Loading...
Water and Sewerage By-law Amendment 2019-12-16 (2)BY-LAW NO. M-16 A LAW TO AMEND A BY-LAW RESPECTING WATER AND SEWERAGE ARRtTk NO M-16 ARRATt MODIFIANT L'ARRETE CONCERNANT LE RESEAU WEAU ET D'EGOUTS Be it enacted by the Common Council of Lors d'une reunion du conseil municipal, The City of Saint John as follows: The City of Saint John a d6cr&6 ce qui suit : A By-law of The City of Saint John Par les presentes, 1'arret6 de The City of entitled "A By-law Respecting Water and Saint John intitul6 << Arrete concemant les rdseaux Sewerage", enacted on the 7"' day of June, A.D. d'eau et d'6gouts >>, d6crete le 7 juin 2004, est 2004, is hereby amended as follows: modifrd comme suit: 1. Section 43 is amended by adding the following immediately after subsection 43(2): "43(2.1) The owners of property listed at Schedule "E" which receive raw water for industrial purposes shall pay the charges set out at Schedule "E" for each such owner." 2. Section 44 is amended by adding the following subsection 44(1)(c) immediately following subsection 44(1)(b): "44(1)(c) Bills shall be rendered to each customer paying rates as contained at Schedule "E" bi- monthly." 1. L'article 43 est modifrd par 1'adjonction du paragraphe suivant immediatement apr6s le paragraphe 43(2): "43(2.1) Les proprietaires 6num6r6s a 1'annexe `B" qui recoivent les services d'approvisionnement en eau brute pour des fins industrielles doivent payer les tariffs forfetaires enonc6s a 1'annexe "E" pour chacun des ces propri6taires. " 2. L'article 44 est modifre par 1'adjonction de 1'alinea 44(1)(c) suivant imm6diatement apres 1' alinda 44(1)(b): "44(1)() Les cornptes sont envoyes a tous les abonnds taxds en fonction de 1'annexe << E bimensuellement." 3. Schedule "E" attached hereto is added to the by- 3. L'annexe «E» ci jointe est ajoutee a 1'arret6 law immediately following Schedule "D". immddiatement apres 1'annexe "D". IN WITNESS WHEREOF The City of Saint John has caused the Corporate Common Seal of the said City to be affixed to this by -lav the 16th day of December, A.D. 2015 EN FOI DE QUOI, The City of Saint John a fait apposer son sceau municipal sur le present arret6 le 16 decembre 2019, avec les signatures First Reading - December 4, 2019 Second Reading - December 4, 2019 Third Reading - December 16, 2019 Premiere lecture - le 4 decembre 2019 Deuxieme lecture - le 4 decembre 2019 Troisieme lecture - le 16 decembre 2019 Schedule << E Raw Industrial Water Customers and Rates Raw Water Infrastructure Rate per Rate Customer Cubic Stabilizing Metre ($) Reserve Bi - Monthly($) 1. New This user draws its industrial raw water 0.2492 1,528.39 Brunswick through a 1500mm diameter concrete Power intake pipe running from Ludgate Lake across Route I to the Coleson Cove Screen Building located at coordinates N 7355170.56 and E 2522389.97 just off of Route 1. Once through the screen building water passes through approximately 5,O00m of 600mm diameter transmission main to ultimately make its way to the Coleson Cove generating station located at 4077 King William Road. 2. Irving Pulp This user draws its industrial raw water 0.0672 44,101.34 and Paper through a 1800mm diameter intake pipe Limited and approximately 330m of 1800mm diameter concrete pressure pipe originating from Spruce Lake leading to the Spruce Lake Screen building. The screen building is located at coordinates N 7357823.16 and E 2525290.60 and is just to the right of the eastern shore of Spruce Lake. Once through the screen building water passes through the Spruce Lake Transmission main to ultimately make its way to the Irving Pulp and Paper Mill located at 408 Mill Road. The Spruce Lake transmission main consists of approximately 7,500mof 1500mm diameter concrete pressure pipe owned by City of Saint John and approximately 1,000m of 1370mm diameter concrete pressure pipe owned by IPP. 3. Irving Paper This user draws its industrial raw water 0.0445 1,809.22 Inc. through a 1200mm diameter intake pipe originating from Latimer Lake leading to the Latimer Lake control valve chamber. Once through the control valve chamber, water passes through approximately 275m Notes: a) At between approximately 3 to 5 year intervals, the city will undertake industrial raw water rate studies for purposes of reassessing rates and rate structures. b) Rate Stabilizing Reserve will be reviewed annually as part of the yearly rate setting exercise with the intent of holding approximately 7 months of operating costs in the rate stabilizing reserve at any given time. of 1500mm diameter reinforced concrete pipe to ultimately discharge into Eldersley brook. Eldersley Brook recharges the Silver Falls watershed. Irving Paper has a private intake, screen and chlorination building located at Silver falls. From there the water eventually makes its way to Irving Paper located at 435 Bayside Drive. 4. Irving Oil Multiple raw water transmission mains 0.2637 20,100.93 Limited deliver raw water from Latimer Lake to other transmission piping near the Lakewood Heights pump station for use by potable and industrial users. Irving Oil Limited draws its industrial raw water from two separate connections to the above mentioned transmission mains prior to their connection to the Loch Lomond Drinking Water Treatment Facility. The first raw water connection to the transmission system near the Lakewood Heights Pumping Station delivers raw water to a chamber located at Champlain Heights through approximately 2,500m of 600mm HDPE relined cast iron raw water transmission main to ultimately make its way to the Irving Oil Refinery located at 340 Loch Lomond Road. The second connection to the above transmission systems is a 600mm PVC Raw water transmission main, approximately 3,000m delivers raw water along Hickey Road to a chamber located at Champlain Heights. From there raw water is delivered through approximately 450m of 500mm raw water transmission main along Commerce Drive to ultimately make its way to the Irving Oil Refinery located at 340 Loch Lomond Road. Notes: a) At between approximately 3 to 5 year intervals, the city will undertake industrial raw water rate studies for purposes of reassessing rates and rate structures. b) Rate Stabilizing Reserve will be reviewed annually as part of the yearly rate setting exercise with the intent of holding approximately 7 months of operating costs in the rate stabilizing reserve at any given time. Annexe << E » Clients et tarifs de Peau industrielle brute Client d'eau Infrastructure Taux au La reserve de brute metre cube stabilisation $) des tarifs Tari bimensuel($) 1. Energie Cet utilisateur puise son eau brute industrielle 0,2492 1,528.39 Nouveau- dans un tuyau de prise d'eau en beton de Brunswick 1 500 mm de diam6tre qui, traversant la route 1, va du lac Ludgate au batiment de d6grillage de Coleson Cove situ6 aux coordonn6es N 7355170.56 et E 2522389.97, a proximite de la route 1. Une fois sortie du batiment de d6grillage,l'eau circule dans environ 5 000 m de conduite principale de 600 mm de diam6tre pour finalement se rendre a la centrale de Coleson Cove, situ6e au 4077, chemin King William. 2. Irving Cet utilisateur puise son eau brute industrielle 0,0672 44,101.34 Pulp and dans un tuyau de prise d'eau de 1 800 mm de Paper diam6tre vers un tuyau sous pression en beton Limited de 1 800 mm de diam6tre d'une longueur de 330 m environ provenant du lac Spruce et menant au batiment de d6grillage du lac Spruce. Le batiment de d6grillage est situ6 aux coordonn6es N 7357823.16 et E 2525290.60, juste a droite de la rive est du lac Spruce. Une fois sortie du batiment de d6grillage, 1'eau passe par la conduite principale du r6seau de transport du lac Spruce pour finalement se rendre a 1'usine de pates et papiers Irving situ6e au 408, chemin Mill. La conduite principale de transport du lac Spruce est compos6e d'environ 7 500 m de conduite sous pression en b6ton de 1 500 mm de diam6tre appartenant a la ville de Saint John et d'environ 1 000 m de conduite sous pression en b6ton de 1 370 mm de diam6tre appartenant a IPP. 3. Irving Cet utilisateur puise son eau brute industrielle 0,0445 1,809.22 Paper Inc. dans un tuyau de prise d'eau de 1200 mm de diam6tre provenant du lac Latimer et menant a la chambre de vannes de r6gulation du lac Latimer. Une fois sortie de la chambre de vannes de r6gulation,1'eau circule dans environ 275 m de tuyau en b6ton arm6 de 1 500 mm de Notes : a) Tous les trois a cinq ans environ, la Ville entreprend des etudes sur les tarifs de Peau brute industrielle afire de reevaluer les tarifs et les structures tarifaires. b) La reserve de stabilisation des tarifs fait 1'objet d'un examen annuel dans le cadre de 1'exercice annuel d'etablissement des tarifs, Pintention etant de conserver environ sept moil de frais d'exploitation dans la reserve de stabilisation des tarifs en tout temps. diarn&re pour finalement s'ecouler dans le ruisseau Eldersley. Le ruisseau Eldersley recharge le bassin versant de Silver Falls. Irving Paper poss&de un batiment prive de prise d'eau, de degrillage et de chloration situe a Silver Falls. De IA, 1'eau se rend eventuellement a l'usine d'Irving Paper, situee au 435 promenade Bayside. 4. Irving Oil De multiples conduites principales de transport 0,2637 20,100.93 Limited d'eau brute acheminent 1'eau brute du lac Latimer a d'autres conduites de transport situees pr6s de la station de pompage de Lakewood Heights pour etre utilisees par des utilisateurs d'eau potable et industrielle. Irving Oil Limited tire son eau brute industrielle de deux raccordements distincts aux conduites de transport susmentionnees avant leur raccordement a Pusine de traitement de 1'eau potable de Loch Lomond. Le premier raccordement d'eau brute au reseau de transport pr6s de la station de pompage de Lakewood Heights achemine 1'eau brute a une chambre situee a Champlain Heights par l'intermediaire d'environ 2 500 m de conduite de 600 mm en fonte revetue de PEND pour finalement se rendre a la raffinerie Irving Oil situee au 340 chemin Loch Lomond. Le deuxi6me raccordement aux syst6mes de transport ci-dessus est une conduite d'eau brute en PVC de 600 mm, d'une longueur d'environ 3 000 m, qui achemine Peau brute le long du chemin Hickey vers une chambre situee a Champlain Heights. De la, Peau brute est acheminee par une conduite principale de transport d'environ 450 m d'un diam6tre de 500 mm le long de la promenade Commerce jusqu'a la raffinerie Irving Oil situee au 340, chemin Loch Lomond. Notes : a) Tous les trois a cinq ans environ, la Ville entreprend des etudes sur les tarifs de Peau brute industrielle afire de reevaluer les tarifs et les structures tarifaires. b) La reserve de stabilisation des tarifs fait 1'objet d'un examen annuel dans le cadre de 1'exercice annuel d'etablissement des tarifs, Pintention etant de conserver environ sept moil de frais d'exploitation dans la reserve de stabilisation des tarifs en tout temps.