall be
construed to transfer, convey, restrict, impair, or deprive Ricoh of any of its ownership or
proprietary interest or rights in technology, information or products that existed prior to the
provision of deliverables under this SOW or that may be independently developed by Ricoh
Ricoh Canada Inc. I Statement of Work
111
RICOH
imagine. change_
outside the scope of this SOW and without use of any confidential or otherwise restricted
material or information hereunder.
e) General. This SOW represents the entire agreement between the parties relating to the subject
matter hereof and supersedes all prior understandings, writings, proposals, representations, or
communications, oral or written, of either party. Only a writing executed by authorized
representatives of both parties may amend this SOW. Any purchase order, service order or other
Customer ordering document will not modify or affect this SOW, nor have any other legal effect.
All equipment is purchased or leased by Customer pursuant to a separate agreement and are
separate and independent obligations of Customer governed solely by the terms set forth in such
separate agreement. This SOW may not be transferred or assigned by Customer without the prior
written consent of Ricoh. This SOW shall be governed under the applicable law of the province
(or territory) where the Services are performed. In the event the Services are performed in
multiple locations, this SOW shall be governed under the laws of the province of Ontario. The
relationship of the parties is that of independent contractors. Ricoh shall not be responsible for
and shall be excused from performance or have reasonable additional periods of time to perform
its obligations, where it is delayed or prevented from performing any of its obligations for reasons
beyond Ricoh's reasonable control.
This Statement of Work shall be effective as of the Effective Date. Scheduling of resources and project
duration estimates can only be provided after this Statement of Work has been signed by both parties. By
signing below, the undersigned represent that they are duly authorized to enter into this Statement of
Work on behalf of their respective entities.
RICOH CANADA INC.
Glen Borsheim
March 24, 2021
National Manager, Solution Engineering
Ricoh Canada Inc.
Name and Title
Date
Authorized Signature
CUSTOMER
Name (Print)
Location
Authorized Signature
Title
Date
Ricoh Canada Inc. I Statement of Work
112
March 29, 2021
Deputy Mayor and Councillors
Subject: Recommended Appointments to Committees
The Committee of the Whole, having met on March 29, 2021, adopted the following
resolution:
Saint John Parking/Transit Commission: to appoint Nick Cameron, Tina Collins, and
Kurt Peacock each for 3 year terms from March 29, 2021 to March 29, 2024; and to
appoint Councillors Reardon, MacKenzie, and Hickey each until the end of their current
terms of Council; and further that Nick Cameron be appointed Chair.
Sincerely,
Don Darling
Mayor
lr -
SAINT JOHN
P.O. Box 1971 Saint John, NB Canada E2L 4L1 I www.saintjohn.ca I C.R 1971 Saint John, N.-B. Canada E2L 4L1
113
COMMON COUNCIL REPORT
M&C No.
MC 2021 - 086
Report Date
March 24, 2021
Meeting Date
March 29, 2021
Service Area
Public Works and
Transportation Services
His Worship Mayor Don Darling and Members of Common Council
SUBJECT: Weight Restriction By -Law Amendment on Wentworth Street
AUTHORIZATION
Primary Author
Commissioner/Dept. Head
City Manager
Tim O'Reilly
Michael Hugenholtz
I John Collin
RECOMMENDATIONS
Your City Manager recommends Common Council:
1. That Item 10.7 "Weight Restrictions By-law Amendment on Wentworth
Street (3rd Reading)" which was tabled at the Common Council Meeting
dated March 22, 2021, be lifted from the table;
2. Authorize 3rd Reading to an amendment to the Saint John Weight
Restriction By -Law as attached to M&C 2021-086, and
3. That the Mayor and City Clerk be authorized to execute the Agreement
with Irving Equipment Limited attached to M&C 2021-086.
EXECUTIVE SUMMARY
The Saint John Weight Restriction By -Law allows the City to mitigate the impact
that heavy vehicles impose on City streets. One mechanism in this by-law that
achieves this goal is a reduction in the axle loading of trucks on streets during the
spring when roads are particularly susceptible to damage. Occasionally trucking
companies request deviation from the by-law in relation to these spring weight
restrictions.
A deviation from this by-law is required to transport a truck -mounted crane to the
Wentworth development at the corner of Wentworth Street and Leinster Street
to allow the construction of that building to continue on schedule.
PREVIOUS RESOLUTION
At its March 8, 2021 meeting Common Council authorized 1st and 2nd Readings to
the amendment to the City of Saint John Weight Restriction By -Law attached to
this report. City staff note that the 3rd and final Reading that Common Council is
being requested to approve includes a revised set of dates from those
considered in the 11t and 2nd Readings. The reason for this change is detailed
further in this report.
114
IrAN
REPORT
The Saint John Weight Restriction By -Law mitigates the impact of heavy vehicles
on City streets and infrastructure below the street. One such mechanism in this
by-law is that the maximum per -axle mass of various truck configurations
permitted in the Provincial Motor Vehicle Act is reduced to 80% of typical limits
during a Spring Weight Restrictions period on most City streets.
The structural integrity of the soil below the asphalt that supports it is weakened
during the spring as water gets trapped in it by ice as the ice continues to melt
from the surface down. The asphalt and underground infrastructure are
therefore more susceptible to damage by heavy vehicles with the soil structure's
weakened state. Reduced permitted axle weights mitigate this situation. The
City uses the Spring Weight Restrictions period that is determined by the
Province of New Brunswick each year, the dates of which can fluctuate year to
year based on when the weather begins to get warmer causing the thawing ice
in the soil below the asphalt.
The by-law exempts some City streets from this reduced axle mass limit during
the Spring Weight Restriction period. Streets exempt include some arterial and
collector streets and/or those that provide access to major industrial sites.
Spring Weight Restrictions for 2021 are currently in effect. They started March 1
and are expected to continue until May 16, subject to weather conditions.
A phase of construction of the Wentworth development at the corner of
Wentworth and Leinster Streets requires a particular vehicle -mounted crane
owned by Irving Equipment Ltd. to be transported to and from the site to lift and
install heavy concrete panels on the building. This work by this crane is required
during the Spring Weight Restrictions period to prevent delaying the overall
construction schedule for the building. The axle loadings of the crane are above
the 80% limits. The route this crane must travel to get from its origin to the
Wentworth and back again must travel on various Provincial Highways as well as
City streets that are exempt from the 80% limits. However, the 80% limits must
be respected on the final leg of the crane's journey, on Wentworth Street from
Broad Street to Leinster Street, to be compliant with the City's current by-law.
Wentworth Street would need to be temporarily exempt from the by-law to
permit the crane to travel on it during Spring Weight Restriction period. The
attached by-law amendment would facilitate this.
Given that the intention of the Saint John Weight Restriction By -Law is to
mitigate damage to City streets and underground infrastructure, staff would
115
am
facilitate additional measures to manage such risk in this case if Common Council
is supportive of the recommended by-law change:
1. The exemption would be in place for a specific period of time,
2. A Saint John Police escort would accompany the transport operation,
3. A pre and post infrastructure condition assessment would be required
by a third party Professional Engineer to identify if any damage is
attributable to Irving Equipment Ltd.'s transport operation, and
4. An agreement would be in place to ensure Irving Equipment Ltd.'s
obligations are confirmed and so that they would be responsible for
damage attributable to the transport operation.
The agreement referenced in item #4 in the preceding paragraph is attached to
this report for Common Council's consideration.
Staff note however there remains a risk that damage to roadway and particularly
underground infrastructure attributable to the operation may not be identifiable
between the pre and post condition assessments.
The 3rd and Final Reading of the by-law amendment that Common Council is
being requested to endorse as part of this report is different than what Council
approved in 15t and 2nd Readings on March 8, 2021. The difference is related to
the dates upon which the temporary exemption of the weight restrictions for
Wentworth Street will take place, from the period of March 23 through March
28, inclusive, to the period of April 6 through April 17, inclusive. The change in
dates is at the request of the developer of the Wentworth. Confirmation of the
requested change was received following the March 22, 2021 Council meeting
agenda was able to be adjusted with an updated amendment and agreement,
hence the need to table 3rd Reading at that meeting. The General Counsel's
Office has confirmed the appropriateness of that change to the by-law
amendment between 1s1/2nd and 3rd Readings. The attached agreement reflects
these revised dates as well.
STRATEGIC ALIGNMENT
This report is ultimately about balancing two Common Council priorities with the
tools currently available at our disposal. It seeks to align with Common Council's
commitment to its Growth priority by supporting taxbase growth development.
It also demonstrates efforts to fulfill Common Council's Fiscal Responsibility
priority by mitigating risk of and responsibility for excessive damage to street
and below ground infrastructure by transport of this heavy vehicle and crane
during the Spring Weight Restrictions period.
SERVICE AND FINANCIAL OUTCOMES
In the absence of a Permitting process to more effectively balance the needs of
the trucking industry with the impact that heavy vehicles cause to City streets,
116
-4-
including during Spring Weight Restrictions, a more resource -intensive and
lengthy process, such as described in this report must continue in cases such as
this. As part of the current process, City staff from both the Public Works &
Transportation Department and the Office of General Counsel are engaged in
these case -by -case analyses, forming of an agreement, and administering the by-
law amendment process over two Council meetings. From the trucking
company's perspective, legal efforts to review and sign these agreements and
extended timelines to serve their customer's needs as a result of requiring these
matters to be considered over two Council meetings are negative impacts.
Ultimately, often the customer of the trucking company receiving the goods or
service experience impacts as a result of delays. A permitting process would
reduce resource requirements and timelines while ensuring measures remain in
place to ultimately remaining aligned, or even improve alignment, with Council's
Growth and Fiscal Responsibility priorities. Exploring implementation of such a
permitting process will be undertaken with a target of implementation for the
2022 Spring Weight Restriction period.
❑��Il►jrda�luL��/:I�:�i�:7�/[�i��L'7��F��►PI���r�►:7f:r@j4
The General Counsel's Office has assisted with the preparation of the attached
Weight Restriction By -Law Amendment and attached agreement.
ATTACHMENTS
Amendment to City of Saint John Weight Restrictions By -Law.
Agreement with Irving Equipment Ltd.
117
A LAW TO AMEND A BY-LAW
RESPECTING WEIGHT RESTRICTIONS
WITHIN THE CITY OF SAINT JOHN
ENACTED UNDER THE AUTHORITY
OF SECTION 262(1) OF THE MOTOR
VEHICLE ACT
ARRETE No MV-17
ARRETE CONCERNANT LES
LIMITATIONS DE POIDS DANS
THE CITY OF SAINT JOHN
EDICTE EN VERTU DU
PARAGRAPHE 262(1) DE LA LOI SUR
LES VEHICULES A MOTEUR
Be it enacted by the Common Council of Lors d'une r6union du conseil communal,
The City of Saint John as follows: The City of Saint John a d6cr&6 ce qui suit :
A By -Law of The City of Saint John
entitled "a By -Law Respecting Weight Restrictions
Within The City of Saint John Enacted Under The
Authority of Section 262(1) of The Motor Vehicle
Act" enacted on the 5' day of April, A.D. 2004, is
hereby amended as follows:
Par les pr6sentes, Farret6 de The City of
Saint John intitul6 « Arret6 concernant les
limitations de poids dans the city of Saint John
6dict6 en vertu du paragraphe 262(1) de la loi sur
les vMicules a moteur », 6dict6 le 5 avril 2004, est
modifi6 comme suit:
1 Schedule A is amended by adding the 1 L'annexe A est modifi6e par Fadjonction des
following words under the following headings: mots suivants sous les titres suivants :
Connection Routes
Wentworth Street between Broad Street and
Leinster Street only between April 6, 2021
and April 17, 2021 inclusive
IN WITNESS WHEREOF The City of Saint John
has caused the Corporate Common Seal of the said
City to be affixed to this by-law the day
, A.D. 2021 and signed by:
Routes de raccordement
rue Wentworth entre rue Broad et rue
Leinster entre le 6 avril 2021 et le 17 avril
2021 inclusivement
EN FOI DE QUOI The City of Saint John a fait
apposer son sceau communal sur le pr6sent arret6
le 2021, avec les signatures
suivantes :
Mayor/Maire
City Clerk / Greffier de la municipalit6
First Reading - March 8, 2021 Premiere lecture - le 8 mars 2021
Second Reading - March 8, 2021 Deuxi&me lecture - le 8 mars 2021
Third Reading - Troisi&me lecture -
118
THIS AGREEMENT made in duplicate as of the day of , 2021.
BY AND BETWEEN:
IRVING EQUIPMENT LIMITED, a corporation
duly incorporated under the laws of the
Province of New Brunswick, hereinafter called
the "Contractor"
OF THE FIRST PART
— and —
THE CITY OF SAINT JOHN, a body corporate
by Royal Charter confirmed and amended by
Acts of the Legislative Assembly of the
Province of New Brunswick, hereinafter called
the "City"
OF THE SECOND PART
WHEREAS the Contractor has been engaged in the construction of the
"Wentworth" development at the corner of Wentworth Street and Leinster Street in the
City of Saint John and Province of New Brunswick (the "Property"); and
WHEREAS travel to and subsequent removal of heavy industrial equipment
from the Property, namely a crane, requires the operation of vehicles within the City
with axle weights in excess of 80% of the axle weights permitted under the Motor
Vehicle Act, RSNB 1973, c M-17, and the Saint John Weight Restrictions By-law, By-
law Number MV-17, and amendments thereto (the "Heavy Vehicles"); and
WHEREAS the Contractor has requested permission from the City to operate
Heavy Vehicles on Wentworth Street between Broad Street and Leinster Street (the
"Street") between April 6, 2021 and April 17, 2021, inclusive, (the "Move"); and
WHEREAS the City is prepared to accede to the Contractor's request referred
to in the immediately preceding recital by enacting an amendment to the Saint John
Weight Restrictions By-law;
NOW THEREFORE THIS AGREEMENT WITNESSETH that the parties hereto for
and in consideration of these presents and the covenants herein contained agree
each with the other as follows:
1. That the Contractor shall only operate Heavy Vehicles on the Street between
April 6, 2021 and April 17, 2021, inclusive.
2. That the Contractor shall notify (i) the City's Traffic Engineer at least three (3)
business days in advance of the Move, (ii) Saint John Transit at least three (3)
business days in advance of the Move, and (iii) the City's Public Safety
Communications Centre immediately prior to and immediately following the Move.
3. That the Contractor shall, at its sole expense, engage a Professional
Engineering Consultant, for the purpose of (i) conducting an assessment of the
asphalt surfaces on the Street, and reviewing plans provided by the City with respect
to the location and depth of the water, sanitary and storm sewer systems owned or
operated by the City; (ii) identify any risk of the Heavy Vehicles coming into contact
with any parked vehicles and/or other above -ground infrastructure during the Move;
(iii) preparing a Risk Assessment Report for the Move; (iv) preparing a pre -Move and
119
-2-
post-Move Condition Survey Report of the asphalt surfaces and any above -ground
public infrastructure at risk of being contacted relative to the planned and actual route
of travel for the Move; and (v) identify any areas of on -street parking that need to be
restricted during the Move.
4. That the Contractor shall (i) provide copies of the Risk Assessment Report to
the Chief City Engineer or designate not later than April 5, 2021; and (ii) provide a
copy of the pre -Move and post -Move Condition Survey Reports to the Chief City
Engineer or designate not later than three (3) business days following completion of
the Move.
5. That the Contractor shall be solely responsible for the cost of the Risk
Assessment Report and the pre -Move and post -Move Condition Survey Reports.
6. That the Contractor hereby indemnifies, defends and saves harmless the City,
its employees, officers, agents, successors and assigns, from and against any and all
losses, costs, claims, demands, expenses, proceedings and actions of every nature
and kind for injury or direct damages, to persons or property to the extent caused by
the Move.
7. That the Contractor shall reimburse the City for all reasonable costs for work,
repairs, alterations, reconstruction or replacement required to remedy any damage
caused by the Move, within forty-five (45) days of the date of the Contractor's receipt
of an invoice together with reasonable back-up information.
8. That the Contractor will make necessary arrangements with the Saint John
Police Force for traffic control and escort services for the Move, and pay all costs
associated with such services.
9. That the Contractor shall receive approval from the Province of New
Brunswick for operation of the Heavy Vehicles on provincial highways not later than
April 5, 2021.
10. This Agreement shall enure to the benefit of and be binding upon the parties
hereto, their successors and assigns respectively.
IN WITNESS WHEREOF the parties hereto have caused these presents to be
duly executed by the properly authorized officers and their respective corporate seals
affixed hereto as of the day and year first above written.
SIGNED, SEALED & DELIVERED
in the presence of:
IRVING EQUIPMENT LIMITED
Per:
Per:
and
THE CITY OF SAINT JOHN
Mayor
120
-3-
City Clerk
Common Council Resolution:
2021
121
COUNTY OF SAINT JOHN
PROVINCE OF NEW BRUNSWICK
I, of the
Province of New Brunswick, MAKE OATH AND SAY:
and
1. THAT I am the of Irving Equipment Limited, the contractor
named in the foregoing instrument and have custody of the corporate seal of the said
company and am duly authorized to make this affidavit.
2. THAT the seal affixed to the foregoing agreement and purporting to be the
corporate seal of Irving Equipment Limited, is the corporate seal of the said Irving
Equipment Limited, the contractor named in the foregoing instrument and it was
affixed by the officer authorized to so affix the seal.
3. THAT the signature "
is my signature and as
instrument.
" subscribed to the said instrument
I am duly authorized to execute the said
4. THAT the said document was executed as aforesaid
in the Province of New Brunswick on the
2021.
SWORN TO before me at the
in the Province
of New Brunswick, this
day of 12021.
Commissioner of Oaths
Being a Solicitor
at the
day of
122
r it I. I I'
COUNCIL REPORT
M&C No.
2021-092
Report Date
March 26, 2021
Meeting Date
March 29, 2021
Service Area
Growth and Community
Services
His Worship Mayor Don Darling and Members of Common Council
SUBJECT: Proposed Municipal Plan Amendment — 2100 Sandy Point Road
(Ethos Ridge) Supplementary Report
OPEN OR CLOSED SESSION
This matter is to be discussed in open session of Common Council.
AUTHORIZATION
Primary Author
Commissioner/Dept. Head
City Manager
Andrew Reid
Jacqueline Hamilton
I John Collin
RECOMMENDATION
1. That Common Council redesignate, on Schedule A of the Municipal
Development Plan, land having an area of 8.57 hectares, located adjacent to
2100 Sandy Point Road, also identified as PID No. 55238471, from Park and
Natural Area and Rural Resource Area to Stable Area;
2. That Common Council redesignate, on Schedule B of the Municipal
Development Plan, land having an area of 8.57 hectares, located adjacent to
2100 Sandy Point Road, also identified as PID No. 55238471, from Rural
Resource and Park and Natural Area to Major Community Facility and extend
the boundary of the Primary Development Area (PDA);
3. That Common Council rezone a parcel of land having an area of approximately
8.57 hectares, located adjacent to 2100 Sandy Point Road, also identified as PID
Number 55238471, from Rural (RU) to Major Community Facility (CFM) zone;
4. That Common Council impose the following conditions on land having an area of
8.57 hectares, located adjacent to 2100 Sandy Point Road, also identified as PID
No. 55238471 pursuant to section 59(1)(a)(ii) of the New Brunswick Community
Planning Act:
(a) There shall be no vehicular access to the development off Pelton Road. The
entrance to Pelton Road is to be gated and utilized only by service vehicles
required for limited inspection and maintenance of the lift station and pad
123
sa
mount transformer. All other vehicles are to enter the site from Sandy Point
Road.
(b) The Sandy Point Road access driveway shall be owned and maintained by
the property owner. It shall not be owned, maintained or serviced by the
City of Saint John;
(c) The development, in accordance with paragraph 4 (d) and (e), shall be
completed within 5 years of the date the rezoning came into effect. If it is
not completed within that time, Council may take steps to cancel the
resolution and agreement and repeal the rezoning pursuant to Section 59(5)
and 59(6) of the New Brunswick Community Planning Act; and,
(d) The development shall be restricted to the "Supportive Facility" use as
identified in the Major Community Facility (CFM) Zone of the City of Saint
John Zoning By-law.
(e) The development and use of the parcel of land shall be in accordance with a
detailed site plan, landscaping plan and elevation plans, prepared by the
developer and subject to the approval of the Development Officer. These
plans shall be attached to the permit application for the development of the
parcel of land and shall substantially conform to the landscape and site
plans contained in this report, with particular regard to the minimum 30
metre wooded buffer between any building and the northern property line
at Pelton Road and the minimum 30 metre setback and buffer from the
Kennebecasis River.
5. That the City, upon third reading at Common Council, pursuant to the provisions
of Section 59(1)(b) of the Community Planning Act, enter into an agreement
with the developer of the parcel of land having an area of approximately 8.57
hectares, located adjacent to 2100 Sandy Point Road, also identified as PID
Number 55238471 respecting the following:
(a) The developer's obligation, at its own cost, to upgrade the existing
municipal infrastructure required to service the proposal, which
comprise the extension of water and sewer, and the restoration of the
street;
(b) The developer is to maintain public pedestrian access to a private trail
system on the property;
(c) The developer is to contribute to the cost of implementing traffic
calming measures at the Foster Thurston/Sandy Point Road intersection.
The contribution is to be commensurate with the amount of impact;
and,
124
am
(d) Subsequent to extension of services on Sandy Point Road, the developer
is to restore the east side of the street from the subject property to the
Westmount Drive intersection to include an asphalted and delineated
pedestrian walking surface.
That the City, upon third reading at Common council, pursuant to the provisions
of Section 131(1) of the Community Planning Act, enter into an agreement with
the developer of the parcel of land having an area of approximately 8.57
hectares, located adjacent to 2100 Sandy Point Road, also identified as PID
Number 55238471 respecting the following:
(a) The developer paying the charges, if any, made to the current
landowners of 2002 Sandy Point Road (PID # 00050930), 2020 Sandy
Point Road (PID # 55184337), and 2045 Sandy Point Road (PID #
00051276) pursuant to section 117(5) of the Local Governance Act or
the cost of said landowners to connect to the municipal water and
sewer infrastructure constructed pursuant to paragraph 5 (a),
whichever option is elected by the said landowners, within 1 year of the
commissioning of the municipal infrastructure extension in question;
and the developer entering into an agreement with the said landowners
in this respect; and,
(b) The developer commissioning and making available to the public an
expert opinion regarding the impact of the development on the
groundwater recharge in the area.
That the City Manager direct staff to take the following actions respecting the
identified traffic issues:
(a) Prioritize the Foster Thurston Road/Sandy Point Road intersection
roundabout, as identified by MoveSJ, to be considered as part of the
City's 10-year capital budgeting plan process;
(b) Implement traffic calming measures in the area of the Foster Thurston
Road/Sandy Point Road intersection to address speeding and sightlines
and continue to conduct appropriate monitoring;
(c) Report back to Council no later than one year after the date of the
issuance of any occupancy permit for the development on the status of
the Foster Thurston Road/Sandy Point Road intersection; and,
(d) Proceed with the installation of a four-way stop at the intersection of
Sandy Point Road and Westmount Drive/Kennebecasis Drive.
125
-4-
EXECUTIVE SUMMARY
The purpose of this report is to provide Council with supplementary information
to give effect to the Planning Advisory Committee (PAC)'s recommendation
before Council.
Staff have prepared a suggested recommendation for Council considering this
information based on what is within the City's jurisdiction and existing By-laws.
In summary, staff propose the following adjustments:
(1) Recommending that limitations on construction vehicle access to Pelton
Road is dealt with through the City's Traffic By-law, as the existing
mechanism, and not through a Section 59 condition;
(2) Adopting and enhancing the Committee's proposed amendment to
ensure the 5-year time limit on the development is linked to the
development as it is presented, by also adding a condition that limits the
use of the property exclusively to a "supportive facility" (defined as
senior's housing);
(3) Ensuring the developer's agreement to examine the groundwater
recharge is dealt with through a Section 131 agreement, as opposed to a
Section 59 agreement to reflect the appropriate legal mechanism under
the Community Planning Act; and,
(4) Ensuring the developer's agreement to pay the referenced water costs
are dealt with through a Section 131 agreement, as opposed to a Section
59 agreement to reflect the appropriate legal mechanism under the
Community Planning Act.
Furthermore, this report expands on several issues which were highlighted at the
Committee's meeting, including municipal servicing, fire service, and
environmental impact.
A recommendation is also included to provide staff direction on traffic issues, as
was committed to in the report to PAC, but which lay outside the Committee's
jurisdiction and was not put forth at that meeting in recommendation form.
On February 22, 2021, Common Council received letters of correspondence from
the 30-day comment period and referred the Plan Amendment and Rezoning to
the Planning Advisory Committee for a recommendation.
126
SIE
REPORT
Staff have carefully reviewed the Committee's proposed amendments to the
staff recommendation, which occurred at the Planning Advisory Committee
meeting on March 16t", and was made in response to concerns identified by
citizens. As per the Chair's Recommendation Letter (Attachment 1), the
Committee resolved to make four amendments to the staff recommendation.
These are each discussed below:
1. Pelton Road Access
The development is proposed to be accessed from Sandy Point Road via an
approximately 500 metre driveway, owned and maintained by the developer.
This access has not yet been constructed. There is also a frontage on Pelton
Road, which is proposed to be gated and used exclusively for servicing a pump
station and transformer pad, which is expected to be infrequent. With this
understanding, staff proposed a Section 59 condition to ensure access is
oriented to Sandy Point Road.
In response to neighbours' concerns regarding construction, the Committee
passed a resolution to amend the condition 4(a) to prohibit, in addition to any
vehicles once the development was completed, any construction vehicle from
using the Pelton Road access.
Staff understand the concerns relate to Pelton Road being a local road, wear and
tear on street infrastructure, and safety concerns. The Traffic By-law provides
the means to address these concerns. Staff recommend that Common Council
give effect to the views of the Planning Advisory Committee through the
processes in the City's Traffic By-law.
Section 19(3) of the By-law ensures that commercial vehicles over 4,500 kg use
the safest and shortest route through any local road from a truck route to the
construction site. Further, Section 19(4) requires permission from the
Commissioner of Public Works for any commercial vehicle engaged in activities
related to construction, for the use of any road other than a truck route. Sandy
Point Road to Kennebecasis Drive is classified as a Truck Route in accordance
with Schedule J of the By-law. Any construction vehicles, particularly those that
are over 4,500 kg, using Pelton Road will require approval from the
Commissioner.
As per typical practice for a project of this size in its current phase, the developer
has not yet selected a general contractor or developed a detailed construction
management plan. The developer has indicated that they intend to limit access
off Pelton Road and they are encouraged to do so; however, in certain cases
access may be desirable from Pelton Road prior to the construction of the Sandy
Point Road private access. For example, the developer intends to conduct well
monitoring by drilling a test pit but without access to Pelton Road, vehicles
127
sm
would not be able to access the site through Sandy Point Road to conduct this
activity.
2. 5-Year Sunset Clause
Section 59(a)(iii) of the CPA enables Council to prescribe time limits in which the
proposal may be carried out. Condition 4(c) of the staff recommendation
proposes a 5-year period as a reasonable timeframe in accordance with
Municipal Plan Implementation policy to complete the development, otherwise
Council may revert the lands to the former land use.
Concern was expressed at the meeting and in written correspondence that this
condition was ambiguous and urged it be strengthened by indicating that it
reference the specific proposal brought forward by the proponents. This led the
Committee to expand staff's recommendation and tie the 5-year period to the
specific development. The implications of this are that if the development as
proposed by the proponent is not built within 5 years, Council would have the
authority to revert the zoning.
Staff have reviewed this amendment and it is within Council's power to impose.
Recommendation 4(e) requires the development "substantially conform to the
landscape and site plans contained in this report." Substantial conformance is a
reasonable condition that ties the development to the site and landscaping plans
but enables design changes that may be required during the detailed design
phase of the project. Recommendation 4(e) provides that at the time of building
permit application submission, the Development Officer will be required to
review the submission and ensure it substantially conforms with the site plan
and landscaping plans submitted with the Rezoning application.
For further clarity and strengthening of this condition, staff have also introduced
an additional condition 4(d), to limit available land uses under the Major
Community Facility Zone exclusively to a Seniors Housing, meaning no other
main uses would be permitted on the property and the proposal should overall
substantially conform to what has been brought forward by the proponent.
3. Groundwater Recharge Study
Hearing concerns raised by citizens related to well water quantity and quality in
the area, in particular about how the development may impact groundwater
recharge, the Committee resolved to apply a condition as part of the
development that groundwater recharge be incorporated within the developer's
scope of work for a stormwater drainage submission.
The City has reviewed this resolution with the General Counsel's Office in terms
of legal jurisdiction and Infrastructure Development staff in terms of the
Drainage By-law. The City has no jurisdiction in regulating well water and further,
this is reflected in the city's review and regulation of stormwater management.
128
At the same time, it is understood that the developer is proposing to address this
concern through a hydrogeological submission as a matter of public record, in
conjunction with their efforts to measure and monitor the impact of the
development on the neighbourhood. This submission will be available to the
public but not reviewed by City staff as it falls outside the municipality's
jurisdiction. As the submission is strictly being proposed by the developer, it is
recommended that this condition be incorporated as part of a Section 131
agreement under the Community Planning Act.
4. Payment of Unconnected Fees
In accordance with the Water and Sewer By-law and current Saint John Water
policy, there are three properties that would be charged an annual unconnected
rate upon commissioning of the proposed 270 metre watermain should they
decide not to connect. The March 12t" staff report made this clear. During the
Committee meeting, the developer provided a commitment to either pay for
these property owners to hook up to services or pay the unconnected fee. The
Committee requested that this commitment be formalized through a condition
of the development. Staff recommend that the condition be implemented
through a Section 131 agreement, as it is something similarly being proposed by
the developer outside of the normal land use provisions governed by the Zoning
By-law or Subdivision By-law.
5. Other Changes
The developer has acquired the property and consolidated the two former PID
numbers into one. The PAC's recommendation been updated to reflect this. For
clarity, should the by-law amendment be registered, staff recommend that
Council's resolution correctly reference the property as PID Number 55238471,
and note that the civic number in question is located adjacent to 2100 Sandy
Point Road.
Issues Identified at PAC
The staff report dated March 12, 2021 contains a comprehensive review of the
proposal based on feedback provided by several departments. Additional
information and clarification is provided below in response to detailed concerns
that emerged at the meeting:
Municipal Operations and Servicing
In response to concerns regarding the state of existing stormwater and
road infrastructure, Public Works and Transportation has reviewed the
submissions and are in the process of investigating and will make repairs
where appropriate. Staff encourage citizens to submit work requests for
any issues that they are aware of. Citizens may do so through the City's
Integrated Customer Service Centre at 658-4455, via our website, or by
emailing service@saintiohn.ca.
129
WE
Priority of re -paving is based on condition of roadways as measured by
the Pavement Condition Index. Staff have identified that Pelton Road is
presently on the short list for paving in the next few years. This work will
be scheduled around any potential development, or any required culvert
repairs identified through the review.
Fire Services
- The proposal was circulated to the City of Saint John Fire Services. From a
public safety perspective, it is understood the development will require
both a Fire Sprinkler System and Fire Alarm System. Function fire
suppression systems combined with maintained and accessible means of
egress are two critical life safety factors that will be addressed through
the Building Permit and Office of the Fire Marshall's Plans Review
processes.
- With respect to the fire department access route to the building, the
access is subject to adherence with Access Route Design Requirements of
the 2015 National Building Code, as part of the Building and Development
Permit Review process. This access road would be tested well in advance
of occupancy of the building.
Environmental Impact
The Proposal was circulated to Province's Department of Environment
and Local Government (ELG). A Wetland and Watercourse alteration
permit would be required prior to any activity within 30 metres of a
watercourse or wetland feature on the property. According to the ELG
mapping application, there are no such features on the property. A
WAWA permit would be required for any activity within 30 metres of the
Kennebecasis River.
CONCLUSION
This recommendation before Council has been crafted to best give effect to the
Planning Advisory Committee's unanimous recommendation to proceed with the
development while addressing the concerns raised by the public.
&'Jr: JFA rff�r�►�r�u� �►�u►�
While the holding of public hearings for proposed rezoning and Section 59
amendments is a legislative requirement of the Community Planning Act, it is
also a key component of a clear and consistent land development process
envisioned in the One Stop Development Shop Program. These processes
provide transparency and predictability for the development community and
130
osm
City residents.
On a broader note, the development approvals process works towards fulfilling
key Council priorities including:
• ensuring Saint John has a competitive business environment for
investment,
• supporting business retention and attraction; and
• driving development in accordance with PlanSJ which creates the density
required for efficient infrastructure, services and economic growth.
INPUT FROM OTHER SERVICE AREAS AND STAKEHOLDERS
Input from Public Works and Transportation, Utilities and Infrastructure, Fire
Services, and the Office of General Counsel were incorporated into this report.
ATTACHMENTS
1— PAC Recommendation Letter
2 — Staff Report to PAC and Correspondence
3 —Additional Correspondence
4 —Amending By-law
5 — Council Presentation
131
PLANNING ADVISORY COMMITTEE
March 17, 2021
The City of Saint ]obn
His Worship Mayor Don Darling and
Members of Common Council
Your Worship and Councillors:
SUBJECT: Plan Amendment and Rezoning Application
2100 Sandy Point Road (Ethos Ridge)
On February 22, 2021, Common Council referred the above matter to the
Planning Advisory Committee for a report and recommendation. The Committee
considered the attached report at its March 16, 2021 meeting.
A presentation by Andrew Reid, Growth and Community Services, was provided
to the Committee outlining the report and recommendation.
The applicant, Mr. Scott Walton, on behalf of Ethos Ridge Ltd., appeared before
the Committee in agreement with the staff report and recommendation and
provided a presentation in support of the application. Mr. Walton committed to
paying the cost incurred by any of the three current residents required to pay an
annual unconnected flat rate for water should they decide not to connect to the
new watermain, or the cost of hooking up to services. On blasting, Mr. Walton
noted that geotechnical studies and the amount of blasting anticipated did not
indicate a major effect to adjacent landowners but that pre -blast surveys would
be conducted, and insurance would cover any unforeseen impacts. Mr. Walton
also outlined the site selection process for the development.
The following eleven citizens appeared before the Committee and provided a
PowerPoint presentation in opposition to the proposal: Jill Jollineau, Joan
Pearce, Paul Desjardins, George Losier, Daniel Guest, Colin Forsythe, John
Mowatt, and Kory Kinsella.
Citizen concerns and objectives to the proposal were related to the following:
parking and increased traffic, stormwater impacts, community character,
availability of emergency services, existing issues at the Foster Thurston Drive
Page 1 of 5
132
PAC Recommendation Letter 2100 Sandy Point Road March 17, 2021
intersection, disturbances during construction, downstream sanitary impacts,
impact of development on adjacent wells' quality and quantity of water, other
environmental impacts, and blasting.
The Committee thanked the citizens for their presentation and recessed for ten
minutes. Additional citizens spoke in opposition to the proposal, including Paul
Chase, Greg Collins, Robert Bazaluk, and Leslie King-Bazaluk. There were a
total of eleven citizens who spoke in opposition to the proposal.
Mr. Steve Carson, on behalf of Envision Saint John, appeared before the
Committee and spoke in favour of the proposal. Mr. Carson was followed by
Alexandra Baird Young and Margot Young who provided demographic/marketing
information and best practice overview for municipalities conducting plan
amendments.
Additional citizens appeared before the Committee to speak in favour of the
proposal including: Percy Wilbur, Robert Manning, Monica Adair and Sandra
Cooke, Norm McFarlane, and Tom Gribbons.
The applicant, Scott Walton, reappeared before the Committee and thanked the
citizens for submitting their concerns, noting many of them were identified during
the community engagement process. Mr. Walton provided the Committee further
information on the site selection process, experience of the developer's team, the
CBRE marketing study conducted, ESA study, groundwater recharge, shadow
studies, and parking.
After considering the report and recommendation, presentations, and attached
correspondence from 45 citizens, the Committee resolved to amend staff's
recommendation by adding the following conditions:
1) The developer be required to cover any costs related to unconnected fees
for the current property owners of the three dwellings affected, or the cost
to connect, whichever option is elected by the resident within 1 year of the
commissioning of the watermain,
2) Part 4(a) include prohibiting any construction vehicle to enter the site via
Pelton Road during the construction phase of the project,
3) Part 4(c) reference the development as presented to ensure that the
proposal is built to how it was presented before the Committee; and,
4) As part of their stormwater management plan, the developer incorporates
a statement or study pertaining to how the development may affect
groundwater recharge in the area.
The Committee unanimously approved the staff recommendation, as amended.
Page 2 of 5
133
PAC Recommendation Letter 2100 Sandy Point Road March 17, 2021
RECOMMENDATION:
1. That Common Council redesignate, on Schedule A of the Municipal
Development Plan, land having an area of 8.57 hectares, located at 2100 Sandy
Point Road, also identified as PID No. 55233977 and a portion of PID No.
55233233, from Rural Resource Area to Stable Area;
2. That Common Council redesignate, on Schedule B of the Municipal
Development Plan, land having an area of 8.57 hectares, located at 2100 Sandy
Point Road, also identified as PID No. 55233977 and a portion of PID No.
55233233, from Rural Resource and Park and Natural Area to Major Community
Facility and extend the boundary of the Primary Development Area (PDA);
3. That Common Council rezone a parcel of land having an area of approximately
8.57 hectares, located at 2100 Sandy Point Road, also identified as PID Number
55233977 and a portion of PID Number 55233233, from Rural (RU) to Major
Community Facility (CFM) zone;
4. That Common Council impose the following conditions on land having an area of
8.57 hectares, located at 2100 Sandy Point Road, also identified as PID No.
55233977 and a portion of PID No. 55233233 pursuant to section 59(1)(a)(ii) of
the New Brunswick Community Planning Act:
a) There shall be no vehicular access, including construction vehicles, to the
development off Pelton Road. The entrance to Pelton Road is to be gated
and utilized only by service vehicles required for limited inspection and
maintenance of the lift station and pad mount transformer. All other
vehicles are to enter the site from Sandy Point Road;
b) The Sandy Point Road access driveway shall be owned and maintained by
the property owner. It shall not be owned, maintained or serviced by the
City of Saint John;
c) The development, in accordance with part e), shall be completed within 5
years of the date the rezoning came into effect. If it is not completed within
that time, Council may take steps to cancel the resolution and agreement
and repeal the rezoning pursuant to Section 59(5) and 59(6) of the New
Brunswick Community Planning Act; and,
d) As part of their stormwater management plan, the developer incorporates a
statement or study pertaining to how the development may affect
groundwater recharge in the area.
Page 3 of 5
134
PAC Recommendation Letter 2100 Sandy Point Road March 17, 2021
e) The development and use of the parcel of land shall be in accordance with a
detailed site plan, landscaping plan and elevation plans, prepared by the
developer and subject to the approval of the Development Officer. These plans
shall be attached to the permit application for the development of the parcel of
land and shall substantially conform to the landscape and site plans contained in
this report, with particular regard to the minimum 30 metre wooded buffer
between any building and the northern property line at Pelton Road and the
minimum 30 metre setback and buffer from the Kennebecasis River.
That the City, upon third reading at Common council, pursuant to the provisions
of Section 59(1)(b) of the Community Planning Act, enter into an agreement
with the developer of the parcel of land having an area of approximately 8.57
hectares, located at 2100 Sandy Point Road, also identified as PID Number
55233977 and a portion of PID Number 55233233 respecting the following:
(a) The developer's obligation, at its own cost, to upgrade the existing
municipal infrastructure required to service the proposal, which
comprise the extension of water and sewer, and the restoration of the
street;
(b) The developer is to maintain public pedestrian access to a private trail
system on the property;
(c) The developer is to contribute to the cost of implementing traffic
calming measures at the Foster Thurston/Sandy Point Road intersection.
The contribution is to be commensurate with the amount of impact;
and
(d) Subsequent to extension of services on Sandy Point Road, the developer
is to restore the east side of the street from the subject property to the
Westmount Drive intersection to include an asphalted and delineated
pedestrian walking surface.
(e) The developer agrees to be responsible to cover any costs related to
unconnected fees for the current property owners of the three
dwellings affected or the cost to connect, whichever option is elected by
the resident within 1 year of the commissioning of the watermain.
Respectfully submitted,
Page 4 of 5
135
PAC Recommendation Letter 2100 Sandy Point Road March 17, 2021
Brad Mitchell
First Vice -Chair
Attachments
Page 5 of 5
136
PLANNING ADVISORY COMMITTEE
March 17, 2021
The City of Saint John
His Worship Mayor Don Darling and
Members of Common Council
Your Worship and Councillors:
SUBJECT: Plan Amendment and Rezoning Application
2100 Sandy Point Road (Ethos Ridge)
On February 22, 2021, Common Council referred the above matter to the
Planning Advisory Committee for a report and recommendation. The Committee
considered the attached report at its March 16, 2021 meeting.
A presentation by Andrew Reid, Growth and Community Services, was provided
to the Committee outlining the report and recommendation.
The applicant, Mr. Scott Walton, on behalf of Ethos Ridge Ltd., appeared before
the Committee in agreement with the staff report and recommendation and
provided a presentation in support of the application. Mr. Walton committed to
paying the cost incurred by any of the three current residents required to pay an
annual unconnected flat rate for water should they decide not to connect to the
new watermain, or the cost of hooking up to services. On blasting, Mr. Walton
noted that geotechnical studies and the amount of blasting anticipated did not
indicate a major effect to adjacent landowners but that pre -blast surveys would
be conducted, and insurance would cover any unforeseen impacts. Mr. Walton
also outlined the site selection process for the development.
The following eleven citizens appeared before the Committee and provided a
PowerPoint presentation in opposition to the proposal: Jill Jollineau, Joan
Pearce, Paul Desjardins, George Losier, Daniel Guest, Colin Forsythe, John
Mowatt, and Kory Kinsella.
Citizen concerns and objectives to the proposal were related to the following:
parking and increased traffic, stormwater impacts, community character,
availability of emergency services, existing issues at the Foster Thurston Drive
Page 1 of 5
137
PAC Recommendation Letter 2100 Sandy Point Road March 17, 2021
intersection, disturbances during construction, downstream sanitary impacts,
impact of development on adjacent wells' quality and quantity of water, other
environmental impacts, and blasting.
The Committee thanked the citizens for their presentation and recessed for ten
minutes. Additional citizens spoke in opposition to the proposal, including Paul
Chase, Greg Collins, Robert Bazaluk, and Leslie King-Bazaluk. There were a
total of eleven citizens who spoke in opposition to the proposal.
Mr. Steve Carson, on behalf of Envision Saint John, appeared before the
Committee and spoke in favour of the proposal. Mr. Carson was followed by
Alexandra Baird Young and Margot Young who provided demographic/marketing
information and best practice overview for municipalities conducting plan
amendments.
Additional citizens appeared before the Committee to speak in favour of the
proposal including: Percy Wilbur, Robert Manning, Monica Adair and Sandra
Cooke, Norm McFarlane, and Tom Gribbons.
The applicant, Scott Walton, reappeared before the Committee and thanked the
citizens for submitting their concerns, noting many of them were identified during
the community engagement process. Mr. Walton provided the Committee further
information on the site selection process, experience of the developer's team, the
CBRE marketing study conducted, ESA study, groundwater recharge, shadow
studies, and parking.
After considering the report and recommendation, presentations, and attached
correspondence from 45 citizens, the Committee resolved to amend staff's
recommendation by adding the following conditions:
1) The developer be required to cover any costs related to unconnected fees
for the current property owners of the three dwellings affected, or the cost
to connect, whichever option is elected by the resident within 1 year of the
commissioning of the watermain,
2) Part 4(a) include prohibiting any construction vehicle to enter the site via
Pelton Road during the construction phase of the project,
3) Part 4(c) reference the development as presented to ensure that the
proposal is built to how it was presented before the Committee; and,
4) As part of their stormwater management plan, the developer incorporates
a statement or study pertaining to how the development may affect
groundwater recharge in the area.
The Committee unanimously approved the staff recommendation, as amended.
Page 2 of 5
138
PAC Recommendation Letter 2100 Sandy Point Road March 17, 2021
RECOMMENDATION:
That Common Council redesignate, on Schedule A of the Municipal
Development Plan, land having an area of 8.57 hectares, located at 2100 Sandy
Point Road, also identified as PID No. 55233977 and a portion of PID No.
55233233, from Rural Resource Area to Stable Area;
That Common Council redesignate, on Schedule B of the Municipal
Development Plan, land having an area of 8.57 hectares, located at 2100 Sandy
Point Road, also identified as PID No. 55233977 and a portion of PID No.
55233233, from Rural Resource and Park and Natural Area to Major Community
Facility and extend the boundary of the Primary Development Area (PDA);
That Common Council rezone a parcel of land having an area of approximately
8.57 hectares, located at 2100 Sandy Point Road, also identified as PID Number
55233977 and a portion of PID Number 55233233, from Rural (RU) to Major
Community Facility (CFM) zone;
4. That Common Council impose the following conditions on land having an area of
8.57 hectares, located at 2100 Sandy Point Road, also identified as PID No.
55233977 and a portion of PID No. 55233233 pursuant to section 59(1)(a)(ii) of
the New Brunswick Community Planning Act:
a) There shall be no vehicular access, including construction vehicles, to the
development off Pelton Road. The entrance to Pelton Road is to be gated
and utilized only by service vehicles required for limited inspection and
maintenance of the lift station and pad mount transformer. All other
vehicles are to enter the site from Sandy Point Road;
b) The Sandy Point Road access driveway shall be owned and maintained by
the property owner. It shall not be owned, maintained or serviced by the
City of Saint John;
c) The development, in accordance with part e), shall be completed within 5
years of the date the rezoning came into effect. If it is not completed within
that time, Council may take steps to cancel the resolution and agreement
and repeal the rezoning pursuant to Section 59(5) and 59(6) of the New
Brunswick Community Planning Act; and,
d) As part of their stormwater management plan, the developer incorporates a
statement or study pertaining to how the development may affect
groundwater recharge in the area.
Page 3 of 5
139
PAC Recommendation Letter 2100 Sandy Point Road March 17, 2021
e) The development and use of the parcel of land shall be in accordance with a
detailed site plan, landscaping plan and elevation plans, prepared by the
developer and subject to the approval of the Development Officer. These plans
shall be attached to the permit application for the development of the parcel of
land and shall substantially conform to the landscape and site plans contained in
this report, with particular regard to the minimum 30 metre wooded buffer
between any building and the northern property line at Pelton Road and the
minimum 30 metre setback and buffer from the Kennebecasis River.
That the City, upon third reading at Common council, pursuant to the provisions
of Section 59(1)(b) of the Community Planning Act, enter into an agreement
with the developer of the parcel of land having an area of approximately 8.57
hectares, located at 2100 Sandy Point Road, also identified as PID Number
55233977 and a portion of PID Number 55233233 respecting the following:
(a) The developer's obligation, at its own cost, to upgrade the existing
municipal infrastructure required to service the proposal, which
comprise the extension of water and sewer, and the restoration of the
street;
(b) The developer is to maintain public pedestrian access to a private trail
system on the property;
(c) The developer is to contribute to the cost of implementing traffic
calming measures at the Foster Thurston/Sandy Point Road intersection.
The contribution is to be commensurate with the amount of impact;
and
(d) Subsequent to extension of services on Sandy Point Road, the developer
is to restore the east side of the street from the subject property to the
Westmount Drive intersection to include an asphalted and delineated
pedestrian walking surface.
(e) The developer agrees to be responsible to cover any costs related to
unconnected fees for the current property owners of the three
dwellings affected or the cost to connect, whichever option is elected by
the resident within 1 year of the commissioning of the watermain.
Respectfully submitted,
Page 4 of 5
140
PAC Recommendation Letter 2100 Sandy Point Road March 17, 2021
Brad Mitchell
First Vice -Chair
Attachments
Page 5 of 5
141
The City of Saint John
Date:
To:
From:
Meeting:
SUBJECT
Applicant:
Landowners:
Location:
PID:
Existing Plan Designation:
Proposed Plan Designation:
March 12, 2021
Planning Advisory Committee
Growth & Community Services
March 16, 2021
Ethos Ridge
Ethos Ridge
2100 Sandy Point Road
55233977 and 55233233
Rural Resource and Park and Natural Area
Major Community Facility
Existing Zoning:
Rural (RU)
Proposed Zoning:
Major Community Facility (CFM)
Application Type:
Municipal Plan Amendment and Rezoning
Jurisdiction:
The Community Planning Act authorizes the Planning
Advisory Committee to give its views to Common Council
concerning matters related to community planning and
proposed amendments to the Zoning By-law. Common
Council will consider the Committee's recommendation at
a public hearing on Monday, March 29, 2021.
Page 1 of 17
142
Ethos Ridge 2100 Sandy Point Road March 12, 2021
EXECUTIVE SUMMARY
The proposal is to develop a partially vacant and forested waterfront property located between
Pelton Road and Westmount Drive into a nature -based retirement community. The applicant is
seeking to amend the Municipal Plan by re -designating the property to Major Community Facility
and extending the Primary Development Area, and further to rezone the property from Rural
(RU) to Major Community Facility (CFM). The applicant is proposing to be responsible for all
costs related to the extension of municipal water and sewer services to the subject property's
entrance, adjacent to 2100 Sandy Point Road. Several added public benefits are also being
proposed, which include the developer providing neighbourhood access to walking trails,
reasonable contributions towards traffic calming measures at Foster Thurston Drive intersection,
and enhanced pedestrian safety infrastructure along Sandy Point Road. The proposal does not
detract from the vision of the Municipal Plan and it is aligned with many of the overarching goals
of the Plan, including emphasis on complete communities and fiscal responsibilities. Extension
of services will have minimal ongoing costs and no downstream issues were identified by Saint
John Water.
This report also responds to the many valued concerns identified during the 30-day Plan
Amendment comment period, which have been factored into the analysis and staff's
recommendation.
RECOMMENDATION
That Common Council redesignate, on Schedule A of the Municipal Development Plan,
land having an area of 8.57 hectares, located at 2100 Sandy Point Road, also identified
as PID No. 55233977 and a portion of PID No. 55233233, from Rural Resource Area to
Stable Area;
2. That Common Council redesignate, on Schedule B of the Municipal Development Plan,
land having an area of 8.57 hectares, located at 2100 Sandy Point Road, also identified
as PID No. 55233977 and a portion of PID No. 55233233, from Rural Resource and
Park and Natural Area to Major Community Facility and extend the boundary of the
Primary Development Area (PDA);
3. That Common Council rezone a parcel of land having an area of approximately 8.57
hectares, located at 2100 Sandy Point Road, also identified as PID Number 55233977
and a portion of PID Number 55233233, from Rural (RU) to Major Community Facility
(CFM) zone;
4. That Common Council impose the following conditions on land having an area of 8.57
hectares, located at 2100 Sandy Point Road, also identified as PID No. 55233977 and a
portion of PID No. 55233233 pursuant to section 59(1)(a)(ii) of the New Brunswick
Community Planning Act:
Page 2 of 17
143
Ethos Ridge 2100 Sandy Point Road March 12, 2021
a) There shall be no vehicular access to the development off Pelton Road. The
entrance to Pelton Road is to be gated and utilized only by service vehicles required
for limited inspection and maintenance of the lift station and pad mount transformer.
All other vehicles are to enter the site from Sandy Point Road;
b) The Sandy Point Road access driveway shall be owned and maintained by the
property owner. It shall not be owned, maintained or serviced by the City of Saint
John;
c) The development shall be completed within 5 years of the date the rezoning came
into effect. If it is not completed within that time, Council may take steps to cancel the
resolution and agreement and repeal the rezoning pursuant to Section 59(5) and
59(6) of the New Brunswick Community Planning Act; and,
d) The development and use of the parcel of land shall be in accordance with a detailed
site plan, landscaping plan and elevation plans, prepared by the developer and
subject to the approval of the Development Officer. These plans shall be attached to
the permit application for the development of the parcel of land and shall
substantially conform to the landscape and site plans contained in this report, with
particular regard to the minimum 30 metre wooded buffer between any building and
the northern property line at Pelton Road and the minimum 30 metre setback and
buffer from the Kennebecasis River.
5. That the City, upon third reading at Common council, pursuant to the provisions of
Section 59(1)(b) of the Community Planning Act, enter into an agreement with the
developer of the parcel of land having an area of approximately 8.57 hectares, located at
2100 Sandy Point Road, also identified as PID Number 55233977 and a portion of PID
Number 55233233 respecting the following:
(a) The developer's obligation, at its own cost, to upgrade the existing municipal
infrastructure required to service the proposal, which comprise the extension of
water and sewer, and the restoration of the street;
(b) The developer is to maintain public pedestrian access to a private trail system on
the property;
(c) The developer is to contribute to the cost of implementing traffic calming
measures at the Foster Thurston/Sandy Point Road intersection. The contribution
is to be commensurate with the amount of impact; and
(d) Subsequent to extension of services on Sandy Point Road, the developer is to
restore the east side of the street from the subject property to the Westmount
Drive intersection to include an asphalted and delineated pedestrian walking
surface.
Page 3of17
144
Ethos Ridge 2100 Sandy Point Road March 12, 2021
DECISION HISTORY
In 2017, Common Council approved money in lieu of Land for Public Purposes and approved
the vesting of a public street cul-de-sac located off Pelton Road.
ANALYSIS
Proposal
The proposal is to establish a four -storey retirement facility in Millidgeville, having approximately
125-units. The proposal emphasizes outdoor amenity space and a connection to nature, with
panoramic views of the Kennebecasis River, low -impact design, woodland buffers, and a suite
of amenities proposed such as hiking trails and water access. The level of care proposed is a
mixture of Independent and Supportive Living; the developer is in the process of selecting a
licenced operating partner. The proposal would be accessed via a single private driveway
located adjacent 2100 Sandy Point Road. Access to Pelton Road is proposed to be gated and
limited to servicing access to the proposed pumping station and transformer pad. A total of 70
underground parking stalls are proposed and 30 surface parking stalls for staff, visitors, and
servicing. The proposal would be serviced via extension of water and sanitary services from the
Westmount Drive / Sandy Point Road intersection at the cost of the developer. There are
several other public benefits that have been incorporated the proposal. In reviewing existing
transportation issues, staff are also proposing additional measures to enhance the roadway
system.
Site and Neighbourhood
The subject property consists of 8.57 hectares of vacant land and woodlot, situated between
Pelton Road and Westmount Drive in Millidgeville. The site has two frontages, one located off
Sandy Point Road and the other on an unbuilt cul-de-sac located off Pelton Road, which was
vested to the City in 2017. The subject property is separated from Westmount Drive by a
second 6.3 hectares forested property, which is not part of the proposal. The property has
notable topographic features. The entrance to the site sits at 35 metres above sea level. At the
entrance, an open field slopes up 200 metres to the high point, a 65-metre ridge. The ridge is
topped by a canopy of mature coniferous trees. From the ridge, the forest descends sharply to
an open field, formerly farmland. The former farmland is even terrain, with half of the field now
occupied by rows of coniferous plantings. Because of the ridge, this means that the proposed
building should not be visible from Sandy Point Road. The remaining land is a mix of hardwood
trees gradually leading to the river, where there is a final, sharp descent to the water. There is a
second clearing at the location of the cul-de-sac, which was also former farmland. There are no
wetlands in proximity to the site. Due to the cliffside that runs along the river, the site is
unimpacted by flooding.
The subject property is in a transition area between rural residential development to the north
and serviced residential subdivisions to the south. The dividing point is the Westmount Drive
and Sandy Point Road intersection. North of the intersection consists of unserviced rural
residential dwellings located off Pelton Road, Beach Road, and Sandy Point Road. The
Page 4 of 17
145
Ethos Ridge 2100 Sandy Point Road March 12, 2021
neighbourhood has a variety of houses and lot sizes, all predominantly single family. The
neighbourhood has changed over the years from one being comprised of small farms and
cottages perched on the riverside to year-round homes that capitalize on the water view. This
segment of Sandy Point Road is built to a rural standard, with open ditches and without
sidewalks or curbs. Sandy Point Road is classified as a Local Street and serves to carry low
volumes of traffic south through the Kennebecasis neighbourhood or east towards the Foster
Thurston Road intersection. Foster Thurston Drive is an arterial street that carries traffic
eastward towards Highway Number 1. Here Sandy Point Road transitions to a collector street
that connects to Rockwood Park and the Hospital/University complex. The subject property is
centrally located at approximately 3.5 km from the Regional Hospital and 7 km from the city
centre.
South of the Westmount Drive intersection, the Kennebecasis Drive subdivision consists of a
network of local streets. Largely built out in the 1980s, the subdivision has sidewalks and is
serviced up to the point of the Westmount Drive intersection. The neighbourhood includes the
Summerville-Millidgeville ferry, which operates seasonally, with a capacity of 24 vehicles.
Municipal Plan Review
The developer has requested an amendment to the Municipal Plan, "PlanSJ," to change the
future land use designation and extend the Primary Development Area to connect the proposal
to services. In formulating staff's recommendation, the proposal has been comprehensively
evaluated based on the intent of PlanSJ. A full policy of the Municipal Plan has been attached to
this report (Attachment 2). In summary, although requiring amendments to the Plan in the form
of amending the designation and Primary Development Area boundary, the proposal still can
meet the overall intent of PlanSJ.
The Municipal Plan's vision emphasizes reducing sprawl and focusing on growing the City in a
more compact, sustainable manner. The Plan intends to reverse the outward development
pattern of uneconomical low density rural sprawl. Years of sprawl took away residential
development from the city core and had an environmental impact on the rural lands in the form
of additional roads and private systems.
The Vision of PlanSJ
- The subject property is situated on the edge of the Primary Development Area and
borders serviced residential neighbourhoods. By infilling the underutilized lands between
two developed neighbourhoods, it provides the opportunity to achieve a more complete
community with housing to serve a growing segment of the population.
- The proposal is compact and maximizes the use of land, without compromising quality of
life.
- The proposal takes a "low impact," environmentally sensitive approach and has a small
lot occupancy.
Page 5of17
146
Ethos Ridge 2100 Sandy Point Road March 12, 2021
The subject property is centrally located. It makes use of existing roadways without
proposing new streets and the servicing extension can be accommodated without
negative downstream effect by the existing system.
To rationalize growth, the Plan establishes the Primary Development Area (PDA). This was
done so to capitalize investments made in existing infrastructure and focus on a dense, compact
urban form. Existing services had the capacity to absorb the anticipated growth without
expansion of services. The proposed extension of the watermain and forcemain to the property
fulfills this objective as the existing infrastructure in the neighbourhood was designed for more
customers than are currently being serviced.
Housing for an Aging Population
The Plan's outlook and analysis on growth is primarily based on attracting and retaining
professionals and workers from across the country and abroad due to Saint John's aging
population. The opportunity to retain or even attract a seniors demographic from elsewhere, was
not a focal point of the Plan, but is an emergent issue and one that will be an important
discussion point in the upcoming reviews of the Plan. Providing a range of appropriate housing
to meet the needs of an aging population includes the full continuum of senior's housing
options. The developer commissioned CBRE to conduct a feasibility study, which included
current comparable offerings such as the Shannex and Chateau de Champlain in Millidgeville
and concluded there to be sufficient market demand and depth in Saint John. As the "baby
boomer" generation ages, the population over 65 is projected to constitute 24% of the
population by 2029.
Table 1 Metroeconomics Population Projects 65+ Population
Total65+ 14,263
I
17,773
3,510
24.61%
18,476
4,212
29.53%
al Population 71,364
76,046
4,682
6.56%
83,981
12,617
17.68%
According to the Province of New Brunswick publication, We are all in this together. An Aging
Strategy for New Brunswick (New Brunswick Council on Aging, January 2017, p. 5), there were
approximately 147,929 seniors in New Brunswick in 2016, representing 19.5% of the total
population. By 2038, it is expected that 31.3% of the New Brunswick population will be seniors.
Notably, there is both a local and regional demand for seniors' facilities. The proposal integrates
within a residential neighbourhood and is near major services such as the hospital to provide
additional housing to meet this forecasted demand.
Municipal Services and Infrastructure
PlanSJ is a living document intended to be updated and amended to consider the evolving
needs of the community and unforeseen situations. Council has the prerogative to consider
Municipal Plan amendments to ensure the Plan remains current and responsive. Since the
implementation of the PDA, Council has amended the service boundary several times and
completed over 22 amendments to the Plan, most recently the Primary Development Area was
extended as part of the Crossing project.
Page 6of17
147
Ethos Ridge 2100 Sandy Point Road March 12, 2021
Proposed amendments must be reasonable and keeping with the overall intent of the Plan. In
considering amendments to the boundary, one of the primary considerations in this case is in
keeping with the goals and policies set out for municipal services and infrastructure.
- There is a sound business case that extending services benefits the City (both in
terms of infrastructure and economic development) and the developer;
By comparison to the proposal, an 8-hectare portion of the Kennebecasis Road
subdivision that contains approximately 60 units requires 1.2 kilometres of public
road and utilities to service the one -unit dwellings. The impact of rural residential
development is even larger.
- Based on the required land area, natural features, and access to amenities such as
the hospital, the developer indicated there to be no suitable lands within the PDA to
accommodate the business case. A desktop analysis of the Plan's intensification
areas reveal that these areas, the majority of which are biased towards the urban,
would not meet the site selection criteria, with the exception of the undeveloped
lands adjacent the University. The site appears to be uniquely positioned as a
transition area for infill.
- The service extension makes use of an existing roadway (Sandy Point Road), which
will provide future benefits to residents in the form of the opportunity to connect to
city water services, should they choose; and
- The proposal will further limit unserviced development that otherwise may have
taken place on the subject property.
Character, Density, and Fit
PlanSJ intends neighbourhoods to evolve over time to meet the needs of the community and
even low -density neighbourhoods must accept a degree of change. It is important to manage
that change through effective design to ensure it integrates well. The Plan does not intend
neighbourhoods to be static and homogenous.
At approximately 125 units within a 4,829 square metre building footprint on a large 8.57-
hectare lot, the proposal preserves a good portion of the natural environment while focusing
density within a compact, mid -rise building. With lot occupancy estimated to be 18%, it is under
the 50% maximum lot occupancy of a low -density residential zone.
In terms of height, the Major Community Facility (CFM) Zone provides up to 24 metres in
maximum building height. At four storeys, the proposal meets this standard at approximately 19
metres on the west elevation and 24 metres on the east elevation, owing to the slope of the
land. With the ridge obscuring any view of the building from Sandy Point Road, the height of the
building should only be perceived on Pelton Road. The impact of height here is mitigated by
setbacks that more than double this height ranging from approximately 48 to 65 metres.
Millidgeville contains a broad mixture of densities and demonstrates the principles complete
communities. It includes high-rise residential and mid -rise residential buildings clustered around
single family neighbourhoods, with schools and retirement facilities integrated. The proposal
Page 7 of 17
148
Ethos Ridge 2100 Sandy Point Road March 12, 2021
represents an opportunity to provide a contemporary housing form in a neighbourhood that
straddles the rural and suburban. The Municipal Plan introduces an urban design framework to
provide a more detailed level of guidance for Council in weighing a proposal's compatibility. The
proposal is well situated in meeting the Plan's Urban Design goals:
- The proposal is designed to incorporate existing natural features and topography;
- Although the proposed building represents a departure from the physical character of
the established neighbourhood, the building and parking areas are invisible to the
eye from Sandy Point Road and are proposed to be buffered through woodlots from
adjacent properties; and
- The proposal incorporates innovations in built form, aesthetics, and building function
to encourage high quality contemporary design and celebrate the view plain to the
water.
Economic Prosperity and Quality of Life
How the proposal contributes to new investment and achieving economic prosperity, while
ensuring the highest standards of quality of living for residents were considerations of the
Municipal Plan review. The proposal will create economic benefits for the City. The developer
has reported the value of construction to be $55 million dollars, $1 million in new tax revenue
per year and approximately 50 staff members. Staff have reviewed these figures with tax
revenue received from comparable facilities. Additional revenue will contribute towards the
City's overall sustainability and improving quality of life investments moving forward. Investment
in public benefits as part of this recommendation are already a sign of this.
The Plan dictates that land use planning decisions balance economic development with quality
of life. This is most relevant when considering incompatible uses such as industry within a
residential area. The overall quality of life improvements that would be made possible by the
development outweigh any general concerns that quality of life would be jeopardized by an
increase in traffic, light pollution, or temporary disturbances during construction.
The proposal meets the following Economic Prosperity goals of PlanSJ:
- The proposal maximizes the use of a valuable waterfront property to create a
significant economic contribution in terms of new tax revenue and employment, while
enhancing quality of life, providing local public benefits, and benefits to the City as a
whole.
Natural Environment
The Plan seeks to achieve an increased level of diligence in protecting the City's natural
environmental, waterways, groundwater resources, and ensuring access to drinking water. No
Environmental Impact Assessment is required as the proposal is serviced. The Department of
Fisheries and Oceans (DFO) was contacted as part of the application and did not identify any
concerns. The applicant will be required to obtain a Wetland and Watercourse (WAWA) permit
from the Province for any alteration within 30 metres of the Kennebecasis River. DFO would
reserve the right to inspect the property for compliance with all WAWA permit requirements. The
proposal complies with the Natural Environment policies of the Plan:
Page 8 of 17
149
Ethos Ridge 2100 Sandy Point Road March 12, 2021
The proposal will be serviced. Of principal concern is limiting unserviced
development to protect groundwater for existing users;
The proposal maintains protection of the riparian area (30 metre setback); and
Preservation of existing woodlands is proposed to retain a large portion of the tree
canopy and planting of native species where additional buffering is desirable.
Transportation
The Municipal Plan's key transportation goals tie strongly to its growth goals and emphasize a
balanced transportation system that meets the needs of community members while offering a
variety of options. The developer's traffic impact study assesses the impacts of the proposal on
the street network, which includes both the entrance and approach to the Westmount Drive
intersection, as well as the nearby intersection at Foster Thurston Road.
- With the added development, traffic volumes remain within the general range of
volumes acceptable for Sandy Point Road.
- Beyond the traffic study, the developer has proposed several traffic calming
measures of a monetary value commensurate with the development's impact on the
Foster Thurston Drive intersection, in addition to pedestrian safety enhancements
along Sandy Point Road.
- Staff have taken the development as an opportunity to further investigate the
neighbourhood to propose improvements that would further enhance pedestrian
safety (e.g. 4-way stop at Westmount Drive intersection).
- Transit is a desirable amenity to provide an additional mode of transportation and is
available 450 metres away at Lentook Avenue and Kennebecasis Drive. While the
primary means of transportation for residents are vehicular or shuttle service, the
transit is available to supplement.
Regulatory Basis of the Municipal Plan
The Plan clearly establishes goals for its implementation. There have been several
amendments to the PDA over the past 10 years. Under Municipal Plan policy, Council may, but
is not required to, consider amendments to the PDA through a comprehensive review of the
Municipal Plan. This review is currently scheduled for 2022 in accordance with legislated
timeframes. Council is further enabled by the Plan to consider amendments, without conducting
any review, that confer significant public, economic, social or cultural impacts to the City (Policy
1-21), as was undertaken with the Crossing project.
The Plan Amendment is appropriate to consider as the proposal meets the following
Implementation criteria of Policy 1-21 for considering such Plan Amendment applications:
- The development does not place an undue fiscal burden on the City;
- The proposal makes use of low -impact design, aims to preserve as much natural
amenity as possible, and would not have a detrimental impact on the natural
environment, particularly in view of possible alternative development scenarios for
the site;
- The proposal is largely capable of meeting the key goals of the Plan; and
Page 9 of 17
150
Ethos Ridge 2100 Sandy Point Road March 12, 2021
- There have been several opportunities for public input into the consideration of the
proposal over the course of 6 months that have appeared to have resulted in iterative
changes to the design, access, building placement, and buffering.
Rezoning and Section 59 Agreement
The subject property is currently zoned Rural (RU). The proposal seeks to rezone the property
to Major Community Facility (CFM). The proposal has been designed to meet all the standards
of the CFM zone in terms of parking, landscaping, amenity space, setbacks and height.
The proposal would be considered as a "supportive facility," under the Zoning By-law, which is
defined as the following:
(a) An establishment licensed or approved by a government agency that provides care
and or supervision to residents on a 24-hour basis by professional staff; or
(b) An establishment devoted to retired residents where common amenities and
services, including communal dining, are provided exclusively to such senior
residents.
This use best fits the proposal's intended mixture of independent and supportive living.
Distinction between a supportive facility and an apartment complex would primarily be made
through the business operations of the facility, but also in the types of facilities offered (e.g.
communal dining) and corresponding National Building Code requirements. No residential
dwellings (e.g. apartment complex) are permitted within the Major Community Facility zone.
As part of the rezoning, staff recommend that Council impose Section 59 conditions to address
the following:
- Access. Restricting access to Sandy Point Road and ensuring the City will not be
responsible for any future ownership or maintenance of the private driveway.
- Sunset Clause. Should the project not be executed within a reasonable time, staff
recommend the land revert to its previous zoning within 5 years. This will ensure the
developer moves forward with their proposed development plans in a timely manner
and that any future development remains subject to a public process.
- Conformity with Site/Landscaping Plans. The proposed site plan and landscaping
plan identify several unique features that are important to ensuring a greater level of
compatibility with the neighbourhood. These include existing woodland buffers on the
northern property line, as well as proposed plantings to fill in the area adjacent the
Pelton Road cul-de-sac. This buffer currently is proposed as approximately 40
metres. To provide added flexibility staff recommended a minimum 30 metre buffer is
maintained. This is intended to exceed Zoning By-law requirements for screening. In
addition, setback and buffering from the Kennebecasis River are recommended.
A Section 59 agreement is proposed to be executed between the City and the developer on the
following items:
Page 10 of 17
151
Ethos Ridge 2100 Sandy Point Road March 12, 2021
- Services. In accordance with the intent of the Plan and its infrastructure policies,
onsite and offsite infrastructure costs are the responsibility of the developer. It will be
the developer's responsibility to extend the watermain and forcemain from
Westmount Drive to the entrance of the property, as well as rebuild Sandy Point
Road, all in accordance with City specifications.
- Traffic Improvements. While the Traffic Study does not recommend physical
improvements to the neighbourhood, the development will contribute a percentage of
additional traffic to an intersection flagged as an existing problem. The developer is
proposing a contribution commensurate with the degree of impact on the roadway.
This may include such traffic calming and sightline measures as brush clearing,
rumble strips, and an overhead flashing beacon.
Pedestrian Walkway. Sandy Point Road was constructed to a rural standard and
does not have sidewalks. Staff reviewed possible implementation in accordance with
the City's Sidewalk Infill Strategy and found a traditional concrete sidewalk with curbs
would not be a priority in this location, even post -development. Furthermore, the cost
of sidewalks is prohibitive here because of the lack of storm drainage infrastructure.
As an alternative, the developer has agreed, as part of the reconstruction of the
portion of Sandy Point Road, to provide an enhanced pedestrian walking surface.
The asphalt width would be extended to provide a delineated pedestrian space. This
alternative would improve pedestrian safety by providing connection to
Kennebecasis Drive and at a minimal operating cost to the City.
Trails. There are existing woodland trails on the subject property, which have been
utilized by the neighbourhood. The developer has shown an interest in incorporating
these trails into the facility but also allowing continued community usage. In many
cases, the City may require Land for Public Purpose (LPP) as part of a development
where there is a subdivision of land. However, in this case, money in -lieu of LPP has
already been granted in 2017 as the property is not identified as part of the City's
Trails and Bikeways strategy. Ownership and liability of the trail system goes beyond
what is required by the City. It would be the developer's responsibility and liability to
maintain neighbourhood access to a trail system.
Implications of Extending the Primary Development Area and Servicing
The Primary Development Area (PDA) currently borders but does not include the subject
property. The closest connection point is the Westmount Drive intersection, 270 metres from the
entrance to the subject property.
There are 8 homes along Sandy Point Road that are within the limits of the proposed
infrastructure extension. The sewer extension from the subject property would be by way of a
private forcemain (from the site to the municipal connection point) and only being designed to
service the development site, there is no requirement for residents along Sandy Point Road to
Page 11 of 17
152
Ethos Ridge 2100 Sandy Point Road March 12, 2021
connect to a municipal sewer system. Connection to a proposed watermain extension (to be
municipally owned and maintained) would be available for residential connection; however
residents are not required to connect.
Upon successful installation and commissioning of the proposed watermain, it would be the
intention of Saint John Water to give Notice to all 8 residences notifying them of the new
municipal water infrastructure in front of their property and the opportunity to connect. Existing
residents who are given notice by the Commissioner to connect with said watermain in
accordance with the By-law, shall be eligible for financial assistance, based on the following
formula:
Financial Assistance = Annual water rate x 0.25 x distance (in metres) from the building to street
right-of-way.
Formula
Example
[2021 Annual Flat Rate Water Rate]
$791.80
x [0.25]
X 0.25
x [Distance to in metres form the building to the street right -of-
X 10 metres
way] (varies)
Total amount of financial assistance
1 $1,979.50
Additionally, Per the By-law, if an owner who has been given Notice by the Commissioner to
connect chooses not to connect, an owner shall pay a rate equal to what the rate would be
under the applicable By-law Schedule. In 2021 the flat rate (water) for an unconnected home is
$267.54. This unconnected rate applies to 3 homes that located within 45 metres from the
street.
The developer is proposing a low -impact stormwater management approach, which utilizes
means such as swales and rain gardens to store stormwater. As per the City's Storm Drainage
Design Criteria Manual, the development must have a net zero impact on adjacent properties.
There should be no additional stormwater directed to drainage ditches because of the
development.
Fiscal Analysis and Operating Costs
Staff evaluated the fiscal implications the development would have on the City. As the
development connects into existing city infrastructure and the developer is fronting all capital
costs, costs are limited to operating costs described below.
Servicing Extension
According to Saint John Water, the operating costs related to a small distribution watermain
expansion are very small. The lifecycle of a watermain built in accordance with the City's
General Specifications is forecasted to be 60-80 years but can last much longer as the City has
experienced. With routine maintenance of the system, the costs associated with upkeep are
insignificant considering this will add approximately 270 metres to a 481,495 metre (481.5 km)
Page 12 of 17
153
Ethos Ridge 2100 Sandy Point Road March 12, 2021
long existing water system. The proposed development will be metered and subject to metered
rates for usage.
Increasing the number of water and sewer customers connected to the infrastructure and
contributing toward the water and wastewater infrastructure is financially a positive result for the
Water Utility as the infrastructure is designed for more Customers than is currently being
serviced.
The existing receiving municipal wastewater lift station will see a very small increase in
electricity and maintenance costs but overall, the revenue from the new sewer customer will
financially be a positive result by contributing to the operational cost of the existing water and
wastewater systems.
Additionally, there is an already planned project for 2021-2022 at the Beach Crescent Sewage
Lift Station to reconstruct the Lift Station above flood level to provide for reliable collection of
wastewater. This reconstruction is within the City's 2021 Capital Budget and was identified prior
to the proposal coming forward.
Private Access and Maintenance
It is the responsibility of the developer to bear all costs related to the private driveway that
provides access to the facility. As per the proposed Section 59 agreement, all costs into the
future associated with maintenance, snow clearing, and garbage collection are to be privately
provided and are not the City's responsibility.
Roadways
There may be a level of wear and tear on the roadway system surrounding the subject property.
These costs are general to any development in the City and repair of roads will be funded
through the City's operating budget. Road maintenance is scheduled based on the age of the
road and will occur based on this set timeline. It should be noted that the Developer will be
resurfacing a portion of Sandy Point Road. The road was last paved in 2019.
Traffic Flow and Access
The applicant submitted a Traffic Impact Study to examine how the development would impact
traffic flow and the location of the access. It is important to highlight that even with the added
development traffic, traffic volumes on the section of Sandy Point Road with which the
development would connect remain within general range of volumes expected on a Local
Street. "The Annual Average Daily Traffic (ADDT) volume on Sandy Point Road (east) near the
site is estimated to be approximately 600 vehicles per day." As the development will add an
estimated 437 vehicles daily, Sandy Point Road will remain within the typical ADDT range of
1,000 vehicles per day for a Rural Local Road. In terms of the access, the Study found its
location to satisfy minimum turning sight distance and stopping sight distance.
Foster Thurston Drive and Sandy Point Road Intersection
Page 13 of 17
154
Ethos Ridge 2100 Sandy Point Road March 12, 2021
Given awareness of the existing issue and concerns identified by residents, the City requested
that the Traffic Study be updated to include an analysis of the Foster Thurston Drive and Sandy
Point Road intersection (Submission 4). The Study concluded that "intersection delays caused
by the development would be negligible." Staff recognize that the development will not
significantly worsen the situation at the intersection, given the LOS analysis of the traffic study,
the relatively low daily traffic volumes relative to background traffic, and opportunities to
disperse development traffic between this intersection and Kennebecasis Drive. It is important
to note that offloading of the nearby Summerville Ferry can create concentrated intermittent
groupings of vehicles accessing the surrounding street network including at this intersection.
Staff also recognize the findings of a 2011 traffic study that there are constrained existing sight
lines at the Foster Thurston/Sandy Point intersection, which are problematic due to documented
speeding issues. The 2011 study suggested a roundabout as a solution to solve the speeding
problems. The 2011 study also recognized the available sight lines are more acceptable when
the posted speed limit is observed. Based on discussions with the Saint John Police Force,
speeding on Foster Thurston remains a challenge. A Roundabout Strategy, part of MoveSJ, the
City's Strategic Transportation Plan, identified a single -lane roundabout as an appropriate
solution to improve the level of service and mitigate speeding issues, substantiating the 2011
suggestion. Staff recommend that this design intervention be considered within the City's 10-
year capital budgeting process to ensure improvements are made. In the meantime, the City's
Traffic Engineer will work with the developer toward providing safety measures to ensure
greater observance of the speed limit and the Traffic Unit of the Police Force will continue to
monitor the area as resources permit.
The following recommendation will be provided to Common Council in a supplementary report
prior to third reading, directing staff to take the following actions respecting the identified traffic
issues:
(a) Prioritize the Foster Thurston Road/Sandy Point Road intersection roundabout,
as identified by MoveSJ, to be considered as part of the City's 10-year capital
budgeting plan process;
(b) Implement traffic calming measures in the area of the Foster Thurston
Road/Sandy Point Road intersection to address speeding and sightlines and
continue to conduct appropriate monitoring;
(c) Report back to Council no later than one year after the date of the issuance of
any occupancy permit for the development on the status of the Foster Thurston
Road/Sandy Point Road intersection; and,
(d) Proceed with the installation of a four-way stop on the intersection of Sandy Point
Road and Westmount Drive.
Page 14 of 17
155
Ethos Ridge 2100 Sandy Point Road March 12, 2021
30 Day Comment Period and the Public Participation Process
Through the 30-day comment period several prominent themes were identified in 44 letters
received by residents of the neighbourhood who expressed opposition to the proposed Plan
Amendment. Many concerns were expressed early on and drew conclusions based on
inadequate or incorrect information.
All concerns were carefully read by staff and relevant concerns have been addressed in this
report's recommendation or forwarded to the developer for consideration where appropriate.
Feedback from the neighbourhood is valued as it provides immediate on the ground knowledge
about the area. Pertinent issues identified by the neighbourhood have been summarized below.
These concerns have been prioritized in accordance with how frequently they appeared in the
letters.
Concern for an increase in traffic ranked perhaps highest among the concerns. Staff rely on the
expert opinion of the City's traffic engineer, best practice, and review of Traffic Impact Study's
findings. The level of service post -development and the access location has been thoroughly
explored in the Study and in this report. Staff have recommended a condition that vehicular
access be limited to Sandy Point Road. Further, residents expressed concern about pedestrian
safety given a lack of sidewalks in the area. The developer has proposed a delineated
pedestrian walkway to be constructed with the rebuilding of Sandy Point Road. The Foster
Thurston Drive intersection is an existing and known issue to the City and this development
review has triggered staff to secure additional benefits from the developer in the form of interim
traffic calming improvements. The solution to the speeding and sight line issues will also be
explored through the City's capital budget process.
Second, and perhaps of equal concern to traffic was a perception that the proposal was
contradictory to the Municipal Plan. Municipal Plan amendments are not uncommon; however
require a higher level of public participation and review by professionally accredited planners.
Pages 5-9 provide a review of the proposal's conformity with the overall intent of the Plan. This
review is based upon the overall intent of the Plan in terms of its vision for compact
development, efficient services, environmental preservation, and complete communities. It has
been well established that the proposal involves little to no cost to the City. Other concerns
regarding servicing have been addressed in this report.
Third was a concern for the effect of the development on wells and the water table because of
construction or possible blasting. The Province regulates blasting in New Brunswick, and it is
the responsibility of the developer to ensure that there are no impacts on neighbourhood
properties. The developer has expressed an interest in mitigating blasting concerns and
following all proper protocol, including conducting pre -blast surveys where necessary. Given the
uncertainty of site conditions, staff do not recommend any conditions relating to blasting. The
developer is recommended to conduct appropriate consultation prior to blasting and work with
their hydrologist to minimize any potential issues.
Page 15 of 17
156
Ethos Ridge 2100 Sandy Point Road March 12, 2021
Conclusion
The amendment to the Municipal Plan largely carries out the intent of the Plan to maximize
efficiency of services and deliver compact growth. There are no sound planning reasons why
the development cannot proceed in this location. While the subject property was not identified
as an opportunity site during PlanSJ process, it represents a good candidate site for an infill
project such as this, which is sensitive to the neighbourhood, meets the needs of a growing
demographic segment of the community, does not compromise quality of life, and provides
several benefits to the neighbourhood and City as a whole.
ALTERNATIVES AND OTHER CONSIDERATIONS
None were considered.
ENGAGEMENT
Developer
• Prior to submission of the application, the developer conducted door to door
engagement with the neighbourhood and circulated a pamphlet beginning from
November to December 2020. Input on the project was gained during this time through
an online survey.
• The developer created a website associated with the project, included a Q and A
section.
• Engagement continued into January 2021 through conversations neighbours.
• On February 19, 2021, a virtual public information session was held, led by Brackish
Design Studio. There were 26 people in attendance and 55 live questions were fielded.
Public
• In accordance with the Community Planning Act, public notice of the Plan Amendment
was advertised on the City Website on December 31, 2020.
• On January 11, 2021 the Plan Amendment was given Public Presentation at Common
Council and a 30 day comment period initiated.
• On February 22, 2021 Common Council received and filed 45 letters from members of
the public (1 in favour, 44 in opposition) and referred the Plan Amendment application to
the Planning Advisory Committee and set a public hearing date.
• In accordance with the Committee's Rules of Procedure, notification of the proposal was
sent to landowners within 100 metres of the subject property on March 4, 2021. The
rezoning was posted on the City of Saint John website on March 3, 2021.
APPROVALS AND CONTACT
Author
Manager/Senior Planner
Commissioner
Andrew Reid, MCIP, RPP
Jennifer Kirchner, MCIP, RPP
Jacqueline Hamilton, MCIP,
RPP
Page 16 of 17
157
Ethos Ridge 2100 Sandy Point Road March 12, 2021
Contact:
Andrew Reid
Telephone:
(506) 658-4447
Email:
Andy. Reid @saintjohn.ca
Application:
20-3014
APPENDIX
Map 1: Site Location
Map 2: Future Land Use
Map 3: Zoning
Map 4: Aerial Photography
Map 5: Contours
Attachment 1: Site Photography
Attachment 2: Municipal Plan Policy Review
Submission 1: Site Plan
Submission 2: Landscape Plans
Submission 3: Elevation Plan
Submission 4: Floor Plans
Submission 5: Traffic Impact Study
Submission 6: Public Benefits
Attachment 3: Correspondence
Page 17 of 17
158
Map 1 Ethos Ridge Development - Site Location
2021-03-09
Subject Property
.. Primary Development Area
m
�dstone-Dr
�F�PidsGo n
1:9,000
0 0.05 0.1 0.2 mi
0 0.07 0.15 0.3 km
Street Centrelines Esri Community Maps Contributors, City of Saint John, Province of New
159
Map 2 Ethos Ridge Development - Zoning
2021-02-26
Subject Property Zoning
Street Centrelines R2
RR
C Property Parcels
RU
0 Primary Development Area
160
1:7,000
0 0.04 0.08
0 0.05 0.1 0.2 km
0.16 mi
Esri Community Maps Contributors, City of Saint John, Province of New
Brunswick, Province of Nova Scotia, Esri, HERE, Garmin, INCREMENT P,
METI/NASA, USGS, US Census Bureau, NRCan, Parks Canada
Map 3 Ethos Ridge Development - Future Land Use
2021-03-09
Subject Property 0 Rural Residential
Primary Development Area E� Park and Natural Area
Future Land Use Stable Residential
1:8,000
0 0.05 0.1 0.19 mi
0 0.07 0.15 0.3 km
GeoEye, Maxar
Rural Resource
161
Map 4 Ethos Ridge Development
2021-02-26 1:6,000
0 0.04 0.07 0.14 mi
Subject Property
Street Centrelines
Civic Addresses
Property Parcels
0 Primary Development Area 162
0.05 0.1 0.2 km
Esri Community Maps Contributors, City of Saint John, Province of New
Brunswick, Province of Nova Scotia, Esri, HERE, Garmin, INCREMENT P,
METI/NASA, USGS, US Census Bureau, NRCan, Parks Canada, The City
of Saint John
Map 5 =thos Ridge Development - Contours
r .fir �,� . fir• .. . -. ��
V''f 7.7
4
2021-03-09
Subject Property
Elevation Contours
Street Centrelines
0 Property Parcels
r
eAP Al
r b •rCi/J
\ r'
If
1:4,500
0 0.03 0.06 0.11 mi
0 0.04 0.09 0.17 km
Esri Community Maps Contributors, City of Saint John, Province of New
Brunswick, Province of Nova Scotia, Esri, HERE, Garmin, INCREMENT P,
METI/NASA, USGS, US Census Bureau, NRCan, Parks Canada, The City
of Saint John
163
jf lIf
AW
Ad
Open field, formerly farmland, facing towards Pelton Road Facing towards Pelton Road entrance from waterfront trail
6t i
3.
now
From same same open field, facing southwest portion of ridge Kennebecasis River
Facing Pelton Road unbuilt cul-de-sac entrance
Foster Thurston Drive / Sandy Point Road Intersection (approx.
1km away)
From top of ridge facing Sandy Point Road
1y
'� lgj d a �� if' �r ' I', j ry
41
Approx. location of access adjacent 2100 Sandy Point Road
Municipal Plan Policy Review — Ethos Ridge
Land Use Policies
• Schedule A - City Structure, of the Municipal Plan, designates the property "Rural
Resource Area." The rural designation describes areas that are not provided with
municipal water and wastewater services. The Rural Resource Areas are "undeveloped
lands with the potential for rural resource activity such as pits and quarries and/or
forestry uses" (Policy LU-95).
Schedule B — Future Land Use, of the Municipal Plan, and accompanying land use
policies intend to create a comprehensive picture of the community and the legal
framework for how land in the City should be developed. The Future Land Use of the
subject property is also designated Rural Resource Area. Aside from resource related
activities, including pits and quarries, forestry, agriculture, fisheries, wind and solar
energy development, limited residential land uses may be contemplated within these
areas. New public streets are generally discouraged within these areas.
• Schedule B also establishes the boundaries of Primary Development Area (PDA).
• Within both Schedules, there is a 30-metre strip along the Kennebecasis River
designated Park and Natural Area.
• The proposal seeks to Amend Schedule A by redesignating the property to Major
Community Facility and extend the PDA to encompass the 8.57 hectare subject
property.
Policy LU-4
Council Shall not consider changing the
designation of lands on the Future Land Use map
(Schedule B) through a Municipal Plan
amendment, unless the proposal:
a
Cn
C.
d
e
Is consistent with the general intent of the
Municipal Plan and further advances the
City Structure;
Is necessary by virtue of a lack of supply
of quality land already designated in the
Municipal Plan to accommodate the
development;
Enhances the community and the quality
of life offered to residents of the City;
Efficiently uses available infrastructure;
Does not negatively impact the use and
enjoyment of adjacent lands and
neighbourhoods;
Is an appropriate use within the land use
designation being sought for the
Evaluation
✓ The proposal is consistent with the
general intent of the Plan's vision for
sustainable, compact growth and
efficiency of services. It will not
detract from growth within the
intensification areas. Existing
services can accommodate the
proposed extension of services
without any significant financial
implications on the City.
✓ The proponent undertook a site
selection process that evaluated land
based on size, natural features, and
proximity to amenities. The
opportunities to locate within an area
already designated Major Community
Facility are limited, as there are no
such vacant sites in the City. More
broadly, a quick desktop analysis of
the intensification areas show that
166
z
Municipal Plan Policy Review — Ethos Ridge
property, and the proposal is consistent
with the specific policies regulating
development in the designation; and
g. Adequately addresses and mitigates any
significant environmental impacts.
their locations do not meet the site
selection criteria, except for the lands
adjacent the University. Given the
proposal capitalizes on the natural
setting of the site, there would be
limited locations readily available to
accommodate it within the areas
designated for serviced urban
development in the Plan.
✓ The proposal offers new housing
opportunities for an aging population
without compromising the quality of
life within the neighbourhood.
✓ The proposal makes efficient use of
the existing roadway and there will be
no new public streets. Existing
infrastructure is designed for more
customers than are currently being
served and the minor extension of
water and sewer services will be fully
funded by the developer, while also
optimizing infrastructure investments
in the area.
✓ The proposal should not have a
negative or noxious effect. The
proposal is designed to reflect the
natural environment, siting the
development to minimize impact on
adjacent neighbourhoods, limit site
disturbance and maximize the tree
canopy on site, while also
incorporating landscape buffering
aimed at reducing visual impact on
the neighbourhood.
✓ The proposed use is "Supportive
Facility" under the CFM designation,
which is further evaluated on page
10.
✓ Any development within 30 metres of
the Kennebecasis River will require a
WAWA permit.
Policy LU-6
Council shall intend that the PDA form the growth ✓ The proposal does not detract from
boundary of the City. Lands within the PDA are the Plan's growth goals. The
the priority areas for accommodating future proposal provides housing for an
167
Municipal Plan Policy Review — Ethos Ridge
growth over the planning period, to capitalize on
investments made in existing infrastructure.
Policy LU-8
Council shall not permit development serviced
with municipal water and wastewater services
beyond the boundaries of the PDA without first
changing the boundaries of the PDA which will
require an amendment to the Future Land Use
map (Schedule B). Large-scale, heavy industrial
development is excluded from compliance with
this policy.
Policy LU-9
Council may consider amending the boundaries
of the Primary Development Area boundary when
a comprehensive review of the Municipal Plan
has taken place, as outlined in the
Implementation Chapter of the Municipal Plan.
2014, C.P. 106-8
Policy LU-89
Councill shall create the Major Community
Facilities designation on the Future Land Use
map (Schedule B) to accommodate a range of
larger -scale institutional uses including, but not
limited to, high schools and post -secondary
educational facilities, major care facilities,
recreation facilities, places of worship and
assembly, and other government and community
uses.
Policy LU-90
Council shall ensure that new major community
facilities that are used by residents across the
City and the Greater Saint John Region are
located in areas designated Major Community
Facilities and shall generally be permitted only
aging population and the developer
has provided justification that suitable
lands could not be found within the
PDA.
✓ The application comprises an
amendment to Schedule A and B of
the Municipal Plan to extend the
PDA.
✓ Council has considered 5 PDA
extensions to date, including the
Crossing Project in 2016, which was
endorsed by Council as a catalytic
growth project. The policy does not
bind Council to conducting a
comprehensive review prior to
amending the PDA boundaries (that
review is currently scheduled for
2022, per legislative requirement).
The implementation chapter does
provide Council a means to consider
an application that confers significant
public, economic, social, or cultural
benefits to the City notwithstanding a
review (See Policy 1-21).
✓ The proposal consists of a retirement
community that will have both an
independent living and supportive
living operation and is appropriate
within this designation.
✓ The proposed land use is desirable
from the perspective of the Municipal
Plan and proposes to contribute
several public benefits to the
neighbourhood.
4
Municipal Plan Policy Review — Ethos Ridge
subject to a rezoning process where compliance ✓ While the proposal represents a
is demonstrated with the following requirements: departure from the height and
appearance of the surrounding
a. The proposed land use is desirable and neighbourhood, these are mitigated
contributes positively to the neighbourhood; through design and building
b. The proposal is compatible with surrounding placement. The use being a
land uses; retirement community is a compatible
c. The development is in a location where all residential use. The building should
necessary water and wastewater services, not be seen from Sandy Point Road
protective services, and appropriate and owing to topography and treed
transportation infrastructure including public buffers along Pelton Road.
transit can be provided; ✓ Necessary services can be provided.
d. Site design features that address such matters In terms of transit, the closest route is
as safe access, buffering and landscaping, site currently located 450 metres away at
grading and stormwater management are Lentook Avenue and Kennebecasis
incorporated; Drive. The developer is proposing to
e. A high quality exterior building design is augment transit with private shuttle
provided that is consistent with the Urban Design service.
Principles in the Municipal Plan; and ✓ The access meets the width
f. Public transit and active transportation links are requirements of the Zoning By-law
provided to and from other key destinations. and will be required to meet the City's
General Specifications and minimum
standards of the National Building
Code such as grades, widths, etc. for
emergency services. The developer
is proposing several landscaped
buffers (formalize through condition).
The developer is proposing a low -
impact design to handle stormwater.
✓ The proposed building is a high
quality contemporary design tailored
to the subject property and designed
to raise the standard for design of
supportive facilities. Conditions on
the substantial conformity of the
proposal to the site plan will ensure
that this design is carried forward into
the construction review stage.
✓ As a retirement facility, the most
important transportation links will be
nearby facilities such as the hospital
and commercial areas. As is typical
with this type of facility, a shuttle
service would operate in place of
transit/active transportation.
Urban Design Policies
Policy UD-9
169
5
Municipal Plan Policy Review — Ethos Ridge
Council shall ensure all development proposals ✓
generally conform to the following General Urban
Design Principles:
a. That new development respect and reinforce
the existing and planned context in which it is
located through appropriate setbacks,
landscaping, buildings entrances, building
massing, architectural style and building
materials. Specifically, the built -form of new
development shall be designed to achieve the
following objectives for specific areas of the City:
i. In Stable Areas, as identified on the City
Structure map (Schedule A), new development
will be designed to respect and reinforce the
physical character of the established
neighbourhood, as set out in Policy UD-10;
ii. In the Primary Centre...
iii. Special considerations are established for the
Uptown Waterfront as set out in Policy UD-13...
iv. In Employment Areas,...
v. In Rural Areas, as defined on the City Structure
map (Schedule A), new development, where
permitted, shall be rural in character and
conserve and strengthen the rural context in
which it is situated, as set out in Policy UD-16 of
the Municipal Plan.
b. Locating building entrances facing the public
street;
c. Designing sites to incorporate existing natural
features and topography;
d. Designing sites to protect, create and/or
enhance important view corridors to the water or
landmark sites or buildings;
e. Incorporating innovations in built form,
aesthetics and building function to encourage
high quality contemporary design that will form
the next generation of heritage;
f. Where appropriate and desirable, encouraging
active pedestrian -oriented uses and a high level
of transparency at grade to reinforce and help
animate the public realm;
g. Designing sites, buildings and adjacent public
spaces as complete concepts with integrated
functions;
h. Using quality, durable building materials and a
consistent level of design and detail for all
elements of the building;
i. Designing for visual interest by incorporating
well -articulated building facades, landscaping,
The development is unlike anything
in its surroundings. This is
acknowledged through the treatment
of building placement and buffering.
The building is setback approximately
388.5 metres from Sandy Point Road
and is buffered by a ridge and tree
canopy. The building is setback
approximately 49-65 metres from
Pelton Road. Much of the existing
natural woodlot is proposed to be
conserved, keeping with the rural
character of the area.
The building entrance faces Sandy
Point Road; however, it is obscured
from view because of the ridge.
The site is designed to take
advantage of the natural topography.
The building is situated on a lower
plateau, where the ground is most
even with views to the water provided
by cantilevered upper storeys.
The site is designed around having a
connection to the Kennebecasis
River.
The proposal has been submitted by
professional architecture/landscape
architecture firms and is designed to
provide innovative, nature -based
accommodation for seniors.
The proposal should not impact the
public realm.
The 8.57 hectare property has been
designed as a complete concept.
Integrated functions include
public/private walking trails, a bark
park, and several other amenities.
The building has been
comprehensively designed with what
appear to be high quality, durable
materials. The quality of design will
be assured through the Section 59
agreement.
The building has been designed for
visual interest with a prominent and
contemporary design that celebrates
the Kennebecasis River.
In terms of sustainable design, the
proponent is committed to low impact
design, preserving much of the
existing woodlots and planting native
170
N.
Municipal Plan Policy Review — Ethos Ridge
local history, public art and/or culture into sites
and buildings;
j. Directing high-rise buildings to appropriate
areas and ensuring their design is sensitive to the
neighbourhood and/or heritage context;
k. Encouraging sustainability in design by:
i. Utilizing reused, recycled, renewable or local
building materials where possible;
ii. Using green building or neighbourhood
standards;
iii. Designing for energy efficiency and alternative
sources of energy;
iv. Designing for water conservation and on -site
stormwater management;
v. Promoting the conservation and adaptive re-
use of existing buildings and designing sites to
retain mature trees;
vi. Designing sites and buildings to work with,
rather than against, the natural environment by
designing according to the topography, hydrology,
ecology and natural drainage patterns of the site
and taking advantage of passive solar gain and
natural light; and
vii. Using native vegetation for landscaping where
appropriate.
I. Designing sites and buildings according to the
Crime Prevention through Environment Design
(CPTED) principles to promote safety and
security, in balance with other urban design goals;
and
m. Locating and screening parking and loading
facilities so they are generally not visible from the
street, particularly in Centres and Neighbourhood
Intensification Areas
Neighbourhoods and Housing Policies
Policy HS-17
Council shall encourage the provision of housing
for people with special needs, including senior
citizens, group homes and shelters, to integrate
into appropriate residential areas of the City, in
close proximity to major transit routes, community
facilities and needed services.
Economic Prosperity Policies
Policy EP-6
Council shall recognize that economic
development is an important component of
sustainable development but that land use
species where providing additional
buffers, and is further exploring the
use of solar energy.
✓ Parking facilities should not be seen
from either Sandy Point Road or
Pelton Road.
✓ Most of the parking is provided
underground.
✓ The building will be required to be
designed to meet all accessibility and
barrier free requirements.
✓ The proposal integrates within an
existing residential neighbourhood
and is ideally situated in proximity to
major community facilities such as
the Regional Hospital.
✓ The economic development benefits
of the proposal are significant, an
estimated $1 million in new annual
tax revenue, without need for major
171
7
Municipal Plan Policy Review — Ethos Ridge
planning decisions must also be balanced against
environmental, social, cultural and fiscal impacts.
Natural Environment Policies
new capital or operating investments
by the City, in addition to job creation
and other spinoffs of creating
additional housing product to meet a
growing market. The overall impact of
the development should be positive
for the neighbourhood and City as a
whole. Environmentally, the proposal
celebrates natural amenity and seeks
to preserve much of the
environmental integrity of the site.
Socially/Culturally, the proposal
provides additional seniors housing.
Fiscally, the proposal does not pose
a risk or threat to the City.
Policy NE-8
Council shall limit unserviced development to ✓ The alternative to the proposal would
protect groundwater for existing well users and to be additional unserviced
promote more compact urban settlement. development on site.
Policy NE-11
Council shall protect environmentally sensitive
areas, including watercourses and wetlands,
riparian areas, and floodplains and appropriately
restrict development near these features.
Policy NE-24
Enhance biodiversity throughout the City by:
a. Encouraging the use of native species of
vegetation for landscaping in private and public
development, where appropriate; and
b. Preserving representative vegetation, species
and ecosystems in major open spaces and City
parks.
Policy NE-35
Improve the natural stormwater storage capacity
of watercourses and wetlands in urban and
suburban areas on a comprehensive watershed
basis in accordance with the City's Storm
Drainage Design Criteria Manual and by:
a. Restricting development in natural and rural
areas;
b. Utilizing `low impact development' techniques
for on -site stormwater management wherever
possible and encouraging innovative stormwater
✓ The proposal's adjacency to the
Kennebecasis River will be protected
by preserving the 30-metre riparian
buffer and restricting additional
stormwater flow into the river.
✓ The proposal is to preserve a
significant amount of woodlot and
plant additional naturalized buffers
from native species.
✓ The property is currently zoned Rural
Resource. The development strikes a
balance in preserving existing
woodlots and utilizing existing open
space.
✓ The proposal seeks a low impact
development approach to stormwater
management, including swales, rain
gardens, and other means.
172
H.*
Municipal Plan Policy Review — Ethos Ridge
management methods such as green roofs,
permeable surfaces, and rainwater collection;
c. Designing stormwater management facilities as
local amenities by locating them adjacent to
parks, open spaces, or greenways and permitting
public access where appropriate; and
d. Increasing public awareness and engagement
regarding stormwater management practices and
site design.
Transportation and Mobility Policies
Policy TM-4
Councill shall consider the following transportation
matters when evaluating new
development proposals:
a. A street hierarchy should be identified and
designed to accommodate traffic within the
development and provide connections to adjacent
areas;
b. The capacity of adjacent streets should be
sufficient to accommodate the forecasted traffic
generated by the new development;
c. Vehicular access points to arterial and collector
streets should be minimized where possible by
encouraging shared access driveways,
appropriately controlling access from corner lots,
or other appropriate measures;
d. The street layout should be designed to
facilitate effective transit system operations;
e. Amenities such as benches and shelters
should be provided along transit routes;
f. Pathway connections between streets should
be provided in locations where the safety and
convenience of pedestrians can be enhanced;
g. Active transportation infrastructure should be
encouraged to support alternative modes of travel
within the development;
h. The design of residential streets should provide
a safe, convenient and livable environment for
residents, motorists and pedestrians; and
i. Pedestrian connectivity and circulation to public
sidewalks and between adjoining neighbourhoods
should be encouraged.
✓ The development is served by a
private access.
✓ The street hierarchy and adjacent
areas have been considered. There
are two access routes to the Sandy
Point Road entrance. One through
the Local Street network of
Kennebecasis Drive and the other
through the Collector Street, via
Sandy Point Road at Foster Thurston
Drive. A traffic study was submitted
with the application; the study
advised that no transportation
infrastructure improvements were
required and Sandy Point Road
would maintain a level of service
acceptable for a local street.
✓ There are no access points onto an
arterial/collector from the site
✓ Not applicable — No new streets are
being proposed
✓ The existing sidewalk network begins
at Westmount Drive intersection.
Policy TM-5
Councill shall ensure developers contribute to the ✓
cost of on and off site transportation
improvements made necessary as a direct result
of a development proposal.
The Traffic Study recommends no
new transportation infrastructure is
necessary to support the
development; however, there are
existing issues which will be
173
17
Municipal Plan Policy Review — Ethos Ridge
Municipal Services and Infrastructure Policies
Policy MS-3
Councill shall generally require that onsite and
offsite infrastructure costs associated with new
subdivisions and development be the
responsibility of the developer.
considered by the City in the capital
budget process. In the interim, traffic
improvements to slow down drivers
and improve sightlines are
recommended.
✓ All infrastructure improvements will
be the responsibility of the developer,
as established by a Section 59
Agreement.
Policy MS-20
Councill shall make the approval of new ✓
development contingent upon available reserve
capacity in the City's wastewater collection
system and treatment facilities.
Policy MS-29
Councill shall require that stormwater impacts are ✓
considered when development is reviewed and
approved and techniques such as `low impact
design' and natural stormwater management
approaches are used where appropriate.
Implementation Policies
Policy 1-2
Councill shall in considering amendments to the
Zoning Bylaw or the imposition of terms and
conditions, in addition to all other criteria set out in
the various policies of the Municipal Plan, have
regard for the following:
a. The proposal is in conformity with the goals,
policies and intent of the Municipal Plan and the
requirements of all City bylaws;
b. The proposal is not premature or inappropriate
by reason of:
i. Financial inability of the City to absorb costs
related to development and ensure efficient
delivery of services, as determined through Policy
1-7 and 1-8;
Saint John Water has modelled the
proposed sanitary flows and does not
see any issue with the development
in relation to the downstream sanitary
sewer system.
Any design on site related to
drainage, including the proposed `low
impact design,' needs to meet the
City's Drainage By -Law. The By -Law
(and the Storm Drainage Design
Criteria Manual) have requirements
for maximum flow and speed to
protect the property, neighbours and
the environment.
✓ The report and this attachment
substantially confirms the proposal's
conformity with the vision, intent, and
policies of the Municipal Plan.
✓ There are no significant costs to the
City related to the delivery of
services. While extension of services
is required, these are to be provided
by the developer. The proposal is
ideally situated in proximity to the
Hospital, the road network has
thoroughly been reviewed, there are
no heritage buildings in the area, the
type of use has been established as
compatible and well buffered from
174
10
Municipal Plan Policy Review — Ethos Ridge
ii. The adequacy of central wastewater or water
services and storm drainage measures;
iii. Adequacy or proximity of school, recreation or
other community facilities;
iv. Adequacy of road networks leading to or
adjacent to the development; and
v. Potential for negative impacts to designated
heritage buildings or areas.
c. Appropriate controls are placed on any
proposed development where necessary to
reduce any conflict with adjacent land uses by
reason of:
i. Type of use;
ii. Height, bulk or appearance and lot coverage of
any proposed building;
iii. Traffic generation, vehicular, pedestrian,
bicycle or transit access to and from the site;
iv. Parking;
v. Open storage;
vi. Signs; and
vii. Any other relevant matter of urban planning.
d. The proposed site is suitable in terms of
steepness of grade, soil and geological
conditions, locations of watercourses, wetlands
and susceptibility of flooding as well as any other
relevant environmental consideration;
e. The proposal satisfies the terms and conditions
of Policy 1-5 related to timeframes and phasing of
development; and
f. The proposal meets all necessary public health
and safety considerations.
Policy 1-5
Councill may establish timeframes on the phasing
and/or completion of development where it is
determined that an application to rezone land is
speculative in nature. In this case, Council may
require that the rezoning be subject to a
Development Agreement which may include
provisions including, but not limited to the
following:
a. That, in addition to any other securities or
bonds Council considers appropriate under
section 39(8) of the New Brunswick Community
Planning Act, the applicant provide a certified
cheque in the amount of $1000 to cover expenses
relating to the cancellation of the agreement
and/or repeal of the rezoning. The $1000 security
shall be repayable on completion of the
development for which the rezoning is granted;
adjacent properties, traffic generation
has been addressed through the
Traffic Impact Study.
✓ The developer has undertaken
geological studies to confirm soil
suitability. The topography of the site
has been considered by the
proponent in arriving at the most
suitable placement for the building in
terms of the grade and proximity to
watercourse.
✓ As part of the Section 59 agreement,
a timeframe has been proposed
whereby the development must be
completed.
✓ The proposal will be required to meet
all considerations in conformity with
the National Building Code.
This agreement is proposed to ensure
timely development of the project.
175
11
Municipal Plan Policy Review — Ethos Ridge
b. Should construction of the development (or in
the case of a phased development, the first phase
of the development) not be completed within five
(5) years from the date the rezoning comes into
effect;
i. No further development shall be permitted;
ii. Council shall immediately take steps to cancel
the agreement and repeal the rezoning pursuant
to section 39(5) and 39(6) of the New Brunswick
Community Planning Act;
c. That upon repeal of the rezoning pursuant to
section 39(5) and 39(6) of the New Brunswick
Community Planning Act, the land to which the
agreement pertains shall revert to its last previous
zoning designation.
Policy 1-21
Councill may notwithstanding the foregoing
policies, and specifically the provisions of Policy
LU-75, where a proposed amendment addresses
unforeseen circumstances or is deemed by
Council to confer significant public, economic,
social or cultural impacts to the City, consider the
amendment in light of the following criteria:
a. Studies demonstrating that the proposed
development will have significant long term
benefit for the City and that the proposed
development does not place an undue fiscal
burden on the City or have a detrimental impact
on the natural environment;
b. The proposed development fulfills other key
goals of the Municipal Plan; and
c. Appropriate opportunities are provided for
public input into the consideration of such
amendments to the Municipal Plan.
✓ Policy 1-21 references foregoing
monitoring and review policies of the
Plan and supports the extension of
the Primary Development Area in lieu
of a 5-10 year Municipal Plan
Review. Staff have undertaken a
comprehensive analysis of the Plan
to emphasize the long-term benefit of
additional senior housing to the City,
as well as fulfillment of other key
goals of the Plan.
✓ The proponent has provided
appropriate opportunities for public
input and all legislated public
participation procedures have been
followed, beginning on December
31 st, 2020 with the advertisement of
the Plan Amendment.
176
KENNEBECASIS
RIVER
�J
NOTES:
1. DRAWING IS IN METERS
2. REFER TO LANDSCAPE PLAN FOR LANDSCAPE FEATURES,
AMENITITES, AND DRAINAGE FEATURES.
o ra c ^/\
BRACKISH DESIGN STUDIO INC.
204-1521 GRAFTON STREET
HALIFAX NS 33J 2139 T 902.422.7216
www.brackish.ca
9 I
PELTON ROAD
Lj
� GATED EACCos_�oAA. _ � 34
vr�niivnv�
SWALE
A R C H I T E C T
ACRE ARCHITECTS
87 Canterbury Street, Suite 301
Saint John, NB E21- 2C7
G ARCHITECTS
310 Spadina Avenue, Suite 303
Toronto, ON, M5T 2E8
uivvvvrIL-L-
P R E L I M I NARY : NOT FOR CONSTRUCTION
THIS DRAWING IS FOR INFORMATIONAL PURPOSES
C I V I L S T R U C T U R A L A N D E L E C T R I CAL
ONLY AND IS NOT INTENDED FOR
E N G I N E E R S CONSTRUCTION DO NOT START CONSTRUCTION
WITHOUT A SEALED SET OF CONSTRUCTION
DOCUMENTS.
ALL RIGHTS RESERVED. THE DRAWINGS,
DESIGNS, AND IDEAS EMBODIED THEREIN ARE
PROPERTY OF BRACKISH DESIGN STUDIO INC. AND
SHALL NOT BE COPIED, REPRODUCED, OR
CRANDALL ENGINEERING / ENGLOBE DISCLOSED IN CONNECTION WITH ANY WORK
OTHER THAN THE PROJECT FOR WHICH THEY
133 Prince William Street HAVE BEEN PREPARED, IN WHOLE OR PART,
Saint John, NB, E21- 2135 WITHOUT PRIOR WRITTEN AUTHORIZATION OF
BRACKISH DESIGN STUDIO INC.
36 "
O
ENTRY SIGNAGE /
CIVIC ADDRESS
IDENTIFICATION
wr
SCALE
E T H O S R I D G E 1:7-10 M U N I C I P A L P L A N
R E T I R E M E N T DATE A M E N D M E N T
2020 DEC. 4
Saint John, NB DRAWN BY
177
PELTON ROAD
I
I
I II NATURALIZED
BUFFER PLANTING
(NATIVE TREES AND
SHRUBS)
EXISTING MIXED
WOODLAND TO BE
PRESERVED
CANOE `
LAUNCH
F 1 L
L
r
l #
I RIVERSIDE TRAIL �1 '
4t TERRACED
GARDENS WITH ti
PATH AND SEATING
+ RIVERSIDE
ti TERRACE +
t �
L �
t
h
WALKOUT
TERRACES �r
J
KENNEBECASIS
RIVER
f
EXISTING
WOODLAND BUFFER
TO BE PRESERVED
EXISTING
SOFTWOOD BUFFER
TO BE PRESERVED
GREENHOUSE
KITCHEN
GARDEN
WALKOUT;`
TERRACES
f
{,
P
�
_
ORANGERIE/
BOSQUE
WINTERGARDEN
-
EXISTING
SOFTWOOD
BUFFER
—
FIRESIDE
CAFE
_
' `
PLAZA
PATIO
NTRYJ
,
PLAZAi
TERRACE f,
PLANTING
EXISTING
SOFTWOOD j
BUFFER TO j
BE
PRESERVED 1
0
PROPERTY LINE
ti EXISTING MIXED
WOODLAND TO BE
WORKSHOP PRESERVED
t
ti
POOLSIDE j MEADOW
DECK LOOP
TRAIL • . °
�' — — PROPERTY LINE
— LAWN STEPS
NATURALIZED
BUFFER PLANTING
(NATIVE TREES AND
SHRUBS)
i
NOTES:
1. FOR SITE CIRCULATION, DRAINAGE FEATURES, LOT
DIMENSIONS, SETBACKS, AND PROPOSED GRADES, SEE
DRAWING L-01 (SITE PLAN)
8
P R E L I M I NARY : NOT FOR CONSTRUCTION
7
THIS
ONL DRAWING Is FOR INFORMATIONAL PURPOSES
ONLY AND IS NOT INTENDED FOR
BRACKISH DESIGN STUDIO INC.
A R C H I T E C T
C I V I L, S T R U C T U R A L A N D E L E C T R I C A L
6
204-1521 GRAFTON STREET
E N G I N E E R S
CONSTRUCTION. DO NOT START CONSTRUCTION
WITHOUT A SEALED SET OF CONSTRUCTION
5
HALIFAX NS B3J 2139 T 902.422.7216
ACRE ARCHITECTS
DOCUMENTS.
ALL RIGHTS RESERVED. THE DRAWINGS,
4
5
o r a c s www. b ra c k i S h.ca
87 Canterbury Street, Suite 301
Saint John, NB E21- 2C7
DESIGNS, AND IDEAS EMBODIED THEREIN ARE
PROPERTY OF BRACKISH DESIGN STUDIO INC. AND
4
SHALL NOT BE COPIED, REPRODUCED, OR
G ARCHITECTS
CRANDALL ENGINEERING / ENGLOBE
DISCLOSED IN CONNECTION WITH ANY WORK
OTHER THAN THE PROJECT FOR WHICH THEY
1
310 Spadina Avenue, Suite 303
133 Prince William Street
HAVE BEEN PREPARED, IN WHOLE OR PART,
Toronto, ON, M5T 2E8
Saint John, NB, E21- 2135
WITHOUT PRIOR WRITTEN AUTHORIZATION OF
BRACKISH DESIGN STUDIO INC.
ISSi
E T H O S R I D G E
R E T I R E M E N T
Saint John, NB
0I
Q
O
F-
_z
O
0
z
Q
U
S C A L E
1 : 7 5 0 M U N I C I P A L P L A N
DATE A M E N D M E N T
9
'1
3
6
a
c
r
e
S
0
architects
310 Spadina Avenue, Suite 303 1 Toronto, ON M5T 2E8
www.garchitects.ca 1 (416) 937-7733 1 hello@garchitects.ca
LEGEND
❑ 1.0-ILISL
❑ 2.0 -AMENITY AREAS
FA4.0 -SUPPORT AREAS
11 5.0 -VERTICAL CIRCULATION
# date: revision:
rNOFOR
CONSTRUCTION
Ethos Ridge
Saint John, New Brunswick
LEVEL 0 - FLOOR PLAN
by:
All drawing and specifications
are the property of the
Architect. The Contractor shall
verify all dimensions and
information on site and report
any discrepancy to Architect
before proceeding.
PN
scale: 1 : 150
drawn by: Cv
reviewed by: PG
job number: 20005
plot date: 2020-12-04 10:38:01 AM
179
drawing number:
P110
9
'1
3
6
a
c
r
e
0
0
co
lcl-
FITNESS
189 M2 (2033 ft2)
I
I
I
I
I
I
I
I
I
RECEPTION &
TUCK SHOP
41 M2 (446 ft2)
MAIN
ENTRANCE
architects
310 Spadina Avenue, Suite 303 1 Toronto, ON M5T 2E8
www.garchitects.ca 1 (416) 937-7733 1 hello@garchitects.ca
LEGEND
❑ 1.0-ILISL
❑ 2.0 -AMENITY AREAS
❑ 3.0 -ADULT DAY PROGRAM
❑ 4.0 -SUPPORT AREAS
❑ 5.0 -VERTICAL CIRCULATION
# date: revision:
(NOT FOR
CONSTRUCTION
Ethos Ridge
Saint John, New Brunswick
LEVEL 1 - FLOOR PLAN
by:
All drawing and specifications
are the property of the
Architect. The Contractor shall
verify all dimensions and
information on site and report
any discrepancy to Architect
before proceeding.
PN
scale: 1 : 150
drawn by: CV
reviewed by: PG
job number: 20005
plot date: 2020-12-04 10:38:04 AM
drawing number:
P11
0650
............
18300
60
o
00
2 BEDROOM 0000
S03
20 DROOM
030�
STUDIO STAIR A
o
STUDIO (Y30 N
2 BEDROOM 0
1 BEDROOM
1 BEDROOM o
10500 2 BEDROOM
STAIR D
o
106s 1 BEDROOM o
0
BEDROOM
y
_EDROOM
�00 2 BEDR00
0 1 BEDROOM +
STUDIO
DEN o
11 o
0so
0 1 BEDROOM
1 BEDROOM +
DEN LOUNGE
116 M2 (1244 ft2)
1000
ELEV-4
M&E
90 40m (428ft) LEV- LOUNGE M&E
00 75 m2 (803 ft2) LEV- 47 inz (506 W)
ELEV-2
M 1 BEDROOM 1 BEDROOM Cy') 00 00 �V �� cA
BEDROOM + 1 BEDROOM
� DEN
o �
0 0
CD
00 1 BEDROOM 1 BEDROOM
o00
co
co
co 1 BEDROOM + 1 BEDROOM
DEN
o 4
co STUDIO
1 BEDROOM + o ;
0
I
CY) O
O
1 BEDROOM
2 BEDROOM
o
00
STUDIO �, o
1 BEDROOM + CD
CD
rn �. O
STAIR C 2 BEDROOM
o 2 BEDROOM
U
CD
o =�
2 BEDROOM o
1 BEDROOM +
STAIR B
� C.r
O
2 BEDROOM
1 BEDROOM +
18600
9 '1 3 6
acre
architects
310 Spadina Avenue, Suite 303 1 Toronto, ON M5T 2E8
www.garchitects.ca 1 (416) 937-7733 1 hello@garchitects.ca
LEGEND
❑ 1.0-ILISL
❑ 2.0 -AMENITY AREAS
❑ 4.0 -SUPPORT AREAS
5.0 -VERTICAL CIRCULATION
# date: revision: by:
All drawing and specifications
are the property of the
NOT FOR
Architect. The Contractor shall
verify all dimensions and
CONSTRUCTION information on site and report
any discrepancy to Architect
before proceeding.
Ethos Ridge
Saint John, New Brunswick
LEVEL 2 - FLOOR PLAN
PN
scale: 1 : 150
drawn by: CV
reviewed by: PG
job number: 20005
plot date: 2020-12-04 10:38:07 AM
drawing number:
P112
181
9
'1
3
6
a
c
r
e
2 BEDR00
M&E
40 m2 (428 ft2)
1 BEDROOM
O
O
O
O
co
co
co
DROOM
ME
47 mz (506 ft2)
18300
STAIR A
architects
310 Spadina Avenue, Suite 303 1 Toronto, ON M5T 2E8
www.garchitects.ca 1 (416) 937-7733 1 hello@garchitects.ca
LEGEND
❑ 1.0-ILISL
❑ 2.0 -AMENITY AREAS
❑ 4.0 -SUPPORT AREAS
5.0 -VERTICAL CIRCULATION
# date: revision:
by:
All drawing and specifications
(IN 0 T F 0 R are the property of the
Architect. The Contractor shall
verify all dimensions and
CONSTRUCTION information on site and report
any discrepancy to Architect
before proceeding.
Ethos Ridge
Saint John, New Brunswick
LEVEL 3 - FLOOR PLAN
PN
scale:
1 : 150
drawn by:
CV
reviewed by:
PG
job number:
20005
plot date:
2020-12-04 10:38:11 AM
drawing number:
P113
WIN
0650
18300
0600
0
2 BEDROOM 6600
s63
20
DROOM
STUDIO 6300 STAIR A
o
STUDIO 63 N
2 BEDROOM 00
1 BEDROOM 1 BEDROOM
o
106-00 2 BEDROOM
STAIR D
o
1065 1 BEDROOM o
0
BEDROOM
_EDROOM
y
�60 2 BEDROOM
0 1 BEDROOM + STUDIO
DEN o
" o
060
0 1 BEDROOM
1 BEDROOM +
DEN LOUNGE
116 m2 (1244 ft2)
9000
ELEV-4
M&E
90 40m (428ft) LEV- LOUNGE M&E
2 2
0 75 m2 (803 ftZ) LEV- 47 m (506 ft )
ELEV-2
M 1 BEDROOM 1 BEDROOM M
00
I BEDROOM + 1 BEDROOM
ail y 00 _
DEN
o �
0 0
00 1 BEDROOM 1 BEDROOM 0
o
ry
coco
1 BEDROOM + 1 BEDROOM
DEN
CD
co STUDIO
1 BEDROOM + o ;
0
I
� O
O
1 BEDROOM
2 BEDROOM
o
00
co STUDIO �, o
1 BEDROOM + o
CD
L' STAIR C 2 BEDROOM
o 2 BEDROOM
LO
CD
o =
2 BEDROOM o
LO
1 BEDROOM +
STAIR B 'o
g C.r
O
\\ 2 BEDROOM
1 BEDROOM +
18600
9 '1 3 6
acre
architects
310 Spadina Avenue, Suite 303 1 Toronto, ON M5T 2E8
www.garchitects.ca 1 (416) 937-7733 1 hello@garchitects.ca
LEGEND
❑ 1.0-ILISL
❑ 2.0 -AMENITY AREAS
❑ 4.0 -SUPPORT AREAS
5.0 -VERTICAL CIRCULATION
# date: revision: by:
All drawing and specifications
are the property of the
NOT FOR
Architect. The Contractor shall
verify all dimensions and
CONSTRUCTION information on site and report
any discrepancy to Architect
before proceeding.
Ethos Ridge
Saint John, New Brunswick
LEVEL 4 - FLOOR PLAN
PIN
scale:
1 : 150
drawn by:
CV
reviewed by:
PG
job number:
20005
plot date:
2020-12-04 10:38:14 AM
drawing number:
P114
183
OVOa 1NIOd AONVS
I
I
I
.n I
•�,av -
_1 T
------------------
NOV913S 1V1N3WN0211nN3 WOE
-----
•1
afi,
—
a�
a�
a3Na SISV0399NN3N
184
-------------------
N3VB138 IVIN3NNOUIAN3 WOE
185
-"A%
Vcrandalloflb
�. crandaIIengineering.ca
englobecorp.com
Englobe
Ethos Ridge Development
Traffic Impact Study
PROJECT NO. 2000116
Prepared by:
Approved by:
Adriana Teran, P. Eng.
Traffic Engineer
Crandall, a Division of Englobe
Peter Allaby, P. Eng., M.A.Sc.
Senior Transportation Engineer
Crandall, a Division of Englobe
T 506.693.5893 • F 506.693.3250 • adriana.teran@englobecorp.com
133 Prince William St, Suite 703 • Saint ohn (NB) • Canada E2L 2135
Table of Contents
1.0
Introduction....................................._..........................................................1
1.1 BACKGROUND...................................................................................1
1.2 STUDY TASKS.....................................................................................
2
1.3 HORIZON YEAR... ..............................................................................
2
2.0
Information Gathering................................................................................
3
2.1 STREET AND DEVELOPMENT ACCESS CHARACTERISTICS .................
3
2.2 TRAFFIC DATA...................................................................................
3
3.0
Traffic Generation and Assignment............................................................
5
4.0
Level of Service Analysis.............................................................................
7
4.1 LEVEL OF SERVICE CRITERIA..............................................................
7
5.0
Access Considerations................................................................................. 11
6.0
Summary and Conclusions.......................................................................... 14
Tables
Table 1— Traffic Generation for the Proposed Development...........................................................5
Table 2 — Development Traffic Assignment Distribution...................................................................5
Table 3 — intersection Level of Service Criteria.................................................................................7
Table 4 — 2026 Background and Projected Conditions Level of Service Results................................9
Table 5 - Sight Distance Criteria......................................................................................................11
Table 6 - Sight Distance Measurement Summary ...........................................................................12
Figures
Figure1-- 5ite Location Plan.............................................................................................................1
Figure 2 — 2026 Background Traffic Volumes....................................................................................4
Figure 3 — 2026 Traffic Volumes with Development in Place............................................................6
Figure 4—Sight Distance along Sandy Point Road..........................................................................13
Appendices
Appendix A
Development Site Plan
Appendix 8
Traffic Counts
Appendix C
Synchro LOS Results
Appendix D
Sight Distance Photos of Sandy Point Road
OpROFE 51.
64 New
Pr�r c A1St�y
cO
•UHIM,9P��
!of24
Crandall, a division
of Englobe Corp.
187
Subject: Ethos Ridge Development Traffic Study February 12, 2021
INTRODUCTION
1.1 BACKGROUND
The Ethos Ridge development is proposed in the north end of Saint John, NB between Westmount Drive
and Sandy Point Road. The development will consist of a senior adult housing complex with approximately
115 units. The development will be accessible through an access driveway proposed off Sandy Point Road.
Ethos Ridge is expected to open in the year 2021. The proposed development location is shown below in
Figure 1 and the development site plan is provided in Appendix A.
As part of the development approval process, the City of Saint John has requested that a Traffic Impact
Study (TIS) be completed for this development. The City's primary concern is to determine how the new
development could impact traffic flow and the location of the proposed access and if it meets industry
standards. The Study Area for this TIS includes the intersection of Westmount Drive/Sandy Point Road and
Sandy Point Road/Foster Thurston Drive in the vicinity of the development site.
Figure 1 —Site Location Plon
1 of 24
Crandall, a division
of Englobe Corp. 188
i
I
Subject: Ethos Ridge Development Traffic Study February 12, 2021
1.2 STUDY TASKS
Them a in objectives of this TIS were to estimate how much traffic would be generated by the new
development, determine what impacts this new traffic would have on the surrounding street network, and
evaluate the access to Sandy Point Road. The following activities were undertaken as part of this study:
• The Study Team visited the site on Wednesday, April 15t", 2020;
• Existing traffic volumes were estimated from existing data collection at nearby intersections, and
the projection of traffic volumes based on development in the area. Note that a new traffic count
was not completed given that results would be unreliable due to COVID-19 restrictions;
• The 2020 traffic volumes were projected forward to 2026 by applying a 1.0% annual growth rate;
• ITE Trip Generation rates were used to estimate the amount of traffic that will be generated by the
new development. These were added to the background traffic volumes to estimate the 2026 total
traffic volumes with the development in place;
• A LOS analysis was completed for the Study Area using the 2026 background traffic volumes
without the development and the 2026 projected traffic volumes with the development in place;
• A sight distance analysis was completed to determine if the driveway access to Sandy Point Road
meets Transportation Association of Canada (TAC) guidelines;
• Alternative access location to the development site was reviewed; and
• The methodology, findings, and recommendations of the TIS were documented in this written
report.
1.3 HORIZON YEAR
A 5-year horizon period was utilized for the analysis. Should all approvals be granted it is expected that the
proposed development will be fully operational in 2021, therefore 2026 was chosen as the future horizon
year for the analysis.
Crandall, a division
of Engiobe Corp. 189
2of24
r, �.
Subject: Ethos Ridge Development Traffic Study February 12, 2021
2.0 INFORMATION GATHERING
2.1 STREET AND DEVELOPMENT ACCESS CHARACTERISTICS
Sandy Point Road is classified as a local street within the Study Area and mostly serves residential lots and
local neighborhood streets. Sandy Point Road intersects Westmount Drive at a stop -controlled intersection,
where stop signs are located on the southbound and eastbound approaches, a yield sign is located on the
westbound approach and the northbound approach is free flow. Sandy Point Road forms the south and east
legs of the intersection while Westmount Drive forms the north leg and Kennebecasis Drive forms the west
leg. All intersection approaches have a single lane.
Sandy Point Road (east) has a narrow 6.Om paved surface with narrow gravel shoulders, is striped, and has a
speed limit of 50 km/h. There are no sidewalks present on either side of the roadway including directly in
front of the development site. The Annual Average Daily Traffic (AADT) volume on Sandy Point Road (east)
near the site is estimated to be approximately 600 vehicles per day. The Annual Average Daily Traffic (AADT)
volume on Sandy Point Road (south) is estimated to be approximately 1,510 vehicles per day.
Westmount Drive is classified as a local street. Westmount Drive features curb and gutter along both sides
and has a speed limit of 50 km/h. A small number of large single-family residents are located off the
roadway. There are no sidewalks present on either side of the road. The Annual Average Daily Traffic (AADT)
volume on Westmount Drive is approximately 130 vehicles per day.
2.2 TRAFFIC DATA
Traffic patterns have decreased significantly due to the current Covid-19 pandemic. The Study Team
determined any data collected in the current situation would not be representative of an average work day,
therefore; new traffic counts at the intersection of Sandy Point Road and Westmount Drive were not
collected. As an alternative, intersection traffic volumes were estimated using traffic data previously
collected by the City at the intersection of Sandy Point Road and Foster Thurston Drive (2015), and data
collected by Crandall further west at Kennebecasis Drive and Millidge Avenue (2017). The Sandy Point Road
at Foster Thurston Drive 2015 traffic volumes were grown by 10% to meet current day volumes. Traffic
volumes were also predicted along Westmount Drive and Sandy Point Road (east) based on trip estimations
of the existing developments using the ITE TripGen Web -based App, which is based on the loth Edition of
the Institute of Transportation Engineer's (ITE) Trip Generation Manual. Using the previous traffic counts
and ITE predicted volume counts, the Study Team assembled traffic data at the Study Area intersections.
These traffic data were projected forward to estimate the background 2026 volumes using a 1.0% annual
growth rate. The 2026 background traffic volumes for the morning and evening peak hours used in the
analysis are shown in Figure 2. The 2020 traffic volume estimates are included in Appendix B.
3of24
Crandall, a division
of Engiobe Corp. 190
Subject: Ethos Ridge Development Traffic Study
February 12, 2021
Figure 2 — 2026 Background Traffic Volumes
LEGEND:
f- XXX AM PEAT( HOUR VOLUME 4 YIELD SIGN
f-(X C}C) PM PEAK HOUR VOLUME r) STOP SIGN
4of24
Crandall, a division
of Englobe Corp. 191
Subject: Ethos Ridge Development Traffic Study February 12, 2021
3.0 TRAFFIC GENERATION AND ASSIGNMENT
Trip generation rates for the proposed development were estimated using the ITE TripGen Web -based
App, which is based on the 101" Edition of the Institute of Transportation Engineer's (ITE) Trip Generation
Manual. The Developer provided information regarding the size and type of development that is planned.
The development will consist of 115 senior adult housing units.
ITE Land Use #252 (Senior Adult Housing - Attached) was used to generate trips for the development.
The resulting vehicle trip generation is shown in Table 1. No reductions to these trip rates were made to
account for trips made by bus or active modes. This represents a worst -case scenario in terms of traffic
generation.
Table 1 — Traffic Generation for the Proposed Development
Senior Adult Housing 115 Units 8 15 23 16 14 30 437
(ITE Land Use #252)
The development traffic was added to Sandy Point Road and Kennebecasis Drive on the distributions
shown below in Table 2. These distributions were determined based on existing traffic volume
distributions along the street.
Table 2 — Development Traffic Assignment Distribution
South (via SANDY POINT RD) 84%
West (via KENNEBECASIS DR) 16%
North (via SANDY POINT RD) 84%
East (via KENNEBECASIS DR) 16%
The peak hour traffic volumes for the 2026 horizon year were estimated by adding the development
traffic to the 2026 background traffic volumes. The 2026 traffic volumes with the development in place
are shown in Figure 3. No other known developments are planned near the Study Area at this time.
5 of 24
Crandall, a division
of Engiobe Corp. 192
Subject: Ethos Ridge Development Traffic Study
February 12, 2021
Figure 3 — 2026 Traffic Volumes with Development in Place
LEGEND:
f- XXX AM PEAK HOUR VOLUME -1 MELD SIGN
#+(XY,X) PM PEAK HOUR VOLUME STOP SIGN
6 of 24
Crandall, a division
of Englobe Corp. 193
i
Subject: Ethos Ridge Development Traffic Study February 12, 2021
CKI» Vie]SMATI"11\I-M&W
Level of Service (LOS) analyses were completed using Synchro traffic modelling software for the future 5-
year (2026) traffic conditions at the primary development access with the development in place. The
findings are discussed in this section.
4.1 LEVEL OF SERVICE CRITERIA
The LOS analyses were completed with Synchro 10, which is a traffic analysis software that uses the
Highway Capacity Manual and Intersection Capacity Utilization procedures.
The intersection performance was evaluated mainly in terms of the level of service (LOS), which is a
common performance measure of an intersection. The LOS is determined based on vehicle delay and is
expressed on a scale of A through F, where LOS A represents very short delay (<10 seconds per vehicle)
and LOS F represents very long delay (>50 seconds per vehicle at a stop controlled intersection and >80
seconds per vehicle at a signalized intersection). A LOS D is often considered acceptable in urban
locations; however, some communities will accept a LOS E. The LOS criteria for both signalized and stop
control intersections are shown in Table 3.
Table 3 — Intersection Level of Service Criteria
Control
Delay (seconds
per
vehicle)
Signalized
Stop
Controlled
Intersections
Intersections
A Very low delay; most vehicles do not stop (Excellent)
less than 10.0
B Higher delay; more vehicles stop (Very Good)
between 10.0 and
20.0
Higher level of congestion; number of vehicles
between 20.0 and
C stopping is significant, although many still pass
35.0
through intersection without stopping (Good)
Congestion becomes noticeable; vehicles must
between 35.0 and
D sometimes wait through more than one red light;
55.0
many vehicles stop (Satisfactory)
Vehicles must often wait through more than one red
between 55.0 and
E light; considered by many agencies to be the limit of
80.0
acceptable delay
This level is considered to be unacceptable to most
F drivers; occurs when arrival flow rates exceed the
greater than 80.0
capacity of the intersection (Unacceptable)
less than 10.0
between 10.0 and
15.0
between 15.0 and
25.0
between 25.0 and
35.0
between 35.0 and
50.0
greater than 50.0
In addition to the LOS criteria described above, the volume to capacity (v/c) ratio, the 951h percentile
queue length, and the average delay were reported for each turning movement.
The analysis results for the 2026 background traffic conditions at Sandy Point Road/Westmount Drive
without the development in place were summarized in Table 4. The analysis revealed all overall
intersection operations during both the AM and PM peak hours operate at an excellent LOS A with no
operational deficiencies were identified. Sandy Point Road/Foster Thurston Drive intersection was also
7 of 24
Crandall, a division
of Englobe Corp. 194
i
i
Subject: Ethos Ridge Development Traffic Study
February 12, 2021
analysed and results and provided in Table 4. While the overall intersections are performing excellently,
the stop -controlled approaches at Sandy Point Road/Foster Thurston Drive intersection are performing at
a satisfactory LOS D.
The analysis results for the 2026 projected traffic conditions with the development at the Sandy Point
Road/Westmount Drive intersection would perform similarly to the 2026 background traffic conditions.
The access driveway at Sandy Point Road would also operate at an excellent LOS A during both peak
hours and no operational deficiencies were identified. Overall, the intersection of Sandy Point
Road/Foster Thurston Drive is projected to operate with a 0.2-0.8 second delay increase during the peak
hours due to the development. Model outputs for both 2026 background and 2026 projected conditions
are provided in Appendix C.
8of24
Crandall, a division
of Engiobe Corp. 195
Subject: Ethos Ridge Development Traffic Study February 12, 2021
Table 4 — 2026 Background and Proiected Conditions Level of Service Results
Turning Movement LOS
Average Delay (seconds per vehicle)
Intersection
Overall LOS
[Volume to Capacity Ratio (v/c)]
&
95t" Percentile Queue (m)
Delay
(sec/veh)
Eastbound
Westbound
Northbound
Southbound
East-West Street @
Traffic
Time
L
T
R
L
T R
L T
R
L
T
R
North -South Street
Control
Period
41
1
e
41
t
41 t
41
t
2026 Background Conditions (without development)
A
B
A
A
AM Peak
LOS A
Shared
8.7
Shared
Shared
10.1
Shared
5.3
Shared
Shared
Shared
0.0
Shared
6
10.071
[0.06]
10.021
10 01
Sandy Point Rd @
2
2
1
0
A
B
A
A
Westmount Dr
PM Peak
LOSA
Shared
8.7
Shared
Shared
10.5 Shared
Shared 4.5
Shared
Shared
0.0
Shared
6.1
[0.04]
[0.04]
[0.05]
[0.0]
1
1
1
0
A
A
D
D
AM Peak
LOS A
Shared
1.7
Shared
Shared
0.0
Shared
29.9
Shared
Shared
Shared
27. 9
Shared
2.9
[0.03]
[0.0]
[0.03]
[0.42]
Sandy Point Rd @
1
1
1
16
A
A
B
C
Thurston Dr
PM Peak
L� 3A
Shared
1.4
Shared
Shared
0.1 Shared
Shared 13.6
Shared
Shared
24.2
Shared
[0.06]
[0.0]
[0.01]
[0.25]
1
1
1
8
2026 Projected Conditions (with development)
A
B
A
A
AM Peak
LOS A
Shared
8.7
Shared
Shared
10.2
Shared
4.6
Shared
Shared
Shared
0.0
Shared
5
10.071
10.081
10.021
10 01
Sandy Point Rd @
®'
2
2
1
0
A
B
A
A
Westmount Dr
PM Peak
LOS
Shared
9.0
Shared
Shared
10.7 Shared
Shared 4.1
Shared
Shared
0.0
Shared
6 1A
[0.04]
[0.07]
[0.05]
1
[0.0]
1
2
1
0
9 of 24
196
Subject: Ethos Ridge Development Traffic Study
February 12, 2021
Turning Movement LOS
Average Delay (seconds per vehicle)
Intersection
Overall LOS
[Volume to Capacity Ratio (v/c)]
&
95th Percentile Queue (m)
Delay
(sec/veh)
Eastbound
Westbound
Northbound
Southbound
East-West Street @
Traffic
Time
L
T
R
L
T R
L T
R
L
T
R
North -South Street
Control
Period
41
t
41
f
41 f
41
1
e
A
A
A
A
AM Peak
LOS A
Shared
2.8
-
0.0 Shared
-
8.6
8.6
2.5
[0.01]
[0.03]
[0.02]
[0.02]
Sandy Point Rd @
1
<1
1
1
A
A
A
A
Access Driveway
PM Peak
LOS A
Shared
2.0
0.0 Shared
8.5
8.5
2.4
[0.01]
[0.02]
[0.01]
[0.01]
1
<1
1
1
A
A
D
D
AM Peak
LOS A
Shared
1.8
Shared
Shared
0.0
Shared
30.1
Shared
Shared
Shared
32.9
Shared
3.7
[0.03]
10.01
[0.03]
[0.51]
Sandy Point Rd @
1
1
1
21
A
A
B
C
Thurston Dr
PM Peak
LOS A
Shared
1.6
Shared
Shared
0.1
Shared
13.6
Shared
Shared
Shared
24.1
Shared
2.7
[0.071
[0.0]
[0.01]
10 29]
2
1
1
9
10of24
197
Subject: Ethos Ridge Development Traffic Study February 12, 2021
5.0 ACCESS CONSIDERATIONS
This section provides a summary of the access considerations that were reviewed for the development.
The proposed access is located on the south end of the development site, on the north side of Sandy
Point Road. To satisfy sight distance requirements, it is recommended to locate the proposed access
approximately 270.Om north of the Sandy Point Road/Westmount Drive intersection where an existing
residential driveway is located. The existing residential driveway should be relocated to the east on Sandy
Point Road a minimum of 5.Om from the development access
SIGHT DISTANCE ANALYSIS:
A sight distance analysis was completed using the guidelines set forth in TAC's Geometric Design Guide for
Canadian Roads (2017). Table 9.9.4 of the TAC guideline provides minimum stopping sight distances for
various posted speed limits. To be conservative in this analysis, a design speed of 60 km/h was selected
(posted speed plus 10 km/h).
The TAC Guidelines require 130m of turning sight distance be provided for vehicles turning left onto a
roadway for a 60 km/h design speed and 110m of turning sight distance be provided for vehicles turning
right onto a roadway with a 60km/h design speed. The minimum required stopping sight distance is 85m
on Sandy Point Road for a 60 km/h design speed.
TAC Guidelines use a driver eye height of 1.08m, an object height of 1.30m when measuring turning sight
distance and an object height of 0.60m when measuring stopping sight distance. In summary the
following criteria were applied in this analysis:
Table 5 - Sight Distance Criteria
Design Speed
Minimum Turning Sight Distance (TSD) Required for left turn
Minimum Turning Sight Distance (TSD) Required for right turn
Minimum Stopping Sight Distance (SSD) Required
Driver Eye Height
Object Height
Location of Approaching Vehicle
Driver Eye Location at Access
60 km/h
130m
110 m
F.W11
1.08m
0.60m for stopping sight distance
1.30m for turning sight distance
1.0m from centerline of roadway
4.4m from edge of lane, centered on
access
Sight distances were measured on site and using aerial mapping and topographic survey. Measured sight
distances are shown in Figure 4 and the results are summarized in Table 6 and discussed as follows:
At the Access Driveway, the existing sight distance to the west on Sandy Point Road is measured at
approximately 255.Om and exceeds the minimum turning sight distance for left turns of 130m and the
minimum stopping sight distance of 85m for a 60 km/h design speed. The sight distance to the east is
approximately 160.6m which exceeds the minimum turning sight distance for left turns of 130m and the
stopping sight distance of 85m. Vertical constraints were difficult to perceive to the east of the access
11of24
Crandall, a division
of Engiobe Corp.
•1
Subject: Ethos Ridge Development Traffic Study
February 12, 2021
driveway and so Sandy Point Road profile was recorded and a sight distance analysis performed which is
shown in Appendix D. The vertical curvature of Sandy Point Road shows an average slope of 8.5% to the
east of the site and an average slope of 3.1% west of the site. Sight distances and roadway curvature to
the east and west of Sandy Point Road access driveway are shown in the site photos in Appendix E.
Table 6 - Sight Distance Measurement Summary
Sight Distance to the West 255.Om 85m 130m Yes Yes
Sight Distance to the East 160.6m 85m 130m Yes Yes
12of24
Crandall, a division
of Engiobe Corp. 199
.4 '106
LESS oR1VEWAY
r
yii 2rfi err)
4m OFFSET FROM
EL7GE OF ROAD
i� ten' �i���� .� __ _ � • i
tk
- - - n': '� r �� ._ _ .•�,.' � � . �:. �' ' ���_ .. :mot` �' y ,
-1%
Crandall
z division of Ingloba
6.0 SUMMARY AND CONCLUSIONS
Grand al leng ineering.ca
eng lobecorp.com
M Englobe
The key findings and recommendations of this Traffic Impact Study are summarized as follows:
The Ethos Ridge development is proposed in Saint John, NB between Westmount Drive and
Sandy Point Road. The development will consist of a senior adult housing complex with
approximately 115 units. The development would be accessible through an access driveway
proposed off Sandy Point Road. Ethos Ridge is expected to open in the year 2021.
2. It is expected that the proposed development would generate 23 vehicle trips in the AM Peak
hour (8 entering/15 exiting), 30 vehicle trips in the PM Peak hour (16 entering/14 exiting), and
437 vehicles daily.
It is recommended to locate the development access approximately 270 m east of the Sandy
Point Road/Westmount Drive intersection as this location would satisfy the minimum turning
sight distance of 130m and stopping sight distance of 85m. It is recommended the existing
residential driveway at this location be relocated east by at least 5.0m, the minimum driveway
separation.
4. The LOS results for the 2026 horizon period with the development in place suggest that the trips
generated by the proposed development would not be expected to have a significant impact on
traffic operations along Sandy Point Road. Increases in delay at the Sandy Point Road/Westmount
Drive intersection would be marginal. No transportation infrastructure improvements would be
required as a result of the proposed development.
The Sandy Point Road/Foster Thurston Road intersection was also analysed. Impacts to the
intersection delays caused by development traffic would be negligible. The intersection would
continue to operate at an excellent LOS A and all individual turning movements would remain
well below capacity. The City has previously identified this intersection as a candidate for
upgrades to address sight distance issues. Timing of the upgrades are not known at this time.
We trust the enclosed to your satisfaction. If, however, additional information should be required, please
communicate with the undersigned.
Yours very truly,
Adriana Teran, P.Eng
Traffic Engineer
Crandall, a division ,
of Englobe Corp.
201
14 of 24
Crandall
a division of Englobe
APPENDIX A — DEVELOPMENT SITE PLAN
c ra n d a I leng i neeri n 9.ca
englobecorp.com
r•, E.ng]obe
202
203
Subject: Ethos Ridge Development Traffic Study
APPENDIX B - TRAFFIC COUNTS
May 22, 2020
204
Sandy Point Rd/Westmount Dr/Kennebecasis Dr
AM Peak Hour 8:00-9:00
205
PM Peak Hour 16:00-17:00
m
Sandy Point Rd/Foster Thurston Dr
AM Peak Hour 8:00-9:00
207
PM Peak Hour 16:00-17:00
0
Subject: Ethos Ridge Development Traffic Study
APPENDIX C - SYNCHRO LOS RESULTS
May 22, 2020
209
Ethos Ridge TIS 2026 Background Conditions
1: Sandy Point Rd & Kennebecasis Dr & Westmount Dr Timing Plan: AM Peak
-11 --1. 4--- t t
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h)
2
3
62
34
6
0
31
1
11 0
8
2
Future Volume (Veh/h)
2
3
62
34
6
0
31
1
11 0
8
2
Sign Control
Yield
Stop
Free
Free
Grade
0%
0%
0%
0%
Peak Hour Factor
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92 0.92
0.92
0.92
Hourly flow rate (vph)
2
3
67
37
7
0
34
1
12 0
9
2
Pedestrians
Lane Width (m)
Walking Speed (m/s)
Percent Blockage
Right turn flare (veh)
Median type
None
None
Median storage veh)
Upstream signal (m)
pX, platoon unblocked
vC, conflicting volume
88
91
10
154
86
7
11
13
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
88
91
10
154
86
7
11
13
tC, single (s)
7.1
6.5
6.2
7.1
6.5
6.2
4.1
4.1
tC, 2 stage (s)
tF (s)
3.5
4.0
3.3
3.5
4.0
3.3
2.2
2.2
p0 queue free %
100
100
94
95
99
100
98
100
cM capacity (veh/h)
876
782
1071
748
787
1075
1608
1606
Direction, Lane #
EB 1
WB 1
NB 1
SIB 1
Volume Total
72
44
47
11
Volume Left
2
37
34
0
Volume Right
67
0
12
2
cSH
1049
754
1608
1606
Volume to Capacity
0.07
0.06
0.02
0.00
Queue Length 95th (m)
1.8
1.5
0.5
0.0
Control Delay (s)
8.7
10.1
5.3
0.0
Lane LOS
A
B
A
Approach Delay (s)
8.7
10.1
5.3
0.0
Approach LOS
A
B
Intersection Summary
Average Delay
7.6
Intersection Capacity Utilization
24.6%
ICU Level of Service
A
Analysis Period (min)
15
04-15-2020
Synchro 10 Report
Page 1
210
Ethos Ridge TIS 2026 Background Conditions
6: Sandy Point Rd Timing Plan: AM Peak
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h)
20
123
0
0
859
20
3
2
0
23
2
79
Future Volume (Veh/h)
20
123
0
0
859
20
3
2
0
23
2
79
Sign Control
Free
Free
Stop
Stop
Grade
0%
0%
0%
0%
Peak Hour Factor
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
Hourly flow rate (vph)
22
134
0
0
934
22
3
2
0
25
2
86
Pedestrians
Lane Width (m)
Walking Speed (m/s)
Percent Blockage
Right turn flare (veh)
Median type
None
None
Median storage veh)
Upstream signal (m)
pX, platoon unblocked
vC, conflicting volume
956
134
1124
1134
134
1124
1123
945
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
956
134
1124
1134
134
1124
1123
945
tC, single (s)
4.1
4.1
7.1
6.5
6.2
7.1
6.5
6.2
tC, 2 stage (s)
tF (s)
2.2
2.2
3.5
4.0
3.3
3.5
4.0
3.3
p0 queue free %
97
100
98
99
100
86
99
73
cM capacity (veh/h)
719
1451
129
196
915
177
199
318
Direction, Lane #
EB 1
WB 1
NB 1
SIB 1
Volume Total
156
956
5
113
Volume Left
22
0
3
25
Volume Right
0
22
0
86
cSH
719
1451
150
268
Volume to Capacity
0.03
0.00
0.03
0.42
Queue Length 95th (m)
0.8
0.0
0.8
15.9
Control Delay (s)
1.7
0.0
29.9
27.9
Lane LOS
A
D
D
Approach Delay (s)
1.7
0.0
29.9
27.9
Approach LOS
D
D
Intersection Summary
Average Delay
2.9
Intersection Capacity Utilization
59.4%
ICU Level of
Service
B
Analysis Period (min)
15
02-10-2021
Synchro 10 Report
Page 1
211
Ethos Ridge TIS 2026 Background Conditions
1: Sandy Point Rd & Kennebecasis Dr & Westmount Dr Timing Plan: PM Peak
-11 --1. 4--- t t
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h)
1
4
30
22
4
0
70
7
40
0
4 1
Future Volume (Veh/h)
1
4
30
22
4
0
70
7
40
0
4 1
Sign Control
Yield
Stop
Free
Free
Grade
0%
0%
0%
0%
Peak Hour Factor
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92 0.92
Hourly flow rate (vph)
1
4
33
24
4
0
76
8
43
0
4 1
Pedestrians
Lane Width (m)
Walking Speed (m/s)
Percent Blockage
Right turn flare (veh)
Median type
None
None
Median storage veh)
Upstream signal (m)
pX, platoon unblocked
vC, conflicting volume
188
208
4
221
186
30
5
51
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
188
208
4
221
186
30
5
51
tC, single (s)
7.1
6.5
6.2
7.1
6.5
6.2
4.1
4.1
tC, 2 stage (s)
tF (s)
3.5
4.0
3.3
3.5
4.0
3.3
2.2
2.2
p0 queue free %
100
99
97
96
99
100
95
100
cM capacity (veh/h)
741
657
1079
684
675
1045
1616
1555
Direction, Lane #
EB 1
WB 1
NB 1
SIB 1
Volume Total
38
28
127
5
Volume Left
1
24
76
0
Volume Right
33
0
43
1
cSH
999
682
1616
1555
Volume to Capacity
0.04
0.04
0.05
0.00
Queue Length 95th (m)
0.9
1.0
1.2
0.0
Control Delay (s)
8.7
10.5
4.5
0.0
Lane LOS
A
B
A
Approach Delay (s)
8.7
10.5
4.5
0.0
Approach LOS
A
B
Intersection Summary
Average Delay
6.1
Intersection Capacity Utilization
28.1%
ICU Level of Service
A
Analysis Period (min)
15
04-15-2020
Synchro 10 Report
Page 1
212
Ethos Ridge TIS 2020 Background Conditions
2: Sandy Point Rd & Foster Thurston Dr Timing Plan: PM Peak
-11 --1. 4--- t t
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h)
69
668
3
2
203
49
0
0
3
34
0
22
Future Volume (Veh/h)
69
668
3
2
203
49
0
0
3
34
0
22
Sign Control
Free
Free
Stop
Stop
Grade
0%
0%
0%
0%
Peak Hour Factor
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
Hourly flow rate (vph)
75
726
3
2
221
53
0
0
3
37
0
24
Pedestrians
Lane Width (m)
Walking Speed (m/s)
Percent Blockage
Right turn flare (veh)
Median type
None
None
Median storage veh)
Upstream signal (m)
pX, platoon unblocked
vC, conflicting volume
221
729
1129
1102
728
1132
1130
248
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
221
729
1129
1102
728
1132
1130
248
tC, single (s)
4.1
4.1
7.1
6.5
6.2
7.1
6.5
6.2
tC, 2 stage (s)
tF (s)
2.2
2.2
3.5
4.0
3.3
3.5
4.0
3.3
p0 queue free %
94
100
100
100
99
78
100
97
cM capacity (veh/h)
1348
875
168
199
424
171
192
791
Direction, Lane #
EB 1
WB 1
NB 1
SIB 1
Volume Total
804
276
3
61
Volume Left
75
2
0
37
Volume Right
3
53
3
24
cSH
1348
875
424
247
Volume to Capacity
0.06
0.00
0.01
0.25
Queue Length 95th (m)
1.4
0.1
0.2
7.5
Control Delay (s)
1.4
0.1
13.6
24.2
Lane LOS
A
A
B
C
Approach Delay (s)
1.4
0.1
13.6
24.2
Approach LOS
B
C
Intersection Summary
Average Delay
2.3
Intersection Capacity Utilization
72.8%
ICU Level of
Service
C
Analysis Period (min)
15
02-10-2021
Synchro 10 Report
Page 1
213
Ethos Ridge TIS 2026 Projected Conditions
1: Sandy Point Rd & Kennebecasis Dr & Westmount Dr Timing Plan: AM Peak
-11 --1. 4--- t t
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h)
2
4
62
47
8
0
31
1
18
0
8
2
Future Volume (Veh/h)
2
4
62
47
8
0
31
1
18
0
8
2
Sign Control
Yield
Stop
Free
Free
Grade
0%
0%
0%
0%
Peak Hour Factor
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
Hourly flow rate (vph)
2
4
67
51
9
0
34
1
20
0
9
2
Pedestrians
Lane Width (m)
Walking Speed (m/s)
Percent Blockage
Right turn flare (veh)
Median type
None
None
Median storage veh)
Upstream signal (m)
pX, platoon unblocked
vC, conflicting volume
94
99
10
158
90
11
11
21
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
94
99
10
158
90
11
11
21
tC, single (s)
7.1
6.5
6.2
7.1
6.5
6.2
4.1
4.1
tC, 2 stage (s)
tF (s)
3.5
4.0
3.3
3.5
4.0
3.3
2.2
2.2
p0 queue free %
100
99
94
93
99
100
98
100
cM capacity (veh/h)
868
774
1071
742
783
1070
1608
1595
Direction, Lane #
EB 1
WB 1
NB 1
SIB 1
Volume Total
73
60
55
11
Volume Left
2
51
34
0
Volume Right
67
0
20
2
cSH
1043
748
1608
1595
Volume to Capacity
0.07
0.08
0.02
0.00
Queue Length 95th (m)
1.8
2.1
0.5
0.0
Control Delay (s)
8.7
10.2
4.6
0.0
Lane LOS
A
B
A
Approach Delay (s)
8.7
10.2
4.6
0.0
Approach LOS
A
B
Intersection Summary
Average Delay
7.5
Intersection Capacity Utilization
25.9%
ICU Level of Service
A
Analysis Period (min)
15
04-16-2020
Synchro 10 Report
Page 1
214
Ethos Ridge TIS 2026 Projected Conditions
3: Sandy Point Rd & Foster Thurston Dr Timing Plan: AM Peak
-11 --1. 4--- t t
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h)
22
123
0
0
859
26
3
2
0
35
2
81
Future Volume (Veh/h)
22
123
0
0
859
26
3
2
0
35
2
81
Sign Control
Free
Free
Stop
Stop
Grade
0%
0%
0%
0%
Peak Hour Factor
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
Hourly flow rate (vph)
24
134
0
0
934
28
3
2
0
38
2
88
Pedestrians
Lane Width (m)
Walking Speed (m/s)
Percent Blockage
Right turn flare (veh)
Median type
None
None
Median storage veh)
Upstream signal (m)
pX, platoon unblocked
vC, conflicting volume
934
134
1131
1116
134
1131
1130
948
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
934
134
1131
1116
134
1131
1130
948
tC, single (s)
4.1
4.1
7.1
6.5
6.2
7.1
6.5
6.2
tC, 2 stage (s)
tF (s)
2.2
2.2
3.5
4.0
3.3
3.5
4.0
3.3
p0 queue free %
97
100
98
99
100
78
99
72
cM capacity (veh/h)
733
1451
126
201
915
175
197
316
Direction, Lane #
EB 1
WB 1
NB 1
SIB 1
Volume Total
158
962
5
128
Volume Left
24
0
3
38
Volume Right
0
28
0
88
cSH
733
1451
148
253
Volume to Capacity
0.03
0.00
0.03
0.51
Queue Length 95th (m)
0.8
0.0
0.8
21.0
Control Delay (s)
1.8
0.0
30.1
32.9
Lane LOS
A
D
D
Approach Delay (s)
1.8
0.0
30.1
32.9
Approach LOS
D
D
Intersection Summary
Average Delay
3.7
Intersection Capacity Utilization
60.7%
ICU Level of
Service
B
Analysis Period (min)
15
02-10-2021
Synchro 10 Report
Page 1
215
Ethos Ridge TIS 2026 Projected Conditions
2: Sandy Point Rd & Access Rd Timing Plan: AM Peak
--,, -*---
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
4
Traffic Volume (veh/h)
8
14
40
0 0
15
Future Volume (Veh/h)
8
14
40
0 0
15
Sign Control
Free
Free
Stop
Grade
0%
0%
0%
Peak Hour Factor
0.92
0.92
0.92
0.92 0.92
0.92
Hourly flow rate (vph)
9
15
43
0 0
16
Pedestrians
Lane Width (m)
Walking Speed (m/s)
Percent Blockage
Right turn flare (veh)
Median type
None
None
Median storage veh)
Upstream signal (m)
pX, platoon unblocked
vC, conflicting volume
43
76
43
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
43
76
43
tC, single (s)
4.1
6.4
6.2
tC, 2 stage (s)
tF (s)
2.2
3.5
3.3
p0 queue free %
99
100
98
cM capacity (veh/h)
1566
922
1027
Direction, Lane #
EB 1
WB 1
SIB 1
Volume Total
24
43
16
Volume Left
9
0
0
Volume Right
0
0
16
cSH
1566
1700
1027
Volume to Capacity
0.01
0.03
0.02
Queue Length 95th (m)
0.1
0.0
0.4
Control Delay (s)
2.8
0.0
8.6
Lane LOS
A
A
Approach Delay (s)
2.8
0.0
8.6
Approach LOS
A
Intersection Summary
Average Delay
2.5
Intersection Capacity Utilization
17.8%
ICU Level of Service A
Analysis Period (min)
15
04-16-2020
Synchro 10 Report
Page 2
216
Ethos Ridge TIS 2026 Projected Conditions
1: Sandy Point Rd & Kennebecasis Dr & Westmount Dr Timing Plan: PM Peak
-11 --1. 4--- t t
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h)
1
7
30
34
6
0
70
7
53
0
4 1
Future Volume (Veh/h)
1
7
30
34
6
0
70
7
53
0
4 1
Sign Control
Yield
Stop
Free
Free
Grade
0%
0%
0%
0%
Peak Hour Factor
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92 0.92
Hourly flow rate (vph)
1
8
33
37
7
0
76
8
58
0
4 1
Pedestrians
Lane Width (m)
Walking Speed (m/s)
Percent Blockage
Right turn flare (veh)
Median type
None
None
Median storage veh)
Upstream signal (m)
pX, platoon unblocked
vC, conflicting volume
197
222
4
230
194
37
5
66
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
197
222
4
230
194
37
5
66
tC, single (s)
7.1
6.5
6.2
7.1
6.5
6.2
4.1
4.1
tC, 2 stage (s)
tF (s)
3.5
4.0
3.3
3.5
4.0
3.3
2.2
2.2
p0 queue free %
100
99
97
94
99
100
95
100
cM capacity (veh/h)
729
644
1079
671
668
1035
1616
1536
Direction, Lane #
EB 1
WB 1
NB 1
SIB 1
Volume Total
42
44
142
5
Volume Left
1
37
76
0
Volume Right
33
0
58
1
cSH
946
670
1616
1536
Volume to Capacity
0.04
0.07
0.05
0.00
Queue Length 95th (m)
1.1
1.7
1.2
0.0
Control Delay (s)
9.0
10.7
4.1
0.0
Lane LOS
A
B
A
Approach Delay (s)
9.0
10.7
4.1
0.0
Approach LOS
A
B
Intersection Summary
Average Delay
6.1
Intersection Capacity Utilization
29.7%
ICU Level of Service
A
Analysis Period (min)
15
04-16-2020
Synchro 10 Report
Page 1
217
Ethos Ridge TIS 2026 Projected Conditions
8: Sandy Point Rd & Foster Thurston Dr Timing Plan: PM Peak
-11 --1. 4--- t t
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h)
81
668
3
2
203
51
0
0
3
36
0
33
Future Volume (Veh/h)
81
668
3
2
203
51
0
0
3
36
0
33
Sign Control
Free
Free
Stop
Stop
Grade
0%
0%
0%
0%
Peak Hour Factor
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
0.92
Hourly flow rate (vph)
88
726
3
2
221
55
0
0
3
39
0
36
Pedestrians
Lane Width (m)
Walking Speed (m/s)
Percent Blockage
Right turn flare (veh)
Median type
None
None
Median storage veh)
Upstream signal (m)
pX, platoon unblocked
vC, conflicting volume
221
729
1156
1128
728
1159
1158
248
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
221
729
1156
1128
728
1159
1158
248
tC, single (s)
4.1
4.1
7.1
6.5
6.2
7.1
6.5
6.2
tC, 2 stage (s)
tF (s)
2.2
2.2
3.5
4.0
3.3
3.5
4.0
3.3
p0 queue free %
93
100
100
100
99
76
100
95
cM capacity (veh/h)
1348
875
157
190
424
163
183
790
Direction, Lane #
EB 1
WB 1
NB 1
SIB 1
Volume Total
817
278
3
75
Volume Left
88
2
0
39
Volume Right
3
55
3
36
cSH
1348
875
424
263
Volume to Capacity
0.07
0.00
0.01
0.29
Queue Length 95th (m)
1.7
0.1
0.2
9.1
Control Delay (s)
1.6
0.1
13.6
24.1
Lane LOS
A
A
B
C
Approach Delay (s)
1.6
0.1
13.6
24.1
Approach LOS
B
C
Intersection Summary
Average Delay
2.7
Intersection Capacity Utilization
74.4%
ICU Level of
Service
D
Analysis Period (min)
15
02-10-2021
Synchro 10 Report
Page 1
r
Ethos Ridge TIS 2026 Projected Conditions
2: Sandy Point Rd & Access Rd Timing Plan: PM Peak
--,, -*---
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
4
Traffic Volume (veh/h)
16
44
26
0 0
14
Future Volume (Veh/h)
16
44
26
0 0
14
Sign Control
Free
Free
Stop
Grade
0%
0%
0%
Peak Hour Factor
0.92
0.92
0.92
0.92 0.92
0.92
Hourly flow rate (vph)
17
48
28
0 0
15
Pedestrians
Lane Width (m)
Walking Speed (m/s)
Percent Blockage
Right turn flare (veh)
Median type
None
None
Median storage veh)
Upstream signal (m)
pX, platoon unblocked
vC, conflicting volume
28
110
28
vC1, stage 1 conf vol
vC2, stage 2 conf vol
vCu, unblocked vol
28
110
28
tC, single (s)
4.1
6.4
6.2
tC, 2 stage (s)
tF (s)
2.2
3.5
3.3
p0 queue free %
99
100
99
cM capacity (veh/h)
1585
878
1047
Direction, Lane #
EB 1
WB 1
SIB 1
Volume Total
65
28
15
Volume Left
17
0
0
Volume Right
0
0
15
cSH
1585
1700
1047
Volume to Capacity
0.01
0.02
0.01
Queue Length 95th (m)
0.3
0.0
0.3
Control Delay (s)
2.0
0.0
8.5
Lane LOS
A
A
Approach Delay (s)
2.0
0.0
8.5
Approach LOS
A
Intersection Summary
Average Delay
2.4
Intersection Capacity Utilization
19.9%
ICU Level of Service A
Analysis Period (min)
15
04-16-2020
Synchro 10 Report
Page 2
219
Subject: Ethos Ridge Development Traffic Study
May 22, 2020
APPENDIX D - SIGHT DISTANCE ANLAYSIS AND PROFILE OF SANDY POINT ROAD
220
aw,
50
49
48
47
46
45
44
43
42
41
40
39
38
m 37
rm
n 36
ti
O
Z 35
34
33
32
31
30
29
28
27
26
25
24
23
PROPOSED SITE DRIVEWAY CIVIC# 2100
- I RELOCATED RESIDENTIAL DRIVEWAY
/I
SANDY POINT ROAD—�—
_��
o �
w�
\,\
j -Al
dill z
L Q
U
W N0. DATE REVISIONS
U
50
49
48
47
46
45
44
43
42
41
40
39
38
37 Z
0
36 a
W
35 W
34
33
32
31 >
u
30
70
29 >��
mow
28 =QC)
<0
27 =
26 r
m
25
24
23
0+090 0+120 0+150 0+180 0+210 0+240 0+270 222 0+300 0+330 0+360 0+390 0+420
NN
NpN
u1of
Ian
NN
aY
M
0mm10
W 8
1�np
n NN
N
MM
nn
M
u1
M
N
W t010
t0
I�ApN
(O
< N
M
N
01 t010
a0
MM
R,(�N
a
I�
a
I� W
NN
O1
w4J
O�Of
o 00
W wO
MM
m0
W
(AM
N
W
W
0 u1of
m MM
0o
t010
00
N
00
N I�
a<
I�
N
V
Y
M
M h
M M
M M
�p
M M
M M
M Mnl
��0pp1
M M
M M
M M
M M
��pp
M M
M M
,f,((0�ao
M M
M M
M N
M
,+0O
M M
M M
pp
M M
M N
N N
N N
N lOV
N (�`1
N N
N N
N N
N N
N N
N N
N
—
SIGH
DI
�
f—
C9
E
w
a,
rN
\
OF R
\
ZCENTEF
LOCATED
\ \
RESIDENTIAL
DRIVEWAY
3
\
�F
\
\
160.6
APP
XIM
TELY 2
5.0 m
FULL L
N TH
N T S
OWN)
—,"%A
crandall
A DIVISION OF ENGLOBE
TRAFFIC IMPACT STUDY
ETHOS RIDGE DEVELOPMENT
SANDY POINT ROAD PROFILE
INTERSECTION SIGHT
DISTANCE CHECK
5m6=s6EEsmmd -- ---
1.500 Hon—tal (Fall Scale) Checked By Cadd Check
5m6--i6T!--Td -
1:50 Verllcel(Full Scele)
Sheet --- of 00
Name
2000116 SURVEY.DWG
wing No.
C-02
Subject: Ethos Ridge Development Traffic Study
May 22, 2020
APPENDIX E - SIGHT DISTANCE PHOTOS OF SANDY POINT ROAD
223
fiAL
+ i
ar
• ..✓;-. - •i` • ,'ry'y it
Subject: Ethos Ridge Development Traffic Study
May 22, 2020
VIEW TO THE EAST AT THE ACCESS DRIVEWAY LIMITED BY VERTICAL CONSTRAINTS
(SIGHT DISTANCE = 63.4M)
225
Subject: Ethos Ridge Development Traffic Study
May 22, 2020
VIEW TO THE WEST AT THE ACCESS DRIVEWAY
(SIGHT DISTANCE = 250.OM)
226
Ethos Ridge
2100 Sandy Point Road
Saint John, NB
506 647 2715
Planning & Advisory Committee
City of Saint John
March 12, 2021
Dear Planning and Advisory Committee,
This letter serves to fulfill your request for a description of the public benefits associated with our
proposed senior living development, Ethos Ridge, located at 2100 Sandy Point Road. We have
included details to facilitate the draft conditions to be included with staff recommendations but
understand that a separate developer agreement will be drafted with greater detail as part of the
approval process.
Traffic Improvements
While the Traffic Study does not recommend physical improvements to the neighbourhood, we
understand the development will contribute a percentage of additional traffic to an intersection
flagged as an existing problem. The loads, both existing and projected, are within the limits for
residential streets and the existing intersection, which your City Engineer has affirmed.
However, party to our development we will help address existing issues with traffic calming
measures as follows:
Foster Thurston/Sandy Point
a. Introduction of speed mitigations including rumble strips, signage, and radar
speed signs and possibly an overhead yellow/red blinking signal to raise
awareness of the intersection.
b. Speed cushions to be considered if the initiatives in point a. above are deemed
ineffective.
2. Sandy Point/Kennebecasis Drive/Westmount
a. Integration of a crosswalk, with appropriate signage/indicators, connecting an
exit/entry path onto Ethos Ridge to the nearest sidewalk.
Ethos Inc. will cost share these initiatives with the City of Saint John based on a mutually agreeable
formula.
Trails
As there are existing woodland trails on our property, we are desirous of incorporating these trails
into the development and allowing for continued neighbourhood use. We also intend to develop
further trails/walking paths on site. It is understood the ownership and liability of the trail system
will be exclusively our responsibility.
227
The following details the specifications for use:
1. Catchment area to be the surrounding neighbourhood only and not open to the public. At
minimum one trail/path will be retained as private for residents. It is expected that this
trail/path will run along the front of the residence and thus situated will be situated near
walk -out suites.
2. The accepted mode of transportation will be pedestrian only. Pets will be permitted,
however access to the onsite bark park will be limited to residents only.
3. Our preference is that entrance to trails/paths be from Felton, however we are willing to
consult the neighbourhood to determine best functionality. Entrance will be by foot only
(as parking demands will require monitoring).
4. Neighbourhood access will include waterfront access, but there will be not loitering,
beaching, or docking permitted.
5. Access will be limited to daytime use with no guarantee of lighting.
6. There will be no motorized vehicles (on trails or atwater's edge), and no
alcohol/substances permitted on our site.
Trail signage and waste receptacles will be provided.
Pedestrian Walkway
Sandy Point Road was constructed to a rural standard and does not have sidewalks.
Staff reviewed possible implementation in accordance with the City's Sidewalk Infill Strategy and
found a traditional concrete sidewalk with curbs would not be a priority in this location, even post -
development. Furthermore, the cost of sidewalks is prohibitive here because of the lack of storm
drainage infrastructure.
Considering the above determinations by the City, we are willing to commit to the following as part
of reconstruction of the portion of Sandy Point Road that will be required by our development:
1. Extension of the asphalt width to provide a dedicated roadway space for pedestrians,
delineated by a white lane line and rumble strips.
These pedestrian friendly measures will be made at our cost.
Sincerely,
Scott Walton, Ian McLeod, Olivier Letard
Partners, Ethos Ridge
228
Brian Lynch
46 Beach Road
Saint John N.B. E2K 5H5
February 28, 2021
Planning Advisory Committee (PAC)
City of Saint John N.B.
PO Box 1971
Saint John N.B. E2L 41_1
Dear Members of the PAC:
Ethos Ridge Proiect 2100 Sandy Point Road
0 4c� meson
h)wch lo, 2021
):)LI Pliq\Q &Vrs ,
At the City of Saint John Common Council meeting of February 22, 2021, regarding the Proposed
Municipal Plan Amendment-2100 Sandy Point Road, it was decided to refer the application to the
PAC for a report and recommendation. I am of the opinion that the amendment is not warranted as
it does not meet the criteria outlined in Land Use (LU) 90 of Plan SJ and request your consideration
of the following in arriving at a recommendation.
Plan SJ enacted in 2012, was designed to create a new and sustainable direction for Saint John by
creating a clear framework for complete communities where Saint Johners will live, work and play. It is
this clear framework that has established and maintained 2100 Sandy Point Road and the surrounding
neighborhood as a low density residential area. Clearly the proposed development is not compatible
with surrounding land uses. Over the years homes in the area have been purchased and built by both
young families and senior citizens in consideration of residing in a tranquil low residential area. It is
what attracted myself to the area 38 years ago. To recommend such a high density apartment building
complex would be contrary to the social fabric of our community. In September 2020, a young family
purchased land on the Pelton Road with the intent to build their home. If this proposed development
had been known to them it would have negatively impacted their decision to purchase and at the very
least reduced the price they paid for the property.
The letters (56) of opposition and concerns with the proposed development outline many varied
and valid issues that need to be addressed in consideration of the proposed amendment. Several
letters highlight the non -conformity with Plan SJ and Policy LU-90, in particular, Mr. Jollineau's and
Mr.MacDonald's which are found at pages 129-133 and 134-136 of the agenda for the Feb22,2021,
Common Council meeting. They very succinctly make the case for why the proposed development
does not meet the criteria laid out in Plan SJ and Policy LU-90.
Cherise Letson reported in the Dec10,2020 edition of Huddle (a Matritime Business publication) the
following : "The project is being led by developers Scott Walton and Ian McLeod and came about
through a discussion Walton had with his friend who owned the 19-acre property on Sandy Point
Road. "They had ideas about subdividing or putting a small number of houses on the property. It
didn't really jive with me," says Walton, who's worked previously in the tech startup scene in
Fredericton."
229
230
As per the land owners we always envisioned that this property would be developed with single
family residences in keeping with the existing homes in our community.
In the February 23,2021 edition of the Telegraph the following is reported : "Scott Walton, one of
the Ethos Ridge partners, said in an interview on Monday that the location on Sandy Point Road was
chosen after an extensive site selection process, and is the only location he and other project
partners are considering at the time."
Thus, we have two contradictory statements by the developer, as to how 2100 Sandy Point Road
came to be the site for the Ethos Ridge project. One can reasonably conclude there never was an
extensive site selection process. From day one the developer's goal was to come up with a plan to
build a multi -unit apartment building at 2100 Sandy Point Road. Also, please refer to Paragraphs
two and three of Mr. MacDonald's letter regarding what Plan SJ does and doesn't allow for in rural
low density residential areas.
From the documents submitted we are not able to have a clear vision as to what the project will
entail. The overall theme of the project is presented as being that "Ethos Ridge is a proposed 125
Unit retirement community located in Milledgeville...". However, later in the documents it is
described as, "Not only will this project provide housing opportunities for seniors, and residents
who may not want to leave this gem of a community....". Suggesting the project will provide
apartments to both the senior community and others. The point being that it will not be solely a
retirement community but more apt to be an apartment complex. If so, this complex will
substantially increase the traffic flow to the area and put demands on the infrastructure much
greater than if it was a retirement complex solely for seniors 75+. It is also interesting to note there
are only 3 handicapped parking spaces out of 70 in the parking garage which seems inadequate for
a retirement complex.
We ask that you not recommend approval of this development as we understand it does not meet
with the approved Municipal Plan and raises serious concerns described by residents of the
neighborhood. If approved it would forever change the community in a negative fashion.
Thank you for consideration of this matter.
Yours sincerely,
Brian Lynch
231
m
232
'17rwt- ADS
aj
Rog —tir
aaw,n ►w o't iu,
I� k&I 4-o � c�nskru- .
�x,
)kt - 4W .� �. she - } Vt vie
des
bohda adMK oeAevAvp• ii� *A ���
ku.a �
�a
' �oi5e, ll��ivr�
d _
�a,d �s a ,na.rrav�
�nntk naxynur, e►'a&
' �b read. ►ntkw� � �i�'� .
& W�A euxt jw
how �n,e'�` berv� "Mr
S vc •S d� 5fi�s LAW k, cjbvvru�o.
• �o �d,�vv�cs.
IOA Ilk-
. Will 1�0- 7 '
n►�,a�
. 1-� wi�l�
�� "�4k
mhos i h,af, .d -�na-�►- vvtiUTAAj
-�i�nn o ux l l
is- r iz-
.
Q Lu�
r wr,�,( •
aid << WWI1a� 4fide cv�
iy�Dll� +r' r vinak� 1111 aXca. I L6
'GZ RAL.r . Ufa. CAM rot � D-vu vst�
-tb
r+
'tk
234 .
knielectric@2maii.com
From: Joan Lawrence <j.l.lawrence@rogers.com>
Sent: Saturday, January 23, 2021 7:45 PM
To: knlelectric@gmail.com
Subject: Thoughts on the Ethos Project from Joan Lawrence
Subject: Our Neighbourhood and the Ethos project
From: Joan L Lawrence
34 Beach Road
Saint John. NB
E2K 5H5
506 214 1275
Cell 506 608 9543
Email j.l.lawrence@rogers.com
My personal thoughts;
My "low density" neighbourhood will be negatively impacted...
I moved in from the Kennebecasis Valley in 2010 and built a home. I chose my neighbourhood( and chose to pay higher
city taxes) based on the fact that it was a country setting. As a nature lover, I loved the trees, pristine environment, the
low traffic and noise and the small and friendly neighbourhood.
In 2018,1 was diagnosed with an incurable illness ( a rare cancer) that I will deal with the rest of my life. Now, more than
ever, nature and a calm setting is important to me.
have now become anxious of the proposal set before us as I feel this is now threatened. A commercial building in a
residential setting does not seem right for a variety of reasons.
Traffic Impact ( Pedestrian safety)
I walk and ride my bike on Sandy Point Road daily. I recognize there are no sidewalks however with the current low
traffic it is manageable. The neighbours know to go slow down this road due to its twists and turns and blind spots. I fear
that with the many proposed units, there will be increased traffic and therefore more hazard to me(us) ,the walkers (and
the bikers). In fact, I find this when the ferry lands and there is an onslaught of fast and often reckless ( not taking into
consideration the walker or biker on the side of the road ) vehicles going by. This will be the ongoing case with many
more cars coming and going at all times of the day. It is my personal opinion that the traffic study quoted is low on the
percentage increase in traffic cited. How was this assessed? Please provide the details of this study.
Question: What guarantee do we have that sidewalks will be built? How will this impact existing landowners along the
road? We are going from lower density to higher density traffic. Is this fair to the current property owners who chose to
live in a " non commercial", low density neighbourhood. One such neighbour moved ( invested in this area) from a
subdivision to this area because of the "quiet" environment.
Note that the Quispamsis and Millidgeville Shannex properties are accessed via commercial roads and do not impact
residential neighbourhoods.
�35
Environmental impact
Question: Has there been a statement of environment effects done?
The beautiful trees....
We generally know how construction goes. The intent will be to save the trees but construction costs are lower once the
landscape is raped. Many of the trees on the proposed property are very old and they deserve to be respected and
preserved. With changing climate conditions and water run off, trees and their root systems are critical especially along
our waterways. Will there be an arborist report submitted?
Displacement of wildlife
There are many deer that roam the woods. They will be impacted and perhaps there will be more motor vehicle
accidents as the deer roam onto the roads in their displacement.
Rainwater
Question: What is the storm water management plan? Rainwater runoff needs to be critically planned and managed.
How will the proposed storm water measures impact the neighbouring properties? What will happen "downstream"
(down the hill on Pelton road) ? As it is now, the ditches on Sandy Point Road are being taxed in heavy rain storms
(seemingly more prevalent with climate change) resulting in overflow situations, culverts being destroyed, roads being
compromised and erosion.
Question: Have Geotechnical reports been provided assessing erosion and land slip that would impact the property and
surrounding properties.
Question: Have studies been performed and offered ( financial compensation) to surrounding neighbours as to what
impact this commercial development and land disturbance will have on their wells?
Acoustic Impact
As this is a commercial operation coming into a quiet and pristine residential neighbourhood, what is the ongoing noise
impact of the operation of the facility. What can be anticipated? I anticipate increased traffic noise, comings and going
of ambulances, comings and goings of staff, food supply trucks, maintenance trucks, courier trucks ( and they travel
fast!) heating and cooling systems noises going on and off. Also what is the impact during the construction phase. As a
side note, what control is in place for waste management and rodent control.
During construction, what are the hours or construction and dwation of the plan? Is there anticipated blasting? What
guarantees are given to the neighbouring homes that there will be no impact to their basements ( cracked foundations)
and wells?
Our river system is unlike any other. I feel a behemoth complex on its banks does not suit the environment. Light
pollution is also of concern on both sides of the property. Question: How will this be minimized?
Target Market/Market
As a side note, my father has been in a Shannex facility for 10 years. Over the years, I have interviewed many of the
residents living in the retirement section. I would say that the majority of them would prefer not to live there and only
do so,because there are no alternatives for them such as smaller garden homes or nicer senior apartments (granted in
the greater Saint John area, senior apartments and condos are now only starting to proliferate as the baby boomers are
needing them ). Mose people would prefer to remain independent and not (in their older years) have to live in a dorm
style environment.
336
Question: Has research been performed in the Saint John market that a facility such as this is in demand with the
corresponding high price point? Perhaps we could have the details of this report.
Question: In one meeting it was stated that neighbours would be allowed to continue to walk on the paths of the site.
Would we be given passes to do so? Explain how this will work?
On a side note, I feel that with the recent pandemic the thoughts of people wanting to live a bit more "separated" is
more prevalent rather than apartment style facilities ( refer especially the large condo complexes of Toronto). I would
suggest a modest number of small garden homes would be more appropriate if I had to choose between two evils. In
fact, I probably already know of five prospective couples that would be interested in such a concept within a year or
two. They live in Millidgeville and would like to stay here. They would like to sell their large family homes, and purchase
a small garden home. They would not want to live in an apartment style complex.
Sent from my iPad
)37
08Jan-2021
To Whom it May Concern,
The Ethos Ridge development will be formally introduced at the City Council meeting on Jan
11". This will mark the beginning of a 30-day consultation period with the general public. The exact
details of the project have yet to be shared with the neighbourhood, but the consensus is that Ethos
Ridge will be a 120-unit residential complex targeting the senior demographic. The proposed
development is to be built on a parcel of land off 2100 Sandy Point Road situated between Pelton
Road and Westmount Road. This area is currently zoned RU (rural) and is outside the PDA (Primary
Development Area), according to PLAN SJ. This means the developer is attempting to build a high -
density development in an area that is not designated for large scale projects.
As you may have heard, this proposal has already drawn some positive media coverage.
However, most residents in the area feel the information conveyed is one sided and frankly
inaccurate. Historically, letters of opposition and concern have proven successful in stopping
developments that do not fit the neighbourhood. We understand submitting multiple letters to local
politicians and the Planning Advisory Committee (PAC) have a strong impact on their decision to
approve or deny a project. Delivering these letters as a group will show strength in numbers and
ensure the residents in the neighbourhood are heard. We would also like to graphically represent
how many people are in favour or opposed to this project which we will do following receipt of the
letters.
If you would like to voice your opinion regarding this project, we kindly ask that you provide
your letter by Jan 23. In your letter please be mindful to include your name, address, and specific
concerns about the project. Your letter does not have to be lengthy or technical, but please feel free
to share as much information as you feel necessary in order to get your point across. Please also
note that all letters must be signed by the homeowner(s) and dated for acceptance by PAC.
For convenience, the person delivering this letter will arrange to pick up your letter.
Alternatively, please feel free to scan and email it to: knielectric@gmall.com. Please just ensure you
sign and date it before sending it. We also invite you to provide your contact information (i.e. phone
number and email address) if you would like to be kept up to date regarding the status of this
project. Lastly, please feel free to share this request with your neighbours or anyone else you feel
will be impacted by this development. The more letters we receive the better.
Thank you in advance for taking the time to do this.
n
Sincerely, I C; jI -F" 4
r!WJ1,
Concerned residents of the neighbourhood .-df5+Wr Pp{ C4* kt Cje
tk retf-on U.
238
V-1-2�77 &xa,,
o-��Grn�,�
,20
239
January 23, 2021
City of Saint John, Community Development Services
15 Market Square
Saint John, N.B.
Attention: Jonathan Taylor, Common Clerk
To Whom It May Concern:
RE: Proposed Rezoning and Development at 2100 Sandy Point Road
I am writing to express my concerns regarding the proposed development and rezoning of land located
at 2100 Sandy Point Road.
As a resident of the area, i am concerned that this development will create increased traffic in a
residential area that already experiences high volumes of traffic due to its proximity to the hospital and
the ferry located on Kennebecasis Drive. By developing an additional 125 unit building, along with those
that will be working at and visiting this location, the volume of traffic will rise significantly. Infrastructure
upgrades would also be needed to withstand the increased traffic and construction that would result
from this development, including, but not limited to, sidewalk installation on Sandy Point Road, traffic
lights at the intersection of Foster Thurston and Sandy Point Road and traffic lights or a reconfiguration
of the intersection located at Kennebecasis Drive and Sandy Point Road.
While I am not against further development of this land to allow for additional residential housing, I am
opposed to a development of the size that has been proposed as part of the Ethos Ridge Project. After
speaking with other residents in the area, this appears to be a shared concern.
Thank you for your time and consideration.
Sincerely,
Contact:
1236 Kennebecasis Drive
Saint John, NB E2K 5131
phinneyjay@gmail.com
M
Jan
21,2021
To whom it may concern
Regarding the developement of Ethos Ridge at 2100 Sandy Pount Road.
Our concern is regarding the zoning that may be needed for this developement. We are
concerned that it may be changed to allow appartment buildings and residences other than
single family dwellings that we now have in our area.
We are also concerned with the increased traffic and construction that such a developement
would cause.
Glen and Donna Lamb
1213 Kennebecasis Drive
Saint Sohn
dlamb@nb.sympatico.ca
241
Stephen Biggs
1225 Kennebecasis Drive
Saint John, NB, E2K 5A7
January 22, 2021
Planning Advisory Committee
City of Saint John
Reference to Ethos Ridge Development
Dear Planning Advisory Committee Members:
I was admittedly surprised to hear that this kind of development (Ethos Ridge Development) is being considered
for this quiet, tranquil, single-family dwelling area, and would like to voice some of my concerns:
I am worried about the blasting and/or rock digging (pounding) necessary for the land preparation of such a
retirement development, which may cause rock movement in the area, resulting in expense to the present
homeowners. I can attest to this happening from recent movement/fracturing of rock on the back hill of my yard,
resulting in a gushing of water (spring) up from the area, flooding my back yard and spreading to my neighbours'.
I was obligated to spend thousands of dollars to have numerous drain pipes installed and coverage of the area with
rocks, to move water away from my back yard where it had been gradually inching closer and closer to my home.
This issue had never presented before in my 34-years as a home owner at this same location. A neighbour also
suffered movement of their foundation and bricks falling from the side of their home. I am concerned that this is
all the result of the incessant pounding (rock breaking) by machinery and sometimes blasting of rock in the area to
create subdivisions and dig foundations for homes. The rock bed in the area is obviously precarious and I am
concerned as to what might occur from further construction in the area, especially in light of the magnitude of the
proposed Ethos Ridge retirement development and associated access road.
With the number of units proposed, traffic will be an issue and with it, safety. A number of residents walk Sandy
Point Road to the beach (from the corner that meets Kennebecasis Drive) and there is no sidewalk or shoulder to
walk on. I have walked this street with my children and now granddaughter without issue as there is only the odd
vehicle on the road, sometimes none. Both pedestrian and vehicle just look out for each other when they do meet.
With more than one vehicle at any time on the road, it will not be safe to walk as there is limited shoulder and a
large ditch to avoid. During construction of such a complex, with trucks on the road, it will be impossible to walk
to the water which I feel I have a right to do, especially after paying city taxes here all these years.
In summary, I am very concerned about the proposed development, especially as it relates to construction, traffic
increase and safety of residents in the area.
Sincerely,
Stephen Biggs
242
Jan 16, 2021
To Saint John City Council,
This letter is to voice our concerns over a new 120-unit residential senior complex that is being proposed for 2100 Sandy
Point Road. As much as we would love to retire in such a place as described in the newspaper, we do not believe that
this is the right location for such a place. We are all for development in our city but these are our concerns with the
proposed location of this project;
1. Minimal traffic ... We think not! 120 units would see 120 families being visited plus all the staff that would be
required to run the bistro, pool, wellness center, keep up the grounds, and the health care personal required on
site. Great employment opportunity, but a lot more traffic for 2 already busy intersections at Kennebecasis
Drive -Westmont Drive and Foster Thurston -Sandy Point Road.
2. This is not a regular bus route, so we would suspect at least 60 resident cars as well driving to do errands every
day.
3. The traffic alone on these side roads would be greatly increased and there are no sidewalks for residents
currently to walk on Sandy Point Road. Would the city be updating the road with sidewalks and keeping them
cleared in the winter so the children in the neighborhood could make it to their bus stops safely, or the seniors
in this residence could walk to the bus stop safely.
4. The price of these senior complexes makes us think that 75r of the residents will be coming in from other
provinces, not NB. This will put a further burden on our health care system. Saint John already has many people
still waiting for a family doctor, are we going to be able to provide proper health care for all the new seniors
coming into the province?
5. There are already 3 seniors housing complexes in Milledgeville, are these full?
6. Will this new development be on city water and sewage? if so, can the system handle such a large quantity of
water and waste? Will overflow be pumped into our beautiful river system?
7. We lose our community sliding hill, and will the trails be accessible for all neighbours or just the residents of the
retirement home?
8. Speaking of the hill, to get to this new development is a steep incline and decline, can emergency vehicles get
here safely. I hear the excavator had to go around on Pelton Road to do testing.
9. We are in a rural community and purchased here for that reason. This community is unlike most communities.
Everyone knows 90% of their neighbours by name if not all of them. We all enjoy the tranquility of this area.
Thank you for taking the time to review our concerns,
Ulk*
Deborah Hughes
Y
Maria Hughes
24 Beach Road,
Saint John, NB, E2K-5H5
L-IM
� e hes
Rachel #uest
Cam er /nH ghes
41�
Jacob Hughes
243
Dear Saint John Council, January 23, 2021
am writing to express my opposition to January 11. 2021 proposed rezoning at the 2100 Sandy
Point Road between Pelton road and Westmount road for the proposed development -Ethos Ridge
120- unit residential complex on an area currently zones as RU( Rural) outside the primary
development area according to the PLAN SJ.
The developer is attempting to build a high -density development in an area not designated for
large-scale projects. That in itself will be detrimental to the site. Nearly all neighborhood
residents are entirely opposed to multi -unit development projects that will cause a heavier
density of traffic and safety problems. Due to the traffic from the Kingston peninsular ferry. the
neighborhood is already over -capacity. with some vehicles not stopping when school buses pick
upldrop school children, causing safety concerns. Traffic and safety of schoolchildren &
pedestrians are significant areas of concern. The local neighborhood traffic will
disproportionately surge in our neighborhoods. The traffic surge during morning rush hours will
also negatively influence safety for children; since students walk towards the school bus and. as
mentioned earlier, do not stop when the bus signal is on.
urge you and the Planning Advisory Committee to disapprove of the proposed rezoning. From
recent meetings and discussions kNith my neighbors. I know many who have not managed to
attend meetings or write letters and emails share my opinions.
Thank you for }'our continued service and support of our communities.
Best regards.
John Mascarenhas
1830 Sandy Point Road
Saint John N.B.
rAVI
21 January 2021
To whom it may concern,
I am writing to oppose the potential Ethos Retirement Centre from being built at 2100 Sandy Point
Road.
I am part of a multi -generational family, all of whom have lived or currently live on Pelton Road for the
last 70 years. I myself have lived here since my teens, and I am currently a senior citizen who has no
intention of moving. I certainly have no intention of selling my house and moving into the proposed
development, as the developer would have you believe.
This has always been a rural area and I strongly believe should remain so. My reasons for this are:
1) As a rural area, we have no sidewalks and extremely poor road quality. in fact, the road has
never been paved in all my time here. We have children biking and walking to bus stops,
heading up a hill with no visibility to oncoming traffic and vice versa. The rise in traffic would
greatly increase the risk of injury to anyone walking.
2) This construction will cause land erosion, which will potentially affect the water in the wells of
every house down here. It could also create runoffs which will cause flooding in the area.
3) The endless increase in noise level during construction of such a facility, as well as the day-to-
day operations (employees coming and going at all hours, deliveries, emergency vehicles, etc.)
are all unwelcome intrusions in such a quiet, rural neighbourhood.
4) This development will cause a decrease in green space by removing trees that have been there
for centuries. This in turn will reduce air quality and destroy the natural habitat of wildlife,
causing the deer population to migrate to our properties.
5) Based on the above issues, I feel our property values will greatly diminish by such a large
development in the area.
If the need for such a community exists in our area, there are several options on Sandy Point Road which
would be closer to emergency facilities. I would suggest the location of the former Cherry Brook Zoo as
that location would be more easily accessible, and with utilities already in place.
I ask that the City Council reject the proposal for the Ethos Development Project.
Sincerely,
C "IPIN
Janet Capson
444 Pelton Road
Saint John NB
E2K-5H7
245
17 January 2021
To whom this may Concern
I am writing this letter apposing the proposed development of the Ethos Retirement project at
2100 Sandy Pt. Rd.
I have several concerns regarding the proposed development. I reside at 305 Pelton lid, which is
located at the corner of Sandy pt_ and Pelton and have been a resident of this community for
approximately 16 years. As a family we own 4 properties on Pelton rd. and feel that we have a lot to
lose if this development is approved. I am verry concerned about the impact on the property values and
how they will be negatively affected if The Ethos Project is approved. This neighborhood is transitioning,
from a mature demographic to a younger demographicr as the newer residents have small children and
are starting new families. As a community we enjoy the peace and quiet this area has to offer, and this
development will without a doubt, jeopardizes the safe community that we foster. This is a rural
residential area, and this development simply does riot fit, as per Plan SJ and the city's development
plan. The city invested millions of taxpayers' dollars to create these two programs, in my opinion if this
Ethos Retirement complex is approved, it was all for not.
Here is a list of concerns that I feel need to be addressed
1. Increase in traffic
2. Access to municipal services (Water and Sewer)
3. Emergency Access (Fire, Ambulance)
4. Sidewalks
5. Water run off
6. Environmental Impacts
7. Deer Population
8. Common access to deeded beach access
9. Increase to population density
10. Commercial traffic
I am asking that you deny the proposed Ethos Project and the rezoning application recently
submitted to city council for review. I want to be clear I am not anti -development and would like to see
something done with the property; However, it must fit the neighborhood.
Sincerely yours
ory Kinsella
305 Pelton Rd
246
17 January 2021
To whom this may Concern
I am writing this letter apposing the proposed development of the Ethos Retirement project at
2100 Sandy Pt. Rd.
I have several concerns regarding the proposed development. I reside at 305 Pelton Rd, which is
located at the corner of Sandy pt. and Pelton and have been a resident of this community for
approximately 16 years. As a family we own 4 properties on Pelton rd. and feel that we have a lot to
lose if this development is approved. I am ver concerned about the impact on the property values and
how they will be negatively affected if The Et�s Project is approved. This neighborhood is transitioning,
,rom a mature demographic to a younger demographic, as the newer residents have small children and
are starting new families. As a community we enjoy the peace and quiet this area has to offer, and this
development v4ll without a doubt, jeopardizes the safe community that we foster. This +s a rural
residential area, and this development simply does not fit, as per Plan SJ and the city's development
plan. The city invested millions of taxpayers' dohars to create these two programs, in my opinion if this
Ethos Retirement complex is approved, it was all for not.
Mere is a list of concerns that I feel need to be addressed
1. Increase in traffic
2. Access to municipal services (Water and Sewer)
3. Emergency Access (Eire, Ambulance)
. Sidewalks
5. Water run off
6. Environmental Impacts
7. Deer Population
8. Common access to deeded beach access
9. Increase to population density
10. Commercial ?raffic
I am asking that you deny the proposed Ethos Project and the rezoning application recently
submitted to city council for review. I want to be clear I am not anti development and would like to see
somethi-rg done with the prop,:(ty, Huwever, it must fit the neighborhood.
Sincerely yours
- Qom, �►..��.�.
ory Kinsella
305 Pelton Rd
247
12 January 2021
2101 Sandy Point Road,
Saint John, NB
E2K 5H4
To: Planning Advisory Committee
From: Residents of 2101 Sandy Point Road
We have recently received a flyer booklet about Ethos Ridge development of the 120-unit
residential complex to be built on a parcel of land off 2100 Sandy Point Road.
As a neighboring residents we wish to express our objection to this plan.
This area is currently zoned RU (rural) while the developer is attempting to build a high -
density development in an area that is not designed for large scale projects. This section
of our neighborhood is dominated by single-family homes, where we enjoy a comfortable
and quiet environment to live away from busy traffic.
Building this 120-unit apartment complex would require hammering, drilling and blasting
of the rock, which would be incredibly disruptive to the heart of residential Millidgeville.
A steady convoy of dump trucks and heavy equipment during prep, resource extraction
and construction will result in potential damage to property and roads. The noise and
vibrations will be disruptive on a long-term time scale, as will road dirt, construction
dust, and blocked roads and driveways. Blasting will also cause damage to homeowners'
foundations and might impact water wells. This would change the entire feel of the
neighbourhood from a quiet, family -oriented community to a noisy, busy area.
Every person in our area we were comminucating to about this development expressed
strong opinion against this development.
As a residents of this presently quiet, peaceful suburb we strongly urge you to deny this
application, and leave the development of Ethos Ridge properties to areas suitable for
large scale constructions in which they will have direct access to major roadways, and
will not overload rural roads not designed for such high traffic.
Sincerely,
Homeowners of 2101 Sandy P/nt Road
Igor Zotov Olena Zotova
Dated January 12, 2021.
N
Rory L. Ervin and Fairiie D. Mclean
64 Beach Road
Saint John, NB E2K5H5
January 23, 2021
Mayor and Councillors of
The City of Saint John
15 Market Square
Saint John, NB E2L 1E8
Re: 2100 Sandy Point Road (Portion of PID 55233233 and PID 55233977) — Amendment to
Municipal Development Plan from Rural Resource and Park and Natural Area to "Major
Community Facility" (i.e.,125-Unit Apartment Complex)
Dear Mr. Mayor and City Councillors:
We are residents of Beach Road, a private road, which is located at the end of Sandy Point Road. We
have learned that there is a proposed development comprising a 125-unit apartment building on the
above -noted property. We would like to point out our concerns to you with regard to this proposed
development (hereinafter "Ethos Ridge Development").
• Safety to Residents
Beach Road and the lower part of Sandy Point Road (from the intersection with Kennebecasis
Drive and Westmount Drive) is a rural area within City limits. This portion of Sandy Point Road,
together with Pelton Road, Scenic View Drive and Beach Road, are very quiet roads with very
little traffic. There are no sidewalks and there are deep culverts on these roads. Ethos Ridge
Development would significantly increase traffic flow on the above -noted roads with residents'
and visitors' vehicles, staff vehicles, service vehicles and emergency vehicles. These roads are
not equipped to handle this increased traffic. We are concerned for the safety of walkers with
no sidewalks and deep ditches on the sides of the roads.
• Infrastructure
■ Sidewalks: The Ethos Ridge Development would require the building of sidewalks on
Sandy Point Road and Pelton Road to ensure the safety of City citizens. There is a blind
spot on the hill of Sandy Point which is dangerous for pedestrians, even for only one
vehicle passing. We would expect that there would be many more instances of two
vehicles passing each other on the road while pedestrians are present leaving no safe
area for pedestrians.
N
2
■ City Services:
o At present, we understand that there is inadequate water and sewage capacity
for Ethos Ridge Development.
o Storm water run-off has become a concern for us in recent years with ever more
severe storms and precipitation events. Recently, significant rainfall resulted in
a washout of the culvert and road surface damage at the bottom of Sandy Point
Road. We are concerned that additional runoff from the Sandy Point Road
access as shown in the plans will exacerbate the situation unless significant
work is done to improve the integrity of the culverts.
• Environment
■ Light Pollution: Presently there very few street lights in this portion of Millidgeville
enhancing the rural nature of the area. The concern is that there will be additional
lighting on Sandy Point Road as well as lighting to illuminate the access road from Sandy
Point Road leading to the proposed development. It is known that light pollution is
disruptive and life -threatening to birds.
■ Noise Pollution: With few homes and little traffic it is a very quiet neighbourhood.
There is no question that additional noise from such a large development including
residents' and visitors' traffic, staff vehicles, service vehicles and sirens from emergency
vehicles will have a major impact on us and the environment.
■ Destruction of Flora and Fauna: It would be impossible to develop such a large property
without destroying the existing natural environment and the wildlife that lives in it.
• Loss of Quality of Life
■ Increased Traffic:
* The additional vehicular activity supporting 125 accommodation units will likely
cause intermittent yet significant back up at the intersection of Sandy Point Rd.,
Westmount Dr. and Kennebecasis Dr. This intersection is challenging due to the
grade and visibility and poses additional risk with increased traffic, especially
during winter months.
* Beach Road is a private, dead end dirt road that requires the residents to
maintain an insurance policy that protects the City from liability during snow
removal operations. Residents are responsible for and have incurred significant
costs over the years to repair damage from seasonal flooding and other impacts
as well as vehicular wear and tear. We expect that a great increase in
sightseeing traffic on this dirt road will result from this development and be the
source of additional disturbances, wear and tear and noise pollution. There are
no areas for vehicles to turn around without trespassing on resident's
properties. Insurance impacts are not known at this time.
Rural Living: The rural nature of the area will be compromised greatly and we will
always lament the changes after the fact due to this development.
250
In sum, we vehemently oppose this proposed development for the various reasons we have outlined
above.
Sincerely,
Rory L. Ervin
4
Fairlie D. McLean
251
1/15/2021
2100 Sandy Point Road
2100 Sand Point Road
From: Lesley Bazaluk <kingbazaluk@beilaliant.net>
To: "Bazaluk, Robert <rbazaluk@bellaliant.net>
Cc: Lesley Bazaluk <kingbazaluk c@bellaIiant.net>
Priority: Normal
Date 01/15/2021 01:37 PM
City of Saint John Planning Committee
I have been made aware of a proposal to develop land situated at 2100 Sandy Point Road, Saint John N.B. to accommodate a multi
residential seniors complex for approximately 125 units and unknown numbers of staff. This land is currently zoned "rural" and as such is
not currently available for the proposed use. This proposal is much like trying to put a square peg in a round hole. 1, the undersigned,
would be seriously and detrimentally affected by this development if approved. I put forward the following reasons of my opposition to
this proposed development.
1. The nearest fire station is 9 kilometers away, making any emergency response time 8 to 10 minutes away.
2. There are no nearby amenities such as a grocery store, medical clinic, library, church, community center nor is there any public
transportation.
3. There is no infrastructure - no water - no sewer - no natural gas - no sidewalks & minimal lighting.
4. Housing units of 125 will escalate noise, congestion and conflict due to crowding. It appears that parking spaces will have to be in the
vicinity of 200 or more to accommodate
the attending staff & visitors.
5. As residents of Pelton Road we have "deeded" beach rights to Sandy Point Beach. If the proposed trails are put in to place, just how
are we to maintain our privacy.
6. If this project is approved I cannot imagine what will happen to our existing wells. There is already serious water issues here that will
only be magnified by this disruption to
the existing landscape.
alifax, Dartmouth, Moncton &Toronto. How can any of these companies claim to have
7. Many of the contracted companies are from H
a vested interest - they do not live here;
their homes will not be affected at all.
8. On a personal note, I am a native of New Brunswick who lived away for many years. I had long wanted to return but could only do so
after retirement - deliberately seeking
green space, low density, quiet and peaceful surroundings. This took several trips, a great deal of searching & a great deal of planning
to achieve. This is now under threat by
this project. IF] had wanted to live in a multi residential area I would have chosen to. This proposal is a fish out of water.
9. 1 am not opposed to development of these lands, but please keep it in harmony with the surroundings. Multi anything is not a suitable
fit to the existing homes.
Lesley King-Bazaluk.
433 Pelton Rd.,
Saint John N.S.
E2K 5H6 ✓✓✓ l L
email�J�y�'
kingbazaluk@belialiant.net
'telephone ##674-9085
https:llwebmaii.bellaliant.neVox6lox.html 252
January 11,2021
Neil and Candace Boyle
2001 Sandy Point Road
Members of Saint John City Council;
We are writing this letter to strongly oppose the proposed building of the senioes complex know as
Ethos Ridge in our neighbourhood. This building is out of character and scale with our community as
stated below:
Incongruity- the proposed 120 residential unit on Sandy Point Road, Pelton Road and Westmount
Road in a mature, high- value single family neighbourhood fundamentally out of character with the
nature and structure of the community.
Unsuitability -of Sandy Point Road, Westmount Road and Pelton Road. The increase of traffic from this
type of venture would be famfly's, at an unacceptable level of risk. The doubling or more of vehicular
traffic to this neighbourhood with blind corner and sidewalks increase's the risk of harm to the elderly
and young children of this neighbourhood.
Impact on residents during extended construction (noise, dirt, debris and disruption).
Property Values — (concerns regarding all existing home -owners will see an immediate decrease In the
value of their homes).
Trusting this matter will receive your careful consideration and It will result in the refusal for this project
to proceed.
Sincerely '►
Candace and Neil Boyle
Concerned residents of 2001 Sandy Point Road
253
To The City of Saint John
Mayor and Council
January 15,2021
We wish to advise you of our objections to the Ethos Ridge proposal to be built at 2100 Sandy Point Rd.
We have been residents of Sandy Point Rd since 2008. The above mentioned project does not fit in to
the present zoning of our community. Our neighbors will be extremely prejudice by this type of
commercial business.
These are some of our objections;
- The blasting and breaking of rock is a threat to our wells
- The construction for the next two years will be extremely loud
Increase of vehicle traffic
Decrease in our property value
- Destruction of wild life habitat
- Change in water run off pattern
Adding 125 family units will over load the already reduced fire protection
There are no benefits to our neighborhood from this project. We have no faith in the developer of Ethos
Ridge because of the lies that he has told such as that he spoke to 50 homes and 35 were in favor. Io-
date I have found no one in favor of this, not one.
We ask that you reject the applications for Ethos Ridge proposal.
Sincerer
Paul De rdins & Sherrill Desjardins
2121 Sandy Point Rd
Saint John NB
254
255
January 22, 2021
To Whom It May Concern:
My husband, Kevin Gallivan, and I, would like to express our opposition to the proposed
Ethos Ridge project.
In spite of the fact that Ethos representatives have publicly stated that they had a great
support for this project, I have yet to speak to anyone who supports this project in
anyway at all.
We have lived on this street for 34 years, at 2025 Sandy Point Rd., which is across the
street and very slightly south of the proposed development.
We have great concerns regarding the increased traffic flow. During what will be a very
long construction period, heavy trucks and other construction vehicles will disturb our
quiet neighborhood, damage our street, and any blasting which may need to be done has
potential to damage our houses, outbuildings, wells and septics, our privacy, and our
enjoyment of our neighborhood.
We have no sidewalks, and minimal lighting, so increase traffic flow will be dangerous
for our many walkers and their pets who are out on a daily basis.
After completion, the increased traffic associated with workers, inhabitants, and their
visitors, will also endanger and disturb their reluctant neighbors.
How much ambulance and fire traffic will be expected? This would also create an
increased disturbance in the neighbourhood which has previously enjoyed privacy and
quiet.
The corner at Sandy Point Rd and Foster Thurston, which is already treacherous, will be
subject to increased traffic flow and, amazing as it is that there has not yet been a fatality
there, I fear that the increased traffic flow due to Ethos may indeed result in such an event
Our enjoyment of the plentiful wildlife is also at risk, and our wildlife and our pets will
be at increased risk of being hit by vehicle. As a veterinarian, I object vigourously to
putting these animals at risk, and the abundance of wildlife is why I chose to live in this
neighborhood.
I will also point out that the proposed walking trails will be a risk for exposure to the
plentiful Nodes scapularis ticks that are endemic in Millidgeville. Ticks do not come to
an area solely on the deer population, although they unfortunately get called deer ticks.
They are equally plentiful on rodents and birds, and most of the Nodes scapularis species
in this area are proven to contain Borrelia burgdorferi, the bacteria which causes Lyme
disease.
256
We vigourously oppose this development, and vigourously resent the fact that the
developer has misrepresented the level of community support for this project.
Sincerely
Dr. Catherine Adams
Mr. Kevin Gallivan
2025 Sandy Point Rd.,
Saint John, NB
E2K5H1
257
Rick Watters Jan 23/21
928 Kennebecasis Dr
Saintlon NB E2K SA8
To Whom it may concern.
Please be advised that i am against the development proposed by Ethos Ridge in the Sandy Pt. Rd. area.
I don't consider that a 120 unit project fits the neighbour character of the area. Also I don't think that
the existing road will handle the additional traffic that would be created by the development.
spectfully submitted,
Rick Watters
258
Jan 12, 2021
PAC Chairman,
I am writing to express my objection to the deN elopment of the "Ethos Ridge" project, on properties
located near Sandy Point on the Kennebecasis river. The property proposed to be developed is currently
designated as "Rural Resource (RU)" within Plan SJ. It is an undisturbed forested area which abuts the
Kennebecasis river and is presently provided pedestrian access from adjacent "RR" and "R2"
residential areas.
A significant concern is that the development will necessitate a major extension of the City's
infrastructure to provide access roads, power, water and sewage services to meet the requirements of
ibis high density apartjnc aL c.)mplc-x and ancillary faciiitjes. 1 his wouid jesult in considerable
environmental degradation to the existing greenfield forested area from the scarification and removal of
materials over several hectares to facilitate construction and operation of the project. Additionally,
modification to the existing environmental landscape would also be necessary to allow operational road
access and emergency egress to and from the project site to Sandy Point and Pelton Roads.
Further, within the larger area surrounding the project site the existing road infrastructure will see
considerable increase in vehicular traffic on both Sandy Point and Pelton roads. To access the project
both during construction and operation vehicles must travel through the intersections of Sandy Point
Road/Foster Thurston Drive and Sandy Point Road/Kennebecasis Drivee'Westmount Drive. Both of
these intersections have poor sight lines and carry considerable traffic to and from the hospital,
university and "Peninsular Princess" ferry landing at peak times during the morning and evenings.
This increased traffic will undoubtedly expand the risk of the potential of vehicular accidents and given
that there are no sidewalks on Sandy Point or Pelton Roads in this area, the potential for pedestrian
accident would increase as well.
Another concern with respect to road infrastructure is that of the topography of the Pelton road which
as it exists is very challenging. The road has a very sharp blind turn coupled with a steep gradient
which I do not believe would meet current design guidance for safe vehicular access/egress or
clearances for pedestrian usage.
In my opinion to address these specific trafficipedestrian issues would result in major capital works
costs for the City in order to mitigate the potential of increased risk of accidents. In addition, the
extension of the City services infrastructure will also encumber the City with the requirement to
maintain and service; water and sewer lines as well as pumping stations for the life of the development.
All of these additional costs would of course be born by the citizens of Saint John.
Therefore, in conclusion I do not agree with a development of this type of high density occupancy
project within the proposed area.
A concerned citizen of Sandy Point Road,
Fraser Forsythe
forsythe@rogers.com
259
2021/01/16
To Whom it may concern,
I am writing regarding the pending Ethos Ridge development. I believe that the addition
of a multiunit housing complex will change the community and not for the better. We
live in a low -density rural area, and the sudden addition of a large residential complex
does not fit the style of the community.
Further, the Developer has made no effort to ease the disruption this facility will place
on the community. In other municipalities, city councils requires developers to provide
benefits to the local community in exchange for approval to develop an area. Although
an increased tax base will help Saint John as a whole, what is the Developer doing to
maximize the benefit for the local residents? When sneaking to a rPnrPrentat!ve from
Ethos Ridge they indicated there will likely be an additional 180 vehicles in the area as a
result of the new residents and facility staff. The Westmount Dr./ Kennebecasis Dr./
Sandy Point Rd intersection is dangerous to begin with, and I believe the increased traffic
will further exasperate the issue. This intersection is on the list of locations considered
for a traffic circle. If the Saint John City Council does approve this development, I ask that
they require the Developer to be responsible for solving the problems it is going to
create in our community as a condition of their development.
In summary, I do not believe this development will have a positive impact on the local
community and the increased traffic will result in an increase in accidents. I ask that the
Saint John City Council reject the proposal to develop the area with a high density living
facility. If not, I ask the City to make the Developer responsible for alleviating the traffic
burden the facility will create.
Thank you for taking the time to read this.
Best regards,
William Derks
308 Pelton Road
Saint John, NB
E2K 5H7
260
Carole and Joel McCarthy
994 Kennebecasis Drive
Saint John, NB E2K 5A9
January 14, 2021
It has recently come to our attention that a 120 condo unit building may be built
close to our home. We wish to object to this large development based on the
reasons stated in this letter.
The area in question is currently zoned rural for a reason, meaning there are no
sidewalks, wide roads or current infrastructure to accommodate a huge high rise
of this size. Currently there is already a safety concern at a very dangerous
intersection across the street from the former Cherry Brook Zoo. This will be
significantly worse with a large increase in traffic.
This project would be ideal for Saint John in the properly zoned area somewhere
designated in the PDA according to Plan SJ. Our rural area boasts no convenience
stores, retail or even gas stations within miles.
Changing the zoning would alter the quiet character of this neighborhood for
generations to come. It would decrease the value and enjoyment of the nearby
homes, some of which have very high tax rates. People have moved to this
location to escape high density, such as we did 17 years ago, from uptown Saint
John. Putting a building the size of an uptown hotel in this quiet area would be
unusual to the point of being almost comical.
Noise and traffic aside, there is a legitimate safety issue considering the lack of a
fire station in Millidgeville. The Fire Department has stated that they currently lag
in national emergency response times to this area. This is a serious matter when
you consider adding 120 condo units in a zone already lacking proper response
times.
261
We feel as though this development would cause discord with the quiet suburban
nature of the area. There are many current condo vacancies for seniors at
Chateau Champlain and elsewhere, making the business model for this large
undertaking in this part of Millidgeville questionable.
It is for the above stated reasons that we respectfully oppose this location and
wish the development well in a new proper area within the PDA (Primary
Development Area) in accordance with Plan SJ.
Sincerely,
Carole an Joel McCarthv
994 Kennebecasis Drive
262
To Whom It May Concern,
My name is Jia Lawrence Yao, reside in 41 Westmount drive, Saint John,
NB. E2K 5GI. This letter is to express my concerns about this new Ethos
Ridge Development. our neighborhood is a very quiet residential area, by
putting suck a development will significantly increase traffic and will for
sure affect the quietness of this neighborhood. More traffic will also bring
unforeseeable accident and things that I don't want to talk about. We
appreciate the lovely environment that we worked hard and paid for. This
development will have negative effect on our property values that I
personal will not accept. please take my concern into your consideration
and be mindful to not approve this development. Thank you in advance
for your effort.
All the best,
Lawr nce Jia Yao
i
E
Friday, January 15, 2021
263
Subject: Ethos Ridge Development
Date: January 17, 2021
To who it may concern;
I am writing this letter to express my strong opposition to the proposed Ethos Ridge
Development. This development will be very detrimental to the area. First of all, developing
outside the PDA will be added stress on the already strained city services.
As a long time resident and property owner of Sandy Point Rd, large developments like this
do not fit in with the mostly single family homes in our rural setting neighborhood , with very
little traffic. This development will also add to our growing deer problem, taking away more of
there natural habitat.
Do we realty need to develop more land which needs water, sewage, road maintenance for
the city to service??
Let alone our property values will almost certainly decline.
I urge you to disapprove the proposed rezoning, and from recent conversations
with my neighbors, I know my opinions are shared by many.
Bob and Kim DeLong
2173 Sandy Point Road
N
January10 2021
His Worship Mayor Don Darling, Deputy Mayor Shirley McAlary, and Counsellors
Re; Development of Ethos Ridge off of Sandy Point Rd and Pelton Rd
We are concerned that the (complete) Neighbourhood in the area of this planned
development has not been informed or consulted or even been given any details (exact or
otherwise) of this project! in actual fact no details were brought to our attention, except by
concerned neighbours!
From what little details we have that are only second hand news,
We do not approve of this project in our neighbourhood in any form, or any way.
To start with the project has been mostly hidden from the people that would
ultimatly be most effected by it so it, does not sit well to start with being a hidden
agenda until the first meeting about it in council on Jan 112021 where undoubtebly
it would be unsuitable to attend due to social distancing with Covid 19.
That being said, what we do know about it, is that it is planned to be a commercial
endeavol of a 120 unit apartment complex featuring bistro bakery and bar at
minimum, placed in a residencal area of traditional individual family homes and a farmland.
Has there been any enviromental impact study done and may I have a copy sent to me?
We do not see this as a development that fits into the family values and home
residential structures of our community, or showinA anything but distractina from
our community.
Traffic must be concidered, as at this point, as at many times of the day it is difficult to
get out of our community in emergencies or during times of heavy traffic. When the Millidgeville
Ferry is in and cars are coming up Kennebecasis Drive we can barely exit from this area as
it is. Once you are heading towards town it can get even more congested heading towards
the area where the zoo was, we have seen it backed up bumper to bumper all the way from
there to Westmount Drive and down Kenebecasis Drive and with a full stop in our directon
theres no geting out of here until traffic clears. DO you see a safety issue in this?
Then bring spring floods that are getting worse each year, and often close off Kennebecasis
Drive into the mix each spring.
We have often traveled from direction of the main highway driving through Foster Thurston
and counted 450 or more cars driving through there before we get from one end to the other
or sat at the corner by the closed zoo trying to get out heading towawds city or towards
Foster Thurston Drive waiting in the morning while bumper to bumper traffic heading towards
the regional hospital doesnt let anybody get out of here. This has been brought to councils
attenition in years past and hasnt been addressed. This Traffic has been, for a time greatly
reduced since covid 19 as there are not as many people heading in the direction of the hospital.
In conclusion this has been a quiet, family neighbourhood where We have resided for
over 56 years, it is family orientated with lots of children and we prefer it to remain so.
We do not wish to have 120 extra cars and extra people noisily coming out of pubs 1 beastros
or even without that part the loud traffic noises
We respectfully ask that this neighbourhood remain a Quiet Residential Area
ResidenIA of 25 Scenic View Drive Saint John N.B. Elk
�. R. 0.- Yn Thelma McKim
Estey Mckim
265
54 Beach Road
Saint John NB E2K5H5
January 16, 2021
Re: Proposed "Ethos" development between Sandy Point Road and Pelton
Road, adjacent to Kennebecasis River
I have been a resident of Beach Road for more than 30 years, and wish to express
my concerns regarding the above proposal to construct a high density apartment
complex on land currently classified as "rural".
It appears to be a development of significant magnitude, with the potential to
house well over 200 people, and could result in a large cost to our city, which is
currently experiencing a financial crisis. Costly creation of roads, water supply,
sewerage, lighting etc. will occur, along with the potential for environmental
damage and the loss of flora and fauna.
The whole area is a quiet, residential part of the city, not even needing sidewalks
for the few people living here to walk safely for access or exercise. The increased
vehicle traffic will increase risk after construction, and the development phase
could be particularly noisy, dirty and dangerous.
Development will always be an issue, and usually comes with a price. Therefore,
it is my wish that before any begins that all residents in the surrounding area be
given a voice, with the hope that the developers will be open to considering
options with a lesser population density.
I would not be opposed to the development of a few garden homes, which would
leave rather more green space intact for all to enjoy.
Yours truly,
,4��� ol,�,ew,
Marie Oliver
N
We always envisioned that this property would be developed with single family residences in
keeping with the existing homes in our community. The construction phase of this project would
bring mayhem, epic disruption and perhaps damage to nearby homes.
We ask that you not approve this development as we understand it does not meet with the
approved Municipal Plan and raises serious concerns described by ourselves and others in the
neighborhood. If approved it would forever change the community in a negative fashion.
Thank you for consideration of this matter.
Yours sincerely,
A�
Ka—ql k-)
Brian and Kathy Lynch
267
Kevin & Brenda McDermott
33 Scenic View Dr
Saint John, NB E2K SK3 January 14 2021
kevinmcdermott@rogers.com 632-081S
To City Council
Re: PROPOSED MUNICIPAL PLAN AMENDMENT RE: 2100 SANDY POINT ROAD- Re -designate a portion of
PID No. 55233233 and PID No. 55233977 from Rural Resource and Park and Natural Area to Major
Community Facility
Our Neighborhood is very rural with narrow streets, steep ditches, numerous hills with no sidewalks
which makes life challenging now especially in the winter with traffic coming and going from our homes
on Sandy Point Rd, Pelton Rd and Scenic View Drive and with increased traffic of 437 vehicles estimated
daily we feel it is a safety hazard waiting to occurl
Children ride their bikes on the side of the street with gullies that are often filled with water from large
rainfalls and school buses transport them and stop and pull into Scenic View Dr to pick up students then
back across Sandy Point Rd onto Pelton Rd where some of the increased traffic will be coming and
going — the buss then proceeds up a steep hill with a blind knoll just where the entrance to your 2100
Sandy Point Rd will be. Students walk on the side of the rd. navigating the hill, snow banks and traffic
on Sandy Point and Pelton Rd.
We have had incidences of cars going in the ditch and a school 'bus that slid on the hill and into the steep
gully on the downward grade towards Pelton Rd.
Pelton Rd also has a significant blind knoll and its steep grade makes winter and summer navigating on
narrow streets tricky for drivers and pedestrians. With the proposed increase in traffic, the weather, the
school buses I feel this will create bottlenecks and concern for accidents and put our children at riskl
In looking at the Entry Drive Diagram which goes along Ridgeview Trail — driving in the winter may
create challenges in both ascending and descending that hill to the exit and entrance of Sandy Point Rd
which is where the hlind knoll Is.
Our neighborhood already has traffic increases in the summer every 45-50 minutes from the Ferry -
Peninsula Princess at the top of the hill by Westmount and if traffic is heading left on Foster Thurston the
traffic from the Hospital, Xerox employees etc. make it dangerous and challenging in the am and afternoon
turning left at the zoo onto Foster Thurston and the Arterial. I feel there should already be lights there
due to accidents resulting from high traffic times and not having a clear view to the left due to brush and
trees impeding a clear view to pull out. We oppose_ this development at the proposed location.
Respectfully Brenda & Kevin McDermott
Brian and Kathy Lynch
46 Beach Road
Saint John N.B. E2K 5M5
January 22, 2021
Mayor and Saint John Councilors
City of Saint John N.B.
PO Box 1971
Saint John N.B. E21. 41_1
Dear Mayor and Saint John Councilors:
Regarding the Proposed Ethos Ridge Proiect 2100 Sandy Point Road
The magnitude of the apartment complex proposed for 2100 Sandy Point Road was a surprise to us
and we have concerns with the development and the effect it will have on our community. We have
been Beach Road residents for 38 years and very much appreciate being able to live in an area with
a low traffic flow that allows us to safely walk the neighborhood on a daily basis. Our primary
concerns are with the increased traffic flow, increase in storm water drainage and the ability of the
city's water and sewerage infrastructure to efficiently handle the flow from this project. Also, the
needs of the retirement community that Ethos Ridge is supposedly targeting are already adequately
met by the Shannex complex and The Chateau Champlain in the Milledgeville area.
From the documents submitted regarding the proposal to Common Council for your January
10,2021 meeting we are not able to have a clear vision as to what the project will entail. The overall
theme of the project is presented as being that "Ethos Ridge is a proposed 125 Unit retirement
community located in Milledgeville...". However, later in the documents it is described as, "Not only
will this project provide housing opportunities for seniors, and residents who may not want to leave
this ,gem of a community....". Suggesting the project will provide apartments to both the senior
community and others. The point being that it will not be solely a retirement community but more
apt to be an apartment complex. If so, this complex will substantially increase the traffic flow to the
area and put demands on the infrastructure much greater than if it was a retirement complex solely
for seniors 75+. It is also interesting to note there are only 3 handicapped parking spaces out of 70
in the parking garage which seems inadequate for a retirement complex.
There is already concerns with the traffic flows and speed of traffic on the Sandy Point Road
speedway. A few days ago while walking we witnessed a distracted driver ignore a yield sign at the
Westmount Drive intersection and if it not for the on -coming driver with the right of way slamming
on his brakes at the last minute there would have been a major collision with severe injury or death.
269
January 20, 2021
Blake and Bonnie Crawford
2024 Sandy Point Road
Saint John, NB E2KSG9
To Whom It May Concern
I am writing this letter to address concerns that we have regarding the Ethos Ridge development on
2100 Sandy Point Road. 1+Ve built our home 30 years ago and have lined in this quiet neighborhood and
raised our children here.
1) There will be a huge increase in the number of vehicles on the street . The exit and entrance on
Sandy Point Road is at the top of a blind hill where children play and families walk There are no
sidewalks and very little lighting there. This increases the likelihood of accidents.
2) We are concerned that the construction of this complex will causes problems with our well as
we live below the level of the building and blasting will be necessary. We have no interest in
hooking up to city water as it will be too expensive for us to do so and we are very happy with
the well water that we currently have.
3) This complex will destroy the green space that the deer in this area (highest population of deer
in the city) and they will have to migrate onto our property for feed. As you know we have the
highest rate of tick in this area.
4) We area secondary road and do not get ploughed sometimes for a day or two. This makes a
dangerous situation for emergency vehicles to enter the complex at their intersection and also
Sandy Pt Rd intersection.
Blake and Bonnie Crawford
270
Jan 21, 2021
To whom it may concern:
We would like to express our concern for the proposed Ethos Ridge development. We do not believe
that this kind of development is appropriate for the area and we can see no reason for changing the
zoning to allow it to happen.
This is a quiet community, which is why we moved here 25 years ago, and the Sandy Point, Pelton and
Westmount roads are used extensively by the residents for walking, jogging and biking. We feel the
long-term traffic, and the heavy traffic that will be the result of the, we expect, lengthy construction
process, will be highly detrimental to this activity.
Already, in advance of any kind of approval, the developers have driven steel tracked vehicles the length
of Pelton road with resultant mess and damage to the road. This, we sense, is a harbinger for what is to
come.
We are also concerned that the project, once started, will not be adequately completed, leaving the land
and area a mess. We are well into the second decade of putting up with the eyesore caused by the
development on Fieldstone drive and we really don't want to see that kind of mess on both sides of the
road.
The land in question, in our opinion, is best suited for a park or greenspace, but if development must
occur, it would be much more appropriate for single family houses as that would be in keeping with rest
of the community.
Sincerely,
Mary Beth and Robert Ash
72 Beach Road
Robert.ash@lordsheffield.com
506 650-9891
271
January 22, 2021
To Whom It May Concern;
The following are my concerns about the Ethos Development at Sandy Point area in Millidgeville
Safety and security is paramount. The entrance to the Foster Thurston and Sandy Point roads are
extremely busy at this point in time requiring a roundabout for the heavy traffic. Many speed, rushing
to their destination of the hospital, university or ferry . The streets are dangerous for walking or
cycling as they were never designed for heavy traffic, just a country road. There are no sidewalks nor
street lights as in other city neighbourhoods. Many from the neighbourhood have relocated here
because of the quiet rural community.
With the Ethos Development project there will be delivery trucks, staff, ambulances, residents and
families entering and exiting. Huge machinery will be operating daily for months upending the
geological structure in the area. The noise is another factor.
Our wells and septic systems will be affected possibly contaminating the water.
My home is on the water and is lower than the development which concerns me. Since the
development of Fieldstone Subdivision on Foster Thurston, there has been an increase in water
drainage causing ditches to overflow and culverts to be replaced several times in one year. This is
extra costs to the city. creating drainage , culverts replaced within a year of each other because of the
force of water pressure. I have a brook running into my property which has overflowed because of the
water flowing downhill. This created heavy costs of a retainer wall and drainage as well as a
neighbours road to be built up. This will worsen with the drilling of the rock ledges and clearing of the
forest area causing unnatural flow patterns and erosion. This area on the Kennebecasis River is an
important watershed and most vulnerable. We are having more flooding as climate change progresses.
Home insurance rates have increased due to this vulnerability.
Thanking you for your time.
Margaret Hayward
2180 Sandy Point Road
633-0132
trulyhayward@hotmail.com
)%— , e16LM—.. y I—< _ L - c
272
January 12, 2021
To: City Council & Planning Advisory Commitee of Saint John, NB
This letter is regarding the plan for development "Ethos Ridge" for 120 residential units complex, to be
built at the parcel of land off 2100 Sandy Point Road and was introduce to city council on January 11th,
2021.
As property owners, just across the street from this development, we have great concerns that this
development will cause us undue hardship and undermine our quality of living.
First and foremost, we moved to the neighborhood about three years ago. The reason we bought the
property was that we enjoy its rural setting and that the house not connected to the city water and
septic services. Now, if this development goes ahead, it will counter the exact reasons for our decision
to moved here at 2045 Sandy Point Road, Saint John, Instead of choosing to live in Rothesay or
Quispamsis. We don't want the city water and sewage and we don't want to be forced to pay for it.
Second, the area is zoned rural and outside the primary development area according to plan SJ, we
would like that the previous decisions that were implemented from prior council and plan SJ, to be
honored. Basically, we don't agree to having our rural neighborhood to become a commercial one.
Third, this development will create excessive noise, lights and air pollution from the heavy traffic from
cars, trucks, ambulances, fire trucks, etc. Our narrow street is not designed to accommodate such an
increase in traffic, there is also no sidewalks and would become a security issue with all the pedestrians
walking in the neighborhood. Furthermore, due to the heavy construction, it can comprise our water
well.
Finally, we are not against this project, this project looks like it got great potential and could easily be
develop somewhere else in the city, like for example, on the property of the Cheery Brook Zoo. This
project does not fit our needs and will disturb the neighborhood in a unprecedent way. Just like
Westmount Street already said NO, we ask city council to vote against this project, we are not any
different.
Thank you for reading,
Stephane Brideau
Nancy Brideau
5NI
273
January 22, 2021
Rosanne & Michael Thorne
30 Beach Rd
Saint John, NB
To Whom It May Concern,
am writing this letter today to express our objection to the proposed development of land between
Pelton and Westmorland road that is currently zoned rural.
This parcel of land should not be developed into a 120 unit residential complex as it certainly does not fit
the surroundings, nor can the area accommodate the significant increase in traffic this development will
bring. This is a very quiet residential area that supports a large population of wildlife. Outside of the
increased traffic for the residents, is the significant impact on wildlife this development complex will
have. There currently is a large deer population that have always lived in this area. Increased traffic and
decreasing animal habitat will pose a significant safety risk for both residents and the animals that reside
here.
My husband and I have lived in this area for over 30 years and are very disheartened to see this
beautiful piece of land be turned into large heavy traffic apartment complex that will forever more be an
eyesore. This will change the natural environment and will bring negative consequences for years to
come to all the citizens that call this area home.
I understand the need to grow as a city, but we need to make sure decisions made today align with the
needs and values of the community. I trust you will make the right decision on this issue. Thank you for
your consideration to our viewpoint.
Sincerely
274
/ A 16-Jan-2021
a �/ To Whom it may concern,
I am writing to share my concerns regarding the proposed Ethos Ridge development. As
a resident of Pelton Road, I believe the neighbourhood will be adversely affected by this
project.
The area is a quiet, spacious, rural neighbourhood, with limited vehicular traffic. These
aspects make it a wonderful place to live and raise a family. A high -density development
does not match the community landscape. This is evident based on the area being zoned
RU (rural) and outside the PDA (Primary Development Area). The disruption to the
neighbourhood by the construction process will negatively impact daily life of all the
nearby residents.
As a rural area, there are no sidewalks in the vicinity, which is currently not an issue
given the low amount of traffic. Many of the residents, myself included, often go for
walks along the roads of the neighbourhood. These roads are hilly and have areas of low
visibility for oncoming traffic. Both the construction and the addition of 120 residents to
the neighbourhood will result in a significant increase in vehicle traffic. This increase will
make it no !anger possible for members of this community to safely walk in their
neighbourhood. In my opinion, this is a major issue for both current and future residents
of this neighbourhood.
Thank you for taking the time to read this.
Sincerely,
Lindsay Ott
275
360 Pelton Road
Saint John, NB E2K5H7
January 23, 2021
City Clerk
15 Market Square
Saint John, NB, E2L 1E8
Dear Sir
This letter is written in opposition to the proposed "Ethos Ridge" development at
2100 Sandy Point Road.
I have been a resident of this area for the past 50 years. Before purchasing my own
property at 360 Pelton Road I lived with my parents on Pelton Road. When I
purchased my property I was very aware of the services provided and the services I
would be responsible for in terms of infrastructure and maintenance. In this area I
have a well and a septic system, paying myself for the infrastructure and its
maintenance. The road infrastructure is minimal with no curbs or sidewalks and
the lowest priority for snowplowing. The city provides garbage pickup, minimal
road maintenance and basic lighting. I pay the same tax rate as other primary
homeowners in the city. I have happily lived here since 1986 content with my
choices and responsibilities.
The following list states some of my concerns for the development:
1. the impact of blasting and construction on the infrastructure of my well and
septic system
2. the impact of the change in topography due to the construction of a 4 story,
extensive complex on a parcel of land that is bounded by the Kennebecasis River
and the subsequent changes to drainage and the water table.
3. the impact of construction vehicles accessing the area constructing a roadway
into the construction site
4. the impact of increased traffic on the single entry roadway (Sandy Pt Rd and the
newly constructed roadway entering on to Sandy Pt Rad)
S. the inadequate traffic report taken during the pandemic shut down and when the
ferry was not in operation and not including the critical intersection of Sandy Pt Rd
and Foster Thurston/Sandy Pt Rd adjacent to the zoo
Concurrent with these concerns are my questions:
1. Has there been a proper environmental assessment done to determine the impact
of blasting and construction and how that seismic activity may impact on the wells
and septic systems of the area? If so what are the results/indicators of the effects?
276
2. Has there been a proper environmental and fisheries departments assessment
done on the impact of changes in the drainage and watershed to the river system
and to the quality and availability of water for all dependent on the water table for
their wells? If not, why not? This is an important component of the possible
impacts of the development and proper authorization should be required at both a
local level and at a provincial level.
3. Sandy Point Road from Westmount toward the Beach Rd is a narrow roadway
with a narrow shoulder and deep ditches. Has the city considered the impact of the
increased traffic especially with large construction vehicles on the road
infrastructure? Should the proposal go ahead will the city be responsible for
returning the road to its present condition? Will the city bar all construction
vehicles from accessing the construction site by way of Pelton Road? This past week
when excavators could not access the property from Sandy Pt Rd they drove the
excavator on its metal treads down Sandy Pt Rd and then down Pelton Rd to access
the site.
4. Have the fire, police and ambulance services been consulted regarding the single
entry into a site, along a roadway that will be at a steep grade with a hairpin turn
into a proposed 125 unit complex for people 75 years of age and older? If so, what
are their concerns?
S. There is no doubt that the traffic in our area will be greatly impacted by the
addition of 125 households, employees of the complex and service vehicles required
to maintain the complex. The traffic study included in the proposal is deficient in its
data as it did not survey at a time of normal activity such as non pandemic, ferry
running, and beginning at lam. The school buses arrive before 8 am for example.
Will there be a proper study of the traffic pattern to include the intersection at
Foster Thurston and Sandy Pt? It is the area of bottle neck at peak times.
Thank you for the opportunity to express some of my concerns with a proposal that
does not meet Plan SJ policy. There have been many homes built in this area over
the 50 years of my life here and the promise of new neighbours and a consistent
level of activity has always been welcome. My objection is to the'spot change' in
zoning, something the city council has sought to avoid in Plan SJ, and a complex that
would be completely out of synch with our rural designation. Additionally forcing
neighbours to conform to water and sewage changes inflicted upon them through
this development is totally unnecessary and extremely costly.
Sincerely
Jill Jollineau
277
Leo Maloney
29 Scenic View Dr.
Saint John, NB
E2K 5K3
Jonathan Taylor
Common Clerk,
City of Saint John
RE: Ethos Ridge Proposed Development
am writing to express my opposition to this project.The area of the city in which this
project is proposed is a uniquely quiet residential neighbourhood, composed entirely of single
family residences. It should remain as such. I, personally, would not oppose the identified area
being rezoned to single family residential. However, the proposed commercial development
project would have a dramatically negative effect on the neighbourhood in regard to increased
daily traffic and the overall tranquility and lifestyle of those of us (many retired) who live here.
am also concerned about the impact that the construction may have on the water table that we
all rely on for our well water. Simply stated, this project is a bad fit for this neighbourhood.
Signed,
4�� VAZ7—
Jan. 21, 2021
278
352 Pelton Road
Saint John
New Brunswick
E2K 5H7
January 28, 2021
Mayor Darling and Councillors
Re: Proposed Municipal Plan Amendment 2100 Sandy Point Road
Concerns
• Zoning changes
There are numerous inconsistencies between the different reports within the proposal. For
instance, the number of units, the sanitary load calculations, height of the facility and traffic
numbers.
• Water and sewage
The neighbouring properties all have wells and septic systems. When my husband and I
built on Pelton Road in 1991, the well -digger said he was getting pretty worried about
the availability of water because he had dug most of the wells on the street and it was
becoming more difficult to find water.
Presently there is no water and sewage at 2100 Sandy Point Road. The proponent must provide
these services and an entrance to the site. It is proposed to join with the City services at
Westmount Drive and bring the lines along Sandy Point Road to 2100, through the field and
over the hill. I am quite worried that the construction of the water and sewer lines to this site
may change the flow of water or in some way damage the water table. There is history of that
happening in adjacent properties when a well has been dug. If my well casing gets cracked or if
the water table is drained due to this construction, is the city of Saint John prepared to dig me a
new well?
Having the proponent provide the infrastructure for the water and sewage implies that there
will be little cost to the city. BUT on Page 272 it says the city "has advised that downstream
wastewater lift stations are at or near their pumping capacity." These stations are scheduled to
be upgraded in the coming years but no specific time is given. Will this not be a considerable
cost to the city?
279
• Traffic Study
This study was conducted around the time that COVID restrictions began which limited
traffic from the east coming to work and study at UNBSJ. The Millidgeville ferry wasn't
operating, and there was no mention at all about the very dangerous intersection of
Sandy Point Road and Foster Thurston.
There was no mention that when there is high flooding in the spring in exceptional
flood years, (2 in the last 5 years), Kennebecasis Drive is closed. In any full moon, high
tide and torrential rain then Foster Thurston and Ashburn Lake Road are closed for a
couple of days. Sometimes both major access roads are flooded at the same time.
• Environment
Page 273 of the proposal states that the majority of the stormwater will go directly
into the river. Most climate change specialists are predicting higher seasonal
temperatures and precipitation with more severe rain storms and greater snowfall,
bringing increased precipitation. Floods once expected every 30 years are now
more likely to be once every five years or even every two to three years.
Paved parking spaces, the removal of vegetation and the covering of much of the acreage with
the building along with a paved street will cause an enormous amount of groundwater run-off.
This property and the neighbouring ones might also become more vulnerable to
flooding. Might that mean an ugly seawall along the river?
The environmental impact of a development of that size on the river will be great.
Even if the building is sited back from the shore, will the developer remove shoreline
vegetation and put in lawn right to the water? A 30 m. buffer is required by provincial
law, but it's very rarely followed and almost never enforced. People usually want an
unobstructed view. Building on the shore could increase erosion and destroy the
shoreline ecosystem.
I respectfully ask that an environmental assessment be undertaken which would
concentrate on all aspects of this proposal.
Sincerely,
��t�t-cam
Joan Pearce 652-1551
352 Pelton Road Saint John, NB, E2K 5117
420 Pelton Road
Saint John, NB E2K 5H7
January 29, 2021
Mr. Jonathan Taylor
Common Clerk
City of Saint John
15 Market Square
Saint John, NB
Subject: Proposed Municipal Plan Amendment "Re 2100 Sandy Point Road"
Dear sir
Thank you for the opportunity to express my views and concerns regarding the re -
designation of the properties identified as PID numbers 55233233 and 55233977
and the proposed amendments to Schedules A and B of the Municipal Development
Plan and to extend the boundaries of the Primary Development Area (PDA) to
accommodate the proposed Ethos Ridge Development.
The Public Notice states that the reason for those changes is "To permit the
development of a retirement community". Yet the re -designation of PID no.
55233233 from Rural and Resource to stable area as clearly shown on the map has
absolutely nothing to do with the retirement project. Is there some kind of hidden
agenda here? The re -designation should not be allowed without full disclosure.
Currently the relevant portion of the PDA lies to the west of Sandy Point Road and
Westmount Drive centered on the junction they make with Kennebecasis Drive.
That junction is the closest point on the PDA boundary that you can get to the
proposed development. It is approximately a quarter of a kilometre away. There is
clearly no common boundary between the two, as the proposal would have us
believe.
Under the subtitle Future Land Use Schedule B (page 270 of the proposal) the first
paragraph states, "the proposed Ethos site is literally touching/adjacent to the edge
of the existing PDA along Sandy Point Road". This is not so!
The same paragraph goes on to say Policy LU-1 recognizes that the boundaries of
land use designation are `intended to be approximate'. This is not so!
However Policy LU-3 does state `that the boundaries of land use designations, as
shown on the Future Land Use map (Schedule B) are intended to be approximate,
exce t where they coincide with roads or other clearly defined physical features.'
281
This clearly and firmly fixes the MPA boundary passing through the Sandy Pt
Rd/Westmount Dr/Kennebecasis Dr junction. There clearly is no common
boundary!
Under the heading Major Community Facilities the first paragraph (page 271) of the
proposal states:
"By providing aging in community, Ethos proposal will contribute positively to the
neighborhood as ensured by Policy LU-90".
Policy LU-90 follows in its entirety:
Council shall: Ensure that new major community facilities that are used by residents
across the City and the Greater Saint John Region are located in areas
designated Major Community Facilities and shall generally be
Permitted only subject to a rezoning process where compliance is
demonstrated with the following requirements:
a. The proposed land use is desirable and contributes positively to the
neighbourhood;
b. The proposal is compatible with surrounding land uses;
c. The development is in a location where all necessary water and
wastewater services, protective services, and appropriate
transportation infrastructure including public transit can be provided;
d. Site design features that address such matters as safe access,
buffering and landscaping, site grading and storm water management
are incorporated;
e. A high quality exterior building design is provided that is consistent
with the Urban Design Principles in the Municipal Plan; and
f. Public transit and active transportation links are provided to and
from other key destinations.
I find the quotation just above the insertion of Policy LU-90 above rather baffling
and meaningless. The policy states what council will ensure happens
in new major community facilities where compliance is demonstrated
through meeting requirements a. through f. as listed above.
My views on requirement a. through f. and how the proposal responds to them
follow:
a. the neighbourhood disagrees
b. it isn't
c. I believe this requirement cannot adequately be met particularly
with regard to protective services and transportation infrastructure
including public transit.
d. I believe the project cannot provide safe access. The remainder lies
in the eyes of the beholder.
e. the current zoning bylaws prohibit building heights above 2 storeys
with a height limit of 11 metres. This plan clearly violates this
requirement.
2
282
f. They are not at present, who will provide them in future?
If the PDA is expanded to incorporate the Ethos Ridge project where will the new
boundaries be? The eastern boundary down Sandy Point Road should not extend
beyond PD no. 55233977 in the absence of any good explanation of why PD no.
55233233 should be included. Will they extend east down Sandy Point Road just far
enough to include the project? Will they extend north up Westmount Drive to the
Kennebecasis River then down the shoreline to meet and coincide with the
development? What would the property encompassed by the extension have in
common with a 125 unit complex to justify it?
It seems to me that the re -designation of the properties represents a classic case of
"Spot Rezoning" something that I understand PLAN SJ was designed to eliminate. I
believe that approving this project would be a precedent -setting action that will
come back to haunt city council.
Services
The developers intend to connect to the existing municipal sanitary and water
system at the intersection of Sandy Point Road and Westmount Drive, some 250
metres southward on Sandy Point Road. Would this require that all of the
residences on that stretch of road be forced to hook-up to the facilities as seems to
be the normal practice? This would force these residents to undergo very
substantial 'up front' costs, lose the long term benefits expected from their large
investments in wells and septic systems and face the on -going costs (approximately
$1200 per year) for water that they neither need nor want.
The Access Road
On page 271 of the proposal in the first paragraph it is stated that "the subtle entry
drive will rise from Sandy Point Road and then descend over the ridge which will
completely hide the project from the road..." This seems to suggest that the access
road will be something of a bucolic country lane. Surely the access road would have
to be a city street conforming in all respects to the requirement of such; like all
utility and services be underground, the street will be paved with sidewalks, curbs,
storm sewers, markings and signage. A conforming street could hardly be called
'subtle'. The paragraph cited is, I believe, disingenuous.
Will the city be responsible for snowplowing, sanding, and salting? If so, given the
nature of the development, it would probably have to be in the very high priority
category for such.
Does it have the approval of our Protective Services like fire, police protection,
ambulance service, etc.? If this proposed development had been in place when the
decision to decommission the Millidgeville Fire Station would it have had any
impact on the decision? It would not likely have changed the decision but would
surely have been considered germane. These considerations are important - it is a
single access to a complex consisting of 125 units for seniors 75 years of age and
over - the access road seems to be about 0.5 kilometres long and comprised of a 180
3
283
degree loop astride the ridge that is very steep sided on the side away from Sandy
Point Road. The grades are significant which could result in treacherous conditions
especially when negotiating the'loop' during our wintry season.
The traffic in and out will be significant - the proposal itself estimates that the
complex will have 216 people in residence, in addition to 27 staff and an expectation
of 108 visitors.
Since the complex is geared to 75+ years old folk who want to live an active lifestyle
it is hard to believe that most of them will be willing to give up their driving
privileges and their cars for a good many years to come (It is often expressed that
75 years of age is the new 65).
Exactly how much parking will be provided?
Additionally should the project proceed I believe that city council should require
that the access road be completed and in service before any construction can begin
at the building site. There should be an absolute ban on any construction traffic on
Pelton Road, which is in no shape to handle it.
The last paragraph in the proposal states that, "an Engineer Traffic Study has been
completed by Englobe Engineer to make sure no negative impacts to the local
system will be experienced". To suggest that adding some 351 people will
experience no negative impacts, most of them drivers, to this north end of Sandy
Point Road, is utterly ridiculous, in my view.
The outdated incomplete study fails to recognize that the real traffic choke point will
be where Sandy Point Road connects to Foster Thurston Drive. Very short sight line
combined with morning and afternoon rush traffic would make Traffic Lights there
absolutely required. Not doing so would be absolutely unconscionable on behalf of
the city.
Water
All of the residents in the entire neighbourhood surrounding the proposed
development are dependent on our wells for our water supply. We greatly fear that
our wells will be negatively impacted by the blasting that would be required at the
building site which sits on solid rock and during the construction of the access road
that will need to be cut through the solid rock ridge that the access road will need to
straddle and continue downhill to the building site.
Many of us have had problem with the security of water supply over the years.
I had to drill a new well some years ago because the old one kept running dry during
the summer months. The new well had to be drilled to a depth of 500 feet before
getting water and yet I have still run out of water during hot spells. I know of others
in the neighbourhood who have also had to carefully ration their water usage to
avoid running dry. One resident lost all of their water and had to drill a new one as
a result of a neighbor drilling a new well.
Should this development go ahead I believe it incumbent on the city to require the
developer to engage an independent contractor with the expertise to test all of the
wells in the area for water quality and flow volumes to provide solid base -line data
to use in any dispute resolution arising from the project.
4
KM
It is my understanding that this proposal excludes consideration of using Pelton
Road as a part of the traffic flow that would be engendered by its approval. The
proponents are quoted in the newspaper saying that, "Traffic flow concerns will be
mitigated by limiting property access to a single entry point off Sandy Point Road".
The map that is part of the proposal shows only a gated entrance from Pelton Road
to the complex presumably denying access to anx motor vehicle traffic. The
inclusion of Pelton Road in the project would require a whole new conversation by
all the parties impacted.
In closing I wish to state that I would fully approve of any development proposal on
the subject properties that is appropriate to the neighbourhood. This proposal,
however, I feel will be highly detrimental to the residential character of the
neighbourhood and highly destructive to the whole sense of 'pride in community'
that forms the fabric from which all great cities are woven. All of the flowery
phrases meant to evoke idyllic'Shangri-La"- like images of the proposal cannot
change the fact that it is inappropriate to this community. Many may suggest that
our positions on this matter are elitist. Our community is composed of a broad
cross-section of residents -employed and retired, residences comprised of floor
spaces of 800 sq ft to grand homes as a review of property assessments would
attest. We have welcomed construction in the area within and outside the PDA and
an increase in our community population - young families bringing vitality and older
members bringing wisdom with their experiences. It is the scope and magnitude of
this particular proposal that we object to vigorously.
Thank you very much for the opportunity to make my views and opinions known.
Writing this piece has given me a new appreciation for the burden that is placed
upon you who are given the onerous duty of reading it and others of its ilk. Thank
you very much for your patient commitment and exercising of 'due diligence' on
behalf of us all.
Sincerely
Wayne Jollineau
cc. Gary Sullivan
John MacKenzie
Sean Casey
Shirley McAlary
i«1
285
January 29, 2021
To Mayor and Council CSJ, Common Clerk and PAC,
My name is Brian J. MacDonald, I live at 978 Kennebecasis Drive in the City of Saint John, E21K 5A9. My
home phone number is 648-9481.1 am writing in opposition to the rezoning and development of a 120-
unit multi-storey residential complex to be located at 2100 Sandy Point Road.
PlanSJ was adopted in 2012 that clearly defined Primary Development Area (PDA) where 95% of all
development (including senior living developments) was to be located using existing infrastructure.
Rural low density residential areas are to be protected from high density development
Plan SJ recognized that there could be exceptions to allow other use buildings inside rural residential
zones including; a developer was unable to find land for a proposed development. According to the
developers, they spent a year looking for a property similar to the property at 2100 Sand Point Road —
the exception is if land is not available inside the PDA for the development - not land similar to 2100
Sand Point Road. The development doesn't need 19 acres to replicate the buildings for the development
and if required, a well -designed landscape plan would provide natural and sustainable amenities for
older seniors.
Even if there were no available land to build a seniors' nursing home, land Use (LU) 90 Plan Si outlines a
number of criteria that need to be satisfied before a development like the Ethos project could go
forward. There needs to be a positive for the neighbourhood — there is a growing unanimous resistance
to the project from the neighbourhoods) affected by this project — where is the positive. Where is the
compatibility of the land use; this area is low density rural residential — single homes. Seniors nursing
homes are high density. To apply a schedule B designation of this development as a Community Facility
that is surrounded by other community facilities like the SJRH, UNBSJ and the Peninsula Princess Car
Ferry could almost be considered misleading. The SJRH and UNBSJ are several Kms away. The Peninsula
Princess Ferry landing (probably better described as a transportation link) is over a km away from the
actual physical buildings proposed for this development.. The Ethos facility will not be surrounded by
other community facilities — it will be surrounded by single family homes in a rural setting. This
development will negatively impact the adjacent property owners.
The proposed building site for the Ethos development is not adjacent to the existing PDA boundary line
and existing infrastructure. The actual buildings are probably Y4 kilometer away from the PDA boundary
having to drive past a number of homes and then turning and passing by other homes.
The City of Saint John has indicated that the lift stations servicing the existing demand inside the PDA in
this area are nearing capacity — what will be the immediate impact and what will be the future impact
on existing infrastructure as a result of an unplanned 125 units being added into a Rural area that is not
zoned for such a development? Water pressure, has been an issue in the past for this area.
What is the implication for Protective Services, specifically fire services? Nursing homes and senior care
homes like the Ethos development are classified as high risk, high density. There was no Emergency
Fire Response Plan as part of the proposal. Fires in these facilities require high number of fire personnel
arriving at the scene within a recommended NFPA response time, with adequate water supply.
Building design within the context of the neighbourhood was an important consideration within the
parameters LU 90 of Plan Si. Does it complement the character of the neighbourhood? Four storey
buildings, high density housing does not add to this rural residential neighbourhood. Ethos facility may
be a beautiful building but out of context with single family homes in a rural residential neighbourhood.
Plan SJ's vision was to transform Saint John beyond traditional land use planning. Importantly, it tackles
the "fundamental quality of life issues ....". Currently families living in this area can take a comfortable
walk or bicycle without over worrying about a large volume of vehicle traffic and activity that will occur
as a result of this development, it is just basically people who live in the neighbourhood — neighbours —
that is what the area was intended to provide.
The Ethos development will require a large staff (most of whom, if not all. will drive to the development)
to take care of over 200 seniors at various stages of senior life and to manage large multi storey
buildings with complex building systems and maintenance issues that will require staff 24/7 - 365 days.
There will be a need for a significant number of support services having to go to the complex on a
regular routine basis (and off hours for emergency service) including garbage removal, food deliveries,
routine service maintenance on different systems servicing the building (fire, heating, air conditioning
etc.) are some of the outside agencies that will need to visit the site. This is a workplace imposed on a
rural/residential area - a place that people go to work. Add to this work activity and vehicle traffic,
family and friends visiting the facility at different times of the day, 365 days of the year. This activity and
traffic doesn't end at the entrance to the site. There will be folks visiting seniors that will continue down
Sand Point Road to Beach Road enjoying the views and looking at some of the new homes in the area.
There is the cul de sac at the end of Pelton Road that has yet to be determined by the developer on how
it may be used.
This increased activity and vehicle traffic resulting from this development is going to take away from the
quality of life for families in this area had envisioned and enjoyed. There will be vehicle congestion,
noise pollution from the traffic and light pollution from the facility itself.
There will also be a significant spill over effect onto the flow of traffic along Kennebecasis Drive,
Westmount Drive and Sand Point Road leading to and from the connector intersection of Foster
Thurston and Sand Point Road. The developers' proposal included a traffic study. The data used to
develop the traffic flows did take into account the Pandemic affect but the use of past statistics, future
projections, LOS really wasn't very clear, was it for a certain day, week, month or a year. A traffic study
conducted by City of Saint John in 2011 confirmed what citizens living in the area at that time
complained of the dangers at that intersection. A decade later families living in this area are again
bringing attention to this dangerous intersection and asking not to add additional traffic into
intersection, especially when it is not necessary. Any increase in traffic at the intersection near the
former Cherry Brook Zoo location will make the intersection more dangerous. If you were to ask anyone
living and driving in this area what their thoughts are on navigating through the Cherry Brook
287
Intersection — dangerous. The developer's study may paint a different picture but the reality is —
dangerous. Increase traffic — more dangerous.
The intersection of Kennebecasis Drive, Westmount and Sandy Point Road is also a very difficult
intersection, commuters are using the Peninsula Car Ferry to travel back and forth to work and often
times might be in a hurry to get to work or to catch the ferry to go back home or to their cottages. This
intersection is the exact location where traffic will be turning to enter and exit from that section of Sand
Point Road leading down to or from the proposed Ethos development. Adding more traffic into that
intersection creates more stress on travelling through that intersection, especially for residents living in
the area.
The families living in this area are opposing this application; City of Saint John has already stated that the
infrastructure servicing the PDA is nearing capacity in this area — the application does not satisfy the
criteria in LU 90 Plan SJ or the designation of the development as a Community Facility in schedule B for
this area and traffic concerns will be dramatically increased. I think the application to rezone the area
should be denied.
Thank you for your consideration on this important community issue.
Brian J. MacDonald
KM
January 15, 2021
To Whom I May Concern:
This letter is being submitted by myself, Lance A. Crawford and my wife Alana M.
Crawford. We have resided at 2044 Sandy Point Road (PID 00052266) since April of
1991, and our property is adjacent to the proposed roadway leading to the proposed Ethos
Ridge Development. We want it duly noted for the record, that at no time did we sanction
the proposed venture, when the gentleman from Ethos provided us with the brochure
announcing the project.
As senior citizens, some of our concerns, are as follow:
• Given that the current residents have their own wells and septic tanks, any blasting
would pose an opportunity to destroy these infrastructures.
What are the plans regarding water and sewerage to the proposed Development?
It is our understanding our current neighbours on Sandy Point Road have their own
wells and septic tanks, and do not need, nor want to be included in any plan to join
the City's systems. For example, our house would be close to 400 feet from any
water and sewage lines and to join the City's systems, could cost us in excess of
$60K.
• Given that Sandy Point Road is a tertiary road regarding plowing in the winter
months, has there been any thought to how Fire and/or Ambulance vehicles can
adequately provide protection to "seniors' in the proposed complex, at the top of
the Ridge, given that the slope on the hill is at least 30 degrees?
• We are extremely concerned regarding increased road traffic, noise pollution and
years of construction traffic on our already extremely narrow, congested streets,
that do not have sidewalks or proper lighting? It is already extremely dangerous
walking our surrounding narrow streets, and we presently have grave concerns for
the residents' safety.
• With regard to vehicle traffic, what measures would be taken with respect to the
increased congestion at the intersection of Foster Thurston Drive, which is already
a disaster waiting to happen?
• What measures are being taken regarding the safe relocation of the huge wildlife
population that currently has made this area their home?
• Has any consideration been given to the safety and health of potential workers on
the site, in regard to exposure to ticks and the risk that they carry Lyme Disease?
Do the employers of these workers accept potential increase workers'
compensation costs because of this potential risk to their workers? For your
information, untreated, Lyme disease can spread to other parts of your body for
several months to years after infection, causing arthritis and nervous system
problems.
It would be
Yours truly,
Lance A. Cr
2044 Sandy
Saint John, ] ,
506 633-5189 or 506 333-5201
bkdandy@nb.sympatico.ca
290
Stephen Ough
1970 Sandy Point Road
Saint John, N.B.
January 20, 2021
January 23, 2021
Planning and Development Permit Department
15 Market Square
Saint John, NB, E21, 1E8
(506) 658-4455
To Whom it May Concern:
This letter is a written confirmation of our express opposition to the development of
the Ethos Ridge Development at 2100 Sandy Point Road ("Project") without the
proper transit, road development, sideway, traffic management, water and sewage
infrastructure enhancements being incorporated as part of the larger development
and community impact plan.
For the record, we are supportive of development in our neighborhood, and for the
developers of the Project; however, we as the community at large, are asking the
City of Saint John to mandate the required upgrades to the surrounding
infrastructure to support a safe, moderated, and balanced approach to a high traffic
development in a low -density region of the City of Saint John.
It is our position, and that of our surrounding members of the community, that the
Project developers have not completed a thorough review of the considerations to
congestion and traffic impact mitigation.
We are long standing members of the community and supporters of development in
the City of Saint John as a whole. It is the entrepreneurial drive of developers,
businesses and companies that will enable Saint John to excel long term. To be
supportive of the Saint John Vision and economic development, we are requesting
that the City of Saint John take a balanced approach of all parties involved by
requiring the following Project enhancements as part of the approval requirements
to the development permit:
Traffic Congestion Mitigation:
- Traffic lights to be installed at Foster Thurston Dr and Sandy Point Rd (in
front of the zoo),
- Traffic lights to be installed at Kennebecasis Drive and Sandy Point Rd (4-
way intersection).
Pedestrian Safety and Community Impact Mitigation:
291
Without these mitigation measures, it is our strong and measured opinion, that this
development should not proceed.
Yours truly,
C.
, -, P - 011fl�
Stephen Ough
292
16/2021 Development of 2100 Sandy Point Road
Development of 2100 Sander Point Road
From: "rbazaluk@bellallant.net" <rbazaluk@bellaliant.net>
To: "rbazaluk@bellallant.net" <rbazaluk@beilallant.net>
Priority: Normal
Date 01/16/2021 03:56 PM
City of Saint John Planning Department
I am writing to voice my objection to the proposal to develop the property at 2100 Sandy Point Road. for a
Seniors Home
As you are aware the property is currently zoned rural, and the developers wish to change this to build a
125 unit Seniors home on the property. I have read the material from the developers hand out as well as
their website and I find a few irregularities between the proposal and their website.
I - No where in the developers literature from the Council meeting does it state that these units will be
owner occupied, in their literature the developer says that elderly people do not want the responsibility of
ownership, yet they are proposing a strata development where the proposed residents aged 75+ will be
owners. .
2 - I have read absolutely nothing stating that the developer will be undertaking an environmental study.
This complex will destroy countless habitats, such as Blue .lays, Finches, Chickadees, Robins, Cardinals
and Eagles. Not to mention the construction will push Skunks, Raccoons, Opossum, Rats, Field mice and
other critters from their habitat to the surrounding homes causing an increase in pests and damages caused
by these animals.
3 - The developer has shown on their proposal that they wish io install a " canoe launch " on the river, they
could not have picked a worse location for this, just slightly downstream from the narrows at Sandy Point
where the current is extremely swift making it hazardous for all but the very experienced canoers ( most
75+ seniors are not experienced cancers ) The current is so swift that it pushes the ferry ( which is located
a few 100 yards downstream ) approximately 20-30 yards downstream,.. a 75 r years old will not be able
to handle this current safely and with the Fire hall located at University & Miliidge Avenues closed, the
swift water rescue equipment will be more than10 minutes away
4 - The statement that the facility will only be seen by a few nearby homes is completely false, the
developers documents show the project is 50 feet tall and will be visible to the majority of properties on
the west end of Pelton Road.as existing stands of trees will be insufficient to block out its presence I
myself will be looking at a workshop, truck/park turnaround, and a garbage facility and a 50 foot tall
building 50 feet from my property
5 - Speaking from experience ( 30 years in the Vancouver Fire Rescue Services with 14 of then in charge
of dispatching Fire apparatus for 7 different Fire Departments) I am gravely concerned with the proposed
location of this facility. 9 km from the closest Fire hall, this puts the residents of this facility at a greater
risk of insufficient medical protection.
The NFPA standards for dispatching is 63-t03 seconds per call, in other words the call taker/dispatcher
takes between 63 - 103 seconds to collect the information from the caller and dispatch the apparatus. If 1
give the benefit of the doubt on the low side I will say the call takes 1 minute. The Fire Hall is 7-8
minutes away so if i add the 1 minute to the 7-8 of travel time I come up with 8-9 minutes and 1 have not
taken into account the 45-60 seconds for the fire personal to suit up, get on the rig and leave the hall, this
now takes us to between 9-10 minutes. I also have not taken into consideration the time it takes for the call
to be generated to 911 Very few people know what to do in this situation, their loved one has collapsed and
their first response is to see what is the problem. If they are alert enough to notify and nearby staff it will.
take anotherl-2 minutes for staff assistance to arrive before any call to 911 is initiated. So to be realistic,
https;Nwebmall.ballaliant.nat/ox6/ox.html
112
293
Development of 2100 Sandy Point Road
an occupant of this facility will be looking at approximately 12 minutes before profession medical help
arrives.
When a cardiac ar x�yt occurs, it is essential to start cardiopulmonary resuscitation (CPR) within 2
minutes. After 3 minutes, global cerebral ischemia (the lark of blood to brain) can lead to progressively
worsening brain injury.
By 9 minutes, severe and irreversible brain damage is likely. After 10 minutes the chances of survival are low.
Even if a person is resuscitated, 8 out of every 10 will be comatose and sustain some level of brain damage. Simply
put, the longer the brain is deprived of oVgen, the worse the damage will be.
This appears to be a wonderful project in the eyes of the developer but certainly not for the health and
wellness of the proposed occupants. This proposed location is completely wrong and should not be
approved for development as a Seniors Facility
Robert Bazaluk
433 Pelton Rd
Saint John NB
rbazaluk@bellaliant.net
6'74-9085
httpsliwebmall.belialiant.naL/ox6/ox.html
2 r2
294
Fr. George. Losler
2021-01-14
Dear Mayor and Saint John Councillors,
I have been reading a proposal put to you on January 11"', relating to a proposed amendment to the
Municipal Development Plan for 2100 Sandy Point Road from Rural Resource to Major Community.
Further reading has perked my interest in opposing the proposed. The rational for the Ethos Ridge
Proposal is very forthcoming in the way it's public relations and marketing people have promoted this
sight as to be the withal for seniors. Though it is a bit narcissistic in the Ethos Ridge's approach to the
city and surrounding citizens about the way water runoff and automobile traffic is to be controlled along
with safety.
On page 272 of the Ethos Ridge Proposal, it states detailed storm water management plans and a
design report indicating how storm water will be managed on site in accordance with the City's Storm
Drainage Design Criteria and all applicable drainage by-laws. The onsite storm water management will
be designed to achieve a net zero impact.
It further states on page 272 --Although the overall development is expected to increase the storm
water runoff from this site, the majority of this increase will continue to be discharged directly to the
Kennebecasis River through overland methods; ditches, swales, and site grading.. A small portion of
this site, adjacent to Sandy Point Road' will require storm water management as it will be discharging
into the existing overland municipal drainage system on Sandy Point Road. Control of this increase in
runoff will be achieved through the design and construction of various retention features including rain
gardens, bio swales, and storm water retention ponds.
I believe that the runoff now on Sandy Point Road is controlled by ditches not city drains.
It also states that in preliminary discussions with the city, they have been advised that downstream
wastewater lift stations are at or near their pumping capacity. These stations are to be upgraded in the
coming years, BUT, we will work with the municipal staff with regards to flows from our system.
I would also like to point out we have also had many problems with water mains breaking In the area
and water pressure.
There's a lot of misleading information and divertive tactics by the Ethos Ridge proposal in these
statements alone. In my experience and noted estimates of the city's engineering projects, duly the
West Side water fiasco, I have lost faith in their engineering ability to get things done right in some
cases. The Ethos proposal and the above statements leave me cynical about their ability to curb water to
achieve a net zero impact on the area in which their proposal presents.
295
The most important issue to my mind is that the area to be developed is in a part of Saint John that is
the Pelton Road and the last part of the Sandy Point Road before it meets the Kennebecasis River which
is NOT serviced by water and sewer systems, and it's a community has mostly wells and cisterns, these
systems being mostly downhill from the proposed construction site. It is very possible and most likely
that these wells could and would be contaminated during construction, let alone the problems arising
from the cisterns.
It is by the Ethos Ridge Proposal admittance that the flow of water and sewage will greatly increase
the pressure to our water and sewage limitations. To an amount of 423609.43 litres per day. Remember
the city has already stated that the pumping stations are already at capacity. Does the Saint John Council
have an estimated cost to increasing the volume of our water and sewer pumping stations capacities to
meet and exceed the requirements of such a project as the Ethos Ridge proposal.
Other interesting factors pop up concerning the Ethos proposal. It is not all that forthcoming about
the cities involvement in their construction project. For one thing they say they are going to connect
with Saint John's water and sewer systems and the start of the Kenebecasis Road and Sandy Point Road
where the service end at that point. There is substantial distance to the proposed driveway from this
point. Who will pay for this extension, the Saint John City or The Ethos Ridge company ? I believe that
the infrastructure needed for this project is beyond what the City could pay at this time as I believe that
the City of Saint John would have to extend the water and sewer to all citizens in this area, to make sure
the water and sewage were right. With a facility of this size sidewalks would have to be included for the
safety of the seniors who may want to walk beyond their facility.
If the construction were to go ahead without new water, sewage, and infrastructure I can foresee
many problems arising from the poor planning of the water control system proposed.
Other situations will arise with the traffic in this area. In the Ethos Ridge proposal they specifically
point only to the areas directly pertaining to Sandy Point Road and Kennebecasis Drive and directly
pertaining to the entrance and exits to the complex. What about where Sandy Point Road meets Foster
Thurston. This section of Saint John's city streets was another III planned project. It's a spot where, it's
accident waiting to happen. Either lights or the reshaping of the road would need to be done.
The reason I mention this is the increase of traffic that the Ethos Ridge proposal fails to mention in
this area and that the Traffic Impact Study was done during the Pandemic. This Traffic study being done
during this time of the Pandemic is not conducive to the natural flow of traffic during a regular year.
There Is no mention of when the Millidgeville ferry is In operation and the amount of traffic it creates
during the months it is in operation. I live quite near the ferry and recognize the increase in traffic every
296
3
year. It also creates a backup problem at the Sandy Point Road and Faster Thurston corner mentioned
above.
Another concern is the recent closing of the Millidgeville Fire Station due to Saint John's budget's
scrutiny and cost cutting. Within the parameters of Millidgeville we now have 4 new apartment
buildings just off of University Ave. Shannex on Millidge Ave., the Regional Hospital and various homes
and older apartments. It leaves one's mind in consternation as to what would the results be if we had a
major fire in any one of the complexes.
I thank the Mayor and City councillors for their time to listen to the citizens of this area where the
proposal to re -designate our Rural Resource and Park to a Major Community Facility is in conflict with
the citizens of the Sandy Point Road, Pelton Road, and Kennebecasis Drive area where the Ethos Ridge
Proposal would like to construct their facility.
Yours
ph. 506 642 5937 giosierBB07@beliaiiant.net
4 Lentook Ave.
Saint John N.B.
E2K 5G7
297
To Whom it May Concern,
This letter sets out the reasons for my opposition to the proposed municipal plan amendment to allow a
senior's residential complex at 2100 Sandy Point Road. In addition to concerns about protecting
personal use and enjoyment of my property and my neighbourhood, the factors that are relevant to
your consideration of this application include construction impacts, traffic and road safety,
environmental impacts, costs and risk that the development will not succeed.
As a general principle, I do not support significant changes to Plan SJ that may be a precedent allowing
other developers to argue that they too can develop in a rural area outside the City centre. Not only will
spot zoning in a residential area result in alienation of the residents of the area, urban sprawl can
compromise the current growth being realized in uptown Saint John.
Given the current pandemic, concentrating a significant number of seniors in a high -density complex
may need to be reconsidered. Housing seniors in an isolated area remote from the amenities of Saint
John is not desirable. Uptown Saint John is undergoing a renaissance, so a seniors complex would best
be positioned in that high density area, close the amenities the City has to offer. The Uptown, with the
City Market, Imperial Theatre, Harbour Passage, churches, shops and restaurants, as well as new
exciting developments like Fundy Quay, would be a preferable location for this population, assuming
they are willing to live in a congregate setting.
A senior's complex aimed at residents 75 years of age and older could be beneficial to residents of
southern New Brunswick. I appreciate the need for more seniors housing and development in Saint John
that will lead to an increase in its tax base, given the significant financial challenges the City faces. To
continue with its recent success in increasing the number of new buildings, the City needs to continue to
make prudent development decisions, especially in following its plan. Plan SJ has put the right kind of
development in the right place. Moving the boundary of the primary development area to
accommodate this proposed development is contrary to the plan's intent; it clearly considered this a
rural area.
Use and en'o ment of property in a rural neiehbourhood
My wife and I have lived in Millidgeville for the past twelve years. We moved to 470 Pelton Road from
Deveber Terrace 16 months ago to enjoy a home in a quieter area with a larger lot. Our new home was
in an ideal location as it was in a quiet rural neighborhood just minutes from the hospital where we
work. Despite being within the city limits we can sit on the beach at night in solitude. The closest home
we can see is across the river and the only ambient sounds are the waves and occasional noise from the
ferry crossing the river or a distant train. The natural setting also allows us to watch the bald eagles and
osprey from our living room.
The entire Pelton Road neighborhood will be adversely affected by the proposed development.
Currently this neighbourhood is truly a rural neighbourhood with many small one storey homes. The
neighbourhood's character is truly reflected in the plan SJ rural designation of this area.
The proposed development would result in a 24 meter high building built on higher ground in a lot
adjacent to ours. The base of this building would be 13 meters higher than our house which would result
in the new large structure towering 37 meters above our small one storey house. Building a 24-metre-
tall structure in a rural area will constitute a significant threat to the character and desirability of all of
the other properties in the area, which have had to remain within the 11 meter maximum height
allowed in an area designated as rural.
An immense structure, both in square footage and height, will undoubtedly compromise our current
serene setting, as well as that of our neighbours, with noise, light and sound pollution. It will diminish
sunlight on our property and be detrimental to our greenhouse during the day and its lights will impinge
on the natural darkness of the night. More people and vehicles will mean more noise. The significant
elevation difference between the complex and our house gives rise to concern about damage from
storm water run off. Although the current plan describes this run off as going into the river, I would
suggest that much of this run-off would enter my property and damage my house, greenhouse and
landscaping.
Construction Impacts
Construction of the proposed building complex near our property raises concerns about damage to our
home and surrounding landscaping. The site, like my lot, is located on bedrock so there will be blasting
required for preparation of the site. As well, the topography of the site will result in significant
alterations of the terrain on the access road from Sandy Pont Road. Past development in the area
(Fieldstone Subdivision) caused contamination of the wells on Pelton Road, where some residents had
to drill new wells. Blasting and construction noise, including that from movement of heavy equipment to
and around the site, is not in keeping with the quiet rural neighbourhood setting to which we moved.
Traffic and Road Safety
The proposed plan illustrates a gated secondary access to the development of the end of Pelton Road,
which has no sidewalks. Pelton Road is a narrow winding residential road with a steep hill on a blind
knoll, that cannot reasonably accommodate an increase in traffic. Vehicles using the access to Pelton
Road during construction or an emergency would compromise the safety of pedestrians and
homeowners driving to and from their property, especially when there is low visibility due to weather or
a narrowing of the roadway due to snow and ice.
The main access to the proposed complex is off Sandy Point Road, which although recently paved, lacks
a sidewalk. Any 125 unit complex will result in a significant increase in traffic volume. The proposal's
traffic report would suggest that there will only be a slight increase in traffic, however doubling the
volume of residents in the neighbourhood and the addition of people visiting and working at the
proposed senior citizen's residential complex will increase the traffic to a significant extent.
Sandy Point Road will have three critical intersections: one intersection at the former Cherry Brook Zoo,
the four corner intersection of Sandy Point Road, Kennebecasis Road and Westmount Drive, and the
intersection created to provide access to 2100 Sandy Point Road. All three intersections involve blind
knolls and sharp corners. Given the demographic of its residents, it is reasonable to anticipate there will
be frequent emergency response calls to the site of the proposed development. A fire truck will have to
navigate long steep winding roads to the complex. The tortuous nature of these roads with school bus
stops and no sidewalks will significantly increase risk of injury to pedestrians and those in other vehicles.
This risk will further increase during the winter as this road is notorious for being icy. I regularly drive on
Pelton and Sandy Point Roads during poor weather to attend to patients in the hospital after hours; my
first-hand experience of the road leads me to consider that the current traffic report is not an accurate
reflection of the likelihood and impact of accidents that may occur.
299
In addition to the risk to other vehicles and pedestrians along the route, these trips will add further
mileage on the fire trucks and delay response to another call while firefighters attend to a senior in a
relatively remote area. This risk of delay obviously has been compounded by the recent closure of the
Millidgeville fire station.
Environmental Impacts
The building of a large residential complex on the Kennebecasis River will not only change the character
of the neighbourhood and how residents enjoy it, but will also have significant environmental impact.
The proposed site is one of the few areas of natural land remaining on the east side of the lower
Kennebecasis River. Currently, there is significant wildlife in the area including bald eagles and osprey.
Construction of such a large complex will disrupt their habitat. Such a large structure on the bank of a
river will result in the loss of plants and trees and creates significant ongoing storm water runoff and
erosion.
Other costs
The proposed residential complex may create new costs and potential obligations for the City because it
is planned for a location outside the primary development area. As presented, the proposal for a
senior's complex would stretch the current sewage system to its maximum capacity, such that further
residential development would require new sewage infrastructure at the City's expense. likewise, there
is a potential need to expand bus routes and increase snow removal in the area. These are costs that can
be avoided by situating a senior's complex in other parts of the City that are already appropriately zoned
and serviced.
Downside risk
The developers responsible for this proposal are not experienced in the construction and operation of a
residential senior's complex. There have been many changes to proposal in recent months, including the
number of buildings, the number of floors and the number of units, which have undermined my
confidence in the financial viability of the project to succeed. In the unfortunate event that the
development were to falter, there could be no tax revenue, an abandoned site, a residence that does
not meet required standards for housing seniors, or a building in the hands of a landlord that allows it to
deteriorate, (like the Mitchell Apartments).
Conclusion
I oppose this development at its proposed location. A residence twice the height of rural residential
buildings housing 216 people will permanently interfere with use and enjoyment of my home and will
change the character of my neighbourhood. This development could cause physical damage to nearby
properties, increase traffic and create long term road safety issues and irreversible environmental
damage. Saint John should not be burdened by future costs or the risks associated with the proposal. I
would respectfully urge that the property at 2100 Sandy Point Road not be re -zoned and the Plan SJ
zoning requirements be upheld to keep the area rural.
John Mowatt 470 Pelton Road
300
To whom it may concern,
My name is Lisa Forgrave, and I reside with my partner Jason Parlee and our children at 1104
Kennebecasis Drive Saint John NB. I have lived most of my life in the Millidgeville area. I take great
pride in having the ability to reside in such a well maintained, well cared for, quiet and safe
neighbourhood. When we purchased this house in 2017, we decided that we enjoyed all the luxuries
that come with living just outside of the "heart" of Millidgeville. We enjoy that we have a lot of privacy,
that it is always very peaceful, that we know most of our neighbours and that there is very little traffic.
I am writing to express my strong opposition as a resident of the area to the 2021 proposed plan
build by Ethos Ridge Development, of the 120-125 unit Residential Complex located on a parcel of land
off 2100 Sandy Point Road, situated between Pelton Road and Westmount Rd. This area and land is
considered a rural area, OUTSIDE the Primary Development Area according to Plan Si. I understand that
this is a very beautiful location, however, it is not zoned for such a Large Scale build. While the local
community may be able to prevent the development I would imagine that not only the long time
residents who have been residing in this area for many years, but new residents are strongly opposed to
the addition of a complex of such magnitude. WE are not talking about a multi- family home, but a
building that will house many residents as well as other care providers for what they are suggesting will
be geared towards a senior demographic. I have NO idea how we are to know for sure that this building
will only house seniors now and in the future to come. I have many concerns with what might happen if
you go ahead with this plan.
Firsts of all this is a very quiet part of Millidgeville and something we want to maintain as
residents. Building this Large complex will require time, and that will mean that we residence will
endure months if not years of constant noise. There will be a lot of trucks and large pieces of equipment
being used in the process. Because this is considered a rural area, we do not have many side walks and
honestly the lighting is scares. As residents who have been living here, we know that it can be
dangerous walking the road and even to just pick up your mail. This 120 Unit Residence, will bring with
a great influx in the amount of traffic and possible safety problems. I would imagine that at some point
the city would be required to put in sidewalks and more lightening. As well as mentioned, if geared to a
more senior demographic, the roadways would have to be easily accessible to the emergency medical
teams that may required from time to time. We already struggle in this area to have it plowed regularly,
so I would hope that you would have a plan for more plowing on these streets. It is also possible that
with the surge in traffic it will make it less safe for students and children who are out walking in the
mornings to get to their buses, as well as returning home afterschooi. The lightening is so poor at times,
and I do not have to worry about the traffic flow and my children walking to get home.
As well, in the
Millidgeville is also having grave issues with the amount of wildlife and deer that have having to
relocate due to the current and ongoing development happening in and around Millidgeville. The loss of
their home, forces them to displace, pushing them out and into our environments. This has put the
Millidgeville area in a high risk zone of lime disease. I believe that this large development will further
increase the risk of developing lime disease if you are driving the wildlife out into the more populated
areas. This also increases the risk of accidents, car or person. The number of deer in this are is already
301
overpopulated. As a mother of 5 children, I do not want to see or have to worry that this may make
things worse.
There are NO other buildings of this nature in this particular neighbourhood. Nor should there
be. This is not the place to build such a large complex and I am disappointed that the council would
even consider such a build. I am also sad to report that this plan build was not brought to our attention
sooner and communicated to us residents before I had to hear about it from a neighbour and the article
in the news paper.
I am also very interested in how this build will affect Not only mine, but the surrounding
resident's property value, possibly lowering it.
I realize this is a beautiful area, but this area has always been preserved and I would like to see
that continued. I and my family urge you to recognize our small voice and our concerns, and to
disapprove the proposed plan build by Ethos Ridge Development, brought to you January 111h 2021.
1 see another beautiful piece of property right in the "Heart" of Millidgeville for sale that might
be a better location for such a large build and 125 Unit complex, that would allow for better access to
other businesses, doctors, dentist, and emergency and medical staff, places to shop and walk too safely
or even bus stops.
This is the listing link: https://www.realtor.ca/real-estate/22423075/661-millidRe-avenue-saint-iahn
"This 9.36 acre island has over 1000 ft of shoreline and is located near upscale homes in the
Millidgeville area of Saint John. The property features 2 sandy beaches as well as one large gravel beach.
The underground power and telephone conveniently connects through conduit in the causeway and the
building site is prepared. Deep water anchorage close to shore can easily accommodate yachts up to 150
ft with 10 drafts. Absolutely fantastic area for sail and power boating on the Kennebecasis River
connecting to the St John River, Belleisle Bay, Washademoak Lake, Grand Lake, Grand Bay, the Saint
John Harbour and the Bay of Fundy into the Atlantic! Walking distance to RKYC yacht club with the Saint
John Regional Hospital, UNBSJ University, all levels of schools & the city center within a 5 minute drive.
Rockwood Park with 2200 acres offering extensive outdoor activities is the largest park within any city in
Canada and located 5 minutes from this property. (22341593)
Thank you for your continued service and support of our communities.
Best regards,
Li For,rave and Jason Parlee
YI(A M Ct CA - - c
T
302
Jan 25, 2021
Common Council
City of Saint John, NB
Canada
To Clerk of the Common Council:
My name is Greg Collins, and I am an owner of 467 Pelton Road, Saint John NB. My wife Alisha Losier
Collins is also an owner of this residence. This property is adjacent to the lot next to Ethos Ridge
buildings are intended to be placed. Our property is the most impacted from the current design plans
submitted to the City of Saint John on Jan 11, 2021. My purpose for writing this letter is to provide
notice of my opposition for the proposed Ethos Ridge Senior development at 2100 Sandy Point Road.
My property will be directly affected in many ways illustrated in the current proposal of 120 plus units.
The integrity of the rural area in my yard, my back yard, and all my neighbours' yard, are in serious
jeopardy with an approval of Ethos Ridge proposed over development on said. The intent of the
proposed development does not take into consideration " a voluntary pre -consultation with the Sandy
Point Road community", as stated in the brochure. There is absolutely no regard in these plans for the
neighborhood concerns despite the intent from the developer to "We care about the community impact
of our project and believe that local residents should hear about it before the formal early steps of
planning". Consideration, listening and satisfying the neighbourhood concerns has failed.
My concerns were clearly outlined when speaking over the phone with Scott Walton and Ian McLeod
directly. From the proposed plans submitted to the City of Saint John, it is evident, none of the concerns
have been considered or implemented since beginning the consultation processes. This fail to address
my concerns in a fair and considerate manner and clearly outlines the intent of their overall
development moving forward. I will provide an outline of some issues of Ethos Ridge over development
to support the reasoning why City Council of Saint John must decline the amendment of moving the PDA
of Plan SJ and rezoning the land from current RU zoning.
Building Height, visibility:
The current zoning of RU does not fit the requested building size of 19.3 M. RU allows for 11 M in height.
The proposed building size is 27.39' higher than what is permitted for RU zoning. Looking out my back
yard the sun actually signs through the day from approximately 9.30 am — 8:00 pm during spring and
summer hours. A building of this nature would completely obstruct natural sunlight, cause substantial
noise and lighting pollution into a current RU neighborhood.
The proposed buffering has not been clear. Are 30 and 40' trees going to provide "only a glimpse of a 64
foot building set only 150' away? Who will be monitoring the buffering for properties? Is their going to
be a condition mandated with an community agreed type of buffering zone?
RU Zoning for proposed Senior Development:
303
The lack of conformity for Ethos Ridge over development is clear and present. The intent of developers
has not considered the current zoning in their plan. This is evident with the proposed size and overall
magnitude of project on rural land. Why build 120 plus units at 4 stories if you are and have considered
the neighbourhood? Is this a considered and environmentally friendly approach? The answer is it does
not fit. The City Council has an obligation to its citizens and more importantly taxpayers to protect
communities such as ours. Changing a zone must not change the landscape of the land in question. The
request to move the PDA and change the zone from RU to Community facility would undoubtedly
change the landscape of land.
Personally, I am pro growth and development of our City. I have built more than one multi unit building
and own several properties all within the Saint John City limits. This project does not fit the area
currently zoned for single- and two-family dwelling units and mobile homes. The scale of the project
does not fit the location and just changing a zone does support such a high -density scale development.
If this building were kept to the 11 m height scaled back to a much lower density than I may be in
support of changes. With existing plans, I can not accept a building of this size in the area of land
proposed, regardless of a zone change.
Pelton Road — Public Safety violation
The proposed development plans on approximately 80% of all traffic through 2100 Sandy Point Road.
The proposal also outlines 20% of all traffic through Pelton Road and through a proposed gated access.
Community concern on traffic in general along Sandy Point Road, Kennebecasis Drive, and to the corner
of Sandy Point Road and Foster Thurston, are impacted significantly, yet none more than Pelton Road.
Pelton road is a former cottage road, 6 M in width, resulting in a dead end. The infrastructure of this
road has not been updated to support increased traffic flow. The original design of Pelton Road was
done in 1950's and 1960's.
The safety of Pelton Road is a concern for my family of 4, including 2 children, and all the residents of
Pelton Road. The developers are suggesting only 20% of overall traffic will be used on this road. 20% of
what? 20% of 350 plus residents/workers/patrons? If we used 20% of the approximate 400 volume of
traffic per day (perhaps higher during peak summer/fall time) = a minimum of 80 vehicles traveling back
and forth on a road without any sidewalks, a blind knoll, and a severe turn with low protection barriers,
is not feasible or acceptable in any City's plan.
Furthermore, this proposed 20% usage will be unchecked or unmonitored. How will the City control the
amount vehicles used on one road versus Sandy Point road? In other words, there can be no control
over the number of vehicles being used on Pelton Road or 2100 Sandy Point Road.
Construction equipment, emergency response vehicles, will not be able to navigate Pelton Road
properly for a proposed senior complex with an average age of 75 years. The City may be held
responsible for the safety on main roads with adequate infrastructure such as side walks, protection
barriers (guard rail system on Saint John River edge), and water and drainage for the current proposed
development.
Environmental Impact Water and Sewer Infrastructure:
304
Why hasn't there been an environmental study been done or been requested to assess the impact on
the surrounding environment? The City of Saint John NB and the Province of NB has an obligation to
protect our natural environments such as the Saint John River Watershed. Meeting the buffer
requirements shall not be enough to permit a large scale project of 120 plus units at 4 plus stories.
"Discussing potential offset projects to remove unwanted flows from existing system", has been
outlined in proposal. Why has this study or report not been done in advance before submitting for
approval to council? This seems like a major reason for infrastructure expense to the City of Saint John
without knowing in advance of what costs are or needs are to support a building of this size.
Plan SJ was designed with the PDA in place to protect such oversights and additional costs to the citizens
and taxpayers of Saint John. Was this a primary reason why PDA was designed for Plan Si?
Who is going to cover the cost of managing this infrastructure expense?
How much water is going to be moved into the Saint John River System from the proposed building size?
Also, how much water will run off into adjacent properties from removal of vegetation and substrate
overall? Why is this study or report not being presented now? The developer must be held accountable
financially for "ALL" water flow increases to be diverted from proposed property "and" adjacent
properties. Residents will not accept any additional water on properties because of project, nor any
costs associated to moving potential water flows to culverts or overflow systems.
What condition will be implemented to ensure water is not running into my property and diverted into
proper draining culverts and water reusage systems?
How will the City of Saint John ensure my property does not undergo loss of well and septic services
currently in use?
Who will be responsible for the potential contamination in drinking water on my property at 467 Pelton
Road? Water tests were mandatory prior to purchase in 2015. Who will cover the costs of any
disruption?
In closing, I do not support the proposed the development of 2100 Sandy Point Road. I have outlined
some of the most important reasons above which are direct reflection of public safety, the environment,
and zoning within this community. Support for a project can be considered if conditions are placed on
the development outlined in my letter. Without these conditions, which clearly protect City of Saint
John's natural beauty and our community, my family cannot and will not support such a project. To
speak to me directly you can reach me at my personal email gregPcollinstours.ca.
Sincerest Regards,
i2
Greg Collins
467 Pelton Road
Saint John, NB
Canada
305
Questions included in letters:
Water and sewage/wells and septics
1. Does the Saint John Council have an estimated cost to increasing the volume of
our water and sewer pumping stations capacities to meet and exceed the
requirements of such a project as the Ethos Ridge proposal?
2. Who will pay for the extension of water and sewage services from the corner of
Sandy Pt Rd /Kennebecasis Dr/ Westmount Dr and the entrance to 2100 Sandy Pt
Rd?
3. Has there been a proper environmental assessment done to determine the impact
of blasting and construction and how that seismic activity may impact on the wells
and septic systems of the area? If so what are the results/indicators of the effects?
4. Do we really need to develop more land in Saint John that needs water, sewage
and road maintenance?
S. The developers intend to connect to the existing municipal sanitary and water
system at the intersection of Sandy Point Road and Westmount Drive., some 250
metres southward on Sandy Point Road. Would this require that all of the
residences on that stretch of road be forced to hook-up to the facilities as seems to
be the normal practice?
6. Have studies been performed and offered financial compensation to surrounding
neighbours as to what impact this commercial development and land disturbance
will have on their wells?
7. What are the hours of construction and the duration of the plan? Is there
anticipated blasting? What guarantees are given to the neighbouring homes that
there will be no impact to their basements (cracked foundations) and wells?
8. Will this new development be on city water and sewage? If so, can the system
handle such a large quantity of water and waste? Will overflow be pumped into our
beautiful river system?
9. If my well casing gets cracked or if the water table is drained due to the
construction, is the City of Saint John prepared to dig me a new well?
10. On page 272 it says the city'has advised that downstream wastewater lift
stations are at or near their pumping capacity'. These stations are scheduled to be
upgraded in the coming years but no specific time is given. Will not be a
considerable cost to the city?
306
11. How will the City of Saint John ensure my property does not undergo loss of
well and septic services currently in use?
12. Who will be responsible for the potential contamination in drinking water on
my property? Who will cover the costs of any disruption?
Environmental and Drainage concerns
13. Has there been a proper environmental and fisheries departments assessment
done on the impact of changes in the drainage and watershed to the river system
and to the quality and availability of water for all dependent on the water table for
their wells? If not, why not? This is an important component of the possible
impacts of the development and proper authorization should be required at both a
local level and at a provincial level.
14. Has there been an environmental assessment done and may I have a copy?
15. How will their engineering system guarantee flows and speeds to ensure no
downstream?
16. Where will the storm water retention ponds be located?
17. Has there been a statement of the environmental effects done? Will there be an
arborist report submitted?
18. What is the storm water management plan? Rainwater runoff needs to be
critically planned and managed. How will the proposed storm water measures
impact the neighbouring properties? What will happen `downstream' (down the hill
on Pelton Rd)?
19. Have geotechnical reports been provided assessing erosion and land slip that
would impact the property and surrounding properties?
20. Light pollution is also of concern on both sides of the property. How will this be
minimized?
21. This property and neighbouring ones might also become more vulnerable to
flooding. Might mean an ugly seawall along the river?
22. Even if the building is sited back from the shore, will the developer remove
shoreline vegetation and put in lawn right to the water?
307
23. Who will be monitoring the buffering for properties? Is there going to be a
condition mandated with a community agreed type of buffering zone?
24. Why hasn't there been an environmental study done or been requested to
assess the impact on the surrounding environment? Why has this study or report
not been done in advance before submitting for approval to council?
25. How much water is going to be moved into the Saint John River System from the
proposed building size? Also, how much water will run off into adjacent properties
from removal of vegetation and substrate overall? Why is this study or report not
being presented now?
26. What condition will be implemented to ensure water is not running into my
property and being diverted into proper draining culverts and water reusage
systems?
Traffic and Road Infrastructure
27. Has the city considered the impact of the increased traffic especially with large
construction vehicles on the road infrastructure? Should the proposal go ahead will
the city be responsible for returning the road to its present condition? Will the city
bar all construction vehicles from accessing the construction site by way of Pelton
Road?
28. Have the fire, police and ambulance services been consulted regarding the
single entry into a site, along a roadway that will be at a steep grade with a hairpin
turn into a proposed 125 unit complex for people 75 years of age and older? If so,
what are their concerns?
29. Will there be a proper study of the traffic pattern to include the intersection at
Foster Thurston and Sandy Pt?
30. Has there been any thought to how fire and ambulance services can adequately
provide service at given the slope to the top of the ridge is 30 degrees?
31. Will the city provide proper lighting and street infrastructure to support the
development?
32. What measures would be taken with respect to the increased congestion at the
Foster Thurston/Sandy Pt Road "T" intersection?
33. The Access Road
Will it be a city street? If so will it have to conform to all of the standards of such in
new development paved with curbs, storm sewers etc?
Will all of the city services be underground including electrical wiring (consistent
with new subdivisions across the city)?
Will the city be responsible for snowplowing, sanding, and salting?
34. Does it (the access road) have the approval of our Protecting Services like fire,
police protection, ambulance service, etc? If this proposed development had been in
place when the decision to decommission the Millidgeville Fire Station would it have
had any impact on the decision?
35. What guarantee do we have that sidewalks will be built?
36. How will this impact existing landowners along the road? We are going from
lower density to higher density traffic. Is this fair to the current property owners
who chose to live in a 'non commercial', low density neighbourhood?
37. Would the city be updating the road with sidewalks and keeping them cleared in
the winter so the children in the neighbourhood could make it to their bus stops
safely, or the seniors in this resident could walk to the bus stop safely?
38. To get to this new development is a steep incline and decline, can emergency
vehicles get here safely?
39. The developer was committing to not using that access (Pelton Road) but how
can that be controlled?
40. How much ambulance and fire traffic will be expected?
41. The developers are suggesting only 20% of overall traffic will be used on this
road (Pelton Road). 20% of what? 20% of 350 plus residents/workers/patrons? If
we used 20% of the approximate 400 volume of traffic per day (perhaps higher
during peak summer/fall time) = a minimum of 80 vehicles traveling back and forth
on aroad without any sidewalks, a blind knoll, and a severe turn with low protection
barriers, is not feasible or acceptable in any City's plan.
Wildlife and Health and Safety
42. Has any consideration been given to the health and safety of the workers during
construction and afterwards in this environment? (i.e. heavy deer population and
tick population)
Boundaries and Rezonine
43. If the PDA is expanded to incorporate the Ethos Ridge project where will the
new boundaries be? Will they extend east down Sandy Point Road just far enough
to include the project? Will they extend north up Westmount Drive to the
Kennebecasis River then down the shoreline to meet and coincide with the
development? What would the property encompassed by the extension have in
common with a 125 unit complex to justify it?
309
44. Surely there is plenty of land to develop that is already properly zoned, without
seeking to rezone rural land and destroy more green space? Perhaps the developer
could take over one of the undersubscribed projects already begun and revitalize it,
or develop property in the city where retirees are more likely to want to live
anyway?
45. Plan SJ was designed with the PDA in place to protect such oversights and
additional costs to the citizens and taxpayers of Saint John. Was this a primary
reason why PDA was designed for Plan SJ? Who is going to cover the cost of
managing this infrastructure expense?
Miscellaneous
46. What is the developer doing to benefit the residents he will inconvenience
during construction?
47. Exactly how much parking will be provided?
48. Will the trees (buffers) remain? Only clearcutting would allow for'stunning
water views'.
49. Questions directed to information in the brochure:
a) How will you create a destination for residents, their families, and their
community?
b) 'amenities that have yet to be realized in our region' - which are what?
c) 'we care about the community impact of our project and believe that local
residents should should hear about it before the formal consultation begins' -
when???
c)'services will respond to the evolving needs of your residents' - what ones?
Will health professionals be on site?
d) 'preserving the forest canopy' How when you want to expose'stunning
views'? Can you guarantee a buffer of trees?
50. Has research been performed in the Saint John market that a facility such as this
is in demand with the corresponding high price point?
51. In one meeting it was stated neighbours would be allowed to continue to walk
on the paths of the site. Would we be given passes to do so? Explain how this will
work?
52. There are already 3 seniors hosing complexes in Millidgeville, are these full?
53. The price of these senior complexes makes us think that 75% of the residents
will be coming in from other provinces, not N8. This will put a further burden on our
health care system. Saint John already has many people still waiting for a family
310
doctor, are we going to be able to provide proper health care for all the new seniors
coming into the province?
54. Will the trails be accessible for all neighbours or just the residents of the
retirement home?
55. The proposal suggests that the location is ideal due to its proximity to
Rockwood Park, the hospital, and the University. Yes, seniors are welcome to attend
the University, but this number remains small and why not place the development
closer to the park if proximity matters? Why would you need the park if you are
going to have your own trails?
56. Who will be responsible if the market is not there for expensive senior housing
or the building is too large for its market? Who will be responsible for the building
if the developer cannot complete the proposal and our neighbourhood is tainted by
an empty building or partially finished building?
57. What sort of research has been done to determine the suitability of this area for
a retirement complex? Have the developers spoken with older people?
58. Why build 120 plus units at 4 stories if you are and have considered the
neighbourhood? is this a considered and environmentally friendly approach?
311
31-Jan-2021
Dear City Councillor/PAC Members,
My husband and I moved to Pelton Road after several years of looking for "the right home" that
would give us peace and tranquillity. We wanted to keep our connection with the city, yet feel like
we were not in the hub of it. When we found this property, we studied it carefully for a significant
length of time to make sure it was the perfect location for our oasis. We absolutely love it for its
calm, quiet and friendly atmosphere. The sunlight to our home makes us feel energized and upbeat.
Our greenhouse allows us to grow organic healthy food that we hope will lead us to a long and
healthy life.
The proposed Ethos Ridge development located at 2100 Sandy Point Road is one that I am opposed
to. By that, I mean not development but "this particular development". This development is
inappropriate for our area. As the city has said, Plan SJ was developed as a strategy to limit urban
sprawl and add density to the core, ultimately providing a sustainable direction for Saint John. That
is why the PDA exists. The city has spent millions of dollars and a significant amount of time to
develop this plan with these objectives. To disregard this plan and change the zoning of 2100 Sandy
Point Road to Major Community Development and move the PDA is irresponsible. In the past 9 years
it has been very rare to move the PDA as a result. Plain and simple, Ethos Ridge development does
not compliment the area, contrary to what the developers are suggesting. What would?? Single
housing units or a small 1-2 story complex (under 11m in height) that would blend into the area. Not
a 125-unit multilevel complex with a height of 24m.
I have multiple areas of concern over this large complex in our neighbourhood. They are as follows:
RE -ZONING AND MOVING THE PDA
In addition to not following Plan Si as mentioned, changing the zoning and moving the PDA sets a
precedent for future proposals. It does not blend in with the neighbourhood. The developer has
stated in their proposal that the project will be "completely hidden from the road" as it will be
situated behind the ridge. This is only a true statement from Sandy Point Road. The neighbours on
Pelton Road will have this massive building invading their privacy. A building they will not be able to
ignore due to its size. Allowing this complex at this location is irresponsible to the 75+ age group
walk that distance safely. The proposal suggests that the location is ideal due to its proximity to
Rockwood Park, the hospital and the University. Yes, seniors are welcome to attend the University,
but this number remains small and why not place the development closer to the park if proximity
matters? Why would you need the park if you are going to have your own trails??? The trails at the
park would be much safer than the ones they are proposing up the steep ridge. There are properties
closer and safer to these stated necessities.
312
SAFETY
Sandy Point Road and Pelton Road have a number of safety issues. Roads are narrow, poor lighting,
no sidewalks, which increases the danger for pedestrians (including children and pets). Starting at
the connection with Foster Thurston and Sandy Point Road there are several blind knolls and
corners. Ironically, one is located at the entrance of the development, increasing the risk of car
accidents, especially with emergency vehicles (EMS) entering and exiting. Traffic will be significantly
increased with the residents, staff and visitors entering and exiting Ethos Ridge. The intersection at
Sant Point Road and Foster Thurston is extremely dangerous now. The increase in traffic from this
facility will be detrimental. A traffic controlled study was performed in 2010 and it stated that the
City of Saint john will need to coordinate improvements to this intersection with any development
plans in the general area.
There is an access to the property from the end of Pelton Road. A road that has been poorly
maintained and has a very sharp turn and downhill with poor visibility. This area is known for poor
and infrequent snow plowing. The concern again is safety (same as above) and deteriorating road
condition from increased traffic, especially from heavy equipment. Parked cars on the street will
cause congestion, as this road is narrow and no designated parking. This is likely as the access on
Pelton is close to the complex. The developer was committing to not using that access but how can
that be controlled?
Closure of the fire station in Milledgeville increases the response time, leading to poor outcomes.
The entrance to the property is steep and difficult to access especially in winter months. Thus,
making it difficult for staff, residents, visitors, and EMS. This should be assessed further.
CONTAMINATION OF WELLS
This area has a history of well contamination and issues with water supply during single housing unit
construction. Therefore, there is an increase risk with a much larger complex. Our property is next to
it therefore, putting us at high risk. This would be very disruptive, costly, and unsafe.
ENVIRONMENTAL
Storm water run-off, poor water absorption (due to the clearing of trees) and the amount of rock
that exists in this area leads to flooding and contamination of neighbouring properties and the river.
Our property is at great risk for flooding as we are adjacent to and below the complex.
Contaminating the river places aquatic species at risk and thereby worsening those already at risk.
We have not been provided with a plan to prevent erosion, flooding and contamination.
Bald eagles and Osprey nest and hunt in this neighbourhood frequently. They are put at risk from
pollutants, a decrease in their food supply and by decreasing access to suitable nesting trees. Any
pollutant that contaminates the river, contaminates their food supply. It will take a significant length
of time to construct this development. Significant amount of noise from blasting and heavy
equipment will negatively influence the nesting and reproduction of these eagles. Nesting followed
by breeding occur from February -May. With the developer's goal of starting late fail to early winter
this is of grave concern. Bald eagles remain on the endangered and species at risk list therefore
putting them at risk is irresponsible.
313
Light pollution is caused by the lighting in and around the complex. This lighting has a very disruptive
effect on flora and fauna cycles. It will also inhibit the observation of stars and planets and will
disrupt the ecosystem by altering the environment which interferes with reproduction and thus
decreasing population of species. The NB government and the Department of Natural Resources
state there needs to be limited changes to the environment around an eagle's nesting site (noise and
light pollution). The light will also be very disruptive to the houses surrounding the complex. We
moved outside the PDA as that was the atmosphere we were looking for. The peace of the darkness,
quietness, and the sounds of nature aid in the relaxation we feel after a long day's work.
Noise disruption to the neighbouring houses will be created by frequent visits from EMS vehicles,
the dog park, number of residence and staff, increased traffic, lengthy construction involving
blasting, rock hammering and heavy equipment. All of this will disrupt the peace in our
neighbourhood forever.
The size and the location of this complex will block sunlight to our home and our greenhouse. The
proposed development is placed on an area that is 11 meters above my home and the building is 24
meters high.
Privacy
Privacy will be completely lost for several homes on Pelton Road. The building towers over all these
homes and there is direct visual access to our yards and into our homes from ground level and from
the windows/balconies. We will lose the peacefulness at our waterfront significantly with 210
residents and staff. I am not interested in being a lifeguard. This is a river not a lake and the waters
can change quickly. This section of the river has a strong current, placing the elderly at risk for
drowning. The proposal has a canoe launch on site. So instead of relaxing after a long day I must be
worried about those who may drown. I DO NOT want to be put in that position, nor do I want to risk
being a victim. As we all know, the rescuer often becomes the victim. Residents with cognitive
impairments living in an assisted living environment should not be placed at risk by living near a cliff
with access to a large river.
The number of trees near the complex and the existing houses is minimal to none. Suggesting that
planting trees near our homes to hide the complex is somewhat insulting. You would need to plant
an enormous number of massive trees to block 24-meter building. With all the bedrock I doubt there
is enough soil for large trees to grow and sustain a healthy root system for survival. That maybe
possible if planting small trees but given the amount of time trees take to grow, privacy at ground
level would be non-existent. We propose a fence or a berm with lots of trees and low shrubbery to
aid with privacy. At ground level we have direct access to the property.
Potential Damage
There is concern regarding damage our water supply and to surrounding homes from blasting. This
proposed site is close to homes on Pelton Road. The area consists of large amounts of bedrock that
will transmit the energy through the rock in the form of ground and airwaves. it is well documented
houses/wells become damaged due to blasting. It is not unusual for companies to declare they are
not responsible. Who will be responsible for the damage created during construction? Those
responsible must have document for each homeowner stating that they will cover the cost of any
damage. That does not resolve the fact that this damage and needed repair is very disruptive and
314
upsetting. I suggest having a blasting seismograph be conducted to evaluate the risk of damage to
surrounding homes. As well as a detailed description of how the planned blasting will be safely
performed.
Cost for the City
There will be an increase in cost for city to maintain roads in the area due to increased traffic.
Significant cost to upgrade the intersection of Santy Point road and Foster Thurston to reduce the
safety risk. The roads will require frequent snow plowing to ensure EMS has access. As we are all
aware, EMS frequent these senior developments. The city will also be responsible for the long-term
maintenance and repairs to the water and sewage system. A system that is documented to be near
or at max capacity. As taxpayers, we paid for plan SJ, a costly endeavour. To then ignore this plan to
make exceptions for developments outside the PDA undermines the point of Plan SJ and therefore,
wasting millions of dollars. Who will be responsible if the market is not there for expensive senior
housing or the building is too large for its market? Who will be responsible for the building if the
developer cannot complete the proposal and our neighbourhood is tainted by an empty building or
partially finished building?
There are a number of issues that come to mind with this development plan. It is stated that the
target age is 75+ years and they wanted to aid in maintaining a connection with the community. This
facility has absolutely no connection with the community. It does not blend in or have anything to
offer this area. This property is not on a bus route, there are no amenities, has a long and steep
entrance, a drop off to the river and hiking trails with uneven terrain. This increases the risk of falls
and fractures. Falls increase mortality. This design would be better suited in one of the areas of the
city that would offer these seniors a holistic approach to aging. Not a place where they feel they are
unable to escape. If it is the neighbourhood and residents the developer and city care about, thls
construction should be evaluated carefully. This is NOT the ideal location for this development)
In closing, I want you to understand that there have been several inconsistencies from the developer
both verbally and in writing of the proposal. There has also been a lack of information provided to
several residents of the neighbourhood surrounding the project. We are not able to obtain
information from the city website due to the cyber-attack. The proposal has failed to have an up-to-
date traffic safety report, an environmental and fisheries assessment and blasting assessment. The
traffic report must include the traffic coming and going during the peak season of ferry operation
and include restaurant traffic, as I have heard it will be open to the public. I do not see how this
proposal could be granted without these assessments. A well as implementing sidewalks, lighting,
road and intersection improvements and frequent plowing.
Concerned Resident of 470 Pelton Road,
Brenda Rolfe
DATE:
315
To Whom it May Concern,
This letter sets out the reasons for my opposition to the proposed municipal plan amendment to allow a
senior's residential complex at 2100 Sandy Point Road. In addition to concerns about protecting
personal use and enjoyment of my property and my neighbourhood, the factors that are relevant to
your consideration of this application include construction impacts, traffic and road safety,
environmental impacts, costs and risk that the development will not succeed.
As a general principle, I do not support significant changes to Plan Si that may be a precedent allowing
other developers to argue that they too can develop in a rural area outside the City centre. Not only will
spot zoning in a residential area result in alienation of the residents of the area, urban sprawl can
compromise the current growth being realized in uptown Saint John.
Given the current pandemic, concentrating a significant number of seniors in a high -density complex
may need to be reconsidered. Housing seniors in an isolated area remote from the amenities of Saint
John is not desirable. Uptown Saint John is undergoing a renaissance, so a seniors complex would best
be positioned in that high density area, close the amenities the City has to offer. The Uptown, with the
City Market, Imperial Theatre, Harbour Passage, churches, shops and restaurants, as well as new
exciting developments like Fundy Quay, would be a preferable location for this population, assuming
they are willing to live in a congregate setting.
A senior's complex aimed at residents 75 years of age and older could be beneficial to residents of
southern New Brunswick. I appreciate the need for more seniors housing and development in Saint John
that will lead to an increase in its tax base, given the significant financial challenges the City faces. To
continue with its recent success in increasing the number of new buildings, the City needs to continue to
make prudent development decisions, especially in following its plan. Plan SJ has put the right kind of
development in the right place. Moving the boundary of the primary development area to
accommodate this proposed development is contrary to the plan's intent; it clearly considered this a
rural area.
Use and enio ment of property in a rural neighbourhood
My wife and I have lived in Millidgeville for the past twelve years. We moved to 470 Felton Road from
Deveber Terrace 16 months ago to enjoy a home in a quieter area with a larger lot. Our new home was
in an ideal location as it was in a quiet rural neighborhood just minutes from the hospital where we
work. Despite being within the city limits we can sit on the beach at night in solitude. The closest home
we can see is across the river and the only ambient sounds are the waves and occasional noise from the
ferry crossing the river or a distant train. The natural setting also allows us to watch the bald eagles and
osprey from our living room.
The entire Pelton Road neighborhood will be adversely affected by the proposed development.
Currently this neighbourhood is truly a rural neighbourhood with many small one storey homes. The
neighbourhood's character is truly reflected in the plan SJ rural designation of this area.
The proposed development would result in a 24 meter high building built on higher ground in a lot
adjacent to ours. The base of this building would be 13 meters higher than our house which would result
in the new large structure towering 37 meters above our small one storey house. Building a 24-metre-
tall structure in a rural area will constitute a significant threat to the character and desirability of all of
316
the other properties in the area, which have had to remain within the 11 meter maximum height
allowed in an area designated as rural.
An immense structure, both in square footage and height, will undoubtedly compromise our current
serene setting, as well as that of our neighbours, with noise, light and sound pollution. It will diminish
sunlight on our property and be detrimental to our greenhouse during the day and its lights will impinge
on the natural darkness of the night. More people and vehicles will mean more noise. The significant
elevation difference between the complex and our house gives rise to concern about damage from
storm water run off. Although the current plan describes this run off as going into the river, I would
suggest that much of this run-off would enter my property and damage my house, greenhouse and
landscaping.
Construction Impacts
Construction of the proposed building complex near our property raises concerns about damage to our
home and surrounding landscaping. The site, like my lot, is located on bedrock so there will be blasting
required for preparation of the site. As well, the topography of the site will result in significant
alterations of the terrain on the access road from Sandy Pont Road. Past development in the area
(Fieldstone Subdivision) caused contamination of the wells on Pelton Road, where some residents had
to drill new wells. Blasting and construction noise, including that from movement of heavy equipment to
and around the site, is not in keeping with the quiet rural neighbourhood setting to which we moved.
Traffic and Road Safety
The proposed plan illustrates a gated secondary access to the development of the end of Pelton Road,
which has no sidewalks. Pelton Road is a narrow winding residential road with a steep hill on a blind
knoll, that cannot reasonably accommodate an increase in traffic. Vehicles using the access to Pelton
Road during construction or an emergency would compromise the safety of pedestrians and
homeowners driving to and from their property, especially when there is low visibility due to weather or
a narrowing of the roadway due to snow and ice.
The main access to the proposed complex is off Sandy Point Road, which although recently paved, lacks
a sidewalk. Any 125 unit complex will result in a significant increase in traffic volume. The proposal's
traffic report would suggest that there will only be a slight increase in traffic, however doubling the
volume of residents in the neighbourhood and the addition of people visiting and working at the
proposed senior citizen's residential complex will increase the traffic to a significant extent.
Sandy Point Road will have three critical intersections: one intersection at the former Cherry Brook Zoo,
the four corner intersection of Sandy Point Road, Kennebecasis Road and Westmount Drive, and the
intersection created to provide access to 2100 Sandy Point Road. All three intersections involve blind
knolls and sharp corners. Given the demographic of its residents, it is reasonable to anticipate there will
be frequent emergency response calls to the site of the proposed development. A fire truck will have to
navigate long steep winding roads to the complex. The tortuous nature of these roads with school bus
stops and no sidewalks will significantly increase risk of injury to pedestrians and those in other vehicles.
This risk will further increase during the winter as this road is notorious for being icy. I regularly drive on
Pelton and Sandy Point Roads during poor weather to attend to patients in the hospital after hours; my
first-hand experience of the road leads me to consider that the current traffic report is not an accurate
reflection of the likelihood and impact of accidents that may occur.
317
In addition to the risk to other vehicles and pedestrians along the route, these trips will add further
mileage on the fire trucks and delay response to another call while firefighters attend to a senior in a
relatively remote area. This risk of delay obviously has been compounded by the recent closure of the
Millidgeville fire station.
Environmental Impacts
The building of a large residential complex on the Kennebecasis River will not only change the character
of the neighbourhood and how residents enjoy it, but will also have significant environmental impact.
The proposed site is one of the few areas of natural land remaining on the east side of the lower
Kennebecasis River. Currently, there is significant wildlife in the area including bald eagles and osprey.
Construction of such a large complex will disrupt their habitat. Such a large structure on the bank of a
river will result in the loss of plants and trees and creates significant ongoing storm water runoff and
erosion.
Other costs
The proposed residential complex may create new costs and potential obligations for the City because it
is planned for a location outside the primary development area. As presented, the proposal for a
senior's complex would stretch the current sewage system to its maximum capacity, such that further
residential development would require new sewage infrastructure at the City's expense. Likewise, there
is a potential need to expand bus routes and increase snow removal in the area. These are costs that can
be avoided by situating a senior's complex in other parts of the City that are already appropriately zoned
and serviced.
Downside risk
The developers responsible for this proposal are not experienced in the construction and operation of a
residential senior's complex. There have been many changes to proposal in recent months, including the
number of buildings, the number of floors and the number of units, which have undermined my
confidence in the financial viability of the project to succeed. In the unfortunate event that the
development were to falter, there could be no tax revenue, an abandoned site, a residence that does
not meet required standards for housing seniors, or a building in the hands of a landlord that allows it to
deteriorate, (like the Mitchell Apartments).
Conclusion
I oppose this development at its proposed location. A residence twice the height of rural residential
buildings housing 216 people will permanently interfere with use and enjoyment of my home and will
change the character of my neighbourhood. This development could cause physical damage to nearby
properties, increase traffic and create long term road safety issues and irreversible environmental
damage. Saint John should not be burdened by future costs or the risks associated with the proposal. I
would respectfully urge that the property at 2100 Sandy Point Road not be r d and th Plan SJ
zoning requirements be upheld to keep the area rural. �
John Mowatt 470 Palton Road
318
Ethos Ridge 2100 Sandy Point Road
January 22, 2021
Office of the Common Clerk
Saint John City Council
commoncierk@saintjohn.ca
(506) 658-2862
To Whom it May Concern,
We are writing with our concerns regarding the potential zoning change from Rural
Resource to Major Community Facility to allow development of the Ethos Ridge
seniors' facility.
These issues have been shared via Survey Monkey with the Ethos Ridge team but have
not been acknowledged. Most of what we understand about the project has been
learned from local news outlets. We thank you for your prompt response by phone
and email on January 22, 2021.
We purchased our property and built our home in 1999 because of its private, rural
feel, access to the river and proximity to work, all of which we still value. By
introducing a larger high -density community in our neighborhood we fear the loss of
our quiet, private rural life and the impact on our river resources.
Construction of this development will introduce heavy machinery through a pristine
forest. The road seen in the landscaping plan will come close to our property line and
runs the risk of interfering with the water table and subsequently our well water. There
has been no public indication as to the water or sewage requirements of such a major
facility.
Heavy equipment moving on Pelton Road will surely cause the already crumbling
roadway to disintegrate. This rural street is barely wide enough for two private
vehicles to pass safely let alone accommodate heavy equipment.
If the development does occur, the street is not safe for increased foot traffic as no
sidewalks exist and the road itself winding and steep with blind corners.
319
Previous re -zoning has been undertaken in the past for private separate dwellings that
ensure a solid tax base, community life and lower density impact on our river access
and resource.
We look forward to continued dialogue with the City and proposed developers.
S:;�-"Za'
ours,
Ryan Green and Andrea Canty
ata
rgsdream4O@icloud.com andreapanWicloud,com
345 Pelton Road, Saint John, E2K 51-16
(506) 693-1252
Cc: knlelectric@gmail.com
320
January 23,2021
subject: Our Neighbourhood and the Ethos project
=rom: Joan L Lawrence
34 Beach Road
Daint John, NB
=2K 5H5
506 2141275
;ell 506 608 9543
=mail j.l.lawrence@rogers.com
Ay personal thoughts;
-My "low density" neighbourhood will be negatively impacted.
moved in from the Kennebecasis Valley in 2010 and built a home. I
-.hose my neighbourhood( and chose to pay higher city taxes)
)ased on the fact that it was a country setting. As a nature lover, I
oved the trees, pristine environment, the low traffic and noise and
:he small and friendly neighbourhood.
n 2018, 1 was diagnosed with an incurable illness (a rare cancer)
:hat I will deal with the rest of my life. Now, more than ever, nature
and a calm setting is important to me.
have now become anxious of the proposal set before us as I feel
321
:his is now threatened. A commercial building in a residential setting
Joes not seem right for a variety of reasons.
Traffic Impact ( Pedestrian safety)
walk and ride my bike on Sandy Point Road daily. I recognize there
are no sidewalks however with the current low traffic it is
manageable. The neighbours know to go slow down this road due to
is twists and turns and blind spots. I fear that with the many
)roposed units, there will be increased traffic and therefore more
iazard to me(us) ,the walkers (and the bikers). In fact, I find this
A/hen the ferry lands and there is an onslaught of fast and often
'eckless ( not taking into consideration the walker or biker on the
aide of the road ) vehicles going by. This will be the ongoing case
Atith many more cars coming and going at all times of the day. It is
ny personal opinion that the traffic study quoted is low on the
)ercentage increase in traffic cited. How was this assessed? Please
)rovide the details of this study.
Duestion: What guarantee do we have that sidewalks will be built?
-low will this impact existing landowners along the road? We are
3oing from lower density to higher density traffic. Is this fair to the
:urrent property owners who chose to live in a " non commercial" ,
ow density neighbourhood. One such neighbour moved ( invested
n this area) from a subdivision to this area because of the "quiet"
environment.
gote that the Quispamsis and Millidgeville Shannex properties are
accessed via commercial roads and do not impact residential
322
ieighbourhoods.
nvironmental impact
Duestion: Has there been a statement of environment effects done?
The beautiful trees....
Ne generally know how construction goes. The intent will be to save
:he trees but construction costs are lower once the landscape is
aped. Many of the trees on the proposed property are very old and
:hey deserve to be respected and preserved. With changing climate
conditions and water run off, trees and their root systems are critical
especially along our waterways. Will there be an arborist report
submitted?
Displacement of wildlife
There are many deer that roam the woods. They will be impacted
and perhaps there will be more motor vehicle accidents as the deer
-oam onto the roads in their displacement.
Rainwater
Duestion: What is the storm water management plan? Rainwater
-unoff needs to be critically planned and managed. How will the
)roposed storm water measures impact the neighbouring
)roperties? What will happen "downstream" (down the hill on Pelton
-oad) ? As it is now, the ditches on Sandy Point Road are being taxed
n heavy rain storms (seemingly more prevalent with climate change)
-esulting in overflow situations, culverts being destroyed, roads
323
)eing compromised and erosion.
question: Have Geotechnical reports been provided assessing
erosion and land slip that would impact the property and
Surrounding properties.
question: Have studies been performed and offered ( financial
;ompensation) to surrounding neighbours as to what impact this
:ommercial development and land disturbance will have on their
Neils?
Ncoustic Impact
Ns this is a commercial operation coming into a quiet and pristine
-esidential neighbourhood, what is the ongoing noise impact of the
)peration of the facility. What can be anticipated? I anticipate
ncreased traffic noise, comings and going of ambulances, comings
and goings of staff, food supply trucks, maintenance trucks, courier
:rucks ( and they travel fast!) heating and cooling systems noises
3oing on and off. Also what is the impact during the construction
)hase. As a side note, what control is in place for waste
management and rodent control.
)uring construction, what are the hours or construction and
Duration of the plan? Is there anticipated blasting? What guarantees
ire given to the neighbouring homes that there will be no impact to
heir basements ( cracked foundations) and wells?
324
Jur river system is unlike any other. I feel a behemoth complex on its
yanks does not suit the environment. Light pollution is also of
.oncern on both sides of the property. Question: How will this be
minimized?
Target Market/Market
ks a side note, my father has been in a Shannex facility for 10 years.
Dver the years, I have interviewed many of the residents living in the
'etirement section. I would say that the majority of them would
)refer not to live there and only do so,because there are no
3Iternatives for them such as smaller garden homes or nicer senior
apartments (granted in the greater Saint John area, senior
apartments and condos are now only starting to proliferate as the
oaby boomers are needing them). Mose people would prefer to
-emain independent and not (in their older years) have to live in a
Jorm style environment.
question: Has research been performed in the Saint John market
:hat a facility such as this is in demand with the corresponding high
price point? Perhaps we could have the details of this report.
question: In one meeting it was stated that neighbours would be
3Ilowed to continue to walk on the paths of the site. Would we be
]iven passes to do so? Explain how this will work?
Dn a side note, I feel that with the recent pandemic the thoughts of
325
)eople wanting to live a bit more "separated" is more prevalent
'ather than apartment style facilities ( refer especially the large
rondo complexes of Toronto). I would suggest a modest number of
Small garden homes would be more appropriate if I had to choose
)etween two evils. In fact, I probably already know of five
)rospective couples that would be interested in such a concept
Nithin a year or two. They live in Millidgeville and would like to stay
sere. They would like to sell their large family homes, and purchase a
-5mall garden home. They would not want to live in an apartment
style complex.
326
To the City of Saint John
Mayor and Council
January 21, 2021
We are writing this letter to strongly oppose the proposed building of the senior's
complex known as Ethos Ridge in our neighborhood.
My name is Charline Chase and I reside at 468 Pelton Road. We have been here for 20 years. I
am writing this letter to voice strong opposition to the proposed Ethos Development for the
following reasons.
As a resident of the area who enjoys walking, one of my main concerns is the traffic flow. There
are several sight restricted areas because of the hilly terrain and severe curves in the road. One
of those areas is exactly where the entrance of the new development is proposed to be located.
Coming up Sandy Point Rd, you cannot see the entrance until you are right on top of it. In
addition to this, in the winter, this part of Sandy Point Rd is very slippery. When coming down
the road, it is very hard to stop. Several times after a storm this hill restricts drivers going up the
hill and compromises safety and stopping going down the hill. The traffic report from Crandall
talks about a significant increase in traffic flow on Sandy Point Rd. That is certainly not good
news for pedestrians particularly since there are no sidewalks in this area. The city hopefully
will do their own traffic study and, in their records, will see reports of their own plow trucks
being off the road at the corner of Sandy Point Road and Pelton Road. This is where the kids
wait for the school bus I might add. Also, in the reports I am sure it is documented where a
plow truck was stuck going up the blind knoll on Pelton Road. This blocked traffic for a day. The
other issue with the Crandall traffic report is that it was done during COVID 19 where traffic was
minimal. Also, it did not address the exodus from the Millidgeville ferry. I hope the city will itself
complete a traffic report that will take all of this into consideration. Also, the increased traffic at
the intersection of Foster Thurston and Sandy Point Rd. will have to be addressed, as 84°Y of the
increased traffic from the development on Sandy Point Rd. will end up at this dangerous
intersection according to the Crandall traffic report. We see close calls several times a week
with traffic turning left from Sandy Point Rd to Foster Thurston.
From an environmental point of view the city needs to consider the impact of surface water
runoff and installation of service lines. The area where the road curves to the complex is
extremely rocky and to install services will require blasting. This will undoubtedly affect all wells
in the area as this is an area of the City where the homes are serviced by wells and septic
systems. When the Fieldstone development was done several residents dealt with
contaminated wells. That development is much further away than the distance between these
homes and the Ethos Development. The proposal from the developer even admits that the
surface water runoff cannot be addressed at this time but hopes the city can deal with it in the
327
future. It is hard to imagine that in this day and age anyone could imagine allowing surface
water runoff to the River. Most of us are concerned with rising water levels and flood zones and
also contaminants free flowing into the river. The steep terrain down to the complex will require
lots of salt which will end up in our wells and into the river. Undoubtedly there will be other
contaminants including gas and oil that also will end up in the river Water that does not run
into the river will end up running over ground downhill to the surrounding parcels of land which
is of concern for flooding of lots and basements. Since a large portion of the property will be
clear cut for the development, the natural water absorption of the vegetation will no longer be
able to minimize this run off.
As a taxpayer another concern is the fact that this development is occurring in an area outside
of the Primary Development Area. It is noted that the Ethos Development is just on the edge of
the PDA. I would assume that given the large amount of money, time and taxpayer input spent
on researching, preparing and implementing the Plan SJ strategy that the boundaries were set
up for good reason. As part of Plan SJ to keep these projects in their designated areas I am sure
there are proper areas for these types of development. This will set a bad precedent for future
developments as the boundary seems flexible.
Media coverage for this project has been very misleading. The indication has been that the
residents are in favour. I would encourage any member of councilor PAC to canvass the
neighborhood or make a couple phone calls to see how the residents really feel. There is very
little positive support. This brings me to another point. If the media is of the mistaken belief
and is reporting that there is widespread area support for this project, does City Hall staff and
council believe the same based on those reports. We have heard that this is an upscale senior's
home commanding monthly rents in the $5000- $6000 range. We have been told these
residents don't have cars so not a lot of parking is needed and traffic will be minimal. The same
article in the newspaper says this will be a destination for friends, family, grandchildren. They
can garden, swim, hike and boat. This certainly sounds like a lot of additional traffic. It should
be noted that this is probably the highest tick infested area in the province so hiking is not
advised. The area in front of the complex is treacherous terrain to the water. If part of the
complex is assisted living, I don't feel this would be safe. See pictures on page 4 & page 5 that
show seniors treacherous access to the water.
There are a lot of questionable areas in the application and a seeming lack of preparation and
information. At this point I feel the developer should have a firm handle on the actual number
of units and not change on a daily basis. He should also have water and geotechnical studies at
his disposal. The drawings provided with the application are vague. Perhaps the developer
could share with the City and the residents his experiences with previous developments. Surely
an experienced developer could give an idea of development costs instead of just in "the tens of
millions of dollars". I would wonder what investors or banks would say if at this stage of
development that there is no budget. I also think it would be fair for the developer to share
some information about the investors in this project. If there are local investors with a proven
track record it would be nice to know. In projects such as this where there are minimal specific
details on the hard costs, there is always the fear that something gets started and the money
runs out so the project is not completed. This would leave a huge eyesore on the landscape.
This is of particular concern if the project approval is given before these details are confirmed
and site preparation is done, or partially done. In these cases, aside from the eyesore of a
partially completed project, the water run off becomes a substantial issue due to a change in the
328
landscape and topography. I believe that it is vital that the City and PAC examine the track
record of the developer and require information with respect to his financial backing to ensure
that the project, if approved, can be completed.
One of my last concerns is regarding the layout of the complex itself. Units are small and a lot
without kitchens. In this day and age of COVID is it not a good idea to revaluate senior living to
allow more space and freedom.
In conclusion I trust the city will take all these issues into account. This project clearly does not
make sense for this area.
Sincerely,
- �Z211 �c ��/ �f6
Dr. Paul Chase
468 Pelton Rd
Saint John NB E2K 5H7
506-721-8809
chasemailletO)arnail.com
Charline Chase
468 Pelton Rd
Saint John NB E2K5H7
506-639-4594
chasemailletnamail.com
329
`i
i�yd ��'.�` ++=, r '; I { ?_ •}k:tF {�� � of
tit i - A ' '�R+'�� :fLj
�F• -+F •k # ry1 *�4 '�I t�IY-�•T'f 3 '. fy ��tL 'd
IN
l h
lk
i { F''i,�.
F r ,F ram-. wk
i,
_KEY. .:� � �•.. 4�,.
�+ ti - } , •� ',' * t� '# —01 ice,lp
14
443 Pelton Road
Saint John, New Brunswick E2K SH6
Dear Members of the City Council,
We are writing to express our significant concerns about the proposed "Ethos Ridge"
development behind Pelton Road, off Sandy Point Road.
Our house was built circa 1960 and we have lived in it since 2000. Since we moved here,
there has been a considerable amount of building in the immediate and nearby vicinity,
with no environmental impact analyses done, to our knowledge, and certainly with no
upgrades to infrastructure. Significantly, we and our neighbours are still on septic tanks and
wells despite the increased population density in the larger area. Our infrastructure is
already strained by the rising number of single-family dwellings in the area without adding
a high -density development for which the area is not zoned. We are worried about what
such a disruptive and large-scale facility would mean for the integrity of our wells and
septic tanks.
Council needs to be aware that the neighbourhood will need significant infrastructural
improvements to offset the stresses that would be caused by the proposed development,
should it go ahead.
In terms of environmental impact: our neighbourhood may seem quite idyllic but it is
already stressed. There is already considerable erosion due to removal of trees and ground
cover, not to mention the drainage of pesticides into the river. We are worried that the
whole -scale removal of trees and ground cover from the land behind our home, which is all
uphill from us, would result in significantly more erosion. It would also mean increased
saturation of the soil, which can be disastrous for septic tanks. (Council should know that
the clearing of the woodlot has already begun, despite the development still only being at
the proposal stage.)
In our immediate vicinity a stream was blocked when the original houses were built in the
1960s and codes were presumably laxer. There is a house built on the site of that blocked
stream immediately next door to oui-s, and there have been ongoing flooding issues for its
various owners. We are justifiably worried that further environmental stressors will cause
additional flooding beside our property and onto the road, particularly in the spring. There
is only one road out and if it were blocked by flooding, we would be cut off.
We have further concerns about increased traffic in the area. While the plan is not to enter
the new development from Pelton Road, we would still be affected by more traffic on Sandy
Point Road and surrounding streets. These are already busy roads given the proximity of
the Millidgeville ferry, and a large development would only exacerbate the traffic.
Before the Council deliberates the issue any further, we would ask that there be an
impartial environmental impact assessment with adequate transparency and oversight.
332
Our preferred option, of course, is that there be no further development of the woodlot,
that the cutting down of trees that has already begun be halted, and, ideally, that there be
some replanting.
Finally, we wonder what sort of research has been done to determine the suitability of this
area for a retirement complex? Public transportation to this neighbourhood is practically
non-existent. Have the developers spoken with older people? Yes, the sunsets are
spectacular but as people approaching retirement age ourselves, we can say with
confidence that being isolated in a drive-in community is not a solution that would appeal
much to us. It would be particularly galling to loose the beautiful woodlot to another white
elephant real estate project. Surely there is plenty of land to develop that is already
properly zoned, without seeking to rezone rural land and destroy more green space?
Perhaps the developer could take over one of the undersubscribed projects already begun
and revitalize it, or develop property in the city where retirees are more likely to want to
live anyway? We know that marketing to retirees is a new boom market but frankly, we are
skeptical that an isolated and under -serviced location will prove quite the investment the
developers are seeking. Being able to say "I told you so" will be little comfort, however, once
the green space is clear cut.
We urge the Council to reject the "Ethos Ridge" proposal. If it were to pass we envision
increased environmental degradation, structural and environmental stresses leading to
possible breakdowns of our septic systems, contamination or drying up of our wells, and
increased traffic and noise. We are already seeing the loss of green space every time we
look out the back window.
We are also concerned about the value of our home. How ironic if it were to lose so much
value that we would be unable to take care of our own retirement needs. We appreciate that
some people will say that homeowners like us are selfish when we seek to keep our
neighbourhoods as they are, but when the alternative is to lose the very qualities that make
a neighbourhood a good place to live in in the first place, then nobody wins and the city and
those that come after us lose much.
Thank y•)u for your attention. We look forward to continuing this discussion.
Sincerely yours,
0
Joseph Galbo and Miriam Jones
jgalboCa unb.ca
jones@unb.ca
333
The Concerned Residents of the Sandy Point Road,
Pelton Road, Westmount Drive, and Kennebecasis Drive Neighbourhood
Whose Names and Signatures Appear on the Counterpart Signature Pages Below
January 22, 2021
To: The Mayor and the Common Council of the City of Saint John
Statement of Opposition to a Proposed Amendment to the Municipal Plan in relation to 2100
Sandy Point Road
As residents of the neighbourhood in which it is proposed to develop the Ethos Ridge Project, we
object to the grant of the zoning variance claimed to be necessary for the project to proceed. Our
objections are based upon information and belief and may be stated in summary form as follows:
First, the manner in which the project sponsors have proceeded appears inconsistent with
their claim to have been inspired by some admirable "ethos" at least to the extent that the sponsors'
ethos is claimed to encompass concern for the community;
Second, the project sponsors have identified certain conditions to the development that they
have chosen to impose upon themselves, but the sponsors have not met their own self-imposed
conditions, and, therefore, their application for a zoning variance is premature upon the sponsors'
own terms;
Third, the development of the project will materially adversely affect the residential
character of the neighbourhood;
Fourth, the application for the variance is replete with inconsistent and incomplete
information and cannot properly be the basis of the sought-after variance; and
Fifth, the sought-after variance is greater in scope than is necessary for the proposed
project, and the unnecessarily broad scope raises questions about whether there are undisclosed
development plans.
We will, in this letter, briefly develop each of these points of objection.
I. Objections
A. The manner in which the project sponsors have proceeded appears inconsistent with their
claim to have been inspired by an "ethos" to the extent that the sponsors' ethos
encompasses concern for the community.
To introduce the Ethos Ridge Project to the neighbourhood, the project sponsors left a copy of a
brochure at the front doors of our residences. We assume that the same brochure was left at the
front doors of other neighbourhood residents. That brochure, a copy of which is provided with
this letter, provided no material information about the project. The most basic information about
the project is not supplied. The brochure offered no information regarding the size of the project
or the number of new residents to be added to the neighbourhood. Of the nature, size, and scope
L
334
of the Ethos Ridge Project, the brochure says only: "Ethos Ridge is a proposed retirement
community set deep within the forest canopy adjacent to the Kennebecasis River."
The brochure describes itself as "a voluntary pre -consultation with the Sandy Point Road
community." A consultation without information is an oxymoron. This oxymoron is not
dispensed with by the brochure's reference to the project website (www.ethosridge.com) which
even to this day appears to offer no meaningful project information.
The provision of information about the project that is superficial at best suggests that the manner
in which the project sponsors have proceeded is inconsistent with their claim to have been inspired
by some "ethos" to the extent that the sponsors' ethos encompasses concern for the community.
The project description submitted to the Council represents to the Council as a basis for the sought-
after zoning variance that the sponsors "are committed to creating a design that fits within the
neighbourhood of Millidgeville ...." The sponsors' pursuit of that commitment is less than
obvious based upon their wholly inadequate provision of information to the residents of the
neighbourhood in question before their application for a zoning variance.
The sponsors' naming their proposed project "Ethos Ridge" pitches their intentions high. The
sponsors' actual course of dealing with the community to date suggests a material gap between
their pitch and their intentions. That gap must be eliminated if any reliance is reasonably to be
placed upon the sponsors' representations. We have been warned.
B. The proiect s onsors have es oused conditions to the development that they have not
qpparently met, and, therefore, their application for a zoning variance is premature.
The above -referred -to brochure states: "We care about the community impact of our project and
believe that local residents should hear about it before the formal consultation begins. As we
embark on the early stages of planning, we are seeking the input of our neighbours." Seeking input
before providing all information to enable the evaluation of the project and its impact is a
meaningless gesture intended to communicate a concern without providing the means to realize it.
This observation is so obvious that it begs the question: Exactly what ethos is in operation here.
It seems, therefore, inescapable that the project sponsors have expressed a self-imposed condition
to their development that they have not met, and, therefore, their application for a zoning variance
is, upon their own terms and conditions, premature.
C. The development o the proiect will material.y adverseIX a ect the residential character o
the n&hbourhood.
This neighbourhood is residential and nowhere densely populated. The development of the project
appears to contemplate the addition of 216 new residents in addition to 27 support staff and a
substantial number (108) of guests. Nowhere in the neighbourhood is there any commercial
development or obvious concentration of people. The sponsors appear to believe that the impact
of a material number of new residents is to be measured in terms of traffic, sewage, and like
matters. That belief is doubly unsound because the quality of life experienced by a community is
not reducible to some engineering calculations and because the proffered engineering calculations
335
do not have the hoped -for soothing effect for which they were provided, but, rather, raise a series
of unsettling questions as hereinafter explained.
First, respecting the critical matter of quality of life, the sponsors do not highlight or otherwise
emphasize the addition of the following facilities to the neighbourhood for the first time: A
restaurant with capacity for 155 persons (counted for certain purposes separately from residents
and guests), a beauty salon, and a 12-hour carwash. Are the residents of the neighbourhood
seriously to believe that the Common Council would authorize the development of a car wash on
Sandy Point Road if a car wash operator sought the necessary permits for such a facility? Should
the proposed developers of Ethos Ridge be able to achieve indirectly what seems so obviously
could not be achieved directly?
Are the residents of the neighbourhood expected to believe that the addition of about 350 people
(possibly doubling or more the number of persons present depending upon how the
"neighbourhood" is defined) and the indicated facilities will not have a material adverse effect
upon the present residential character of the neighbourhood? If so, nothing in the materials
provided by the sponsors of the project has a tendency to mitigate obvious concerns. How does
that approach square with the sponsors' assertion that they "care about the community impact of
our project"?
In addition, the project plan indicates that existing waste water lift stations to be affected by the
project are "at or near their pumping capacity." The timing of the upgrading of those lift stations
is such that it appears that the upgrading will not be completed before the project is in operation.
The project sponsors offer no assurance that the sewage facilities utilized by existing residents will
not be adversely affected by the development and offer nothing but the vaguest of assurances that
they will "review and discuss potential offset projects as needed to remove unwanted flows from
the existing system to compensate for the increased flows from this development." No binding
guarantees are offered, and the representation that they will "review and discuss" does not provide
even cold comfort.
It is notable that the sponsors contemplate "remov[ing] unwanted flows from the existing system,"
i.e., it seems that flows from the use of the system by existing residents are to be removed in order
that the flows from their project can utilize the city's waste water system. The lack of a guarantee
that existing residents will not be affected by the project coupled with the apparent potential plan
to affect existing residents directly surely indicate that the project is likely to have a material
adverse effect upon the residents of the neighbourhood.
D, The application for the variance is replete with inconsistent and incomplete in Lrmation
and cannot properly be the basis of the sought-after variance.
The sponsors of the project claim that a traffic study they secured indicates that "no negative
impacts to the existing (traffic] system will be experienced." Even the most casual review of that
traffic study undermines that conclusion.
336
• The Traffic Study Utilizes Incorrect Information. The traffic study is based upon a project
size of 115 units. The sponsors state the size of the project to be 125 units. All of the
calculations made in the traffic study that rely upon the understated project size are in error.
• The Traffic Study Ignores One Critical Intersection. The traffic study does not address the
effect of increased traffic at the intersection of Sandy Point Road and Foster Thurston
Drive. Much of the traffic exiting the project or travelling to the project will utilize that
intersection. As all residents of the neighbourhood know, that intersection has no traffic
signal and is very dangerous because it is almost completely blind for traffic on Sandy
Point Road. Plainly neither the project sponsors nor the traffic engineers are familiar with
the neighbourhood or their attention would have been rivetted upon the effect of increased
traffic at that intersection. No traffic study is needed to reach the conclusion that increased
traffic increases the likelihood of an accident. In addition to accidents, increased traffic
will necessarily cause additional delays especially for traffic on Sandy Point Road seeking
to enter Foster Thurston Drive. Delays happen already and will be increased by additional
traffic.
• The Traffic Study Utilized Outdated and Estimated Traffic Information. The traffic
engineers did not undertake to measure actual traffic in 2020 because it was likely reduced
by COVID-19. The traffic engineers utilized traffic data from 2015 and 2017 and estimated
what would have been present levels, but for COVID-19, therefrom. The traffic study does
not indicate that the estimation process took into account residential development in the
vicinity of the intersection of Sandy Point Road and Kennebecasis Drive since 2015 or
2017.
• The Traffic Study Does Not Disclose Critical Information respecting the Traffic
Information Utilized. As noted above, the traffic engineers utilized traffic data from 2015
and 2017, but they do not indicate when the traffic data they utilized were collected.
Especially because of the local ferry to the Kinston Peninsula, which does not operate year
round, local traffic volume and patterns are highly seasonal. Without understanding when
the traffic data utilized was collected, no credibility can be placed thereon.
• The Traffic Study Relies upon Statistics that May Not Be Applicable. The traffic study
utilizes statistics provided by the Institute of Traffic Engineers. Ethos Ridge projects a
large number of daily guests (108) and a large number of daily restaurant patrons (225). It
is not clear that the use of the ITE statistics for "Senior Adult Housing Attached" alone
adequately model the resultant traffic.
The study offered in support of the Ethos Ridge Project does not nearly support all of its purported
critical conclusions.
E. The sou ht-a ter variance is greater in scol2e than is necessary or the ro osed proiect.
and the unnecessarily broad scone raises questions about whether there are undisclosed
development plans.
337
The application for rezoning covers a far greater area than the Ethos Ridge Project as described
requires. The application seeks rezoning for both Lot 20-2 and Lot 20-1. The project utilizes only
Lot 20-2. While it is true that the minimum required lot size for Lot 20-1 may need to be reduced
to accommodate the project, that lot size reduction requirement need not be accompanied by any
redesignation of Lot 20-1 from Rural Resource Area to Stable Area and from Rural Resource and
Park and Natural Area to Major Community Facility. The effort to secure a broader than necessary
redesignation raises the question whether further development is planned. No such further
development plan is disclosed. If no such plan exists, the broad redesignation is unnecessary. if
such a plan exists, it must be disclosed and justified. None of the studies which related solely to
Lot 20-2 can be or properly should be utilized to redesignate both Lots 20-1 and 20-2.
'I he applicant for rezoning should be required either (i) to reduce the area for requested
redesignation or (ii) to withdraw the present application and make full disclose of all plans and
provide proper justification for the otherwise unnecessarily broad redesignation requested.
U. Requested Relief
For the reasons stated, the proposed amendment to the Municipal Plan should be denied.
Respectfully submitted by the following; persons who support the foregoing Statement of
Opposition to a Proposed Amendment to the Municipal Plan in relation to 2100 Sandy Point
Road and whose signatures are set forth below
[Signature]: Ail
d&A,,�,§WPrinted Name]: d-,kw
j Street Address]: [1 �� [Date of Signature]:
[Phone]: s L-D L
[.Signature]:
[Street Address]: It' .._
[Phone[:
[Printed Name]: ro 3� C-J
[Date of Signature]
[Signature]: � � I'Printed Name]:
(Street Address]. ` P ' `-lIV-' �` [Date of Signature]:
[Phone]: dk'a J IVY
338
Additional Signatures of Supporters of
Statement of Opposition to a Proposed Amendment to the Municipal Plan in relation to 2100
Sandy Point Road
[Signature] -
[Printed Name]:jF
[Street Address]:���
[Date of Signature]:
[Phone]: Jf
[Signature]: '1 `
[Printed Name]:. 2A'---x r aA 7,44-U k
[Street Address]: �,�,�•.,. r�'
[Date of Signature]: Zb z,
[Phone]: _ 1 i caP-S:�
[Signature]: (1pi, 0
[Printed Name]: J1,11
[Street Address]: , fe)-
[Date of Signature]: !
1
[Phone] : `P
339
Additional Signatures of Supporters of
Statement of Opposition to a Proposed Amendment to the Municipal Plan in relation to 2I00
Sandy Point Road
[Signature]: X�)I
0,
[Printed Name]: (/V/1 y 41t Z�« 110�-:4 y
[Street Address]:
[Date of Signature]: t
[Phone]: (?) /27
[Signature]:
[Printed Name]:
[Street Address]:
[Date of Signature]: 341 0-09AI 2a 2 /
[Phone]:
[Signature]:
[Printed Nam . e]: 0 ,-,n r7 f e'n r c
[Street Address]:
3 5� P' PW
[Date of Signature]: ��tr1, 20, . Zo
[Phone]: 6_5� - ISr1
7
340
Additional Signatures of Supporters of
Statement of Opposition to a Proposed Amendment to the Municipal Plan in relation to 2100
Sandy Point Road
� � /L [Printed Name]: �5 p r r S f [Signature] �� .
[Street Address]: pJ �(;� [Date of Signature]: S t� i�,L- c?
[Phone]: ,Svc? '2-
[Signature]:
[Printed Name]: .%q%o •t t %>*ke
[Street Address]: Lm - o _ [Date of Signature]:. 3a �r,r.g o t
[Phone]:,
[Signature] : .�
[Printed Name] : ) , q j h.f
[Street Address]:. _ r7` E !`e �R ,�. [Date of Signature]:Ll-�
8
[Phone]: SAL ' 6 4-5
[Signature]: t' `r''`� [Printed Name]: -;'"' F 7 L ar
[Street Address]:
[Phone] : 64ej zfp .
[Date of Signature]:~
f�
341
Additional Signatures of Supporters of
Statement of Opposition to a Proposed Amendment to the Municipal Plan in relation to 2100
Sandy Point Road
r. �
[Signature]:
[Printed Name]:
[Street Address]:arr W'
[Date of Signature]:
[Phone]: S O/ r 25`g$i
[Signature]:
[Printed Name]: .-.
[Street Address]:c�{ , c
[Date of Signature]:
[Phone] :
[Signature]: K ,r.-r Lia.
[Printed Name]: jUv1
[Street Address]:. �5 Pei%n I?A^
[Date of Signature]: web l Z I _
[phone]: Sob - 1,5 zi - j.55
7
342
Additional Signatures of Supporters of
Statement of Opposition to a Proposed Amendment to the Miniripal Plan in relation to 2100
Sanely Point Road
I Signature]:�?
[Printed Name]: 1
[Street Address]: Zo�
(.Date of Signature j:
j Phone]:
I.Signature];
[Printed Name]:
[Street Address
[Date of Signature]:
.Phone I : ___(23 'r—
Signature]: X2�
[Printed Name I:.. _TA er;-I j 1
f trect Address]: � _ SA A,f .120 l,t ;
[Date oi' Signature]: ! �!Lt / / T
f Phone]: S —13 ho
y
343
Additional Signatures of Supporters of
Statement of Opposition to a Proposed Amendment to the Municipal Plan in relation to 2100
Sandy Point Road
[Signs
a�� k,LAk�-
{Printed Name6-tocooff Al —I 0
[Street Address]: `' -,So ?C- 6) 'PA
[Date of Signature]: F;C, 01 OZ
[Phone]:{0 2
uu►[i...l.�.l r .
/ l
[Printed Name] : 2 P l� f%Y �rt t OS
[Street Address]: 92 + h RQAd
[Date of Signature]: Leh � ! 2 GZ
[Phone]: 34-3 -I A (12 1
[Signature]: {
[Printed Name]: M- j .r,!17t;4
[Street Address]: Lb 2 7?,- ^j
[Date of Signature]:. �� {5. z .2
[Phone]: Z 14 YJ
7
344
Additional Signatures of Supporters of
Statement of Opposition to a Proposed Amendment to the Municipal Plan in relation to 2100
Sandy Point Road
[Signature]: Wt G~� 1 Cl,i✓�
[Printed Name]:
[Street Address]: 4�L�e,� i o11 c
[Date of Signature]: Lb
[Phone] : G
[Signature]: =4�
[Printed Name]: CZci� co(-aAs
[Street Address] : i t,1 Irn 6aw
[Date of Signature]: Feb Oct 2)
[Phone]:
WA,,
[Printed Name]:
[Street Address]:
[Date of Signature]: 0
[Phone]: 6�d -3-3
7
345
Additional Signatures of Supporters of
Statement of Opposition to a Proposed Amendment to the Municipal Plan in relation to 2100
Sandy Point Road
[Signature]:
[Printed Name]:. _,C� ►--e .i d ay u 9
[Street Address]:
[Date of Signature]:
[Phone] :
[Signature]:
[Printed Name]:
[Street Address]:
[Date of Signature]:
[Phone]:
[Signature]:
[Printed Name]:
[Street Address]:
[Date of Signature]:
[Phone]:
7
346
Proposed Development
The Ethos Ridge Project
This isapetition for the residents ofSandy point, Pe|tonRd, Scenic View Drand Beach Rd.
I would like to invite the community to meet at 305 Pelton Rd for a group discussion
Name&�� Signature ��w���� �/ " n��
m
347
6 a 1 , c'
o *p,
Rs ixi
? 'fitD�
r!��I
f f
i)l it d J3 c Ir J -ve , L 1 �+
�r
C J e
»
1 '
/
1
p �
City of Saint John Council and PAC Committee
RE: 2100 Sandy Point Road rezoning
I am writing to you to voice my concerns over the proposed re -zoning of 2100 Sandy Point Rd.
I have listened to the developer and the answers in which he has given the residents about
their concerns over the development. Mr. Walton stated to CBC News, that he was not
concerned about the access to medical services at that location, his exact words were "People
mentioned the issue of the fire service station closing in Millidgeville and that presenting
problems. But when we looked at the service times, there are still like everything was in
compliance with what would be required to keep people safe."
As for my background. I worked as a career Firefighter for 28 years with the 2nd largest Fire
Department in Canada, the Vancouver Fire Rescue Services, retiring #5 in line of command in
senior management. My last 12 years were in command of the 911 dispatch centre. We
dispatched over 80,000 calls per year for 8 different Fire Departments.
I can tell you from my 28 years of experience that MR. Walton has no idea what he is talking
about nor have I any idea of how he came up with his ridiculous conclusion other than he is
more concerned for the completion of the development than he is for the safety of it's
residents.
#1 - Very few people are prepared or aware of what to do in the situation where their loved
one has collapsed, their first response is to see what happened, If they are alert enough to
notify any staff of the situation it will take another minute for assistance to arrive even before
the 911 call has been made. So, from the time the patient has collapsed, we are looking at
approximately 1-1.5 minutes or more before the patient is accessed and the call is made to 911.
#2 — NFPA 1221 establishes call -handling times in that, "90 percent of emergency alarm
processing shall be completed within 64 seconds, and 95 percent of alarm processing shall be
completed within 106 seconds.". In conversations with the Saint John 911 centre, I was
informed that they strive to complete the call in 60 seconds. So, for the remainder of his letter,
I will use 1 minute as the call time allotment.
#3- In this scenario we currently sit at approximately 2 minute and 30 seconds from the
discovery of the patient to the completion of the 911 call, and the call has still not been
dispatched. An average time to dispatch a call is 30 seconds, this takes us to 3 minutes and
from there we have to add an addition 30 seconds for the crew to man the apparatus and leave
the firehall.
#4 —The closest Firehall (Firehall #5) is 7 km from the site. Driving at 60 kmh it would take 7
minutes to arrive under ideal conditions, longer in wet or icy road conditions. This now take us
349
to 10 minutes and 30 seconds to arrive from the time the patient has been discovered. The
medical personnel still need to gain entry to the building and get to the patient location.
#5 - Cardiac Facts - When a cardiac arrest occurs, it is essential to start CPR within 2 minutes.
After 3 minutes the lack of blood to the brain leads to a progressively worsening brain injury. By
9 minutes, severe and irreversible brain damage is likely, and after 10 minutes, the chances of
survival are low.
Even if the patient is resuscitated, 8 out of every 10 will be comatose and sustain a high level of
brain damage. Simply put, the longer the brain is deprived of oxygen, the worse the damage
will be.
Mr. Walton expects the seniors living there to purchase their unit and pay an additional $3000 -
$4500 per month to live there. According to Ethos Ridge own literature, they hope to start pre -
sales later this year and they will be marketing to seniors over the age of 75. 1 would hope that
MR. Walton would like to see the residents live a long healthy life at the residence where
according to him they can receive adequate medical attention. At 10 minutes and 30 seconds
the chances of survival are slim at this proposed location. This is adequate?
For this single reason a lone, I believe that the 2100 Sandy Point Road location is completely
unsuitable for the construction of a 125 unit Senior living residence. If we, as caring sons and
daughters, want our parents and other seniors to live a long, healthy comfortable life then we
must provide them with the services to do so. Putting them at risk when they are at a venerable
age is not the way to do this.
Robert Bazaluk - 433 Pelton Road
506-674-9085
350
C. SUTA��NPE BALL, B.A., LLB_
2174 Sandy Point Road
Saint John, New Brunswick
E2K 5H2
Tel. (506) 648-1891
Cell (506) 650-7238
suzanneball mail, corn
January 21, 2021
Jonathan Taylor, Common Clerk
City Hall
15 Market Square
Saint John, N.B.
Mayor Darling and Common Councilors:
Re: Amendments to Municipal Plan 2100 Sandy Point Road - Ethos Ridge
I have reviewed the documents filed with the City and am most impressed with such a lovely
proposal — although I must say that making such a development available to only those over 75 is a
shame. People often retire in their 50's and 60's so I was sorry to see that such lovely facilities
would not be available to mixed age groups for the benefit of wider stimulation.
There is one issue raised in the document which will be imperative to address.
"A small portion of the site, adjacent to Sandy Point Road will require storm
water management as it will be discharging into the existing overland
municipal drainage system on Sandy Point Road. Control of this increase
in runoff will be achieved through the design and construction of various
retention features including rain gardens, bio swales and storm water
retention ponds.
All work related to this project carried out within the existing municipal
right of way would be carried out as per the City's General Specifications
(Latest Edition)"
Situation
The north side of the Sandy Point Road is ditched from Westmount Drive to 2100, the Marilyn
Peacock property. Past the driveway to Peacock's the ditch leaves the roadside and runs north,
behind the two houses on the corner of Sandy Point Road and the Pelton Road. It then flows into a
pond and down into the Kennebecasis River. The pond is part of the municipal drainage system and
has fallen into serious disrepair.
When my Grandfather Pelton purchased the property around 1947, the City Engineering
Department looked after the pond which ran the full distance between the upper and lower parts of
the semicircular driveway to the main house. It didn't require a lot of maintenance but when it did, it
was handled by the City.
Following the death of my grandparents in the late `50's the property containing the pond was sold
to Miller Britain and a number of the other lots had been sold off, so the vast tract of land no longer
belonged to one person. My Mother's cottage was adjacent to the pond property and in the 1970's
(by which time the house and all the outbuildings had been torn down) the pond was flowing over
351
the driveway. Mother called the City but they declined to do anything about it. She had to have the
driveway rebuilt.
Following the recent death of Jennifer Britain, the portion containing the pond was sold to and is
now owned by Mr. and Mrs. Guest.
Problem
Some twenty years ago there was a significant enlargement to a house on the upper part of the
Peiton Road and we began to notice the filling in of the pond_ Mr. and Mrs. Kidd, who at that time
lived at the end of our driveway experienced flooding from the pond. When Mr. and Mrs. Hayward
acquired the Kidd property, to prevent further flooding they proposed a raising of the driveway,
which we did and shared the cost.
My Grandfather Pelton was a lumber broker and trees were also his hobby. He had three apple
orchards on the property and one of them was situated between the pond and the Sandy Point
Road. That area is now just a swamp.
Over the last twenty years, half of the pond has been filled in with earth and full growth has taken
place. The force of the water rushing out has moved one of the concrete pipes way out from under
the driveway and we have had to arrange another major driveway repair to be done. These are
expensive propositions.
There would appear to be two options — run the ditch down the north side of the Sandy Point Road
from Peacocks to the River or open up and repair the pond. Your Engineering staff may have other
solutions and to that end, I would ask if you could arrange for a site visit before February 11, 2021.
Yours truly,
C. Suzanne Ball
cc. Jacqueline Hamilton
Commissioner of Growth and Community Development
Mark Reade, P. Eng., Senior Planner
Andy Raid, City Planner
Jordan Moran, Municipal Engineer
John Granger, Engineering Technician
One Stop
Scott Walton, Ethos Ridge
2
352
To: Jonathan Taylor, Common Clerk, City of Saint John
From: Daniel Guest, owner, 2 & 4 Pelton Road
CC: Scott Walton
Subject: Ethos Ridge Development
This letter is in response and objection to the Ethos Ridge Proposal on Sandy Point Road
presented to the City of Saint John during the Common Council Meeting held on January 111n
My intention is to have this letter included in the public record.
I am always excited to see new developments in and around Saint John, especially when they
are as interesting and innovative as the Ethos Ridge project. That said I have a number of
questions and concerns that need to be addressed before the approval process for this project
progresses any further.
Storm Water Management
The storm water management section of the proposal was both contradictory and alarming.
Item 3 in the Municipal Servicing and Infrastructure section that outlines documents to be
submitted to the City as part of the subdivision approval process says:
Detailed storm water management plans and a design report indicating how storm water will be
managed on site in accordance with the City's Storm Drainage Design Criteria Manual and all
applicable drainage by- laws. The onsite storm water management will be designed to achieve a
net zero impact.
This is exactly the type of commitment I would expect for a project like this, and I would expect
the City to hold a developer to a net zero impact on storm water infrastructure. However, the
proponents' intentions become clear in the paragraph that follows:
Although the overall the development is expected to increase the storm water runoff from the
site, the majority of this increase will continue to be discharged directly to the Kennebecasis
River through overland methods, ditches, swales and site grading, and will not require storm
water management. A small portion of the site, adjacent to Sandy Point Road, will require storm
water management as it will be discharging into to the existing overland municipal drainage
system on Sandy Point Road. Control of this increase in runoff will be achieved through the
design and construction of various retention features including rain gardens, bio swales and
storm water retention ponds.
This is especially concerning as not only do these statements indicate the design will not
conform to a Net Zero impact but the last 130m of infrastructure that conveys storm water
from the ditch on Sandy Point Road to the Kennebecasis River is on my property. Negatively
impacting this infrastructure would result in very costly repairs or upgrading and would also be
353
detrimental to my property value. These potential impacts are great enough that pre -
development conditions have been documented.
Therefore, I am looking for the following questions to be answered:
1. Will the proponent be held to a Net Zero impact design?
2. Will the Net Zero impact design include contingency for climate change?
3. Will there be follow up inspections and monitoring to ensure the storm water
management system complies with Net Zero?
4. Will a full assessment of the existing storm water infrastructure be conducted?
Traffic Study
An existing traffic volume of 600 vehicles per day increased by 437 vehicles per day represents
73% increase in traffic, this is far from insignificant. This has a broader impact to the
neighborhood and is not consistent with an area zoned to be rural residential. While the roads
can accommodate this increased traffic, I would suggest that sidewalks be considered to keep
increased pedestrian traffic safe from the increased vehicle traffic. Can we be assured Pelton
Road will not become available for day to day entry/exit from the site?
Zoning
This is a rural area and as such is zoned appropriately. Therefore, I would like to understand the
motivation behind rezoning this area, whether it falls under an overarching development plan
for the City and whether this will follow new patterns for its growth and development? This
potential rezoning seems more opportunistic than part of a long term development plan for this
area.
I understand densification is important for improving the City's ability to efficiently provide and
maintain services but developing density should be focused where existing services have
capacity or can be upgraded without excess investment by the City. The location of this
development is not good for the existing home owners and it will be a liability for the City's
infrastructure.
I Strongly disagree with rezoning this area, I don't see the net long term benefit to the City or
the neighborhood.
Conclusion
Given the nature of this project the standard 30-day public review period is inadequate and
doesn't allow for full meaningful consultation. The consultation phase of this project is also
missing a very important component and that is First Nations consultation, especially
considering the proximity to the Kennebecasis River. First Nations Consultation has become an
354
integral part of all project planning and development across Canada and this project should be
no different.
Should the development continue to move forward I will retain the services of a Professional
Engineer to review storm water management and document any infrastructure damage or
degradation that occurs on my property post development. I have suggested to the owners of
the adjacent properties they undertake the same level of due diligence.
Please confirm receipt of this email.
Regards,
Daniel Guest
355
352 Pelton Road
Saint John, New Brunswick
E2K 5H7
January S, 2020
RE: Ethos Ridge: Active Senior Living in Saint John
Proposed amendments to the Municipal Development Plan for property
located at 2100 Sandy Point Road, from Rural Resource Area to Stable
Area and from Rural Resource and Park and Natural Area to Major
Community Facility and extend the boundary of the Primary
Development Area (PDA
Your Worship and Common Councillors,
I am writing this letter to ask that you postpone sending the proposed
amendments to the Planning Advisory Committee until you and the residents of
the Sandy Point area see an actual specific plan for the development of this
major community facility, which will allow the developer to build a high density
development in an area that is not designated for large scale projects. I am
requesting this because the neighbouring properties have not received the
information about the development that would normally be sent by the city to
residents within 100 m of the proposed development.
This area is outside the Primary Development Area , which goes against Plan SJ
and .Zone SJ, which outlined growth and development areas of the city where
road, water and sewage infrastructure is already in place.
The developer dropped off a glossy, 4 page brochure to residents on Pelton Road
that describes a wonderful concept for retirement living. The brochure gives
glowing details of the concept or the dream. There were no specific details on
what was proposed. No information on how the property would be accessed, how
water and sewage services would be handled, how many units or how tall the
building would be. I asked the developer for information and was told it would be
120 units in a 3 storey building and accessed from Sandy Point Road.
356
A 120 unit, Major Community Facility that is 3 or 4 storeys tall is not suited to
the neighbourhood.
Another concern that 1 have is the inability to access Plan SJ and Zone SJ with the
maps and associated municipal plan context, permitted uses, conditions of use,
and zone standards for the proposed new zones. One used to be able to access
this information on -line until the Ransomware Virus Cyber Attack so we don't
know what exactly can be developed in these new amended zones.
It is unfair, in my opinion, to ask for objections to this proposed amendment
by February 10, 2021, when very little information is given. It would be more
appropriate to postpone all this until the planning department has studied
everything and the public has all the information it needs to either agree or
disagree with the zoning.
Sincerely,
Joan Pearce
357
From: jill jollineau <0ill.moll ineau(a�yahoo.ca>
Sent: Thursday, February 4, 2021 7:45:00 AM
To: McAlary, Shirley<shirley.mcalary(cD_saintiohn.ca>
Cc: Sullivan, Gary <gary.sullivan(d-)saintiohn.ca>; MacKenzie, John<]ohn.mackenzie(a)saintiohn.ca>;
Casey, Sean <sean.casey(aD_saintiohn.ca>; Greg Collins <greg(a_collinstours.ca>
Subject: 2100 Sandy Point Road development
Dear Ms McAlary
Thank you for your prompt response to my earlier email. Our community is very
concerned about the proposed project at 2100 Sandy Point Road and the amendments to
the Municipal Development Plan. We have not had the opportunity for public consultation
and request a postponement of the February 10, 2021 date for submitting our concerns
regarding the proposal and a postponement of the council's consideration of the project to
a later session of council.
Due to COVID and the red and orange designations for our zone we have not had the
traditional opportunity to gather and share with the community members and with the
developers. We have some elderly residents who wish to participate in the discussion
however the physical restrictions and their minimal computer skills have limited their
participation.
We thought more information would be available to us from the city and from the
developer- with the lack of information it is now upon us to do the research. For example
the traffic study is severely outdated- safety is important to us and we may do our own
traffic study- with particular emphasis on the intersection of Sandy Point and Foster
Thurston- no mention was made of this intersection in the developers
proposal. Additionally the timing chosen for the study in April 2020, in the midst of a shut
down and the ferry not operating, missed the 7 to 8 am time period when the school buses
are in the neighbourhood and the majority of people are heading to their place of work.
No geotechnical data was provided to us. We are talking with the province regarding water
runoff and with provincial and federal departments regarding the impact on the river
system and the lower lying properties.
We would offer to the developer a chance in an open forum to meet with the residents as
we don't feel that enough effort was made to contact the residents and it was very difficult
to get together. We are open to a virtual meeting and are making plans to assist those who
are unfamiliar with the technology so that they may be present.
We respect the developers time and it may be a way to avoid conflicts before they occur- if
the city would allow time for this meeting it would also show good faith in their behalf. The
proposed meeting would only slow the process down a month - a minor request to solve a
lot of concerns before they arise.
M
There are several properties within the PDA that could provide the developer with the
space and zoning to allow for the development of this project. We can provide a list of
potential properties if you are interested in considering alternatives to our area with the
services and maintenance of these services already being provided.
I am attaching a list of the questions that have come out of the letters that have been
presented to Council in opposition to the proposed project. Our hope is you will see these
as legitimate concerns and an expression of the need for the time required to obtain the
information requested.
Thank you for your consideration on our behalf.
Sincerely
Jill Jollineau
360 Pelton Road
and the Community of Sandy Point
359
Questions included in letters:
Water and sewage/wells and septics
1. Does the Saint John Council have an estimated cost to increasing the volume of our water and sewer
pumping stations capacities to meet and exceed the requirements of such a project as the Ethos Ridge
proposal?
2. Who will pay for the extension of water and sewage services from the corner of Sandy Pt Rd
/Kennebecasis Dr/ Westmount Dr and the entrance to 2100 Sandy Pt Rd?
3. Has there been a proper environmental assessment done to determine the impact of blasting and
construction and how that seismic activity may impact on the wells and septic systems of the area? If so
what are the results/indicators of the effects?
4. Do we really need to develop more land in Saint John that needs water, sewage and road
maintenance?
5. The developers intend to connect to the existing municipal sanitary and water system at the
intersection of Sandy Point Road and Westmount Drive., some 250 metres southward on Sandy Point
Road. Would this require that all of the residences on that stretch of road be forced to hook-up to the
facilities as seems to be the normal practice?
6. Have studies been performed and offered financial compensation to surrounding neighbours as to
what impact this commercial development and land disturbance will have on their wells?
7. What are the hours of construction and the duration of the plan? Is there anticipated blasting?
What guarantees are given to the neighbouring homes that there will be no impact to their basements
(cracked foundations) and wells?
8. Will this new development be on city water and sewage? If so, can the system handle such a large
quantity of water and waste? Will overflow be pumped into our beautiful river system?
360
9. If my well casing gets cracked or if the water table is drained due to the construction, is the City of
Saint John prepared to dig me a new well?
10. On page 272 it says the city 'has advised that downstream wastewater lift stations are at or near
their pumping capacity'. These stations are scheduled to be upgraded in the coming years but no
specific time is given. Will not be a considerable cost to the city?
11. How will the City of Saint John ensure my property does not undergo loss of well and septic services
currently in use?
12. Who will be responsible for the potential contamination in drinking water on my property? Who
will cover the costs of any disruption?
Environmental and Drainage concerns
13. Has there been a proper environmental and fisheries departments assessment done on the impact
of changes in the drainage and watershed to the river system and to the quality and availability of water
for all dependent on the water table for their wells? If not, why not? This is an important component of
the possible impacts of the development and proper authorization should be required at both a local
level and at a provincial level.
14. Has there been an environmental assessment done and may I have a copy?
15. How will their engineering system guarantee flows and speeds to ensure no downstream?
16. Where will the storm water retention ponds be located?
361
17. Has there been a statement of the environmental effects done? Will there be an arborist report
submitted?
18. What is the storm water management plan? Rainwater runoff needs to be critically planned and
managed. How will the proposed storm water measures impact the neighbouring properties? What will
happen 'downstream' (down the hill on Pelton Rd)?
19. Have geotechnical reports been provided assessing erosion and land slip that would impact the
property and surrounding properties?
20. Light pollution is also of concern on both sides of the property. How will this be minimized?
21. This property and neighbouring ones might also become more vulnerable to flooding. Might mean
an ugly seawall along the river?
22. Even if the building is sited back from the shore, will the developer remove shoreline vegetation and
put in lawn right to the water?
23. Who will be monitoring the buffering for properties? Is there going to be a condition mandated
with a community agreed type of buffering zone?
24. Why hasn't there been an environmental study done or been requested to assess the impact on the
surrounding environment? Why has this study or report not been done in advance before submitting
for approval to council?
25. How much water is going to be moved into the Saint John River System from the proposed building
size? Also, how much water will run off into adjacent properties from removal of vegetation and
substrate overall? Why is this study or report not being presented now?
26. What condition will be implemented to ensure water is not running into my property and being
diverted into proper draining culverts and water reusage systems?
Traffic and Road Infrastructure
362
27. Has the city considered the impact of the increased traffic especially with large construction vehicles
on the road infrastructure? Should the proposal go ahead will the city be responsible for returning the
road to its present condition? Will the city bar all construction vehicles from accessing the construction
site by way of Pelton Road?
28. Have the fire, police and ambulance services been consulted regarding the single entry into a site,
along a roadway that will be at a steep grade with a hairpin turn into a proposed 125 unit complex for
people 75 years of age and older? If so, what are their concerns?
29. Will there be a proper study of the traffic pattern to include the intersection at Foster Thurston and
Sandy Pt?
30. Has there been any thought to how fire and ambulance services can adequately provide service at
given the slope to the top of the ridge is 30 degrees?
31. Will the city provide proper lighting and street infrastructure to support the development?
32. What measures would be taken with respect to the increased congestion at the Foster
Thurston/Sandy Pt Road "T" intersection?
33. The Access Road
Will it be a city street? If so will it have to conform to all of the standards of such in new development
paved with curbs, storm sewers etc?
Will all of the city services be underground including electrical wiring (consistent with new subdivisions
across the city)?
Will the city be responsible for snowplowing, sanding, and salting?
34. Does it (the access road) have the approval of our Protecting Services like fire, police protection,
ambulance service, etc? If this proposed development had been in place when the decision to
decommission the Millidgeville Fire Station would it have had any impact on the decision?
35. What guarantee do we have that sidewalks will be built?
363
36. How will this impact existing landowners along the road? We are going from lower density to
higher density traffic. Is this fair to the current property owners who chose to live in a 'non commercial',
low density neighbourhood?
37. Would the city be updating the road with sidewalks and keeping them cleared in the winter so the
children in the neighbourhood could make it to their bus stops safely, or the seniors in this resident
could walk to the bus stop safely?
38. To get to this new development is a steep incline and decline, can emergency vehicles get here
safely?
39. The developer was committing to not using that access (Pelton Road) but how can that be
controlled?
40. How much ambulance and fire traffic will be expected?
41. The developers are suggesting only 20% of overall traffic will be used on this road (Pelton Road).
20% of what? 20% of 350 plus residents/workers/patrons? If we used 20% of the approximate 400
volume of traffic per day (perhaps higher during peak summer/fall time) = a minimum of 80 vehicles
traveling back and forth on aroad without any sidewalks, a blind knoll, and a severe turn with low
protection barriers, is not feasible or acceptable in any City's plan.
Wildlife and Health and Safety
42. Has any consideration been given to the health and safety of the workers during construction and
afterwards in this environment? (i.e. heavy deer population and tick population)
Boundaries and Rezoning
43. If the PDA is expanded to incorporate the Ethos Ridge project where will the new boundaries be?
Will they extend east down Sandy Point Road just far enough to include the project? Will they extend
north up Westmount Drive to the Kennebecasis River then down the shoreline to meet and coincide
364
with the development? What would the property encompassed by the extension have in common with
a 125 unit complex to justify it?
44. Surely there is plenty of land to develop that is already properly zoned, without seeking to rezone
rural land and destroy more green space? Perhaps the developer could take over one of the
undersubscribed projects already begun and revitalize it, or develop property in the city where retirees
are more likely to want to live anyway?
45. Plan SJ was designed with the PDA in place to protect such oversights and additional costs to the
citizens and taxpayers of Saint John. Was this a primary reason why PDA was designed for Plan SJ? Who
is going to cover the cost of managing this infrastructure expense?
Miscellaneous
46. What is the developer doing to benefit the residents he will inconvenience during construction?
47. Exactly how much parking will be provided?
48. Will the trees (buffers) remain? Only clearcutting would allow for 'stunning water views'.
49. Questions directed to information in the brochure:
a) How will you create a destination for residents, their families, and their community?
b) 'amenities that have yet to be realized in our region' — which are what?
c) 'we care about the community impact of our project and believe that local residents should
should hear about it before the formal consultation begins' — when???
c)'services will respond to the evolving needs of your residents' — what ones?
Will health professionals be on site?
d) 'preserving the forest canopy' How when you want to expose 'stunning views'? Can you
guarantee a buffer of trees?
50. Has research been performed in the Saint John market that a facility such as this is in demand with
the corresponding high price point?
365
51. In one meeting it was stated neighbours would be allowed to continue to walk on the paths of the
site. Would we be given passes to do so? Explain how this will work?
52. There are already 3 seniors hosing complexes in Millidgeville, are these full?
53. The price of these senior complexes makes us think that 75% of the residents will be coming in from
other provinces, not NB. This will put a further burden on our health care system. Saint John already has
many people still waiting for a family doctor, are we going to be able to provide proper health care for
all the new seniors coming into the province?
54. Will the trails be accessible for all neighbours or just the residents of the retirement home?
55. The proposal suggests that the location is ideal due to its proximity to Rockwood Park, the hospital,
and the University. Yes, seniors are welcome to attend the University, but this number remains small
and why not place the development closer to the park if proximity matters? Why would you need the
park if you are going to have your own trails?
56. Who will be responsible if the market is not there for expensive senior housing or the building is too
large for its market? Who will be responsible for the building if the developer cannot complete the
proposal and our neighbourhood is tainted by an empty building or partially finished building?
57. What sort of research has been done to determine the suitability of this area for a retirement
complex? Have the developers spoken with older people?
58. Why build 120 plus units at 4 stories if you are and have considered the neighbourhood? Is this a
considered and environmentally friendly approach?
366
352 Pelton Road
Saint John
New Brunswick
E2K 5H7
February 9, 2021
Mayor Darling and Councillors
Re: Proposed Municipal Plan Amendment 2100 Sandy Point Road Ethos Ridge
I have re -read the proposed development plan and discovered that apparently
there is a planned car wash and a restaurant that seats 155 people.
Two questions. What are the zoning regulations for a car wash depositing effluent
overland to drain into a river? Are the two dining rooms of the planned residence
in addition to the restaurant or are they different places?
I respectfully ask that Common Council and the Planning Advisory Committee
require an Environmental Impact Assessment by the NB Department of the
Environment before allowing this development.
I respectfully ask That the Department of Fisheries be asked to give an
assessment on the stormwater run-off impacts on the sturgeon, eels, salmon and
other species of fish in the river.
My rationale follows.
Page 273 of the proposal states: "Although overall the development expected to
increase the storm water runoff from the site, the majority of this increase will
continue to be discharged directly to the Kennebecasis River through overland
methods, ditches, swoles and site grading, and will not require storm water
management." This stormwater runoff occurs in two places on the Kennebecasis
River. It will discharge into the river at the end Of Sandy Point Road, where there
already exists a serious drainage problem and it will discharge off the proposed
development site close to the end of Pelton Road into a different place on the
river.
367
Climate change specialists are predicting higher seasonal temperatures and
precipitation with more severe rain storms and greater snowfall, bringing
increased precipitation. All this extra stormwater will be going into the river
and carry whatever is on the ground with it.
Paved parking spaces, the removal of vegetation and the covering of much of the
acreage with the building along with a paved street will cause an enormous
amount of groundwater run-off. Salt and sand added to the roads and parking
lots in the winter will run off into the river when it melts.
There is a proposed carwash on the site. What are the environmental regulations
for car wash runoff? What zoning conditions does the city have for operating a
car wash?
This property and the neighbouring ones might also become more vulnerable to
flooding. Floods once expected every 30 years are now more likely to be once
every five years or even every two to three years.
Might that mean an ugly seawall along the river to protect this proposed facility
and its grounds from flooding.?
The environmental impact of a development of that size on the river will be
great. Even if the building is sited back from the shore, will the developer
remove shoreline vegetation and put in lawn right to the water? People usually
want an unobstructed view of the water. Building on the water could increase
erosion and destroy the shoreline ecosystem.
I respectfully ask that Common Council and the Planning Advisory Committee
require an Environmental Impact Assessment by the NB Department of the
Environment before allowing this development.
There will be an impact on the fish in the river from stormwater runoff during the
construction of this development and with the winter runoff into the river. 1
respectfully ask That the Department of Fisheries be asked to give an assessment
on the stormwater run-off impacts on the sturgeon, eels, salmon and other
species of fish in the river.
Sincerely,
o eA_ (_C_exl�
368
2002 Sandy Point Road
Saint John, NB
January 28, 2021.
Mayor and Councillors
RE: Proposed Municipal Plan Amendment
2100 Sandy Point Road to allow for a 4storey apartment building, Major
Community Facility
The house I am living in was constructed in the early 1950's. My water
comes from a well. My sewage goes to a sewage tank and a septic field,
which is in the front of my house adjacent to the street.
The developer has stated in his Ethos Ridge proposal that "it is the intent of
the developer to connect to the existing municipal sanitary and water
systems at the intersection of Sandy Point Road and Westmount Drive."
It is my understanding that the connection will be along Sandy Point Road
to #2100 Sandy Point Road, thereby passing in front of my house. I am
concerned that the construction will damage my septic field and depending
on the extent of the drilling through rock might in some way interfere with
water flow or damage my well. In that case, is the city or the developer
responsible for the repair? I expect councillors will enforce a commitment
from the developer to cover the full cost of any damage to my property
that results from the installation of water and sewage lines along Sandy
Point Road.
When the city placed water infrastructure and sewage along Sandy Point
Road two decades ago, residents along that route, who had wells and
septic, were forced into joining the new infrastructure and if they didn't,
had to pay the water bill, whether they were using the water or not. I am
not at all interested in being obligated to this,
Sincerely, _
�( �1?GIlin/N
Y 369
420 Pelton Road
Saint John, NB E2K 5H7
January 29, 2021
Mr. Jonathan Taylor
Common Clerk
City of Saint John
15 Market Square
Saint John, NB
Subject: Proposed Municipal Plan Amendment "Re 2100 Sandy Point Road"
Dear sir
Thank you for the opportunity to express my views and concerns regarding the re -
designation of the properties identified as PID numbers 55233233 and 55233977
and the proposed amendments to Schedules A and B of the Municipal Development
Plan and to extend the boundaries of the Primary Development Area (PDA) to
accommodate the proposed Ethos Ridge Development.
The Public Notice states that the reason for those changes is "To permit the
development of a retirement community". Yet the re -designation of P1D no.
55233233 from Rural and Resource to stable area as clearly shown on the map has
absolutely nothing to do with the retirement project. Is there some kind of hidden
agenda here? The re -designation should not be allowed without full disclosure.
Currently the relevant portion of the PDA lies to the west of Sandy Point Road and
Westmount Drive centered on the junction they make with Kennebecasis Drive.
That junction is the closest point on the PDA boundary that you can get to the
proposed development. It is approximately a quarter of a kilometre away. There is
clearly no common boundary between the two, as the proposal would have us
believe.
Under the subtitle Future Land Use Schedule B (page 270 of the proposal) the first
paragraph states, "the proposed Ethos site is literally touching/adjacent to the edge
of the existing PDA along Sandy Point Road". This is not so!
The same paragraph goes on to say Policy LU-1 recognizes that the boundaries of
land use designation are 'intended to be approximate'. This is not so!
However Policy LU-3 does state 'that the boundaries of land use designations, as
shown on the Future Land Use map (Schedule B) are intended to be approximate,
except, where they coincide with roads or other clearly defined physical features.'
370
This clearly and firmly fixes the MPA boundary passing through the Sandy Pt
Rd/Westmount Dr/Kennebecasis Dr junction. There clearly is no common
boundary!
Under the heading Major Community Facilities the first paragraph (page 271) of the
proposal states:
"By providing aging in community, Ethos proposal will contribute positively to the
neighborhood as ensured by Policy LU-90".
Policy LU-90 follows in its entirety:
Council shall: Ensure that new major community facilities that are used by residents
across the City and the Greater Saint John Region are located in areas
designated Major Community Facilities and shall generally be
Permitted only subject to a rezoning process where compliance is
demonstrated with the following requirements:
a. The proposed land use is desirable and contributes positively to the
neighbourhood;
b. The proposal is compatible with surrounding land uses;
c. The development is in a location where all necessary water and
wastewater services, protective services, and appropriate
transportation infrastructure including public transit can be provided;
d. Site design features that address such matters as safe access,
buffering and landscaping, site grading and storm water management
are incorporated;
e. A high quality exterior building design is provided that is consistent
with the Urban Design Principles in the Municipal Plan; and
f. Public transit and active transportation links are provided to and
from other key destinations.
I find the quotation just above the insertion of Policy LU-90 above rather baffling
and meaningless. The policy states what council will ensure happens
in new major community facilities where compliance is demonstrated
through meeting requirements a. through f, as listed above.
My views on requirement a. through f. and how the proposal responds to them
follow:
a. the neighbourhood disagrees
b. it isn't
c. I believe this requirement cannot adequately be met particularly
with regard to protective services and transportation infrastructure
including public transit.
d. I believe the project cannot provide safe access. The remainder lies
in the eyes of the beholder.
e. the current zoning bylaws prohibit building heights above 2 storeys
with a height limit of 11 metres. This plan clearly violates this
requirement.
371 2
f. They are not at present, who will provide them in future?
If the PDA is expanded to incorporate the Ethos Ridge project where will the new
boundaries be? The eastern boundary down Sandy Point Road should not extend
beyond PD no. 55233977 in the absence of any good explanation of why PD no.
55233233 should be included. Will they extend east down Sandy Point Road just far
enough to include the project? Will they extend north up Westmount Drive to the
Kennebecasis River then down the shoreline to meet and coincide with the
development? What would the property encompassed by the extension have in
common with a 125 unit complex to justify it?
It seems to me that the re -designation of the properties represents a classic case of
"Spot Rezoning" something that I understand PLAN SJ was designed to eliminate. I
believe that approving this project would be a precedent -setting action that will
come back to haunt city council.
Services
The developers intend to connect to the existing municipal sanitary and water
system at the intersection of Sandy Point Road and Westmount Drive, some 250
metres southward on Sandy Point Road. Would this require that all of the
residences on that stretch of road be forced to hook-up to the facilities as seems to
be the normal practice? This would force these residents to undergo very
substantial 'up front' costs, lose the long term benefits expected from their large
investments in wells and septic systems and face the on -going costs (approximately
$1200 per year) for water that they neither need nor want.
The Access Road
On page 271 of the proposal in the first paragraph it is stated that "the subtle entry
drive will rise from Sandy Point Road and then descend over the ridge which will
completely hide the project from the road..." This seems to suggest that the access
road will be something of a bucolic country lane. Surely the access road would have
to be a city street conforming in all respects to the requirement of such; like all
utility and services be underground, the street will be paved with sidewalks, curbs,
storm sewers, markings and signage. A conforming street could hardly be called
'subtle'. The paragraph cited is, I believe, disingenuous.
Will the city be responsible for snowplowing, sanding, and salting? If so, given the
nature of the development, it would probably have to be in the very high priority
category for such.
Does it have the approval of our Protective Services like fire, police protection,
ambulance service, etc.? If this proposed development had been in place when the
decision to decommission the Millidgeville Fire Station would it have had any
impact on the decision? It would not likely have changed the decision but would
surely have been considered germane. These considerations are important - it is a
single access to a complex consisting of 125 units for seniors 75 years of age and
over - the access road seems to be about 0.5 kilometres long and comprised of a 180
372 3
degree loop astride the ridge that is very steep sided on the side away from Sandy
Point Road. The grades are significant which could result in treacherous conditions
especially when negotiating the `loop' during our wintry season.
The traffic in and out will be significant - the proposal itself estimates that the
complex will have 216 people in residence, in addition to 27 staff and an expectation
of 108 visitors.
Since the complex is geared to 75+ years old folk who want to live an active lifestyle
it is hard to believe that most of them will be willing to give up their driving
privileges and their cars for a good many years to come (It is often expressed that
75 years of age is the new 65).
Exactly how much parking will be provided?
Additionally should the project proceed I believe that city council should require
that the access road be completed and in service before any construction can begin
at the building site. There should be an absolute ban on any construction traffic on
Pelton Road, which is in no shape to handle it.
The last paragraph in the proposal states that, "an Engineer Traffic Study has been
completed by Englobe Engineer to make sure no negative impacts to the local
system will be experienced". To suggest that adding some 351 people will
experience no negative impacts, most of them drivers, to this north end of Sandy
Point Road, is utterly ridiculous, in my view.
The outdated incomplete study fails to recognize that the real traffic choke point will
be where Sandy Point Road connects to Foster Thurston Drive. Very short sight line
combined with morning and afternoon rush traffic would make Traffic Lights there
absolutely required. Not doing so would be absolutely unconscionable on behalf of
the city.
Water
All of the residents in the entire neighbourhood surrounding the proposed
development are dependent on our wells for our water supply. We greatly fear that
our wells will be negatively impacted by the blasting that would be required at the
building site which sits on solid rock and during the construction of the access road
that will need to be cut through the solid rock ridge that the access road will need to
straddle and continue downhill to the building site.
Many of us have had problem with the security of water supply over the years.
I had to drill a new well some years ago because the old one kept running dry during
the summer months. The new well had to be drilled to a depth of 500 feet before
getting water and yet I have still run out of water during hot spells. I know of others
in the neighbourhood who have also had to carefully ration their water usage to
avoid running dry. One resident lost all of their water and had to drill a new one as
a result of a neighbor drilling a new well.
Should this development go ahead I believe it incumbent on the city to require the
developer to engage an independent contractor with the expertise to test all of the
wells in the area for water quality and flow volumes to provide solid base -line data
to use in any dispute resolution arising from the project.
373 4
It is my understanding that this proposal excludes consideration of using Pelton
Road as a part of the traffic flow that would be engendered by its approval. The
proponents are quoted in the newspaper saying that, "Traffic flow concerns will be
mitigated by limiting property access to a single entry point off Sandy Point Road".
The map that is part of the proposal shows only a gated entrance from Pelton Road
to the complex presumably denying access to @= motor vehicle traffic. The
inclusion of Pelton Road in the project would require a whole new conversation by
all the parties impacted.
In closing 1 wish to state that I would fully approve of any development proposal on
the subject properties that is appropriate to the neighbourhood. This proposal,
however, I feel will be highly detrimental to the residential character of the
neighbourhood and highly destructive to the whole sense of 'pride in community'
that forms the fabric from which all great cities are woven. All of the flowery
phrases meant to evoke idyllic 'Shangri-La"- like images of the proposal cannot
change the fact that it is inappropriate to this community. Many may suggest that
our positions on this matter are elitist. Our community is composed of a broad
cross-section of residents -employed and retired, residences comprised of floor
spaces of 800 sq ft to grand homes as a review of property assessments would
attest. We have welcomed construction in the area within and outside the PDA and
an increase in our community population - young families bringing vitality and older
members bringing wisdom with their experiences. It is the scope and magnitude of
this particular proposal that we object to vigorously.
Thank you very much for the opportunity to make my views and opinions known.
Writing this piece has given me a new appreciation for the burden that is placed
upon you who are given the onerous duty of reading it and others of its ilk. Thank
you very much for your patient commitment and exercising of'due diligence' on
behalf of us all.
Sincerely
Wayne Jpllineau
cc. Gary Sullivan
John MacKenzie
Sean Casey
Shirley McAlary
374 5
From: GARY ROSS <rossgarv@rogers.com>
Sent: March 7, 2021 12:29 PM
To: Common Clerk <commonclerk@saintlohn.ca>
Subject: Development called Ethos Ridge Sandy Point Rd Saint John NB
[ External Email Alert] **Please note that this message is from an external sender. If it appears to be
sent from a Saint John employee, please forward the email to spamsample@saintiohn.ca or contact IT
Service Desk at 649-6047.**
Please accept this as my opposition to the proposed above development.
1. Present road construction not designed for the additional traffic.
2. Lack of inadequate fire protection with the closing of Millidgeville Station.
3. Possibility of environmental damage.
Respectively
Gary Ross
16 O'LEARY Crescent
Saint John E2K 5G8
375
Reid, Andy (Planning)
From: OneStop
Sent: March 25, 2021 9:33 AM
To: Peterson, Benjamin; Reid, Andy (Planning)
Subject: FW: Opposition to the Ethos Project
Hey guys — this just came in
From: Igor Zotov <iamzty@gmail.com>
Sent: March 24, 2021 8:59 PM
To: OneStop <onestop@saintjohn.ca>
Subject: Opposition to the Ethos Project
[ External Email Alert] **Please note that this message is from an external sender. If it
appears to be sent from a Saint John employee, please forward the email to
spamsample@saintiohn.ca or contact IT Service Desk at 649-6047.**
Dear Councilors,
As current residents of this quiet, peaceful, rural area we are strongly opposed against building a high -density
development here, in an area that is not designed for large scale projects.
Increased traffic is another concern, as this cul-de-sac part of Sandy Point Road is narrow and steep without pedestrian
sidewalks. Driveway up the hill to Ethos construction site will have a steep grade of more than 10% which will be
dangerous in winter conditions.
This section of our neighborhood is dominated by single-family homes, where we enjoy a comfortable and quiet
environment to live away from busy traffic. Building a 120-unit apartment complex would require hammering, drilling
and blasting of the rock, which would be incredibly disruptive to the heart of residential Millidgeville.
In light of the upcoming elections our votes will be strongly biased toward a candidate who listens to the voice of
concerned people from our neighbourhood.
Sincerely,
Igor & Lena
Homeowners of 2101 Sandy Point Road
1
376
From: Jean du Plessis <jduplessis@gmail.com>
Sent: March 6, 2021 3:49 PM
To: Common Clerk <commonclerk@saintlohn.ca>; dondarling@saintiohn.ca; McAlary, Shirley
<shirley.mcalary@saintiohn.ca>; Armstrong, Blake <blake.armstrong@saintiohn.ca>; Hickey, David
<david.hickev@saintiohn.ca>; Merrithew, David <david.merrithew@saintiohn.ca>; Reardon, Donna
<donna.reardon@saintiohn.ca>; Sullivan, Gary <gary.sullivan@saintiohn.ca>; Norton, Greg
<greg.norton@saintiohn.ca>; MacKenzie, John <john.mackenzie@saintiohn.ca>; Strowbridge, Ray
<ray.strowbridge@saintiohn.ca>
Subject: Support for Ethos Ridge Project
Hello City Representatives,
Today we had a resident visiting canvasing our home in protest of the Ethos Ridge Project, citing
numerous concerns (traffic, environment, and use of tax payer dollars for a sidewalk). I believe in
sustainable development and a need for the city to pursue projects that will not only improve the
aesthetic of the city, improve the value of properties (and therefore tax base), but also result in
economic activity that will benefit the community. Too often you will only hear the voice of decent.
We only moved to the area recently, having lived in Quispamsis previously. We moved to Ottawa for
four years and on our return chose to live in Saint John because we wanted to contribute to the city that
we work in and believe has so much potential. It has been really positive to see the changes that have
occurred in Saint John over the past 4 years. The uptown areas seem to be doing better than I've ever
seen it (excluding the mall which needs some investment).
I think that the Ethos Ridge project is a great idea. There is a need for retirement homes, and in my view
providing a location here would be good for the city overall. I believe that providing areas for older
residents that are near the hospital is the right thing to do. It will also ensure that older residents free up
residential areas in town that provide working families and individuals with housing near to their work.
That said I think it would be important to hold the developer to account on their plans to ensure that
they follow the commitments they are intending to make to the area. I would also ask the city that they
factor the following needed investments including sidewalks, of which there are few and a better
solution for traffic control at the intersection of Sandy Point Road and Foster Thurston. Currently the
road is hazardous, as it is on a blind corner with the entrance to Rockwood park further adding to the
hazard. Vehicles also speed considerably coming around the corner making it difficult to turn onto the
street. This is even more dangerous for pedestrians, which have no sidewalk and no way to slow traffic
in order to cross the street to get to the park. It would be great to not have to drive to the park that is a
5 min walk from our house.
I know you probably don't get a ton of support. But I wanted to end on a positive note. Keep focusing on
making Saint John a better place to live. This city has an incredible history and so much character.
Thanks for the focus on progress!
Regards,
Jean & Isabelle du Plessis
377
Dear council members and Mayor Don,
March 21, 2021
I am writing you today to speak about the proposed development called Ethos Ridge. I am
speaking on behalf of my 94-year-old mother who lives at 455 Pelton Road.
My mother has lived at this address since 1960. She is the last original resident to have lived on
Pelton Road. My mom has a 250 foot deep well. When the Fieldstone Estates was being
developed my moms, water went cloudy and had a sulfur smell. We had it tested and it was
drinkable. After several years, it became clear once again with no smell. This well is the deepest
on the street and is a canary in the mine.
The house I speak of has been flooded several times during extreme rain events. The water will
rise through a drain in the floor usually resulting in 12 inches of rain in the basement. It can rise
to that height in about ten minutes. As the ground gets saturated, the threat becomes more
likely. All the water flows off the back field and across this property. We have recently added
new tiles and hope we will no longer have to deal with flooding. The amount of water that
comes from the ridge, washed out the ditch beside 433 Pelton Road last year, resulting in two
days worth of work by the outside workers. They lined the ditch with cobble to stop the erosion
and to fix the wash out. The proposed development will not improve flooding to this property.
The Ethos Ridge development will impact my moms house more than most folks, it is literally in
her back yard. This house, which is on the side of the hill, will be dwarfed by the building. The
development with it's five floors will already be six stories higher than 455 Pelton Road. I
assume there will also be ventilation equipment on the roof. No vegetation will hide this
building. It will also be high enough to block out the winter sun in the afternoons. All the
structures within miles are one or two stories.
The proposed development represents urban sprawl. I am pro -development, but I am not
development anything just to increase the tax base. Each development needs to make sense for
each area. This proposal is very much like the warehouse in Drury Cove. Many of the new
neighbours have moved to Pelton Road to get away from the bustle of the city. If this proposal
can proceed, the property value of every house on the road will decrease.
Thanks for allowing, me to share my input. I am happy to see a balanced budget for next year
and the property tax rates going down.
Respectfully submitted,
Ken Ward
378
Burgess, Aimee
From: VillageView Suites <stephen@villageviewsuites.com>
Sent: March 16, 2021 11:32 AM
To: Reid, Andy (Planning); OneStop
Subject: Ethos Ridge
Follow Up Flag: Follow up
Flag Status: Flagged
[ External Email Alert] **Please note that this message is from an external sender. If it
appears to be sent from a Saint John employee, please forward the email to
spa msample@saintjohn.ca or contact IT Service Desk at 649-6047.**
To PAC/Andy Reid, One Stop,
Please accept this submission to the Ethos Ridge File.
I am in support of this application. The development seems to have considered many, if not all of the challenges this
project presents to the neighbours. The design seems very well thought out, intentional and sensitive.
Saint John needs investment, tax base and residential options, we know this to be fact. Ethos Ridge helps check the
boxes to all of these important priorities. We also know this is a high profile file and it is just not local stakeholders
looking at it, there are outside investors and developers paying attention to how we proceed and perform as a
community in this matter.
This is an opportunity to once again show that Saint John is open for business and that we can safely and responsibly
negotiate concerns of the neighbours while achieving the developments we need.
Thank you for the opportunity to weigh in.
S. Brittain
Stephen Brittain
Village View Suites
Sent from my iPhone
1
379
420 Pelton Road
Saint John, NB E2K5H7
March 12, 2021
Members of the Planning Advisory Committee
City of Saint John Common Council
Saint John, NB
Dear Members of the PAC
I reside on Pelton Road that is part of a somewhat unique pocket of land in that it
lies within both the river valley and the city. Although it lies within the city it is
bounded by the river and the escarpment including that part of the escarpment
surrounding Westmount Drive and from there down to the river. It includes the
land where the Ethos Project seeks a re -zoning. Because of the topography and its
relative small size it has remained relatively unchanged for generations. We are
strongly in favour of growing the city and its tax base, but only in an appropriate
manner. Our pocket of land is undeniably rural in nature and should be preserved
and valued as such.
As mentioned above our community is very stable, has been for generations and
should continue as such. There is room for some growth in the area that is the
subject of this proposal but it should be compatible with its surroundings and the
very rural nature in which it lies.
Like our neighbours we have chosen to live here because - after much diligent
searching - it fits the life-style we value so highly and for which we made the biggest
investments of our lives. When settling here and while living here we believed that
P1anSJ and the zoning bylaws protected us from any degradation of the rural nature
of the community that we love so much. The proposed Ethos development is so
incompatible with the neighbourhood and so contradictory to the zoning bylaws
that it is a grotesque intrusion on our way of life.
Any serious consideration of accepting this proposal, so flagrantly in violation of the
current zoning, we find inconsiderate and disrespectful of our contribution to the
tax base of the city and our dependence upon the promises inherent in PlanSJ and its
bylaws.
The committee that crafted the Municipal Plan had the foresight to recognize that
these are neighbourhoods that differ from each other in meaningful ways and that
the plan must recognize, respect, and value such differences.
The following excerpts from the Municipal Plan speak to the above (the underlining
is mine):
Under Section 1-1 "Purpose of the Municipal Plan" it states:
The Municipal Plan presents a new direction for development and
investment in the City, and is based on the aspirations of Saint Johners to
grow the City in a more compact and sustainable manner. It is rooted in the
City's many assets, placing a stronger emphasis on quality of life and the
development of a more urban City in the future. This is a holistic Municipal
Plan that integrates the principles of progressive urban planning with the
unique needs and desires of Saint Johners.
The Municipal Plan is not just about land use. It is about valuing the City's
rich built and natural heritage: investing in its neighbourhoods to strengthen
and reinvigorate the City: providing support for neighbourhood -level
planning in key areas to ensure ongoing local input in the land use decision -
making process; creating a balanced transportation network to make public
transit and active transportation more viable and desirable mobility options;
and most importantly, the Municipal Plan is about ensuring the people who
live in the City and those who will come in the future want to stay for the
economic opportunities and the enviable quality of life the City provides.
Under Section 1.4.1 it states:
3. Saint Iohn is comprised of healthv. unique and inclusive neighbourhoods.
Saint John:
• Strengthens the concept of `one' Saint John by working to make
distinct neighbourhoods feel part of one City and one future:
• Supports mixed income living, offering a range of diverse housing
choices to meet different life -cycle needs;
• Enables people of any income level to live in a neighbourhood of their
choosing;
• Builds on the strong tradition of neighbours taking care of each other -
neighbourhoods are the foundation of the strong community pride
that defines Saint John: and
• Provides a range of services, employment, leisure and recreational
choices within neighbourhoods to provide people with the
opportunity to live, work, and play in their neighbourhood.
I have just finished reading the report of Community Services to the PAC on the
Ethos Ridge proposal and am disappointed to see it is so dismissive of the opinions
expressed by the letter writers particularly ignoring the overwhelming disapproval
of the surrounding community.
I am adamantly opposed to the project, but should city council approve it I would
like PAC to insist upon the following restrictions:
381
1) I find'the sunset clause', item 4 c) page 3 of the report far too weak. It should be
very direct, unambiguous, explicit in specifying that the rezoning of the property
pertains only to the project for which the proponents specifically sought the
rezoning permit with no repurposing allowed. It is my great fear that sometime in
the next year or so the proponents will 'discover' that due to `unforeseen
circumstances' like changing market forces or running into prohibitive costs the
project will have to be changed. "Not to worry" the property (whose value will have
multiplied with the rezoning in hand) will be repurposed. NO! NO! NO!
2) In addition to the restrictions on the use of Pelton Road in part 4a) on page 3
there should be a very specific, unambiguous sentence banning au construction
related traffic on Pelton Road.
3) Clarify that the plans discussed in item d) page 3 be not only attached to the
permit application but be part of the permit itself.
4) Make it clear that the rezoning permit specifically and clearly allows
construction to only take place on the river side of the property and that no building
of any nature be allowed on the Sandy Point Road side of the ridge.
Sincerely
Wayne Jollineau
cc. Gary Sullivan
Susan Baxter
Anne McShane
Peter Pappas
Brad Mitchell
Neil Clements
Alexandra Weaver Crawford
Lourdes Clancy
Gerry Lowe
382
Reid, Andy (Planning)
From: OneStop
Sent: March 25, 2021 9:33 AM
To: Reid, Andy (Planning); Peterson, Benjamin
Subject: FW: Opposition to 2100 Sandy Point Development - Ethos Ridge
From: Kevin McDermott <kevinmcdermott@rogers.com>
Sent: March 25, 2021 9:16 AM
To: OneStop <onestop@saintjohn.ca>
Subject: Opposition to 2100 Sandy Point Development - Ethos Ridge
[ External Email Alert] **Please note that this message is from an external sender. If it
appears to be sent from a Saint John employee, please forward the email to
spamsample@saintiohn.ca or contact IT Service Desk at 649-6047.**
I am a neighbour and resident in the Sandy Point area and have lived here since 1988- Kevin and myself are opposed to
the 2100 Sandy Point Ethos Development. My understanding is the current infrastructure for the pumping stations in
the area are inadequate to support this facility of that size.
The roadways on Sandy point rd - are narrow without sidewalks, and emergency vehicles trying to make hills in
inclement weather and on blind knolls would be challenged especially in winter and on hills- getting up and down
through the high ridge of the roadway being proposed. In summer being surrounded by hectares of trees I feel poses a
threat of a forest fire on the proposed site should a resident or visitor drop a cigarette- the fire would spread quickly
throughput the neighborhood as conditions in August are very dry.
The intersection at the zoo looking left to Foster Thurston has a sight intrusion preventing vehicles enough time to turn
left safely. That area should be cut back and it was noted in a previous report that vehicles were reported driving above
the speed limit which adds danger of an accident. We feel this would create a bottleneck and safety issue at this
intersection with the proposed development due to the increase in traffic.
The yield sign at the top of Kennebecasisis dr should be changed to a stop sign - if you are proceeding to sandy point rd
towards Pelton you can't see vehicles coming down the hill from the zoo as there is a bush on the corner lot that
impedes a clear view to go straight across or turn left or right - you have to move almost in the middle of the rd -to cross
or turn at this intersection. In summary we have issues now with traffic intersections adding more traffic to already
dangerous intersections is a issue.
I do feel this development would be better suited in a different location and would be good for the City but do not feel
it is ideally suited in this location -re pumping stations, traffic, emergency and fire concerns
Respectfully submitted
Brenda & Kevin McDermott
632-0815
1
383
Sent from my Wad
From: Tony Roman <tonyroman80@gmail.com>
Sent: March 10, 2021 9:16 PM
To: dondarling@saintlohn.ca; McAlary, Shirley <shirley.mcalary@saintiohn.ca>; Armstrong, Blake
<blake.armstrong@saintiohn.ca>; Hickey, David <david.hickev@saintiohn.ca>; Merrithew, David
<david.merrithew@saintiohn.ca>; Reardon, Donna <donna.reardon@saintiohn.ca>; Sullivan, Gary
<gary.sullivan@saintiohn.ca>; Norton, Greg <greg.norton@saintiohn.ca>; MacKenzie, John
<john.mackenzie@saintiohn.ca>; Strowbridge, Ray <ray.strowbridge@saintiohn.ca>
Cc: Common Clerk <commonclerk@saintiohn.ca>
Subject: Ethos Ridge Project
[ External Email Alert] **Please note that this message is from an external
sender. If it appears to be sent from a Saint John employee, please forward the
email to spamsample@saintiohn.ca or contact IT Service Desk at 649-6047.**
To whom it may concern,
We are Tony and Joanna, residents of Kennebecasis dr. We would like to oppose the Ethos Ridge
Project.
The streets and traffic are not designed for an additional 125 units. The streets are extremely narrow
and there are no sidewalks. Foster Thurston traffic is already dense as is with Hospital and UNB traffic.
You do not want to further endanger our community!
This project will most definitely affect the environment. Think about the overall negative impact on
nearby the Kennebecasis River, humans and wildlife.
Instead, why not demolish some of the rundown buildings in Indian Town to develop this project. Our
community is not zoned for such a project!!!
Tony and Joanna
385
420 Pelton Road
Saint John, NB E2K5H7
March 12, 2021
Members of the Planning Advisory Committee
City of Saint John Common Council
Saint John, NB
Dear Members of the PAC
1 reside on Pelton Road that is part of a somewhat unique pocket of land in that it
lies within both the river valley and the city. Although it lies within the city it is
bounded by the river and the escarpment including that part of the escarpment
surrounding Westmount Drive and from there down to the river. It includes the
land where the Ethos Project seeks a re -zoning. Because of the topography and its
relative small size it has remained relatively unchanged for generations. We are
strongly in favour of growing the city and its tax base, but only in an appropriate
manner. Our pocket of land is undeniably rural in nature and should be preserved
and valued as such.
As mentioned above our community is very stable, has been for generations and
should continue as such. There is room for some growth in the area that is the
subject of this proposal but it should be compatible with its surroundings and the
very rural nature in which it lies.
Like our neighbours we have chosen to live here because - after much diligent
searching - it fits the life-style we value so highly and for which we made the biggest
investments of our lives. When settling here and while living here we believed that
P1anSJ and the zoning bylaws protected us from any degradation of the rural nature
of the community that we love so much. The proposed Ethos development is so
incompatible with the neighbourhood and so contradictory to the zoning bylaws
that it is a grotesque intrusion on our way of life.
Any serious consideration of accepting this proposal, so flagrantly in violation of the
current zoning, we find inconsiderate and disrespectful of our contribution to the
tax base of the city and our dependence upon the promises inherent in PIanSJ and its
bylaws.
The committee that crafted the Municipal Plan had the foresight to recognize that
these are neighbourhoods that differ from each other in meaningful ways and that
the plan must recognize, respect, and value such differences.
The following excerpts from the Municipal Plan speak to the above (the underlining
is mine):
Under Section 1-1 "Purpose of the Municipal Plan" it states:
The Municipal Plan presents a new direction for development and
investment in the City, and is based on the aspirations of Saint Johners to
grow the City in a more compact and sustainable manner. It is rooted in the
City's many assets, placing a stronger emphasis on quality of life and the
development of a more urban City in the future. This is a holistic Municipal
Plan that integrates the principles of progressive urban planning with the
unique needs and desires of Saint Johners.
The Municipal Plan is not just about land use It is about valuing the City's
rich built and natural heritage; investing in its neighbourhoods to strengthen
and reinvigorate the City: providing support for neighbourhood -level
tannin inke areas to ensure ongoing local input in the land use decision -
making process; creating a balanced transportation network to make public
transit and active transportation more viable and desirable mobility options;
and most importantly, the Municipal Plan is about ensuring the people who
live in the City and those who will come in the future want to stay for the
economic opportunities and the enviable quality of life the City provides.
Under Section 1.4.1 it states:
3. Saint John is comprised of healthy, unique and inclusive neighbourhoods.
Saint John:
• Strengthens the concept of'one' Saint lohn by working to make
distinct neighbourhoods feel part of one City_ and one future:
• Supports mixed income living, offering a range of diverse housing
choices to meet different life -cycle needs;
• Enables people of any income level to live in a neighbourhood of their
choosing;
• Builds on the strong tradition of neighbours taking care of each other -
neighbourhoods are the foundation of the strong community_ ride
that defines Saint John; and
• Provides a range of services, employment, leisure and recreational
choices within neighbourhoods to provide people with the
opportunity to live, work, and play in their neighbourhood.
I have just finished reading the report of Community Services to the PAC on the
Ethos Ridge proposal and am disappointed to see it is so dismissive of the opinions
expressed by the letter writers particularly ignoring the overwhelming disapproval
of the surrounding community.
1 am adamantly opposed to the project, but should city council approve it 1 would
like PAC to insist upon the following restrictions:
387
1) 1 find 'the sunset clause', item 4 c) page 3 of the report far too weak. It should be
very direct, unambiguous, explicit in specifying that the rezoning of the property
pertains only to the project for which the proponents specifically sought the
rezoning permit with no repurposing allowed. It is my great fear that sometime in
the next year or so the proponents will 'discover' that due to 'unforeseen
circumstances' like changing market forces or running into prohibitive costs the
project will have to be changed. "Not to worry" the property (whose value will have
multiplied with the rezoning in hand) will be repurposed. NO! NO! NO!
2) In addition to the restrictions on the use of Pelton Road in part 4a) on page 3
there should be a very specific, unambiguous sentence banning any construction
related traffic on Pelton Road.
3) Clarify that the plans discussed in item d) page 3 be not only attached to the
permit application but be part of the permit itself.
4) Make it clear that the rezoning permit specifically and clearly allows
construction to only take place on the river side of the property and that no building
of any nature be allowed on the Sandy Point Road side of the ridge.
Sincerely
Wayne Jollineau
cc. Gary Sullivan
Susan Baxter
Anne McShane
Peter Pappas
Brad Mitchell
Neil Clements
Alexandra Weaver Crawford
Lourdes Clancy
Gerry Lowe
Dear respected Mayor and City Councillors,
I just wanted to show my support for the new development of the Ethos Ridge project in the
Milledgeville area. This new project will add more pristine seniors residence and will also bring a lot
more tax revenue than independent homes in the same footprint.
At the same time, I am also hopeful that the additional revenue will be utilized to create sidewalks in the
same area connecting it to the rockwood park, as currently it is a risk for anyone walking on the roads
and crossing the intersection towards Rockwood park trailway.
Thanks and regards,
Am it Tamrakar
7 Fieldstone Dr
Saint John, NB E2K OA6
C 506-333-8686
OFFICE OF ARLENE DUNN
MLA for SAINT JOHN HARBOUR
55 UNION ST., SUITE 140
Saint John, NB
Canada E2L 5137
.Ln,. xcn s�i
March 29, 2021
His Worship, Don Darling, Mayor
City of Saint John
15 Market Square
P.O. Box 1791
Saint John, NB
E2L 4L1
Dear Sir and Members of Common Council,
BUREAU DE ARLENE DUNN
Depute de SAINT JOHN HARBOUR
55 UNION ST., SUITE 140
Saint John, NB
Canada E2L 567
As the Member of the Legislative Assembly of New Brunswick for the Saint John Harbour riding,
I wish to express my public support for the proposed Ethos Ridge development.
I have reviewed the proposed development and I believe it will deliver on two very important
priorities for Saint John: economic development and new housing for seniors.
We are all aware of New Brunswick's aging demographic, so it's nice to see we have a
developer prepared to step up to the plate and provide housing specifically designed for
seniors. And it's nice to see the proposed development calls for high -calibre accommodations.
The construction of 125 new housing units will no doubt ease some of the pressure on low
vacancy rates in the area and attract outside investment that provides employment for local
tradespeople and contractors.
The investment of tens of millions of dollars will create direct and indirect jobs that will benefit
the entire region. As we start to prepare for a post-COVID world, this is precisely the type of
development the city needs, and the spinoffs will be felt in multiple sectors in the region.
We can't ignore the fact this development would be a significant boost to the city's tax base
and a sign to all developers that Saint John is open for business and ready to be part of New
Brunswick's post -pandemic economic growth.
With kind regards, I remain
Yours truly,
Hon. Arlene Dunn
506-643-6138 (tel.)
390
1970 Sandy Point Road
Saint John, N.B.
E2K5E9
March 25, 2012
To the City Councilors and the Common Clerk:
We (Brenda and Stephen Ough) are writing this letter to express our deep concerns
about the development of the Ethos Project at 2100 Sandy Point Road.
On March 16th the PAC met for five hours to talk about this project. It is very evident
that the developers did not do their homework in the area of environment issues,
which include wildlife, fisheries and species at risk. Has there been a proper
environmental impact assessment done? If so, by whom? What were his or her
qualifications? We have not had any information on this.
One of the things we are concerned about are the wetlands which are on the
property. Have they been PROPERLY looked at and has an assessment by a qualified
person been properly done? Another issue is the overflow of water and sewage.
Will this be going into the Kennebecasis River and if so, has a proper evaluation of
this been done? If storage tanks are going to be used, we believe an expert
assessment of this should have been done and made available to the public.
The people in the neighbourhood have not been given enough information on the
above topics and we feel that the development should not be allowed to continue
until they are.
The developer has made verbal promises but how can the developer be believed if
he was quoted (in the magazine Huddle) as saying he made personal contact with
most of the neighbours and most people were in agreement with the project. We
know that SIXTY-TWO letters were sent to the council and there were fifty six
against, five neutral and only one in support of the project. His verbal comments at
the PAC do not seem very credible to us.
Other concerns:
---fire and ambulance concerns have not been addressed
---taxpayer money being used to upgrade sewage, streets and intersections when a
private developer is going to be making the most money out of this.
Please keep these concerns in your minds as you make decisions on the property.
The people of the neighbourhood deserve better answers and assurances.
Yours truly,
Brenda and Stephen Ough
391
January 11,2021
Neil and Candace Boyle
2001 Sandy Point Road
Members of Saint John City Council;
We are writing this letter to strongly oppose the proposed building of the senior's complex know as
Ethos Ridge in our neighbourhood. This building is out of character and scale with our community as
stated below:
Incongruity- the proposed 120 residential unit on Sandy Point Road, Pelton Road and Westmount Road
in a mature, high- value single family neighbourhood fundamentally out of character with the nature
and structure of the community.
Unsuitability -of Sandy Point Road, Westmount Road and Pelton Road. The increase of traffic from this
type of venture would be family's, at an unacceptable level of risk. The doubling or more of vehicular
traffic to this neighbourhood with blind corner and sidewalks increase's the risk of harm to the elderly
and young children of this neighbourhood.
Impact on residents during extended construction (noise, dirt, debris and disruption).
Property Values — (concerns regarding all existing home -owners will see an immediate decrease in the
value of their homes).
Trusting this matter will receive your careful consideration and it will result in the refusal for this project
to proceed.
Sincerely
Candace and Neil Boyle
Concerned residents of 2001 Sandy Point Road
392
March 25/21
To the City of Saint John,
My name is Charline Chase and I live at 468 Pelton Rd. I am writing this letter to let you know
that I am still opposed to the Ethos Project being built between Sandy Point Rd and Pelton Rd.
Here are my concerns and questions:
1. The proposed project does not comply with Plan SJ. The City of Saint John has spent
millions of dollars on Plan SJ which is supposed to guide intelligent planning of our City
for the future. We all know that the City says it cannot afford to have our population
spread out over huge areas. Plan SJ answers that by encouraging population density.
It would result in a 125-unit project being built in the middle of "Stable Residential" and
"Rural" zones. That does not make sense and it deviates from the Plan.
Question
As tax payers Can you please share with us how this zoning change will benefit our
community?
2. The streets and traffic design are not built for an additional 125 units. Real concerns
with traffic safety have to be considered if a dense 125-unit project is built in this low -
density neighbourhood. These streets are already extremely narrow and there are no
sidewalks. The intersections of Sandy Point Road and Foster Thurston Drive and also at
Sandy Point Road, Kennebecasis Drive, and Pelton Road, there are already dangers that
will be multiplied significantly if 125 units worth of traffic are added. Traffic reports
indicate an increase in traffic of over 400 cars per day. This is a doubling of traffic
compared to what it is today. Additionally, the infrastructure is not designed for this
kind of major increase in population.
Questions
1. How can you allow the recommendation of keeping rural roads?
2. Why are you not upgrading the roads for the most dense zoning possible? This road
will not be safe for our seniors, our children, the workers, the emergency vehicles, the
delivery trucks.... ?
393
3. As Sandy Point community residents for many years, we know the challenges our
winter bring to the infrastructure of our road for snowplows, salt trucks, school buses
and residents. There have been many incidents from slippery road with our hilly area
where vehicles have ended up in the ditch. For the winter the road design for the hill on
2100 Sandy Point road is unacceptable. How will the developer and the city make Ethos
Ridge residents, workers safe to reach the site through the slippery season??
3. The environment will be affected. Environmentalists have already expressed concerns
about the impacts that this project would have on wildlife, groundwater and the
Kennebecasis River, which are very close to the proposed development. It is fine that
we talk about climate change and environmental protection, but why would we allow
for the destruction of "Rural" land so that a 125 unit building can be constructed so
close to a river? Are there no partial of land available in the areas designated in Plan SJ
for increased population density? Of course, there is. So why would we allow for the
destruction of rural land?
Questions
Every spring we deal with water runoff on Pelton Rd and this is a natural part of spring.
Throughout the years it has had an affect on our well and our properties. We accept
this challenge because we are rural. The City has done nothing on our road, ditches to
ensure good drainage. At this point neither the city nor the developer has offered
recommendations to the residents of Pelton Rd in how they will face the challenges of
the destruction of rural land and water runoff.
Pelton Rd is at the lowest part of the project how will the city, developer assure us that
our properties are not damaged?
4. The City would not be able to provide proper fire service for such a dense project. We
have to remember that the City just closed the Millidgeville Fire Station because it could
not afford it anymore. Yet now, the City is considering the approval of a 125 unit
building in the very area that the Millidgeville Fire Station would have serviced. That
makes no sense and it is dangerous.
394
Dear Mayor and Council,
On Friday, February 19th, 20211 had the opportunity to attend a presentation by the proponent in regards to the
proposed Ethos Ridge Development. The presentation highlighted for me several concerns the community and I
have with the project. One of those concerns was the lack of detailed information or any additional clarity in regards
to the project. I was disappointed that many of the questions asked by the community were answered with since
the project is in the early design phase the proponent did not have clear detailed information answers to the
questions with nor were they interested in taking the questions to provide follow-up answers at the later time. As a
senior environmental consultant who has taken part in public engagement sessions with other projects, this
presentation demonstrated exactly what not to do when interacting with the public. And it indicated that important
aspects of the project such as socio/economic, environmental and health and safety components that provide critical
information to make informed decisions have not been well prepared or researched by the proponents or their
consultants.
I understand that a rezoning application amendment is to come before the Council during the February 22nd, 2021
meeting to decide whether or not to send the application to the Planning Advisory Committee for review and public
consultation. Given the lack of information and numerous concerns raised by residents, it indicates that the
proponent's application to the City Council for a referral to the Planning Advisory Committee is premature as much
of the required technical information in regards to the project needed to make a comprehensive review of the
project is not yet available. I would strongly advise the council to dismiss the application until the proponent has
demonstrated they have addressed the communities concerns and completed the necessary due diligence so that a
comprehensive review can be accurately completed. At which time an assessment of the Ethos Ridge project can be
properly carried out by the municipality.
Sincerely,
Mr. Colin Forsythe
(BSc. Hons. MSc.)
Phone (506) 648-9378
Cell (506) 640-1029
Email colinforsythe@rogers.com
395
Dear Councilor
Please consider the following questions I have regarding the Ethos Development proposal.
1. Are you in support of the conditions set forth by the Planning Advisory Committee in
order for the proposal to go forward? Including, a more specific Sunset Clause that specifies
that the project can only support the Ethos Ridge, 125 unit complex for senior citizens as
proposed and if not completed within five years the zoning will revert back to Rural
Resource. There are to be no construction vehicles or delivery vehicles associated with
construction on Pelton Road before, during or after construction. The detailed landscaping
plan to construct a mature tree buffer on the Pelton Road (north side) of the development is
to be a part of the building permit. The ensuring of groundwater recharge.
2. Have the city planners and council reviewed the business plan and financing
commitments to determine if the proposed development is financially sound? Considering
a 50 million dollar investment with a million dollar property tax annually and a staff of fifty
is a considerable expense to be borne by 125 units. Amortization of the building over 25
years would approximate $1350 per unit per month on average. The average share of the
tax per unit would be approximately $667 per month. Fifty employees earning a minimum
figure of $25 000 per year including benefits would add another $833 per unit per month.
This puts the monthly amount at $2850 without including variable costs of
snowplowing/sanding the private driveway, repair and maintenance, food costs etc. The
rent per unit would have to be greater than the $2500 - $4000 suggested by the developer.
3. Has a local, complete marketing study been done to determine the viability of this
development? The marketing study described at PAC was very general and described an
aging population that is the demographic of most of the western world. In a province where
the median income is $54 000 and a large proportion of the population is impoverished, are
there the numbers needed to fill this complex?
4. Has there been a letter from the Fire Department definitely stating that the complex, its
inhabitants of both active and assisted living description, and the entrance to the complex
will be at the end of a private, 0.6 km driveway meets with their approval? The
maintenance of the driveway during the winter months would require a diligent effort with
sophisticated equipment as it is a climb, hairpin turn and then decline into the complex.
When I think of the difficulty in keeping Pelton Road clear by the city snow removers, it is a
concern.
S. The developer mentioned at the PAC that the overflow strategy for the lifting station on
the property would be either by a pipe to the river or a storage tank on the property. I
believe either of these alternatives would require an environmental assessment similar to
that required for a septic system. Have you looked into this to see if this would be required?
Thank you very much for your consideration of my concerns. I would appreciate following
up with you by telephone or meeting (respecting covid restrictions) to discuss your
responses. I can be reached at this email address or 506 652 4752.
Sincerely
Jill Jollineau
360 Pelton Road
0.
Mayor and Common Council,
I would like to speak against the proposed amendment zoning bylaw for 2100 Sandy point Road on the
following points:
1. The proposed development does not meet any of the criteria as outlined in PIanSJ , Section
10.1013ural Residential, 10.10(1) Permitted uses or 10.10(2) Conditions of use
2. PlanSJ 2.5 Parks and Natural Area are not generally not appropriate for development.
3. Policy LU-87 - Stable Residential .... new and redeveloped land use are to reinforce
the predominate community character and make a positive contribution to the neighbourhood.
4. Major Community Facilities must not negatively impact adjacent land uses and must be located
for convenient access to all transportation modes.
5. Of the environmental concerns, I believe that the open ditch roadsides may be the most
important. With a large amount of paving in the proposal, accompanied by the torrents of rain
that develop or freezing culverts, the open ditches can easily become overburdened. This effect
could cause moderate to severe damage to residences lower down the slope, wash out roads to
neighbouring housing and put large amounts of runoff silt, debris and contaminants directly in
the river.
6. Sandy Point road, at this point, is narrow and not designed for large amounts of traffic. The
volume of traffic basically would put pedestrians in jeopardy.
7. The citizens of ward 2, in this area, are at a disadvantage on this vote with only having one
representative. If nothing else speaks to equality, having lost one of their voices does. This issue
should perhaps be delayed until after the upcoming election.
Thank you,
Larry E Harlow
Ward 2 Citizen
397
420 Pelton Road
Saint John, NB E2K5H7
March 25, 2021
Mayor and Councilors
City of Saint John
Saint John, NB
I live on Pelton Road in a pocket of land lying between the Kennebecasis River valley
on one side and the escarpment that encircles the pocket, from steep rocky shore to
steep rocky shore. It is unbroken except for where Sandy Point Road descends to
the shore.
Within this pocket exists a very strong community. Many of its residents have been
here for generations. Many have converted cottages to homes and new homes have
sprung up where the topology allows it, but it is very stable and has remained
relatively unchanged for ages due to its topography and small size. This area is
undeniably rural in nature and should be valued and preserved as such.
Unfortunately this pocket includes the land that the Ethos Project seeks to have
rezoned from Rural Resource and Park and Natural Area to Major Community
Facility. Quite a leap! We are all in favour of growing the city's tax base, but only in
an appropriate manner. Surely any growth should be compatible with its
surroundings and the very rural nature in which it lies.
Like our neighbours we have chosen to live here because- after much diligent
searching- it fits the life-style we value so highly and for which we made the biggest
investment of our lives. When settling here and while living here we believed that
PlanSJ and the zoning bylaws protected us from any degradation of the rural nature
of the community that we love. The proposed Ethos development is so incompatible
with the neighbourhood and so contradictory to the zoning bylaws that it is a
grotesque intrusion on our way of life.
We believe that the city has a'duty of care' to abide by the tacit agreement implicit
in the approved legislation upon which its citizenry make their home investment
decisions. We strongly feel that city staff, by recommending acceptance of this
proposal, so flagrantly in violation of the current zoning, to be inconsiderate and
disrespectful of our contribution to the tax base of the city and our dependence
upon the promises inherent in P1anSJ and its bylaws.
Under section 1-1 "Purpose of the Municipal Plan" it states:
The Municipal Plan is not just about land use. It is about valuing the City's
rich built and natural heritage; investing in its neighbourhoods to strengthen
and reinvigorate the City; providing support for neighbourhood -level
planning in key areas to ensure ongoing local input in the land use decision -
making process; creating a balanced transportation network to make public
transit and active transportation more viable and desirable mobility options;
and most importantly, the Municipal Plan is about ensuring the people who
live in the City and those who will come in the future want to stay for the
economic opportunities and the enviable quality of life the City provides.
Under Section 1.4.1 it states:
3. Saint John is comprised of healthy, unique and inclusive neighbourhoods.
Saint John:
• Strengthens the concept of `one' Saint John by working to make
distinct neighbourhoods feel part of one City and one future;
• Supports mixed income living, offering a range of diverse housing
choices to meet different life -cycle needs;
• Enables people of any income level to live in a neighbourhood of their
choosing;
• Builds on the strong tradition of neighbours taking care of each other -
neighbourhoods are the foundation of the strong community pride
that defines Saint John; and
• Provides a range of services, employment, leisure and recreational
choices within neighbourhoods to provide people with the
opportunity to live, work, and play in their neighbourhood.
I have read the report of Community Services to PAC on the Ethos Ridge Proposal
and am disappointed to see it is so dismissive of the opinions expressed by the letter
writers particularly ignoring the overwhelming disapproval of the surrounding
community.
We are adamantly opposed to the project but are pleased that city staff did include
conditions 4a), 4c) and 4d) on page 3 of their report which were amended by the
PAC at their meeting to be more specific. Both Mr. Andrew Reid for the city and Mr.
Scott Walton for the developers agreed with the amendments and both stated these
were reflecting their original intent.
Should the project go ahead, despite the opposition of the entire community
surrounding it, we respectfully request that council ensure that the conditions noted
above, as amended by PAC, become an integral part of the approval.
I was able to watch the PAC meeting, which I believe was well conducted. Well -
prepared representations were made for and against the proposal. Supporters of
the project spoke very eloquently praising the concept behind the proposal. But the
concept is not, and never was, the issue. Likewise they praised the benefits that the
elderly would derive from proximity to nature, the outdoor amenities etc. Again,
not an issue. They spoke of hiking trails etc. and again, not an issue. Additionally
399
they spoke at some length about the fact that as a proportion of the population, we
are all getting older, again, this is certainly not an issue (we feel it). The issue is
plunking down a 125 unit monstrous structure looming 24 metres (80 feet) high in
the middle of thoroughly rural area. This intrusion is totally incompatible with the
neighbourhood (it is literally in the backyards of several homes) and is a flagrant
violation of the existing zoning bylaws that accurately reflect the nature of the area.
Like my neighbours 1 was very disappointed by PAC's decision to support the
rezoning but must, of course, respect it.
There are other questionable considerations I would like to address with respect to
financial and marketing aspects of the proposal. Regarding financial returns the
staff report of March 12e', which went to PAC states, page 8, "the developer has
reported the value of construction to be $55 million, $1 million in new tax revenues
per year and approximately 50 staff members. Staff reviewed these figures with tax
revenues received from comparable facilities".
The comparable facilities apparently are well -established profitable establishments,
hardly comparable to something that has not yet received approval. Surely
councilors and the public should expect and demand a credible report on the
viability of the project, one that is developed in house rather than provided by the
developer. Is this'due diligence'?
The figures given in the quote above should make anyone skeptical of the viability of
this proposal. Some rough calculations indicate that the initial investment given
above equates to $440 000/unit. Amortized over 25 years it would be $17
600/unit/year. The value of the property taxes to the city, $1 million, given that I
am told, the city receives 45% of the total property bill of $2,222,222; this would
equate to $17 778 per unit per year. On a monthly basis this would amount to
$2948 per unit per month. (It might be noted here that Shannex is currently
advertising suites at $2650 per month.) To this would have to be added all the other
expenses, including salaries for the staff, dining room costs, etc. and hefty profit
margins for owners/investors to justify such a high risk venture.
The calculations I have made are very shaky like the very skimpy numbers in the
quote are very shaky. Councilors surely should be given much more information
(and a lot more could be given from sources in the public domain that would not
compromise confidentiality).
This project is as sparse with marketing data as it is with financial data. No one
disputes the data on the proportion of seniors in the population and how it is
growing; and no one doubts that there is a local and regional demand for senior's
facilities. But this report gives absolutely no reason to believe that the project can
meet this demand. We understand that it will target active 75+ year olds. What is
the size of this demographic and what are its characteristics? Surely there are many
sources of data in the public domain that could provide some useful information for
M
councilors to aid them in their decision -making role, and they should demand such
before approving this proposal.
This proposal, I feel, will be highly detrimental to the residential character of the
neighbourhood and highly destructive to the whole sense of `pride in community'
that forms the fabric from which all great cities are woven. All the flowery phrases
meant to evoke idyllic "Shangri-La" like images of the proposal cannot change the
fact that it is inappropriate to this community. Many may suggest that our positions
on this matter are NIMBY (it's easy to be flippant in that way). It is not NIMBY, it is
merely standing up and asking to be respected for our contribution to the tax base
of the city and the preservation of the neighbourhood we love.
Sincerely
Wayne Jollineau
401
BY-LAW NUMBER C.P. 106-xx
A LAW TO AMEND THE
MUNICIPAL PLAN BY-LAW
Be it enacted by The City of Saint John in
Common Council convened, as follows:
The Municipal Plan By-law of The City of Saint
John enacted on the 30th day of January, A.D. 2012
is amended by:
1 Amending Schedule A — City
Structure, by redesignating a parcel of land
having an area of 8.57 hectares, located adjacent
to 2100 Sandy Point Road, also identified as
PID No. 55238471, from Park and Natural Area
and Rural Resource Area to Stable Area
classification;
2 Amending Schedule B — Future
Land Use, by redesignating a parcel of
land having an area of 8.57 hectares, located
adjacent to 2100 Sandy Point Road, also
identified as PID No. 55238471, from Rural
Resource and Park and Natural Area to Major
Community Facility and extending the
boundary of the Primary Development Area
(PDA);
- all as shown on the plans attached hereto
and forming part of this by-law
IN WITNESS WHEREOF The City of Saint John
has caused the Corporate Common Seal of the said
City to be affixed to this by-law the * day of *, A.D.
2021 and signed by:
Mayor
ARRETE MODIFIANT L'ARRETE
RELATIF AU PLAN MUNICIPAL
ARRETE N° C.P. 106-xx
Lors d'une reunion du conseil communal, The
City of Saint John a edicte ce qui suit:
L'arrete concernant le plan municipal de The
City of Saint John decrete le 30 janvier 2012
est modifie par:
1 La modification de 1'annexe A —
Structure de la municipalite, afin de faire passer
la designation d'une parcelle de terrain d'une
superficie d'environ 8.57 hectares, situee
adjacent a 2100, rue Sandy Point, egalement
identifie de NID 55238471, afin de la faire
passer de zone de ressources rurales pares et
aires naturelles a zone stable;
2 La modification de 1'annexe B —
Utilisation future des sols, afin de faire passer
la designation d'une parcelle de terrain d'une
superficie d'environ 8.57 hectares, situee
adjacent a 2100, rue Sandy Point, egalement
identifie de NID 55238471, afin de la faire
passer de zone de ressources rurales et de
pares et aires naturelles a grandes
installations communautaires et repoussera
les limites de la zone d'amenagement primaire;
- toutes les modifications sont indiquees
sur les plans ci joints et font partie du present
arrete.
EN FOI DE QUOI, The City of Saint John a fait
apposer son sceau communal sur le present
arrete le 2021, avec les signatures suivantes :
City Clerk/Greffier communal
First Reading - Premiere lecture -
402
Second Reading -
Third Reading -
Deuxieme lecture -
Troisieme lecture -
403
BY-LAW NUMBER C.P. 111-X
A LAW TO AMEND THE ZONING BY-
LAW
OF THE CITY OF SAINT JOHN ARRETE
No C.P. 111-X
Be it enacted by The City of Saint
John in Common Council convened, as
follows:
The Zoning By-law of The City
of Saint John enacted on the fifteenth day of
December, A.D. 2014, is amended by:
Rezoning land having an area of approximately
8.57 hectares, located adjacent to 2100 Sandy
Point Road, also identified as PID No.
55238471, from Rural (RU) to Major
Community Facility (CFM).
- all as shown on the plan attached
hereto and forming part of this by-law.
IN WITNESS WHEREOF The City of
Saint John has caused the Corporate
Common Seal of the said City to be affixed
to this by-law the X day of X, A.D. 2021 and
signed by:
Mayor/Maire
ARRETE NO C.P. 111-X ARRETE
MODIFIANT L'ARRETE DE ZONAGE
DE THE CITY OF SAINT JOHN
Lors d'une reunion du conseil
communal, The City of Saint John a
decrete ce qui suit :
L'arrete sur le zonage de The
City of Saint John, decrete le quinze (15)
decembre 2014, est modifie par:
Changement de zonage d'un terrain d'une
superficie d'environ 8,57 hectares, situe a
cote du 2100 Sandy Point Road, egalement
identifie comme NID 55238471, de rural
(RU) a grande installation
Communautaire (CFM).
- toutes les modifications sont
indiquees sur le plan ci-joint et font partie
du present arrete.
EN FOI DE QUOI, The City of Saint John
a fait apposer son sceau communal sur
le present arrete le X 2021, avec Ies
signatures suivantes :
Common Clerk/Greffier communal
First Reading - X Premiere lecture - X
Second Reading - X Deuxieme lecture - X
Third Reading - X Troisieme lecture - X
e
OL01rg
_f
Ethos Ridge
2100 Sandy Point Road
Planning Advisory Committee Presentation
March 29 2021
Growth & Community Services
405
lt'--
SAINT JOHN
Proposal
�r ..
PEJON
- ,
•tom.. _ - 'tc c— '. :?r.� _ -- F
waodkndmi>E -�+ ,unodleMto be' 1�... .E _ .' •�r -.
�• `i: Aden i. �, '-'� �
-
PI. x
S
- ,'W , _ `•rI -°�
dope se lmrh " ` e,
. ' y �'mstn6 � '.,�• .i�r
i
wooal�dmbr:'•
Prcerved
rre6uutx ��� ll
..............
..`...
k y
NENNE@EGLSIS RIVER
Plan Amendment and Rezoning
• Foster Thurston Dr/
Rockwood Park:
• Hospital:
• City Centre:
900M
Um �
7.5km
Site & Neighbourhood
2100 Sand; Point Road
OPR
.. � � '� '•Y� it 1
71
Natural forest descending the ridge
Site
S'.
Cleared area facing Pelton Road cul-de-sac
jo
°.,. �:.
.. . �:s
Natural forest and trail ascending ridge
Hardwood forest and water from Pelton Road cul-de-sac
Site
Q
.:.
Wig
in
Hardwood forest from building site facing Pelton Road Planted forest adjacent former farm
From ridge towards Sandy Point Road with natural forest
Kennebecasis River
Neighbourhood
Sandy Point Road facing �north
Sandy Point Road facing south
I wr,
I Neighbouring properties along Sandy Point Road
Neighbouring properties along Sandy Point Road
a mop
Growth
Strategy
xz�
A "Living
document"
Subject Property
L I Primary Development Area
Future Land Use
Rural Resource
0 Rural Residential
Park and Natural Area
Stable Residential
1:8, 008
0 0_05 0.1 0.19 mi
0 0.07 0.15 0.3 km
(P--
SAINT JOHN
Subject Property
Street Centrelines
Property Parcels
0 Primary Development Area
Zoning
R
RR
RU
,1;8,000
0 0.05 0.1 0.19 mi
0 0.07 0.15 0.3 km
SAINT JOHN
"xx
112
NT
Pp
-:,Wan
LN-1
Where a proposed amendment addresses unforeseen
circumstances or is deemed by Council to confer significant
public, economic, social, or cultural impacts to the City
Municipal Plan
Policy 1-21
14
240Yco of Saint John's
population are seniors by 20
«D
1 � of New Brunswick's
"e"'T'^o elation are seniors b 2038
BI'Uri. p p Y
C A N A 419
---,.ya_ � _.,..� � _ - mod— ;��- -� � - - ti • _ _ - ,- - rt � __ �-� � _ �....� � -. - T T �-
-:.=-
#^•f' - � 'w. - -- T'��- ;.-.�.' „ , ,..r v' of -��.-- .' �- � rX #'-r r -
,t £ �•,- + JR7 '� r .A ^ter rat
• 'fir ' , -f J ; - op k .s lax r
j 1, ��+ T - Yam•
}"ram
—17
IAILtOP
1'
—�l—---- •• � �t ^y Rai �'+�. .
43
A Y `1 . .
-F
- - _ -
.00 Sandy Point Road
�y
700 Millidge Ave
421
Policy LU-90
Council shall ensure that new major
community facilities shall generally be
permitted subject to a rezoning process
demonstrating compliance with the
following requirements
422
✓ Contribution - Land use is desirable from the perspective of the overall intent of
the Municipal Plan and makes positive contributions to the neighbourhood
through several public benefits to help address existing issues
423
✓ Compatibility - While the proposal introduces a new building form, height and
massing are minimized by invisibility from Sandy Pt Road and maintaining a 47m
setback from Pelton Road with minimum 30m buffering.
�rn I
�Iflrlill'li�i��l��� IYI
�Fj�l--------------------------�
i
+�,SM
424
T.
WOMLANDTRAk
WIMERLARDEN
DairnNe
DOM-
WOODLANO TO BE
ol
P�NG BE
LODKDUT
DECK
TN.IYPIC
DLA pDw IQlp if
-----
T-p 5ppr
426
. . .. . . . . . ..
18% Lot Occupancy
427
4
Neighbourhood:
Beach Rd / Pelton Rd
Type of Units:
Single Detached (serviced)
Number of Housing Units:
39
Property Size:
8.3 Hectares
Density:
4.6 du / hectare
I •
OIr -
Neighbourhood:
Kennebecasis Drive
Type of Units:
Single Detached (serviced)
Number of Housing Units:
57
Property Size:
8.12 Hectares
Density:
7 du / hectare
429 �Ir
M M-. GEan
06
430
Neighbourhood:
Ethos Ridge
Type of Units:
Supportive Facility
Number of Housing Units:
125
Property Size:
8.57 Hectares
Density:
15 du / hectare
Rezoning - Compatibility
"Supportive Facility" means an
establishment licensed/approved by a
government agency that provides care or
supervision to residents by professional staff
or, an establishment devoted to retired
residents where common amenities and
services are provided exclusively to such
senior residents
✓ Services - Necessary services will be provided at the developer's expense. The
roadway has been evaluated through a Traffic Impact Study. Fire and transit
services are available.
432
"Saint John Water does not see any
issues with the proposed
development in relation to the
downstream sanitary sewer system"
29
"Saint John Water does not see any
issues with the proposed
development in relation to the
downstream sanitary sewer system"
30
Rezoning — Site Design
Policy LU-90
or
YS..
M
plashed
cc wrAir6
•h
y};` r- i
's�modlend be ':
��
LYI�
W'
✓ Urban Design — The building is a high -quality contemporary design and aligns with
many of the Urban Design goals set out in the Municipal Plan.
4OU
✓ Contribution - Land use is desirable from the perspective of the overall intent of
the Municipal Plan and makes positive contributions to the neighbourhood
through several public benefits
✓ Compatibility - While the proposal introduces a new building form, height and
massing are minimized by invisibility from Sandy Pt Road and maintaining a 47m
setback from Pelton Road with minimum 30m buffering.
✓ Services - Necessary services will be provided at the developer's expense. The
roadway has been evaluated through a TIS.
✓ Site Design — Access can safely be provided, a detailed landscaping plan will be
required and the `low impact design' stormwater management will need to result
in no increase to adjacent properties
✓ Urban Design — The building is a contemporary design and aligns with many of the
Urban Design goals set out in the Municipal Plan.
✓ Public Transit - Transit is located withfA7a 6 minute walk of the subject property.
Council shall not consider amending the Future Land use
Designation unless the proposal... (c)Enhancesthe
community and the quality of life offered to residents of the
City;
Municipal Plan
Policy LU -4
34
(a) The developer's
obligation, at its own
cost, to upgrade the
existing municipal
infrastructure required
to service the proposal,
35
(b) The developer is to maintain
public pedestrian access to a
private trail system on the property;
Y
FA
...r. _ .r-- - ' - Fes- �.•
T
4 4 r
- Y
}
- - (c) The developer is to contribute to the cost of
y�•_ implementing traffic calming measures at the Foster
Thurston/Sandy Point Road intersection.
A
YI
a) Studies demonstrating the proposed development will
have a significant long-term benefit for the City and does
not place undue fiscal burden on the City or have a
detrimental impact on the environment
✓ Additional housing segment for an aging population
✓ Maximizes efficiency of land to increase economic prosperity
✓ Provides community benefits (formalized trails, walkway, traffic)
✓ No fiscal burden on City — developer pays all servicing costs;
operating costs are minimal
✓ Low -impact design, emphasis on preserving existing woodlands
443
b) The proposed development fulfills other key goals of the
Municipal Plan
✓ Fulfills the vision for complete communities and integration of
seniors into residential neighbourhoods
,,,
c) Appropriate opportunities are provided for public input
into the consideration of such amendments to the
Municipal Plan
✓ 4-month long formal development review process
✓ Developer -initiated engagements, including public information
session
445
Mar 2/20
First Pre -Application
Meeting
Jan 11— Feb 10/21
Plan Amendment 30 Day
Comment Period
Mar 4/21
Neighbours within
100m notified via letter
Process
Dec 4/20
Application
Received
Feb 22/21
Common Council
Referral to PAC
Mar 16/21
Planning Advisory
Committee Meeting
Dec 31/20
Plan Amendment
Advertised
Mar 3/21
Public Hearing Notice
Posted to City Website
Mar 29/21
Common Council
Public Hearing
,W-
44 Letters and a petition containing 17
signatures was received during the 30-day
comment period in opposition to the
proposal. Since that time, an additional 2
letters have been received in support and 2
against.
On March 16th, 2021, the PAC heard from 15 citizens
in opposition to the proposal and 5 in support. The
PAC voted unanimously to approve the Proposal,
with 4 amendments to Staff's Recommendation.
PAC Recommendation
Staff Recommendation
1-2. Approve Plan Amendment to Stable
Area/CFM and extend the PDA
3. Approve the rezoning from RU to CFM
4. Enter into Section 59 agreement per
Pages 2-3
5. Enter into a Section 59 agreement
regarding servicing and public benefits
0;r,d'. �?X-j
0�'N
Section 59 Conditions
a) No vehicular access to development off Pelton Road
b) Sandy Point Road access shall be owned/maintained by
the developer
c) The development shall be completed within 5 years
otherwise Council may revert the zoning
d) The development shall be in accordance with detailed site,
landscaping, and elevation plans substantially conforming
to those contained in the report (setbacks, buffering)
0;r,d'. �A-
Section 59 Agreement
a) Developer is responsible for extension of services and
restoration of street
b) Developer is to maintain access to private trail system
c) Developer is to contribute to cost of traffic calming
measures at Foster Thurston Dr intersection
d) Developer is to restore east side of Sandy Point Road with
asphalted/delineated pedestrian walking surface
0;r,d'. �A-