Loading...
2013 Water Capital BudgetHis Worship Mayor Met Norton Your Worship, and Members of Council: ::1 1, !111 11, 1 ' � I ", 111' !111 11111111111111 r';III 1111111111111 . I 11 1 - The �a,Aua Find attached the proposed 2013 Water & Sewer Utility Capital Budget, This report was considered by Council at its meeting of 19 November and subsequently tabled to allow Council time to consider the implications of the proposed Capital Budget on the proposed 2013 Utility Operating Budget, Following Council's adoption of the 2013 Operating Budget, it would be appropriate for Council to adopt the following resolutions: 1) That Common Council Approve the 2013 Capital Budget for the Utility Fund in the amount of $20,665,000 (gross) with contributions from other sources of $4,835,000 yielding a Capital Budget in the amount of $15,830,000 (net) as set in Appendix A 2) That the City of Saint John and Saint John Water make no expenditures from the envelope identified for safe, clean drinking water, or from the envelope identified for watershed protection, without express approval of Council. Respectfully Submitted Wm. Edwards, P. Eng, Commissioner Saint John Water J. atiick Woods, CGA fly Manager 4 NNNEMEW 1', P, 0 11 T TO C 0 IIA jM, 0 N C 0 U 'IN C I L Z''IFRIGNOMIZ C Fl- 11111111111111111111111111111 1111111111 1, 11! 11 pill I 'I 'L I 1 10 ` M i In November 2004, Common Council established 3 fundamental goals/objectives for the Water and Sewer Utility. These were 100% treatment of collected wastewater effluents; Full treatment/filtration of drinking water; Adequate annual investment in existing infrastructure renewal. Subsequent Councils have demonstrated their oonitnitment to these goals through continued aggressive expenditures in these pursuits, This is evidenced through the Harbour Clean - Up program (nearing completion), the Safe Clean Drinking Water program (now beginning) and the substantial investments in existing infrastructure. The attached proposed 2013 Utility Capital Budget is consistent with the established goals, is fiscally responsible, and if approved, will move the Utility closer to achieving Council's stated priorities. The Utility Capital Budget is unlike other Capital budgets in. that it is financed exclusively by the water and sewer rates charged to the customers (users of the system). This budget is not directly linked to the property tax rate, unconditional grant, assessment base or other fiscal pressures and uncertainties. Nevertheless, the Council is acutely aware of the need to establish affordable rates for its Utility customers. This proposed Capital Budget respects that overriding concern, iht92M2MSMq Treatment of Wastewater Effluent As Council is aware, the Harbour Clean -Up project is nearing completion. Presently, there remains only one significant project: Sewerage Lift Station No 31. This project is expected to be tendered by the end of'2012 and completed in 2013. The funds for this project ($2.3 Million) were 9 M & C 2012 — 21 Page 2 O:ctober 1, 2012 included in the 2012 Capital Budget and will be carried forward to 2013. This construction completes the overall project. Final project costs are anticipated to be $99,400,000, including the City's eligible HST rebate as reported to Council on September 28, 2009 (M & C 2009-318). Of that amount, $39,200,000 will be funded directly by the Utility, an amount of $28,400,000 ($26,600,000 CSIF Agreement + $1,800,000 approximate interest) from the Province and $31,800,000 ($26,600,000 CSIF Agreement + .$5,200,000 GTF) from the Federal government There are a number ofcarry-forward projects, (projects which have begun in 2012 and will be completed in 2013) related to Harbour Clean-up carrying a total cost of approximately $11,300,000. FuH Treatment of Drinking Water Safe, Clean Drinking Water Safe, Clean Drinking Water is this community's most significant infrastructure initiative. Conunon Council has clearly expressed the importance of this project to the community and has identified it as one of Council's top priorities.This multi-year project requires huge financial commitments from the ratepayers of the UWity. It is essential that the City explore all alternatives for construction of the facilities required, determine the most cost effective service delivery model, and secure funding from the senior levels of government. The City currently has an application to P3 Canada for funding participation in the project. All aspects of a potential P3 project are being considered; those being design, build, finance, operate and maintain, The initial examination of a P3 model, the business case analysis (value for money), has just begun. This will guide the City's decision making with respect to aspects of service delivery. This will also be a determinant in P3 Canada's decision to financially partner with the City, The provincial government has also expressed strong support for the Safe Clean Drinking Water project; although the level of financial support has not been determined. The approved 2012 Utility Capital Budget includes approximately $5 Million for the project; most of that amount not allocated to specific projects. Approximately $100,000, will be ,expended on the initial business case analysis and an additional approximate $95,000 on ground water feasibility usage. The proposed 2013 Utility Capital Budget includes $8,065,000 for the project. Of that amount $3,065,000 is identified for the replacement of an existing watetmain across the Reversing Fall-cz Br;eiae. At t"Whis timp. 4 is iink"nwn c to ,vhetuar 0� - t tl1i.p- i t - - i__ a- ro CC wait proceed - 111 U III ZVI.3. Work on the Harbour Bridge, structural capacity of the Reversing Falls Bridge, results of the groundwater availability analysis all must be determined before this project can proceed. 2013 Water & Sewer Utility Budget YN Page 3 October 1, 2012 The remaining $5,000,000 recommended in the 2013: Capital Budget is intended to advance the P3 investigative supply, etc. Much more significant expenditures are identified in subsequent years' Capital dgets as we begin construction of facilities. Sanitary Like all municipal water and sewer utilities, there is a perpetual need for reinvestment in existing infrastructures, Infrastructure, by its very nature, is installed incrementally over the years and consequently must be incrementally upgraded, replaced and repaired. Notwithstanding the patently obvious need for Harbour Clean Up and Safe, Clean Drinking Water, significant funding must be made available annually to safeguard the functionality of the existing systems, and protect the environment. Council has acknowledged this basic need each year by providing funding for infrastructure renewal, The proposed 2013 Capital Budget proposes construction totaling $5,330,000 to maintain this sanitary inftastructure. Investments will be made in all geographic sectors in accordance with the greatest need and the most cost effective choices. A listing of these specific projects is included in the appendix to this report. In addition to the new projects recommended for 2013, there are a number of carry over projects which were previously approved in the 2012 Capital Budget. These projects are currently underway and will be completed in 2013. The carry over projects for sanitary renewal will be an investment of approximately $4,100!,000. All combined, total investment insanitary sewer infrastructure renewal will total about $9.4 Million in 2013, including the cagy over projects. Water The 2013 proposed Capital Budget also continues to invest in water system renewal projects. A total investment of $3.7 Million combined with $9001,000 in other funding will result in approximately $4.6'Million in new work in 2011 The $900,000 will be provided from the gas tax fund for the cleaning and lining of existing cast iron watermains. Tice cleaning and lining program improves pressure, water quality and fire flows; avoiding a much more costly complete piping replacement. The carryover projects, in water infrastructure renewal amount to approximately $3,0100,000. A complete listing of water system infrastructure renewal projects is included in the attached appendix, 2013 Water & Sewer Utility Budget M. M & C 2N 12 — 260 Page 5 October 1, 2012 RECOMAIENDATIONS Ij •. 0 "1 1� # I'M IVMA"kfhall I i I IWO' 1. wtvi'mrt-ramrsINT-mm's ass -mg 2) That the City of Saint John and Saint John Water make no expenditures ftm the envelope identified for safe, clean drinking water, or from the envelope identified for watershed protection, without express approval of Council. Win. Edwards, P. Eng. Commissioner Saint John Water IN atrick Woods, CGA City Manager 2013 Water, & Sewer Utility Budget MI r n, Category No. of Other Utility Projects Total . .............. Share Share ..... . . . . ...... . infrastructure Renewal - Sanitary In-frostmeture Renewal , Water Safe, Clean Drinking "rater 12 $1,800,000 10 $900,000 2 $2,1 OO,000 ME= 22= a= 02MMITI $10,165,000 W2stewater'rreatment 3 S3S,000 $290,000 $325,000 Watershed Prot do I o $200,ODO 5200,000 TOTALS: 28 $4,835,000 $15,930,000 $20,665,000 Allffill"Mll KIROMPIM, UWE M 1 IMPNOMM"1111 f C t S f WS3tVi0Wf4*Z, dWVMZ1J0:n Infrastructure ipanewal Sanitary 22.3% Safe, Chan Drinking Water 50.9% WrUtrudure Ronewal a& - 'ata r M -O WDH:: MUNICIPAL DESIGNATED HIGHWAYS PDH: PROVINC IALLY DESIGNATED HIGHWAYS RDH: REGIONALLY DESIGNATED HIGHWAYS w&s; WATER AND SEWER RELATED PROXCTS 1, h fs 4't' tlr S" "" k0 i, � iv"` o' ve ct ": PROJECTS CARRIED OVFR FOR COMPLETION THE FOLLOWING YEAR *:: PROJECTS DEPENDANT ON FUNDING FROM OTHERS 211 13 n t 'af ft I 'I /' m wadaovlwln ...... . ..... a . .. .... . Other Ut"Ity Project Location Description Share Share 01 Beach Millidge Avenue Construct new sanitary severs and sanim as 1,800,000 1,200,000 Crrscant,Mcadowbank reccommended In the Beach Sanitary SysteirI Crescent(Meadowbank Drainage Basin Stud), including design and construction management services. Project to be partially Ninded under GJY, W Atlantic Avenue Russell Sweet to St. Catherine Renewal of approx. 45m of I 50mm sanitary 0 401,000 Street sewer in conjunction with the One -mile tntencltatrgelRnssell Street renewal, including design and construction management services, D3 Loch Lomond Road Russell Street to Westmorland Rmewal of existing sections of sanitary sewer 0 275,009, Road; Atlantic Avenue in conjunction,with road real ignment as part of the One Mile Interchange project; includes construction managemcniservices, Wi I I seek to tender as part of D.O.T.,contruct 04 Duke Street West Watson Street to Ludlow Strw Renewal of approx, 140m of saintary sewer, 0 250,000 including design and construction management services, 05 Douglas Avenue Civic;V228 to Bentley Stred Renewapprox. 125m of 300mm T.C. with new 0 730,000 250mm sanitary sewer and install tiff station to eliminate existing outfall, including design and construction management services 06 Wastxwatm Pumping Millford Randolpb Greendale Renewal of sewage lift station Y. including 0 325,000 "am design and construction mars services. 07 Dom Road Dever Road area near ballfields Renewal of 45m of existing 200mm sanitary 0 75,000 sewer and design of over flow structure off Dever Road, including construction management swvices. 09 Milford Sanitary System Kingsville Road Renewal of various langths of deteriorated 0 300,000 sanitary sewer as roccommended in U Milford Drainage Basin Shady, including design and construction management services. 12 Wastowaw Pumping MiMrd Randolph Greendale Design services for renewal of forcemain x- 0 100,000 systcrn station to y -station ands easement and ]:&,no acquisition. 13 UniN-ersity Avenue Cif Midge Avenue to Royal Design services for cured: in place muctural 0 1'00,000 Parkway lining of approx. 1300m of existing saniwry sewer, 211 MDH: MUNICIPAL DESIGNATED HIGHWAYS PDH, PROkANCIALLY DESIGNATED HIGHWAYS: RDH: REG)OkALLY DESIGkATEV HIGHWAYS od 11"or!D�a fuyd w&v., WATER AND SEWER RELATED PROJECTS 'N&, i2%f l nm� lein bl-, Curpqnorl Cov1 �-- PROJECTS CARRIED OVER FOR COMPLETION THE FOL( -OWING' YEAR t", o t, �, iayq! Ll �',qt ,� myO i aw', 1; PROJECTS DEPENDANT ON FUNDING FROM OTHERS m 1.1101 P"x ..... . . 'fmom' Project Location Description Other Willy Share Share .. . . .... . MON %mmorgym","mmommem 14 Union Street Waterloo Street to Wellington Design services for cured in place stmctural 0 100,000 Row lining of appr=. 650m of existing 375mm sanitary sewer. 15 Chcs)cy Drive Between Ocean StecI and preliminary design for outfall redirection and 0 35,000 Thiomes mewal of approx. 390 of existing saniwy Sewer. m 1.1101 MDH. MUNICIPAL DeSIGNATED HIGHWAY'S PDH: PROVINMALLY DESIGNATED HIG14WAYS ROM: REGIONALL Y DESIGNATED HIGHWAYS 04 wa$: WATER AND SEWER RELATED PROJECTS i h, �wsflhn'� not n�' C-": PROJECTS CARRIED OVER FOR COWLE71ON THE FOLLOWING YEAR P tn, f " '!Rn'01111(.111V'1, '� PROJECTS DFPENQAXT ON FUNDING FROM OTHERS � ,,17, '�' 0 ......... . . Z' 0."V't M"4 Project Location Description Other Utility Share Share rmue womummarmill(a ovw mwampaw 01 Loch Lomond Road Russell Sorel to Westmorland Renewal of existing waterm9ins including the 0 1',125,000 Road; Atlantic Avenue installation of twosections of 600mm transmission MAIA for fQWM use in conjuntion with mad realigninent as pan of the tine Mile Interchange prviect-, includes construction management services. Will seek to tender as part of D,07. contract 02 Watemain Cleaning and Various locations Cleaning and lining of existing unlined Cj, 9010,000 0 Lining Phase 8 & 9 w8temains to improve PYOSSUM, water quality, and fire flows, Project to be funded under G.T,F. 03 Water Meta Renewals Various Renew approximately 1200 existing water 0 800,000 met= that require rePIAOOZerit including installation of automated reading system. 04 Fairville Boulevard Catherwood Strew to Civic N Renew approx. 720m of 300mm Cl. 0 715,000 885 (Sobeys) watennain, including design and construction management services. 05 Cottage Hill Zone Champwn Heights pump Replacement of the Portion of the existing 0 165,000 station to Cottage Hill tank 300mm watermain that presently traverses the Silver Falls reservoir, including design and conametion management services. 06 St. Jw= Street West Watson Street to Uncastcr Sit Renewal of approx, 175m of existing 200mm 01 200,000 diameter watormain, including design and construction management services 07 Rodney Saw Watson Street to CiNic # 256 Design services for renewal olf approx. 120m of 0 140,000 existing 15 Omm diameter watermain, 120m of existing 225mrn sanitary sewer for separation and installation of new storm sewer, 08 Musquash Purnfir Station Musquash Pacility evaluation and preliminary design for 250,000 upgradareconstruction including appropriate pump sizing, electrical upgrades, reduction in flooding, electrical substation upgrades etc, 09 North End - Forest Street to Reversing'Falls Rehabilitation of the 90ftrn "Central Spine"" 0 250,000 Transmission Bridge Phase 2 pipeline chambers and associated equipment to improve the delivery security 10 Witter Pumping Station Golden Grove Road Facility, evaluation and design for upgrades, 0 100.000 0 MDH!, MUNICAPAL QF51UNA) tV HIGHWAYS pDHPRO04CLAUY DESIGNATED HIGHWAYS ROH. REGIONA11Y DESIGNATED HIGHWAYS vAS: WATER AND SEWER RELATED PROJECTS Y'Ofr' 1a by a Mnwr <.ra C,**-, PROJECTS CARRIED OVER FOR COMPLETION THE FOLLOW(NG YEAR � PRCJEM$ DEPENDANT ON FUNNNG FROM OTHERS Project Location, Description Other Utility Share Share ...... . . . .. ...... .m�rmu w.own. . ......... o-.., — — -------- - --- Roversing Falls Wdge Reversing Falls Bridge Renew existing 475mm watarrnain with two 2,100,000 3,065,000 new 5 00mm WAtcm6us including design and construction managementservices. Pro ect funded under (ITY, as a 00nitiOgency plan should the project fundfng not be a -s ai1pble under the SCDW program, Safe, Clean Drinking TBD Safe, Clan Drinking Water Program cm elope 0 5,,000,000 Water Program for 2013, Details of program for 2013 10 be established and approved bY COnUmn Council, MaL. ILIM02 &&MUM M MDK N)NICA PAL DESIGNATED HI WAYS POI PROIANcLALLY OESIGNATED HIGHWAYS RDH: Rec;*NALLY rJESIGNATED HIGHWAYS wft WATER ANT) SEWER RELATED PROJECTS fl, 0 1 A 601"Prp V 6y C- C, C---: PROJECTS; CARRIED OVER FOR COMPLETION THE FOLLOWING YEAR V N� tr W; o 1, PROJECTS DEPENDANT ON FUNDING FROM OTHERS , .-4 111,41111,1101=1110 "'v, Apm Project Location Description !Other Utility Share Share Wastewater Treatment Lancaster Wasiewater Treatment Access roadrealipmeM, including design and 0 200,D00 Facilities Facility wnstruction management services. lu Sustainable Energy Miffidgeville Wastewater Installation of VFD and control system for the 30.000 80,000 Management Treatment Facility bio -cell and blower frumps. Other share: flown Efficiency NEI I SusWnable Energy Market Place Pumping StaI Installation of,pump upgrades. Other share 5,000 10,000 Management from Efficiency NB NIGH."MUNICIFIAL mSIGNATED 14IGHWAYS PDH: PROVINQALLY DESIGNATED HIGHWAYS RDH: REGIONALLY DESIGNATED HIGHWAYS p, W&6: WATER AND SEWER RELATED PR0j5CT8 pp vo "I bb I", " o � 0 rr v� 'T C, t 4A 40Iv ,C--PRojE. PROJurs DEPENDECTS CARRIED OVEFUNDINR FOR COMPG LETION TOTHERS WIHE FOLLONG YEAR in yet., a c� 6 c t. to l�� h, 4, o"(, n nf�y : ANT ON FROM - -- - - - ... . .. Project Location Description Other Utility Share Share fumm IP I Walersbods Laab Umond Watershed Land acquisition for wain ed protection (as 0 200,000 required) IgJAL- JU Lai= LMH,, MUNICIPAL DESIGNATED HIGHWAYS FbH: PROIANCKUY DESIGNATED HIGHWAYS RDH': REWONALLY DESIGNATED HtGHWAYS w&s: WATER AND SEWER RELATED PROJECTS n t„t (aµµ f,�J a,amcr l. c. -t PRojEr—TS CARMED OVER FOR COMPLE'nON TME FOULOWING YEAR PROJECTS DEPENDANT ON FUNDM FROM OTHERS )`V Project Location Description Other Utility Share Share . . <..„.., . ..... WE