Saint John Water 2017 Capital Budget1'�'t16Nxa^I1t ._ ti .Ly r� jj� 1m11�i1"]i,a3t a n i a r v .. ..MM. ..� 17 Category No. of Other Utility Total D...... Projects Share Share Infrastructure Renewal - Sanitary 15 $2,835,000 $2,855,000 $5,690,000 Infrastructure Renewal - Water 11 $1,756,250 $3,753,750 $5,510,000 Safe, Clean Drinking Water 1 $27,240,875 $0 $27,240,875 TOTALS. 27 $31,832,125 $6,608,750 $38,440,875 Infrastructure Renewal - WWate r 56.8% Safe, Clean Drinking WWate r 0.0% Infrastructure Renewal Sanitary 43.2% // � /ri c% „151 1/ > MDH: MUNICIPAL DESIGNATED HIGHWAYS PDH: PROVINCIALLY DESIGNATED HIGHWAYS RDH: REGIONALLY DESIGNATED HIGHWAYS This is a pp°o gr;ami Usting of proposed capital' projects. w&s: WATER AND SEWER RELATED PROJECTS i ha s @�st has, not boon approved by Common Council, C-": PROJECTS CARRIED OVER FOR COMPLETION THE FOLLOWING YEAR Priontyr assignments are subject to rhi nage at any tirne. ': PROJECTS DEPENDANT ON FUNDING FROM OTHERS Project Location Des criptieDn Other Utility Stare Share Clyde Street City Road to Forest Street Renew approx, 90m of timber sewer with 250,000 900mm sanitary sewer, including construction management services. Currie Avenue Pugsley Avenue to Visart Street Renew 165 In of 300mm concrete sanitary 0 160,000 sewer, including construction management services. McLellan Street Pokiolc Road to Highland Road Renew approx. 110m of 250mm concrete 90,000 30,000 sanitary sewer (1960), including design and construction management services. Project to be partially funded under the Clean Water Wastewater Fund, Pokiok Road Spar Cove Road to bead End Renew approx. 1.20m of existing 300mm, and 270,000 90,000 225mm Terra Cotta with new 200man sanitary sewer, install a'pumping station and required piping to connect two houses that currently do not receive treatment, including design and construction management services, Project to be partially funded under the Clean 'Water Wastewater Fund . Autumn Street. Wright Street to Glenburn Court Design services to renew approx. 120m of 0 40,000 (including Glenburn Court to existing 200mm, 300mm, and 375mm ,r,c. dead end) with new 200mm, and to extend services approx. 50m with new 200mm sanitary sewer. Visart Street Adelaide Street to Natalie Street Design services to renew approx. 1 10m of 225 0 40,000 mm T.C. (1925) with new 200 nun sanitary sewer. Leinster Street Sydney Street to Carmarthen Design services to renew, approx, 130m of 0 40,000 Street 300mm T.C. with new 200mm sanitary sewer. Fegan Court Wellesley Avenue to end Design services to renew approx. 75 m of 300 0 40,000 mm sanitary sewer.. Sanitary Sewer System , Various Locations Design and construction of infrastructure to 0 400,000 CSO/SSC Controls remove floatable materials in CSO and SSO chambers to meet requirements set out in the approval to operate granted by DOE City Line Fort Dufferin Road to Existing Pumping station and required piping to connect 225,000 395,000 Sanitary Sewer sanitary sewers from four houses at the end of City Line and direct flows to the nearest sanitary sewer, including construction management sen ices. Project to be partially funded under the Clean Water Wastewater Fund. MDH: MUNICIPAL DESIGNATED HIGHWAYS PDH: PROVINCIALLY DESIGNATED HIGHWAYS RDH: REGIONALLY DESIGNATED HIGHWAYS I'Msi k; a WJ�tative groom m listing of proposed capital prof em w&s, WATER AND SEWER RELATED PROJECTS TWs list has not beLiii approved by Conirion Council. C-**: PROJECTS CARRIED OVER FOR COMPLETION THE FOLLOWING YEAR Priority �WSSiqlMiOMS ZkrO SUbject to cl idIrIye at any tirne *: PROJECTS DEFENDANT ON FUNDING FROM OTHERS 10TAL- .00 Q $2855,000 Project Location Description Other Utility Share Share Tilley Avenue. Tilley Avenue to Marsh Street Install approx. 152m ofne%v 200rnm sanitary 0 500,000 sewer, a pumping station, force main, and line 80m of existing sewer under highway to separate now to LS # 6, including construction management services. Wastewater Treatment Morna Heights Wastewater Upgrade of mechanical system to increase 1,125,000 375,000 Facilities - Local Treatment Facility process efficiency of the existing treatment facilities in accordance with the previous study, including design and construction management services Project proposed to be partially funded under the Clean Water Wastewater Fund, StrUCtUrnl lining Various Locations Design services to line existing deteriorated 0 20,000 sanitary sewers, Lancaster Lagoon Lancaster Lagoon Analyze and Design upgrades to the existing 0 100,000 grit collection system at the Lancaster Lagoon or design a new grit collection system. Wastewater Treatment Greenwood Subdivision Upgrade of mechanical system to increase 1,125,000 375,000 Facilities - Local Wastewater Treatment Facility process efficiency of the existing treatment facilities, including design and construction management services Project proposed to be partially funded under the Clean Water Wastewater Fund. 10TAL- .00 Q $2855,000 MDH; MUNICIPAL DESIGNATED HIGHWAYS PDH: PROVINCIALLY DESIGNATED HIGHWAYS This is a tsent,tdv roG barn fisting of roro osied ca ittitl projects. RDH, REGIONALLY DESIGNATED HIGHWAYS p' t It I t, ' �j y �• w&s: WATER AND SEWER RELATED PROJECTS Thils list has riot boot"t aptgtrove(l by D+':arntrawi CoutI C-- PROJECTS CARRIED OVER FOR COMPLETION THE FOLLOWING YEAR fl'riosrity assicir'Vrgtent s are siibject to change at any time. ': PROJECTS DEFENDANT ON FUNDING FROM OTHERS www�mw�wowwry u�u�i Project � ��... wu�m�ummwu �uum Location Description �iwoouwmmwwwmmioiro tither Utility =MSW. UN Share Share Bulk Water Dispensing Fast and West Installation of two new bulk water dispensing 150,000 541,0001 .Stations stations, including design and construction management services. Project to be partially funded under the Clean Water Wastewater Fund. * Watermain Cleaning and Various locations Cleaning and lining of existing unlined C,1, 1,355,000 0 Lining Phase 13 watennains to improve pressure, water quality, and fire flows. Project to be funded under G.T.F. Currie Avenue Pugsley Avenue to Visart Street Renew 165 in of 150 mm C.1, watermain with 0 185,000 200 mm watermain, including construction management services McLellan Street Pokiok Road to Ifighland Road Install approx. 52m of200mm watermain for 45,000 15,000 looping, including design and construction management services. Project to be partially funded under the Clean Water Wastewater Fund, Pokiok Road Spar Cove Road to Dead End Renew approx. 90m of 50mm brass watermain 206,250 68,750 with 15 Omni watermain, renew approx. 11.5an of 2.00mm C1 vvatermain to improve water quality and Fre flows, including design and construction management sen ices. Project to be partially funded under the Clean. Water Wastewater Fund. PCCP Repair and West For repairs on the 15O0mm and EMI Scanning, 0 420,000 Inspection including design and construction management services, McAllister Drib e Civic 4 402 to Mountain View Renew approx. 640m of 250mm and 300mm 0 800,000 Drive C.1, watermain with new 300mm„ including constructionmanagement services, District metering Various locations Installation of flow meters on watermains 0 400,000 Program within the distribution system and the creation of a program to monitor and audit the water usage in each district, including design and construction management serve ices. SCADA System Various locations Design of reliable independent link for 0 450,000 monitoring of water and wastewater infrastructure including hardware and software upgrades and design and construction management services. MD ++ MUNICIPAL DESIGNATED HIGHWAYS PDH: PROVINCIALLYDESIGNATED HIGHWAYS RDH: REGONALLY DESIGNATED HIGHWAYStentative This is a ten ative tro2 9anlisting of pr'r pNSe'd cail tal projects. w&as: WATER AND SEWER RELATED PROJECTS This list has not been <apirroved by Common GouncV, C-": PROJECTS CARRIED OVER FOR COMPLETION THE FOLLOWNG YEAR VsHority as o-1+,lar rents are subject to change at carry^ titno. ": PROJECTS DEPENDANT ON FUNDING FROM OTHERS i iw wwmw�o �u im ouwmwwumwu�. wwwwwuuwuwu�mwwmwuu�miw�mm miuwwwiwwarrvu�wo�m ��wu�uw'ww Project Location Description Cather Utility Share Share i wwuo iu uu�uwwWuur�uwwuw mwr�mmm i.. i� �i�u�iou�u m m �.. Riverview Drive Riverview Drive Rcnew 90m of 100mm C.I. Aatemlain with 0 90,000 150mm watermain that curently runs under the thruway, including design and construction management services. Musquash Pumping Musquash Pumping Station Relocate substation across the road under the 0 1,275,000 Station 69KV Transmission Line, including design .and construction management services. Phase A IOTAL: $1.7%269 $3,753,759 MDH: MUNICIPAL DESIGNATED HIGHWAYS ECK PROVINCIALLY DESIGNATED HIGHWAYS "I'his is a tentative program listing ol proposed capital projects. RDH: REGIONALLY DESIGNATED HIGHWAYS w&s: WATER AND SEWER RELATED PROJECTS This llst has not boon approved by Connnon Council. C-**: PROJECTS CARRIED OVER FOR COMPLETION THE FOLLOWING YEAR Priority assiqmnents are subject to change at any ti o. *: PROJECTS DEFENDANT ON FUNDING FROM OTHERS 't.f "lean F)I-inki-nu, Wa te'r TOTAL: $27,240 876 U 7' F, I 1 0111 Project Location Description Other UtHity Share Share Safe, Clean Drinking TBD Safe, Clean Drinking Water Program envelope 27,240,875 0 Water Program for 2017. Details of program for 2017 to be established and approved by Common Council. TOTAL: $27,240 876 U 7' F, I 1 0111