Loading...
2015-04-13_Agenda Packet--Dossier de l'ordre du jourCity of Saint John Common Council Meeting Monday April 13, 2015 Committee of the Whole 1. Call to Order Si vous avez besoin des services en frangais pour une reunion de Conseil communal, veuillez contacter le bureau du greffier communal au 658 -2862. Each of the following items, either in whole or in part, is able to be discussed in private pursuant to the provisions of subsection 10.2(4) of the Municipalities Act and Council / Committee will make a decision(s) in that respect in Open Session: 4:00 P.M. 8t" Floor Boardroom City Hall 1.1 Employment Matter 10.2(4)0) 1.2 Approval of Minutes 10.2(4) 1.3 Common Council and Annual General Meeting Attendance 2015 1.4 Land Matter 10.2(4)(d) 1.5 Legal Matter 10.2(4)(f) 1.6 Labour Matter 10.2(4)(j) 1.7 Personal Matter 10.2(4)(b) 1.8 Employment Matter 10.2(4)0) Regular Meeting 1. Call to Order - Prayer 2. Approval of Minutes 3. Approval of Agenda 4. Disclosures of Conflict of Interest 5. Consent Agenda 5.1 K. McLean Letter: Council's Authority Regarding Riverview Memorial Park (Recommendation: Receive for Information) 5.2 Asian Heritage Society of New Brunswick — Invitation to Asian Heritage Celebration (Recommendation: Receive for Information) 5.3 Canadian Association for Conservation Letter of Support for NB Museum Expansion (Recommendation: Receive for Information) 5.4 License Agreement with Beavertails (food Vendor) in Waterfront Area (Recommendation in Report) 6. Members Comments 7. Proclamation 7.1 National Volunteer Week — April 12 -18, 2015 7.2 Intergenerational Day Canada — June 1, 2015 8. Delegations / Presentations 9. Public Hearings - 6:30 p.m. 10. Consideration of By -laws 10.1 Third Reading Street Closing — Elliott Row 10.2 Third Reading Zoning By -Law Amendment — Elliott Row / Carmarthen Street/ Wentworth Street (with Section 39 Conditions) 11. Submissions by Council Members 11.1 Spring Road Renewal Work (Mayor Norton) 11.2 Pole Garbage Baskets (Mayor Norton) 11.3 Waterloo Street (Deputy Mayor Rinehart) 12. Business Matters - Municipal Officers 12.1 Update on Fire Department's Readiness to Respond to an Oil Train Derailment 12.2 2015 Spring Street Sweeping Services 12.3 Tender for Asphaltic Concrete Mixes 12.4 2015 Service — Based Budget 13. Committee Reports 13.1 Saint John Board of Police Commissioners — Saint John Police Force Legal Fees 14. Consideration of Issues Separated from Consent Agenda 15. General Correspondence 15.1 Youth Safe Harbour Transitional Services Inc. — Request for Grant 16. Supplemental Agenda 16.1 Tender 2015- 084901T — Reinstatement of Utility Cuts — Asphalt Work 16.2 Tender 2015- 084902T — Reinstatement of Utility Cuts — Concrete Work 16.3 Rescheduling Council Meeting Date (Verbal) 17. Committee of the Whole 18. Adjournment The City of Saint John Seance du conseil communal Le lundi 30 mars 2015 Comite plenier 1. Ouverture de la seance Si vous avez besoin des services en frangais pour une reunion de Conseil communal, veuillez contacter le bureau du greffier communal au 658 -2862. Chacun des points suivants, en totalite ou en partie, peut faire ('objet d'une discussion en prive en vertu des dispositions prevues au paragraphe 10.2(4) de la Loi sur les municipalites. Le conseil /comite prendra une ou des decisions a cet egard au cours de la seance publique : 16 h — Salle de conference, 8e etage, hotel de ville 1.9 Question relative a 1'emploi — alinea 10.2(4)j) 1.10 Approbation du proces- verbal — paragraphe 10.2(4) 1.11 Conseil communal et participation a I'assemblee generale annuelle de 2015 1.12 Question relative aux biens -fonds — alinea 10.2(4)d) 1.13 Question juridique — alinea 10.2(4)0 1.14 Question relative au personnel — alinea 10.2(4)j) 1.15 Question relative au personnel — alinea 10.2(4)b) 1.16 Question relative a 1'emploi — alinea 10.2(4)j) Seance ordinaire Ouverture de la reunion, suivie de la priere 2. Approbation du proces- verbal 3. Adoption de I'ordre du jour 4. Divulgations de conflits d'interets 5. Questions soumises a I'approbation du conseil 5.1 Lettre de K. McLean : Autorite du conseil au sujet du parc commemoratif Riverview (recommandation : accepter 6 titre informatif) 5.2 Asian Heritage Society of New Brunswick — Invitation a la celebration du patrimoine asiatique (recommendation : accepter a titre informatif) 5.3 Lettre de I'Association canadienne pour la conservation et la restauration appuyant I'ag rand issement du Musee du Nouveau - Brunswick (recommandation accepter a titre informatif) 5.4 Contrat de licence avec BeaverTails (vendeur de produits alimentaires) dans le secteur riverain (recommendation : accepter a titre informatif) 6. Commentaires presentes par les membres 7. Proclamation 7.1 Semaine de I'action benevole — du 12 au 18 avril 2015 7.2 Journee intergenerationnelle au Canada — 1erjuin 2015 8. Delegations et presentations 9. Audiences publiques a 18 h 30 10. Etude des arretes municipaux 10.1 Troisibme lecture de I'arretb relatif a la fermeture de la ruelle Elliott 10.2 Troisibme lecture de la modification de I'Arretb de zonage visant la ruelle Elliott /rue Carmarthen /rue Wentworth (conformbment aux conditions imposbes par I'article 39) 11. Interventions des membres du conseil 11.1 Travaux printaniers de refection des routes (maire Norton) 11.2 Poubelles montees sur un poteau (maire Norton) 11.3 Rue Waterloo (mairesse supplbante Rinehart) 12. Affaires municipales evoquees par les fonctionnaires municipaux 12.1 Le point sur I'aptitude a intervenir en cas de deraillement d'un train de pbtrole 12.2 Services printaniers de nettoyage des rues en 2015 12.3 Soumission relative aux melanges de beton asphaltique 12.4 Budget de 2015 axe sur les services 13. Rapports deposes par les comites 13.1 Bureau des commissaires de la police de Saint John — Frais juridiques du Service de police de Saint John 14. Etude des sujets ecartes des questions soumises a I'approbation du conseil 15. Correspondance generale 15.1 Youth Safe Harbour Transitional Services Inc. — Demande de subvention 16. Ordre du jour suppiementaire 16.1 Soumission 2015- 084901T relative a la restauration des tranchees destin6es aux services publics — Travaux d'asphalte 16.2 Soumission 2015- 084902T relative a la restauration des tranchees destin6es aux services publics — Travaux de b6ton 16.3 Report de la date de rbunion du conseil (rapport verbal) 17. Comite pienier 18. Levee de la seance Tibbits, Kelly To: External - CommonClerk Subject: RE: Council's Authority Regarding Riverview Memorial Park From: Karen J. McLean [ mailto :friendsofthenbm @gmail.com] Sent: March -28 -15 2:41 PM To: Norton, Mel; Rinehart, Shelley; Farren, Bill; Norton, Greg; Fullerton, Susan; MacKenzie, John; Lowe, Gerry; Reardon, Donna; Merrithew, David; Strowbridge, Ray; McAlary, Shirley; External - CommonClerk Subject: Council's Authority Regarding Riverview Memorial Park Dear Mayor Norton, Deputy Mayor Rinehart, and City Councillors; My name is Karen McLean and I live in Ward 2 of the City of the Saint John. I am writing to you as a concerned citizen who is passionate about this city -- its culture, heritage, and well -being -- as well as about education and opportunities for our fixture generations. After attending the information presentation at the NBM on February 24, 2015, I was moved to create the Friends of the New Brunswick Museum Facebook group, and later its companion blog. (Links may be found, for further information, in my signature below.) I am not -- nor have I ever been -- an employee of the New Brunswick Museum. I am, however, a staunch supporter of the vital work this institution does in preserving -- and sharing -- the stories of New Brunswickers. The fact that it was begun in our city nearly 175 years ago is part of what makes Saint John great. Like many people in this city, I respect and care deeply about veterans, both past and present. Each Remembrance Day at the eleventh hour finds me at the War Memorial in King's Square. Although the official ceremonies take place at Harbour Station, there is always a number of veterans at the traditional cenotaph. My husband and I show our respect there, along with an informal group of civilians that swells each year, so that by our presence those veterans see that their sacrifice have not been forgotten. I was also instrumental in the recognition of the 236th CEF Battalion (the MacLean Kilties) from World War One, including the installation of a plaque at Old Government House in Fredericton (which had been that battalion's barracks). I was the primary force behind the gathering, creation, and interpretation of an information display -- the star of which was the actual set of bagpipes which led the Canadians in the victory parade in Mons on Armistice Day. Contrary to what some may believe, those of us who support an expansion on the park -side of the New Brunswick Museum's Douglas Avenue building are not disrespectful of veterans' sacrifices, nor are we sitting in bulldozers with the engines running, eager to start mowing down anything in sight. After learning that Riverview Memorial Park would have an opportunity to be rededicated and revitalized as a result of the park -side expansion of the NBM, I quickly saw it as a win -win. Those soldiers' stories have been largely forgotten by the public. Who better to be involved with invigorating interest in those stories -- bringing them to the forefront again -- than the New Brunswick Museum, who have been doing just that sort of thing for nearly 175 years? The park as it stands now is not a well -used (or well - acknowledged) public space. Allowing the NBM to obtain less than ten percent of it in exchange for its return to prominence is a very small price to pay. And for those who argue that figure is deceptive, because it is nearly forty percent of the currently developed area, I would like to point out that this would be a golden opportunity to expand its useable area -- possibly even an 12 expansion of the Harbour Passage walking trail, through the back of the park, along the river to Fallsview Park. There is so much potential here, an opportunity that this city is in danger of losing, because of stagnation and fear. The park -- and the veterans in whose memory it was created -- deserves this opportunity. It's a win -win situation, for the park, the museum, and the citizens of Saint John. One only has to look back twenty years to see a similar situation with the proposal to revitalize the Loyalist Burial Ground. It had become a crumbling eyesore. Thankfully those who were unable to conceive of its potential were overruled, and it became the beautiful asset it is now. Riverview Memorial Park deserves the same. I attended the Common Council meeting on March 2nd, 2015, and I have viewed the video archive of the meeting that took place on January 19th, 2015. What I saw there -- and what I have seen since -- is that Council is afraid to move forward with a decision because it is not sure it has the authority to act, or that it would be in violation of the original intentions of those who had created the park. In the Saint John Free Public Library in Market Square, there is a book called Acts of the General Assembly of Her Majesty's Province of New Brunswick 1900 -1902. Pages 154 to 163 contain "An Act to incorporate the Riverview Memorial Park Board in the City of Saint John. (I have scanned and attached a copy of these pages for your convenience and information.) This Act is what created Riverview Memorial Park in the first place, and clearly lays out what the intentions were of those who created it. Their wishes and procedures are all there in black and white. I don't know what may have transpired when the City took over the park, or what is in the covenant, as I do not yet have that information. But if nothing contradicts the following excerpts of the Act, I don't see why Common Council can't move forward to grant the New Brunswick Museum less than ten percent of Riverview Memorial Park in exchange for a revitalization and rededication of the remaining more than ninety percent. It is very clear that in the creation of the park, the Board was keen that it be used by the public, and trusted Common Council to make decisions with regards to the Park at the very beginning — the act of incorporation. Given the passages I've quoted below (and the rest of the document which I have attached), the authority was given to Council even before the City took ownership of the park. From Section 3 of the Act:... As vacancies occur in the said Board from time to time from death, resignation or otherwise, the same shall be filled by said Board from among the citizens of the said City of Saint John, nominated by the said, The Women's Christian Union of the Town of Portland. In case of the said, The Women's Christian Union of the Town of Portland, failing from any cause to nominate at least two persons for each vacancy that may occur on said Board within three months after such vacancy occurs, then it shall be lawful for the said Board, and they are hereby empowered and required, to select and appoint from among the citizens of Saint John fit and proper person or persons to fill such vacancies Section 4 of the Act: If at any time the said Board shall refuse or neglect, for the space offour months from the date of the date of the occurring of any vacancy, to fill the same, then, and in each such case, the Common Council of the City of Saint John are hereby authorized to forthwith appoint a fit andproper person from among the said citizens to fill the same. From Section 8 of the Act: The said Board shall have power and authority from time to time, and at all times, to make, ordain, enact, revise, alter, amend and rescind such bye - laws /sic], rules and regulations as they may deem proper for the purposes of regulating the calling of meetings of the Board, and the management and business of the Board, and the control and use of the said Park lands, roadways, waters 23 and premises as they shall see fit for the better protection and ordering of the same and the use of the same by the public ... I'm guessing the Board was likely dissolved when the City formally took over the park in 1929. But according to this Act, it's obvious those who created the park gave Common Council the authority to fill vacancies (and therefore essentially create a brand new board over time if it wanted). Since the Board could change the rules at any time, then it was clear they trusted Common Council to change the rules to benefit both the park and the citizens of Saint John. As I said, I haven't seen the documents from 1929 yet, but they should be a matter of public record. But it stands to reason that if Common Council had this much power and authority when the park didn't actually belong to them, why would they have less once it did? Let me be absolutely clear: Besides being concerned about the NBM getting the expansion it needs in the most functional and cost- efficient way possible, I also want to see Riverview Memorial Park get the attention, upgrades. and possible expansion of useable area it desperately needs and deserves. The New Brunswick Museum has said that it is now exploring the north side options, but that's because they can't afford to wait for Council any longer. They have said the park -side option is still the preferred one. It is almost -- but not quite -- too late for the expansion on the park side of the Collections and Research Centre. It is almost -- but not quite -- too late to take advantage of this incredible opportunity for Riverview Memorial Park to benefit in a way that may not present itself again for a long time, if ever. I love Saint John, and at the last municipal election, I voted with a sense of hope for this city. I believed in the #renaissancecity. I believed that #TellMel meant all citizens who cared about making this city great again would finally be heard. That the days of stagnation, closed- mindedness, and watching this city decay because of impotence and fear were finally -- finally -- over. I've since come to the conclusion that while hashtags are catchy, action is far better. Thank you for your time, attention, and your service to this great city of ours. Please do everything in your power to make this happen -- for the park, the veterans it honours, the museum, and the forward - thinking citizens of Saint John. All the best, Karen J. McLean Karen J. McLean The Friends of the New Brunswick Museum Blog: hgps : / /fiiendsofthenbm.wordpress.com/ On Facebook: https://www.facebook.copl/ goLaps/friendsofffienbm/ 0 Excerpt from Acts of the General Assembly of Her Majesty's Province of New Brunswick 1900 -1902 (Pages 154 -163) 15-1 2 EDWARD VII., A. D. 1902. 0, Riverview A1lemorial Park Board, Scant John, 1 ncorp(j�. CAP. LVIIL An Act to incorporate the Riverview Memorial Park Board City of Saint John. Sec. See. 1. Board of Trustees incorpor- of flues; bye -laws, aced, proved. - 2. Title of Board of Trustees; 10. Board may receive be,141 A ` purposes. etc. 3. Number and appointment 11. General statement of giffa }- of Trustees. to be filed in ProNloW. 4. When Common Council Secretary's office ?very tea.,; may appoint Trustees. years. 5. Appointment of officers, 12. Exemption fiom taaat etc.; duties and remunera- 13. Members cannot cq)A6 :, tion. with Board; no reruur erg, B. First meeting of Board; tion to members. how called. 11. Roads, etc., not public hig' 7. Offences; penalties; proviso; ways; no rights acquired �c application of penalties ; list user. _- of offences to be posted up, 15. This Act and all by-e -la: �. S. Power to nacre bS e- laws. to apply to any adcUL ' 9. Power to make additional lands acquired. bye -laws, and impose fines 16. 3/lay convey to the Clity 4, and penalties; to be approv- Saint John under cex ' ed by Governor-in-Council; circumstances. prosecutions; by whom and in what manner; application Passed 10th April, 1�4 Whereas the ladies of the Women's Christian Un enl. , _ the Town of Portland, in the City of Saint John, in the.`4 vince of Now Brunswick, acquired certain fundV, for purpose of providing a memorial to those citizens of said of Saint John who recently served in the Canadian gents in the war in South Africa, and have applied a e ? portion of said funds for the purchase of lands, with the vim: of establishing a Memorial Park, the said lands I 5 Excerpt from Acts of the General Assembly of Her Majesty's Province of New Brunswick 1900 -1902 (Pages 154 -163) r_S 2 EDWARD VII., A. D. 1902. 155 < �' ►.iew Xemmorial Park Board, Saint Tohn, Incorporated. A purchased from one Gabriel DeVeber and others, and ��3red by deed dated the first day of November, A. D. ` JO01. and therein described as" All that certain lot, piece or ,� -,p vel of land and premises situate on the western side of ' . uglas AvEnue, in the said City of Saint John, described as �..Jo s :— Beginning at a point on the said western side of ' ottglas Avenue, where the southern line of property owned the Hilyard estate meets the said western side of Douglas ..:_—Avenue; thence running southerly along the said Douglas uue a distance of two hundred and twenty -two feet, more _:::loss, to lands owned by the estate of the late William )%zen ; thence westerly a distance of three hundred and fifty more or less, to the shore of Marble Cove; thence *�erly, following the various courses of the said Cove, two bra ^:I�hdred and twenty -two feet, more or less, to the said ipthern line of Hilyard estate ,.:... y property; thence easterly 4kfty the said last mentioned line three hundred and twenty =., more or less, to the place of beginning, and being lots ben two and three on plan L of partition of lands be- ;"69i;ig to the estate of the late N. H. DeVeber, deceased, on -in the «ifir.e of the Registrar of Deeds in and for the City C'Onlity of 'Saint John," the title thereto having been by ;;raid deed vested in John Gilchrist, Henry Maher, Philip N. . B. Jnnns, Henry Hilyard, James Boyd, R. mm, Everett Hamm, George A. Hetherington, J. Fraser Gregory, ►ti`'imas R. Hilyard, Richard Rawlings and Alexander P. F. hill, as Trustees. upon trust to convey the same to a Park to be ther(After incorporated. And whereas the said, The Women's Christian Union of Town of Portland aforesaid, and the said Trustees are rous that the said lands, together with all other lands and << "*Perty whieh may be hereafter acquired in extension of park, as well as all funds now on hand, and all funds ` :Which may be received as income, donations or endowments n Excerpt from Acts of the General Assembly of Her Majesty's Province of New Brunswick 1900 -1902 (Pages 154 -163) 156 2 EDWARD VII., A. D. 7902. R-�ve- ,-view 11Iemo'iia.l Pavk Board, Saint John, in respect thereof, shall be held, manacred and employed kT'..'. an incorporated Board of Conr nissioners, in accordailcc the intention expressod in the trust contained in said deod alga. J. , .herein particularly specified ; Be it therefore; enactod by the Lieutenant- Goventor ai;u! : .. Legislative: Assembly as follows:— 1. John Gilchrist, Honry Maher, Philip N.Hanm -i, Evcrett B. Jones, Henry Hily ar d, James Boyd, R. Park.cr Hamra: George A. Hetherington, J. Fraser Gregory, JoYin P. M(!- Inerney, Daniel F. Tapley, Thomas R. Hilva,rd, Richard Raw = . ;..": lings and Alexander P. Barnhill, and their successors, to k 3., appointed as hereinafter provided, are hei eby constituted a s..:. body corporate under the name of The Riverview 14Iemoriol - "� , -t; Park Board, and by that naine shall have all the genemk.:" powers and privileges made incident to a corporati- )n by AAt,t.,, of Assembly of this Province, and niay sue and be sued, plead and be impleaded, and shall have, and enjoy all proper reznedies at law as well as in equity to secaro and protect theirs in tire. exercise, and use of the rights and privileges and in the per -'J" forrnanoe of the duties hereinafter imposed, and to prevent invasion thereof in exercising and perforwing the salve f >r:.' :. the purpose of holding, managing and iiiaiziteinin ; the land yµ hereinbefore described and hereinafter cic clared vested them as Guch corporation, and all other I€snrls if ally, NvhiC:h.,:`f"" may be hereafter vested in them as a Park for the use, recrea = ". -`` .1 tion and amusement of the citizens of Saint John, and othez ,e visiting the said City, 2. The title of the said Trustees in and to the Said lahtl� in the recital hereof described as having been convened to said Trustees, is hereby declared vested in the said, The RiV(!r view Mernorial Park Board, their successors and assigns:, trust for the purposes in this Act specified. 7 Excerpt from Acts of the General Assembly of Her Majesty's Province of New Brunswick 1900 -1902 (Pages 154 -163) ,r ;r 2 EDWARD VII., A. D. 1902. l a7 Mbgrzori tj Fat z Boavd•, x5cc d J61�3� I�aco,��osc�tncl. 3. The said Board shall cansist of the persons men - "i;r�3 in tlae fixsi s� coon of this Act, and shall he limited to rteexz members, the number therein named, of whom any iiie, at a meotil)g duly called, shall constitute a, quo' °um. As ,t, occur occur in the said Board from time to dine, from de tl�, °esionation or otlicrwise, the saine shall be filled by :. d Board from among tlac citizens of the said City of Saint ranadnated by the said, The Won acx+'S Christian Union ,- the Town of Portland. In case of the said, The Women s ( ?'lsti.an Union of the Town of Portland, failing from any ".:aiiRe to nominate at least Iwo persons for each vacancy that occur on said Board within three months after such aricy occurs, then it shall be lawful fur the said Board, and P.y are hereby empowered and required, to select and appoint = nLn aanaong the citizens of Saint John fit and proper person i t;er,5on5 to fill 5uc]a vacancy or vacancies. In case, ho�ir- �Ter, the said, '1`l1e ��4'oznen's Christian Union of the Town of ,'rtlanr , ,shall have, within three months after such vacancy 4)Wirred, norninated at lea, -,t two persons for such vacancy an -.adid ..)ar•(l, then it shall be the duty of said Board, and they . empowered and required to select one of such t. JWrlinjai<< to -gill Such vacancy. ..;`: 4. If a.t -, -.,-)y the said Board shall refuse or neglect, w -1161,. tlae sl,arc� �It four irlu�lths froill t }le dale, of the ocCialrili of "air tacanc�T, t,) fill tlic sane, then, and in e +ach suc-h ease, t }ie ` �eu�naui� (.,01111c11 of -i lze City of �Saiiit John are hereby At lRorizc3d to fnrth�� it }i appoint a fi.t and proper person frO111 f,11c the said to till the sa,laze, 5. The said 1 o:�zd laa]1 alarar ?ally (1ect fronn-1 among their " er a chairlman in Sucb inannex as they may by bye-law ' zmide ; they nlp al v) ,appoint such officers, including a : 'e tar�Y- trea5uz er a1� d ca a °«'t zl;.er of grounds; and employ such e:9§vz' a ;sgistaalts azd emplo-, e�_.s, ��nd such la as h lnay s �11 Excerpt from Acts of the General Assembly of Her Majesty's Province of New Brunswick 1900 -1902 (Pages 154 -163) 158 2 EDWARD VII., A. D. 1902. C. 58 e Riverview Netnorial Park Board, Saint John, Inro,�oaaterl; deem necessary for the caretaking, maintenance, preserrafic }n -2. and improving of said Park, prescribing their duties awl : powers and fixing their remuneration, and may in all thine manage and control the funds and properties of said 'Coi- poration. 6. The first meeting of the Hoard for organization and election of officers may be called by any tyro of the car - porators named in this Act, by a notice in writing sent through the post office to the addresses of the others of said persons named herein, at least two days before the time :. appointed for such meeting, and said Meeting shall be held at the time and place appointed by such notice. 7. (1) Every person shall be guilty of an offence.:` against this Act, and be liable to a penalty of eight dollars or to imprisonment for a term not exceeding thirty days, whol within the, limits of the said Park, or upon any of the lands. ponds, roadw ays, paths and premises thereof; (a) Shall destroy or cut, hurt, deface or tear an 7 tree, shrub, bush, flower or fence, or remove any rock:, sod, flowers or earth from said lands; or (b) Shall discharge a gun, pistol, revolver or any other species of firearm of any nature or kind ever therein, or shall carr any firearms through upon the said grounds; or }' (c) Shall build, make, light or set any fire, or Set, off any rocket, squib, cracker, or any other species uF firework therein; or (d) Shall hunt, snare, shoot or otherwise kill or injure any bird or animal therein, or destroy and jaest or eggs; or 9 Excerpt from Acts of the General Assembly of Her Majesty's Province of New Brunswick 1900-1902 (Pages 154-163) 2 EDWARD VII., A. D. 1902. 159 )NOrview Me'nwl'ial Par7e Board, Saint John, Tneorporated, e) Shall throw stones or other missiles at any bird or animal on the said grounds; or (f) Shall use any obscene or profane language, l a any cursing or swearing, or shall do or commit any allow any dog or dogs that accompany other indecent action within the limits of said Park; or g) Shall 111111 to be upon the Park grounds, except under leash. s�", Provided always that nothing contained in this section shall apply to any officer or employee of the Board for any act or thing done by him in discharge of his duty. (2) The penalties recovered under the provisions of the foregoing sub-section shall be paid over to the treasurer of the said Board, and shall be applied to the purposes of the Board. (3) It shall be the duty of the said Board to cause to be posted up, and keep posted in conspicuous places in the sai( -1 Park, a copy of sub - ;section one of this section. 8. The said Board shall have power and authority from 6p, to time, and at all times, to make, ordain, enact, revise, Aer, amend and rescind such bye-la-vvs, rules and regulations they may deem proper for the purposes of regulating the , inig of meetings of the, Board, and the management of the dues of the Board, and the control and use of the -,aid lands, roadways, -vvaters and premises as they shall see kJor the better protection and ordering of the same and the of the seine by the public, including the several purposes _1619Aling- -the bye-laws for the purposes follow ing-, however, in force only within and in respec=t of the, said Park, 10 Excerpt from Acts of the General Assembly of Her Majesty's Province of New Brunswick 1900 -1902 (Pages 154 -163) 160 2 EDWARD VII., A. D. 1902. Ri•vervi,ev, Vemorial Park Board, Saigit John, .Tnco7Por,at � (a) The exclusion and removal of di8()rd characters ; (h) To prevent immoderate rifling or driving; ",r' riding or driving on the turf or sod ; (c) The digging or removal of gravel, or e;artl','. or turf ; (d) Carrying earth or other matter into Park, or com. mitting nuisances therein ; (e) Shaking or cleaning carpets therein ; (f) The playing of games therein without. trie permission of the Board; (b) Regulating the sale of refreshments; (h) Walking on the' grass or sward . (i) Generally to male such lasers and ordinwieni as may be necessary for enforcing the above, and for carrying out and executing the powers, rested in �-�th" " , Board. 9. The said Board may, by any bye -laws, rule < Cdr = reaulatioDs, impose such fines and penalties, and ordain sqO forfeitures in addition to those hereinbefox -e provided they may deem necessary for the non - observance or 11re�i any bye -law, rule or regulation passed by them under': Act, not to exceed in any case the sum of eight dollars, the same shall not go into effect unless and until tbey laid before the Lieutenant- Governor -in- Council, and. :,�:` approved or confirmed by him. Any prosecution for bro of the said bye -laws shall be proceeded with in the nan, and . on the information of the Secretary of said Beard, before:f - Police Mao-istrate of said City= of Sint Johzi and 1,111d et 010 11 Excerpt from Acts of the General Assembly of Her Majesty's Province of New Brunswick 1900 -1902 (Pages 154 -163) 2 EDWARD VII., A. D. 1902. 101 f R r i Boc, Saint John, T oral. aiew emoa -�c� , wp�c isions of the Summary Convictions Act; and any fines, collected, sball be paid to the treasurer of the said :mod to be used for the purposes of said Parr. A certificate , r .t° the seal of the Province, that the bye -laws as stated ,ecin have been duly approved or confirmed by the , ".'!;eutenant- Governor -in- Council. shall bel,)rima facia evidence Courts of the fact that the bye-laws, ,so certified, have been lly passed by the Board and so approved or confirmed, :gud that the same are legally in force. 10. The said Board, hereby incorporated, are authorized rrnpowered to receive any donation, bequest, gifts or sum ' sums of money that may be presented or donated to theirs ..4' ud towards supporting, maintaining or extending the ,.mod nark, and may either expend the same toward maintain- A4. improving, repairing; or extending the same, or in carry- out the special p ur l oses specified or provided by the or make a special deposit at interest in any chartered k. in the name of said corporation as an endowment fund, F � s.pecified by the donor in any case. And the said Board 4ie.,Oso authorized and empowered to purchase, or otherwise uirc or receive in fee simple, any lands contiguous to or iexi the paid lands he? °einbefnre described, as and for the loses of an extension of the area of said Park. 11. It, shall be. the duty of the said Board to file in the t!e of the Provincial Secretal y, at least once in every two Hers, a genes °0.1 staten)ent and report of their proceedings, :psi a general statement of the moneys received and expended .3° r .hem ,since the last statement so filed, and of the moneys . properties they may then have on hand, with the esti- *A ed values of said properties. 12. The propertiep and funds of said corporation shall 'sempt from taxation within ,said City- of Saint John for 1i �icipal or civic purposes, 12 Excerpt from Acts of the General Assembly of Her Majesty's Province of New Brunswick 1900 -1902 (Pages 154 -163) 162 2 EDWARD VIE, A. D. 1902+ Bi'verview 31-'emorial Park Board, Saint Johi2, Incorporat,..d, 13. No person, while a member of the said Board, sbail be eligible to enter into any contract, or have any interest, iu any contract, either directly or indirectly, with the said Board, or to receive pay or recover for any -�N-ork done or goods furnished or services performed for, to or with or ;gin behalf of the said Board. The members shall not at anyT time. be entitled to receive or be paid any remuneration for : their services as members or officers of the said Board,_ 14. The roadways, avenues, boulevards, drives, paths` and ways of all kinds now made, constructed or laid out, Or hereafter to be made, constructed or laid out, over, through or _ upon any of the lands and premises forming; said Park shall E _ not be or be considered or used as public highways, but shall. be used by the public only in accordance with tho by,--laws; rules and regulations of the said Board from time to time.'. made or to be made, which said bye -laws, rules and regular- tions may be altered or changed from time to time in the dis' . cretion of the said Board; and any such path, road, avenue,., boulevard, drive or way may be changed or entirely closed u at any time by the said Board, and no rights shall Le acquired,. by the public or any individual in or to any of the lands,nd premises forming said Park, or any roadway, path or by -wAY: over or upon the ,same, by reason of possession or use thek*4 - for any number of years for any purposes whatever. 15. In the event of said Board hereafter purchasing.M otherwise acquiring or receiving any land.9 in addition to .thy? ' .. lands hereinbefore described, then immediately upon other lands vesting in said Board this Act and the bye-l&i's -' e of said ' Board, for the time being in force, shall apply and ex- tend to such other lands and all such other lands so hereafter: vesting in said_ Board, and each and every part and paicel" thereof as fully, completely and effectually as if said other .,' lands were hereby vested in said Board, and i.nolude.d zn tlz foregoing description, 13 Excerpt from Acts of the General Assembly of Her Majesty's Province of New Brunswick 1900-1902 (Pages 154-163) 7 2 ED WARD VII., A. D. 1902. 163 Act rcTecti,,,�q C011ecti"19 of Taxes Saint John. 1.6. If at any time hereafter the City of Saint John, by h�dution of the Common Council shall signify its Willing- f.*w ip accept, the care, custody, control and management of r.0 Park, it shall be lawful for said Board, under authority ;­J A resolution to that effect, passed by said Board by the *wative vote of not less than two - thirds of the members of r .. corpora i6d' tion, at o. special meeting called for the purpose of r - I—' -"�widering the same, to grant, convey and -make over to the file City of Saint John, the said lands and premises,andany lands then vesting in said Board in trust to be used as _)61 a. -Park for the use of the citizens of Saint John and rs visiting the said City. M CAP. LIX. .pct respecting the collecting of Taxes in the City and County of Saint John. See. 14 of 62 Vic., Cap. 20 2. See. 111, Cap, 100 Consolid&. 'hOt to apply or affoct 43 Vic. ted Statutes as enacted by 60 Zd 7" Lap.. Vic. Cap. 35, amended. Passed 10th April, 1902. enacted by the Lieutenant-Governor and Legislative .l Assembly as follows :_ 7. Section 14 of the Act 62 Victoria, Chapter 20, shall apply to or in any way affect the provisions of the Act OTictoria, Chapter 23. Section 71 of Chapter 100 of the Consolidated 41t',O-es as enacted by the Act, 60 Victoria Chapter 'D,5, is "i !fly amended. by adding at the end thereof the following 14 - It Asian gleritage Society o�,f -New Grunswick Saint lohn CFiapter www.ahsnb.org ahsnbsj @hotmail.com �U City Hall, 15 Market Sq. P.O. Box 1971 Saint John, E2L 4L1 Feb. 28, 2015 Dear Mayor Norton and Councilors, I IAIIPY (ASIAN) NEW YEAR! The Saint John Chapter of the Asian Heritage Society of New Brunswick is well advanced in planning for the 2015 May Asian Heritage celebrations in Saint John. The following dates and venues have been booked. y Opening Ceremony: 2 pm, May 3, 2015 (Sunday), Market Square Atrium Exhihition and Lunch and Learn: May, 2015, Saint John and KV Free Public Libraries Ethnic Cooking Workshops: May 9, 16, 2015, Saint John Stone Church, Thai Pho Asian Heritage Cultural Gala: 7 pm, May 24, 2015 (Sunday) Dennis Knibb Auditorium, SJHS Our Asian Heritage Gala in the past years have showcased the talents, culture and heritage in our city and beyond and have brought together more than 7 different Asian ethnic communities. It is really pleasing to see different ethnic communities networking, working together and competing in a positive way. Through the Asian Heritage Month celebrations, some communities have become more organized while others have just been formally established in recent years. We learn from each other and we share our expertise and resources to celebrate the Asian Heritage Month in Saint John. During May, not only are our events always well attended, they are often heard or seen in the newspaper, radio and TV media. Our celebration received the Cultural Infusion Award from the City of Saint John in 2010, and the Progress Award by the Saint John Community Arts Board in 2014 and is developing into a signature festival in the Greater Saint John. We are grateful to have been receiving financial support, greetings and attendance for our May celebrations from different levels of government, e.g. Senators Vivienne Poy, Tobias C. Enverga, Jr. and Thanh Hai Ngo joined our celebrations in previous years. This year, in honoring the growing Lebanese community in New Brunswick, we have invited Maria Mourani (Member of the Canadian Parliament) along with Wadih Fares, Robert Ghiz and other guests of honor to our events. Lt. Governor of New Brunswick has also been a longtime supporter to our Asian Heritage community and I am very pleased to hear that her Hon. Jocelyne Roy- Vienneau has kindly accepted our invitation for the Cultural Gala on May 24. We would be most honoured to have your presence at our Opening and Cultural Gala in May, 2015, and would be delighted if you are able to attend. We would be very appreciative if you could send us a written greeting to include in our program brochure. We are extremely grateful for your continued support and again look forward to welcoming you to our celebration of a large group of important cultures that help make up the diverse Saint John community. Yours truly, c. 'tea —J- k.' Director Officers Coordinators Prof. Li -Hong Xu Ophelia Maestrado, Choohee Lee, Jay Yong Chang, Liping Zhou Li Song/Stacey Pineau (lxu @unb.ca, Tel. 1506 - 648 -5632) The Asian Heritage Society of New Brunswick, Saint John Chapter consists of representatives from the Bhutanese Nepalese Cult ®l Society, the Chinese Community, the Greater Saint John Korean Association, the Filipino Group, the Saint John Indo-Canadian group, the Saint John Iranian Community; the Japanese Community, the Pakistani Community, the Vietnamese Community, the Multicultural Association of Saint John In partnership with Saint John Multicultural & Newcomers Resource Centre PRUDE Inc., YMCA Newcomer f9nections, Saint John and KV Free Public Libraries 1 � 1 t � �y Br-totg�' et�tie �ttr� »i�ot�z The Asian Heritage Society of New Brunswick - Saint John Chapter which includes representatives from Bhutanese Nepalese Cultural Society Chinese Community in Saint John Filipino Association of NB — SJ Chapter Greater Saint John Korean Association Indo- Canadian Community Iranian Community, Japanese Community Pakistani Community, Vietnamese Community Multicultural Association of Saint John In partnership with Saint John Multicultural & Newcomers Resource Centre PRUDE Inc. YMCA Newcomer Connections Saint John and KV Free Public Libraries ' Citizenships and Immigration Canada Canadian Patrimoine C O N S E i L Heritage r-anadien ar5 de Saint John r` Proudly Present the Asian Culture & Heritage May, 2015 moo? • y�'RtTAG� , Organized by Asian Heritage Society of New Brunswick — Saint John Chapter — ahsnbsj @hotmailxom www.ahsnb.org May is Asian Heritage Month. This acknowledges the long and rich history of Asian Canadians and their contributions to Canada. It also provides an opportunity for Canadians across the country to reflect on and celebrate the contributions of Canadians of Asian heritage to the growth and prosperity of Canada. 2015 Asian Heritage Month Celebrations — Free Admission — Opening Ceremony May 3th, 2015 (2pm) Market Square Atrium Asian Heritage Cultural Gala May 24, 2015 (7pm) Dennis Knibb Auditorium - SJHS (170 -200 Prince William St. Saint John) A� 'Ho Exhibition, Lunch - Learns May, 2015 SJ and KV Free Public Libraries Culinary Workshol Mn 9 - Stone ChuY Vll May 16 - Thai Pho Restaurant 4 CAC I A C R Canadian Association for Conservation of Cultural Property Association canadienne pour la conservation et la restauration des biens culturels Mel Norton, Mayor, City of Saint John Common Clerk, City of Saint John Brian Gallant, Premier, Province of New Brunswick Bill Fraser, Minister, Department of Tourism, Heritage and Culture, Province of New Brunswick Roger Melanson, Minister, Department of Transportation and Infrastructure, Province of New Brunswick 31 March 2015 Dear Sirs: As the national organization dedicated to the physical care of heritage and cultural assets in Canada, the Canadian Association for Conservation of Cultural Property (CAC) fully supports the New Brunswick Museum's (NBM) plans for improved facilities for their Collections and Research Centre. As Canada's oldest continuing public museum and New Brunswick's provincial museum, the NBM will celebrate its 175th anniversary in 2017. The museum's holdings and staff expertise are widely recognized and regarded as important and significant assets both provincially and nationally. The NBM's conservation staff has been recognized by the Canadian Museum Association for Outstanding Achievement in Conservation twice in the past three years. In 2013, the NBM hosted the CAC's 39th annual conference and welcomed delegates to tour the Collections and Research Centre. Delegates were deeply concerned by the inadequate facilities that are endangering both the collections and the staff who work in the facility. The existing collection storage spaces are in dire need of improvement, in terms of access, health and safety, security and efficiency, as well as fire suppression. Additionally, the serious and urgent structural issues that have now been recognized will require the building to be vacated by 2017. It is our understanding that in order for the necessary repairs to the historic building to be completed, that the museum's board has proposed and planned a multi -year phased approach to build an appropriate environmentally controlled facility that will minimize the need to move the collections. Undertaking a significant renovation and expansion project that involves properly moving collection is incredibly complex. The unnecessary movement of collections increases the risk that irreparable damage may occur; a risk that increases while the NBM waits for decisions to be made by the province and the city. ... 2 207 Bank Street, Suite #419, Ottawa, Ontario, K2P 21\12, Canada Tel: 613 - 231 -3977 Fax: 613 - 231 -4406 coordinator(aD_cac- accr.com www.cac- accr.ca in We urge the Province of New Brunswick and the City of Saint John to move quickly in providing all of the necessary resources and approvals to allow the NBM to proceed with the construction of a suitable and secure facility. A renewed Collections and Research Centre will ensure that the long- term preservation and sustainability of the NBM's diverse collections will be available for residents and visitors today and in the future. Sincerely yours, f� r Cindy M. Colford, President Email: president(o-)cac- accr.ca CC: Jane Fullerton, CEO, New Brunswick Museum 207 Bank Street, Suite #419, Ottawa, Ontario, K21P 2N2, Canada Tel: 613 - 231 -3977 Fax: 613 - 231 -4406 coordinator cac- accr.com www.cac - accr.ca REPORT TO COMMON COUNCIL M & C — 2015 -66 April 2, 2015 His Worship Mayor Mel Norton and Members of Common Council Your Worship and Councillors: City of Saint John SUBJECT: License Agreement with Beavertails (food Vendor) in Waterfront Area BACKGROUND: Common Council at its meeting of April 14, 2014 approved the operation of the Beavertails mobile unit on City owned property, near the Little Red Schoolhouse. Saint John Waterfront Development manages and maintains the City owned lands, included as part of the Loyalist Plaza. Saint John Waterfront Development has reviewed the terms and conditions for this season, which are set out in the attached License document that has been prepared by the City's Legal Department. If Council is in agreement, the following recommendation will facilitate Beavertails mobile unit to once again be in operation for the season of 2015 on City owned property. RECOMMENDATIONS That the City enter into a License agreement with Beavertails Commercial Inc. and Parent and Sons Investment Ltd. in the form and upon the terms and conditions set forth in the License Agreement attached to M &C 2015 -66, and further 2. That the Mayor and Common Clerk be authorized to execute the said License Agreement. Respectfully submitted, Curtis Langille, BA Real Estate Officer Gregory J. Yeomans, CPA, CGA, MBA Commissioner Finance and Administrative Services Attachment 20 Brian Irving, BBA Manager Real Estate Patrick Woods, CGA City Manager THIS LICENCE made in duplicate as of the .3i day of c.�i .2015. BY AND BETWEEN: THE CITY OF SAINT JOHN having its City Hall at is Market Square, Saint John, New Brunswick, a amended by Acts of the Legislative Assembly of the Province of New Brunswick, hereinafter called the "Licensor", OF THE FIRST PART - and — BEAVERTAILS COMMERCIAL INC., a body corporate duly incorporated under the laws of Canada, having its head office in the City of Montreal in the Province of Quebec, and PARENT AND SONS INVESTMENTS LTD., a body corporate duly incorporated under the laws of the Province of New Brunswick, having its head office in the City of Saint John in the County of Saint John and Province of New Brunswick, hereinafter Collectively called the 'Licensees', OF THE SECOND PART RECITALS: WHEREAS the Licensor is the owner of the lands bearing PID number 550111384 shown on Schedule A attached hereto and forming part hereof (hereinafter the 'Lands-); AND WHEREAS the Licensees wish to operate a BeaverTaiis mobile unit from the northeast comer of the Lands outlined in red on Schedule 'A' (hereinafter the 'Licensed Area "); AND WHEREAS the Licensor has agreed to give the within Licence under the terms and conditions hereinafter set forth; NOW THEREFORE THIS LICENCE WITNESSETH that for and in consideration of the sum of Two Dollars of lawful money of Canada now paid by the Licensees to the Licensor, the receipt and sufficiency whereof is hereby acknowledged, the Licensor does hereby grant, subject to the terms, conditions, covenants and provisions herein contained, permission and license to the Licensees to enter into and upon and exit from the Lands for the sole purpose of using the Licensed Area to locate and operate a E, 21 Ttm City orsalydJohn and Beavenaiis Con merdal ink. 008verTails mobile unit for the term of this Licence, on the following farms and conditions. IT iS AGREED BY AND BETWEEN THE PARTIES HERETO AS FOLLOWS: 1. This Licence shall be for a period of seven (7) months, beginning on April 15, 2015 at 12:01 a.m. ADT and ending on November 15, 2015 at 11 :50 pm ADT (the "Term "), 2. The Licensees shall pay to the Licensor for the permission and license herein given the sum of Two Thousand Eight Hundred Dollars 02,1300,00) (Canadian dollars) payable in seven (7) equal installments of Four Hundred Dollars ($400.00) each payable on the le day of each and every month from and including April 1 including October 15, 2016. 5, 2015 to and 3. This License may be terminated at any time by the Licensor giving to the Licensees fifteen (15) days written notice to terminate this Licence or by one (1) to both of the Licensees giving lo the Licensor a like notice. 4. Notice to the Licensor shall be to the Common Clerk of the City of Saint John at 15 Market Square, P.O. Box 1971, Saint John, New Brunswick, E21- 41-1, with a copy to Saint John Waterfront Development at One Market Square, Suile 301, Saint John, New Brunswick, E21- 4Z6, Attention: Kent Macintyre. Notice to the Licensee BeaverTails Commercial Inc. shall be by email 10 m nda beavertail . and to the Licensee Parent and Sons Investments Ltd. at 20 Burnside Crescent, Saint John, New Brunswick, E2M 5P4. 5. The Licensees agree and acknowledge that there is a pending Development on the Lands. B. Notwithstanding anything else herein contained, this Licence may be terminated forthwith without notice to the Licensees in the event that either one or both of the Licensees shall, in the opinion of the Licensor, be in default of any of the terms a conditions of this Licence nd 7. No transfer or assignment of this Licence or of any of the rights or privileges herein granted shall be made, or caused or permitted to be made by the Licensees. 8. The Licensees hereby covenant and agree with the Licensor as follows: a) that they shall only use the Licensed Area for the location and operation of the BeaverTans Mobile Unit for the sale of food products, b) that they shall pay for all connection and operational costs associated with electrical power, water and drainage for the BeaverTalls Mobile Unit and for the disconnection of same upon completion of the Term; 22 The City of SafrH Juhh end Cammerclaf Inc. Page 3 of 4 C) that the hours of operation will conform to daily retail h permitting and will not exceed 7:00 a.m. daily; ours, weather d) that only the BeaverTails Mobile Unit is permitted in the Licensed Area (no passenger/cargo vehicles); e) that they shall comply with all applicable Canadian Food Inspection Agency and Other applicable regulations and legislation; f) that they shall not use the Licensed Area for any other purpose than that which is stated at paragraph a) hereof; g) that they shall keep the area around the BeaverTails Mobile Unit dean and tidy at all times and clean up daily in the immediate area surrounding the BeaverTalls Mobile Unit. Clean up shall include the disposal of any /all debris associated with fast food delivery (pop cans bottles, coffee, cups, napkins, plates, utensils and related articles) within a c fool diameter of the BeaverTalls Mobile Unit; h) that they shalt, at no expense to the Licensor, obtain and maintain in full force and effect during the entire term of this Licence, a Commercial General Liability Insurance policy with policy limits of not less than flue million dollars ($5,000,000.00) inclusive per occurrence for bodily injury and property damage; which policy shall name the City as an additional insured and shalt contain a cross - liability clause; i) that they shall, on or before April 15, 2015, submit to the City a Certificate of Insurance or other satisfactory evidence of having obtained and maintained the insurance coverage required at paragraph h) hereof; IT IS FURTHER MUTUALLY AGREED By AND BETWEEN THE PARTIES AS FOLLOWS: 9. No change or modification of this Licence shall be valid unless 11 is in writing and signed by the Licensor and the Licensees. 10. This Licence supersedes and takes the place of all prior agreements entered into by the parties with respect to the Licensed Area. 11. This Licence shall not be enforced or bind any of the parties thereto, until executed by all the parties named in it. 12. Notwithstanding any clauses herein, the Licensees do hereby indemnify and save harmless the Licensor from all damages, cost, claims, demands, actions, suits or other proceedings by whomsoever claimed, made, brought or prosecuted in any manner 1111MI "T 23 The City of Saint John and Beave rlal a CommercW Inc. and whether in respect Of a Page 4 of 4 Property owned by others or in respect of damage sustained by others based upon or arising out of or in connection with the use of the Licensed Area and BeaverTalls Mobile Unit pursuant to the within Licence or anything done or Purported to be done in any manner hereunder, except for damages caused by the City's negligence. THIS LICENCE shall enure to the benefit of and be bindin g upon successors and assigns of the parties hereto respectively. SIGNED, SEALED & DELIVERED ) In the presence of: ) THE CITY OF SAINT JOHN ) ) ) ) � Mayor ) ) } Common Clerk Common Council Resolution: 2015 ) } } BEAVERTAILS COMMERCIAL INC. ) ) } Per } } Pres4dent ) PARENT AND SONS INVESTMENTS LTD. } } Per. } President ) 24 4ji w m m 25 CANADA PROVINCE OF QUEBEC I, Joseph Pino Di Ioia, of the City of Montreal, in the Province of Quebec, MAKE OATH AND SAY: I . That I am the President of Beavc rTails Commercial Inc., a body corporate duly incorporated under the Iaws of Canada, having its head office in the City of Montreal aforesaid, one of the parties named in the foregoing instrument and am duly authorized to make this affidavit 2. That BeaverTails Commercial Inc. does not have a corporate seal, 3. That the signature "Joseph Pino Di Ioia" subscribed to the said instrument is my signature and as President of BeaverTails Commercial Inc. I am duly authorized to execute the said instrument. 4• THAT the said document was executed as aforesaid at the City of Montreal, in the Province of Quebec on the Ll day of,�,, , 2015. SWORN TO before me at the City ) Of Muntreat, in e.Pnovince of ) Quebec, th- day of ) L'1 , 2015. l '01)q let Notary' pwft Province of Quebec ) 26 4 i 4ohPino Di ioia PROVINCE OF NEW BRUNSWICK COUNTY OF SAINT JOHN I, Brian Parent, of the City of Saint John, in the County of Saint John and Province of New Brunswick, MAKE OATH AND SAY: I. That 1 am the President of Parent and Sons Investments Ltd,, a body corporate duly incorporated under the laws of the Provinec of New Brunswick, having its head office in the City of Saint John aforesaid, one of the Parties named in the foregoing instrument and am duly authorized to make this affidavit. 2• That Parent and Sons Investments Lid, does not have a corporate seal. 3. That the signature "Brian Parent" subscribed to the said instrument is my signature and as President l am duly authorized to execute the said instrument. 4• THAI' the said document was executed as aforesaid at the City of Saint John, in the Province of New Brunswick on the day of 20I5. SWORN TO before me at the City ) of Saint John, in the County of ) Saint John and Province of New ) Brunswick, this day of ) 2015. ) ) Brian Parent ) Commissioner of Oaths Being a Solicitor ) E 27 FR O CLAMA TIOJ.N WHEREAS During the week of April 12" to April 18th, 2015, Volunteers across Canada are recognized for their hard work in giving back to the community. Volunteers in our region mentor our children, feed our hungry and fundraise for our charitable organizations; and WHEREAS Rogers TV works with volunteers on a national and provincial level and have over 3 00 volunteers in the province of New Brunswick with over 45 here in the City of Saint John. Volunteers are young students, workers, retirees, men and women of all ages and background; and WHEREAS The goal of Rogers TV is to provide community- based programming with the help and participation of people in the community for the benefit of viewers at home, providing over 2900 hours of programming annually, including coverage of our City Council Proceedings; and WHEREAS Rogers TV in the City of Saint John and Province of New Brunswick is an important facet of our communities, helping to raise over 300 Thousand Dollars through telethons each year to different charitable organizations. NOW THEREFORM I, Mayor Mel Norton, of Saint John do hereby proclaim the week of April 12th to April 18th, 2015 as National Volunteer Week in the City of Saint John and urge my fellow citizens to recognize the crucial part played by volunteers in our community. In witness whereof I have set my hand and affixed the official seal of the Mayor of the City of Saint John. PR0CLAMATI ®N WHEREAS Intergenerational Day Canada, June 1 st, is meant to raise awareness about the power of making simple, respectful intergenerational connections; WHEREAS Intergenerational Day Canada, June 1st is a day to focus on the profound positive influence intergenerational connecting has in creating healthy, all -age friendly communities; WHEREAS Intergenerational Day Canada, June 1 st is a day to celebrate all of the good things presently taking place between generations in local community; WHEREAS Intergenerational Day Canada, June I st does not require funding, excessive time or extensive planning. but rather comes from the people for the people; WHEREAS Intergenerational Day Canada, June I st will be an official reminder, a yearly invitation for every citizen to take one small respectful step to bridge generations within his or her local community. (How much effort and time does it take to smile at someone from a different generation ?); NOW THEREFORE; I, Mayor Met Norton, of Saint John, do hereby proclaim the day of June 1, 2015 as Intergenerational Day Canada. In witness whereof I have set my hared and affixed the official seal of the Mayor of the City of Saint John. 29 BY -LAW NUMBER M -23 A BY -LAW TO AMEND A BY -LAW RESPECTING THE STOPPING UP AND CLOSING OF HIGHWAYS IN THE CITY OF SAINT JOHN Be it enacted by the Common Council of The City of Saint John as follows: 1 A by -law of The City of Saint John entitled, "A By -law Respecting The Stopping Up and Closing of Highways in The City of Saint John ", enacted on the nineteenth day of December, A.D. 2005, is hereby amended by adding thereto Section 239 immediately after Section 238 thereof, as follows: 239 The City of Saint John does hereby stop up and close permanently the following highway: ELLIOTT ROW: All that portion of Elliott Row, a public street in the City of Saint John in the County of Saint John and Province of New Brunswick, comprising 1,702 square metres as shown on a Plan of Survey titled, "Showing portion of Elliott Row, City of Saint John, Saint John County, New Brunswick ", prepared by Hughes Surveys & Consultants Inc. and dated June 23, 2014 attached hereto. IN WITNESS WHEREOF The City of Saint John has caused the Corporate Common Seal of the said City to be affixed to this by -law the * * ** day of * * * * *, A.D. 2015 and signed by: Mayorr'Maire ARRETE No M -23 ARRETE MODIFIANT L'ARRETE SUR L'INTERRUPTION DE LA CIRCULATION ET LA FERMETURE DES ROUTES DANS THE CITY OF SAINT JOHN Lors dune reunion du conseil communal, The City of Saint John a decrete ce qui suit : 1 Par les presentes, 1'arrete de The City of Saint John intitule, «L'arrete sur ]'interruption de la circulation et la fermeture des routes dans The City of Saint John» , decrete le 19 decembre 2005, est modifie par 1'ajout de I'article 239 immediatement apres ]'article 238, comme suit : 239 Par les presentes, The City of Saint John Barre et ferme de fagon permanente la route suivante : RUELLE ELLIOTT: Tout le trongon de la ruelle Elliott, une rue publique daps The City of Saint John, comte de Saint John, Bans la province du Nouveau- Brunswick, d'une superficie de 1 702 m2 comme le montre le plan d'arpentage intitule << Showing portion of Elliott Row, City of Saint John, Saint John County, New Brunswick )> (plan d'arpentage indiquant une partie de la ruelle Elliott, City of Saint John, comte de Saint John, Nouveau - Brunswick), prepare par Hughes Surveys & Consultants Inc. et date du 23 juin 2014, ci joint. EN FOI DE QUOI, The City of Saint John a fait apposer son sceau communal sur le present arrete le * * ** * * * * ** 2015, avec les signatures suivantes : Common Clerk/Greffier communal First Reading - March 30, 2015 Premiere lecture - le 30 mars 2015 Second Reading - March 30, 2015 Deuxieme lecture - le 30 mars 2015 Third Reading - Troisiemc lecture - 30 WWAI gow Upw No + _V.D. WAm.'PmKW Plopoly dt PAK OIL %041 04 SA 'Y 30 04 Poe Ik i� No. 200m Aw A UMAy "n-ru -b-wWW& m K L 0aww .e NAM CM W" Vak— r . Ka d MR, 21kiew dw " 1 4 4D s0mitTA owtsmft Cr i 29&w& ow mm w dw Kwjomow-BmmwmM � ZOW �t b- 4. MA&M okom*- mw" cm VOW" m Ih rAO—. t. mfwrt. Io M*a *A6. Arm ct &JWMd ftm qpmk@� koVffggW I 3) Unk p =01=4 "4:6;w d" Sint d--.* -W pi- ,.ft a Aftr i. M.Gmy ow— fa c. 4r d- bm- e FbW 9, WID Mcm koUbm 4. 9 2DI0 ww womm-- I an tw. FI. 10* = P= —Wdw.w.—" Mom � 0- to* M Iwo W- "M 2 Lm 01Sm 7 JU M744 "A Mmftho, No 31M 2 ON 2Q9.3W 7 30 *MA34 WL Vwilm M aw 2 M* 41, .795 7 364 iWAR KL UwQ%m% m ism a su 071.110 7 30 TWIN KAL Nook& In 29110 2 m MINI 7 am imm kAL Kw M. He 20M 2 M5 SM754 7 384 941345 NAL No -- -- —1 --- --- — Plan Of Survey/Plan dArpentage I shoot% PWIM of me ftw Mw* m ww pwU do Pmq tMoU My of Soft Jdm Wo do kM JdM S" JGM Om* . MW Wwodok CWM do SM Jda , NwAvw- bwm*k Vf Our 23 2014 2J .1111 Pkw laid John M U*M i 3a w.Yw Si 'JOQaaN 2e96 D.& W4 ILL wie -FE: ............. .tw L'-/ 00-".t. FWMI~ I - . . ............... MILKY w Z- � z— 6- ?W-4mv. d. ft; —4. ........... r-- ft.*-A ftlxt^tnrk —t,.I. -W P—&"- A%,A.U- %041 04 SA 'Y 30 04 Poe Ik i� No. 200m Aw A UMAy "n-ru -b-wWW& m K L 0aww .e NAM CM W" Vak— r . Ka d MR, 21kiew dw " 1 4 4D s0mitTA owtsmft Cr i 29&w& ow mm w dw Kwjomow-BmmwmM � ZOW �t b- 4. MA&M okom*- mw" cm VOW" m Ih rAO—. t. mfwrt. Io M*a *A6. Arm ct &JWMd ftm qpmk@� koVffggW I 3) Unk p =01=4 "4:6;w d" Sint d--.* -W pi- ,.ft a Aftr i. M.Gmy ow— fa c. 4r d- bm- e FbW 9, WID Mcm koUbm 4. 9 2DI0 ww womm-- I an tw. FI. 10* = P= —Wdw.w.—" Mom � 0- to* M Iwo W- "M 2 Lm 01Sm 7 JU M744 "A Mmftho, No 31M 2 ON 2Q9.3W 7 30 *MA34 WL Vwilm M aw 2 M* 41, .795 7 364 iWAR KL UwQ%m% m ism a su 071.110 7 30 TWIN KAL Nook& In 29110 2 m MINI 7 am imm kAL Kw M. He 20M 2 M5 SM754 7 384 941345 NAL No -- -- —1 --- --- — Plan Of Survey/Plan dArpentage I shoot% PWIM of me ftw Mw* m ww pwU do Pmq tMoU My of Soft Jdm Wo do kM JdM S" JGM Om* . MW Wwodok CWM do SM Jda , NwAvw- bwm*k Vf Our 23 2014 2J .1111 Pkw laid John M U*M i 3a w.Yw Si 'JOQaaN 2e96 D.& W4 BY -LAW NUMBER C.P. 111 -7 A LAW TO AMEND THE ZONING BY -LAW OF THE CITY OF SAINT JOHN ARR.ETE No C.P. 111 -7 ARRETE MODIFIANT L'ARRETE DE ZONAGE DE THE CITY OF SAINT JOHN Be it enacted by The City of Saint Lors d'une reunion du conseil John in Common Council convened, as communal, The City of Saint John a follows: decrete ce qui suit : The Zoning By -law of The City of Saint John enacted on the fifteenth day of December, A.D. 2014, is amended by: 1 Amending Schedule A, the Zoning Map of The City of Saint John, by re- zoning a parcel of land having an area of approximately 6400 square metres, located at 10 -40 Elliott Row, 28 -36 Carmarthen Street, and 25 Wentworth Street, also identified as PID numbers 00016626, 00016642, 00017046, 00017053, 00017061, 00017079, 00017087, 00017095, 00017103, 00017111, 00017129, 55106827, 55106835, 55106843 and a portion of Elliott Row, from Urban Centre Residential (RC) and unzoned street to Uptown Commercial (CU) pursuant to a resolution adopted by Common Council under Section 39 of the Community Planning Act. - all as shown on the plan attached hereto and forming part of this by -law. IN WITNESS WHEREOF The City of Saint John has caused the Corporate Common Seal of the said City to be affixed to this by -law the * day of *, A.D. 2015 and signed by: MayorlMaire Uarret6 de nonage de The City of Saint John, decrdt6 le quinze (15) decembre 2014, est modifre par: 1 La modification de l'annexe A, Carte de zonage de The City of Saint John, permettant de ;modifier la designation pour une parceile de terrain d'unc superficie d'environ 6 400 metres carres, situ6e au 10- 40, rang Elliott, 28 -36 rue Carmarthen, et 25, rue Wentworth, et portant les NID 00016626, 00016642, 00017046, 00017053, 00017061, 00017079, 00017087, 00017095, 00017103, 00017111, 00017129, 55106827, 55106835, 55106843 et 6tant aussi une partie du rang Elliott, de zone residentielle du centre -ville (RC) et rue non zon6e a zone Commerciale du centre - ville (CU) conform6ment a une resolution adoptee par le Conseil municipal en vertu de Particle 39 de la Loi sur l'urbanisme. - toutes les modifications sont indiqu6es sur le plan ci joint et font partie du present arrete. EN FOI DE QUOI, The City of Saint John a fait apposer son sceau communal sur le present arret6 le 2015, avec les signatures suivantes Common Clerk/Greffier communal First Reading - March 30, 2015 Premiere lecture Second Reading - March 30, 2015 Deuxieme lecture Third Reading - Troisieme lecture 32 - le 30 mars 2015 - le 30 mars 2015 Section 39 Conditions - 10 -40 Elliott Row, 28 -36 Carmarthen Street and 25 Wentworth Street That, pursuant to Section 39 of the Community Planning Act, the development and use of the parcel of land with an area of approximately 6400 square metres, located at 10 -40 Elliott Row, 28 -36 Carmarthen Street, and 25 Wentworth Street, also identified as PID Numbers 00016626, 00016642, 00017046,00017053,00017061, 00017079, 00017087,00017095, 00017103, 00017111, 00017129, 55106827, 55106835, 55106843 and a portion of Elliott Row for a parking area serving the adjacent office tower at 300 Union Street, be subject to the following conditions: a. The site shall not be developed except in accordance with a detailed site plan, prepared by the developer and subject to the approval of the Development Officer, indicating the location of all parking spaces, accesses, exterior lighting, street furniture, and all landscaped areas; b. The site shall include the provision of a pedestrian walkway linking Carmarthen Street to Wentworth Street as a component of the development to preserve public access through the site, which shall be maintained by the applicant; c. The approved plans mentioned in condition (a) above must be attached to the application for building permit for the development; and, d. All work shown on the site plan must be completed by the proponent within one year of the building permit being issued. 33 GROWTH & COMMUNITY DEVELOPMENT SERVICES SERVICE DE LA CROISSANCE ET DU DEVELOPPEMENT COMMUNAUTAIRE REZONING / REZONAGE Amending Schedule A of the Zoning By -Law of The City of Saint John Modifiant Annexe A de I'Arr6t6 de zonage de The City of Saint John FROM 1 DE TO 1 A Urban Centre Residential Zone r6sidentielle de centre urbain CU Uptown Commercial Zone commerciale du centre -ville Pursuant to a Resolution under Section 39 of the Community Planning Act Conform6ment a une resolution adopt6e par le conseil municipal en vertu de I'article 39 de la Loi sur I'urbanisme Applicant: Hughes Surveys & Consultants Inc. (On behalf of J. D. Irving, Limited) Location: 10 -40 rang Elliot Row, 28 -36 rue Carmarthen Street, and /et 25 rue Wentworth Street 00016626, 00016642, 00017046, 00017053, 00017061, 00017079, 00017087, PID(s) /NIP(s): 00017095, 00017103, 00017111, 00017129, 55106827, 55106835, 55106843 and a portion of /et une portion du rang Elliot Row (to be stopped up and closedha titre barrio ou ferme) Considered by P.A.C. /considers par le C.C.U.: March 17 mars,2015 Enacted by Council /Approuv6 par le Conseil: Filed in Registry Office /Enregistr6 le: By -Law # /Arrete # Drawn By /Cr66e Par: Maxime Lapierre Date Drawn /Carte Cr66e: April 7 avril, 2015 April 7, 2015 Deputy Mayor Shelley Rinehart and Members of Common Council RE: Spring Road Renewal Work MOTION: Common Council request an update from staff on plans for Spring road renewal work. Yours very truly, Mel K. Norton Mayor City of Saint John 60-1. SAINT JOHN P.O. Box 1971 Saint John, NB Canada E2L 4L1 I vwvw,saintjohn.ca I C.P. 1971 Saint John, N. -B. Canada E2L 4L1 —ter 35 April 7, 2015 Deputy Mayor Shelley Rinehart and Members of Common Council RE: Pole Garbage Baskets Many of the pole garbage baskets are broken and overflowing and for winter 2015 -2016 would ask staff to provide recommendation on addressing this situation. MOTION: Common Council request that staff provide a solution and advice on maintenance of pole garbage baskets during winter months. Yours very truly, Mel K. Norton Mayor City of Saint John 60-1. SAINT JOHN —ter P.O. Box 1971 Saint John, NB Canada E2L 4L1 I vwvw,saintjohn.ca I C.P. 1971 Saint John, N. -B. Canada E2L 4L1 36 April 7, 2015 His Worship Mel Norton and Members of Common Council Your Worship and Councillors: Subject: Waterloo Street Background I have received inquiries from the public about whether the City intends to open up the bottom portion of Waterloo Street where the former hotel was located. Motion: Direct the City Manager to provide an update on the opening up of the bottom portion of Waterloo Street. Respectfully Submitted, (Received via email) Dr. Shelley Rinehart Deputy Mayor City of Saint John l� - VU SAINT JOHN P.O. Box 1971 Saint John, NB Canada E2L 41-1 1 www.saintjohn.ca I C.P. 1971 Saint John, N. -B. Canada E21- 41-1 37 i 2 , � REPORT TO COMMON COUNCIL M&C- 2015 -68 April 8, 2014 His Worship Mayor Mel Norton and Members of Common Council Your Worship and Councillors: City of Saint John SUBJECT: Update on fire department's readiness to respond to an oil train derailment BACKGROUND: Subsequent to the most recent train derailments in Northern Ontario and further to the October 7 1 2014 Council Report entitled "Railway Safety in Saint John" Common Council at its meeting of March 11th moved the following resolution. "Resolved that Chief Clifford be requested to give an update to Council on his department's readiness to respond to an oil train derailment" The October 7th Rail Safety Report (attached) provided a response to numerous rail safety concerns as raised by the Saint John community. The report highlighted numerous improvement initiatives undertaken by the rail industry nationally and recognized the enhanced approach that has been adopted by NB Southern Railway locally (prior to the Lac Megantic tragedy). The October 7th report provided a synopsis on the City's EMO preparations including; the role of police in evacuation; the role of leisure /social services on reception centres, and the local industrial communities support on firefighting resources. The report also referenced the need for a regional perspective on large scale industrial emergency events. The October 7th report also referenced the need for action priorities that were identified by the Federation of Canadian Municipalities and subsequently endorsed by Federal Transportation Minister Lisa Raitt, specifically. - equipping and supporting municipal first responders to rail emergencies; - ensuring federal and industry policies and regulations address the rail safety concerns of municipalities; - and, preventing downloading of rail safety and emergency response costs to local taxpayers The October 7th report offered that the city is prepared to respond to a major rail incident; however, the report did emphasize the need for a regional perspective on 0. M &C --2014 -009 -2_ April 7, 2014 responding to major industrial incidents. The report put particular emphasis on the training gap as it relates to specialized training to ensure that emergency responders have the appropriate skills to fight a large scale flammable fuel fire. This training gap is one of the focuses of Federal Transportation Minister Raitt's Emergency Response Task Force which is made up of a collaboration of government, industry and first responders including the Fire Chief and EMO Director for the City of Saint John. ANALYSIS Further to the Common Council question on the Saint John Fire Department's ability to respond to an oil train derailment, it is important to note that an oil train derailment may indeed be a minor or major event. Minor derailments are managed primarily through a rail industry response with municipal first responders being informed. Major oil train derailments could be of two different dimensions; 1) a derailment with an oil spill with no fire /explosion; 2) a derailment with an oil spill and either explosion and /or fire. Train derailments and spill without explosion or fire are for the most part mitigated through the resources of the rail / shipper company and assigned cleanup crews in concert with local officials and department of the environment. First responders may or may not have some role in this type of incident depending on local protocol and the response relationship that is in place. Familiarization training is required and can be attained through an exercise schedule. NB Southern Railway and Saint John Fire / EMO are committed to a consistent and sustainable exercise protocol that will ensure that roles and responsibilities on these incidents are as effective as possible. Train derailments with an oil spill and either an explosion or fire have seen great improvements in emergency response as a result of Minister Raitt's implementation of the Emergency Response Assistance Program (ERAP) for flammable fuel by rail. "After the derailment in Lac Megantic, Transport Canada issued Protective Direction PD 33 and subsequently amended the Transportation of Dangerous Goods Regulations to require an ERAP for certain Class 3, flammable liquids in packing groups I, 11, and III including crude oil and ethanol ". (ERAP's were initially created in response to the 1980 Mississauga incident. The regulation did not previously apply to Class 3 - flammable liquids). ERAP regulations require that emergency response assistance teams are in place to support local responders to rail incidents involving hazardous materials (after Mississauga) and flammable liquids (after Lac Megantic) and as such there are predetermined teams set to respond in the instance of a train derailment. It is critical that local emergency responders understand the roles and responsibilities of the ERAP response personnel. ERAP personnel are not responsible for extinguishing fire, operating as the authority having jurisdiction, or taking the lead in an Incident Command System process. (The role of fire suppression and 39 M &C -2014 -009 -3- April 7, 2014 incident command belong to the authority having jurisdiction — which is the local municipality). A successful response to a flammable fuel event on rail depends on the coordination of the local responders and the ERAP team. Local responders are a critical and essential component to ensuring successful outcomes to oil train derailments. First, local responders must be aware of the existence of an ERAP response and how it is activated. Secondly, local responders must provide effective fire suppression activities for spills that have ignited. Local responder competence in responding large scale flammable events is totally dependent on being properly trained. Case studies that followed the catastrophic events of Mississauga (1980) and Lac Megantic (2013) have highlighted the following: - Firefighters are not adequately trained to handle large scale incidents involving flammable liquid spills or fire; - First responders are not aware of the resources available to them such as ERAP' S and Remedial Measures Specialists; - First responders do not have the knowledge and experience required to effectively utilize some of the specialized equipment that can be made available to them during flammable liquid incidents; and - Small and remote communities have a very limited resources capacity (funding for access to specialty training programs and facilities, equipment, etc.) to adequately respond to flammable liquid spills and fires resulting from derailments. Consistent with the points as noted from the above case studies the City of Saint John is challenged to meet the demands of acquiring and sustaining the skills that are required to effectively and intuitively respond to large scale flammable fuel fires. The core issue on skill acquisition and maintenance is appropriate training. The City of Saint John does not stand alone in its training needs and indeed Minister Raitt's Emergency Response Task Force has identified the "Lack of comprehensive and specialize first responder training standards in Canada to adequately respond to rail incidents involving the release of large volumes of flammable liquids" as the main issue arising from the First Responder Subgroup 5. The ERTF's - Subgroup 5's objective as presented in its January 30`x' issue paper "is to provide the Emergency Response Task (ERTF) with recommendations for submission to Transport Canada to address gaps related to first responder specialized training requirements to adequately respond to rail incidents involving the release of large volumes of flammable liquids." Conclusion all M &C -2014- 009 _4_ April 7, 2014 On the question of current response capability, Saint John Fire/EMO together with local industry's help is capable of responding to a large scale emergency involving flammable fuels; albeit there is a significant concern in the fact that emergency responders are not currently provided the type of training that will ensure that they are as effective and safe as they need to be in responding to large scale flammable fuel emergency events. Consistent with the objectives of the Federal Ministers Emergency Response Task Subgroup 5 recommendations; the City of Saint John has numerous existing and proposed facilities as well as transportation networks that have a need for appropriate first responder skills for responding to large scale flammable fuel events. To the above point, the Fire Chief is active with, and supports the collective efforts of; the Federal Minister's Emergency Response Task Force, the Federation of Canadian Municipalities, and the Canadian Association of Fire Chiefs in working to developed a national standard for first responders who respond to emergency incidents involving crude oil rail incidents and furthermore the Fire Chief supports the group's efforts to establish a regional approach to developing and sustaining the skills that are required for responding to emergency incidents involving flammable fuels in transport.. RECOMMENDATIONS Common Council continues to endorse Fire Chief Kevin Clifford's participation as a member of the Canadian Association of Fire Chiefs Transportation of Dangerous Materials committee including the various subcommittees of which he is assigned. Furthermore, Common Council endorses the Fire Chief's efforts in advocating for a national training standard on responding to flammable fuel incidents in transport, with a regional approach to training, as advocated by the Federation of Canadian Municipalities, Transport Canada and the Canadian Association of Fire Chiefs. It is recommended that the attached report be received and filed Respectfully submitted, rytZanagger Kevin Clifford BBA CFO oods Fire Chief / Director SJEMO C City of Saint John a M &C- 2014 -174 October 7, 2014 His Worship Mayor Mel Norton and Members of Common Council Your Worship and Councillors: SUBJECT: Railway Safety in Saint John BACKGROUND: eh city of Saint John The tragedy of Lac- Megantic resonates with many Saint John citizens in that the crude cargo was destined for our community. To this end, our community has posed numerous questions on issues with respect to the movement, storage and processing of dangerous goods in our city. Our community's questions around rail safety are indeed substantiated by the Transportation Safety Board of Canada who provides that "The release of dangerous goods transported by rail can jeopardize the health, safety and welfare of railway employees and of residents living near railway tracks. The risks are even greater in the case of tracks running through urban areas.'" Citizens Raise Concerns The Saint John community has raised the following rail safety concerns with Common Council as well as their Emergency Management and Fire Services. • How prepared is the City of Saint John for a major incident involving fire and explosions? • Does the City have sufficient firefighter equipment • Has a plan been developed for regular emergency response exercises? • Does the city have a detailed evacuation plan including evacuation centres? • What degree of risk are the citizens of Saint John living with on a daily basis? • Should an independent analysis of the safety of the movement and storage of oil tanker cars be conducted? • Do the short haul railway companies have sufficient liability coverage? • What are the report definitions and requirements, reporting channels, and authorities under the Shortline Railways Act? • Are shortline railway reports available to the public? 'Transportation Safety Board of Canada "Railway Investigation Report R13DO054 page 114" M &C- 2014 -009 -2- April 7, 2014 ANALYSIS The tragedy in Lac Megantic and subsequent analysis has determined that a number of steps are necessary to enable and improve a community's response and recovery from rail incidents. Indeed shortly after (Sept 30;13) the Lac Megantic tragedy the Federation of Canadian Municipalities (FCM) announced that Transportation Minster Raitt had agreed on the need for action in the three priority areas identified by FCM's National Municipal Rail Safety Working Group: - equipping and supporting municipal first responders to rail emergencies; ensuring federal and industry policies and regulations address the rail safety concerns of municipalities; and, preventing downloading of rail safety and emergency response costs to local taxpayers Saint John Fire and EMO services agree with the priority areas as listed by the FCM and looks forward to Transport Canada's response on how they will mitigate the issues as raised by FCM's National Municipal Rail Safety Working Group. Notwithstanding the above, the city's emergency service is prepared to respond to any event that could occur, and indeed its Incident Command System (ICS) competence in Plaster Rock NB has been recognized at a National level. However, like many Canadian Fire Services the local response service struggles to sustain the technical and specialize training that is required to appropriately respond to flammable fuel fires of a significant size. To this end, the Saint John Fire Department is actively pursuing a means to address this response training gap, and finds great promise and opportunity in the words of the Canadian Association of Fire Chief s Executive Director John Paul Cody -Cox who provided the following comments in his "Taking Care of Business" report in the September 2014 addition of Firefighting in Canada: "The transportation of dangerous goods has also been front and centre. Our focus has been on railways, as much is happening an the regulatory front. We have been in constant discussion with government, industry and like - minded partners. In 2015, we expect to make major progress in ensuring first responder training for dangerous goods is well- resourced and delivered to as many fire departments as possible in a consistent and sustainable manner "3 2 FCM — Statement by FCM President following today's rail safety meeting with Transport Canada: http: / /www.fcm.ca/home!media` news - releases ,'2013!statement- by -fem- president 3 John -Paul Cody -Cox "Taking Care of Business " Firefighting in Canada" Pg. 43 Sept 2014 60 M&C- 2014 -009 -3- April 7, 2014 Further to the CAFC director's comments with respect to constant discussion with government, industry, and like- minded partners; the Saint John Fire and EMO service has been a participant of the Federation of Canadian Municipalities Rail Safety Working Group throughout 2014. (The rail safety working group is making recommendation to Transport Canada with respect to improvements to rail safety across the Country.) Furthermore, the Saint John Fire and EMO service has also been asked to participate within the following rail safety related groups: The Canadian Association of Fire Chiefs (CAFC) Transportation of Dangerous Goods Committee - including participating as a Transport Canada rail safety discussion panel member. Representing the Canadian Association of Fire Chiefs (CAFC) on the Liquefied Petroleum Gas Emergency Response Committee (LPGERQ technical committee; that is developing the Emergency Response Assistance Plan (ERAP) requirements forflammable liquids. Representing the Canadian Association of Fire Chiefs on the recently created Transport Canada ERAP task force; whose role is to analyze the need for greater investmcnt and resources for first- responder training. The task force has a one - year mandate to evaluate and provide recommendations to the minister of transport. Saint John Fire and EMO services continue to do extensive planning and preparation with respect to the appropriate response to emergency events on our railways. Our analysis of rail and dangerous goods safety needs in our community in the context of the numerous questions directed at staff and Council provides the following. • The City of Saint John is prepared for a major incident involving fire and explosion however; the city needs to have access to a better process for sustaining its flammable fuel fire capability. The City has a good inventory of equipment and can rely on the industrial community for an adequate supply of foam in the event of a major flammable fuel fire. The emergency response to a major flammable fuel event would be much better served by a regional response, utilizing the equipment and personnel assets available across all the fire services in the greater Saint John Community. • Emergency response exercises are conducted on a random basis across the community's industrial infrastructure. A more methodical exercise process and schedule is required to ensure the risk profile of the community receives the attention to ensure competency in response. A 64 M &C- 2014 -009 4- April 7, 2014 regional exercise process would better serve the greater Saint John Community. NB Southern Railway and the City will be conducting a rail way exercise in the fall of 2014 • City police are responsible for the evacuation plan through the Saint John Emergency Management Organization. Reception centres for citizen evacuations have all been identified and are facilitated through Leisure / Social Services as part of the EMO response. • A risk assessment on the Saint John community would highlight the density of heritage and older housing stock, the large geographical area, and the industrial footprint which includes: a port; paper mills; oil refinery; power generating station; LNG facility; fuel loading and off loading facilities, and a major gas pipeline passing through the heart of the city. The degree of risk is higher than most cities across the nation however the risk is mitigated to some extent by this City's investment in public safety. • The City of Saint John public safety services are independent of industry and are in place to serve the best safety interest of the community. Fire and EMO services are in the best position to assess emergency planning, preparedness and response capability of the municipality. Never -the -less numerous third party emergency response assessments have been previously conducted. The technical review committee to the 2004 LNG EIA application recommended an assessment of the local fire services ability to respond. + The Federal Minister of Transport has established new insurance obligations on all railways. NB Southern Railway Company exceeds the minimum requirement as set forth by the regulators. • Short line notification requirements are attached to this report as Appendix A. New Brunswick Southern Railway has agreed to provide the Saint John Fire Department notification in all events when rail cars leave the track, or when a rail car is involved in an event that damages the shell of the rail car Conclusion Catastrophic events such as Lac- Megantic are the rarest of events and as such the emergency planning, preparation, and response needs may not be a priority and can sometimes be based (mistakenly) on the low probability of an actual event occurring. The Lac- Megantic event has been a harsh reminder that more needs to be done to support the emergency response infrastructure that is required to support responsible movement of dangerous goods by rail and roads. Recent M- M&C- 2014 -009 -5- April 7, 2014 changes to regulations and the adoption of a series of Protective Directives are strong indication that the losses of Lac-Megantic will at the very least be remembered through a safer and more prepared community. As we look ahead and in the spirit of zone SJ, the Saint John community needs to be diligent on fizrther industrial growth to existing and potential projects. It is imperative that emergency planning, preparedness and response capability is aligned to the risk in the community. The City of Saint John needs to be mindful of the 2004 recommendation of the Independent EIA Panel on Canaport LNG which stated: "Additional information should be developed and provided to the Department of Environment and Local Government relative to the probable need for outside firefighting support in both a controllable and uncontrollable event, the current ability of the local fire departments to provide the capability, and what entity would be responsible for meeting the required cost (e.g. the facility proponent, the local tax base) of providing additional equipment and training to the local fire fighting department. 114 Finally, and on the issue of cumulative effects on emergency response to hazardous materials incidents involving rail, road, or fixed facilities the former Minister of Environment and Local Government provided that "Opportunities to contribute to a regional approach to management of cumulative effects should be emphasized ".5 On this final point, the City needs to advocate for a regional perspective to the emergency planning, preparation and response needs to existing and developing economic growth to this community's industrial landscape. Environment and Local Government Summary of Public Participation, (2004, July) Environmental Impact Assessment, Proposal by Irving Oil Limited To Construct a Liquefied Natural Gas (LNG) Marine Terminal and Multi- Purpose Pier. s Environment and Local Government. Final Guidelines for an Environmental Impact Assessment Liquefied Natural Gas Receiving, Storage and Processing Facility (2002, March). Available online at: htt : / /www2. b.ca/content/dam/ b/D artments /env/ df/EIA- EIE/IrvingOilLiquefiedNaturalGasFinalGuidelines.pdf ?; M &C- 2014 -274 -6- October 7, 2014 RECOMMENDATIONS Common Council continues to endorse Fire Chief Kevin Clifford's participation as a member of the Canadian Association of Fire Chiefs Transportation of Dangerous Materials committee including the various subcommittees of which he is assigned and that the attached report is received and filed. Respectfully submitted, Kevin Clifford BBA CFO Fire Chief 1 Director SJEMO City of Saint John 64 \ - 0, .0, kPftrick Woods Manager - Document No: Version : 4.0 sVersion date: 03 /20 / 2013 Ra Jffixay Month /Day/Year WORK INSTRUCTION ACTIVITY: Reporting Requirements for Short Line Railway FREQUENCY: As required STEPS: Situations which require notification by telephone within 30 minutes of incident. • A fatality or injury involving an ambulance/ hospitalization occurs involving Railway equipment and /or property. • The rolling stock is involved in a collision or derailment and is carrying passengers. • The rolling stock is involved in a collision or derailment and is carrying dangerous goods, or is known to have last contained dangerous goods- the residue which has not been cleaned or purged from the rolling stock. • More than one piece of rolling stock (not used in dangerous goods service) sustains damage, on other than a yard track, which affects their safe operation. • The rolling stock causes or sustains a fire or explosion. • Runaway rolling stock. • Release of dangerous goods from rolling stock that was not quickly secured. • A trespasser sustains injury. • A crossing collision. Notification to the following agencies must occur within 30 minutes of the incident. DTI - Robb Francis 2. Transport Canada 3. (546) 453 -5646 (w) (506) 851 -7042 (f) (506) 474 -0410 (h) The Department of (506) 444 -7505 (c) Transportation & Infrastructure Note: Leave a message at each of will notify Transport Canada by these phone numbers unless you reach phone if required. me directly. Environment Canada 1 -800- 565 -1633 (Oil, Pesticides and Chemical Spills) TSB (819) 997 -7887 (p) (819) 953 -7876 (f) Note: Any incidents that involve dangerous goods (loaded or residue) require notifying CANUTEC 1- 613- 996 -6666 Page 1 66 Document No: Version : 4.0 Version date : 03 /20 / 2013 Month /Day/year WORK INSTRUCTION I STEPS: Situations which require notification by fax as soon as possible • Unprotected main track switch in abnormal position with no equipment in the immediate area. An employee sustains an injury which would normally be reported to WorkSafe NB. • An employee sustains a serious injury as a result of coming into contact with any part of the rolling stock or its contents. A risk of collision. • Movement of stock exceeds the limits of authority with no other equipment in the area. • Release of dangerous goods from rolling stock that was quickly secured. • A railway signal displays a less restrictive indication than that required for the intended movement of rolling stock with no other equipment in the area. • Unprotected overlap of operating authorities with no other equipment in the area. • Physical incapacitation of a crew member. • One piece of rolling stock (not used in dangerous goods service) sustains damage on a yard track that affects its safe operation. I. DTI - Robb Francis (506) 453 -3701 (f) 2. Transport Canada (506) 851 -7042 (f) 3. TSB (819) 953 -7876 (f) Note: Any incidents that involve Fire /Police or Ambulance to enter through ISL gatehouse contact Industrial Security: 635 -5609 Note: Any situation that involves our train occupying a crossing due to unexpected failures — notify (Public Safety Communication Line): 648 -3333 s r Page 2 REPORT TO COMMON COUNCIL M &C2015 -62 April 7, 2015 . His Worship Mayor Mel Norton and Members of Common Council Your Worship and Members of Council: SUBJECT: 2015 Spring Street Sweeping Services BACKGROUND The City of saint John In October 2014, a Street Sweeping Operational and Financial Analysis was completed to determine the most feasible and sustainable option to complete the annual Spring Street Sweeping Program in 2015. The City's five loader sweepers had come to the end of their useful life and required replacement at an estimated $250,000. This type of sweeper is not ideal from a functional or practical standpoint considering the large amount of resources that are required to operate them. The Analysis determined that contracting this Street Sweeping Program was the most feasible and sustainable option at this time. Funding was approved by Common Council within the 2015 General Fund Operating Budget. The Spring Street Sweeping Program will occur between April 27, 2015 and June 26, 2015. There is adequate supervision of the Program in place to ensure quality results. INPUT FROM OTHER SOURCES — MATERIALS MANAGEMENT: Materials Management facilitated the RFP process to solicit proposals for the provision of the Spring Street Sweeping Services. As such a Request for Proposal (RFP) closed on Thursday, April 2, 2015 with three responses as follows: Classic Construction Saint John, NB John Sweeping Ottawa, ON AVL Construction Group Drummond, NB 50 2015 Spring Street Sweeping Services April 7, 2015 Report to Common Council, M & C 2015 - 62 Page 2 A review committee, consisting of staff from Materials Management and Transportation and Environment Services reviewed the submissions for completeness and compliance with the RFP requirements and selection criteria consisting of the following: 1. Quality and Completeness 2. Proponent's Experience 3. Vendor's Equipment 4. Cost The proposal submitted by AVL Construction Group was ranked highest by the review committee as it met all the requirements set forth in the RFP and represents the best value to the City. Additionally, it is the lowest -cost solution to the City. The above process is in accordance with the City's Procurement Policy and Materials Management support the recommendation being put forth. FINANCIAL IMPLICATIONS If awarded as recommended, the cost to provide the Spring Street Sweeping Services as required will be $148,990.00 plus HST. This is a planned expenditure for which funds are allocated in the 2015 General Fund Operating Budget. RECOMMENDATION It is recommended that Common Council award the proposal for the provision of Spring Street Sweeping Services to AVL Construction Group at a price of $148,990.00 plus HST. Respectfully submitted, Kevin Rice B. Se., CET Deputy Commissioner Transportation and Environment Services Wm. Edwards, P. Eng. Commissioner Transportation and Environment Services J. Patrick Woods, CGA City Manager 51 REPORT TO COMMON COUNCIL M & C — 2015- 67 7 April, 2015 His Worship Mel Norton And Members of Common Council Your Worship and Councillors: SUBJECT: Tender for Asphaltic Concrete Mixes BACKGROUND: The City of Saint john Each year the City of Saint John calls a tender for the establishment of a supply agreement for the provision of asphaltic concrete mixes to establish a guaranteed source of supply. This product is employed by Transportation and Environment Services for a variety of tasks, including asphalt restoration of water cuts, roadway and sidewalk repairs and miscellaneous maintenance projects. In 2006, many government agencies adopted an adjustable price formula based on the Ministry of Transportation of Ontario Performance Graded Asphalt Cement Price Index. Given this and the external pressure being brought to bear by the asphalt industry, staff of the City of Saint John also adopted this approach for contract pricing in 2009 and have continued to use this approach thereafter. The following is a brief overview of the price index formula created by the Ontario Ministry of Transportation and subsequently included in the tender call documents. MTO Performance Graded Asphalt Cement Price Index: A payment adjustment for the change in price between the time the tender opening for the contract and the time of order of the asphalt concrete will apply to the quantity of asphalt cement/binder and will be calculated as follows if the price index between the two (2) months differs by more than 5 %. 52 Tender for Asphaltic Concrete Mixes Report to Common Council, M &C 2015 -67 April 7, 2015 Page 2 PA = Payment adjustment for asphalt cement / binder in dollars T = PG asphalt cement/binder price index for the month of tender opening P = PG asphalt cement/binder price index for the month of paving Q = Quantity of asphalt cement/binder in tonnes When P > 1.05 T, the Contractor receives additional payment as follows: PA = (P — 1.05T) x Q When P < 0.95 T, the Owner receives a credit as follows: PA = (0.95T P) x Q ANALYSIS: There are traditionally three seasons for asphalt: the normal construction season when production is high and product is readily available and the pre and post construction seasons when production is low and higher costs are incurred to produce the product. Bidders are asked to quote a price for the pre - season, another price for the construction season and a third price for the post - season. INPUT FROM OTHER SOURCES — MATERIALS MANAGEMENT: A public tender call was issued on Thursday, March 19, 2015 and closed on Wednesday, April 1, 2015. Two companies responded to the tender call by submitting bids. The results are as follows (excluding HST): ** Indicates Recommendations Note: Exclusive of HST 53 DEBLY ENTERPRISES LTD. NRB CONSTRUCTION CO. LTD. Pre - Season Construction Post- Season Pre - Season Construction Post - Season Season Season Opening Date April 20 Nov 7 May 4 Closing Date May 3 Dec. 11 Dec. 11 1 SUPERPAVE ** $89.50 $69.50 ** $7950 $61.00 ** $61.00 $78.00 19.5mm/tonne 2 SUPERPAVE ** $90.00 $70.00 ** $80.00 $68.00 ** $68.00 $83.00 9.5 mmltoune 3 SUPERPAVE ** $90.00 $75.00 ** $85.00 $70.00 ** $70.00 $88.00 4.75mm /tonne ** Indicates Recommendations Note: Exclusive of HST 53 Tender for Asphaltic Concrete Mixes April 7, 2015 Report to Common. Council, M &C 2015 -67 Page 3 Staff of Materials Management have reviewed the tenders and have found them to be complete and formal in every regard. Staff recommends award to the lowest bidders for the construction season and the post- construction season. The pre - construction season will be awarded to Debly as the NRB's plant is not scheduled to open before the start of construction season. The above process is in accordance with the City's Procurement Policy and Materials Management support the recommendation being put forth. FINANCIAL IMPLICATIONS: The total estimated cost of this supply agreement, for the 2015 season and using quantities based on the estimated usage and if awarded as recommended, will be approximately $640,030.00 plus HST. It is understood that this is not a firm, fixed cost, as quantities are estimates based on previous year's usage and are subject to change given available funding and as a result of the incorporation of the MTO Price Index. This is a planned expenditure and as such, funds to cover the cost are included in both the 2015 Operating and Capital Budgets. RECOMMENDATION: It is recommended that the tender for the supply of asphaltic concrete mixes be awarded to Debly Construction for the pre - construction season startin.§ April 20th ending May 3'd and post - construction season starting on Nov 7th until Dec. 11t . We would also recommend that the tender for the supply of asphaltic concrete mixes be awarded to NRB Construction Co. Ltd., for the 2015 construction season (May 4th — Nov. 6th, 2015). Respectfully submitted, R. Kevin Rice Deputy Commissioner, Transportation and Environment Services Wm. Edwards, P. Eng. Commissioner, Transportation and Environment Services J. Patrick Woods, CGA City Manager 54 REPORT TO COMMON COUNCIL April 7, 2015 His Worship Mayor Mel K. Norton and Members of Common Council Your Worship and Members of Common Council: SUBJECT: 2015 Service -Based Budget 'Ire 2 The City of :Saint John Service -based budgeting is a customer - based, performance driven, results- oriented approach to allocating resources that focuses on achieving desired outcomes in the community through service delivery. Linking resource allocations to service level objectives, the service -based budget outlines in measurable terms all the services to be provided by the City and at what level they are to be provided. The service -based budget allows taxpayers, members of the community and other interested stakeholders to better understand what the public can expect in terms of service delivery (i.e., service levels) and the resources required to deliver on these commitments. This approach encourages transparency and accountability for service results. Attached is the final documentation for the 2015 Service -Based Budget including service level adjustments, community impact and revised funding allocations to reflect the general fund operating budget approved by Common Council on December 22, 2014. RECOMMENDATION It is recommended that Common Council receive and file this report. J. Patrick Woods, CGA City Manager 55 'n d If Jo .r- City of Saint John 2015 Service -Based Budget (General Operating) SAINT JOHN 56 Table of Contents Our Planning Process ................................. ..............................1 Strategic Alignment of Council's Priorities with the Service -Based Budget ................................................................................. ..............................2 Cityof Saint John Service Alignment ............................................................................................................................................ ..............................3 City of Saint John: 2015 Service -Based Budget Summary ............................................................................................................ ..............................4 Growth & Community Development Services ........................................................ ............................... 7 PublicSafety Services ................................................................................................................................................................... .............................57 Transportation & Environment Services ...................................................................................................................................... .............................75 Finance & Administrative Services ........................................................................ ............................... ............................117 StrategicServices ......................................................................................................................................... ............................... ............................145 Legislated Services Approved 2015 ........................................................................ ............................... ............................175 57 Our Planning Process The City uses a strategic planning framework that is designed to translate the vision and goals of the community into action. Illustrated below, the framework identifies the strategic and operational planning process required to build shared agreement on priorities and how to achieve these goals. Creating a clear and collective strategic direction supports transparent decision - making in setting policy and delivering public service. It also improves the City's ability to address community needs and demonstrate accountability for related service results. Fni inj-H Service Based Budget Service -based budgeting is a customer - based, performance driven, results- oriented approach to allocating resources that focuses on achieving desired outcomes in the community through service delivery. The service -based budget approach defines intended service results and links them to the resources required to achieve the desired outcome, particularly as they relate to Council's priorities for the community. Linking resource allocations to service level objectives, the service -based budget outlines in measurable terms all the services to be provided by the City and at what level they are to be provided. It is therefore not only a budget document; it is an important policy document of the City. The Service -Based Budget for the City is intended to: • Support the achievement of Council's Priorities and the City's Strategic Direction • Ensure cost - effective, sustainable service delivery • Promote a continuous improvement focus as part of service delivery • Create awareness of service levels and impacts (informed decision - making) The Service -Based Budget is a document used through the year and promotes accountability throughout the organization. It is also a key tool used year over year by Council during budget deliberations in bridging the gap between service delivery, budgetary requirements for service and the impact budget decisions may have on the overall service delivery for the City of Saint John. Approved 2015 Strategic Alignment of Council's Priorities with the Service -Based Budget The Service -Based Budget identifies budgetary commitments that align with Council's Priorities of Economic Health, Community of Choice and Sustainable Infrastructure; and the strategic direction outlined in AdvanceSJ of providing a Citizen Focused Service Delivery. Collectively these strategic priorities and directions will move the City toward its overall goal of establishing the City as a service - based, results- oriented, high performance public service organization. Highlighted below are some of those projects and service initiatives for 2015. Initiatives may relate to more than one Council Priority. Goal: Generate wealth in the community by emphasizing compact, sustainable development and focusing on responsible fiscal practices One Stop Development Shop: enhance development service to support economic growth PlanSJ: modernization of building, subdivision and stormwater by -laws Economic Development Agencies: continued commitment to drive growth in the community True Growth 2.0: serving as the strategic direction in our coordinated development efforts Trade & Convention Centre: operational funding Financial Management: commence development of an Integrated Financial Management Plan Goal: Contribute to a vibrant, livable community where citizens can celebrate our heritage, enjoy recreation opportunities, and feel safe and connected Transportation Master Plan: comprehensive and integrated approach to moving goods and people Arenas /Community Centres /Parks: continued funding for recreational assets Partnerships: programming at Emera Field; roll -out of Clean Cart Program; Fire Training Centre Community -Based Programs: support for P.R.O. Kids, community festivities, Heritage and Community Arts Awards Community Grant Program: new grant application process Transit: increase of 4% in funding; evaluation of service EMO: focus on emergency preparedness and coordinated response Goal: Invest in new and existing public infrastructure in innovative and fiscally responsible ways to address the evolving needs of the community today and for future generations Goal: Service delivery that is responsive to our citizen's interests and needs in an innovative, cost - effective way and strategically communicates service expectations Roads: increase of 6% to budget for Snow Dump: new location on Sugar asphalt (roads), curb and sidewalk Refinery Site to reduce costs Asset Management: software purchase to maintain City assets Fleet Service Costing Analysis: manage replacement and maintenance costs PlaySJ: rationalization of parks and playgrounds; focus on quality Regional Services Commission: funding for Aquatic Centre, Imperial Theatre, Arts Centre, Harbour Station and the Trade an d Convention Centre Street Sweeping: contract out to reduce costs and transfer resources to other needed on- street improvements Open Data Initiative: promoting greater transparency and accountability Technology: support core service and WiFi in public spaces (access to information) Fire Service By -Law: generate revenue and establish clear service expectations Human Resources: strategic approach to collective bargaining Approved 2015 2 59 City of Saint John Service Alignment Community Planning & Development Heritage Conservation Infrastructure Develop- ment Engineering Geographic Information Systems Permitting & Inspection By -Law Enforcement Neighbourhood Improvement Recreation & Cultural Programming Approved 2015 Fire and Rescue Suppression Technical Rescue Hazardous Materials Response Fire Prevention & Code Enforcement Fire Investigation Medical First Responder Emergency Management Roadway Maintenance Sidewalk Maintenance Pedestrian & Traffic Management Stormwater Management Solid Waste Collection Engineering Parks & City Landscape Sport & Recreation Facilities Drinking Water Industrial Water Wastewater •1 Financial Management Asset Management Services Materials Management • Risk Management • Fleet Management • Facility Management • Real Estate Human Resources Corporate Planning Corporate Communications Information Technology Systems Corporate Admin (City Manager's Office) Legislative Admin (Common Clerk's Office) Legal (City Solicitor's Office) 91 City of Saint John: 2015 Service -Based Budget Summary Community Planning & Development Service 1,648,084 1,660,164 14 Infrastructure Development (Engineering) Service 400,608 432,278 21 Geographic Information Systems Service 324,060 326,379 29 Heritage Conservation Service 309,971 205,343 18 Permitting & Inspection Service 1,000,433 995,755 25 By -Law Enforcement Service 995,000 974,838 33 Economic Development Related Services Tourism Service (Discover Saint John) 925,000 1,000,000 Economic Development Service (Enterprise Saint John) 2,404,021 2,521,496 Urban Development Service (Waterfront Development) 2,606,226 2,608,716 Industrial Parks Development Service (SJ Industrial Parks) 300,000 270,000 Neighbourhood Improvement Service 715,389 536,194 42 Community Development Service Grants 903,130 469,193 Recreation and Cultural Programming Service 1,542,077 1,596,762 49 Arts & Culture Grants & Other Funding 590,993 722,315 Total Growth & Community Development Services $14,664,992 $14,319,433 Fire Rescue and Suppression Service 20,348,550 20,402,288 61 Medical First Responder (Fire) Service 81,500 83,000 63 Hazardous Materials Emergency Response Service 128,231 129,205 65 Technical Rescue Service 58,494 59,404 67 Fire Prevention Service 942,912 979,472 69 Fire Investigation Service 74,879 73,166 71 Water Supply and Hydrants 2,340,000 2,500,000 Emergency Management Service 264,945 292,601 73 Police Services (including Public Safety Communications) 26,052,841 26,758,528 Street Lighting 1,096,857 1,030,000 Total Public Safety Services $51,389,209 $52,307,664 Approved 2015 61 City of Saint John: 2015 Service -Based Budget Summary Roadway Maintenance Service Sidewalk Maintenance Service Pedestrian & Traffic Management Service Stormwater Management Service Solid Waste Management Service Engineering 13,163,078 12,586,777 79 1,493,801 1,898,367 85 2,345,317 2,352,228 89 3,165,539 3,385,292 94 3,547,444 3,546,103 96 499,369 484,575 110 Parks & City Landscape Service 2,969,395 2,985,833 98 Sports and Recreation Facilities Service 3,809,404 3,919,850 104 Parking Service (Administration Support) 560,379 648,379 114 Transit Service 6,886,723 7,105,000 112 Total Environment & Transportation Services $38,440,449 $38,912,404 Financial Management Service Asset Management Total Administrative Services 3,124,669 3,159,670 120 6,925,147 6,893,698 124 $10,049,816 $10,053,368 Strategic Services 2014 Approved 2015 Approved Page Resources Human I 1,570,024 4: Corporate Planning 462,531 471,177 155 Intergovernmental Affairs 155,547 - 160 Corporate Communications 531,754 540,385 163 Information Technology 2,138,707 2,222,368 168 Total Strategic Services $4,816,593 $4,803,954 Approved 2015 5 62 City of Saint John: 2015 Service -Based Budget Summary City Manager Regional Service Commission Legal Common Clerk Mayor & Council 529,045 859,613 178 53,226 41,085 746,755 751,815 190 664,517 662,296 183 588,445 601,043 Total Legislated Services $2,581,988 $2,915,852 Other Charges 2014 Approved 2015 Approved •,•. Fiscal Charges 15,652,875 17,276,679 LTD Payments 1,672,243 1,310,000 Pension 9,504,015 9,244,000 Total Other Charges $26,829,133 $27,830,679 Approved 2015 6 63 Growth & Community Development Services Overview The Growth and Community Development Services team delivers services that support the community in achieving its long -term vision of having a diverse, vibrant, resilient, and environmentally sound economy and a vibrant and livable community. Services include providing guidance, direction and support for development that enhances quality of life for our residents by working to create new and renewed places where people want to live, work and invest and through partnerships, building strong and healthy communities where people feel safe and connected. Organizational Goals To establish the City of Saint John as a service - based, results oriented, high performance public service organization. Service Based • Considering the needs of the community as a whole • Creating opportunities for citizen feedback and input • Responding effectively and efficiently to address community needs Approved 2015 Results Oriented • Creating more complete neighbourhoods and communities • Increasing quality of life and the attractiveness of the City • Ensuring communities are safe and healthy • Ensuring access to diverse recreation and cultural opportunities .11 High Performance • Collaborative, strategically minded workforce • Culture focused on contributing to community goals through service delivery • Resource conscious and accountable for results Community Planning & Development Service Heritage Conservation Service Infrastructure Development Engineering Permitting & Inspection Service Geographic Information Systems (GIS) By -Law Enforcement Service Economic Development Support Neighbourhood Improvement Service Recreation & Cultural Programming Service 7 Growth & Community Development Services Financial Summary *Neighbourhood Grants moved to grant section in 2015 Approved 2015 65 Approved 2015 2014 Expenditures Revenue FTE Notes Community Planning & Development Service 1,648,084 1,660,164 120,000 12.50 1 Contract Heritage Conservation Service 309,971 205,343 1.00 Infrastructure Development 400,608 432,278 20,000 4.00 Permitting & Inspection Service 1,000,433 995,755 999,500 9.85 Geographic Information Systems 324,060 326,379 37,500 2.50 By -Law Enforcement Service Dangerous and Vacant Building Program 419,221 409,530 183,000 2.15 Minimum Property Standards Program 297,868 290,356 2.95 Other By -Laws 195,168 191,692 2.05 Animal Control 82,743 83,260 Total Service 995,000 974,838 183,000 7.15 Neighbourhood Improvement Service Community Development* 603,473 424,116 3.30 P.R.O. Kids 111,916 112,078 14,700 1.00 1 Contract Total Neighbourhood Improvement Service 715,389 536,194 14,700 4.30 Recreation and Cultural Programming Service Recreation Programming 1,423,760 1,477,802 22,000 3.70 Cultural Affairs 118,317 118,960 1.00 Total Service 1,542,077 1,596,762 22,000 4.70 *Neighbourhood Grants moved to grant section in 2015 Approved 2015 65 Budget Allocations For City Delivered Services Growth & Community Development Services ■ Community Planning & Development Heritage Conservation La Infrastructure Development I Permitting & Inspection • Geographic Information Systems • By -law Enforcement • Neighbourhood Improvement • Recreation & Culture Programming Approved 2015 M. 0 Summary Continued... *2015 Funding included in Discover Saint John budget (agreement on events coordinator funding) * *Moved from Community Development operational budget to community grant section. Amount also includes the transfer of the unspecified grant amount of $23,000. Approved 2015 10 67 Approved 2015 2014 Expenditures Revenue FTE Notes Community Grants Program: Organizational Support/ Community Project /Special Event Grants 231,723 Pavilion Cup 2,500 Cherry Brook Zoo 60,000 Seniors Citizen Centre Rent 41,000 Human Development Council 35,000 Human Development Council Rent 16,000 PRUDE Rent 52,000 Seafarer's Mission 1,000 Senior Resource Center 3,000 Fundy Fringe Festival 5,000 Jazz and Blues Festival — Salty Jam 20,000 Saint John Theatre Arts 10,000 Festival de la Baie Fran�ais 4,000 NB Historical Society - Loyalist House 10,000 Total Community Grants 259,500 231,723 Service Agreements / Other Funding Library 458,130 469,193 Imperial Theatre 339,322 343,823 Saint John Hotel Association* 50,000 Saint John Arts Center 85,171 84,769 Total Service Agreements 932,623 897,785 *2015 Funding included in Discover Saint John budget (agreement on events coordinator funding) * *Moved from Community Development operational budget to community grant section. Amount also includes the transfer of the unspecified grant amount of $23,000. Approved 2015 10 67 Summary Continued... Other Funding Arts and Culture Board (Saint John Arts Grants) Public Art - Maintenance and Repair Budget Clean Cart Program Remembrance Day Ceremonies New Year /Canada Day Celebrations Unspecified Grants(2015 included in Community Grants Section) "Non-Profit Housing Conference * *Sculpture Symposium * *Stone Hammer Geopark * *Living Sl * *YMCA Permit Fees Total Grants / Other Funding Approved 2015 2014 Expenditures Revenue FTE Notes 35,000 35,000 10,000 10,000 20,000 0 2,000 2,000 15,000 15,000 23,000 0 1,500 7,500 25,000 15,000 148,000 302,000 62,000 *New Community Grants Program as illustrated in the above table illustrates all the grants provided to community organizations in 2014. ** One time expenditures in 2014 Approved 2015 .: 11 Summary Continued... Approved 2015 2014 Expenditures Revenue FTE Notes Economic Development City Market* 943,036 952,194 520,215 5.00 Enterprise Saint John 475,000 475,000 Saint John Trade & Convention Centre 534,367 569,420 Harbour Station 451,618 524,882 Total Service 2,404,021 2,521,496 520,215 5.00 Industrial Park Development Service Saint John Industrial Parks 300,000 270,000 1.00 Total Service 300,000 270,000 1.00 Tourism Service Destination Marketing Organization (DMO) 925,000 1,000,000 Total Service 925,000 1,000,000 Urban Redevelopment Saint John Development Corporation 300,000 275,600 165,000 Market Square — Common Area 2,306,226 2,333,116 1,018,900 Total Service 2,606,226 2,608,716 1,183,900 Growth & Community Development 14,664,992 14,319,433 3,100,815 52 Services Budget *City Market managed through Facility Management within Finance and Administrative Service Approved 2015 we 12 Table of Contents — 2014 Service Plans Community Planning and Development Approval Service ................................................................................ ............................... 14 HeritageConservation Service ........................................................................................................................... ............................... 18 Infrastructure Development ( Engineering) ........................................................................................................ ............................... 21 Permitting& Inspection Service ........................................................................................................................ ............................... 25 Geographic Information Systems ( G. I. S.) ........................................................................................................... ............................... 29 By -Law Enforcement Service ............................................................................................................................ ............................... 33 Neighbourhood Improvement Service ............................................................................................................. ............................... 42 Recreation and Cultural Programming Service .................................................................................................. ............................... 49 Approved 2015 70 13 Community Planning and Development Approval Service The Community Planning and Development Service supports economic, social and environmentally sustainable development in the City of Saint John. The service is responsible for providing advice and working with developers and property owners to ensure that development in the community is consistent with the City's municipal plan and related by- laws. This involves using various means of public involvement to prepare statutory plans, bylaws, policies, background studies and guidelines for land use to support development. The service also plays a significant role in shaping municipal service delivery and infrastructure development across the community. The service aims to support development that contributes to increasing the quality of life in our community while being efficient and financially responsible. Community economic development Modern planning policy framework and implementing by -laws Change in demographics and socio- economic trends Growing emphasis on community sustainability Adhere to the requirements of Provincial legislation Support environmental sustainability and conservation Community desire to see PIanSJ implemented Expectation for public engagement in the planning process 2014 Community Planning and Development - Service Accomplishments and Performance Implementation of PlanSJ, the City's new municipal plan, which sets the direction for land use and municipal investment decisions in the community for the next 25 years. Key successes include: adoption of a comprehensive new Zoning Bylaw; Launch of Phase 1 of the Master Transportation Plan; framework for implementation of PIaySJ, the Master Recreation Strategic Plan; on -going support and involvement in implementation of the community led True Growth 2.0 Economic Plan; and on -going support and input into AdvanceSJ, the City's new Corporate Strategic Plan. Adoption of a comprehensive new Saint John Zoning By -law (ZoneSJ). This is the key by -law to implementation of the land use framework for the future in PlanSJ. There were substantial engagement efforts throughout the year to reach stakeholders including focused efforts to reach major industrial land owners, developers, builders and investors. These efforts were to provide information and awareness of the impact of the by -law on land holdings and support stakeholders through this process. One of the primary communication tools was the creation and launch of an interactive, GIS -based online mapping tool to support property owners in understanding the existing and the new zone proposed for their property. This mapping tool was internationally recognized as a Distinguished System by the Urban and Regional Information Systems Association (URISA) for its innovation. Approved 2015 71 14 The Zoning By -law was also the first major deliverable of the Council- driven One Stop Development Shop initiative, formally launched in the spring of 2014. This program also saw mapping of current planning processes and the launch of a comprehensive draft service model to the community in the fall of 2014 that went forward for public consultation sessions with key city Boards, the development industry, economic agencies, general public, and staff. Continued external recognition of PIanSJ nationally as an innovative and leading edge planning document. In 2014, the Canadian Institute of Planners (CIP) held the annual conference in Fredericton, NB, the first time the conference has been held in New Brunswick in over 30 years. Community planning staff from this service supported two mobile workshops to Saint John as part of the conference educational opportunities. These workshops were attended by over 60 professional planning staff from across the county and focused on urban re- development in our core, heritage investment, and local food, all strongly supported by PlanSJ. At this time, CIP also awarded the Saint John Market with their annual Great Places in Canada award, now showcased at the market for everyone to see and CIP also awarded Saint John the Vision in Planning award for the 1946 Municipal Plan. The Golden Mile Corridor Plan, a plan to maximize the community benefits resulting from intensified commercial development on the West Side, was adopted by Council in July 2014, with key recommendations implemented as part of the new Zoning By -law. Processed more than 84 applications (YTD to November 21 2014) for rezoning, subdivision approval, and variances pursuant to the Community Planning Act, down from 94 applications in 2013. Investment of human resources to ensure the City's interests are advanced in the Province's effort to modernize Local Governance. Number of Planning Applications 250 200 150 100 50 0 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 Initiatives, Major Projects and Community Planning and Development Approval Service Highlights • Deliver staff training programs to support implementation of the new Zoning By -law. • Complete the review of the Subdivision By -law to align with PlanSJ and ZoneSJ, and other related deliverables of the One Stop Development Shop program. • Advance implementation of the One Stop Development Shop service model, once adopted, to improve the quality of development in the community and make the process more predictable for the developers and the public. Approved 2015 72 15 • Continue to support the delivery of service plans and special projects, including the workplan to support delivery the Neighbourhood Planning program in 2016. • Provide regular reporting of the City's progress in implementing PIanSJ in coordination with Corporate Planning. • Continued investment of human resources to ensure the City's interests are advanced in the Province's effort to modernize Local Governance. • Development support for major waterfront projects including the Coast Guard redevelopment plans and plans to redesign Loyalist Plaza. • Collaboration with Enterprise Saint John, and other economic development agencies, to ensure service area commitments support implementation of True Growth 2.0 Economic Strategy priorities. • Project support for the Transportation Master Plan, a strategic plan to implement PIanSJ directions to promote more choice in transportation across the community. Approved 2015 73 16 Community Planning and Development - Service Levels and Resources Prepare statutory plans, policies, studies • Implementation of the City's new and guidelines for the development and Zoning Bylaw and commence review use of land in the city. of the Subdivision Bylaw Provide advice and work with developers and property owners through various planning approval processes to ensure that development in the community is consistent with the City's municipal plan and related by -laws. Approved 2015 • Periodic updating and amendment of the City's planning by -laws • Continue providing advice and information to property owners and residents respecting land use and planning matters. This function consumes about 20% of total planning staff resources • Due to a comprehensive new Zoning Bylaw and the current economic climate, 2014 was a lower than average year in terms of case volume However, a number of complex planning applications are anticipated to require senior staff and consulting resources over the course of 2015, given the Energy East filing in the fall of 2014 and the expected investments that may come from this significant project. • Provide zoning certificates in support of property transactions in the City. Normal volume of approximately 150 letters is expected in 2015. 74 The staff complement for this service is impacted by having a vacant Planner position and significant demands in managing ZoneSJ delivery and the One Stop Development Shop in 2014. Special project team for the implementation of the "One -Stop Development Shop" was resourced in 2013 with a goal of project completion in 2016. Contract Legal resources were retained in the fall of 2014 to support the team with the timely delivery of by -laws and process improvements in 2015. Wages & Benefits $1,336,711 Goods & Services 147,284 PlanSJ Implementation 176.169 Total Expenditures $1,660,164 Revenue $120,000 Full Time Equivalent Positions(FTE) Management 2.00 Professional — Planners 5.00 Inside Workers 4.50 TotaIFTE 11.50 Contract Position 1.00 Part -Time Positions 0.30 Planner vacancy created an opportunity Administrative / Other Support Services to hire a university student for a three • GIS —analysis and mapping month work term in the fall of 2014. This • IT— support technical applications provided additional resources to support • Legal — legal review of applications the One Stop team. • Common Clerk — by -law processes Reduced capacity for supporting analysis for major planning applications (i.e., industrial risk studies /waterfront urban design) as a result of less funds allocated for professional services. • Communications —support communication related to planning processes 17 Heritage Conservation Service The Heritage Conservation Service is a public service provided to developers, property- owners, merchants, citizens and the general public. The service offers a process to have an area designated a Heritage Conservation Area under the Heritage Conservation Areas By -Law. If an area is designated, changes or work done to the exterior of properties in Heritage Conservation areas is regulated and subject to permit. The service also provides architectural, technical conservation and design advice on existing and proposed new construction and provides incentives including grants and other financial assistance to encourage and assist in the rehabilitation and development of heritage buildings. Providing information and education to promote and raise awareness of the social and economic benefits of heritage conservation to Saint John is another key deliverable. Requirements of new Provincial heritage legislation New Municipal Plan for Saint John Implementation of a heritage service review Desire for growth in the community New development incentive programs delivered by the city Adherence to heritage conservation practices and procedures Community's objectives and expectations with respect to heritage 2014 Heritage Conservation - Service Accomplishments and Performance • Significant enhancements to the Heritage Grants Program were made in 2014, providing a more efficient and clear process to an increased level of available grant money, all while improving financial accountability for the program. As a direct result of these improvements, the grant budget of $90,000 was fully allocated in 2014, with 28 successful grant applications (18 Conservation Grants and 10 Conservation Plan Grants) and 5 applications on the waiting list (to date Nov21/14). • Permit volume increased slightly (72 permits to date Nov21/14), but is still below historic levels of 100 permits per year. • A lack of human resources due to staffing issues was a significant barrier to improving the Heritage Conservation Service in 2014, with reduced levels of service in place for most of the year. • In 2014, the service area digitized over 3,000 historical photo - slides for better access to heritage property information. Approved 2015 75 M 2015 Initiatives, Major Projects and Heritage Conservation Service Delivery Highlights • Participate in the One -Stop Development Shop initiative as it relates to the heritage permit processes. This includes transitioning to digital permit tracking tool for better internal reporting and case management. • Implement phase two of Heritage Grant reforms recommended in the grant program review. • Continue Heritage awareness and recognition, including Heritage Awards to be presented during National Heritage Week in February. • Explore appropriate service levels and service modifications considering the decrease in staffing in this area. When staffing permits, commence a work plan to review of the Saint John Heritage Conservations Area Bylaw in coordination with One -Stop Development shop implementation. Approved 2015 76 19 Heritage Conservation - Service Levels and Resources Administer process to have an area designated a Heritage Conservation Area under the Heritage Conservation Areas By -Law. Process applications for Certificates of Appropriateness to regulate any changes or work done to the exterior of properties in Heritage Conservation areas. Process heritage grant applications and offer financial assistance to encourage and assist in the rehabilitation and development of heritage buildings. Provide architectural, technical conservation and design advice on existing and proposed new construction. Provide information and education to promote and raise awareness of the social and economic benefits of heritage conservation to Saint John. • 11 Heritage Conservation Areas at present, 770 civic addresses (580 properties) designated • The current number of Conservation Areas and number of properties designated is a major challenge given the limited staff resources and high level of effort required to administer the current Bylaw. • An average year of activity is forecast in 2015 with approximately 80 applications expected. • $90,000 in grant funding has been approved for 2015. • Staff meets with clients in the office and on -site to provide information and expertise with respect to projects impacting heritage buildings. This consumes significant resources and normal demand for this service is forecast for 2015 but staffing issues will make this a major challenge to deliver service effectively for first half of 2015. • Various pieces of print materials • Internet information The service encourages the retention of the existing building stock to contribute to the overall sustainability of Saint John. • Provide a unique image for Saint John as a place well connected to traditional values and steeped in a proud history; building on our past while developing for a prosperous and dynamic future. • Contribute to a prosperous future by working to rehabilitate heritage buildings and integrate modern development in heritage conservation areas to attract new residents and support the tourism industry. The 2015 budget removed funding to fill the Heritage Planner position. This will result in less technical support to heritage property owners and applicants, a hold on any major policy review, research and analysis, and service level modifications in this program area to determine appropriate levels of service. Funding for the Heritage Grant programs is to remain at $90,000 with no application fees for service. Wages & Benefits $84,585 Goods & Services 120,758 Total Expenditures $205,343 Revenue $0 Full Time Equivalent Positions(FTE) Inside Workers — Heritage Analyst 1.00 TotaIFTE 1.00 Administrative / Other Support Services • GIS — database maintenance • Legal — Heritage By -Law enforcement • By -law Enforcement - Heritage By -Law enforcement Approved 2015 20 77 Infrastructure Development (Engineering) Infrastructure Development is responsible for engineering and servicing Service Drivers made necessary by new development. The objective of the Service is to Need to facilitate good development in Saint John that is fiscally and ensure that development is undertaken in a sustainable manner in environmentally sustainable and improves quality of life for residents accordance with municipal, community and neighbourhood plans, and the strategic directions and policies of the City. The Service includes reviewing and approving plans and drawings for new infrastructure and also ensuring that what is constructed in the community meets City standards. The Service also plays a key role in ensuring that infrastructure issues are appropriately addressed as part of the building permit and planning processes. Staff also liaises with those who operate and maintain the City's infrastructure to ensure coordination. Expectation to protect public health, welfare, and safety Adherence to sound engineering practice in the development of new infrastructure Expectation of an efficient and informed community planning approval and permitting process Coordination between services within the City corporation that deal with infrastructure that is proposed and under construction and the services responsible for the operation of existing infrastructure 2014 Infrastructure Development (Engineering) - Service Accomplishments and Performance • The Service area actively participated in the One -Stop Development Shop initiative, including the mapping of all infrastructure development processes, conducting detailed best practice research and participating in municipality site visits for the purposes of presenting Development Service Delivery model options to Council in October 2014. • Provided more efficient and timely processing for water and sewer permits to provide same -day service to clients relative to W &S repairs and renewals. • Amended the Excavation of Streets By -law to provide a quicker and more efficient and coordinated process for developers. • Assisted in the development of new street lighting guidelines and standards which were approved in 2014. • Tracked service delivery target turnaround times for locate requests — 2 hours for emergencies, 2 days for all other requests. • Collaborated with Bell Aliant, Rogers, and Saint John Energy to formalize access agreements for their use of public rights -of -way, to be completed in 2015. Approved 2015 W. 21 • Processed (Infrastructure Development review, YTD November 18, 2014) Building Permits; Excavation Permits; Water & Sewerage Permits; and performed infrastructure locates in the field. The following graphs illustrate yearly trends: 400 300 200 100 0 200 150 100 50 0 Building Permits - Infrastructure Development Review 2011 2012 2013 Water & Sewerage Permits 2011 2012 50 40 30 20 10 0 Excavation (Streets) Permits 2014 2011 2013 2014 3500 3000 2500 2000 1500 1000 500 0 2012 2013 2014 Infrastructure Locates 2011 2012 2013 2014 Approved 2015 22 79 2015 Initiatives, Major Projects and Infrastructure Development (Engineering) Service Delivery Highlights • The One —Stop Development Shop program will continue into 2015 and will require substantial involvement of the Infrastructure Development service area. A final Development Service delivery model is expected to be adopted by Common Council early in 2015, to be followed by development of a Stormwater Drainage by -law, amendments of other development - related by -laws and various customer- focused improvements. Full implementation of the One -Stop Development shop will be in 2016. • Conclude the process to develop access agreements with Bell Aliant, Rogers, and Saint John Energy to work within public rights -of -way. • Begin a program of digitizing information, including existing paper street files. • Continue to track service target deliverables for infrastructure locates. Approved 2015 we 23 Infrastructure Development (Engineering) - Service Levels and Resources PERMITS Applications, Review, Approval, Inspection REQUESTS FOR SERVICE /INFORMATION PAC Memo Review /Comments; Utility Reviews /approvals; Service Information requests; Testing- approving, coordinating; Field locate /layouts of municipal infrastructure. Following receipt of an infrastructure locate request, the goal is to provide locates within 2 business days while emergency locates response are to be completed within 2 hours. • W &S Connection Permits - 150 • Excavation Permits - 40 • Building Permits (Engineering Review) - 265 • Tender Packages -90 • Record Information Request- 6,580 • General Inquiry from Public, Consultants, Legal, Planning, etc.- 900 • Customer Inquiry follow -up —450 • PAC & Real Estate Memo Reviews —150 • Infrastructure Locates (Call Before You Dig) — 2,500 • Street light installation requests — new development - 4. DEVELOPMENT • Active Subdivisions (various stages) - 10 • Plan reviews for various submissions - new development servicing; stormwater drainage - 55 Approved 2015 Staff turnover and onboarding of new staff in 2014 in the Infrastructure Development Service has impacted the turnaround times for approvals and the ability to advance further service improvements. Wages & Benefits $369,276 Goods & Services 63,002 Total Expenditures $432,278 Revenues 20,000 Full Time Equivalent Positions(FTE) Management 1.00 Professional 1.00 Inside Workers 2.00 TotaIFTE 4.00 Administrative / Other Support Services • Information Technology- hardware and other support. • City Solicitor- Subdivision Agreements; Easements; By -law Enforcement; Municipal Agreements • Finance- Permit deposits /refunds 24 Permitting & Inspection Service The Inspection and Enforcement Service is a public service offered to those engaging in a construction, renovation, demolition, or change of occupancy project within City limits. Permitting processes determine if the proposed design, construction and occupancy of new buildings; the renovation, demolition and occupancy of existing buildings; or other proposed activity meets minimum acceptable standards as established by building and plumbing codes and related by -laws. Inspection processes determine if the work related to the design approved during the permitting process is being completed in accordance with established standards. The City works with individuals to achieve compliance with these standards before more corrective actions are determined to be required. Regulatory and legislative requirements; new legislation Penalties available to encourage compliance with by -laws Projected growth in the community Organizational capacity Public expectations related to permitting, inspection, enforcement 2014 Permitting & Inspection - Service Accomplishments and Performance • The Service area actively participated in the One -Stop Development Shop initiative, including the mapping of all permitting and inspection processes, conducting detailed best practice research and participating in municipality site visits for the purposes of presenting Development Service Delivery model options to Council in October 2014. Since 2013, the City of Saint John has been taking advantage of a relatively new Service New Brunswick product, the Land Gazette. It is an information repository of land- related notices, restrictions, and other information about land parcels. It allows users to find out essential information, such as if requirements set out in municipal by -laws were met by a property owner /builder /developer. The City of Saint John's use of the Land Gazette has been implemented in a phased approach and will continue into 2015. The service area has already seen positive outcomes as a result of the use of the Land Gazette. In 2014, 12 notices were added to the Land Gazette for this Service Area; two of those have been complied with and have since been removed from the Land Gazette. Staff attended training related to the new Energy Efficiency requirements as defined by the National Building Code of Canada. Staff continues to attend relevant training as it becomes available so as to be aware of emerging technologies, products and methods. Staff also continues to formally meet regularly to discuss and resolve Code and enforcement issues and to ensure consistent application of Codes and by -law provisions. Approved 2015 :i 25 The Service area continued process improvements to deliver service that meets the community's needs. Permit valuations are monitored regularly with value and fee adjustments made as necessary to ensure an accurate reflection of actual construction values. The percentage of permits that are issued in 10 business days after the receipt of a 12% 76% o complete permit application is shown (right). Given the various degrees of 71% complexity associated with permit applications, the goal is to issue permits in 10 business days 80% of the time after receipt of a complete application. In 2014, this was achieved 73 percent of the time, 7 points below the established target. 100% Although process improvements, such as parallel and streamlined processing were 90% in place in 2014 and contributed to exceeding the target in 2012, incomplete 80% application submissions contributed to the target not being met in 2014. Although 70% the metric measures the permit processing time once a complete application is 60% received, in some cases incomplete applications are still being submitted, resulting 50% in a delay in processing time while staff and the applicants work toward a complete 40% submission for review. If complete applications were submitted, the target would 30% have been met in 2014. The One -Stop Development Shop initiative will address 20% this issue by clearly outlining submission requirements and improving 10% communications to applicants about submission requirements. A new reporting 0% mechanism was established mid -year to better track the status of applications, which is intended to more effectively identify "at- risk" permits so the cause of any delays can be remedied. Approved 2015 percentage of Building Permits Issued in 10 Business Days 12% 76% o 71% 2011 2012 2013 2014 26 300 200 100 Enforcement of Building Permit Violations First Second Third — 1-2012 X2013 t2014 Final The graph (left) depicts the level of by -law compliance when initial enforcement actions were utilized (violation notices). Effective by -law enforcement will result in a decreasing trend in the number of enforcement actions required. If compliance has not been achieved with enforcement notices, formal Orders may be issued, followed by a court application, if necessary. It is expected, and the results indicate, that the majority of developers, builders or owners will comply after receiving a first or second violation notice. Very few violations persist to the third and final notice stage as can be seen in the graph. This continual and significant decrease between the progressive notices shows that enforcement efforts are working to achieve by -law compliance. In addition to notices, the Service New Brunswick's Land Gazette is another tool that is being used to gain compliance. 2015 Initiatives, Major Projects and Permitting & Inspection Service Delivery • The One —Stop Development Shop initiative will continue into 2015 and will require substantial involvement of the By -law Enforcement service area, particularly as it relates to by -law development /amendments, and the implementation of compliance processes and tools. A final Development Service delivery model is expected to be adopted by Common Council early in 2015, to be followed by the development of, and amendments to, applicable by -laws and various customer - focused improvements. Full implementation of the One -Stop Development shop will be in 2016. • The service area will collaborate and educate clients as it transitions to working with a new National Building Code of Canada (2010 version), which requires compliance with new national energy efficiency standards. • Staff will work with Provincial counterparts to encourage the proclamation of the New Brunswick Building Code Act and associated regulations by the Government of New Brunswick. • An "Alternative Solutions" process will be implemented in early 2015 for applicants that apply for approval under the Objective Based section of the National Building Code of Canada, enhancing service delivery and flexibility to citizens, builders, and designers. • Call -in inspection scheduling for the Building By -law's six mandatory inspections will be piloted with clients in 2015. Approved 2015 ., 27 Permitting & Inspection - Service Levels and Resources Building permits are issued within ten (10) business days after receipt of a complete application eighty (80 %) of the time. Projected for 2014: • 1,200 building permits • 225 plumbing permits • 40 demolition permits • 100 "other" permits and licenses The rate of by -law compliance with Projected for 2014: progressive enforcement actions. • 11,000 inspections Compliance increases with enforcement • 450 violation letters actions. Approved 2015 The goal of the Permitting and Inspection program is to ensure that the public is protected in that buildings and properties are safe, healthy, and accessible. Wages & Benefits $839,752 Goods & Services 156,003 Total Expenditures $995,755 Estimate Revenues $999,500 The service area is still impacted by the elimination of two inspector positions in Full Time Equivalent Positions(FTE) 2012, particularly in meeting efficiency Management / Professional 1.40 targets and the inspection and Inside Workers — Technical 6.60 enforcement of non -life safety matters. Inside Workers — Administration 1.85 Total FTE 9.85 Administrative / Other Support Services • Legal —support enforcement cases, property ownership inquiries, prepare Orders to Comply, and represent City in court and at hearings • Fleet — equipment availability for inspectors • IT — support software for scheduling inspections, recording inspection results, and reporting W. ndM Geographic Information Systems (GIS) The Geographic Information Systems Service is responsible for creating and maintaining all mapping and associated geographic information for the City of Saint John. The GIS service is also the official source for civic addressing and street names within the City of Saint John. Other responsibilities include coordinating spatial information collection projects for City Service areas, maintaining the City's Enterprise GIS for employee use and the Web - Mapping application for public use, producing maps for City departments, and responding to public and employee enquiries regarding mapping and geographic information. 2014 GIS Service Accomplishments and Performance kervice Drivers Security and protection the City's geo- referenced data Demand for useful geographic information from the development community Demand for useful applications for citizens to obtain geographic information Demand for data from all City service areas Need to utilize data in accordance with the requirements of the provider such as Service NB • Successfully managed and completed the bi- annual orthophotography project for the Greater Saint John area; • Supported mapping needs for the City's draft Zoning Bylaw; receiving international recognition - URISA Distinguished System in Government award - for the ZoneSJ Map Viewer, an interactive web -based tool to support public engagement on the draft Zoning By -law; • Participated in the Canadian Geomatics Community Round Table; • Performed spatial analysis to monitor development trends in relation to PlanSJ implementation including demolitions and new construction over the past 10 years and comparative assessment values for development inside and outside the Primary Development Area; • Conducted an assessment review and met with Service New Brunswick to review errors in assessment data; • Supported implementation of Council endorsed PlaySJ recreation strategic plan by performing demographic analysis for all playground catchment areas; • Participated and contributed to corporate strategic initiatives including the Open Data project and the Customer Relation Management project; • Participated in and contributed to the New Brunswick Road Network project; • Supported the Transit Service by updating the bus route maps and development of a Transit web - mapping application; Approved 2015 W. 29 • Supported Transportation & Environment Service by developing web - mapping applications for Solid Waste & Compost Collection and the Winter Management Plan, updating the street and sidewalk plowing priorities maps, and performing spatial analysis to identify private streets receiving City snow plowing service; • Developed a Ward Representatives web- mapping application; • Supported Discover Saint John by updating the official City tourist map; and • Supported the Parking Commission in mapping and updated all parking meters and parking lots in the Southern Peninsula. 2015 Initiatives, Major Projects and GIS Service Delivery Highlights • Develop mobile device - friendly web - mapping applications for the public to access through the City's web site; • GIS and technical assistance to support delivery of One Stop Development Shop Program deliverables including final mapping to support adoption of a new Zoning by -law and online support tools; • Oblique aerial photography acquisition; • Upgrade the SDE geodatabase; • Develop additional service - specific mapping applications for internal and external clients; • Perform spatial analysis to support evidence -based decision - making to support service delivery across the organization; • Update various data sets; and • Upgrade the internal GIS viewer software. Approved 2015 30 GIS - Service Levels and Resources Creating and maintaining all mapping and associated geographic information for The City of Saint John. Coordinating spatial information collection projects for City departments. Assigning all civic addresses and street names within the City of Saint John. Approved 2015 • Provides and maintains the core information that is required for many of the City's information systems including the maintenance of approximately 200 different datasets • Perform spatial analysis and produce maps for City Services • Reconcile Provincial property information with civic addressing on a monthly basis. This is the core of the Municipal Information System. • Assist and guide City departments in data collection or mapping projects by recommending software, hardware, designing data models and training staff. • Spatial information is now a required part in many other systems, such as MIS, 311, AVL, Document Management, Pavement Management, and Asset Management. GIS Staff provide guidance in the selection and implementation of these systems. Ensure that street names and civic addresses are assigned based on NB911 standards and guidelines, and respect the "By -law Respecting the Numbering of Buildings in the City of Saint John ", the "General Regulation — Emergency 911 Act" and the "Emergency 911 Act ". •• One GIS Technologist position is divided between the Community Planning Service (0.5 FTE) and the GIS Service (0.5 FTE) to maximize the use of this human resource. Staff turnover impacted delivery timeframes for 2014; onboarding of a new GIS technologist is likely to impact service in the first half of 2015 Wages & Benefits $206,594 Goods & Services 119,785 Total Expenditures $326,379 Revenue $37,500 Full Time Equivalent Positions(FTE) Professional 1.0 Inside Workers 1.5 Total FTE 2.5 Administrative / Other Support Services • Information Technology— hardware and other support. 31 GIS - Service Levels and Resources Continued Maintaining the City's Enterprise GIS for employee use and the Web- Mapping application for public use. Handling data sales and dissemination to external organizations. Responding to public and employee enquiries regarding mapping and geographic information. Approved 2015 • Maintain, update and publish web services; • Ensure that sensitive or third -party use - restricted data is only available to City staff; and • Provide tools to enable City staff to perform their required spatial queries • Geographic data is crucial in major development projects. The City's GIS Division is the source for the highest quality geographic data available for areas within the city boundaries. • The number of data sales and dissemination is closely tied to and fluctuates based on the amount of development happening in the City. • The GIS Division encourages self - service by providing useful tools and information either through the GIS viewer or the City's website. The "Maps & Air Photos " - is one of the most popular sections of the website with the public. we 32 By -Law Enforcement Service The By -Law Enforcement Service is a public service offered to citizens, property owners, occupants and neighbourhood residents involving the enforcement of City by -laws related to the maintenance and usage of properties, animal control, and licensing requirements. Inspection of properties and investigation of complaints are conducted to ensure standards established in related by -laws are met. In cases where there is a violation of a by -law, the City works actively for voluntary compliance with the appropriate by -law before more corrective actions are required. Service Delivery The Service area supports ensuring that Saint John is a safe and healthy community with an enhanced quality of life. The following chart identifies each of these programs and the percentage of funds allocated to them to deliver a defined level of service for 2015. o Dangerous and Vacant Buildings N Minimum Property Standards U Other By -Laws Approved 2015 We Legislation that supports more effective enforcement Penalties available to encourage compliance with by -laws Economic climate affects owner / developer ability to comply Organizational capacity Public expectations related to permitting, inspection, enforcement 33 2014 By -law Enforcement - Service Accomplishments and Performance • The Service area actively participated in the One -Stop Development Shop initiative, including the mapping of all by -law enforcement processes, conducting detailed best practice research and participating in municipality site visits for the purposes of presenting Development Service Delivery model options to Council in October 2014. In 2013, Council provided additional funding to the Dangerous and Vacant Building Program which saw an increase in the targeted number of resolved cases from 8 to 20 per year. Since that time, the program has experienced two very successful years, particularly since an additional staff person was hired in May 2013. With a greater focus on enforcement of the Dangerous and Vacant Building Program, voluntary compliance has increased substantially, with 30 buildings being repaired and /or reoccupied, and 13 buildings demolished by property owners. The condition of buildings being monitored has also improved, with the number of critical and high priority cases decreasing by 28 percent and 15 percent, respectively. • In 2014, the Dangerous and Vacant Building Program developed an inspection protocol that outlines the frequency of inspections required depending on the condition and priority of the building, in the interest of public safety and to use resources more effectively. The pilot program for grass seeding vacant lots was continued in 2014, and resulted in 3 properties being seeded after a City- initiated demolition. 2014 results for the Dangerous and Vacant Building Program are below: Resolved Cases 51 Notices to Comply 10 Demolitions 21 City- initiated demolitions 8 Property owner demolitions 13 Repairs / Reoccupy 30 • In 2014, the Minimum Property Standards Program saw 62 cases resolved and 5 Notices to Comply issued. Once information was laid in Provincial Court; two Provincial Court hearings resulted in fines totaling $2,000. Approved 2015 91 34 • Since early 2013, the City of Saint John has been taking advantage of a relatively new Service New Brunswick product, the Land Gazette. It is an information repository of land- related notices, restrictions, and other information about land parcels. It allows users to find out essential information, such as if requirements set out in municipal by -laws were met by a property owner /builder /developer. It will also flag when properties are subject to particular by -laws, such as if the property is in the Flood Risk Area, the Heritage Conservation Areas, or if it is a vacant building that is subject to the Unsightly Premises and Dangerous Buildings and Structures By -law. The City of Saint John's use of the Land Gazette has been implemented in a phased approach and will continue into 2015. In 2014, 57 notices were added to the Land Gazette for this Service Area; four of those have been complied with and have since been removed from the Land Gazette. Comparison of Percentage of Time Initial Response Time Target for By -Law Enforcement Requests is Met 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% ■ 2013 ■ 2014 Minimum Dangerous and Unsightly Zoning Property Hazardous Premises Standards Cases Buildings The Service area measures how quickly it responds to external complaints; the target is an initial response to a complaint within 5 business days, 80% of the time. Initial response generally means an initial inspection or contact with a property owner or complainant. The chart on the left shows the substantial improvement in response times since 2013. In 2013, the service area experienced a number of staffing shortages in both the technical and administrative areas. The significant improvement in 2014 is due to a full staff complement, and an emphasis by the team to respond to complaints in a timely fashion. Approved 2015 35 92 The graphs (below) depict the level of by -law compliance when initial enforcement actions were utilized (violation notices). Effective by -law enforcement will see a decreasing trend in the number of enforcement actions required. If compliance has not been achieved with enforcement notices, formal Orders may be issued, followed by a court appearance, if necessary. It is expected, and the results indicate, that the majority of property owners comply after receiving a first or second violation notice. Very few violations persist to the third and final notice stage as can be seen in the graphs. This continual and significant decrease between the progressive notices shows that enforcement efforts are working to achieve voluntary by -law compliance. When compliance has not been achieved by the final notice stage, cases proceed to legal action on a prioritized basis. Minimum Property Standards By -law 2012 —6-2013 —F 2014 160 140 120 100 80 60 40 20 0 First Notice Second Notice Third Notice Legal Actions This graph indicates that compliance is usually achieved after the issuance of a third notice. Typically, the trend of notices issued should show a decrease as the higher levels of enforcements actions are applied. In all years shown, this expected trend did not occur, due mainly to the way in which case data is recorded. Review of the statistics and case monitoring system indicate that changes must be made to the manner in which data is recorded to more accurately reflect the compliance trends in this program area. For instance, in 2014, the number of third notices includes additional follow up letters to owners as they work to comply with the original notices sent to them. This data will be tracked differently in 2015 so it can be reported on more clearly and accurately. Dangerous Buildings and Structures —■ -2012 2013 —0-2014 140 120 100 80 60 40 20 0 First Notice Second Notice Final Notice Legal Actions The graph above depicting compliance with Unsightly Premises and Dangerous Buildings and Structures By -law (concerning dangerous buildings and structures) indicates that the greatest percentage of compliance is achieved after the issuance of a first notice. Subsequent notices achieve further compliance, with very few remaining cases requiring legal action (which includes the issuance of a Notice to Comply, City- initiated demolitions, and /or Court proceedings). Approved 2015 36 93 Unsightly Premises —0-2012 2013 2014 90 80 70 60 50 40 30 20 10 0 First Notice Second Notice Final Notice Legal Actions The graph above depicting compliance with the Unsightly Premises and Dangerous Buildings and Structures By -law (for unsightly premises) indicates that the greatest percentage of compliance is achieved after the issuance of a first notice. Subsequent notices achieve further compliance, with very few remaining cases requiring legal action (which includes the issuance of a Notice to Comply, City- initiated clean -ups and /or Court proceedings). Approved 2015 ., 120 Zoning By -law —11111111-2012 + 2013 --W-2014 100 80 60 40 20 0 First Notice Second Notice Final Notice Legal Actions As expected, the compliance rate for Zoning By -law infractions increases with the number of violation notices sent, with the highest rate of compliance achieved after the first notice. Very few require enforcement action after the final notice stage. Volumes of complaints /cases and compliance rates have been generally steady over the past five years. It is worthy to note that enforcement of the Zoning By -law is based on complaints received from the public. It is expected that with the anticipated adoption of a new Zoning By -law in 2014, an increase in complaints concerning the Zoning By -law may occur as the public have an increased awareness and higher expectations of Zoning By -law compliance. 37 2015 Initiatives, Major Projects and By -Law Enforcement Service Delivery Highlights • The One —Stop Development Shop initiative will continue into 2015 and will require substantial involvement of the By -law Enforcement service area, particularly as it relates to by -law development /amendments, and the implementation of compliance processes and tools. A final Development Service delivery model is expected to be adopted by Common Council early in 2015, to be followed by the development of, and amendments to, applicable by -laws and various customer - focused improvements. Full implementation of the One -Stop Development shop will be in 2016. • High voluntary compliance rates are expected for the Dangerous and Vacant Building Program in 2015, as the program capitalizes on momentum gained over the past few years. The Grass Seeding Pilot Program for the Dangerous and Vacant Buildings Program will continue into 2015; more lots will be seeded after a City- initiated demolition, and staff will continue to monitor those lots that were seeded in 2014. • The next phases of Land Gazette implementation will continue into 2015, increasing the number of notifications available to property owners and the general public. • The Service area will develop a priority setting matrix system to triage non -life safety by -law enforcement cases once all attempts at achieving voluntary compliance has not resulted in compliance. Approved 2015 38 95 Dangerous and Vacant Buildings Program - Service Levels and Resources Resolve 20 cases per year • 20 cases resolved annually Approved 2015 r. The goal of the Dangerous and Vacant Buildings program is to ensure the public and property are protected against safety hazards caused by vacant, dilapidated and structurally unsound buildings. Budget increases in 2013 resulted in a return to an enhanced service level target of 20 cases resolved per year. Legislation enhancements and momentum gained since 2013 to rid the municipality of dangerous and vacant buildings has resulted in a trend of increased voluntary compliance by property owners. Although approximately 50 new cases are added each year, with increasing owner compliance rates, and City actions, the number of cases resolved in the past two years has been 45 -60. The City's costs to demolish buildings in the case of non - compliance are typically reimbursed by the Province of New Brunswick. Demolition costs for 2015 are expected to be $183,000. Wages & Benefits $202,308 Goods & Services 207,222 Total Expenditures $409,530 Recovery (demolitions) 183,000 Full Time Equivalent Positions(FTE) Management / Professional 1.00 Inside Workers — Technical 0.60 Inside Workers — Administration 0.55 Total FTE 2.15 Administrative / Other Support Services • Legal — support enforcement cases, property ownership inquiries, prepare Orders to Comply, and represent City in court and at hearings. • Fleet — equipment for inspectors • IT — support software for scheduling inspections, recording inspection results, and reporting 39 Minimum Property Standards Program - Service Levels and Resources Work to achieve by -law compliance using progressive enforcement actions. Compliance increases with enforcement actions. Complaints are initially checked within five (5) business days eighty (80) percent of the time. Approved 2015 Projected for 2015: • 110 new cases • 270 active cases • 550 inspections • 40 complaints from external sources (varies annually) 97 The objectives of the Minimum Property Standards Program are: 1. To adopt and establish standards governing the condition, occupancy and maintenance of residential property; and 2. To provide safeguards for the safety, health and welfare of the general public and of the occupiers and users of residential property. Reductions in total building inspection staff in 2012 have impacted the delivery of this program as Minimum Property Standards inspectors have been required to backfill or carry out additional building inspection duties during staffing shortages or peak periods in the Permitting and Inspection Service area. Wages & Benefits $244,839 Goods & Services 45,517 Total Expenditures $290,356 Full Time Equivalent Positions(FTE) Management 0.10 Professional 0.90 Inside Workers — Technical 1.20 Inside Workers — Administration 0.75 TotaIFTE 2.95 Administrative / Other Support Services • Legal — support enforcement cases, property ownership inquiries, prepare Orders to Comply, and represent City in court and at hearings. • Fleet — equipment availability for inspectors • IT — support software for scheduling inspections, recording inspection results, and reporting 40 Other By -Laws Program Service Levels and Resources Work to achieve by -law compliance using progressive enforcement actions. Compliance increases with enforcement actions. Includes enforcement of the Zoning By- Law, Flood Risk Area By -law, Mobile Home Park By -law, Unsightly Premises for those cases which are impacting public health and safety, Dog Control By -Law and the issuance of a variety of licenses. The Dog Control service is contracted to the SPCA Animal Rescue and focuses on dog control and a very limited cat control service. Complaints are initially checked within five (5) business days eighty (80) percent of the time. Approved 2015 Projected for 2014: • 55 new Zoning By -law cases • 125 Zoning By -law violation letters • 5 Flood Risk Area By -law cases • 5 Mobile Home Parks By -law cases • 100 Unsightly Premises cases • 10 Heritage Conservation Areas By -law cases •; The goal of enforcing the Other By -laws Programs is to support a healthy and safe community, protect property values, support an enhanced quality of life, and promote a sense of community pride. Departmental staffing reductions in 2012 impacted this area, as staff focus is on life safety issues first. Less serious by -law enforcement cases are prioritized at a lower level, resulting in fewer resources utilized in this area. This approach will continue in 2015 as required. Wages & Benefits $169,846 Goods & Services 21,846 Total Expenditures $191,692 Full Time Equivalent Positions(FTE) Management / Professional 0.50 Inside Workers — Technical 0.70 Inside Workers - Administration 0.85 TotaIFTE 2.05 Administrative / Other Support Services • Legal — support enforcement cases, property ownership inquiries, prepare Orders to Comply, and represent City in court and at hearings. • Fleet — equipment availability for inspectors • IT — support software for scheduling inspections, recording inspection results, and reporting 41 Neighbourhood Improvement Service The Neighbourhood Improvement Service provides neighbourhood residents with tools and support to build resilient, healthy communities. It promotes and delivers community based projects and programs that contribute to sustainable neighbourhoods and healthy communities through facilitation, partnerships and use of City facilities. The service works with neighbourhood groups and associations to obtain the appropriate funding required ensuring that a variety of opportunities are accessible and inclusive for all citizens. Service Delivery In supporting resilient, healthy neighbourhoods in Saint John, the City delivers several programs. The following chart identifies each of these programs and the percentage of funds allocated to them to deliver a defined level of service for 2015. Neighbourhood Improvement Programs bervice irivers Growth and diversity in population (age, culture, disability and accessibility) Diversity of needs among various neighbourhoods o Community Development Changes in family unit o P.R.O. Kids Economic uncertainty, inflation, and supply and cost of service Focus on sustainable communities Organizational capacity; support from other services (e.g., parks, roads) Expectations for sustainable partnerships with community groups Approved 2015 we 42 2014 Neighbourhood Improvement Service Accomplishments and Performance Community Engagement • 70+ organizations with 700 staff engagement occurrences Community Development — Projects • Jervis Bay -Ross Memorial Park — Re- dedication as part of the D Day Ceremonies. • Glen Road Playground Development Project — Final landscaping with footpaths, benches, signage and waste receptacles completed. Official opening was held in August in conjunction with a neighbourhood family fun day. • Neighbourhood Park Revitalization Projects & Community Clean -up Days (Dominion Park, Crescent Valley, Old North End, Anglin Drive and Lower South End, Pte. David Greenslade Peace Park). • Supported five community gardens throughout the city (Crescent Valley Community Tenants Association Community Garden, Shamrock Park Community Garden, Market Place West Community Garden, Rainbow Park Community Garden and the Greater Saint John Community Garden). • Marigolds on Market Place Tilley Square - St. Patrick's School / Marigolds on Main Street — Centennial, Lorne, Princess Elizabeth and Millidgeville North Schools. Community Development — Partnerships • Active member of the Fundy Wellness Network (fourth year). • Westside Food Bank at Carleton Community Centre — Projected 12,500 visits in 2014 / 9,034 visitations in 2013. Wellness Centres - Partnership with Horizon Health • Market Place Wellness Centre at Carleton Community Centre — Projected 10,714 visitations in 2014 / 8,000 visitations in 2013 • HOPE Wellness Centre — Supported by City of Saint John — Projected 3,384 visitations in 2014 / 2,736 visitations in 2013 • Horizon Health continues to provide specimen collection, social & education programs, consultation with social services and fitness programs for seniors. Active member of the program stakeholder committee at each centre. Approved 2015 100 43 Community Development — Neighbourhood Development • Priority Neighbourhoods supported through the Neighbourhood Development Stimulation Grant Program (Vibrant Communities — Around the Block Neighbourhood Newspaper, Waterloo Village Association & East Side Neighbourhood, Teen Resource Centre, O.N.E. Change, Crescent Valley Resource Centre, People United in the Lower South End (PULSE), and Westside PACT). • Supported LivingSJ Social Planning Process with financial and staff liaison support. • Community Grants Program: Developed a new model for managing community grants from the City of Saint John. Created a policy and process that will ensure a consistent approach in accepting applications, making recommendations, and evaluation of outcomes. Received Common Council approval for implementation of the new program in 2015. • Community Clean -up Trailer Initiative - Purchased, designed and equipped a new landscape trailer in 2014. The official launch of the program is planned for spring of 2015 with the trailer made available to community groups to complete their neighbourhood clean -up, graffiti removal and park beautification projects. • Silver Falls — Assisted with the formation of the Silver Falls Neighbourhood Association; and planning process to repurpose an un -used ball field in this neighbourhood. Phase 1 of the project was completed with the baseball field repurposed to a passive greenspace. Upgrades included installing an armor rock perimeter, planting trees and shrubs, and installing benches, tables and waste receptacles. • East Saint John — Conducted two neighbourhood meetings to determine the neighbourhood interest and capacity in repurposing the East Saint John ball field. This neighbourhood remains at the forming stage of development. • Chown Field Repurposing — Conducted a series of meetings with neighbouring stakeholders to poll interest and ideas on repurposing this underutilized ball field to a shared community green space which will promote active and passive leisure opportunities. • Milford Ball Field - Completed a major upgrade to the ball field in partnership with the Milford Park committee, Emera NB, and Canaport LNG. An official renaming of the ball field to the Donnie Dwyer Memorial Ball field was held in September. • Supported the Grace of God Garden Revitalization Project with Waterloo Village Community Stakeholders. Community Development— Special Events /Program Support • Supported neighbourhood / community special events including Crescent Valley Days, Canada Day, New Brunswick Day, Labour Day, Saint John Uptown Santa Claus Parade, Westside Christmas Parade, Buskers at Rainbow Park, and D Day Ceremonies at Jervis Bay Ross Memorial Park. • Served an active role with the Vibrant Communities Priority Neighbourhoods "Learn & Go" Program. Approved 2015 101 44 P.R.O. Kids • Youth placements in recreational and cultural programs for youth in financial need. [2014] —775 - 850 Placements — Forecast [2013] — 639 Placements [2012] —796 placements • Supported additional children and youth with equipment and deployed new hockey equipment program at Carleton Community Centre [250] Mayors Cup [60] Community Police Helmet Program [35] Hockey Equipment Swap Program • [2014] Funds raised at $200,000 exceeding 2013 revenue by over 30% - 100+ sponsors of the program - 6 sponsors each provided $10,000+ • Deployed new Arena Advertising Program — $10,000 in new fundraising revenue (42 Advertisements throughout 4 arenas) • Designed and implemented new parental cost sharing model providing significant cost savings and over $70,000 in placement value in 2014 • Coordination of major fundraising events /activities: Annual Dinner, 3 Golf tournaments, Mayors Cup, Jumpstart Day, Equipment coordination • Facilitated funding processes to enable establishment of other multiple local recreation programs: SJMNRC, TOP CORNER HOCKEY, SPARC • Developed new SPARC program to give every student (50) at Lorne Middle School 6 hours of instruction in multiple off -site activities Approved 2015 45 102 2015 Initiatives, Major Projects and Neighbourhood Improvement Service Delivery Highlights Community Development • Red Head Community— Explore opportunities with the Red Head neighbourhood to repurpose an un -used neighbourhood ball field. Conduct Neighbourhood meetings to determine the needs, engagement and support level of the community, and develop a proposed action plan for change. • Launch Community Clean -up Trailer Program in 2015. • Launch the new City of Saint John Municipal Grant Program. PRO Kids • Maintain PRO Kids at 700+ youth placements. • Fundraise $160,000 - $220,000 for registration fees, transportation and equipment costs. • Enhance regional cooperation in deployment of service in each participating municipality. • Expand new Arena Signage Program and retain majority of current advertisers. • Expand new SPARC Program to one or more additional priority neighbourhood schools. • New Fundraiser — P.R.O. Kids Fun Run and Swim Event in Summer of 2015, Quispamsis — Target of 300 -400 Participants. Approved 2015 103 46 Community Development Program Service Levels and Resources Encourage community -based organizations to be empowered to meet the needs of their neighbourhoods through forming partnerships and providing guidance, information and other available resources. Administer new community grants program that will enable community - based organizations to leverage support from businesses and other levels of government for neighbourhood initiatives. Provide planning assistance and advice to neighbourhood organizations; support implementation of community -based initiatives. Approved 2015 • 70+ community partnerships & relationships maintained • 700+ engagements with community groups, associations and agencies • Support for Priority Neighbourhoods (Crescent Valley, Lower Westside, Waterloo Village, Lower South End, Old North End, East Saint John) • Community Engagement & Development • Support for Not for Profit Community Centres (KBM, Martinon, Lorneville, Loch Lomond HOPE Centre, Latimore Lake, Milford, Randolph) • Support for the Ability Advisory Committee • Support of 10 neighbourhood / community special events annually (e.g., Crescent Valley Days, Canada Day, New Brunswick Day, etc.) • Support to 5 Community Gardens Build community capacity to respond to opportunities, issues and concerns at the neighbourhood level. Programs and services aligned to meet neighbourhood needs. Strong inter - neighbourhood relationships and community networking; promoting partnerships that encourage information sharing and collaboration that strengthens groups and inclusion. Communities are engaged through: • Sustainable neighbourhood groups, facilities and services, and effective leveraging of other sources of funding • Building leadership capacity resulting in a higher level of neighbourhood engagement. • Celebration and promotion of neighbourhood achievements. Neighbourhood and community spirit, collaboration, participation and involvement. Strong active community. 104 Wages & Benefits $270,221 Goods & Services 58,895 Other Funding 95,000 Total Expenditures $424,116 Full Time Equivalent Positions (FTE) Management 0.50 Inside Workers 2.80 Total FTE 3.30 Administrative / Other Support Services • Legal — agreements • Communications — marketing and media relations • Parks /Landscape/ Recreation Facilities —support of neighbourhood and community development projects. • Planning / Real Estate — land ownership identification, GIS Support, Zoning, By -laws • Roadway Maintenance — special event support (equipment, plowing, street sweeping) • Police/ Fire —address neighbourhood safety concerns 47 P.R.O. Kids Program Service Levels and Resources Placement of children (age 18 and under) into sport, recreation or cultural opportunities suited to their interest including assisting with the purchase of equipment and supplies when needed, and consulting with families on transportation needs. Form partnerships with community recreation, sport and cultural organizations that donate program spaces. Raising funds to purchase additional program spaces, equipment and transportation. Approved 2015 • 700+ placements • Regional participation extending the program to include families in Quispamsis, Rothesay and Grand -Bay Westfield • P.R.O. Kids currently assist 15% of youth living in poverty in Greater Saint John • Connecting 700+ youth with approximately 100 program partners Target Range for 2015: $160,000 - $210,000 P.R.O. Kids is a non - profit program that provides opportunities for disadvantaged youth participating in positive healthy recreational, sport and cultural activities. Providing a safe place for youth to play, learn and be engaged. Improving self- esteem of Greater Saint John youth. Corporate and community pride in offering youth positive life experiences & opportunities. Diverse programs meeting the various needs & interests of youth. Increase program opportunities by reducing barriers to participation. Administration costs are covered by the participating municipalities, allowing 100% of the funds received through donations, grants and fundraisers to go directly to placing children and youth in programs. Substantial increases in registration fees for youth activities and programs. Poor economic climate impacts the level of parental contribution resulting in an increased level of support from P.R.O. Kids. 105 Wages & Benefits $90,186 Goods & Services $21,892 Total Expenditures $112,078 Revenue $14,700 Contract Position 1.00 Part -Time Positions 0.80 Administrative / Other Support Services • Communications— marketing and media relations • Parks /Landscape/ Recreation Facilities —support of neighbourhood and community development projects. M Recreation and Cultural Programming Service The Recreation and Cultural Programming Service provides access to recreation, sport and cultural opportunities that allow our citizens to stay active, enjoy life in their leisure time, and connect with other members of the community. Through innovative leadership, the goal is to deliver service that promotes community well -being and enhances the quality of life of citizens to produce a healthy, vibrant, positive and strong community. Service is focused on meeting the diverse recreation, cultural and leisure needs of our citizens. Service Delivery In providing access to diverse set of recreation and cultural programming opportunities, the City delivers several programs. The following chart identifies each of these programs and the percentage of funds allocated to them to deliver a defined level of service for 2015. Recreation and Cultural Programming Programs 0 Recreation Programming O Cultural Affairs Approved 2015 - Growth and diversity in population (age, culture, disability & accessibility) Diversity of needs among various neighbourhoods Changes in family unit Economic uncertainty, inflation, and supply and cost of service Focus on sustainable communities Organizational capacity; support from other services (e.g., parks, roads) Expectations for better partnerships with community groups 106 49 2014 Recreation and Cultural Programming Service Accomplishments and Performance Special Events Support • "Passport to Parks" consisted of a series of special events organized over a four week period to showcase and increase citizen's awareness of the City's signature parks. These parks included Rockwood Park, Little River Reservoir, Rainbow Park, Market Place West, Victoria Square, Dominion Park, Mispec Park and Station 1 Skatepark. Programs were well attended and enjoyed by the public. This was a collaborative effort between the City of Saint John Communication Service, and the Recreation and Cultural Programming Service in partnership with community stakeholders. • Active partner with the organization of the 4th Annual All American Soap Box Derby in Rockwood Park. • Active partner in the development of the 2nd Annual PALS Adventure Programs at Rockwood. • 2014 Winterfest in partnership with the Fundy Wellness Network, Greater Saint John Municipalities and Neighbourhood Groups. • Active partner with the organization of the 6th Annual Pavilion Cup Pond Hockey Tournament. Proceeds from the Pavilion Cup placed 685 youth in the Awesome Adventure Program at Rockwood Park. • Organized 4th Annual City of Saint John Volunteer Recognition Dinner (200 attendees). • Continued Partnership with Horizon Health in provision of wellness programs at the HOPE Centre & Market Place Wellness Centre. • City of Saint John support to the 20th Annual Marathon by the Sea. • 51h Annual Canaport Volleyball Tournament — Proceeds went to support youth programs at the Carleton Community Centre. Approved 2015 107 Percentage of citizens satisfied with the overall level and quality of recreation programming service 100% 80% 60% v 40% v 20% 0% 2009 2010 2011 2012 Percentage of citizens that think the City is doing a good job supporting arts and culture 100% 80% v = 60% v 40% QJ u 20% 0% 1 2009 2010 2011 2012 Note: A citizen survey was not conducted in 2013 or 2014. 50 • Active partner with Community Special Events including Canada Day, New Brunswick Day and Labour Day. • Supported these special events held in Saint John: Mudd, Sweat and Tears, Triathlon by the Bay, Kids of Steel Triathlon, Anglophone South School District Cross Country Running Events, Safe Kids Week, Little River Fun Run, Little River Aquathon. Senior Programs • Senior Friendship Games including activities such as golf, timed -walk, washer toss, badminton, cards, and opening & closing ceremonies (270 participants). • Seniors' Special Events (Spring, Fall, Winter) in Partnership with Lily Lake Pavilion (At capacity with 200 seniors attending each event). • Senior programs developed in partnership with NB Housing at Stephenson Towers, and Horizon Health Network at the HOPE Centre. • Support of Senior Wellness Fairs at Loch Lomond Villa and Stephenson Towers (400 and 300 seniors in attendance respectively for each event). • Seniors' Springfest and Fallfest at Exhibition Park (500 participants at each event). • Seniors' Summer Shuffleboard Program at the Peter Murray Arena (Summer Program) & Newly Established Program at Somerset Community Centre (Fall Program) • Senior programs are provided through a collective impact approach in partnership with community organizations such as Seniors Resource Centre, Loyalist Zone Senior's Clubs, New Brunswick Senior's Federation, Horizon Health, Market Place Wellness Centre, HOPE Wellness Centre, New Brunswick Go Ahead Seniors, New Brunswick Housing Corporation, Loch Lomond Villa, Saint John Red Cross, St. Joseph's Community Health Centre, Carleton Kirk Senior's Complex, Lily Lake Pavilion, Market Square, Seaside Lawn Bowling, Saint John Horseshoe Club, Saint John Shuffleboard League, and Saint John Pickle Ball Club, etc. Inclusive Recreation Programs • 3rd Annual Recreation Your Way (Inclusive Recreation Opportunities for Persons with a Disability) — Recognized Canada wide as a best practice resource. • Disability Access Awareness Week including DAW Opening Ceremonies, Family Day & BBQ. (700 and 200 respectively participated in these events). Worked in conjunction with the Saint John Police Force on a Handicap Parking Blitz in connection with DAW. • 2nd Annual Program Partnership with Abilities NB providing weekly sport and recreation opportunities for people with disabilities (boxing, sledge hockey, bocce ball, goal ball, tennis, and athletics). Approved 2015 1: 51 • Supported the Adaptive Equipment Fair hosted by Key Industries (250 people in attendance). • Inclusive recreation programs are provided through a collective impact approach with community organizations such as Saint John Ability Advisory Council, Family Resource Centre, Key Industries, Saint John Deaf & Hard of Hearing Association, Outreach Options Employment, United Catena Training Centre, Muscular Dystrophy Association, Muscular Sclerosis, Shining Horizons Therapeutic Riding, Abilities NB, Province of New Brunswick, Canadian Mental Health Association, etc. Youth Programs • Sustained the summer playground program at 15 sites through acquisition of Federal and Provincial student employment grants; and neighbourhood association partnerships. Special Events included Magic Mountain Trip, Dominion Park Beach Day, and Soccer Tournament. Securing grants through other sources is critical in the sustainability of this level of service. • Carleton Community Centre Youth Afterschool & Night Programs (32 weeks in 2014). The Cheerleading Program with 205 members sent competitive teams to Myrtle Beach, New Hampshire, Halifax, Moncton as well as two local competitions. • Somerset Community Centre / Hazen White -St. Francis School Youth Afterschool & Night Programs (32 weeks in 2014) • Free youth programs at Millidgeville and Forest Glen Community Centres in collaboration with the YMCA through funding support by Common Council. • Community Centre Youth Arts Awards with 150 attendees. • C.E. Nick Nicolle Community Centre — Officially opened in fall of 2014. Community Hub for the North End with O.N.E. Change expanding its role within the Centre & Neighbours Working Together Community Partnership. The O.N.E. change assumed the responsibility for program and service delivery for the North End neighbourhood and provided recreational and other opportunities at partnering neighbourhood facilities including Lorne Middle School, Centennial School and the Main Street Baptist Church. Afterschool Program at Centennial School (32 weeks). • South End Community Centre youth afterschool and evening programs (32 weeks). • Youth programs are provided through a collective impact approach with community organizations such as the Boys and Girls Club, Teen Resource Centre, YMCA, Carleton Community Centre Advisory Board, Youth SJ, Anglophone South School District, KBM Association, Latimore Lake Community Centre, Martinon Community Centre, Denis Morris Community Centre, HOPE Community Centre, Milford Community Centre, and Lorneville Community Centre. Approved 2015 52 109 Cultural Affairs • Responsible for coordinating the maintenance and repair of the City's public artworks. The following was completed in 2014: installation and unveiling of the 225th anniversary legacy piece "Shards of Time" along Harbour Passage, "People Waiting" at Barbour's General Store refreshed and painted, installation of new plaque at King's Square Bandstand, "Fiddlehead" sculpture at Peel Plaza repaired with plaque installed, and the placement of the Afghanistan plaque at King's Square Cenotaph. • Awarded $28,000 in small grants for new arts and culture projects. • Ongoing annual coordination of seven art exhibitions at the City of Saint John Gallery and another seven at the Millennium Artplace (Central Library). • Planned the scheduling of promotional signage at King's Square for not - for - profit organizations. • Edited and approved all entries to the online City's Events Calendar and promoting events through social media. Following of over 4,500 subscribers. • Chaired and implemented the City's annual Service of Remembrance (November 11th) at Harbour Station - Attendance: 8,000 +. • Completed the Cultural Mapping Data for Community Arts Board. • Mayor's Tree Lighting Program. • Provided guidance with ceremonial protocol for new Cst. Doug Larche Park, Marathon by the Sea - Red Mile initiative and the Jervis Bay Memorial Park Re- dedication. • Supported the Hospitality Saint John Tourism Awards. • Provided support to the Mayor's Office with drafting city correspondence and proclamations throughout the year. • Resource to the Human Development Council, PRUDE, and Newcomers Resource Centre regarding relocation matters. • Assisted and supported Asian Heritage Month. • Arts and Cultural programs and services are provided through a collective impact approach with community organizations such as Imperial Theatre, The Originals Arts Awards Committee, Sculpture Saint John, Saint John Arts Centre, Canada Day Planning Committee, Exhibitions Selection Committee, Public Art Trust, and the Saint John Community Arts Board, etc. Approved 2015 110 53 2015 Major Initiatives, Major Projects and Recreation and Cultural Program Service Delivery Highlights Recreational Programming Explore further opportunities for the City of Saint John to advance recreation service through the role of facilitator, educator and communicator. • Further strengthen and advance community relationships in the provision of sport and recreation services. Cultural Affairs Programming • Work with Common Clerk's Office to develop protocol & ceremonial policies. • Update inventory of City -owned artworks and public art with notations and photos. • Research opportunities with Foundations to contribute to Community Arts Funding Program. • Research funding inequities from granting agencies as it applies to Saint John arts & culture organizations. Approved 2015 111 54 Recreation Program - Service Levels and Resources Deliver programs (direct programming) that provide a wide range of artistic, cultural, social, educational and recreational opportunities that meet the interests of all ages, regardless of physical limitation or ability to pay. Manage contract agreements for community -based organizations to deliver recreation programs (indirect programming) on the City's behalf. Facilitate the delivery of special recreation, social and cultural programs in partnership with various organizations. Approved 2015 • Operate and manage 2 Community Centres (SCC, CCC) each offering nightly and weekend program opportunities - 32 weeks • 15+ senior programs • 15+ inclusive /disability specific programs • 6+ direct programmed playground sites • 5+ playground sites supported through partnerships • 1 instructional junior tennis program in partnership with the local tennis club. • ASD Contract agreements with the YMCA, Boys & Girls Club, and ONE Change for 4 Community Centres (FGCC, MCC, SECC, NNCC) - 52 weeks • Integrated Day Camp at FGCC • Summer Camps at MCC • Playground Program at SECC & NNCC • Support 20+ community special events (e.g., S1 Sports Hall of Fame, Pavilion Cup, Winterfest, Soap Box Derby, Running Events) • 1 volunteer recognition event Ensure all citizens have access to inclusive recreation and leisure opportunities that meet the diverse needs of our community Benefits include: • Healthier citizens (physically, mentally, emotionally and socially); healthy communities and a healthy lifestyle • Investment in the future of our young people • Fostering cooperation and good citizenship • Positive behaviours • Involved community; developing leadership skill as well as developing physical, creative and social skills • Fun and enjoyment • Reduced crime • Stronger families • Connected community • Community pride and engagement • Celebration of community pride 112 Wages & Benefits $535,504 Goods & Services 469,480 ASD Agreements 457,818 Other Funding 15.000 Total Expenditures $1,477,802 Revenue $22,000 Full Time Equivalent Positions Management 0.50 Inside Workers 3.20 TotaIFTE 3.70 Part Time Positions • Community Centres: 21 part -time staff at 2 centres for 32 weeks • Playground Program: 20 part -time employees for 9 weeks Critical Internal Support Service • Fleet — vehicles for playground program • Purchasing — acquisition of equipment • Insurance —risk management • Communications — program promotion • Legal — agreements with service providers • Parks /Landscape / Recreation Facilities — providing safe and functional park, trail and recreation facilities; resources for initiatives • Facility Management — community centre maintenance; ensuring safety and functionality 55 Cultural Affairs Program — Service Levels and Resources Act as a point -of- contact with arts, • 55 arts organizations cultural and multicultural community- . 24 cultural and multi - cultural based organization to promote awareness organizations and support activities. Promote arts and culture events through social media outlets, web -based applications and signage. • 5,500 arts and cultural events posted in the Cyber - Calendar • Weekly bookings for signage in King's Square. Provide support and /or facilitate various • 12 events annual average festivals and events annually. Administer grant applications for the Saint John Community Arts Funding Program (small project oriented funding for festival ideas and new initiatives). Facilitate maintenance of public art and administration of the public art policy. Coordinate exhibits for showing at galleries. Approved 2015 • $35,000 in grant funding available • 40 applications on average annually • 1 project annually (1% Public Art Policy) • Number of maintenance projects varies annually • 7 formal exhibits @ Art Gallery • 7 informal exhibits @ Millennium Art Place • Cultural Affairs program promotes broad community awareness of access to, and education, in the arts and culture sector. The service provides assistance and information services, as well as opportunities and support to artists and arts and cultural organizations; fosters cross - cultural understanding; and supports economic development of tourism, especially in the uptown core. It also works to increase awareness of the role and contribution arts, culture and heritage make to the City's economy and quality of life. 113 Wages & Benefits $74,790 Goods & Services 44,170 Total Expenditures $118,960 Full Time Equivalent Positions Inside Workers 1.00 Total FTE 1.00 56 Public Safety Services Overview Public Safety Services supports the community in achieving its long -term vision of being a safe, livable community where people want to live, work, shop and play. Services are delivered to help improve the safety and well -being of all citizens with a focus on creating safe neighbourhoods that provide opportunities for individuals to develop and grow. Organizational Goals To establish the City of Saint John as a service - based, results oriented, high performance public service organization. Service Based • Considering the needs of the community as a whole • Creating safe, livable neighbourhoods • Responding effectively and efficiently to mitigate emergency incidents Approved 2015 Results Oriented • Creating a safe, livable community • Improving quality of life and social well -being of residents • Building capacity in emergency response and preparedness through training and education High Performance • Collaborative, strategically minded workforce • Culture focused on contributing to community goals through service delivery • Resource conscious and accountable for results 114 Fire Rescue and Suppression Service Medical First Responder Service Hazardous Materials Emergency Response Service Technical Rescue Service Fire Prevention and Code Enforcement Service Fire Investigation Service Emergency Management Service Police Services 57 Public Safety Services Summary Approved 2015 115 Z Approved 2015 2014 Expenditures Revenue FTE Notes Fire Services Fire and Suppression Service 20,348,550 20,402,288 340,200 148.35 Technical Rescue Service 58,494 59,404 0.25 Hazardous Materials Emerg. Response Service 128,231 129,205 90,000 0.25 Fire Prevention Service 942,912 979,472 4,000 7.60 Fire Investigation Service 74,879 73,166 0.40 Medical First Responder Service 81,500 83,000 Total Fire Services 21,634,566 21,726,535 434,200 156.85 Water Supply and Hydrants 2,340,000 2,500,000 Emergency Management Service 264,945 292,601 2.15 Police Services 23,559,662 24,269,759 916,000 Public Safety Communications 2,493,179 2,488,769 943,662 Street Lighting 1,096,857 1,030,000 TOTAL - Public Safety Services Budget $51,389,209 $52,307,664 $2,293,862 159.0 Approved 2015 115 Z Table of Contents — 2014 Service Plans Fire - Rescue Services ........................................................................................................................................... ............................... 60 Fire Rescue and Suppression Service ............................................................................................................ ............................... 61 Medical First Responder Service ..................................... ............................... Hazardous Materials Emergency Response Service ....... ............................... Technical Rescue Service ................................................ ............................... ........................................... ............................... 63 ........................................... ............................... 65 ........................................... ............................... 67 Fire Prevention and Code Enforcement Service ........................................................................................... ............................... 69 FireInvestigation Service .............................................................................................................................. ............................... 71 Emergency Management Service ...................................................................................................................... ............................... 73 Approved 2015 59 116 Fire - Rescue Services Fire - Rescue Services involves the delivery of six public services to the community that focus on reducing loss of life, personal injury, property damage or impact on the environment caused by fire, accident, medical emergency, or hazardous materials release (accident or malicious), and through code enforcement and public education activities. The goal of the Fire - Rescue Service delivery is to support public safety with effective and efficient emergency preparation and response across a diverse range of emergency calls (response profile); creating public awareness of fire safety and emergency planning; providing for safer assembly of work and residential living by ensuring compliance with regulatory and legislative requirements; and investigation of fire incidents to reduce the risk of future occurrences. Service Delivery In working to improve public safety, the City of Saint John provides six critical services through its Fire - Rescue Services. The following chart identifies each of these services and the percentage of funds allocated to them to deliver a defined level of service for 2014. Fire - Rescue Services o Fire Rescue and Suppression ® Technical Rescue * HAZMAT Emergency Response o Fire Prevention o Fire Investigation o Medical First Responder Approved 2015 4 Regulatory and legislative requirements (life safety and inspections) Diverse industrial sectors located throughout the community Large geographic footprint, bisected by a river, marsh and highway Diversity of needs among various neighbourhoods, focus on priority Type of housing stock (including dilapidated or vacant buildings) Multiple mixed -use neighbourhoods (residential, commercial, industrial) Organizational capacity Evolving demand for service 117 .1 Fire Rescue and Suppression Service The Fire Rescue and Suppression Service provide emergency response to residential, commercial and industrial fires (and explosions). The service is responsible for coordination and implementation of fire suppression operations including sizing up the environment, performing a risk assessment, setting -up incident command, developing an incident strategy, assigning and obtaining resources, communicating status, establishing a safe perimeter, rescuing trapped victims, conducting fire suppression, evaluating preliminary cause, and ensuring the site is left in a safe condition. The goal is to save lives, minimize damage to property and the environment and ensure that commercial and industrial facilities get back into operation quickly. A key component of Fire Rescue and Suppression Service is preparation for safe, efficient response to incidents through training. 2014 Fire Rescue and Suppression Services Accomplishments and Performance • 1,786 calls for fire rescue and suppression service (January to November) • 69 Structure Fires - 91% of these fires were contained to the area of origin • 35 Vehicle Fires —100% of these fires were contained to the area of origin • 185 Grass Fires —100% of these fires were contained to the area of origin • 86 Refuse Fires —100% of these fires were contained to the area of origin • 29% of calls generate simultaneous demands on the Fire Department resources 2014 Fire Rescue and Suppression Services Impact of Reductions • Between January 1 and November 17 of 2014 there were 43 occurrences of no fire response capability being available to address the next incident, up from 6 occurrences in 2011 (prior to service level reductions). 2015 Major Initiatives, Major Projects and Fire Rescue & Suppression Services Delivery Highlights • Establish a live fire (emergency services) training campus with an industrial partner. • Investigate / examine opportunities to champion fire rescue and suppression service (training) at a Regional level. • Introduce a Fire Department Policy and bylaw for Council's consideration. • Provide technical input to various Environmental Impact Assessment processes from a fire rescue and suppression perspective. Approved 2015 61 118 Fire Rescue and Suppression Service — Service Levels and Resources The municipal objective for the initial apparatus is arrival on scene within 5 minutes and 30 seconds at least 90% of the time, from the end of dispatch. Ensure fire rescue operations are initiated immediately with the objective of saving lives, protecting property and environment. Ensure fire suppression operations are initiated immediately with the objective of containing the fire to the area of origin. Ensure members of Fire Rescue and Suppression Service are adequately trained in accordance with all applicable NFPA and OH &S standards (numerous NFPA Standards are applicable). Have sufficient resources to respond to emergency calls, with minimal stacking of calls. To meet the funding level set for the 2014 budget, one position within Fire Administration is being eliminated. Critical tasks will be integrated into remaining administration positions, while non - critical tasks will be deferred. Eliminate overtime for Constant Manning of Fire Apparatus. Approved 2015 • The number of fire calls over the last five years ranges from 323 to 745. • Approximately 75% of city's geographical area is outside the PDA. However, approximately 94% of Fire related calls are within the PDA. • SJFD is attaining desired response time 80% of the time of single company response. • SJFD is only attaining its full response (4 companies) objective of 8 minutes over a 7.1 sq. km portion of the City (8% of the PDA). However, this accounts for 28% of fire responses. • A minimum of 920 hours of pre- planning, preparation and training per annum. • As a percentage of total fires, residential account for 63 %, and commercial - Industrial 37 %. • Facilitate emergency accommodation needs of citizens displaced by fire or flood. • An effective and efficient fire response enhances the ability to contain fires to their area of origin, minimizing fire loss, which translates into lower insurance premiums for property owners. This is most relevant in the priority neighbourhoods of Saint John where multiple unit dwellings are only feet apart. • Currently have a sufficient depth of response to address non - simultaneous structure fire calls regardless of complexity. The response time objective can be met 75% to 80% of the time within the PDA. • Currently have an insufficient depth of response to address simultaneous structure fires and cannot meet response time objectives outside of the PDA. Overtime loss may result in random service loss. • The reduction of one company in early 2012 increased the occurrences of no / low fire response capability from 6 occurrences in 2011 to 45 occurrences in 2012 and 42 in 2013 (YTD). • The establishment of a live fire training campus will facilitate the development of competent emergency response personnel. Wages & Benefits $18,788,728 Goods & Services 1,613,560 Total Expenditures $20,402,288 Revenue $340,200 Full Time Equivalent Positions (FTE) Management 7.10 Professional 1.75 Firefighters 139.00 Inside Workers — Administrative 0.50 TotalFTE 148.35 Holiday Relief Firefighters 32.0 Administrative / Other Support Services • IT— supports software required for operational, and communication • Human Resources — supports recruitment, professional development and attendance management • Facility Management — station maintenance, capital planning • PSCC — receives, records and dispatches related emergency calls • Saint John Water — supplies the water and services the hydrants • Police — site safety, traffic control, as well as assists with site evacuation • Transportation and Environment — ensure viable transportation routes across all weather conditions as well as site clean -up and materials disposal • An enhanced and capable emergency . Communications — notifications response supports economic wellbeing. 119 62 Medical First Responder Service The Medical First Responder Service provides first responder pre - ambulatory care in instances where emergency medical assistance is required. The City of Saint John currently trains its Fire Fighters to the Medical First Responder level. This means fire crews can deliver advanced first aid, patient assessment and treatment prior to the paramedic's arrival on scene. The Fire Department only responds to medical calls that meet predefined criteria for tiered response (NFPA 450 - Guide for Emergency Medical Services and Systems), which represents about 25% of all medicals calls addressed by Ambulance NB. Criteria employed by PSCC to trigger a Medical First Responder response • See side bar 2014 Medical First Responder Service Accomplishments and Performance • 2,845 calls for medical first responder service (January to November) • Self- sustaining skill maintenance and acquisition through internal training program for all 200 first responders • 52% of the time — the Fire Department arrived on scene prior to Ambulance NB • 32% of the time — Fire Fighters initiated first aid to advanced life support care • Between January and November there were 39 occurrences of initiating cardiac care 2015 Major Initiatives, Major Projects and Medical First Responder Service Delivery Highlights Criteria employed by PSCC Chest Pain /Trouble Breathing Cardiac /Respiratory MVA With Injuries Industrial Accident Possible Stroke Seizure /Convulsion Unknown Medical Public Safety Concern Hemorrhage /Lacerations Overdose Drowning/Diving/Scuba Falls /Injuries Due To Falls Choking Diabetic • Investigate / examine opportunities to champion Medical First Responder Service (training) through the new Live Fire Training Campus. • As per the Core Service Review, deliver a report to Council on the assessment of the Medical First Responder Service Approved 2015 120 63 Medical First Responder Service — Service Levels and Resources Participate in a tiered response with Police and Ambulance to emergencies based on predetermined criteria; motor vehicle accidents, heart attack, severe trauma. • Initial apparatus arrives on scene of the incident within 5 minutes and 30 seconds from dispatch at least 83% of the time for Medical Call Types. • Provide initial and on -going emergency medical triage of ill and injured patients that prioritizes the patient's respective treatment and transport. All Fire Fighters are trained to the national standard of Medical First Responder Approved 2015 • The number of calls varies annually, • Having seven locations to respond MFR currently represent approximately from, the Fire Service arrives in advance 60% of total calls. of ANB about 56% of the time, thereby initiating lifesaving assessment and treatment sooner. • All Fire Fighters are recertified annually • Higher survivability rates for victims, supported by national statistics. • Fire Service's response objectives provide significant opportunity for successful intervention on MFR calls. Minutes mean the difference between life and death for heart attack or severe trauma victims. • During simultaneous call events, response times to medical calls will increase based upon the placement of the remaining resources. 121 Wages & Benefits $0 Goods & Services 83,000 Total Expenditures $83,000 Full Time Equivalent Positions (FTE) Human resource requirements are included as part of Fire Suppression and Rescue Service. Administrative / Other Support Services • Fleet — equipment availability, replacement of equipment and vehicles and fuel delivery at extended incidents • PSCC — receives, records and dispatches related calls • Police — scene safety and security, traffic control, keeping of the peace, as well as assists with site evacuation 64 Hazardous Materials (HazMat) Emergency Response Service The Hazardous Materials Emergency Response Service provides a planned response to incidents where the public is exposed to risks created by the release of, or fire involving hazardous materials. All emergency response incidents that occur within a municipal boundary are the responsibility of the municipality. This includes emergency responses to spills or accidental releases of hazardous materials being any solid, liquid, or gas capable of creating harm to people, the environment, and /or property. Emergency responses include site assessment, container evaluation, threat assessment, victim removal, search and rescue, extrication /disentanglement, smoke /toxic gas ventilation, identification / analysis of the material, evacuation, establishing a safe working area and monitoring or sampling of the material. The service also includes decontamination of personnel and equipment, notification of other agencies, and referral to the proper authorities. Through a fee for service agreement, the City delivers (in cooperation with the appropriate local authorities) hazardous materials emergency response service to regional communities, in accordance with established service standards and operational plan. 2014 Hazardous Materials (HAZMAT) Emergency Response Service Accomplishments and Performance • 154 calls for Hazardous Materials Emergency Response Service (January to November) • Actual response time to Hazardous Materials Incidents was 5 minutes and 30 seconds, 74% of the time • 95% of the time — arrived on scene within 10 minutes of call • 100% of the time — had an action plan within 45 minutes • Delivered one regional hazardous materials training exercise to the Royal Fire Fighters Association 2015 Major Initiatives, Major Projects and Hazardous Materials (HAZMAT) Emergency Service Delivery Highlights • Increase revenue through an enhanced Regional Hazardous Materials Agreement. • From the new live -fire training campus, initiate two IFSAC certified Hazardous Materials Technical courses open to any emergency responder in New Brunswick. • When invited, participate in CBRNE international training initiatives. • Continue providing technical input to the FCM railway safety working group. • Provide technical input to various Environmental Impact Assessment processes from a hazardous materials response perspective. Approved 2015 65 122 Hazardous Materials (HAZMAT) Emergency Response Service — Service Levels and Resources First apparatus arrives to the scene of an emergency within 5 minutes and 30 seconds at least 90 % of the time for the completion of dispatch. Hazardous Materials Response is conducted in accordance with National Fire Protection Standards NFPA 471 & NFPA 472; activities include identifying, isolating hazardous materials releases, and to beginning recovery planning. • Scene security is established upon arrival and the product is identified within 10 minutes. • An Incident action plan is developed and initiated within 45 minutes from arrival on scene. Carry out a comprehensive fire training program that supports the effectiveness of Hazardous Materials Response Service. Eliminate overtime for Constant Manning of fire apparatus. Approved 2015 • Average of 300 local incidents each • The presence of a well- trained and Wages & Benefits $30,371 year reactive Hazardous Materials Goods & Services 98,834 Response team ensures minimal Total Expenditures $129,205 • O to 3 regional incident each year disruption to the community and impact on the environment arising Revenue $90,000 from a hazardous materials emergency response. Full Time Equivalent Positions (FTE) Management 0.25 • Hazardous Materials Incidents are Total FTE 0.25 the low frequency high impact incidents that can affect a great Note: Firefighters are accounted for under Fire geographical area. Rescue and Suppression Service • For non - simultaneous events, the Administrative / Other Support Services existing Hazardous Materials . Fleet — equipment availability, replacement of Response team is well positioned to equipment and vehicles and fuel delivery at deal with any incidents that occur extended incidents through processing, storage and . GIS — mapping and relevant occupancy data transportation of hazardous critical to making decisions related to materials • All personnel trained to NFPA 472 materials within the regional incident mitigation and /or evacuation needs Hazardous Materials operations community • PSCC — receives, records and dispatches related level • During simultaneous events, where • Police — scene safety and security, traffic control, • Over 50 trained personnel to a Hazardous Materials Response keeping of the peace, as well as assists with site Hazardous Materials Technician call is the second call, where the Level first is a structure fire, there will be evacuation a limited depth of response until • Roadway Maintenance — provides site clean-up such time as overtime crews arrive. and materials disposal • Communications — notifications • The elimination of overtime may result in random and variable service loss. 123 T. Technical Rescue Service The Technical Rescue Service carries out emergency rescue to those individuals trapped by their physical environment (water, ice, motor vehicle accident, structural collapse, confined space or high angle). (The Fire Department is currently working toward certification in confined space and high angle rescue.) The industrial base, geography and size of Saint John increase the demand for the Fire Service (Technical Rescue Service) to respond to rescues that are highly technical in nature. Firefighters are cross - trained to meet these technical rescue needs. Although emergencies that require dispatch of a technical rescue team seldom occur, they are incidents that pose a highly technical response to ensure a safe intervention for both the victims and firefighters. 2014 Technical Rescue Service Accomplishments and Performance • 19 calls for Technical Rescue Response Service (January to November) • 185 calls relating to motor vehicle accidents • 15 vehicle extrications — on each occasion a victim was removed from automobile enabling advanced life support care • Response Time Efficiency —The Saint John Fire Department operates with the expectation that the first apparatus arrives to the scene of an emergency within 5 minutes and 30 seconds at least 79% of the time • Actual response time to Technical Rescue Incidents was 5 minutes & 30 seconds, 62% of the time • Training — The comprehensive fire training program (920 hrs. per person) supports the effectiveness of the Technical Rescue Response Service • Rope Rescue Program implemented in 2014. Staff trained for high angle rescue support to Saint John Water partnership. On Christmas Eve provided high angle rescue support to Saint John Water on SCADA repairs, avoiding thousands of dollars of expenditures to the City. 2015 Major Initiatives, Major Projects and Technical Rescue Service Delivery Highlights • From the new live -fire training campus, deliver High Angle response competence to a regional market. • Development of confined space rescue response team. • Investigate / examine opportunities to champion other Technical Rescue Service at a regional level. Approved 2015 67 124 Technical Rescue Service — Service Levels and Resources First apparatus arrives to the scene of an emergency within 5 minutes and 30 seconds at least 79% of the time from the completion of dispatch for Technical Rescue Call Types. Provide highly skilled rescue services not part of structural firefighting or medical first responder service, but facilitated within the same response profile as Fire Rescue and Suppression Service. Develop an incident action plan within 10 minutes of arrival on scene. Skills training is unique to each type of technical rescue (auto- extrication, water /ice, confined space and high angle). Eliminate the overtime for Constant Manning of Fire Apparatus Approved 2015 • On average, there are 33 technical rescues performed annually. • High Angle Rope Rescue Program implemented in 2014 • Partnership with Saint John Water for high angle rescue support. • Skills as identified in NFPA Standard 1006 — Standard for Technical Rescuer Professional Qualifications • Technical rescue capability provides emergency response to persons trapped by their environment. • Saint John Water needs high angle rescue service to support critical operations. A relationship agreement to be signed in 2014. • Technical rescue helps address the occupational health and safety requirement inherent to numerous tasks. • Revenue Generation — As the depth of expertise evolves the Technical Rescue Service will generate revenue through the provision of service to third parties as well as eliminate the service cost for other City of Saint John services. • During simultaneous events, where a Technical Rescue Response call is the second call, where the first is a structure fire, there will be a limited depth of response until such time as overtime crews arrive. • The elimination of overtime may result in random and variable service loss. 125 Wages & Benefits $30,371 Goods & Services 29,033 Total Expenditures $59,404 Revenue $0 Full Time Equivalent Positions (FTE) Management 0.25 TotalFTE 0.25 Administrative / Other Support Services • Fleet — equipment availability, replacement of equipment and vehicles and fuel delivery at extended incidents • PCSS - receives, records and dispatches related calls • Police — provides site safety, traffic control, assists with evacuations .: Fire Prevention and Code Enforcement Service The Fire Prevention and Code Enforcement Service performs technical and field work that includes inspections of all manner of occupancies to ensure life safety and to identify possible fire code violations. Service is delivered within the mandate of the Provincial Fire Marshal to enforce and rectify deficiencies found during inspections. Public education is also a huge undertaking carried out by the Fire Prevention Service team. 2014 Fire Prevention Services Accomplishments and Performance • Professional Development: 3 Inspectors completed the professional development for Fire Prevention Officers • Purchased / Implemented Code Pal Field Report System (Oct 2014) for greater efficiency & field reporting for inspection process • 1104 inspections and 126 re- inspections conducted during 2014 (January to November) • 20 Community Events supported • Purchased new Fire Safety House Trailer through the sponsorship of Emera Brunswick Pipeline • Fire Safety House School Program — With 19 schools partnering with our Fire Prevention Division, a total of 1,521 Children in grades 3 & 4 participated in our Fire Safety House School Program 2015 Major Initiatives, Major Projects and Fire Prevention Service Delivery Highlights • Development of better performance measurements for violation pursued through judicial system for 2015 and public fire education programs. • Investigate / examine opportunities to champion fire prevention service at a regional level. • Implement a fire service by -law that will propose revenue generating options in support of Common Council's priorities. Approved 2015 126 1 Fire Prevention Service — Service Levels and Resources Carry out inspections (annual, biennial, or for operating licenses) on properties requiring inspection (e.g., hotels, schools, apartment buildings, daycares) as outlined by the Fire Marshal. All Fire Prevention personnel trained to: • National Fire Protection Standard 1031 - Standard for Professional Qualifications for Fire Inspector as per National Fire Protection Standard 1035 - Standard for Professional Qualifications for Public Fire and Life Safety Educator and NFPA Standard. Carry out a regularly scheduled public education program that addresses all schools in the community in addition to Children's Fire Safety House, Learn Not to Burn Program K -2, Juvenile Fire - setter Counseling, Building Trade Shows, Church Groups and Business Clubs. Approved 2015 • At full staffing, the division can conduct 1,500+ inspections (including 500+ re- inspections) annually, to complete all required inspections over a 4 to 6 year cycle. • At full staffing, the division can identify and close 2,500+ violations annually Numerous fire prevention programs annually. In 2015, present to Council a Fire Department Policy and By -law for consideration. Inspections and public education sessions help to reduce the number of fire incidents. This supports Council's priority of creating safe, livable neighbourhoods as well as reducing operating costs and those related to property loss or damage. The enforcement of fire codes through inspection activities contributes to public safety by ensuring that new and existing buildings are constructed and maintained to current fire safety standards. The fire inspection service aims to inspect nearly 6,000 properties on a regular rotation. Inspections are regulated for properties annually or every two years. Fire Prevention Service contributes to the improved public safety within the community by ensuring that people have the necessary information to stay safe and healthy from the adverse effects of inappropriate uses and behavior of fire. 127 Wages & Benefits $824,675 Goods & Services 154,797 Total Expenditures $979,472 Revenue $4,000 Full Time Equivalent Positions (FTE) Management 0.90 Firefighters 5.70 Inside Workers — Administrative 1.00 Total FTE 7.60 Administrative / Other Support Services • Fleet — equipment availability, replacement of equipment • GIS - provide mapping and relevant occupancy data critical to the decision making • Permitting and Inspection / By -Law Enforcement — support through their day -to -day inspection work including minimum standards and the vacant building program • Communications — assists with public education and awareness 70 Fire Investigation Service The Fire Investigation Service investigates every fire or explosion that results in property damage, injury, or death to determine the origin, cause and circumstances of the fire /explosion. The investigation is initiated immediately during the initial stages of a fire response. The results of the investigations are forwarded to the Office of the Fire Marshal as part of the collection of provincial fire statistics which in turn could impact changes to the provincial fire codes. If the fire is considered to be suspicious or if there is a fatality, the Saint John Police Force participates in the investigation and follow -up. 2014 Fire Investigation Services - Accomplishments and Performance • 34 fire investigations were conducted in 2014 up to the month of November • All Fire Prevention Officers are trained to conduct fire investigations • Hosted fire investigation curriculum in Saint John 2015 Major Initiatives, Major Projects and Fire Investigation Service Delivery Highlights • Investigate / examine opportunities to champion fire investigation service at a regional level. • Continue to provide regional training opportunities in Fire Investigation. Approved 2015 128 71 Fire Investigation Service — Service Levels and Resources Investigator arrives on within 30 minutes • 30 to 100 investigations on average of being called. carried out annually The Saint John Fire Department expects to identify the area of origin 95% of the time, the point of origin 90% of the time and the source of ignition 85% of the time. All Fire Investigators are certified to: • NFPA 912 - Guide for Fire and Explosion Investigations • NFPA 1033 - Standard for Professional Qualifications for Fire Investigator Approved 2015 Without knowing the cause and origin of a structure fire, insurance companies may not payout claims, faulty products may not be identified, contributing human behavior and potential acts of arson may go undetected. Accurate detection of the cause of fire helps determine fire education and code enforcement needs. 129 Wages & Benefits $50,875 Goods & Services 22,291 Total Expenditures $73,166 Full Time Equivalent Positions (FTE) Management 0.10 Firefighters 0.30 TotaIFTE 0.40 Administrative / Other Support Services • Fleet — equipment availability — Fire Investigation Van • Police — participate in the investigation of suspicious fires • Permitting and Inspection / By -Law Enforcement — support through their day -to -day inspection work including minimum standards and the vacant building program • Saint John Salvage Corp and Fire Police — volunteer organization providing site security and traffic management 72 Emergency Management Service The Emergency Management Service is the municipal catalyst for public and private inter - agency coordination of community -based emergency management and business continuity programs. It is managed by an all - hazards approach to preventing or mitigating risks, ensuring preparedness through effective response and recovery mechanisms, and achieving continuous improvement through program evaluation and revision. Provincial, Municipal and Federal legislation/ Standards Community readiness and resilience Municipal government operational readiness Industry standards 2014 Emergency Management Service - Accomplishments and Performance • SJEMO Staff provided Incident Command personnel to the CN Waspke NB Train Derailment • Local representation on the Canadian Association of Fire Chiefs (CAFC) Transportation of Dangerous Goods Committee • Committee member on the Federation of Canadian Municipalities (FCM) National Rail Safety Working Group • Committee member on Transport Canada's ERAP Task Force Sub Group 1— Examining the effectiveness of emergency response assistance plans for rail incidents involving flammable fuel fires • Joint exercises with industry partners including Emera Brunswick to assess emergency notification and evacuation procedures • Numerous community presentations on the role of SJEMO and presence at Community liaison groups regarding pipelines. • Meeting with National Energy Board on Risk Assessment in the community. 2015 Major Initiatives, Major Projects and Emergency Manager Service Delivery Highlights • Develop and practice specific site emergency response plans (postulated events) to augment the existing all hazards plan, for the purpose of enhancing site specific catastrophic event mitigation and recovery. • Identification and development personnel (network) to support the critical roles within the Emergency Operations Centre (EOC). • Provide technical input into various Environmental Impact Assessments / NEB processes related to industrial opportunities in the community. Approved 2015 130 73 Emergency Management Service — Service Levels and Resources Strive to maintain an up -to -date Emergency Plans (including Evacuation & Emergency Management Units) with regular operational testing (CSA Z1600). Strive to ensure that an appropriate number of people have been identified to support a prolonged EMO event. Strive to ensure documentation is regularly updated Strive to ensure the identified EMO participants are adequately trained. Approved 2015 • The regular engagement of numerous EMO participants / stakeholders through planning and exercises • Effective response to events which require EMO participation • Familiarity with Emergency Plans as it relates to community's risk. • EOC fully functional within an hour of the Emergency Measures Organization activation. The service strives to: minimize the impact of emergencies on the residents, property and environment of Saint John; support effective and efficient emergency operations and helps to develop a knowledgeable and prepared community. However without dedicated human resources and sufficient funding, service outputs are diminishing. Without dedicated human resources and sufficient funding for the Service, there will be no regular emergency event exercises or regular employee training. Emergency event exercises and employees training will be addressed on an ad hoc basis. • Without dedicated human resources and sufficient funding, public awareness campaigns will not be regular or ongoing. It will take longer to create an informed public about what to do during an emergency event. Similarly sporadic awareness campaigns lack effectiveness. • The opportunity to lead EMO at the regional level diminishes without dedicated human resources. 131 Wages & Benefits $232,954 Goods & Services 59,647 Total Expenditures $292,601 Full Time Equivalent Positions (FTE) Management /Professional 1.65 Inside Worked - Administrative 0.50 Total FTE 2.15 Administrative / Other Support Services • Fleet — equipment availability —EMO Command Trailer • IT— Facilitates the technological, software and communication needs of the Emergency Operations Centre PSCC — receives, records and dispatches emergency calls as well as acts as acts as a resource to the Emergency Operations Centre during activation Communications — notifications, assistance with public education and awareness, crisis communications preparedness Other Service Areas — provide staff support to the Emergency Operations Centre as well as on scene management when the EOC has been activated 74 Transportation & Environment Services Overview The Transportation and Environment Services team delivers services that support the community in achieving its long -term vision and goal of creating a green, attractive city where people can get around safely and easily. Services are delivered to provide an evolving array of convenient, comfortable, affordable and efficient modes of transportation. Service also focuses on protecting the natural environment with the maintenance of outstanding parks, green and other public space, while promoting a shared commitment to environmental stewardship and keeping Saint John clean. Services delivered include Roadway Maintenance, Sidewalk Maintenance, Pedestrian and Traffic Management, Stormwater Management, Solid Waste Management, Parks and City Landscape, and Recreation and Sports Facilities. Engineering is an internal support to the delivery of these services and other services delivered by the City. Organizational Goals To establish the City of Saint John as a service - based, results oriented, high performance public service organization. Service Based • Considering the needs of the community as a whole • Creating opportunities for citizen feedback and input • Responding effectively and efficiently to address community needs Approved 2015 Results Oriented • Safe, efficient transportation system with minimal service interruption • Quality, fiscally responsible maintained infrastructure • Clean and aesthetically pleasing community High Performance • Collaborative, strategically minded workforce • Culture focused on contributing to community goals through service delivery • Resource conscious and accountable for results 132 Roadway Maintenance Service Sidewalk Maintenance Service Pedestrian and Traffic Management Service Stormwater Management Service Solid Waste Management Service Parks and City Landscape Service Sports and Recreation Facilities Service Engineering 75 Transportation & Environment Services Summary Total Service Storm Water Management Service Stormwater Maintenance Total Service Solid Waste Collection Service Solid Waste and Compost Collection Total Service Engineering Approved 2015 2,345,317 2,352,228 20,000 FTE Notes 28.60 31.78 15.15 75.53 11.51 6.41 17.92 4.49 11.10 15.59 3,165,539 Approved 2014 Expenditures 2015 Revenue Roadway Maintenance Service 3,385,292 0 15.26 Roadway Surface Maintenance 6,332,016 6,073,276 46,000 Roadway Snow and Ice Control 4,945,281 4,849,817 184,000 Street Cleaning 1,885,781 1,663,684 0 Total Service 13,163,078 12,586,777 230,000 Sidewalk Maintenance Service Sidewalk Surface Maintenance 591,192 991,207 0 Sidewalk Winter Maintenance 902,609 907,160 0 Total Service 1,493,801 1,898,367 0 Pedestrian and Traffic Management Service Traffic Enhancements 562,876 564,534 0 Traffic Maintenance 1,782,441 1,787,694 20,000 Total Service Storm Water Management Service Stormwater Maintenance Total Service Solid Waste Collection Service Solid Waste and Compost Collection Total Service Engineering Approved 2015 2,345,317 2,352,228 20,000 FTE Notes 28.60 31.78 15.15 75.53 11.51 6.41 17.92 4.49 11.10 15.59 3,165,539 3,385,292 0 15.26 3,165,539 3,385,292 0 15.26 3,547,444 3,546,103 0 15.91 3,547,444 3,546,103 0 15.91 499,369 484,575 2,000 4.04 133 76 Summary continued... 4dditional 1.5 FTE in Parking Service is funded through the Saint John Parking Commission and is part of the City's establishment Approved 2015 134 77 Approved 2015 2014 Expenditures Revenue FTE Notes Parks & City Landscape Service Parks Maintenance 2,512,162 2,540,655 12.68 Urban Forestry 269,513 279,515 2.95 Lifeguards 117,720 120,663 Mispec Park 30,000 5,000 Saint John Horticultural Association 40,000 40,000 Total Service 2,969,395 2,985,833 15.63 Sports and Recreation Facilities Service Arena Operation and Maintenance 1,508,706 1,502,745 773,569 11.76 Sports field Operation and Maintenance 1,224,401 1,273,653 89,758 9.66 Other Facility Operation and Maintenance 410,405 388,740 2.20 Sport Administration (Facility Booking) Subsidies - Hockey 169,000 173,000 Subsidies — Aquatic Clubs 15,822 15,822 Lord Beaverbrook Rink 159,000 159,000 Aquatic Centre 322,070 406,890 Total Service 3,809,404 3,919,850 863,327 23.62 Parking Service (Administration Support) 560,379 648,379 1,595,000 *3.00 Transit Service 6,886,723 7,105,000 Total Transportation & Environment Services $38,440,449 $38,912,404 $2,710,327 186.50 4dditional 1.5 FTE in Parking Service is funded through the Saint John Parking Commission and is part of the City's establishment Approved 2015 134 77 Table of Contents — 2014 Service Plans Roadway Maintenance Service ......................................................................................................................... ............................... 79 SidewalkMaintenance Service .......................................................................................................................... ............................... 85 Pedestrian and Traffic Management Service .................................................................................................... ............................... 89 StormwaterManagement Service .................................................................................................................... ............................... 94 SolidWaste Management Service ..................................................................................................................... ............................... 96 Parks& City Landscape Service .......................................................................................................................... ............................... 98 Sport and Recreation Facilities Service ........................................................................................................... ............................... 104 Engineering...................................................................................................................................................... ............................... 110 TransitService .................................................................................................................................................. ............................... 112 ParkingService ................................................................................................................................................. ............................... 114 Approved 2015 78 135 Roadway Maintenance Service The Roadway Maintenance Service provides motorists and cyclists with safe, functional roads and maintains accessibility of these roads through all seasons. The service utilizes various techniques and processes to maintain the integrity of the road surface and extend roadway service life, including preventive maintenance activities (asphalt patching, crack - sealing) and maintenance resurfacing of deteriorated roadway sections; mitigation of the effects of snow and ice during the winter months; maintenance of roadway structures (retaining walls, guiderails) and medians; surface reinstatement of roadway excavations; and cleaning streets of sand and debris. Service Delivery Roadways are maintained using a priority system based on street classification (use / need) and traffic volumes. The goal is to ensure that service is delivered to minimize the risk of injury or property damage and service interruptions. Priority 1: main streets, highway connections, emergency routes Priority 2: major bus routes, schools, business areas Priority 3: collector streets, minor bus routes, industrial parks Priority 4: local or subdivision streets In ensuring roadway maintenance is effective in providing the public with a safe and efficient transportation network, the City delivers several programs. The following chart identifies each of these programs and the percentage of funds allocated to them to deliver a defined level of service for 2014. Roadway Maintenance Programs o Surface Maintenance ■ Snow and Ice Control N Street Cleaning Approved 2015 Focus on asset management and integrated planning Accessibility to various sustainable modes of transportation Economic uncertainty, inflation, and supply and cost of materials Global weather conditions and impact on safety and infrastructure Inventory and condition assessment of transportation infrastructure Innovation in maintenance techniques and methodologies Organizational capacity Expectations for safe, functional roads with timely service response 136 79 2014 Roadway Maintenance Service Accomplishments and Performance Council Priority to implement recommendations for improvements to the City's roads using pavement condition index (PCI) measures and increased funding did not result in an increased PCI for 2014. The PCI for 2014 decreased by 1.1% to 75.4 %. The results of the 2014 road condition surveys revealed an enhanced deterioration of the City's road network. Even though funding from all sources facilitated the resurfacing of 97 of the City's 1,236 lane kilometers (7.8 %) of roads; the benefit of the 2014 program was overshadowed by the impact of the severe winter and the numerous freeze -thaw cycles. The winter of 2013/14 could be an anomaly. Staff will review the results of the 2015 road condition survey to determine if increased funding is required to achieve the target PCI. a a d to d a' 100 85 70 55 40 25 10 Total Average Pavement Condition (PCI) for all City of Saint John Streets (asphalt surface only) � PCI 77.5 PCI Target M U a For 2014, the pavement condition index (PCI) slight decrease from the 2013 level of 76.5% but is still higher than the low of 72.8% in 2011. To achieve the PCI target of 77.5% it was previously recommended that 61 lane kilometers of asphalt rehabilitation and /or reconstruction be completed annually. Given the funds allocated to the service in 2014, 73 lane km were enhanced through milling and overlay; 5 lane km were enhanced through total reconstruction and 19 lane km were enhanced through the localized maintenance program. Note: A correction in PCI results was applied to account for anomalies in the software. PCI is calculated using a ten (10) year trend to determine the relative PCI from one year to the next indicating improvement or decline in pavement condition. PCI includes assessment of provincial roads (citizens do not consider responsibility for maintenance when determining • Developed and implemented manhole inspection, retaining wall, and guide rail preventative maintenance programs to identify infrastructure deficits and plan maintenance and replacement costs. Permanent repairs were completed for 85 structures as part of the asphalt resurfacing program (75 General Operating and 10 Capital) and approximately 50 temporary repairs (asphalt collaring) were completed until permanent repairs can be completed. • Street sweeping completed for 97% of asphalt street inventory with curb and sidewalk only. Approved 2015 137 - • The primary service objective for winter roadway maintenance was met 94% of the time and the secondary service objective was met 93% of the time. • Issues occurred during storms of higher severity due to reduced equipment availability (winter operations are hard on equipment). In many situations, objectives could not be measured accurately as new storms started within the timeframes set out in the service objectives. • Winter parking ban supported more efficient operations and a decrease in insurance claims and associated claim costs resulting from incidents with parked cars and snow clearing equipment (in relation to the severity of the winter storm season). • Initiated Brine program by purchasing two units, one east and one west. The goal is to reduce the amount of salt used by 20 %. • Completed an operational and financial analysis of the manhole raising component of asphalt resurfacing operations. Percent kilometres of streets plowed to service level standards for top 6 storm event for 2013 -2014 Winter Storm Season ■ Primary Standard Secondary Standard ♦ Storm Severity Index 100% r c R soi C 60% E Y 40% v v 20% 0% 15 -12 -2013 22 -01 -2014 16 -02 -2014 14 -03 -2014 26 -03 -2014 01 -04 -2014 2015 Major Initiatives, Major Projects and Roadway Maintenance Service Delivery Highlights • Continue to conduct an Operational and Financial Analysis of the asphalt maintenance activities (milling and roller activities); • Revive the Spring Street Sweeping Program • Develop and implement an operational balance between manhole raising and asphalt spreading activities • Complete a roadway fencing inventory and condition assessment • Assist with the development of a Streets and Sidewalks Bylaw that deals with Right -Of -Way encroachment • Complete an operational /financial analysis for asphalt inspection services Approved 2015 138 80 70 60 50 40 30 20 10 0 r T E O AA 81 Roadway Surface Maintenance Program - Service Levels and Resources Asphalt maintenance of roadway surface to maintain a network PCI of 77.5 %. Repair potholes, asphalt damage and shoulder drop -offs within the timelines set out below after becoming aware of the fact 80% of the time. Emergency or Urgent (hazard to persons or property, interrupts service or potential to turn into a hazard and > 200 cmz in area and 10 cm in depth) • Priority 1 Streets —4 days • Priority 2 Streets — 7 days • Priority 3 Streets —14 days • Priority 4 Streets — 30 days Seasonal repair of potholes, asphalt damage and shoulder drop -offs as resources are available or when area deteriorates to Urgent priority. Repair or replacement of guiderail or retaining walls that may be a hazard to persons or property or interrupt service within 1 month for guiderail and up to 2 years for major retaining walls of the becoming aware of the fact. Approved 2015 • 73 lane km resurfacing (mill and sea]) • 5 lane km resurfaced (total reconstruction) • 19 lane km resurfaced (localized maintenance program) • Over 2,000 potholes filled through 592 work orders (cold mix) • 710 other work orders completed for various types of asphalt repairs (patch work, collaring, driveway apron repairs, water rolls and asphalt sidewalk repairs) • 30 km of road shouldering (average) • Requirements vary annually depending on citizen requests and inspection results. • Service strives to maintain streets to an acceptable standard to ensure safety, extend service life, and achieve the best value for the investments made in these public assets. • Proposed asphalt rehabilitation work will support maintaining and minor improvements to the PCI standards and addresses a very small portion of the infrastructure deficit. Investment in asphalt rehabilitation reduces long term costs associated with maintenance and reconstruction of streets. • Cost - effective resurfacing of municipal streets should be coordinated with curb and sidewalk renewal in order to realize the expected service life of the street. Limited funding allocations for curb in the operating budget (some curb and sidewalk in capital) means that the focus of the resurfacing program will be on roads without curb and sidewalk. • Asphalt repair (potholes and damage) addresses immediate safety and liability concerns. • Guidelines support customer service improvement initiatives by providing better information to citizens on service expectations and reducing work order deficit. 139 Wages & Benefits $2,010,073 Goods & Services 4,063,203 Total Expenditures $6,073,276 Revenue(PDH /RDH) $46,000 Full Time Equivalent Positions (FTE) Management 1.03 Inside Workers 1.80 Outside Workers 25.77 TotaIFTE 28.60 Part Time Positions (PTE) 3.60 Administrative / Other Support Services • Fleet — equipment availability • Purchasing — supply of materials • Human Resources — staffing / training • Communications — notifications, assist with public awareness of service expectations • Police — Work Zone Safety monitoring • GIS — inventorying and displaying assets for management of infrastructure Tr Roadway Snow and Ice Control Program - Service Levels and Resources Plow all streets of snow (plowing) within the City's road network to meet service objectives after a storm event 100% of the time. Priority 1: 8 hours — bare travel lanes 2 days — bare curb to curb Priority 2: 8 hours — bare centre line 2 days — bare travel lanes Priority 3: 12 hours — bare centre line 3 days— bare travel lanes Priority 4: 12 hours — accessible / packed 4 Days — bare center line Remove snow as follows: Priority 1: Before 20 cm accumulation or a.s.a.p. after a major storm Priority 2: Before 30 cm accumulation or a.s.a.p. after a major storm Priority 3: Before 60 cm accumulation or a.s.a.p. after a major storm Priority 4: As determined by conditions Response to service requests for winter drainage issues, plowing and snow removal within 72 hours after end of storm 80% of the time - action taken as resources are available (immediate if urgent). Drainage issues may not be resolved until construction season. Approved 2015 Average 10 -12 storm events annually • 330.4 lane km Priority 1 (main streets, emergency routes, highway connect) • 185.4 lane km Priority 2 (bus routes, schools, businesses areas) • 255.4 lane km priority 3 (collector streets, industrial parks, minor bus routes) • 572.4 lane km local streets / subdivisions • Tones of snow removed from streets depends on accumulation and severity of winter storm conditions • Number of requests varies annually • The service strives to enhance public safety by providing functional streets that allow safe movement of people, vehicles and goods safely through the extremes of winter snow and ice events. Ability to meet defined service objectives is dependent on storm severity and frequency as well as equipment availability (winter maintenance operations is hard on equipment). • The service strives to meet plowing objectives for priority 3 and 4 streets. The public should expect that initial response or pass to these streets will occur later than in past winter weather seasons. 140 Wages & Benefits $2,236,388 Goods & Services 2,613,429 Total Expenditures $4,849,817 Revenue (PDH /RDH) $184,000 Full Time Equivalent Positions Management 1.06 Inside Workers 0.60 Outside Workers 30.12 TotaIFTE 31.78 Part Time Positions (PTE) Administrative / Other Support Services • Fleet — equipment availability • Purchasing — supply of materials • Human Resources — staffing / training • Communications — notifications, assists with public awareness of service expectations • Legal — parking / by -law enforcement • Parking — enforcing the Traffic By -law • Police — enforcing the Traffic By -law for the Overnight Parking Ban in the South Central Peninsula • GIS — inventorying and displaying assets for management of infrastructure 7M Street Cleaning Program - Service Levels and Resources Weekly sweeping of streets in the Central Business District Weekly sweeping of city wide priority 1 streets Annual sweeping of streets with curb only and designated biking areas city wide between April and mid - October (i.e., streets swept once a year) Maintain and collect garbage from City barrels and pole baskets (inspected and emptied 4 times / week) Illegal dumping complaints cleaned up within 5 days Approved 2015 • 36.5 lane km streets • 41 lane km streets • 323 km streets annually • 39 City barrels • 101 pole baskets • 352 illegal dumping clean -ups in 2013 • The service strives to clean streets of sand and debris to make it safer and cleaner for the community. • Limiting sweeping operations to only those streets with curbs minimizes the impact on stormwater management operations. However, in areas of the City where materials and debris builds up, line painting may deteriorate faster, dust may be more difficult to control and may pose a small safety hazard to pedestrians, cyclists and motorists. • To maintain a healthy and attractive urban environment, the Central Business District (CBD) receives a strong focus due to high density of activity from citizens and tourists including Cruise Ship visitors. • The barrel /pole basket program provides a valuable service in keeping City streets clean on an ongoing basis. • Illegal dumping clean -ups mitigate construction debris on streets and furniture that can be a fire hazard. 141 Wages & Benefits $1,013,698 Goods & Services 649,986 Total Expenditures $1,663,684 Full Time Equivalent Positions (FTE) Management 0.62 Inside Workers 0.12 Outside Workers 14.41 TotaIFTE 15.15 Part Time Positions (PTE) 0.05 Administrative / Other Support Services • Fleet — equipment availability • Purchasing — supply of materials • Human Resources — staffing / training • GIS — inventorying and displaying assets for management of infrastructure X Sidewalk Maintenance Service The Sidewalk Maintenance Service provides pedestrians with safe and functional sidewalks, walkways and access ramps. The service consists of maintenance of concrete, asphalt and brick infrastructure; installation and maintenance of access ramps; maintenance of grass medians and other green spaces; mitigation of the effects of snow and ice during winter months; and effective lifecycle management of sidewalk assets. Well maintained, connected and accessible sidewalk infrastructure allows all pedestrians to safely exercise or gain access to schools, businesses, public transit or other destination. Service Delivery In ensuring sidewalk maintenance is effective in providing the public with a safe and efficient pedestrian network, the City delivers several programs as part of its service delivery. The following chart identifies each of these programs and the percentage of funds allocated to them to deliver a defined level of service for 2013. Sidewalk Maintenance Programs * Sidewalk Maintenance o Sidewalk Snow and Ice Control Approved 2015 Focus on asset management and integrated planning Accessible municipal sidewalk, walkway and trail network Economic uncertainty, inflation, and supply and cost of materials Global weather conditions and impact on safety and infrastructure Maintained infrastructure that connects neighbourhoods Innovation in maintenance techniques and methodologies Organizational capacity Expectation for safe, functional sidewalks with timely service response 142 .M 2014 Sidewalk Maintenance Service Accomplishments and Performance • The primary service objective for winter sidewalk maintenance was met 67% the time and the secondary service objective was met 92% of the time. • The frequency, severity and wet weather events followed by 100% sudden drops in temperatures resulted in an inability to meet 80% the Service Objectives at a higher rate. E 60% • Completed a comprehensive review of the City's winter 40% sidewalk inventory and enhanced the winter plowing maps. .CU zor 0% Percent kilometres of sidewalks plowed to service level standards for top 6 storm events. 2013 -2014 Winter Storm Season 15 -12 -2013 22 -01 -2014 16 -02 -2014 14 -03 -2014 26 -03 -2014 01 -04 -2014 2015 Major Initiatives, Major Projects, and Sidewalk Maintenance Service Delivery Highlights • Continue to repair trip hazards with more efficient grinding equipment. • Continue to improve accessibility of sidewalks by installing Access Ramps. • Complete a full re- inspection of 50% of the City's sidewalk system to proactively identify Trip Hazards. • Complete a brick /concrete /asphalt maintenance operational analysis Approved 2015 143 80 70 60 50 40 30 20 10 0 x e `o Sidewalk Maintenance Program - Service Levels and Resources Repair Priority 1 Trip Hazards (sidewalks that provide direct access to pedestrian generators with lips or gaps of 25 mm or greater) within 1 month of receiving a request between May and October and within 10 months between November and April. Repair Priority 2 Trip Hazards (sidewalks that do not provide direct access to pedestrian generators with lips or gaps of 25 mm or greater) within 9 months of receiving a request between May and October and within 18 months between November and April. Installation of barrier free accesses to sidewalks at crosswalks. Mowing of medians and other greenspaces around sidewalks will not be completed as part of service delivery other than are required in areas where sight -lines are obstructed. Approved 2015 • Approximately 125 trip hazards repaired annually • 920 mzof brick sidewalk, 240 M 2 Of concrete curb and 441 M 2 of concrete sidewalk to replace asphalt curb and sidewalk. • 10 new access ramps installed annually • As required The service strives to provide maintenance that ensures there is a clean, clear, accessible and safe place for pedestrian traffic, focusing on (1) repair or replacement of sidewalk sections to eliminate trip hazards and (2) installation of access ramps ensuring sidewalks are accessible to everyone. • Pedestrian safety improves with repair to trip hazards. • Mitigate liability to City with respect to trips and fall resulting in injury to the public. • Lower priority trip hazards remain unrepaired, with a small chance of causing injury. • Improve accessibility to the sidewalk and walkway network for everyone. • Mowing of greenspaces around sidewalks will focus on public safety issues resulting in areas of the City that may not be as aesthetically pleasing. 144 Wages & Benefits $837,457 Goods & Services 153.750 Total Expenditures $991,207 Full Time Equivalent Positions (FTE) Management 0.41 Inside Workers 0.08 Outside Workers 11.02 TotaIFTE 11.51 Part Time Positions (PTE) 1.85 Administrative / Other Support Services • Fleet — equipment availability Purchasing —supply of materials Human Resources — staffing / training GIS — inventorying and displaying assets for management of infrastructure M Sidewalk Snow and Ice Control Program - Service Levels and Resources Plow 61% of the sidewalks in the City to the standards set out below 95% of the time. a) plow a pedestrian passage: • Priority 1 within 12 hours • Priority 2 and 3 within 24 hours • Priority 4 within 72 hours b) plow to a walking surface with traction standard • Priority 1 within 2 days • Priority 2 and 3 within 3 days • Priority 4 within 4 days Approved 2015 240 km of sidewalks plowed based on the following criteria: • Higher pedestrian volumes (close proximity to retail areas, SJ Transit bus stops, schools) • Continuity of a pedestrian system • Sun exposure in melting snow and ice • Efficiency of servicing by sidewalk plowing equipment • Higher vehicle volumes or speeds • The service strives to remove snow from a portion of the City's sidewalk infrastructure during and after winter storm events that include salting and sanding operations, supporting the safe, efficient flow of pedestrian traffic in a portion of the City. • With the right- sizing of equipment to support snow control operations, the public should expect that initial response (or first pass) to sidewalks may occur later than in past winter weather seasons. 145 Wages & Benefits $455,020 Goods & Services 452,140 Total Expenditures $907,160 Full Time Equivalent Positions (FTE) Management 0.23 Inside Workers 0.22 Outside Workers 5.96 TotaIFTE 6.41 Critical Internal Service Support • Fleet — equipment availability • Purchasing — supply of materials • Human Resources — staffing / training • Communications — notifications, assists in public awareness of service expectations • Insurance — claims for damage to private property from city vehicles and trip and fall claims • Legal — defense of trip and fall claims • GIS — Inventorying and displaying assets for management of infrastructure :: Pedestrian & Traffic Management Service The Pedestrian & Traffic Management Service strives to provide motorists, cyclists and pedestrians with safe, efficient, organized and synchronized use of the transportation network and maximizes the benefit of the system for all users. This service promotes use of best practices and standards of the Transportation Association of Canada, the Institute of Transportation Engineers and the International Municipal Signal Association. This service is guided by the Provincial Motor Vehicle Act and City's Traffic By -Law. The Service consists of year round maintenance of traffic and pedestrian signals, traffic control and informational (e.g., street name) signage and seasonal painting of traffic lane lines and markings. The Service also investigates community requests, then implements where warranted traffic flow or safety improvement enhancements. Service Delivery In ensuring the public is provided with a safe and efficient multi -modal transportation network, the City delivers several programs as part of its service delivery. The following chart identifies each of these programs and the percentage of funds allocated to them to deliver a defined level of service for 2014. Pedestrian and Traffic Management Programs WTraffic Maintenance 0 Traffic Enhancements Approved 2015 Road users' knowledge in and participation in following traffic rules Accessibility to various sustainable modes of transportation Economic uncertainty, inflation, and supply and cost of materials Environmental considerations in traffic management Regulations, legislation, industry best practices related to roadway safety Innovation in maintenance techniques and methodologies Organizational capacity; Cooperation with enforcement officers Land development that changes traffic flow and demand Age and /or condition of existing infrastructure 146 - 2014 Pedestrian & Traffic Management Service Accomplishments and Performance • Re- painted 100% of the traffic markings (hatches /arrows /crosswalks /lane stop lines) except some hatches and traffic lane lines inventory • Completed installation of Pedestrian Signals on Main Street West • Planned completion of two railway crossing safety assessments with railway and provincial DTI • Participated in SafeKids event to teach safe use of signalized crosswalks to children • Planned completion of Pedestrian Signals on Station Street in front of Harbour Station • Pilot installation of a wireless, solar powered Pedestrian Signal system at the Coburg /Garden intersection • Facilitated and worked with community in enhancing a crosswalk near Beaconsfield School • Worked with Learn & Go group regarding a traffic calming /pedestrian safety study at the Pitt /Elliot intersection • Assessed several design plans and reports for planned land development from a traffic engineering perspective • Reported to Common Council relating to on- street parking on Greendale Crescent, Regent Street, Creighton Avenue and Champlain Drive • Implemented three Safer School Zones Projects at Bayview, Prince Charles and Bayside schools • Completed a service review of the City's Crossing Guard Program • Commenced implementation of a walking safety education campaign for children • Finished installation of an Accessible Pedestrian System (APS) at the intersections of Consumers Drive /Westmorland Road and Union Street/ Sydney Street • Finished and added a Traffic Signal Division to the City's General Specifications • Completed 48 traffic flow or safety improvement investigations or enhancements. More significant projects are detailed above. • Completed 126 traffic signal maintenance job orders Approved 2015 90 147 2015 Major Initiative, Major Projects and Pedestrian & Traffic Management Service Delivery Highlights • Complete 33% of a Transportation Master Plan (that supports Plan SJ) • Improve traffic flow along Loch Lomond Road • Recommended an updated and consolidated Traffic By -Law and seek Common Council and Provincial Registrar of Motor Vehicles approval • Complete three Safer School Zone Projects (Champlain, Centennial, and Forest Hills) • Complete 100 Job Orders related to investigating or completing enhancements in response to requests from citizens for improved traffic flow or safety • Continue managing the City's crossing guard program • Continue implementation of a walking safety education campaign for children • Installation of wireless, solar powered Pedestrian Signal systems at six additional locations including an APS installation Approved 2015 91 148 Traffic Maintenance Program - Service Levels and Resources Annual painting of all traffic lines and required street markings (based on previous markings) Maintenance of signalized intersections with a focus on proactively replacing worn out equipment: • Temporary solution to Priority 1 signal maintenance activities such as malfunctioning red /amber lights, removed or loose poles and lights to be completed within 24 of a request with a permanent solution to follow. • Priority 2 signal maintenance activities such as malfunctioning low volume intersection or some preventative maintenance tasks to be completed within 1 month of a request. Maintenance of the City's inventory of traffic and information signage: • Priority 1 sign maintenance activities (missing Stop and Yield signs) to be completed within 8 hours of a request • Priority 2 sign maintenance activities (missing Warning, Pedestrian crossing, School Zone, or Street Name signs) to be completed within 1 month of a request • 350 kilometers of traffic lines • 3,300 traffic markings including crosswalks • 71 signalized intersections • 23 red /amber flashing lights • 11 signalized pedestrian crossings • Inspection and inventory of signalized intersections infrastructure to continue • 2,000 (approximately) maintained / installed annually • Inspection and inventory of sign infrastructure to continue Manage school crossing guard program • 30 locations morning, lunch (some locations) and after school (September through June) Approved 2015 • Well- maintained traffic control devices (signs, markings, signals) remain visible to roadway users toward keeping them and other users safe. • Current inventory of traffic control markings and signs can be maintained. • An outstanding opportunity to reach resources required to preventatively maintain installed traffic signals exists. • High priority signage can be maintained in a timely manner, lower priority (e.g., parking and guide signs) will take longer to replace. 149 Wages & Benefits $993,360 Goods & Services 794,334 Total Expenditures $1,787,694 Revenue $20,000 Full Time Equivalent Positions (FTE) Management 0.81 Inside Workers 3.51 Outside Workers 6.78 TotaIFTE 11.10 Part Time Positions (PTE) 0.40 Administrative / Other Support Services • Fleet — equipment availability • Purchasing — supply of materials • Human Resources — staffing / training • GIS — inventorying and displaying assets for management of infrastructure 92 Traffic Enhancements Program - Service Levels and Resources Priority 1 traffic enhancements that meet the following criteria to be completed within 1 year of request: • Potential immediate hazard to road users • Intersections that experience a Failing Level of Service • Potential pedestrian crossings providing direct access to high pedestrian generators Approved 2015 Complete 25 traffic flow or safety improvement investigations or enhancements, such as those related to • Traffic calming • Parking restrictions • Bike lanes • Pedestrian crosswalks • Street lighting • Vehicle traffic flow • The service strives to improve safety and enhance the flow of movement for pedestrian, bicycle, and vehicular traffic. • Service delivery is focused on only the highest priority citizen requests with resolution of many requests being delayed. • An updated Transportation Master Plan would assist in guiding long term investment and decision making in the City's transportation system with the resources required to complete it 150 Wages & Benefits $313,692 Goods & Services 250.842 Total Expenditures $564,534 Full Time Equivalent Positions Management 0.33 Inside Workers 1.42 Outside Workers 2.74 TotaIFTE 4.49 Part Time Positions (PTE) 0.15 Administrative / Other Support Services • Human Resources —staffing/ training • Communications — notifications, assists with public awareness of service expectations 93 Stormwater Maintenance Service The Stormwater Management Service provides neighbourhoods, roadway users and adjacent property owners with functional public drainage systems: the minor (piped) component designed to convey runoff from a 1 in 5 -year level storm and the major (overland) system a 1 in 100 -year return period storm. The service utilizes various techniques and Service Drivers Focus on asset management and preventive maintenance Expanding infrastructure Combined sewers Economic uncertainty, inflation, and supply and cost of materials processes to maintain the integrity of drainage courses, ditches, Changing weather conditions culverts, storm sewers, combined sewers (through SJ Water), Regulations around stormwater retention and management manholes and catch - basins. The service involves a Organizational capacity comprehensive system of inspection, preventive maintenance and repair of drainage systems, and reporting on infrastructure Public expectations related to stormwater management and response condition. 2014 Stormwater Management Service Accomplishments and Performance • Completed 7 local drainage projects. • Completed the new West Depot and moved the West TES section to this location. • Installed new plastic CB and MH on Farry Cove Lane as a pilot project. This new type of infrastructure has a life expectance 3 times that of concrete. 2015 Major Initiatives, Major Projects and Stormwater Maintenance Service Delivery Highlights • Continue with ditching and culvert inventory and condition assessment. • Work with Planning to assist with the development of a Stormwater By -law • Coordinate the Guide Rail capital project. • Ongoing stormwater infrastructure inventory condition assessments and local drainage projects. Approved 2015 94 151 Stormwater Maintenance Program - Service Levels and Resources Preventative maintenance of stormwater piping infrastructure: • Stormwater lines videoed and inspected • Catch basins cleaned on a 7 - year cycle Complete 70% of all Priority 1 Critical or Emergency Service Requests - hazard to persons or property, catastrophic causing interruptions to service delivery. Response is within the construction season (April to October) Approved 2015 • 1,100 catch basins as of November 18, 2014 • Completed 119 of 144 priority 1 service requests (83 %) • 9 stormwater lines repaired • 30 culverts replaced • 49 structures repaired / adjusted • 7 local drainage projects • 4.7 km ditching • Above Data as of November 18, 2014 • The service strives to effectively control erosion and mitigate potential damage caused by flooding Wages & Benefits $1,206,253 Goods & Services 2,179,039 Total Expenditures $3,385,292 • Removal of material from the piped Full Time Equivalent Positions (FTE) system to prevent blockages and failure Management 0.82 Inside Workers 2.25 Outside Workers 12.19 TotaIFTE 15.26 • Permit overland drainage of water off of roads and away from properties to mitigate flooding 152 Part Time Equivalents 3.09 Administrative / Other Support Services • Fleet — equipment availability • Purchasing — supply of materials • Human Resources — staffing / training • Communications —flood warnings, preparedness notifications • Insurance— claims for damage to private property from flooded basements • Legal — defense of liability for flooded basements as necessary 95 Solid Waste Management Service The Solid Waste Management Service provides effective and efficient collection and disposal of refuse and compost waste to residential households. Working with the public, the goal is to achieve optimal waste diversion and to reduce environmental degradation. Collection is carried out in accordance to the Solid Waste By -law and the guidelines set out by the Fundy Region Solid Waste Commission Focus on sustainability (waste diversion) Regional partnership relationships, landfill operations Illegal dumping considerations Geographic characteristics of the community Changing customer base (residential mix in relation to commercial) Organizational capacity, nature of labour intensive work Public expectations related to collection and diversion 2014 Solid Waste Management Service Accomplishments and Performance • Completing collection routes within an eight (8) hour shift at least 99% of the time. The chart to the right illustrates the percentage of collection routes completed within an 8 hour shift. The results show a steady improvement in the efficiency of service delivery over previous years. • 2,990 bulky items were collected from 1,968 households in 2013 Approved 2015 120% 100% 80% U0 60% N 40% CO 20% 0% 153 Pecentage of collection routes completed within an 8 hour shift in 2014. Refuse Compost Target 95% Tonnage Tonnage • >a °�aA ` lac` PQc 1,200 1,000 800 600 c C 400 10 011 0 .� 2015 Major Initiatives, Major Projects and Solid Waste Management Service Delivery Highlights • Report to Council regarding Strategic Service activities such as recycling programs. • Report to Council for approval of updated Solid Waste Bylaw M -2 for the storage, collection and disposal of solid waste • Partner with Fundy Region Solid Waste Commission to increase composting & environmental education Solid Waste Collection Program - Service Levels and Resources Ensure all residential refuse and compost collection routes are completed within an eight (8) hour shift not less than 95% of the time. Annual delivery of Bulky Item Pick -Up (scheduled) and White Goods Drop -Off programs. Partner with community organizations to assist improving the local environment. Approved 2015 • 22,190 residential household units covering 53 City administered routes • Approximately 11,225 tons of refuse and 3,510 tons of compost (2013) • Year round bulky item pick -up (Wednesday scheduled pick -up) with approximately 2,990 items collected • 4 White Good Drop -Off days (May & October) with approximately 324 items collected • 1,000 gloves /1,500 bags and garbage pickup to 14 neighbourhood cleanups in ACAP partnership • Waste Reduction Week / Yard Waste Program (Partnership with Fundy Region Solid Waste to promote awareness, funding component) • The service strives to provide efficient Wages & Benefits $1,059,044 collection of refuse and compost for Goods & Services 2,487,059 residential households. Total Expenditures $3,546,103 • Solid waste collection improves Full Time Equivalent Positions (FTE) quality of life by creating a healthy, Management 0.86 clean place to live work and play. Inside Workers 0.65 • Supporting waste diversion programs Outside Workers 14.40 contributes to a sustainable Total FTE 15.91 environment. 154 Part Time Positions 0.05 Administrative / Other Support Services • Fleet — equipment availability • Purchasing — supply of materials • Human Resources — staffing / training • Communications — assists with public education • Legal — support by -law enforcement 97 Parks & City Landscape Service The Parks & City Landscape Service provides citizens and visitors to the community access to parks and open green spaces for their recreational and leisure needs. Service delivery is achieved through the development, operation and maintenance of all community parks, squares, trails, tourist sites, and City right of ways, the preservation and protection of our natural areas, and urban forestry operations and initiatives. Service Delivery In ensuring parks and city landscape maintenance is effective in improving the environment, the City delivers several programs as part of its service delivery. The following chart identifies each of these programs and the percentage of funds allocated to them to deliver a defined level of service for 2015. Parks & City Landscape Programs * Parks Maintenance o Urban Forestry u Rockwood Park Approved 2015 Focus of sustainability, asset management, expanding infrastructure Regulatory and legislative requirements related to maintenance Increasing use of public parks and squares for events Extreme weather conditions and impact on trees and plants Geographic area of Saint John Vandalism Changes to tracking and reporting on Tangible Capital Assets Increasing in -kind support for community cleanups and other neighbourhood park enhancements 155 2014 Parks & City Landscape Accomplishments and Performance • Coordinated local green space park and trail improvements in conjunction with community groups at: Rockwood Park, Harbour Passage, Rainbow Park and the Waterloo Village. • City Urban Forestry service responded to emergency requests for tree service City- wide in the aftermath of the winter ice storms and Tropical Storm Arthur. • Coordinated City -wide curb side debris cleanup program with other TES service areas post Tropical Storm Arthur. • Coordinated with Deloitte Inc. "Impact Day" to re -plant 24 trees in uptown parks and also worked with ACAP to revitalize the green space entering the Tin Can Beach area. • Supported installation of two public art pieces (shards of Time /sculpturesJ 2015) and two interpretive eco -hubs along Harbour Passage. • Expanded spring and summer planting programs. • Expanded annual winter lights program to include Prince William Street • Supported beautification efforts at local area schools for Arbor and Trees Canada Days. • Provided leadership, maintenance and technical support for the 14th year of Marigolds on Main. • Improved seating around the King's Square bandstand with new benches installed. • Supported King's Square entertainment series with over 40 events. • Supported 26 local farmer's market events in City Parks. Percentage of Citizens Satisfied with Parks and Trails Z00% a v so% •� . �.2 > .,_ v ao% v E n. o 20% 0% 2010 2011 2012 Citizen satisfaction is an indicator of how well service delivery is addressing the community's needs. Satisfaction with service is determined through an independent survey of Saint John citizens. From 2010 to 2012, it is clear that citizens are very satisfied with park and trail systems in the community. A survey was not conducted in 2013. Satisfaction results in Saint John are consistent with municipal norms calculated by the consultant (Ipsos Reid) of 90 %. • Supported neighbourhood cleanup efforts at Rainbow Park, Chown Field and in the Old North End. • Planned and supported the re- dedication of Quinton Heights Park to Cst. Douglas Larche Memorial Park • Completed Rockwood Park trails infrastructure assessment (bridges, culverts, signposts, etc...). Approved 2015 156 .. • Provided resources and assistance for 71 major events such as South End Days, Earth Day, Canada Day, New Brunswick Day, Labour Day, Marathon by the Sea, Marsh Creek Eco- Challenge, Pavilion Cup, Soap Box Derby, New Year's Eve, Mayor's Christmas Tree, Winter Lights Program as well as many other smaller events. • Established and supported streetscape beautification programs for Main St West, Main St North and Waterloo St. • Installed 3 remote sensored solar compacting waste receptacles in the uptown area. • Established partnership with DMO to coordinate marketing of Rockwood Park in support of park stakeholders. • Executed tender process for Rockwood Park Golf Course operations management agreement. 2015 Major Initiatives, Major Projects and Parks & City Landscape Service Delivery Highlights • Complete Rockwood Park Arboretum Revitalization plan (mapping, signage and interpretive materials) • Establish City of Saint John Parks and Public Spaces Dog management strategy (research best practices, communication, public education, off leash areas, coordinating with bark park users) • Implement new online reservation process for events taking place in City parks • Implement new snow trail grooming process and equipment to increase outside winter recreation opportunities. • Install new children's mountain biking skills track at Rockwood Park, in partnership with volunteer groups. Approved 2015 157 100 Parks Maintenance Program — Service Levels and Resources Year round daily maintenance of Rockwood Park including: • Mowing, snow removal, planting, leaf removal, turf maintenance, tree planting, tree pruning, lighting maintenance, fertilizing, watering, pruning, garbage clean up and removal. • Cross country and snowshoeing trails maintained • Mountain biking and general use trail system maintained Year round daily maintenance of 14 community parks including: • Mowing, snow removal, planting, leaf removal, turf maintenance, tree planting, tree pruning, lighting maintenance, fertilizing, watering, pruning, garbage clean up and removal • Christmas decoration, set up and removal • Water features maintenance. Approved 2015 • 2,200 acres of nature park space available for public use year -round • 56 kms of general use and wilderness trails maintained • 30 acres of community parks, such as: • King's Square • Queen Square • Loyalist Burial Grounds • Harbour Passage • Victoria Square • 90,000 annuals planted annually • 16,000 flower bulbs planted annually • Service strives to improve the urban environment by offering highly maintained parks, greenspaces, trails and tourist sites. These greenspaces provide people with safe and beautiful spaces for both leisure and active pursuits. • A wide range of trails are available to make active living easily accessible to citizens of all fitness levels and age groups. • A first class nature park is available and easily accessible in the city core, which promotes healthy living through connection with nature. • Environmental benefits include better air quality, increased water retention and reduction of noise and pollution. • Beautiful public spaces increase property values and promote community building through citizen interaction. 158 Wages & Benefits $1,453,808 Goods & Services 1,086,847 Total Expenditures $2,540,655 Lifeguard Grant $120,663 Mispec Park 5,000 Horticultural Society Grant 40,000 Total Grants $165,663 Full Time Equivalent Positions (FTE) Management 1.38 Inside Workers 2.00 Outside Workers 9.30 TotaIFTE 12.68 Part Time FTE 13.99 Administrative / Other Support Services • Fleet — equipment availability • Purchasing — supply of materials • Facilities Management — building maintenance and capital improvements • Human Resources — staffing / training • Communications — signage and promotion of facilities, communication material development 101 Parks - Resources and Service Levels Continued... City right -of -way turf maintenance and Tourist Information Center maintenance: • Seasonal mowing and trimming • Soil and pest management as determined necessary by trained staff • General clean up and garbage removal • Washroom cleaning and maintenance • 134 acres of turf maintained (right -of- • All visitors can easily access Saint John way) parks and see the pride taken in our • 6 Tourist Information Sites maintained community. Seasonal operation and maintenance of • public beaches: • Greenspace maintenance, beach cleaning, and garbage removal • Lifeguard program supervision Support various community projects Approved 2015 Public access (unsupervised) to 5 beaches open 7 days a week from June to September • Dominion Park • Lily Lake • Little River Reservoir • Tucker Park • Fisher Lake • Marigolds on Main - Support planting of 300,000 marigolds with school children, and all subsequent maintenance • Flag Maintenance - Raise and lower all city flags. Replace as necessary • Community Gardens - 3 Community gardens established and maintained — soil, fencing, water • Christmas Decorations — Uptown SJ Christmas Tree program and lighting • Right of ways maintained to safe driving standards. • Orderly City appearance maintained to foster respect for all public spaces. • Active living options for entire families which encourages healthy lifestyles and community building through recreation and leisure activities. • Respect shown to other regions of the province and country, and also to veterans through proper flag display etiquette. • Environmental awareness raised through local food production and community pride instilled in citizens at a very young age. • Establishing strong working relationships between local government and community groups working for positive change. • Additional funds in 2013 for lifeguard program ($30,000) to extend season to September 2nd and Mispec Park ($45,000) to contract operations and maintenance. 159 102 Urban Forestry Program — Service Levels and Resources Maintain existing streetscape tree canopy • 80 trees maintained preventatively through the timely removal, maintenance annually (pruning, fertilize) • 25 unhealthy /dead trees removed Increase urban forestry canopy by • 25 trees planted (new and planting new and replacing unhealthy replacements) existing trees Respond to citizen requests for tree • Historical average of 250 service hazards within 4 days (assessed for safety requests for tree maintenance immediately) Response to special community -based • Approximately 50+ special requests groups requests (Christmas decorations, requiring various amount of effort banners and flags, parks improvement) Approved 2015 • Service strives to eliminate hazards and improve the health and aesthetics of the urban environment. Resources support efforts to achieve international municipal urban forestry standards, so the community can realize the full benefit the urban forest (e.g., stormwater mitigation, increase in asphalt life expectance, improving air quality, aesthetics). • Service delivery is reactive to hazards and not currently meeting municipal urban forestry preventative maintenance standards. 160 Wages & Benefits $203,925 Goods & Services 75.590 Total Expenditures $279,515 Full Time Equivalent Positions (FTE) Management 0.25 Outside Workers 2.70 TotalFTE 2.95 Administrative / Other Support Services • Fleet — equipment availability • Purchasing — supply of materials • Facilities Management— building maintenance and capital improvements • Human Resources —staffing /training 103 Sports and Recreation Facilities Service The Sports and Recreation Facilities Service is a public service that provides all citizens with access to a wide range of indoor /outdoor sport and recreation opportunities. This service is delivered through the scheduling, booking and maintenance of facilities that include sport fields, arenas, parks, and playgrounds. The service also provides event management support and coordination of special community events. Service Delivery In ensuring sports and recreation facilities maintenance is effective in providing spaces for citizens to recreate and enjoy leisure activities, the City delivers several programs as part of its service delivery. The following chart identifies each of these programs and the percentage of funds allocated to them to deliver a defined level of service for 2015. Sports and Recreation Facilities Maintenance Programs Approved 2015 Focus of sustainability and asset management for aging facilities Aging facilities require increased maintenance funds Implementation of PlaySJ Economic uncertainty, inflation, and supply and cost of materials Growth and diversity in population (age, culture, accessibility) Recreation recognized as a community priority Regulatory requirements for turf maintenance Changes to tracking and reporting on Tangible Capital Assets Formal agreements for maintenance of provincial (school) facilities 161 104 2014 Sports & Recreation Facilities Accomplishments and Performance • Partnered with Anglophone South School District on field and playground maintenance projects at Champlain Heights and M. Gerald Teed. • Improved turf maintenance practices to support best practices of Integrated Pest Management and Canadian Sports Turf Association standards. • Consolidated and centralized the booking of all Anglophone South School District fields with City of Saint John fields to one point of contact allowing for better usage management and customer satisfaction generating approximately $7,100 in additional revenue. • Developed field and playground maintenance manual outlining current condition and recommendations for quality improvements based on industry standards and best practices. • Developed Field Allocation and Management Policy including rain out protocols with user feedback and input. • Replaced infields and warning tracks on all class A fields with new engineered infield mix. • Spring /Summer ice allocated and managed by City of Saint John to allow for more equitable access for all program operators while resulting in approximately $114,000 in additional revenue. • Provided logistical support for 6 races and special community events Percentage of Citizens Satisfied with Recreation Facilities 100% v 80% C - R v> m 60% �n m v ao% v o aN 20% 0% 2010 2011 2012 Citizen satisfaction is an indicator of how well service delivery is addressing the community's needs. Satisfaction with service is determined through an independent survey of Saint John citizens (a survey was not conducted in 2013). Results from 2010 to 2012 indicate that citizens are generally satisfied with recreation facilities in the community. Satisfaction results in Saint John are below the municipal norms calculated by the consultant (Ipsos Reid) of 87%. • Hosted 7 tournaments including 1 National and 2 provincial championships on city fields. • Redevelopment of Glen Road Playground with benches, planter boxes, turf reinstatement, and walking trail. • Completed several Capital projects including replacement of ball field fencing and the construction of the new Emera New Brunswick Field at Shamrock Park Approved 2015 162 105 Partnered with the Milford Community Association, Emera New Brunswick and Canaport LNG to make significant improvements to the ball field and play spaces at the Milford Community Centre 2015 Major Initiatives, Major Projects and Sport and Recreation Facilities Service Delivery Highlights • Increase user fee charges for field and arena facilities by 2.5 %. • Increase subsidy for arena youth sports in an attempt to off -set 2.5% increase of ice time rentals. • Develop recreation facility cost recovery policy based on best practices and national trends. • Collect soil samples of all City of Saint John fields to determine soil PH levels. The appropriate materials will then be applied based Sports Turf Canada recommendations and best practices. • Continue implementation of Play SJ, specifically the rationalization of neighbourhood playgrounds Approved 2015 163 106 Arena Maintenance Program — Service Levels and Resources Maintain ice daily at 4 civic arenas for public use and organized sporting groups Lobby, bathrooms, locker rooms, bleachers, multi - purpose room cleaned daily. *Includes spring /summer ice Approved 2015 • 4 ice surfaces • Gorman Arena • Stu Hurley Arena • Peter Murray Arena • Belyea Arena • *13,704 hours (approximate) of available Ice time • *9,459 hours ice time booked • Booked at 77% capacity ✓ Prime time at 100% capacity • Approximately 12 ice floods daily (hourly after each booking or public skate) • Youth Sport Subsidy $169,000 • Regular cleaning throughout the day • Service strives to provide quality, safe Wages & Benefits $792,340 arenas and ice time for recreational Goods & Services 710,405 opportunities for all residents to enjoy. Total Expenditures $1,502,745 • Each City arenas available for public youth Arena Rental Grant $173,000 use 18 hours per day, 7 days per week Lord Beaverbrook Rink 159,000 from mid - October to the end of Other Expenditures $332,000 March. • All prime time (4 pm to 10 pm Monday Revenue $773,569 to Friday and all day Saturday and Sunday) ice booked with availability Full Time Equivalent Positions (FTE) during other times of the day. Management 0.76 Outside Workers ** 10.50 Inside workers 0.50 Total FTE 11.76 164 ** FTE based on 26 weeks (seasonal operations) Administrative / Other Support Services • Fleet — equipment availability • Purchasing — supply of materials • Facilities Management — electrical, plumbing, carpentry work • Human Resources — staffing / training • Communications — promotion of facilities 107 Sports field Maintenance Program - Service Levels and Resources Class A Fields — Complexes with multiple field surfaces, lights and amenities: • Aerate, topdress, fertilize, overseed completed mid - season and fall • Mowed weekly • Lined per game schedule • Clean -up weekly • Washroom cleaned daily Class B Fields — Lower use, single sport fields with no lights or amenities: • Mowed weekly • Response to requests (timing, clean- up) as time permits Class C Fields — Neighbourhood greenspaces that see very limited use: • Mowed every 2 weeks • Response to requests (timing, clean- up) as time permits Approved 2015 • 4 Complexes (Shamrock, Memorial, Forest Hills, Allison Grounds) consisting of 7 Class A Fields • 124,424 square meters of sports turf maintained • 16,947 hours of booking time available (includes weekends - 8,038) all fields) • 3,404 hours booked (representing 67% of total available weekday capacity May to Sept — tournament play on weekends) • Fields customer satisfaction survey level of "Very Good" • 14 Class B Fields (e.g., Havelock, Beaconsfield, Barnhill) • • 5 Class C Fields (e.g., Dennis Morris • Barrack Green) • Limited maintenance on o KBM • Dennis Morris • Chown o Barrack Green o St. Peters • Service strives to provide quality, safe sports fields for recreational opportunities for all residents to enjoy. • The goal is to maintain facilities to accepted standards (aesthetics and safety) to encourage involvement in structured recreational activities and attract tournaments or special events. 168 165 Wages & Benefits $769,088 Goods & Services 504,565 Total Expenditures $1,273,653 Revenue $89,758 Full Time Equivalent Positions (FTE) Management 0.76 Inside Workers 0.50 Outside Workers* 8.40 TotaIFTE 9.66 * FTE based on 26 weeks (seasonal operations) Part Time FTE 2.41 Administrative / Other Support Services • Fleet — equipment availability • Purchasing — supply of materials • Facilities Management — electrical, plumbing, carpentry work • Human Resources — staffing / training • Communications — promotion of facilities 1: Other Facility Maintenance Program — Service Levels and Resources Splash Pads /Ice Pad: • Filter cleaning twice per week • Garbage and washroom cleaning daily • Maintenance of system contracted to Canada Games Aquatic Centre • Ice Pad open Dec to Mar • Ice flooded nightly or when required • Snow removed from ice pad and walkways as required Playgrounds: • Inspected (6) Regional and District playgrounds once per month (May - September) • Inspected Neighbourhood Playgrounds (41) twice per season (May and July) • Mowing and litter pickup weekly • Remove or replace broken equipment as required Tennis Courts: • Putting nets up and down (seasonally) • Maintain windscreens • Litter pick -up daily Basketball Courts: • Nets maintained on request • 2 splash pads (Rainbow Park and • Service strives to provide quality, safe Wages & Benefits $210,952 Fleming Court) playgrounds, tennis courts, basketball Goods & Services 177,788 courts, and splash pads for recreational Total Expenditures $388,740 opportunities for all residents to enjoy Aquatic Clubs Grant $15,822 Aquatic Centre 406,890 Other Expenditures $422,712 • 69 playgrounds- includes Anglophone South School District Playgrounds: • Maintenance only at Shamrock Park (although 31 tennis courts City wide) • 40 courts (e.g., Rainbow Park, Dominion Park, Rockwood Park) Only district courts maintained. Full Time Equivalent Positions (FTE) Management 0.10 Outside Workers* 2.10 TotaIFTE 2.20 * FTE based on 26 weeks (seasonal operations) Part Time FTE 1.23 Administrative / Other Support Services • Fleet — equipment availability • Purchasing — supply of materials • Facilities Management — building maintenance and capital improvements • Human Resources — staffing / training • Communications — promotion of facilities Approved 2015 109 166 Engineering The goal of the Engineering program is to provide professional engineering and technical staff resources for engineering support, design and construction management for projects related to capital programs for the improvement of municipal infrastructure and to ensure the integrity of that system through the implementation of sound engineering standards. 2014 Engineering Accomplishments and Performance • In 2014 the following Stormwater system projects were undertaken to reduce flooding occurrences: • Millidgeville Stormwater Detention Pond • Milford Drainage Basin • Honeysuckle /Sherbrooke Street Drainage Basin 2015 Major Initiatives, Major Projects and engineering Service Delivery Highlights • The major initiatives for 2015 will be to continue with improvements to the storm systems and to undertake major Street Reconstruction projects that will greatly improve the City's transportation network. Stormwater projects to reduce flooding occurrences will be designed and constructed in the following areas: • Conifer Crescent Stormwater Detention Pond • Milford Drainage Basin • Honeysuckle /Sherbrooke Street Drainage Basin • Major Street Reconstruction projects will be completed in the following areas: • Richmond Street (Waterloo Street to Prince Edward Street) • Waterloo Street (Castle Street to Richmond Street) • Belleview Avenue (Highland Road to Civic #72 Belleview Avenue) • Jean Street (Loch Lomond Road to Courtenay Avenue) Approved 2015 167 110 Engineering - Service Levels and Resources Provide design and construction management for the annual General Fund Capital Program —Storm and Transportation Categories as well as the annual Water & Sewerage Utility Fund Capital Program Support annual review and revisions to general specifications Coordinate with the City's Finance and Intergovernmental Affairs Divisions and the Province and /or Federal Government on infrastructure funding agreements Approved 2015 • Infrastructure projects designed and constructed and outlined in the Capital program submission • Updated general specifications • Sound engineering design and construction management is essential to provide an efficient transportation network and to protect the environment and provide safe, clean drinking water by providing infrastructure that is built properly using sound engineering standards. • The development and application of sound engineering standards ensures • Funding agreements established to the long -term integrity of the City's finance infrastructure upgrades transportation network, storm systems and water and sanitary systems. .: Wages & Benefits $422,423 Goods & Services 62,152 Total Expenditures $484,575 Revenue $2,000 Full Time Equivalent Positions Management 0.00 Professional 2.00 Inside Workers 2.04 Total FTE 4.04 Part -Time Positions 0 Administrative / Other Support Services • Fleet — equipment availability • Purchasing — engagement of consultants and contractors • Human Resources — staffing / training • Legal — land issues, agreements • Real Estate — land issues, acquisition • IT — support of software for design and asset inventory • Intergovernmental Affairs — coordination of funding applications 111 Transit Service The Transit Service is a public service that provides the community with safe, accessible and environmentally - friendly public transportation by way of bus. Delivery of service is provided by Saint John Transit, a commission of the City of Saint John. Service consists of scheduled routes, some of which are guaranteed to be accessible, parallel service for the physically disabled, bus charters and site seeing tours. Focused on the environment, the Transit Service offers a number of environmentally friendly park and ride transportation programs within the community and the region. 2014 Transit Service Accomplishments and Performance • Saint John Transit ridership was virtually unchanged from 2014 maintaining a steady ridership of approximately 2.2 Million. • Saint John Transit is pleased to report that despite the slight decline in cost recovery percentage (down from 46.8% to 46.0%), the transit service is still well above the 2013 Canadian average for cities between 50,000 and 150,000 population at 33 %. 2015 Major Initiatives, Major Projects and engineering Service Delivery Highlights • Continue to deliver service hours similar to 2014 until May 3rd when service hours will be reduced from 102,617 to 94,265. • Strive to introduce an Automated Voice Announcement System to improve the accessibility Transit service for hearing and sight impaired passengers. • Multi -trip Fare Media (Monthly Passes and Trans - Cards) will be increasing by approximately 10% in April. Approved 2015 112 169 Transit — Service Levels and Resources Routes • Service within 500 m of 80% of city residents • Main Routes: Monday to Friday — (6 /7am to midnight), frequency is 20 minutes peak; 40 minutes off peak • Feeder Routes: Monday to Friday — 6 /7am — 10pm, frequency of 30 -60 min • Suburban Service : Monday to Friday (two trips morning and evening) • Saturday service is less frequent on mains and feeder routes; Sunday service is limited to four main routes, Harbour Bridge and two feeder routes; No service on Christmas Day Other Service Provision • Comex Service (as requested) at net financial benefit to City • Low entry buses for wheelchair accessibility and riders with mobility impairment —on scheduled routes • Bike racks available on new buses • Handi -bus service — available by reservation Monday- Saturday 7am — 7pm with later hours (10pm) Tuesday and Thursday; within City limits the cost is $5,00 one way • Charter bus service and City tours available for service fee Approved 2015 • 102,617 service hours of service (94,265 after May 3rd) • Projected 2.275 million ridership (2013) • Fare range of $2.50 - $3.50 / Representing approximately 53% tax subsidy • In 2012, Saint John Transit reduced annual service hours by 18% from 117,000 hours to 96,000 service hours. To meet best practice service standards that the Commission believes is the correct goal for Saint John Transit, would require about 120,000 service hours per year. To target a sustainable cities goal of 18 to 20% of the trips taken in the Saint John area would likely require in excess of 160,000 service hours. • With regards to suburban service, best practices would suggest three return trips in both the morning and afternoon, provided they could be operated with in a four hour period in the morning and a four hour period in the afternoon. A noon hour trip would also be preferred as part of the standard. Service standards should represent the goal based on best practices. • Funds added in 2013 to enhance service in the mornings and evenings and well as to UNBSJ /SJRH. 170 Total Expenditures $10,201,478 Revenue (4,835,968) Net Operating Expenses $5,365,510 Long Term Debt 1,739,490 Total Operating Subsidy $7,105,000 Administrative / Other Support Services • Finance - administration 113 Parking Service The Parking Service is a public service that provides all citizens access to both on- street (meters, permits, special events) and off - street (hourly and monthly parking locations) places to park within the uptown area of the City. The service is managed through the Saint John Parking Commission and is responsible for conducting research to maintain current data that supports the efficient operation of both on- street and off - street parking facilities in meeting public needs; establishing a permanent coordinating system of parking facilities; planning, designing, locating, acquiring, holding, constructing, improving, maintaining and operating, owing, leasing, either in the capacity of lessor or lessee, land, buildings and facilities to be devoted to the parking of vehicles of any kind. 2014 Parking Service Accomplishments and Performance The City of Saint John, in 2014, invested in 30 new parking meters to replace the aging parking infrastructure currently employed on- street. The new parking equipment is anticipated to increase meter revenue and improve the experience of visitors to the uptown area. A redesign of King Square North was undertaken to accommodate three additional bus stops at this major connection point. Existing parking spaces on King Square North and Sydney Street were changed to angled parking spaces to offset the loss of parking spaces in the newly created bus stop area. Three pay and display machines were installed; two on Sydney Street and one on King Square North. In continuing to work towards the implementation of a pay -by -phone technology (as per Council resolution), the City of Saint John entered into a pilot project with Hotspot Parking Inc. Preliminary results indicate that the pilot project was successful and the City of Saint John has agreed to extend the pilot until June 30, 2015 to allow additional time for further analysis. Pay -by -phone technology will result in easier payment methods for citizens and reduce effort required to process tickets. Approved 2015 171 Percentage of citizens satisfied with the overall level and quality of parking availability 100% -a 80% T) 60% 40% v a 20% 0% 2009 2010 2011 2012 Citizens have remained consistent in their satisfaction with parking availability in Saint John from 2009 -2012. 114 Revenue for 2014 is projected to be lower than budget projection due to slow economic activity in the uptown core and fewer than projected parking tickets issued. • The Peel Plaza Parking Garage opened at the end of November 2013. There are a total of 446 parking spaces in the garage to be used for both short -term and long -term parking. 2015 Major Initiatives, Major Projects and Service Delivery Highlights • Repeal of the traffic and parking meter bylaws to revise to support better enforcement and parking capacity. • Upgrade handheld ticket writing system and equipment. • Upgrade several single head meters that accept coins, credit cards and smart cards. • As per Council's direction, implement pay -by -phone service. • Invest in an electronic vehicle chalking system for monitoring time limited parking areas. Approved 2015 172 115 Parking — Service Levels and Resources Manage all on- street parking including: • maintenance of meters and pay -and- display machines; • parking by -law enforcement; • issuance of residential and temporary parking permits; • support for snow bans; • and parking administration (processing - including tickets, complaints, customer service) Not included in the allocated resources is the service provided by the Saint John Parking Commission. Expenditures are not budgeted for under the City's general fund operating budget, rather under the Commission's budget. The Commission manages off - street (surface lot and garages) parking including: Approved 2015 • 620 metered and pay- and - display on- street parking spaces • 35,000 average number of tickets issued (annual) • 900 average number of residential parking permits issued (annual) • 450 average number of temporary parking permits issued (annual) • Cost of on- street parking is $2.00 per hour • 33 Commission surface lots • 2,260 Commission surface lot spaces • 4 Commission centrally located parking garages • 680 Commission centrally located parking garage spaces • As a result of staff cuts in the Finance Department in 2012, supervisory and administrative responsibilities related to parking tickets, summonses and court processes continue to be performed by Saint John Parking Commission staff. Any reduction to staffing levels would significantly reduce customer service levels and hinder summons and court processes. • It is anticipated that the current level of enforcement costs (Corps of Commissionaires) will increase by 1.5% in 2015. If the budget amount is reduced, the SJPC would have to further cut the number of enforcement officers on- street which would reduce the number of tickets issued and associated fine revenue. • Ability to meet revenue projects is impacted by slow economic growth and weather conditions (i.e., less ticketing as a result of fewer snow storms and snow bans). 173 Wages & Benefits *$80,090 Goods & Services 480,289 Parking Grant 88,000 Total Expenditures $648,379 Revenue $1,595,000 Full Time Equivalent Positions (FTE) Inside Workers 3.00 TotalFTE 3.00 *Portion of Wages and Benefits Other employees hired through Parking Commission Administrative / Other Support Services • Road and Sidewalk Services — parking signage, alternate side parking and winter parking restrictions, • Finance and Administrative Services — administration and purchasing • Legal — by -law amendments, parking tickets (court) 116 Finance and Administrative Services Overview The Finance and Administrative Services team enables the delivery of municipal services that are effective and efficient in meeting the needs of our community. Service delivery focuses on responsible financial management and sustainable life -cycle management of the City's physical assets (including fleet, facilities, real estate, and materials management). Organizational Goals To establish the City of Saint John as a service - based, results oriented, high performance public service organization. Service Based • Considering the needs of the community as a whole • Creating opportunities for citizen feedback and input • Responding effectively and efficiently to address community needs Approved 2015 Results Oriented • Fund the services provided to the community using sustainable financial resources • Ensure corporate assets are of high quality, fully utilized and meet established standards High Performance • Collaborative, strategically minded workforce • Culture focused on contributing to community goals through service delivery • Resource conscious and accountable for results 174 Financial Management Service Finance Pension Administration Property Assessment Asset Management Service Purchasing & Materials Management Risk Management (Insurance) Fleet Management Facilities Management (Includes Carpentry Shop /City Hall) Real Estate 117 Finance and Administrative Services Summary Approved 2015 175 118 Approved 2015 2014 Expenditures Revenue FTE (Votes Financial Management Service Finance 1,845,817 1,873,663 2,837,900 24.00 Assessment 1,278,852 1,286,007 Total Service 3,124,669 3,159,670 2,837,900 24.00 Asset Management Purchasing and Materials Management 1,056,147 1,061,631 9,000 13.00 Risk Management (Insurance) 272,430 267,860 3.00 Liability Insurance 615,500 650,000 Fleet Management 1,267,518 1,190,274 34.00 Facilities Management (inc Carpenter Shop /cityHall) 3,373,747 3,393,518 59,000 16.00 Real Estate 339,805 330,415 101,289 2.00 Total Service 6,925,147 6,893,698 169,289 68.00 Total Finance and Administrative Services $10,049,816 $10,053,368 3,007,189 92.00 Approved 2015 175 118 Table of Contents — 2015 Service Plans Financial Management Service. Asset Management Service Materials Management. Risk Management.......... Fleet Management ........ Facilities Management.. Real Estate ..................... Approved 2015 ................................................................................. ............................... 120 ......................................................................................... ............................... 124 ......................................................................................... ............................... 125 ......................................................................................... ............................... 129 ......................................................................................... ............................... 131 ......................................................................................... ............................... 135 ......................................................................................... ............................... 143 176 119 Financial Management Service The Financial Management Service team provides guidance to Common Service Drivers Council, the Corporation and a number of the City's agencies, boards and commissions to ensure that resources are used in a fiscally responsible and Compliance with regulatory and legislative reporting requirements sustainable manner. The service is responsible for financial planning and Focus on financial planning and policy development reporting, controls, and decision - making required for the organization to Growth in the community achieve its financial objectives with respect to service delivery, providing Global economy advice and information that helps to ensure that decisions are informed Organizational capacity and made in a timely manner. The Financial Management team manages Expectations related to accountability /performance reporting the accounting systems that support financial reporting requirements that allow service areas to be both accountable and successful in meeting their Emerging technology service objectives. The service also plays an important role in customer service relations with our citizen's, rate payers and vendors. 2014 Financial Management Service Accomplishments and Performance • Improved process and information on Inventory listing of Tangible Capital Assets for Public Sector Accounting (PSA) • Automated monthly and quarterly financial statements for Saint John Parking Commission, Saint John Transit Commission, Saint John Industrial Parks and Saint John Non Profit Housing using CaseWare • Produced all PSA financial statements using Caseware • Process documentation for payroll process completed and scheduling and completing payroll audit on codes • Continue to move all employees to electronic pay advices (EPay) • Project plan established for Integrated Long term Financial Plan Program • Dedicated a Financial Resource to be an integral part of the P3 project • Improved on Audit completion dates Approved 2015 177 120 • Improvements to Budget Analysis and Service Based Process — Consistent documents utilized for both • Completed Harbour Clean up and Gas Tax audits • Processed payments for goods and services acquired (9,000 cheques / 22,500 invoices) • Cash center processed approximately 85,000 payments • Staff hours serving customers in cash center is approximately 3,486 • Cash flow analysis done on a regular basis to ensure the City maintains sufficient funds for its day -to -day operations and to minimize borrowing cost • Administered funding agreements signed between the City and the Federal and Provincial governments • Budget reports and analysis completed on a timely basis with improved cooperation with Finance and Service areas • Maintained low debt service ratio (10.07 for the general fund) • Supported responsible capital spending through long term forecast and project prioritization • Processed and sent out 46,120 water and sewerage bills and 1,110 miscellaneous invoices for a total of 47,230 • Processed approximately 4,050 water and sewerage delinquent notices • Continued testing and conversion from Radix to Sensus Meter Software (expect to be completed in 2015) • Continued to work on documenting and providing information on the Shared Risk Pension Plan to the new Pension Director • Produced annual employee Pension Statements for approximately 850 plus members prior to September 30th • Completion of the 2013 Annual Report for the City (First one done in a number of years) Approved 2015 178 121 2015 Major Initiatives, Major Projects and Financial Management Service Delivery Highlights • Completion of TCA Policy for managing and sustaining the City's Capital Assets • Investigate an asset management solution for the accounting of capital assets of the City • Continue Financial support to the P3 Safe Clean Drinking Water Project • Support the Water & Sewerage By -Law review • Support resolution of expired negotiated water contracts • Prepare consolidated financial statements for the City of Saint John (Earlier) • Prepare financial statements for Saint John Transit Commission, Saint John Parking Commission, Saint John Non Profit Housing and Saint John Industrial Parks • Coordinate Annual Audits and special project audits • Support and improve on the 2015 service -based budget process • Finalize a Debt Management policy • Continue with implementation of new banking software solution • Co- ordination of disability applications with 3 d party claims provider • Members Report for all Pension members • File all required regulatory filings for the Pension Plan • Continue process to complete audit for payroll codes and an audit plan for future • Process and document completed for reconciliation of payroll fringe benefits • Complete final rollout of electronic pay advices (EPay) • Completion of the 2014 Annual Report earlier Approved 2015 179 122 Financial Management - Service Levels and Resources • Accounting — oversees the production of financial statements and reports for the • Effective planning and stewardship of Wages & Benefits $1,961,916 City and agencies such as Saint John Non - Profit Housing, Transit, Parking and financial resources provides the Goods & Services 525,747 Industrial Parks. This service includes Chart of Accounts design and maintenance, leadership required to ensure the long- Recoveries (614,000) account reconciliation and year -end auditing functions. term viability of the Corporation. Total Expenditures $1,873,663 • Cash Management — projects cash flow requirements, ensures all funds received are • Sound financial management practices Revenue deposited in the City's bank account, sufficient funds are available for the City's day- support the effective and efficient Administrative Support * $2,153,000 to -day operations and borrowing cost is minimized. delivery of City services — ensuring the Short Term Interest 350,000 • Debt Management — manages long -term debt instruments to ensure rea sonable City can do what it planned to do in contributing to the achievement of a Miscellaneous 334,900 debt levels are maintained and financial obligations are promptly paid. vision for the community. Total Revenue $2,837,900 • Long -term Financial Plan- develops long -term financial strategies to maintain . Strong financial management processes *Includes Legal Services for P3 of $65,000 sustainability and financial stability. also make it easier for the City to report • Revenue Billing and Collection — responsible for the collection of monies owed to the back to its stakeholders on how well it Full Time Equivalent Positions(FTE) City for services rendered. This service includes the billing and collection of funds has achieved its objectives; enhancing Management 4.00 for a number of services, most notably Water & Sewerage services. accountability in local government. Inside Workers 20.00 TotalFTE 24.00 • Accounts Payable — pays the Corporation's financial obligations for goods and • Budget submission includes funding for services acquired. a new resource for Asset Management • Payroll - Process annual payroll of sixty four million dollars. Weekly payroll processing for 980 + employees. Process annual pension payroll of twenty seven million dollars, monthly payroll processing for 850 + pensioners. Complete numerous payroll requests from internal customers Provide T4s and T4As to all employees and pensioners • Pension Administration — Administrative services to the City of Saint John Shared Risk Plan Provide administrative support to the Pension Board, regulatory compliance, employee /retiree benefit calculations, member communications and work with all pension service providers especially in regards to the actuarial services Approved 2015 :1 123 Asset Management Service Asset Management incorporates the processes of selection, maintenance, inspection and renewal of the City's physical assets. The goal is to minimize the whole life cost of assets that are needed to deliver public services that the community requires. The responsibilities for management of the City's assets are shared by the following areas Fleet, Facilities Management, Purchasing and Materials Management, and Real Estate. Service Delivery Compliance with regulatory and legislative service requirements Focus on asset management Global economy Emerging technology Organizational capacity Service requirements and expectations In ensuring the effective life -cycle management of the City's corporate assets several service programs are delivered to support efficient public services address the needs and interests of the community. • Materials Management • Risk Management (Insurance) • Fleet Management • Facility Management • Real Estate Approved 2015 181 124 Materials Management Materials Management is an enabling service that is responsible for providing professional procurement advice and services including: • the promotion of competitive bidding for the City's needs through the preparation, issuance and receiving of various types of bid solicitations such as public tender calls, requests for proposals and invited bids; • monitoring compliance with the City's Procurement Policy, the Public Purchasing Act of the Province of New Brunswick and applicable legislation and Trade Agreements; • maintaining an internal inventory of commonly used parts and materials including automotive parts, water stock, and general merchandise; • administration of the Corporate Procurement Card Program; and • disposal of surplus equipment. 2014 Materials Management Accomplishments and Performance Procurement Projects Request for Proposals Facilitated the "Request for Proposal" procurement process, evaluation, interview process and debriefing sessions for the following projects: Engineering Services: • Richmond / Waterloo Street Reconstruction • Hickey Rd. / Colpitts Lift Station • Fairville Blvd. Storm Sewer & Channel Upgrade • Hays Ave. Watermain Extension Approved 2015 Safe Clean Drinking Water Project: • Request for Qualification Process and Evaluation to derive a shortlist of three proponents. 182 125 Other Request for Proposals: • CGAC Strategic Plan • CGAC Lighting Upgrade • Orthophotography • Demolition 167 Prince William Street • Lifeguard Services • Shamrock Park Artificial Turf • Transportation Strategic Plan Public Tender Calls Completed the tendering process for the following Projects • Fire Safety Trailer • SJPF Identification Van Retrofit • Employee Benefits Review • Management Job Evaluation and Compensation Review • One Stop Communication Plan • AutoCAD Civil 3D Software • Rockwood Park Golf Course Lease • Roof Replacement — Municipal Operations Complex Garage • Reinstatement of Utility Cuts • Fence Replacement —St. Rose Ball field • Vehicle and Heavy Equipment Replacement • Supply and Install Boiler for CGAC • Various Goods and Equipment • Emera NB Field at Shamrock Park Standing Offers and Requests for Quotes Procurement staff established 59 standing offer agreements and issued 80 requests for quotations to provide the necessary goods and services to all City departments. Approved 2015 183 126 Inventory Stores Achieved the best results to -date once again on the annual physical inventory count. Discrepancies have shown a steady decrease from year to year. This year's physical inventory continued that trend with an outstanding 6% improvement over the previous year. 2015 Major Initiatives, Major Projects and Materials Management Service Delivery Highlights • Work with the City Solicitor's office to update procurement methods for Publicly Advertised Bid Solicitations. • Update City's Procurement Policy to align with changes to the newly enacted Procurement Act and Regulation. • Facilitate the procurement processes required by the SCDWP. • Support all departments with their projects with timely procurement advice, bid solicitations and awards. • Incorporate required changes to procurement documents to enhance PSAB reporting. 2015 Additional Resources No additional resources will be required for 2015. Approved 2015 ., 127 Materials Management - Service Levels and Resources • Ensure all City departments continue to comply with all are required Procurement Legislation and required City Policies including: • City's Procurement Policy • New Brunswick Public Purchasing Act • Atlantic Procurement Agreement • Agreement on Internal Trade • NB / Quebec Agreement • Procure required goods and services for all City departments through established tendering and request for proposal procedures. • Provide a link to the vendor community on all matters relative to the procurement of goods and services. • Maintain internal inventory of approximately 2,000 commonly used parts and materials to provide City departments with required goods in a timely fashion. • Administration the City Corporate Procurement Card Program. Approved 2015 • The competitive bid process and increased competition results in lower costs and therefore, ensures taxpayers receive the best products and services at the lowest cost. • Reduce operational expenses through the inventory of routinely used goods and hard to source items. • Resource levels of procurement staff directly impacts project timelines and service delivery for the requesting departments. 185 Wages & Benefits $926,830 Goods & Services 134,801 Total Expenditures $1,061,631 Revenue Sale of Surplus $9,000 Total Revenue $9,000 Full Time Equivalent Positions(FTE) Management 1.00 Inside Workers 5.00 Outside Workers 7.00 TotaIFTE 13.00 128 Risk Management Risk Management is an enabling service provided to the Corporation that is responsible for the protection of the City's assets and its ability to provide the services required to achieve community outcomes by evaluating risk, reducing its exposure to loss through prevention, mitigation, and the acquisition of insurance. In order to protect the public's interest against damage or liability claims that may occur as a result of the City's delivery of public services, it is necessary to put in place and administer Risk Management practices and insurance policies of the appropriate type and size. The City is fully committed to regularly assessing and treating these risks to minimize their effect on service delivery. 2014 Insurance and Risk Management Accomplishments and Performance • Managed over 400 claims • Started the year on track for over 600 claims with the storms of early 2014 • Implementation of Risk Management Policy, recently approved by council • Launched on -line reporting of claims or incidents from Saintjohn.ca — under Risk Management section • 83 different events booked using the Facility User Insurance Program, very successful, cost reduction for users and protection from liability for both user and the City. • Reduced claim payments by 37% (approximate number due to long -tail claims), despite an increase in number of claims by 14 %. • Direct input to revamp of several by -laws and in specific, the Water and Sewage by -law to give clarity on responsibility and liability. • Review of insurance needs for City A,B,C's • New staff position, Claims Examiner filled in November • Boiler and Machinery inspection for all City of Saint John pressure vessels. 2015 Major Initiatives, Major Projects and Risk Management Service Delivery Highlights • Review video surveillance policy from a Risk Management standpoint, ensure policy is being implemented throughout organization. • Review accident reporting process for possible repeal of council policy Approved 2015 :. 129 • Comprehensive review of insurance values for appropriate replacement cost on all insurable assets. Functional replacement versus actual replacement cost. • Develop Business Continuity Plan • Develop more comprehensive incident /accident reporting for insurance related losses, develop on -line reporting to ease information sharing • Form Risk Management committee to review vehicle accidents /incidents. • Complete RFP for emergency services relating to insurable losses for damages from fire, water, flood, vandalism etc... • Develop more information for public on Risk Management for saintjohn.ca, including some common claims and how to handle contractor issues Risk Management - Service Levels and Resources • Advising on insurance coverage for City contracts • Acquires and recommends coverage for City along with various agencies, boards and commissions. • Develop Risk Management practices for claim avoidance. • Handling claims and direct outside claim handlers such as adjusters or legal counsel on city claims. • Analyzing past losses to develop Risk Management practices to limit future losses. Approved 2015 • Sound risk management practices support the effective and efficient delivery of City services - ensuring the City limits its own liability, protects City assets and to protect the public from damage. • Potential to generate revenue to ensure all city damage relating to insurance claims is recovered. • Ensuring the right amount of coverage is demanded on City contracts to limit cost and limit exposure to the City's assets. 187 Wages & Benefits $223,385 Goods & Services 44,475 Total Expenditures $267,860 Liability Insurance $650,000 Full Time Equivalent Positions(FTE) Management 1.00 Inside Workers 2.00 TotaIFTE 3.00 130 Fleet Management The City of Saint John owns, operates and manages a fleet of 325 vehicles and equipment, including an additional 800 (app.) small engine equipment assets provided for use to various City of Saint John departments who deliver services to the community. Fleet Services, who are responsible for vehicle maintenance, vehicle acquisitions and vehicle asset disposals, includes a team of 34 management, technical and administrative professionals who provide front line departments with their vehicle and equipment needs on a year round basis. 2014 Fleet Management Accomplishments and Performance Organizational Initiatives • Utilized Optimum Replacement Point (ORP) analysis to complete cost - benefit analysis (i.e. repair vs. replace) of various City -owned vehicle and equipment which are nearing the end of their expected useful life • Fleet disposals of 33 fleet assets generating residuals values of $226,000 Operational Efficiency • 2014 Vehicle Replacement Program recommendation (and adopted by Common Council) SJ Water — (1) gravel dump truck, (3) half ton trucks, (2) backhoe loaders, (1) Cargo Van and, (1) hydroexcavator truck; Municipal Operations — (1) front line sander and plow truck, (2)snow blower loader attachments, (2) garbage packer trucks, (1) mini - packer garbage truck, (1) loader, (3) sidewalk machines, (1) asphalt spreader and, (5) half -ton trucks; Fleet Mgmt. — (3) half -ton trucks; Leisure Services - (2) ice machines, (2) one -ton trucks and (1) half -ton truck,; SJFD - (1) sedan; SJPF - (6) patrol sedans and (2) unmarked sedans; • Vehicle and equipment inventory per Public Sector Accounting (PSA) completed Accountability and Transparency • Established monthly meetings with SJFD and SJPF managers and Fleet; provided an additional mechanic for SJFD Risk Management • Developed a pre - operational vehicle inspection program for implementation requiring vehicle operators to conduct daily vehicle inspections • Prepared to implement a comprehensive Fire Safety Plan for the Rothesay Avenue fleet facility, complimented by support from Facility Management and the Saint John Fire Department with the install of an upgraded fire alarm system and Knox Box key entry system. Approved 2015 Im 131 2015 Major Initiatives, Major Projects and Fleet Management Service Delivery Highlights Major Fleet Projects • Fleet Policy recommendation approval and implementation, including departmental "Service Level Agreements" and "Fleet Core Service Review" to be implemented in 2015 • Determine the validity of Automatic Vehicle Locators (AVL) program installation with departmental dialogue, renegotiate supply agreement or develop and implement in -house operating solution and ideally encourage Risk Management to oversee • One new technical management position to be staffed • Mechanical Tractor and Trailer apprenticeship program completed • Several Mechanical staff (supervisors and mechanics) certified to inspect all aerial trucks Organizational Initiatives - High -Level Review of Fleet Operations • Implement the new CSJ Fleet Policy and departmental Service Level Agreements (SLAB) • Implement the new internal vehicle charge back rate system and direct bill all vehicle maintenance activity to departments • Develop and implement the administration of optimizing "Fleet Utilization" (i.e. alternative transportation, vehicle needs analysis, etc.) • Issue monthly summary reports of key fleet statistics to Management • Investigate new revenue opportunities and report an effective business case analysis for implementation • Develop a business case for a new centralized Fleet Facility • Report on established KPIs for Fleet Services at the departmental and staff levels • Re- implement /establish Fleet Preventative Maintenance Program: program for entire Fleet Operational Efficiency - Governance of Fleet Management Functions Implement a formal fleet training program for Management and Staff based on industry recognized certification programs (i.e. NAFA CAFM /CAFS or APWA certification) • Vehicle and equipment inventory control to meet PSA requirements and to support asset management Approved 2015 :• 132 • Review, assess and develop a proactive Fuel Management (FM) program (not addressed in Mercury Assoc. report) • Review, assess and develop a Vehicle Rental Management (VRM) (not addressed in Mercury Assoc. report) • Implement a SharePoint site for Fleet Mgmt. job and work order requests to include operations at Rothesay Avenue, Macintosh Street, McAllister Drive, and Adelaide Street and to include repair status reporting and feedback • Expand SharePoint site for service area requests to include Rothesay Avenue Shop Work Requests • Implement organizational wide "Pre- Operational Vehicle Inspections — Operator Requirements" • Review and improve Fleet 5 *22 program • Review and establish current and future staff training needs so as to align with the Staff Training Matrix Accountability and Transparency - Review of the Fleet Business Model including the Chargeback System • Develop a 20 year Strategic Vehicle Replacement Program so as to capture the optimum vehicle life cycle which in turn identifies annual capital funding requirements and maximizes residual values • Continue to use the vehicle optimum replacement point (ORP) tactical replacement analysis methodology • Manage the Vehicle Reserve Fund balance in harmony with ORP analysis to support annual funding needs • Develop a comprehensive, proactive customer relationship management program • Complete the development of a detailed inventory and established replacement costs including remaining useful asset life for over 1,100 vehicles and equipment • Implemented the use of weekly timesheets and time entry to record and report on staff utilization Risk Management • Risk Management should assume the operational and corporate responsibility for AVL • Continue to develop Standard Operating Procedures (SOPs) for equipment operated by in -house personnel, as time permits • Implementing a comprehensive Fire Safety Plan for the Rothesay Avenue fleet facility • Service Areas to obtain annual Driver abstracts from the Province of New Brunswick Approved 2015 190 133 Fleet Management - Service Levels and Resources • Provision of Fleet maintenance, vehicle and equipment acquisitions, vehicle rentals, • Sound Fleet management practices fleet fuel management, and AVL management services for 350 City -owned vehicle support the effective and efficient and equipment with a value of over $35 million: delivery of City services • Management of routine and preventative maintenance programs which has historically represented up to $3 million in fleet maintenance costs annually • Management of standing offer agreements for maintenance services with external Contractors and /or other service providers • Comply with Federal and Provincial legislation including, but not limited to: o Province of N.B. Motor Vehicle Act • Occupational Health and Safety Act • Clean Environment Act Approved 2015 • Manage risks associated with compliance with Federal and Provincial legislation • Vital to the support of over $35 million in Fleet assets and management • Support operations to focus on front line service providers while managing internal Fleet issues • Reduce operational expenses through the implementation of preventative maintenance and sustainable energy management strategies • Enhance proactive maintenance by way of an aggressive vehicle "Preventative Maintenance" program 191 Wages & Benefits $2,367,509 Fleet Services 2,066,873 Fleet Administration 300,636 Goods & Services $4,497,334 Fleet Services 4,467,086 Fleet Administration 30,248 Total Expenditures $6,864,843 Internal Recoveries ($5,674,569) Fleet Fuel Recovery (1,774,760) Fleet Maintenance (3,389,595) -Equipment Maintenance (179,330) - Vehicle Use (330,884) Net Expenditures $1,190,274 Full Time Equivalent Positions (FTE) Management *2.00 Inside Workers 2.00 Outside Workers 30.00 Fleet Services 20.00 Welding and Auto body Shops 6.00 Small Engine Shop 2.00 Fuel Truck 1.00 Tire Shop 1.00 TotaIFTE 34.00 *New Position — Superintendent Administrative /Other Support Services • Legal • Materials Management • Facility Management • Finance • Information Technology • Human Resources 134 Facility Management The City of Saint John Facility Management Division is responsible for the management of a portfolio of City -owned building infrastructure, including tourist information centers and destinations, historic properties, community and recreational facilities, maintenance and storage depots, police and fire stations, and administrative buildings. A portion of these buildings are occupied by support staff who deliver services to the City. Other buildings are utilized by the public for community events /activities, to support recreational needs, and in some cases to provide a shopping experience, as provided by the Saint John City Market. The portfolio of City -owned buildings is comprised of approximately 80 buildings having an area over 600,000 ft2 that have an estimated replacement value of over $85M; and have annual maintenance expenditures of approximately $1.2M per year on average (excluding other facility operating costs such as property tax, electricity, fuel, insurance, etc.). Currently, the portfolio of buildings with which Facility Management is responsible for excludes buildings operated by Saint John Water as well as Agencies, Boards, and Commissions (ABCs). Facility Management is comprised of a team of administrative and technical professionals that provide building maintenance, capital renewal, and energy management services for City -owned buildings on a 24 -7 basis. Facility Management also includes an in -house Carpentry Shop that completes requests for user departments, as well as in -house Building Maintenance personnel who support the operation of the Saint John City Market. 2014 Facility Management Accomplishments and Performance Building Project Highlights • Completed Phase 2 of the Nick Nicolle Community Centre Revitalization, and cooperated on the Grand Re- Opening of the facility with ONE Change • Received provincial funding under the Disaster Relief Assistance Program for the Shoreline Protection System and pathway down to beach at Mispec Park • Completed renovations at the new West Works facility, and commissioned systems for its opening • Replaced the main electrical service entrance and fire pump at the Peter Murray Arena • Completed the design and tender for the replacement of the roof system of the Fleet Garage, with consideration of the Asbestos Management Program and operational continuity Approved 2015 192 135 • Commenced design work associated with the repurpose and renovation of the City Market Head Tower • Acted in a consultant capacity to the Canada Games Aquatic Centre Commission to facilitate and coordinate the replacement of a gas -fired boiler which is critical to the operation of the facility • Tendered and facilitated the installation of gas detection devices in the Lord Beaverbrook Rink (LBR) on behalf of the Board, and developed and implemented Standard Operating Procedures (SOPS) in order to improve overall public safety and meet regulatory requirements • Replaced the Fort Howe "Saint John" sign lighting with LED technology, thus reducing operational costs associated with energy consumption and maintenance • Replaced the brine headers at the Belyea Arena • Acted in a project management / consultant capacity to the Board of the Saint John Public Library to design and construct two (2) new barrier -free washrooms in the Market Square location • Installed gas detection devices in the City -owned arenas, and developed and implemented Standard Operating Procedures (SOPs) in order to improve overall public safety and meet regulatory requirements • Implemented a significant overhaul of the mechanical and plumbing systems of the Beaver Fountain in Loyalist Square • Completed over 1,350 work requests at City -owned buildings to address urgent, routine, and preventative maintenance requirements, representing over $1.55 million in maintenance costs Organizational Initiatives • Continued to develop and refine building Tangible Capital Assets (TCAs) for all City -owned buildings to meet Public Sector Accounting Board (PSAB) requirements and to support asset management, and worked with financial auditors through the auditing process • Participated in the development of the corporate strategic plan for the City of Saint John — AdvanceSJ • Participated on the negotiation team for CUPE Local 18 — Outside Workers • Completed 5 -6 office renovations and relocations stemming from the organizational realignment, special projects, and other requirements Approved 2015 193 136 Operational Efficiency • Continued the development of Standard Operating Procedures (SOPs) for functions within the Facility Management Division, as time permitted • Developed and delivered a two -day Arena Attendant training program • Attended the second annual CPWA Building Infrastructure Council meeting in Fredericton, including Facility Management professionals from other municipalities in the Province of NB • Attended the first annual Conference on Public Markets, including market professionals from across Canada • Reviewed options for the amalgamation of Fleet Services operations to one (or fewer) locations within City facilities, including exploring the use of the SJ Transit facility Accountability and Transparency • Working with IT, developed weekly timesheet entry system to input and report on staff utilization (i.e. time allocated to projects, inspections, general administration, etc.) Used custom reporting tools through our financial management system to develop Key Performance Indicators (KPIs) for the Facility Management Division (Facility Management Technologist personnel only) at the departmental and staff levels, and established KPI baseline data for future performance goal setting and management • Average time to compete a Facility Maintenance Request — achieved an average of approximately 44 days versus an initial target of 15 days • Average time to close a job order — achieved 55 days versus an initial target of 40 days • Estimate versus actual project cost — achieved an accuracy of 50% versus an initial target of 30% • Monthly job completion rate — achieved a rate of approximately 110 per month versus an initial target of 120 • Completed and analyzed a customer satisfaction survey for the City Market Risk Management • Calculated and analyzed Facility Condition Indices (FCIs) for all City -owned buildings based on estimations of deferred maintenance and building replacement costs and reported current and projected future state results to Common Council Approved 2015 194 137 Finance and Administrative Services Service -Based Budget — 2015 • Implemented a comprehensive Fire Safety Plan at the Police Headquarters (PHQ) Facility • Installed new security cameras and card access system in the Saint John City Market • Negotiated agreements for Chipman Hill and Mercantile Pedways with service providers to provide cleaning, maintenance, and security services • Contributed to the license agreements for the West Side Food bank and Wellness Centre as they relate to the use of space within the Carleton Community Centre • Acted in a consultant capacity to the Canada Games Aquatic Centre Commission through the development of comprehensive external study for the facility, which will guide the strategic direction of the facility over the next 20 years • Acted in a consultant capacity to the Board of the Lord Beaverbrook Rink (LBR) to review the facility renew requirements and develop a long term capital plan • Completed an Asbestos Survey update of the City Market Head Tower, as well as the abatement of Asbestos Containing Materials in the building • Continued the development of Fire Safety Plans for City -owned public facilities • Developed Standard Operating Procedures (SOPS) for carbon monoxide, ammonia, and other gas detection systems for City -owned arenas • Developed a Preventative Maintenance Program for the Rainbow Park Ice Plant and implemented operational improvements • Developed Asbestos Management Plan for the Fleet Garage in accordance with the Asbestos Management Program Other Accomplishments • Successfully implemented "Butterflies" at the City Market in coordination with the local School District • Negotiated and executed new and renewal leases for various tenants in the City Market Approved 2015 195 138 2015 Major Initiatives, Major Projects and Facility Management Service Delivery Highlights Major Building Projects • Subject to Common Council Approval of the 2015 Capital Budget: o Complete renovations of the City Market Head Tower • Replace celestory windows of the City Market Hall to match heritage characteristics of the original units • Replace roof of Fleet Garage • Police Headquarters (PHQ) Facility at One Peel Plaza • Continue to provide 24 -7 maintenance and operation services for PHQ facility • Develop and implement Standard Operating Procedures (SOPS) related to the operation and management of the PHQ facility Organizational Initiatives • Physical relocation of departments and staff in relation to the Organizational Re- alignment and "Restack" of City Hall • Implement the corporate strategic plan for the City of Saint John — AdvanceSJ Operational Efficiency • Refine and report on established KPIs for the Facility Management Division at the departmental and staff levels, including the Carpenter Shop • Continue development of Standard Operating Procedures (SOPS) for functions within the Facility Management Division, as time allows • Expand SharePoint site for Departmental Maintenance Requests to include Carpenter Shop Work Requests Accountability and Transparency • Complete a 2015 customer satisfaction survey for the City Market • Develop and present a year -end report for the City Market summarizing sales, revenue, promotions, merchant mix, and other notable information Approved 2015 196 139 • As time and resources permit: o Develop and implement service level agreements or guidelines for the provision of Facility Management services to internal departments Risk Management • Continue to develop Standard Operating Procedures (SOPs) for equipment operated by in -house personnel, as time permits • Develop Strategic Marketing Plan for City Market • Develop and implement a mandatory Contractor Orientation session for service providers working on facility related projects • As time and resources permit: • Implement a standard form of construction Contract as well as a shift to the use of National Master Specification (NMS) as a basis for all future facility related tenders • Complete Asbestos Surveys and develop facility specific Asbestos Management Plans for high priority facilities identified in the Asbestos Management Program o Develop Fire Safety Plans for all City -owned public facilities Approved 2015 197 140 Facility Management - Service Levels and Resources Provision of building maintenance, capital renewal, and energy management services for over 80 City -owned building assets with a value of over $85 million and an average age of 30 years, including: o Tourist information centers and destinations • Historic properties • Community and recreational facilities • Maintenance and storage depots • Police and fire stations • Administrative buildings • Excludes water and wastewater treatment facility buildings • Excludes Agencies, Board, and Commission(ABC) buildings • Identification and prioritization of maintenance and capital renewal requirements through routine inspections, building condition assessments, and consultation with user departments, currently representing approximately $45 million in cumulated deferred maintenance • Management of routine and preventative maintenance programs which has historically represented the completion of approximately 1,400 -1,700 work orders or up to $1.6 million in maintenance costs annually, including in -house maintenance (e.g. Carpenter Shop) • Development, implementation, and management of capital renewal projects which has historically represented an average of $4 to $6 million in capital costs annually • Identification and management of energy reduction strategies through audits, project implementation, commissioning, and monitoring • Completion of comprehensive analysis for space optimization, changing functional / operational needs, feasibility studies, and life cycle renewal of existing and proposed facilities • Negotiation and administration of approximately ten (10) third -party license, lease, management, and /or operating agreements for the Pedway system, City Hall, Community Centres, Reversing Falls Restaurant, and other City -owned buildings Approved 2015 • Sound facility management practices support the effective and efficient delivery of City services, ensure public safety, and improve accessibility and functionality of City -owned buildings • Manage risks associated with compliance with Federal and Provincial legislation • Vital to the protection of over $85 million in building assets and management of $45 million in cumulated deferred maintenance • Allow operations to focus on external facing services rather than dealing with facility issues • Reduce operational expenses through the implementation of sustainable energy management strategies • Resource levels directly contribute to: • Reactive versus proactive maintenance • Magnitude of the backlog of service requests and deferred maintenance • Degree of ability to comply with legislative requirements, including asbestos management, fire safety, and environment • Inability to manage facilities currently operated by ABCs and SJ Water .w Wages & Benefits $1,638,451 Facility Management 639,702 Carpenter Shop 638,291 City Market 360,458 Goods & Services $6,111,029 Facility Management 1,497,949 Police Headquarters 916,320 Carpenter Shop 250,914 City Market 591,736 City Hall 1,824,110 Street Lighting 1,030,000 Internal Recoveries ($2,373,768) Facility Management (987,448) Police Headquarters (916,320) Carpenter Shop (470,000) Total Expenditures $5,375,712 Total Expenditures(Fin &Adm)$3,393,518 Revenue Facility Rentals 59,000 City Market Rentals 520,215 Total Revenue $579,215 Total Revenue (Fin &Adm) $59,000 Full Time Equivalent Positions (FTE) Management 1.00 Professional 2.00 Facilities 1.00 City Market 1.00 Inside Workers 5.00 Outside Workers 13.00 Carpenter Shop 9.00 City Market 4.00 Total FTE (Finance & Admin) 16.00 141 Facility Management - Service Levels and Resources Continued • Management of over 20 standing offer agreements for maintenance services with external Contractors and /or other service providers • Comply with Federal and Provincial legislation including, but not limited to: • New Brunswick Building Code Act • National Fire Code of Canada o Fire Prevention Act • Occupational Health and Safety Act • Boiler and Pressure Vessel Act • Electrical Installation and Inspection Act • Plumbing Installation and Inspection Act • Elevators and Lifts Act • Heritage Conservation Act • Clean Environment Act • Day to day operational management of the Saint John City Market, including: • Negotiation and administration of over 20 long term leases • Administration of 60 -80 temporary occupancy agreements annually • Merchant/ tenant relations • Marketing and promotions • Managing accounts receivable and accounts payable • Process and policy development Approved 2015 199 Administrative / Other Support Services • Legal • Materials Management • Fleet • Finance • Real Estate • Information Technology • Human Resources Note: • City Market managed through facility management, but contributes to the Growth and Community Development Services Program • Street Lighting managed though facility management, but contributes to Public Safety Services Program 142 Real Estate Real Estate Services professionally manages the City's real estate holdings from an acquisition, disposition and asset management perspective. Real Estate supports the Municipality's' interests in land matters for capital and operating initiatives and also responds to the public's inquiries regarding the City's real estate assets. Revenue generation from real property leases and licenses complement the cost saving work involved with the annual organization, analysis and referral (as necessary) of approximately 800 municipally owned property tax notices. Additional support is deployed for corporate initiatives such as Public Sector Accounting and the City Hall repositioning. 2014 Real Estate Accomplishments and Performance • Acquired a variety of land interests for the benefit of municipal operations, in particular for storm water management in the Boars Head area and the final acquisitions for the Harbour Clean -up requirements. • 825 property tax billings were processed, analyzed and the appropriate referrals (annual average of 30) were completed resulting in a 2014 reduction of $91,075. The gross annual savings of referred assessments since 2009 total $318,911, the cumulative and compounded savings over the 6 year period spanning 2009 -2014 is $1.27m. • Real Estate Services is also Involved in a variety of land and or real property related initiatives including the sale of Peel Plaza surplus properties, the former Millidgeville Fire Training Facility and the site and model selection of a future City Hall. • The department performed several stop up a closures in support of a multitude of developments including apartment building improvements, social assisted senior care housing, commercial development and the YMCA. 2015 Major Initiatives, Major Projects and Real Estate Service Delivery Highlights • Real Estate Services will play a key role in the land interest requirement for clean safe drinking water in 2015. Additional acquisitions will be required for a variety of storm water, sanitary and public right of way projects. • Real property tax billings will be processed, analyzed and referred as necessary to build upon the savings over the past 6 years. • Surplus property processes for the Millidgeville Fire Training Centre lands, Peel Plaza buildings and the Boars Head Municipal Operations lands will continue. • Negotiating the right sizing and relocating of City Hall establishment to new space will be an ongoing initiative. Approved 2015 200 143 Lease and license renewals supported by valuation work. Public Sector Accounting support for any newly acquired real property. Real Estate - Service Levels and Resources • Acquiring or disposing of land interests for municipal projects • Actively manages the City's Real Estate Assets (e.g., tax management, surplus land sales) • Provides professional analysis of land values, negotiating strategies and advice around real property matters throughout the organization • Reports to Council in such land matters • Respond to public inquiries regarding land related matters Approved 2015 • Sound property management practices support the effective and efficient delivery of City services - ensuring the City has access and /or ownership to land required for the delivery of municipal services or capital projects. • Aggressive management of the tax roll has resulted in a cumulative savings of $1,270,000 since 2009 supporting the organizations cost control initiatives. • Revenue streams in the form of land agreements, land sales and any ensuing development generate highly desired revenue and tax base for the City. More than $101,290 of annual revenue is under management in this category. 201 Wages & Benefits $188,649 Goods & Services 76,766 Property Tax (Land) 65,000 Total Expenditures $330,415 Total Revenues $101,289 Full Time Equivalent Positions(FTE) Management* 1.00 Professional 2.00 TotaIFTE 3.00 Industrial Parks * -1.00 Total FTE (Finance & Admin) 2.00 * Management position funded from Saint John Industrial Parks budget 144 Strategic Services Overview The Strategic Services team supports the City of Saint John through the provision of enabling information technology and strategic operational support designed to address evolving community -based economic, social and environmental needs. Organization and service goals are achieved by employing a strategic approach to effective communication; facilitating collaborative service delivery planning and policy development that engages the public in the decision - making process; managing relationships with other levels of government, communities and organizations; maximizing the use of information technology to support continuous improvement of service delivery; and building and retaining a high performance public service. Strategic Services plays a key role in championing organizational collaboration through the City Manager's Office and Senior Leadership Team, while ensuring that service delivery supports Council Priorities and corporate goals as identified in the City's new strategic plan — AdvanceSJ. The Strategic Services Group is also responsible for measuring and reporting to Council and citizens with respect to overall organizational performance and service delivery outcomes. Organizational Goals To establish the City of Saint John as a service - based, results oriented, high performance public service organization. Service Based • Considering the needs of the community as a whole • Creating opportunities for citizen feedback and input • Responding effectively and efficiently to address community needs Approved 2015 Results Oriented • Respond to constant changes in the community through communication, collaboration and technology • Demonstrate value for investment in the community • Build capacity the organization to effectively and efficiently deliver service High Performance • Collaborative, productive and customer - focused workforce • Culture focused on contributing to community goals through service delivery • Resource conscious and accountable for results 202 Human Resources Service Corporate Planning Service *Intergovernmental Affairs Service Corporate Communications Service Information Technology Systems Service *Service function moved to City Manager's Office for 2015 145 Strategic Services Summary *Service function moved to City Manager's Office for 2015 with elimination of Intergovernmental Affairs Coordinator position Approved 2015 203 146 Approved 2014 Expenditures 2015 Revenue FTE Human Resources 1,528,054 1,570,024 10.25 Corporate Planning 462,531 471,177 3.25 Intergovernmental Affairs 155,547 * 0.00 Corporate Communications 531,754 540,385 3.25 Information Technology Systems 2,138,707 2,222,368 81,500 17.25 Strategic Services Budget $4,816,593 $4,803,954 81,500 34.00 *Service function moved to City Manager's Office for 2015 with elimination of Intergovernmental Affairs Coordinator position Approved 2015 203 146 Table of Contents — 2014 Service Plans Human Resources............ Corporate Planning.......... Intergovernmental Affairs Corporate Communications ........ Information Technology Systems Approved 2015 ............................................................................................................... ............................... 148 ............................................................................................................... ............................... 155 ............................................................................................................... ............................... 160 ............................................................................................................... ............................... 163 ......................................................................... ............................... 168 204 147 Human Resources The Human Resources (HR) Department provides strategic support services aimed at providing "a skilled and knowledgeable workforce demonstrating commitment, integrity and responsibility in service to the citizens of Saint John." Key HR functions include human resource planning and consulting, salary and benefits administration, job staffing, employee training and development, industrial relations, performance management, organizational development and employee health and safety programs. HR provides essential "people" support services and functions that provide the foundation for a service - based, results oriented, high performance public sector organization. Compliance with regulatory and legislative requirements Focus on Council's Priorities and the City's new strategic plan (AdvanceSJ) Human resources planning, emerging HR policies and HR best practices Organizational effectiveness, productivity and overall operational efficiency Emerging technologies and continuous improvement External labour market and economy — competition for human resources 2014 Human Resources Service Accomplishments and Performance Human Resources and Salary and Benefits Administration • Launched a formal job evaluation and compensation review process for the City's Management and Professional employees. • Administered employment services for 753 full -time, permanent City staff plus casual employees (salaries, benefits, personnel records, training, professional development and total compensation); 24 crosswalk guards (payroll administration was added for this group in 2014); 808 pensioners; and 58 legacy disability pensioners. • Managed 37 Return -to -Work (RTW) Cases and 20 Workers Compensation (WC) Cases, with a 75% success rate for employees returning to full -time, regular work status. • Focused on attendance management issues through the development of a draft Attendance Management Program for all employees; analysis of attendance records to establish a baseline for process improvement; and implementation of attendance review as part of the regular staffing process. • Updated the Job Descriptions and Job Profiles for the City's outside workforce. • Facilitated the Inside Worker job evaluation process (on -going commitment). Approved 2015 205 RM Organizational Development • Enhanced employee recognition programs including the service pin program developed in partnership with Corporate Communications. Conducted a successful Long Service Recognition and Retirement Banquet (spring of 2014). • Initiated a strategic review of key City of Saint John human resource policies and administrative procedures in support of the effective and efficient delivery of municipal service. Draft policies developed with respect to Drug and Alcohol Abuse and Workplace Conduct, with supporting implementation strategies planned for 2015. • Supported Operational Managers in special workplace investigations and interventions arising from a variety of workforce issues. • Launched an enhanced Corporate Wellness Program (lunch and learn sessions, healthy diet information, fitness promotion); conducted a Corporate Wellness Fair with 21 service providers and over 100 employees and family members in attendance; and established Corporate Wellness Taskforce comprised of 21 members across all areas of the organization. Introduced a new Employee Wellness newsletter. • Launched a succession and recruitment plan that will support the City in attracting and retaining key managerial, professional and skilled employees capable of delivering quality and sustainable municipal services to the general public. Occupational Health and Safety • Enhanced the City's 5 *22 (Safety Management System) through the facilitation of 16 accident investigations across all service areas. Coordinated an external investigation resulting in safety improvements to lower incident and severity rates and the City's Worker's Compensation premium. Increased operational effectiveness of the 5 *22 system through consulting, communication, training, and audits; resolution of sensitive performance issues; review of safety records management requirements; development of a corporate safety scorecard; and transition to an on -line application. • Our workers' compensation premium rate for 2015 is $1.23. This represents a reduction of 9% from 2014. Further, the City's experience (i.e. cost ratio) was 4.28% lower than our Industry Group consisting primarily of other municipalities in New Brunswick. Since 1998, the City has reduced its overall lost time work - related injury rate by over 60 %, resulting in sustained reductions in our workers compensation rates. • Experienced no stop work orders from Worksafe NB compliance division with a focus on protecting the City's corporate compliance record and due diligence posture. • Managed a number of corporate safety projects to support safety improvements including Manual Material Handling Pilot Project, Standard Operating Procedure Project, Pre - operational Safety Inspection Project (on- going), High Angle Rescue Project (ongoing). At least one of these projects supported the development of a safety relationship between the City's Fire Services and Saint John Water that has the potential to be leveraged in implementing other improvements organizationally that increase service effectiveness, efficiency and revenue. Approved 2015 206 149 • Developed strategies to communicate purpose and responsibility related to occupational, health and safety (OHS) programs at every level. These strategies included Senior Management Engagement and creating awareness to comply with changes to the New Brunswick Occupational Health and Safety Act including working with the Police Commission. • Implemented a number of initiatives to ensure the safety of employees and efficient administrative safety processes including the development of a fire evacuation plan for City Hall and the successful appeal of a compliance order to establish a separate Joint Health & Safety Committee at Adelaide Street. Job Staffing • Staffed 254 positions - Internal and External Candidates (since last reported on October 17, 2013). • Improved hiring and retention processes including revamping job profiles to include comprehensive competency requirements; implemented Hiring for Attitude process; enhanced hiring process for Holiday Relief Firefighters; and conducted numerous orientation sessions and on boarding activities. Performance Management • Administration, training and monitoring of performance reviews for employees in our inside and outside workers, non - union, and management /professional employee groups including an audit of all performance reviews to provide feedback for improvement. • Initiated preliminary discussions for enhanced performance reviews in the Fire Services. • Established processes to improve documentation handling, storage and retrieval procedures. • Offered a corporate coaching program. Industrial Relations • Maintained positive relations with employee groups and resolved issues through ongoing communication and collaboration. • Carried out contract administration through a number of rights arbitrations, grievance and disciplinary processes for various workforces. • Managed the negotiation process for the Outside Workers, Inside Workers and Firefighters including the development of collective bargaining strategies, delivery of information sessions to Common Council, and collaborative partnerships with other NB municipalities to address negotiation issues across the province. Collective bargaining has started with the Outside Workers and Inside Workers. • Developed and Conducted a bullying survey with both our Outside and Inside Workers, which will serve as a foundation for a corporate anti- bullying initiative Approved 2015 207 150 Employee Training and Development • Developed, managed and administered the 2014 Outside Workforce Training Plan, including the delivery of a pilot training project for the Sub - Foreman Role and Foreman /Operator training and integration of current standards of certification and licensing into the Outside Workforce Career Development System. • Supported professional development of management, professional and supervisory employees with the implementation of a cost effective webinar program; organization of two major training initiatives with Cornell University (i.e., Negotiations Boot Camp and Managing in a Unionized Environment); enhancement to the orientation package on Human Resource processes; and improvement to the Duty to Accommodate and Return to Work Training. • Delivered a variety of safety training programs including NBOHSA awareness to management, supervisory and outside workforce (i.e., 110 sessions / 600 training days). 2015 Initiatives, Major Projects and Human Resources Service Delivery Highlights The City's new corporate strategic plan, Advance SJ, shapes the future direction and operational responsibilities of the HR Department. The AdvanceSJ service principles drive the Department's future work plan and commitment to the organization. As a service enabling Department, HR will strive to assist other operational units in achieving their service delivery goals, while strengthening its leadership within the organization as a strategic people management change agent. The HR Department will accomplish this through direct involvement with the following AdvanceSJ initiatives: ➢ 4A Continuous Improvement ➢ 4B Service -Based Accountability ➢ 4C Proactive Labor Relations ➢ 5A Customer Service Improvement ➢ 5C Information Management System ➢ 6A Workplace Development ➢ 6B Employee Performance Management ➢ 6C Heath, Wellness and Safety ➢ 7A Communication Framework Approved 2015 1: 151 Human Resources, Salary and Benefits Administration • Implement Compensation and Salary Administration Policies and Procedures for Management, Professional and Non -Union employees and the development of supporting Job Descriptions and Job Profiles for Management /Professional staff. • Update the Terms and Conditions of Employment for Management /Professional Employees. • Implement recommendations from the 2014 Benefits Review, led by the Department of Finance. • Additional enhancements to the City's Return to Work Program. • Proactive review and management of legacy and new long -term disability claims. • Implement anew Attendance Management Program for all employees. • Hold a 2015 Long Service Recognition and Retirement Banquet. Organizational Development • Implement the City's new Respectful Workplace policy. • Design and implement employee assessment and succession planning system that will allow the City to attract and retain individuals that will support the organization in achieving its goals and delivering quality service to the public. • Support the City's business continuity / contingency planning efforts. • Partner with the Communications Department in communicating HR related information and extraordinary staff accomplishments or contributions in the Engage employee newsletter. Occupational Health and Safety • Continue to improve the City's Safety Management System (5 *22) with program delivery that ensures preparation and compliance with new NBOHSA requirements; facilitate development of standard operating procedures in all operational service areas, creation of an integrated on- line City of Saint John Safety Page on SharePoint, implementation of Senior Management Safety Engagement Strategy; full and enhanced implementation of the system in the Public Safety Services (e.g., Police and Fire). • Complete a number of safety initiatives and training programs including implementation of Manual Material Handling Program, Pre - Operational Inspection Project, training for the Facility Inspection Team, and Alcohol and Drug Program; develop GHS compliant training program; update the City's WorkZone Safety Manual; and re- Establish "We look after the City, please look out for us" summer safety campaign in partnership with Corporate Communications. Approved 2015 209 152 Job Staffing • Implement further changes to staffing processes and procedures in alignment with best practices in assessment to staff vacant positions, all workforces, in accordance with approved 2015 establishment. • Design and implement stronger employee orientation /on boarding procedures. • Explore the means to design and implement a staffing forecast process (with associated HR planning tools). Performance Management • Continue to improve the City's employee performance management system with the development and implementation of a new administrative model and communication strategy to increase compliance with respect to performance reviews and support the completion of performance reviews for all employees in the Fire Services. • Review, update and communicate probationary performance evaluations and processes. • Provide enhanced coaching and performance improvement training for managers. • Introduce new HR performance metrics and work with Corporate Planning to introduce an appropriate HR performance dashboard. Industrial Relations • Negotiate collective agreements with the Outside Workers, Inside Workers and Firefighters. • Strengthen mutual interest processes with all City workforces. • Conduct, manage, coordinate and support special investigations, mediation and HR reviews. Training and Development • Focus on workforce development with the design and implement of a Management Development Program, manage career development training system for the Inside Workers, and continue to improve and deliver the Outside Workforce 2015 Training Plan including the review and revision of training structures to ensure alignment with operational requirements and new employment structure and implementation of enhancements to Sub - Foreman /Foreman /Designated Operator training. • Design and implement Managing Personal Effectiveness Program to enable individual employees to better handle difficult situations and stress levels. Approved 2015 210 153 Human Resources - Service Levels and Resources • Core HR functions: recruitment, orientation, retention, performance management. • Succession planning. • Expanded employee wellness and recognition programs. • Updated compensation and benefit administration procedures. • Collective agreement administration: • Mutual Interest Committee facilitation • Grievance administration • Update interpretive guidelines • Interpretation and administration of Collective Agreements • Negotiations • Employee development including performance reviews, training and development, and coaching • Manage Return to Work program for all Employee Groups, including Workers Compensation claims • Manage new and existing Long Term Disability Claims • Complete the Job Evaluation / Compensation Review process for Management / Professional Employees • Provide internal customer service • Guidance and support to managers and employees on a variety of employment issues • Manage employee benefit and payroll processes • Create awareness with respect to both employer and employee obligations. • Safety management (5 *22 Program) and continuous improvement • Participation in various corporate projects and initiatives • Deliver internal HR consulting services • Facilitate, prepare and present: • human rights complaints • grievances • arbitrations • investigations • discipline processes Approved 2015 • Ensure compliance to legislation governing employees in the workplace • Promote a safe and respectful workplace. • Increase organizational capacity and flexibility. • Improve organizational performance. • Supports the organization in building capacity to effectively and efficiently delivery service to the public and respond to change. • Fulfilling employer obligations. • Unplanned service demands requiring a program response are inevitable and consume significant HR resources and reduce ability to carry out service plans. • Planned staff leaves will continue to impact the operational effectiveness and capacity of the HR Department in 2015. 211 Wages & Benefits $988,940 Goods & Services 581,084 Total Expenditures $1,570,024 Full Time Equivalent Positions(FTE) Management 2.25 Professional 4.00 Non -Union 4.00 TotalFTE 10.25 154 Corporate Planning Corporate Planning provides strategic guidance and support to the Corporation in being a service - based, results oriented, high performance public service organization. The area is responsible for coordinating strategic planning processes that ensures service delivery aligns with the vision and goals for Saint John; facilitating a corporate -wide performance methodology that support the Corporation in meeting its accountability objectives; providing project management for corporate initiatives that are transformative in nature; managing a continuous improvement program that looks at end -to -end processes with a goal of improving effectiveness and efficiency; and conducting research and analysis in support of policy development. 2014 Corporate Planning Service Accomplishments and Performance Emergence of consultation and collaboration as a decision - making tool Expectations for transparency and accountability in local government Organizational capacity Requirement to respond to evolving needs of the community Focus on strategic planning and demonstration of results Strategic Planning • Commenced rollout of AdvanceSJ to the management - professional employee team including the delivery of a full day workshop to create awareness on service principles, agreement on the organization's priority projects for the development of a work plan, and ideas on how to communicate the plan to employees. • Coordinated quarterly management - professional employee sessions aimed at creating awareness of the organization's priorities and share ideas to support a more collaborative, innovative and cost - effective approach to delivering public service. • Development of a communications program to rollout AdvanceSJ to all employees with supporting materials and branding. • Established clear roles and responsibilities in the Corporate Planning Service with a focus on strategic and service planning, project management and continuous improvement. The goal was to support effective and efficient service delivery and demonstrate value of this work in the organization. • Continued coordination of service planning and performance measurement as it relates to the service -based approach to budget presentation. Approved 2015 212 155 Project Management • Managed implementation of customer service improvements as outlined in the Customer Service Strategy, more specifically continued coordination of the implementation of SunGard One Solution Customer Relationship Management (CRM) software (pilot in Transportation & Environment Services and Saint John Water) and related processes. Project included an integration alternative analysis and considerable effort to investigate implementation of the SunGard Land application. • Facilitated the development of a project charter and high -level work plan for the One -Stop Development Shop Project that included several workshops focused on project definition for one of Council's priorities. • Participated in the evaluation of the Request for Qualifications (RFQ) for the City's Safe, Clean Drinking Water Program ( SCDWP), acting as the Chair of one of five evaluation teams responsible for the development of detailed criteria and evaluation of submissions. • Delivered a five day Program Management course as part of the City's Outside Workforce Career Development System designed to support employees in better planning and coordinating work related to service delivery. • Continued project management for the SCDWP Virtual Data Room development, a key collaboration tool to support communications and the work of this Council priority. • Provided project management for the Open -Data project that includes the creation of an open -data policy, delivery of an engagement program with all City of Saint John service areas and its agencies, board and commissions, and development of a pilot implementation model. • Provided project management for the Saint John Information Management Project (SAM) with a focus on Legislative Services. Key deliverables include project definition, SharePoint file Plan, information management business rules, and SharePoint Laserfiche integration. Performance Management, Service Improvement and Organizational Effectiveness • Led the development of the 2013 Annual Report: Investment in Our Priorities —Building a Sustainable Saint John. The report was developed by a cross - functional team with representation from across the organization that included an engagement workshop with City management - professional employees and collaboration with a number of service areas. The annual report was the first one published in over twenty years. Approved 2015 213 156 Provided leadership and technical support to the City Manager in the development of process for the sustainable service review. Other work included coordination and development of materials, facilitation at Council workshops, and consolidation of ideas throughout the process. Outcomes of the review process provided the framework for the 2015 service -based budget (first steps in re- designing the service -based budget presentation). Drafted terms of reference for the Legal Service Review. Review is proposed as part of the value for money program aimed at ensuring service is delivered in the most cost - effective manner. 2015 Major Initiatives, Major Projects and Corporate Planning Service Delivery Highlights Strategic Planning — Planning, Project Management and Reporting • Continue to develop and deliver a communications program to create awareness among employees as to the priorities for the organization and how service delivery contributes to the achievement of the strategic directions outlined in AdvanceSJ. A particular focus should be on employee engagement related to our service principles. Contributes to the achievement of 6A Workforce Development (employee engagement) strategic initiative in AdvanceSJ. • Focus on continuous improvement of the service -based budget process and format to achieve full implementation that supports evidence based decision making. The focus will be on further developing service levels for both public and enabling services and ensuring alignment with Council's Priorities, the strategic directions outlined in AdvanceSJ and other policy documents such as PlanSJ. Additional objectives include linking stated public service levels and enabling resource requirements. Aligns with 4B Service -Based Accountability strategic initiative in AdvanceSJ. • Develop high -level objectives and process considerations for public engagement in collaboration with Corporate Communications and Growth & Community Development Services to support the appropriate involvement of citizens and other internal stakeholders in key decision - making. Aligns with 5B Citizen Centered Service Delivery strategic initiative in AdvanceSJ. • Facilitate a process to develop a corporate communications framework that is intended to improve the City's approach to engaging and informing citizens, employees and stakeholders. Aligns with 7A Communications Framework strategic initiative in AdvanceSJ. • Implement a management system to support the achievement and reporting on progress of the strategic directions outlined in AdvanceSJ. The system should provide input to the senior leadership team's decision - making related to priorities, capacity and resource allocation. Approved 2015 214 157 • Provide project management consulting (support) for corporate projects or initiatives as they arise and align with AdvanceSJ. Continued and potential projects may relate to 5C Information Management System (including SJIM and Open Data), 2D Transportation Master Plan and K Quality Drinking Water strategic initiatives in AdvanceSJ. Continue to providing project management for the implementation of customer service improvement initiatives designed to enhance citizen contact experience. Focus should include developing process around corporate customer relationship management (CRM) building on the results of the pilot project, rolling out corporate customer service standards and creating awareness around customer service expectations as defined in the policy, completing a training needs analysis and delivering a phased customer service education program. Process development should contemplate corporate ownership and accountability for customer service. Aligns with 5A Customer Service Improvement strategic initiative in AdvanceSJ. • Publish an annual report that outlines progress on Council's priorities, results of key service performance indicators outlined in AdvanceSJ, and financial position of the City. Aligns with 4D Measuring Results strategic initiative in AdvanceSJ. Continuous Improvement - Performance Management, Service Improvement and Organizational Effectiveness • Redesign the accountability framework to outline an integrated process for identifying opportunities for improvement, conducting service and process reviews, and implementing recommendations including ROI evaluations. Redesign will involve evaluating existing (core service review, value for money, function mapping) and emerging (i.e., lean six sigma 'waste walk') methodologies to develop an approach to continuous improvement that promotes innovation and citizen - focused service delivery. Contributes to 4A Continuous Improvement strategic initiative in AdvanceSJ — Carry -over from 2014 will full complement of staff completed mid -year 2014. • Administer service reviews and /or value for money audits as approved in the 2015 operating budget. Particular focus will be on developing terms of reference, support for contract management (as required) and consulting on the establishment of service levels and analysis. Contributes to 4A Continuous Improvement strategic initiative in AdvanceSJ. • Develop and implement a framework to coordinate reporting of service performance metrics and PlanSJ service measures. As time and resources permit, implement a web -based performance reporting tool, with continued focus on measuring and reporting on citizen satisfaction (with plans to conduct a citizen survey in 2015). Will require resources to conduct a citizen survey. Aligns with 4D Measuring Results strategic initiative in AdvanceSJ - Carry -over from 2014 will full complement of staff completed mid -year 2014. • Provide consulting and support to the Strategic Services team in working to achieve the strategic directions outlined in AdvanceSJ, ensuring alignment with strategic planning and continuous improvement initiatives. Approved 2015 215 158 Corporate Planning - Service Levels and Resources Strategic Planning - ensuring the City's services are aligned with the vision and goals • Strategic planning and continuous of the community. This is achieved through the facilitation and engagement of improvement initiatives support the Council, staff, citizens and other stakeholders. City in establishing itself as a service- • Lead the strategic planning cycle (four year cycle) that aligns with service planning based, results- oriented, high and budgeting performance public service. • Direct the implementation of strategic planning initiatives through portfolio • Supports the organization in management with updates to the senior leadership team three times a year communicating strategic direction and (minimum) and ensure project management related to assigned projects achieve reporting of service results as a means the deliverables and quality objectives outlined in the scope statement (budget and to demonstrate value for public time to be considered as project management best practices mature in the investment in the community. organization) • Facilitate the measurement, tracking and reporting of progress and outcomes • Planned work outlined in the 2014 related to strategic initiatives with delivery of an annual report service -based budget is based on a full staff complement (3 positions). • Administer a framework for public engagement to ensure the needs of citizens are Approved resource allocations will addressed in setting a strategic direction and making decisions about service impact the ability to facilitate and delivery including the delivery of a least one large scale public engagement engage in strategic planning and program every two years continuous improvement initiatives in Continuous Improvement — ensuring that public service delivery is innovative, terms of volume and quality. efficient and effective in addressing the evolving needs of our community. This is • Assignment of unplanned initiatives to achieved through the application of process and tools to evaluate service the Corporate Planning work plan may performance, generate improvement strategies, and implement change. result in a change in direction or in the • Lead service reviews to determine core service improvement opportunities on an execution of planned priorities for annual cycle (depends on allocation of resources in the operating budget); report 2014. back on the impact, both qualitative and quantitative measures of continuous improvement, of results of implementing service improvement initiatives from an organizational efficiency and strategic planning perspective • Coordinate reviews of business process to improve organizational effectiveness (as assigned) • Administer a service -based performance management system that is designed to achieve the City's accountability and transparency objectives in delivering cost - effective public service (annual evaluation and recommendations) Approved 2015 216 Wages & Benefits $328,313 Goods & Services 142,864 Total Expenditures $471,177 Full Time Equivalent Positions(FTE) Management 1.25 Professional 1.00 Inside Workers 1.00 TotaIFTE 3.25 159 Intergovernmental Affairs The Intergovernmental Affairs Officer advances the City's policy and financial interests by pursuing partnership opportunities that specifically address priority community needs. The position is tasked with ensuring that the City's government relations efforts will be coordinated, strategic and consistent with the objectives of the City of Saint John, including the following 20 -year community goal: "Our City plays a leadership role with other local, provincial and national elected officials to address common challenges and opportunities for our community." Financial and policy interests of the City New legislation or changes to existing legislation Availability, competition and focus of external grant and subsidy programs Communication with federal and provincial staff members Successful implementation of intergovernmental strategies Developments from other levels of government and external partners As a relatively new function within the City's administrative structure, the Organizational capacity goal remains to work collaboratively with key stakeholders from other levels of government, other organizations and key service areas within the City of Saint John to build strategic relationships that specifically address Common Council's priorities for moving our community forward. The Intergovernmental Affairs Officer is tasked with identifying new funding sources and coordinating the City of Saint John's external grant or funding applications, as well as serving as a strategic information and policy resource for the City Manager's Office, Senior City Management and Common Council. Byway of fulfilling their job responsibilities, the Intergovernmental Affairs Officer will support the City in establishing itself as a service - based, results oriented and high performance public service organization. 2014 Intergovernmental Affairs Service Accomplishments and Performance (November 2013 to November 2014) Policy and Priority Advancement Supported and coordinated City Staff and Council involvement in the Cities of New Brunswick Association (CNBA) and Federation of Canadian Municipalities (FCM), including direct involvement with two key FCM Committees: Municipal Infrastructure and Transportation Policy and Municipal Finance and Intergovernmental Affairs. • Continued to support the City's SCDWP Project team and strategic relationship with P3 Canada and the Government of New Brunswick. • Developed a series of internal intergovernmental action plans, briefing notes and reports on variety of topics to Senior City Staff and Council. Approved 2015 217 160 Led Saint John's response to the Provinces' Local Governance Reform Agenda including regular updates to Common Council and City staff; advancement of the City's Saint John Position Paper on Legislative Modernization, which was previously submitted to the Cities of New Brunswick Association as well as the Government of New Brunswick; and facilitation of Council's submission to the Government of New Brunswick in response to the draft Legislative Modernization Framework. External Funding Opportunities for the City of Saint John • Continued to identify and pursue relevant Federal and Provincial Government grant or funding programs in support of Council Priorities. • Applied for the Small Communities Fund (New Building Canada Fund) for the Transit Fleet Renewal Program. Strategic Relationships and Partnerships • Supported Common Council's Pre - Budget Submission to the Government of New Brunswick in 2014. • Worked with the City Manager and Mayor's Office in coordinating tri -City partnership meetings and discussions with the Cities of Fredericton and Moncton. Coordinated ongoing tri -City interaction, identified common objectives, exchanged best practices, and strategically linked efforts with the work of the Cities of New Brunswick Association. • Worked with Enterprise Saint John and community partners in supporting implementation of True Growth 2.0, including direct involvement with the Urban Development and Natural Gas Working Groups. • Provided support with respect to the development and potential launch of the Living SJ initiative. • Engaged local stakeholders with respect to a new community grants application and review process, developed a new Municipal Grant Program for the City of Saint John, and undertook a roll -out of the program in late 2014. • Engaged local stakeholders with respect to a new community -based economic development capital investment review matrix, developed a framework and received Council approval in late 2014. • Handled a broad cross - section of intergovernmental affairs received inquiries, requests for support and /or coordinated common initiatives from virtually all branches of every corporate service area within the City of Saint John and a variety of Agencies, Boards and Commissions. Approved 2015 218 161 2015 Major Initiatives, Major Projects and Intergovernmental Affairs Service Delivery Highlights Note: Intergovernmental Affairs has been moved within the Office of the City Manager and service function highlights will be noted in the Legislated Service. Approved 2015 219 162 Corporate Communications The City of Saint John serves its residents, businesses and visitors every day by delivering a variety of public services and products. Corporate Communications strives to provide public education and information that will foster positive relationships between the City, our employees, our citizens and other organizations. Corporate Communications works with service areas across the Corporation to help the public understand what they can expect as a result of delivery of municipal services and the value their investment has in the community and to promote Saint John as a great place to live, work and invest. Awareness and education are created using various channels including print, online and media. Organizational capacity Public expectation with respect to all public service delivery Regulatory / legislative requirements for translation, public notifications Communication requirements for information and public engagement Emerging technology for effective communication Diversity in population (age, culture, accessibility) 2014 Corporate Communications Service Accomplishments and Performance Community and Brand Relations • Key organizer of Passport to Parks (with Neighbourhood Enrichment and Parks and City Landscape services), a City -wide initiative designed to highlight the natural assets of eight City parks. The events were extremely well received, well attended (over 1,500 total attendances) and generated lots of "social media" buzz. Two of the events were scheduled on a weekend during which the City experienced a hurricane. Events were re- scheduled and the program was completed as scheduled. • Key organizer of the Mayor's Cup (with PRO Kids) a Passport to Parks event designed to promote helmet use at the Station One Skateboard Park. Over 200 free helmets were given out and over 60 skaters participated in the event. • Key initiator and developer of Larche Memorial Park (with Parks and City Landscape) a City park renamed in honour of Cst. Doug Larche, one of three RCMP officers killed in Moncton in June. The project resulted in over $40,000 of in -kind donations. The department worked closely with Branch #69 of the Royal Canadian Legion, the RCMP, the Saint John Police Force and the Saint John Fire Service on the opening event. • Supported the One -Stop Development Shop initiative by providing project support, communications counsel and collateral preparation. • Provided input and support to Investment in our Priorities, the City's first Annual Report. • Key organizer of the Common Council's Volunteer Recognition Awards Dinner, where over 63 volunteers and their nominators were celebrated. Approved 2015 220 163 • Supported City -led community partnership initiatives (Passport to Parks, Nick Nicolle Community Centre Opening, Donnie Dwyer Ballpark, Jarvis Bay Park, PRO Kids, Marigolds on Main, Salty Jam). • Supplied speaking notes for Mayor and Council, and produced a number of advertisements for publications and greetings and letters on behalf of the Mayor's Office and Common Council (over 50). Media Relations (Including Social Media) • Organized a number of media events, working with City staff intended to create awareness of the value on service delivery and highlight service levels including solid waste pick up, snow plowing and cleanup efforts around Hurricane Arthur. • Provided communications, media and event management in support of several City corporate partnership initiatives including the Emera Field at Shamrock Park, the Emera Fire Safety Trailer, the IOL SJFD Training Facility Partnership and the Port Saint John contribution to the IOL SJFD Training Facility. • Worked with RDC and ACOA to produce a media event celebrating the completion of the Harbour Clean -Up project. • Implemented several paid Facebook advertising campaigns reaching an average of 12,000 Facebook users per campaign Content Creation and Communications Materials Development • Continued efforts to ensure that the website reflects the communication needs of service areas and the public. This involved focused effort to update news items and content daily. The front page and news sections were re- designed and a content audit was performed. • Developed an auto translated traffic advisory form designed to streamline the process for all departments. • Developed and implemented communications initiatives and materials for the City's Safe, Clean, Drinking Water Project. • Issued over 160 bilingual PSAs (as of November 30), news releases and advisories. Internal Communications and Service Support • Developed and implemented communications for the Caught on the Market and Main Street Blossoms beautification campaigns. • Provided support to three emergency incidents that occurred after regular business hours (i.e., evenings, nights and weekends) related to boil water orders, extreme weather notifications, road closures and flooding and participated in one mock emergency exercise. Approved 2015 221 164 • Worked with Growth and Community Development Services (to support the Canadian Institute of Planners annual conference) to develop an event to recognize the City Market as one of Canada's Great Public Places. • Supported large- scale, ongoing projects such as the Winter Management Plan and the 2014 construction season. • Provided strategic communications on a number of sensitive files and unplanned initiatives. • Supported the City's Open Data program. • Collaborated with Human Resources to roll out a "years of service" pin and recognition program. • Highlighted the accomplishments of 350 employees through two issues of Engage. • Re- implemented the Summer Safety Campaign involving Saint John Water, Transportation and Environment Services, Saint John Police Force, the Saint John Fire Service and Human Resources. 2015 Major Initiatives, Major Projects and Corporate Communications Service Delivery Highlights Community and Brand Relations Develop and implement a communications framework to improve the City's approach to engaging and informing citizens, employees and stakeholders. This includes continuing to develop and document communications, brand and media relations standards. Aligns with 7A Communications Framework strategic initiative in AdvanceSJ. Supporting initiatives include: • Work with key stakeholders (including IT) to complete a website governance model, ensuring that the responsibility of website content becomes part of service delivery and that the site is strategic in meeting communications needs. • Work with the nominating committee to develop a campaign designed to encourage volunteer applications to the City's ABCs. • Develop an online magazine. • Provide communications support to the cross - functional team that will be responding to Common Council's request for an Open Data Policy. Contributes to Information Management System strategic initiative in AdvanceSJ. Address needs for public education about City services and operations. Initiatives (in conjunction with the Neighbourhood Enrichment service and aligns with 2A Vibrant, Safe Neighbourhoods strategic initiative in AdvanceSJ) include: • Support the "Mayor's Cup" an event designed to promote the helmet by law requirements. • Support "Passport to Parks ", designed to promote the PlaySJ goal of "providing quality, accessible recreation and leisure facilities maintained at a high standard and used to their maximum potential." • develop a new initiative designed to highlight City facilities which may include tours of the EWWTF and the SJFS /IOL Training Facility Approved 2015 222 165 • Support True Growth 2.0, through various True Growth Alliance working group initiatives. Contributes to 18 Economic Development Coordination strategic initiative in AdvanceSJ. • Continue to support and organize various community and media events, in order to promote service delivery and the City as a great place to live, work and invest through various channels. Media Relations (including Social Media) • Implement an house media training program Internal Communications and Service Support Support the employee engagement strategy with Human Resources. Planned initiatives that contribute to 6A Workforce Development (employee engagement) strategic initiative in AdvanceSJ include: • Expand on the "service excellence" programs. • Develop SharePoint as the delivery system for Engage, our employee newsletter (in conjunction with IT). Continue to provide strategic support as well as enable service areas to perform basic communication activities (such as emergency notification). Provide communications counsel and support to the City's Safe, Clean, Drinking Water project. Contributes to 3C Quality Drinking Water strategic initiative in AdvanceSJ. Approved 2015 223 166 Corporate Communications - Service Levels and Resources • Establish communications standards and processes across the organization, improving organizational competencies, expertise and management practices to support the delivery of high - quality communication services. • Respond to media requests and media coordination within one business day (95 percent of the time). This accounts for approximately 25 % of the daily activity. • Develop and delivering strategic messaging for the City of Saint John. • Support service areas in developing and executing communication plans and products that educate the public on service initiatives and service levels and responsibilities. • Work with service areas to ensure communication meets quality standards. • Website maintenance including updating news events and content, responding to external requests from the public. • Produce print collateral -- flyers, posters, print advertising for various publications (over 50 pieces annually). • Provide 24 hour — 7 days a week communication support coverage in response to emergency events (not including fire and police unless required otherwise). • Respond to request for information from the public, other levels of government and other organizations) within two business days (95 % of the time). • Monitor media and social media sites to ensure that communication reflects City messaging. • Organize, facilitate or assist community and media events and meetings (approximately 10 per year). • Produce speaking notes and presentations for City sponsored events. Approved 2015 Corporate Communications works with service areas across the Corporation to help the public understand what they can expect as a result of delivery of municipal services and the value their investment has in the community, promoting Saint John as a great place to live, work and invest. • Corporate communications strives to foster positive relationships between the City, our employees, our citizens and other organizations building trust and confidence in the City as a public service provider. • Common Council has adopted Priorities for their term, one of which is strategic communication. • At current staffing levels, the department can only function in an operational, reactive capacity, affecting ability to communicate and educate. • Unplanned and "ad hoc" work affects ability to respond and response times. • Full staff complement (3) is lower than similar sized municipalities. 224 Wages & Benefits $315,190 Goods & Services 225,195 Total Expenditures $540,385 Full Time Equivalent Positions(FTE) Management 1.25 Professional 1.00 Inside Workers 1.00 TotalFTE 3.25 167 Information Technology Systems Information Technology (IT) is responsible for delivering core technology services to the City of Saint John ( "organization ") in the form of network connectivity, IT hardware, software applications, telecommunications, and technology enabled business process enhancements. IT is a core service enabler, while supporting the City and region's fire, police and 911 emergency response services. IT is responsible for ensuring that the City's information and data remains intact and secure and that the City's IT and communications systems remain fully operational (24 hours a day, 7 days per week, and 365 days per year). IT further supports all of their services during regular business hours by means of a Service Desk, and after hours via on -call technicians providing 24/7 coverage. Changing technology; maintenance and availability demands Security needs; protection of the City's information assets Leveraging technology for process improvement and cost effectiveness Legislative requirements around protection of privacy Organizational capacity; needs of service areas Expectations of internal users of information technology assets 2014 Information Technology Systems Service Accomplishments and Performance Customer Service • Managed and supported technology used to deliver key municipal and public safety services to the community. • Completed 6,480 service calls from internal customers (a 3% decrease from 2013). Service calls relate to application and hardware issues. • The City's IT services experienced 1 major unplanned outage and 3 partial planned shutdowns in 2014. The major outage was the result of storm damage and the failure of the City Hall back -up generator. The partial shutdowns were as a result of a winter storm affecting Data Center cooling. Approved 2015 225 Calls to the IT Service Desk for 6 Years 8000 7000 6000 5000 4000 3000 2000 1000 0 2009 2010 2011 2012 2013 2014 ■ Police Parking ■ CGAC ■ SJ Transit ■ City .: Information Technology Infrastructure Maintenance Desktop / Laptop fleet achievements • Replaced 103 desktops and laptops as part of the City's "pay -as- you -go" Evergreen Program. • Continued to expand mobile and flexible user desktop experience by leveraging new virtual technology, mobile platforms, and thin clients. This program enhanced both user security and access. • Successfully applied to the Summer Student program to assist IT staff with deployment and Service Desk duties. This resulted in operational savings. • Server and network infrastructure maintenance program. • Designed and secured Council approval for a core network and server replacement that will allow City services to run in a redundant configuration. The new High Availability system will reduce the risk of unscheduled outages that plagued IT infrastructure in early 2014. • Laid the ground work for potential future Data Center moves. • Streamlined and simplified internal maintenance procedures, resulting in an estimated 15% reduction in maintenance costs. • Installed +100 security updates and maintenance patches on over 160 servers in 2 environments. • The City's server infrastructure is now over 95% virtualized. At this level the City is ahead of most municipalities. Virtualization provides greater flexibility and capacity, increases reliability and redundancy, and reduces licensing and management costs. • Replaced 50% of the City's virtual farm servers. Enabling Corporate Initiatives Implemented SharePoint dataroom for managing the vast number of expected documents for the P3 SCDWP. IT staff working with the Project Team to build designed and implement a site that would securely manage information assets and enable remote access. • IT supported many other Service area projects such as One Stop Shop, CRM, Open Data, HR Absentee Management, Fire Inspection Services, the New Fire Training Facility, Works West Garage, ABC appointment tracking, Police systems. Service to Public and Others • Police Headquarters (PHQ) at One Peel Plaza: • Provided the Police Force expert guidance in creating required security documentation and certification. • Provided the SJPF expertise in moving to the new IP based ANI /ALI service. Saint John is the first and only 911 PSAP (Public Safety Answering Point) in New Brunswick to move to the new platform before the December 31St, 2014 deadline. • Managed and maintained IT in PHQ under the frame work of a Memorandum of Understanding. Approved 2015 226 169 • Launched a community Web Camera initiative designed to showcase key City assets and attractions. A process was been developed to assess future installations. • Expanded the City's Public Space WiFi network from Kings Square, down King Street to Harbour Passage. This was the result of a successful partnership where 50% of project resources were sourced from community partners. The current system supports over 150 users per day, and will be expanded in 2015. • Created over 60 reports and online systems for a variety of service areas including Common Council (i.e., new calendar for Councilors used to track mayoral appearance requests, a new municipal grant application portal, and an RFP review for website design for the City's DMO). Approved 2015 Number of Web Page Requests by Citizens Per Day 20,000 issing Person Boil Water Order Ice StormRainfall /Floodi n now Storm Flooding Storm Little River abour Day C Failur 16,000 N I+ H W 12,000 a N cc a) 0o 8,000 a 4- 0 a� 4,000 Z 0 1_ L i_ E i Q f0 Q ,� 7 O OA 0J O N a) aLL' Q cn 0 Z Approved 2015 227 170 Tropical Storm Arthur issing Person Boil Water Order Ice StormRainfall /Floodi n now Storm Flooding Storm Little River abour Day C Failur 227 170 2015 Major Initiatives, Major Projects and Information Technology Systems Service Delivery Highlights Information Technology Infrastructure Maintenance • Continue to review the Desktop Computer asset inventory and deliver desktop services (e.g., Thin Clients and VDI) to service areas. The goal is to maintain a sustainable service. Contributes to 3A Asset Management strategic initiative in AdvanceSJ. • Develop an Information Security Plan that includes Disaster and DC Recovery plans. This will include a complete security test of the City's logical and physical networks and information protection systems (develop and test procedures for back -up and restoration for data and system). This initiative also includes formalizing IT's ability to support business continuity and identify systems the City cannot function without. • Develop a new Technology Usage Policy and third party (Agency, Board and Commission) IT Service Agreement, with supporting processes and procedures. • Implement and complete a new City of Saint John network core that is central to all IT services. The new core will enable and support future technologies, and incorporate best practice security design and reliability. Contributes to 4A Continuous Improvement strategic initiative in AdvanceSJ. • Conduct a feasibility study and action plan to address the evolving needs of the City's enterprise resource planning (ERP) system (Naviline — SunGard), management software (or integrated applications) that is used to collect, store, manage and interpret data from many service activities. • Work with Police, Fire and the Province of New Brunswick to develop a plan to replace the City's current truck radio system (past its useful life) and enable inter - agency public safety communications. Assess both Cap Ex and Op Ex funding models. Enabling Corporate Initiatives • Support operational process improvement through the use of technology in particular the eCity intranet system. Contributes to 4A Continuous Improvement strategic initiative in AdvanceSJ. One stop Shop support Implement and support the records and information management system ensuring it meets our records and document life cycle obligations and enhance data and information driven decision - making. Contributes to 5C Information Management System strategic initiative in AdvanceSJ. Approved 2015 228 171 Continue to support the implementation of customer service improvement strategy. Key contribution will be the implementation and testing of the CRM software and procuring the final release version of the software. IT will also support the development of business processes related to using the software to track and monitor service requests. Contributes to 5A Customer Service Improvement strategic initiative in AdvanceSJ. Provide IT support to the cross - functional team that will be responding to Common Council's request for an Open Data Policy. Contributes to Information Management System strategic initiative in AdvanceSJ. • Continue to provide support that will enable service areas to perform basic communication activities (such as emergency notification) (with communications). Service to Others • Expansion of WiFi and Web cameras where possible. Investigate partnerships with the City's key service areas, agencies, boards and commissions and technology partners in an effort to further expand the City's public spaces WiFi network (supports Council's sustainable infrastructure and community of choice priorities). • Investigate providing IT services and hosting services to other municipalities (fee for service / external revenue generation opportunity). Approved 2015 229 172 Information Technology Systems - Service Levels and Resources Provide technology support for all aspects of corporate software as required for service related operations ensuring software is available and is licensed, maintained and upgraded based on an agreed upon lifecycle (approximately 20 different applications) • Exchange — email and calendar coordination • SharePoint — Intranet and Information Management • External Web presences — hosting saintjohn.ca, and other web sites • Shared drives — network drives for storing City documents • Databases that store booking records for facilities, Parking Commission interfaces, Billing applications, network health logs, GIS, Scheduling applications. • CCTV camera installations, networking, and storage of recordings • Building management and access control systems • Enterprise resource planning (ERP), Work Order, and Financial Systems • Support Emergency services Support and maintain IT assets including: • 600 desktops and laptop - replaced on a four year cycle as part of the Ever Green Program • 30 Police Toughbooks PCs laptop - replaced on a four year cycle as part of the Ever Green Program • 15 handhelds • 40 printers • 6 Smart Boards • 115 BlackBerrys /Smart phones, 165 Cell Phones, and 361 Data devices • 301 IP Phones, 324 POTS phones and 76 Fax / Modem lines Approved 2015 • IT service delivery is integral to all aspects of services delivered to our citizens. • Vital to the protection of the City's information assets and citizens' personal data. • Enables effective and efficient communications (internally and externally). • Supports continuous improvement of service delivery by ensuring that technology is utilized in a way that makes service delivery more effective and efficient. IT will need to work collaboratively with other service areas for project management and training expertise support. 230 Wages & Benefits $1,389,808 Goods & Services 933,040 Recovery (Planning) (15,000) Recoveries (Police HQ) (85,480) Total Expenditures $2,222,368 Revenue $81,500 Full Time Equivalent Positions(FTE) Management 1.25 Inside Workers 16.00 TotaIFTE 17.25 173 Service Levels and Resources Continued... Provide consulting to assist service areas in evaluating, selecting and implementing technology solutions including hardware and software Manage, maintain and secure City's Local Area Network (LAN) • 150 network devices (including firewall, telephony switches in city Hall, and Police Infrastructure) • 20 high speed links to other City facilities (e.g. Fire Stations, Municipal Operations facilities, Police Stations) • 25 links to small remote sites (Recreation Centers, Pumping stations) • Remote access to employees (VDI and Netmotion) — travel and working from home Manage the telecommunications system including cellular and desk phones and validate /optimize usage and charges Manage, maintain, secure and upgrade the city's servers and services including: • Over 90 servers (physical and virtual) • 20.4TB of data (including managing backups and restorations) • Over 140 server and PC services and applications • Maintain high availability of these servers (99.99% uptime) Deliver internal customer service by providing solutions or work order supported assistance for application, desktop and printer technical support through the IT Service Desk Approved 2015 231 174 Legislative Services Legislative services are inclusive of the corporate offices outlined in the Municipalities Act. These include the City Manager's Office, The Common Clerk's Office and the City Solicitor's Office. The budget also incorporates the planned expenditures related to Common Council. Organizational Goals To establish the City of Saint John as a service - based, results oriented, high performance public service organization. Service Based Results Oriented Hi0, Performance • Considering the needs of the community as a • Providing strategic leadership in delivery cost- • Collaborative, strategically minded workforce whole effective service to the community • Culture focused on contributing to • Creating opportunities for citizen feedback • Ensuring access to Council and its decision community goals through service delivery and input through corporate records management • Resource conscious and accountable for • Responding effectively and efficiently to • Protecting the interests of the City as a results address community needs corporation Approved 2015 175 232 Corporate Services Financial Summary Total Common Council Legislated Services Budget 588,445 601,043 $2,581,988 $2,915,852 14.00 NnI P, Approved 2015 176 233 Approved 2015 2014 Expenditures Revenue FTF City Manager's Office 529,045 859,613 3.00 Regional Services Commission 53,226 41,085 Common Clerk's Office 664,517 662,296 6.00 City Solicitor's Office 746,755 751,815 5.00 Common Council Mayor's Office 185,895 178,893 Council 402,550 422,150 Total Common Council Legislated Services Budget 588,445 601,043 $2,581,988 $2,915,852 14.00 NnI P, Approved 2015 176 233 Table of Contents — 2014 Service Plans City Manager's Office ................................. ............................... 178 CommonClerk's Office .................................................................................................................................. ............................... 183 (Legal Service) City Solicitor's Office ............................................................................................................. ............................... 190 Approved 2015 234 177 City Manager's Office The City Manager's Office provides overall corporate management and strategic and managerial direction to the Corporation of the City of Saint John. The primary objective is to ensure that the administration operates efficiently, cost effectively and in accordance policy set by Common Council. The City is striving to become recognized as a service - based, results oriented high performance organization. The goal is to deliver service that meets the needs of our community in a cost effective manner. In Drivers Expectations for transparency and accountability in local government Organizational capacity Responsiveness to evolving service needs of the community Priority on strategic planning and demonstration of results Focus on building government, corporate and community relationships Expectations for cost - effective service delivery working to accomplish this goal, the City Manager has overall responsibility for Growth and Development Services, Urban Environment Services, Transportation and Environment Services, Saint John Water Services, Finance and Administrative Services, Strategic Services and Legislative Services. The City Manager and senior administrative officers provide Council with information and advice on policy matters and ensure that Council's decisions, policies and programs are executed. In addition, they oversee The City's operating and capital budgets and are accountable for long - range and corporate plans for the organization. Acting as a de facto ambassador for the City Manager's Office, the Executive Director develops corporate policy and provides ongoing support to the organizational efficiency and operational performance of the City of Saint John and its administration. 2013 City Manager's Office Service Accomplishments and Performance Council Priorities • Road Improvement Funding maintained • Nick Nicole Centre reopening • Mispec Park re- opened with private sector funding • One Stop Development Shop process commenced • P3 Application SCDW - Completed and approved • P3 Team Identified — Engineering Firm Engaged Approved 2015 178 235 • P3 funding agreements with federal and provincial governments completed • Fundy Quay — Development Agreement Pending • Artificial Turf Field — Construction completed Strategic Initiatives • PlaySJ — report completed and approved • ZoneSJ — report completed and approved • Corporate Strategic Plan Completed Corporate Initiatives • Introduction of the Executive Director (City Manager's Office) role • Space Needs Analysis City Hall — completed • PSA Compliant Financial Statements - completed • Referrals — Drafted Administrative Process Improvements • Fire Training Site — Agreement Pending • West Works Depot - Acquired • Return to Work Program Business Practice Developed — Inside Workers • Occupancy Agreement with SJPF re Police Facility • Funding Agreement with PNB re Police Facility • Improved Citizen Friendly GIS Mapping Tool Initiated • Core Service Review Implementation Underway • Quarterly Management Meetings ongoing Approved 2015 236 179 • Improvements to capital priorities evaluation process and matrix • Introductions of a more efficient Council referral development, research and response process External /Intergovernmental Participation • Municipalities Act Review — Position Paper submitted • Fiscal Transfer Committee — CNBA Representative • External priorities plan • Hosted Regional Manager's meeting • Cities NB meeting (City Managers) — September • Hosted Tri -City Mayors Meeting • Participation in Living SJ Initiative 2015 Major Initiatives, Major Projects and City Manager's Office Service Delivery Highlights • Complete Service Review • Compensation Review Completed • Job Evaluation Process Completed • Implement Council Referral Process • Continue One Stop Shop Development • Issue RFP (Request for Proposals) for SCDW Project • Finalize outstanding water agreements • Re- establish EMO position and program • Initiate Collective Bargaining with three Locals Approved 2015 237 180 • Finalize direction on City Hall • High -level examination of the City's agencies, boards and commissions • Introduction of more strategic long -term financial planning • Development of sponsorship programming Policy and Priority Advancement • In partnership with the Commissioner, Strategic Services and City Manager's Office, develop an annual Government Relations and External Partnerships Plan in support the successful delivery of Council priorities. • Coordinate the City's strategic involvement in FCM, CNBA, AMAMB and other external organizations. Strategic support for the Cities of New Brunswick's Local Governance Reform and Legislative Modernization Agenda. • On -going intergovernmental affairs support for the City's strategic projects, including the SCDWP. External Funding Opportunities for the City of Saint John Monitor and report on key Federal and Provincial Government policy initiatives and funding programs that could directly impact the City of Saint John. Strategic Relationships and Partnerships • Ongoing support for the True Growth 2.0 process. • Support Mayor, Council, the City Manager and Senior City Staff in engaging and building sustainable relationships with key municipal, provincial and federal counterparts. • Facilitate the City of Saint John's ongoing partnership with the newly elected Provincial Government as well as provide support to the City of Saint John around the 2015 federal election. Approved 2015 181 238 City Manager's Office - Service Levels and Resources Service Level Impact of Service Delivery Resource -. • Provide leadership to more than 600 City employees in working toward • Provides strategic leadership to support the Wages & Benefits $786,366 the implementation of Council's priorities that align with the Community's vision and the principles of PlanSJ • Set the overall strategic direction for short and long -term corporate goals and objectives • Provide oversight to City operations • Motivate and monitor performance to ensure that standards are met, that priorities are pursued and high quality City services are consistently delivered • Make policy recommendations to Council that support the cost - effective delivery of service • Keep Common Council informed of the operations and affairs of the City as well as ensuring that the decisions and the policy direction set out by Council are implemented • Prepare and present operating and capital budgets and make recommendations concerning the financial condition of the City (in consultation with the Commissioner of Finance) • Perform the duties and exercise the responsibilities assigned to the City Manager by Common Council • Identify, track and monitor Provincial and Federal Government initiatives that have the potential to advance the City of Saint John's financial and policy interests. • Prepare, update and circulate appropriate Intergovernmental affairs briefing documents to City Staff and Council. • Identify and monitor Federal and Provincial funding programs that may be applicable to City of Saint John, with a particular focus on Council's priorities. • Support Mayor and Council, City Staff and the City's Agencies, Boards and Commissions in identifying, preparing for and engaging appropriate Provincial and Federal Government representatives with respect to the City's priorities. Approved 2015 achievement of Council's priorities Goods & Services 73,247 Total Expenditures $859,613 • Supports the City in establishing itself as a service - based, results oriented, high performance public Full Time Equivalent Positions(FTE) service organization Management 1.0 • The introduction of the Executive Director role has Professional 1.0 improved the ability of the City Manager's Office Non -Union 1.0 to more efficiently and strategically respond to Total FTE 3.0 matters arising from Council, City Staff, agencies, boards, commissions as well as the community. 239 182 Legislated Services Service -Based Budget — 2015 on 7117 Office of the Common Clerk The Office of the Common Clerk is made up of 5 service units that work in an integrated manner to deliver our core services of making municipal government work and promoting open government. Services provided: Governance and Support Services • participates in reviews of all major initiatives, policy changes and changes to service delivery to ensure Common Council's priorities and corporate objectives can be achieved • facilitates the achievement of strategic corporate objectives by ensuring the availability of accurate, timely official information • provides advice on procedural and legislative matters including Council Priorities and Council Resolutions Public Expectation for Open Government and Civic Engagement Corporate Strategic Plan Municipalities Act, Community Planning Act, Municipal Elections Act, Archives Act, Right to Information and Protection of Privacy Act, Electronic Transactions Act, Evidence Act, ISO Recordkeeping Standards, Bylaws Enabling Technology Advances research and assistance in drafting motions and reports o provides administrative and budgetary support to the Mayor's Office and Common Council Corporate Records and Information Management (RIM) & Right to Information and Protection of Privacy (RTIPPA) & Archival Services • promotes Open Government and safeguards the City's information assets by providing leadership on information management policies and strategies, supporting City programs in their information management practices and ensuring appropriate public access to City records and information • receives and processes Right to Information and Protection of Privacy requests for the City and manages responses to appeals filed with the Office of the Information and Privacy Commissioner of New Brunswick • preserves and makes accessible the archival records of the City Council Secretariat and Registry Services • facilitates government decision - making by managing meetings of Common Council and committees • coordinates appointments of the public and members of Council to Agencies, Boards and Commissions • provides easy public access to Council's decisions • records the minutes and agendas of Council and designated committees Approved 2015 183 240 • maintains the Municipal Plan and City By -laws for public access • manages official correspondence, and is the official signatory to agreements and contracts • responsible for advertising planning and other public notices mandated by legislation • provides services to the public that are mandated by the provincial government; including filing and registration of property related resolutions to Council and ServiceNB, and public access to property assessment rolls • Elections Services • Common Clerk administers the oath of office to elected officials • provide procedural assistance to candidates running in municipal elections • manage appointments to Council vacancies • coordinate plebicites for the City on matters of local interest, such as fluoridation of drinking water and traffic calming • Protocol Services • produce congratulatory messages, proclamations, and the Mayor's protocol correspondence • provide translation, interpretation and photography services for elected officials • manage ceremonial events, such as Freeman of the City, visits, flag raisings • coordinates Council events 2014 Clerk's Office Service Accomplishments and Performance: Governance and Support Services • Procured and implemented a new agencies, boards and commissions software to track appointments, maintain a database of applicants and create a web -based application portal for public access (Granicus) • Implemented and maintained Mayor and Council events calendar to coordinate attendees for events • Prepared and monitored budgets of Mayor and Common Council 2014 Clerk's Office Service Accomplishments and Performance: Corporate Records and Information Management Services • Maintained Electronic Records Management System (Laserfiche) adding in excess of 27,425 pages of official records • Provided historical and research services to public and staff, logging over 160 hours responding to 189 requests • Authorized destruction and secure shredding of 70 boxes of official records in various formats Approved 2015 184 241 • Indexed and scanned 105 Legal Agreements and Contracts • Collaborated with Strategic Services to develop an Open Data Policy and Program • Trained new hires and existing staff over 3 days to be system administrators and contributors using eScribe software for Agenda Creation 2014 Clerk's Office Service Accomplishments and Performance: Access and Privacy Services • Access & Privacy consults: 45 • Formal right to information requests: 45 • Requests acknowledged within 24 hours of receipt: 98% • Requests processed within legally required timeframe: 95% • Requests answered in full or in part: 74% • Requests refused in full: 5% • Requests transferred: 5% • Requests where decision is pending: 16% • Number of pages processed: 12,044 (likely an unusually high volume due largely to two complex requests) • Two requests appealed to Court of Queen's Bench, both of which were discontinued • Two additional staff trained in use of our RTIPPA case management software (ATIPXpress) • Protocol developed with Building & Development Services to ensure RTIPPA compliance with respect to information they contribute to the published Agenda Packets of Council 2014 Clerk's Office Service Accomplishments and Performance: Archival Services • Prepared Report to City Manager for policy direction to preserve the City Charter and documents of unique historical significance in a humidity and temperature controlled environment / vault or alternatively to transfer ownership to PANB for preservation • Sourced estimates for proper environmental control systems to maintain at risk valuable items of historic significance on site Approved 2015 185 242 • Appraised, described, indexed and boxed 600 records (40 boxes) of legacy material dating from 1950 to 1980 • Initiated digitization project of annual reports and studies (15 boxes) to contribute to online staff reference library • Created zoning plans and bylaws index and moved these 70 referenced items to accessible on site storage • Drafted procedures and policies to increase security and control over City Archives and Records Centre • Coordinated mass digitization of heritage slides and ingestion into record keeping system 2014 Clerk's Office Service Accomplishments and Performance: Council Secretariat and Registry Services • Enabled civic engagement with Common Council by scheduling 28 public presentations • Advertised 33 Public Notices for Property rezoning • Registered 29 bylaws at Service New Brunswick • Prepared 39 Regular Common Council Agenda Packets • Prepared 44 In Camera Committee of the Whole Agenda Packets • Transcribed over 600 pages of Common Council Minutes • Prepared 484 resolution correspondence letters • Prepared 11 Pension Board Agenda packets and 107 pages of Pension Board Minutes • In collaboration with Legal Services prepared 35 bylaw amendments Approved 2015 186 243 2014 Clerk's Office Service Accomplishments and Performance: Protocol Services • Coordinated Mayor and Council attendance for 176 events • Coordinated Mayor and Council attendance for 15 Flag Raisings 2015 Major Initiatives, Major Projects and Clerk's Office Service Delivery Highlights Governance and Support Services • Recommend changes to Procedural Bylaw to increase Council meeting efficiencies • Generate revenue through fee for service agreements with Saint John Energy, Saint John Parking Commission and Pension Board • Document and publish service standards for the Clerk's Office (Service Based Budget) • Maintain budgets for Mayor, Common Council and Common Clerk's Office Corporate Records and Information Management Services (RIM) • Refresh the Information Management Policy Suite • Develop an Open Data Policy and Program in collaboration with Strategic Services and selected ABCs • Continue the SAM Program (Saint John Information Management) in collaboration with Strategic Services Access and Privacy Services (RTIPPA) • Continue to perform an analysis of the information contained in the published Agenda Packets of Council and report on the measures that need to be initiated to ensure RTIPPA compliance • Enhance Open Government initiatives on Corporate Website through Routine Disclosure, Active Dissemination and publishing a records inventory Approved 2015 187 244 Archives Services • Digitize 50 boxes of agenda packets to prepare for transfer to Archives • Reorganize 200 boxes of agreements for legal readiness and reference • Prepare in excess of 100 boxes of agenda packets and other material beyond or at retention for transfer to Archives • Significantly reduce the Clerk's Office paper storage footprint in the City Archives and Records Centre • Develop an online archival access and retrieval system Elections Services • Begin preparations for the quadrennial municipal election in May 2016 Protocol Services • Develop a Flag Raising Protocol in collaboration with Cultural Affairs and the Executive Director, City Manager's Office. Approved 2015 188 245 Clerk's Office - Service Levels and Resources Service Level Impact of Service Delivery Resource Requirement • Council meeting preparations with strict timeline requirements • Enterprise wide Archival, Records and Information Management functions: including legislated requirement to transfer official records to PNB Archives following a records schedule • Right to Information and Protection of Privacy functions: legislative requirement to acknowledge RTIPPA requests within 24 hours and provide a final response within 30 days • Timely policy and procedural advice to Council and City employees • Professional member and admin support to Pension Board, Saint John Energy, EMO, Nominating Committee and other ABCs • Information Management Services have been impacted as a result of recent staff cuts in the Clerk's Office that eliminated the Corporate Records Manager FTE position. Approved 2015 • The preparation of Council agendas requires Wages & Benefits $564,496 timely input from City Manager, Legal, all other Goods & Services 97,800 services Total Expenditures $662,296 • Clerk's services relies heavily on timely and adequate services of Information Technology Full Time Equivalent Positions (FTEs) Management 2.00 • Culture Change in all business units to file and Professional 1.00 lifecycle manage information in a corporate Inside Workers 3.00 ECRMS Total FTEs 6.00 • Inaccuracy of input from City services results in increased time spent on searching for correct information • Employee professional development required to remain current in emerging Information Management and Access and Privacy areas • Enabling technology needs to be reviewed and filtered to ensure proper application for Information Management • Lack of information from committees impacts accuracy of committee records • Effective internal communication increases effectiveness • Timely and adequate responses to access and privacy requests required to minimize likelihood of Court action • Failure to lifecycle manage records affects time spent in search activity, increases storage costs, e- discovery costs and costs associated with disclosure under RTIPPA • Council and Senior Management support required 246 Management, professional and inside workers staff are knowledge workers with subject matter expertise in Procedural Rules of Order, Records and Information Management, Archival Management, SharePoint, Laserfiche, Right to Information and Privacy legislation, ATIPXpress, Granicus, FTR and eScribe Inside workers provide admin support to the Mayor and Clerk's office. Duties include: minute and agenda preparation, invoice processing, payroll, budget preparation, recordkeeping, bylaw processing and advertising, customer service, and external email to the Clerk's Office. :• (legal Service) Office of the City Solicitor The City Solicitor's Office, commonly referred to as the Legal Department, provides legal services to The City of Saint John which can be broadly categorized as follows: • Providing legal advice to Common Council in matters of relevance to the municipality; • Providing legal advice to officers of the municipality with respect to the exercising of their authority and the discharging of their responsibility; • Providing legal representation for the City, its officers and certain commi and Resolutions and directions from Common Council and Committee of the Whole respectively. Requirement from each City Department for advice /support. Initiatives directed against the City by others (e.g. actions, appeals, arbitrations, Human Rights complaints, etc.). Queries from external sources who have a relationship with the City or its operation (e.g. subdivision developers, building permit applicants). ttees and boards before the courts and other adjudicative bodies; • Providing the legal support services which are required to implement the decisions taken by Council or by officers of the municipality (e.g. executing property transactions, preparing contract documentation, drafting by -laws, prosecuting by -law violations). 2014 Legal Service Accomplishments and Performance (to November 1, 2014, unless otherwise noted) • Over 225 items before Common Council or Committee of the Whole prepared or materially contributed to by the City Solicitor's Office, or which give rise to decisions, the implementation of which fell to the City Solicitor's Office. • 17 Capital works contracts were vetted through this office. • 7 engineering services contracts were vetted through this office. • Initiation and carriage of the expropriation required for the site of the Safe Clean Drinking Water Treatment Plant, title having vested in the City in September, 2014 with the compensation to be tendered in early December, 2014. • Completed a title review of all lands impacted by the Safe Clean Drinking Water (SCDW) Project and associated advice and direction to the SCDW Team for incorporation in the land interest binders as part of the procurement process. • Management of legal services provided to the SCDW Project. Approved 2015 190 247 • Finalize the Douglas Avenue Lift Station required for the Harbour Clean -Up Project; including the negotiation, preparation and finalization of agreement between the City and private individuals which extended to land transactions between the latter. • Advise with respect to and prepare the required documents to terminate tenancies and establish the terms of new tenancies following upon the water main break in the Market Tower. • Finalize the water main loop easement which had been sought by the City, on the Law Courts site, including the negotiation and drafting of several easements to achieve this result. • Negotiate, draft and complete the amending agreement to the Trade and Convention Centre Management Agreement for the renewal period. • Negotiate, draft and complete the license agreement with IOL with respect to the Fire Training Structure upon the latter's property. • Negotiate, draft and complete the funding agreement with Emera respecting the turf field at Shamrock Park. • Represented the City in two Official Language Act complaints made against the City; each successfully concluded. • Provided advice and direction on a number of procurement matters (Aeroquest, SHU -PAK, etc.). • Provide all the certificates respecting title required for the prosecution of enforcement matters. • Draft almost all amendments to the Municipal By -Laws, with the exception of the Zoning and Municipal Development Plan By -Laws. • Generated the required documentation for initiating and proceeding with and pursuing before the courts at least ten dangerous, dilapidated, unsightly and vacant properties as well as the carriage of all such matters before the courts. • Generated the required documentation for initiating and proceeding with and pursuing before the courts at least seven minimum property standard related matters as well as the carriage of all such matters before the courts. • Achieve settlement on two contentious Human Rights complaints filed against the City. • Provide advice and opinions respecting the City's rights and obligations under the Right to Information and Protection of Privacy Act (RTIPPA) and the carriage of the two referrals to the Court of Queen's Bench made by the requestors of information for disclosure from the City, one demanding more than 200 hours of time commitment. • Responding to the requests from the City's Privacy Officer for advice or opinions respecting 15 -20 of the RTIPPA requests thus far in 2014. Approved 2015 191 248 • Appear weekly in Provincial Court to the return of pleas, ex- partie hearings and trials relating to City By -Laws (subsequent to July with the departure of a lawyer in the department much of this work has been assigned to outside counsel). • Provided advice, opinion and support in connection with an historical allegation of employee misconduct. • The carriage of responding to an application made to Court of Queen's Bench by employee under the Heart & Lung Act, so- called. • The carriage of the City's position in a disciplinary arbitration hearing followed by a judicial review proceeding at the Court of Queen's Bench as well as an appeal by the City to the Court of Appeal, which is ongoing. • The carriage of a zoning by -law enforcement matter before the Court of Queen's Bench consisting in part of the preparation of several affidavits for the court a Brief and Supplementary Brief to the Court which resulted in a Consent Order being signed by the respondent which will facilitate the final resolution of this enforcement file. • The carriage of an appeal respecting the Heritage Preservation By -Law lodged with the Assessment Planning Appeal Board by a property owner. • Provided advice, opinion and direction to various City officers on a number of disciplinary /labour matters. • The carriage of the City's response to an allegation of non - compliance with the Occupational Health and Safety Act of witnesses and production of a Brief on Fact and Law. • Provided advice, direction and representation where required on several Workplace Health Safety Compensation Commission Act files as well as matters brought by employees before the Appeals Tribunal of the Commission which appeals challenged the position taken by the City in a number of instances. All were successfully disposed of from the City's perspective. • Prepared a number of one -off contracts in the IT area as well as several contracts enabling community events, for example Sculpture Saint John, the Saint John 225 wrap -up with the artist providing the signature installation for that project, agreements with Mudd Sweat & Tears, the Originals as well as contracts with VON and the Hotspot parking arrangements with the Parking Commission. • Provided service in the nature of one -off consults with various City Departments that would number in the hundreds. • Generated the required documentation for initiating, proceeding with and pursuing before the Courts and concluding at least 10 dangerous, dilapidated, unsightly and vacant property files. • Had the carriage of all dangerous, dilapidated, unsightly and vacant building enforcement matters in Court. Approved 2015 192 249 • Generated the required documentation for initiating, proceeding with and pursuing before the Court and concluding at least 9 minimum research property standards enforcement files. • Had the carriage of all the minimum property standards violations that were brought before the Court. • Reviewed the proposed new Zoning By -Law (Zone SJ) and provided advice and direction in that regard. • Initiated payment into Court of holdback funds where subs had outstanding complaints at the time of substantial completion. • Responded to a complaint against the City respecting signage, under the Official Languages Act. 2015 Major Initiatives, Major Projects and Legal Service Delivery Highlights • The SCDW Project will proceed toward financial close with continuing legal services required from this department. • The One Stop Project will continue to require legal services as it proceeds. • Negotiations with various locals are anticipated to require increased legal service. • The bulk of legal service will be driven by policy and operational initiatives as they are contemplated and adopted. Approved 2015 193 250 Legal Service - Service Levels and Resources Service mid Service Level Impact of Delivery Resource -. M • Provide advice to Common Council /Committee of the Whole respecting • Allows the municipality to avoid potential liability Wages & Benefits $603,080 the nature and scope of the municipality's authority; as well as matters or impinging unjustifiably upon citizens' decisions; Goods & Services 148,735 of potential liability for the City. avoids expenditure of unproductive effort. Total Expenditures $751,815 • Defend City and the municipality's officers in their exercise of statutorily • Serves to confirm and preserve the legitimate conferred authority, against challenges brought before courts and decision - making authority conferred by the administrative bodies. Legislature. • Provide advice /support • The interpretation and application of collective / pport to Common Council and the Administration on a agreements in a manner consistent with the wide range of Labour Relations matters. intention of the parties and the language of those • Advice /support to Common Council and the Administration on a wide documents is key to stable labour relations and variety of employment matters. predictable working relationships. • Provide advice /support respecting the procurement process. • Support /advice respecting all real property related matters. By -Law enforcement — including advice to Administration respecting collection of evidence, preparation of documentation required as condition precedent to prosecution. • Civil litigation lying beyond the ambit of the City's liability insurance coverage. • By -Law preparation. • Contract preparation /review /assessment. Approved 2015 • This promotes and defends the City's legitimate interests, vis -a -vis, employer /employee relationships. • This serves to optimize the procurement process resulting in best value to the City and in minimizing the risk of legal action undertaken by either the successful bidder or those who are unsuccessful. • Absent this service, capital works projects could not proceed and development initiatives of third parties would be stalled; prosecutions of by -law violations could not occur; claims made against the City would succeed by default; the City would not secure an express and enforceable description of its agreed upon rights and obligations. • This is the vehicle at which the City may establish "rules" of general application within the territory of the municipality. Absent this service, the municipality's ability to regulate within its jurisdiction would be frustrated. 251 Full Time Equivalent Positions(FTE) Management 1.00 Professional 3.00 Non -Union 1.00 TotaIFTE 5.00 Other Service Support: Ongoing communication with the City Manager, the Commissioner of Finance and Common Clerk is imperative. This office in significant measure depends upon the input of each other City Department. In the latter's providing the factual information necessary to allow us to effectively and efficiently deliver our services. 194 7101 SAINT JOHN BOARD OF POLICE COMMISSIONERS PO Sox 1471 Saint John, New Brunswick Canada E2L 4LI Bureau des Commissaires du Service de Police de Saint John C.P. 4979 Saint John Nouveau - Brunswick Canada E2L 4L 4 NICOLE PAQUET Chair/ President JENNIFER CARHART Vice Chair/Vice President MAYOR MEL NORTON Commissioner /Commissaire JOHN MacKENZIE Commissioner /Commissaire JONATHAN FRANKLIN Commissioner /Commissaire BRIAN BOUDREAU Commissioner /Commissaire WILLIAM G. REID Chief of Police /Chef de Police JACKIE FERRAR Executive Administrator/ Secretaire Administrative Telephone/Telephone. (506) 648 -3324 E- mail /Courriel: Aolicecommission(a�s� aintiohn.ca SAINT JOHN Explore our past/ Explorez notre passe Discover your future/ Decouvrez votre avenir March 31, 2015 OPEN SESSION M &C 2015 -63 Mayor Mel Norton and Members of Common Council Your Worship and Councillors: Re: Saint John Police Force - Legal Fees Further to our Council Report of February 10, 2015, we wish to advise you that two additional invoices for legal fees for 2014 were just recently received from Stewart McKelvey. The following resolution was passed at the Saint John Board of Police Commissioners meeting on March 10, 2015- "RESOLVED that the report "Legal Fees Summary 2010- 2014 ", which was passed by the Board on February 10, 2015 be updated with the following invoices from Stewart McKelvey - invoice #90408588 dated October 31, 2014 in the amount of $4,320.11 and invoice # 90422090 dated December 31, 2014 in the amount of $3,769.12, and this updated report be forwarded to Common Council." An updated summary of the legal fees for the Saint John Police Force for 2010 -2014 is enclosed. Please note that the total expense also reflects the HST Input Tax Credit. Respectfully submitted, C—��- fi:; V— Nicole Paquet Chair Saint John Board of Police Commissioners Ijaf encl. 252 2014 2013 2012 2011 2010 Summary of Legal Fees 2010-2014 General Counsel Labour Negotiations Police Act Unfair Labour Hearing PSCC Certification Labour Arbitration Total Expense 44,265 69,503 10,826 - - - 124,594 23,539 41,999 32,264 - - - 97,802 43,324 - 22,385 18,512 - 84,221 16,571 34,321 - - - 23,706 74,599 53,251 - - - - - 53,251 180,951 145,823 43,0901 22,385 18,512 23,706 434,467 * This figure includes $8,089 relating to 2014 but the invoices were paid in 2015. 253 Youth Safe Harbour Transitional Services Inc. c/o Housing Alternatives Inc. 75 Adelaide Street, Saint John, NB E2K 1W4 April 8, 2015 Mayor Mel Norton City of Saint John PO Box 1971, Saint John, NB E2L 4L1 Mayor & Members of Common Council I I Safl,,b,,, On behalf of Youth Safe Harbour Transitional Services Inc. (Safe Harbour), I am writing to request a grant in the amount of $9,053.00 which represents all development related fees incurred during the construction of this much anticipated housing facility. As I'm sure you are aware, youth are one of the fastest growing segments of the homeless population in Canada. Until now, there was no emergency /transitional housing program for homeless or at -risk youth in Southern New Brunswick. As a result, youth experiencing homelessness were left on the streets while trying to get their lives on track. Safe Harbour will get these vulnerable youth off the streets, provide a safe environment where they can get stabilized, and will ensure they receive the support they need to make a healthy transition to adulthood and independent living in the community. Safe Harbour is not a standalone entity; it is a vital piece of the continuum of services for homeless and at risk youth. For some youth, Safe Harbour will be the first point of entry into a long -term, service - delivery model to support them through a difficult time in their lives. If we work together as a community, we can make sure that our most vulnerable youth are supported and given the opportunity to realize their full potential, because when our youth succeed we all benefit. Thank you for your consideration and I look forward to your favourable response. Sincerely, z ,L,,, — Kit Hickey Treasurer 254 REPORT TO COMMON COUNCIL M & C — 2015 -70 9 April 2015 His Worship Mel Norton and Members of Common Council Your Worship and Councillors: SUBJECT: Tender 201.5- 084901T — Reinstatement of Utility Cuts — Asphalt Work BACKGROUND: The City of Saint John Tenders were called for the reinstatement of cuts made in asphalt sections of roadway, curb, and sidewalk over the winter period by Saint John Water crews doing emergency repairs on underground water and sewer infrastructure. Milling and sealing was also included in the tenders. This is an annual activity to make permanent repairs to cuts which were temporarily reinstated with cold mix or granular material during the winter period. This work consists generally of the supply of all necessary labour, materials and equipment for the reinstatement of approximately 15,000 square metres of asphalt roadway, 1,500 square metres of asphalt sidewalk, 200 linear metres of asphalt curb, and 11,000 square metres of milling and sealing using the methods established in the Municipal Operations General Specifications. Tendering this work will allow City forces to focus their efforts on repairing potholes and other street deficiencies that have become more prominent during the winter and spring freeze and thaw cycle. ANALYSIS: Tenders closed on April S, 2015 with three companies submitting bids. Staffs of Materials Management and Municipal Operations have reviewed the bid submissions and have found them all to be complete in every regard. 255 M & C 2015 -70 April 9, 2015 Page 2 The bids received were as follows: Classic Construction (2012) Ltd. $949,100 NRB Construction Ltd. $956,500 Debly Enterprises Limited $993,830 .Above amounts are exclusive of taxes FINANCIAL IMPLICATIONS: This is a planned expenditure and as such funds to cover the cost are included in Saint John Water's 2015 Operating Budget and Municipal Operation's 2015 Maintenance Budget. RECOMMENDATION: It is recommended that tender 2015- 08490IT: Reinstatement of Utility Cuts — Asphalt Work, be awarded to the low bidder meeting all tender requirements, Classic Construction (2012) Ltd., at the tendered price of $949,100 plus HST, and further, that the Mayor and Common Clerk be authorized to execute the necessary contract documents. Respectfully submitted, Y w 4�, t Jodi Stringer -Webb, P.Eng. Municipal Engineer Win. Edwards, ng. Commissioner Transportation & Environment 256 Kendall Mason, P.Eng. Deputy Commissioner Saint John Water »�vLr✓ J. Patrick Woods City Manager REPORT TO COMMON COUNCIL, M & C — 2015 -71 9 April 2015 His Worship Mel Norton and Members of Common Council Your Worship and Councillors: Ma "M The City of Saint John SUBJECT: Tender 2015- 084902T — Reinstatement of Utility Cuts — Concrete Work BACKGROUND: Tenders were called for the reinstatement of cuts made in concrete sidewalk, curb, and curb /gutter sections by Saint John Water crews doing emergency repairs on underground water and sewer infrastructure. This work consists generally of the supply of all necessary labour, materials and equipment for the reinstatement of approximately 600 square metres of concrete sidewalk, 300 linear metres of concrete curb, and 60 linear metres of concrete curb /gutter using the methods established in the Municipal Operations General Specifications. Tendering this work will allow City forces to focus their efforts to repair deficiencies that have become more prominent during the winter and spring freeze and thaw cycle. ANALYSIS: Tenders closed on April S, 2015 with three companies submitting bids. Staffs of Materials Management and Municipal Operations have reviewed the bid submissions and have found them all to be complete in every regard. 257 M & C 2015 -71 April 9 "', 2015 Page 2 The bids received were as follows: Midi Construction Ltd. Maguire Excavating Ltd. Hi Roc Construction Ltd. FINANCIAL IMPLICATIONS: $108,000 $169,200 $189,000 Above amounts are exclusive of taxes This is a planned expenditure and as such funds to cover the cost are included in Saint John Water's 2015 Operating Budget. RECOMMENDATION: It is recommended that tender 2015- 084902T: Reinstatement of Utility Cuts — Concrete Work, be awarded to the low bidder meeting all tender requirements, Midi Construction Ltd., at the tendered price of $108,000 plus HST, and further, that the Mayor and Common Clerk be authorized to execute the necessary contract documents. Respectfully submitted, L9 Jodi Stringer -Webb, P.Eng. Municipal Engineer Wm. Edwards, .Eng. Commissioner Transportation & Environment 258 Kendall Mason, P.Eng. Deputy Commissioner Saint John Water J. Patrick Woods, CGA City Manager