Loading...
2014-05-05_Agenda Packet--Dossier de l'ordre du jourV AL City of Saint John Common Council Meeting AGENDA Monday, May 5, 2014 6:00 pm Council Chamber Please use Chipman Hill entrance S'il vous plait utiliser 1'entree Chipman Hill Si vous avez besoin des services en francais pour une reunion de Conseil communal, veuil bureau du greffier communal au 658 -2862. 1. Call to Order - Prayer 2. Approval of Minutes 3. Approval of Agenda 4. Disclosures of Conflict of Interest 5. Consent Agenda 6. Members Comments 7. Proclamation 8. Delegations / Presentations 8.1 Uptown Saint John - Pedestrian Street Pilot 8.2 Growth & Community Development Services - Presentation - Sustainable Review 8.2.1 Sustainable Service Review - Growth and Communitv Developme 12. Business Matters - Municipal Officers 13. Committee Reports 14. Consideration of Issues Separated from Consent Agenda 15. General Correspondence 16. Supplemental Agenda 17. Committee of the Whole 18. Adjournment City of Saint John Common Council Meeting Monday May 5, 2014 Committee of the Whole 1. Call to Order Si vous avez besoin des services en fran�ais pour une reunion de Conseil communal, contacter le bureau du greffier communal au 658 -2862. Each of the following items, either in whole or in part, is able to be discussed in privat( to the provisions of subsection 10.2(4) of the Municipalities Act and Council / Commit make a decision(s) in that respect in Open Session: 4:30 p.m. 8th Floor Boardroom City Hall 1.1 NB Museum Presentation Uptown Saint John M , OW#& , &J , OWI& AV'W& M t SAM NJ ff I &V W& A E Oft n Mt SAM &*Wt& &*W%k 4 M IN I at Why a Pilff ot? Establish for a trial period, the duration, commencement an, which is to be determined by Uptown Saint John, a pedestric streets. That such pilot project start no later than the spring of 2014 That at the conclusion of the pilot project, and by not later t. of 2014, Uptown Saint John report to Common Council as to advisability of establishing a permanent pedestrian street o► Of nrkricr,hlo tho In�ntinn nnrl imnlomontntinn ctcnc fnr tho c What is a "Pedestrian Stre Safe spaces for people *:- Amenities (seating, lighting, etc) ••• Permanent or temporary ❖ Large infrastructure investment or inexpensive pop -up •t• Street closure or can share space Overflowfrom busy streets or programmedfor attraction t It u �13 Pedestrian Streets -Saint John Ex4lm t�-- �! r A' Pedestrian Streets -Other Exam. Pedestrian Streets -Other exam) 7- �r 1 1 7- �r The Opportunities Market Square Boardwalk ❖South Market Street a• Pedestrian Corridor via — Grannan Lane .t. Fiirthpr nPrJPCtrinni7ntinn of Winn L. _ • -1,j� The Opportunities — Princess F I , r r • VT , %a , 1. o � f-: 1 r .. aw �f t ` •1 ~ /0 ' ' •• O IAW f w ' owl 41 —49 p ,� •i r '�• dOOP WAN �. As W .4 L ; c•+ one AL- _-: • I 1 r • i Opportunities Temporary even� pedestrian str =n 2 L f South Market Street Previous Study Requires Investment -City and Businesses Vacant Building at top o f street Private street r / - 1 r ^� 1 II / I� r 1 rfA i -- i Prinff ce William Stree Build s on buslness success 't Restaurant District Greenery in place Easy traffic rerouting Natural and easy connection a� to current Pedestrian spaces (Boardwalk, Harbour G p_ 0 It N City Wide Opportuniti( North End Community Center — Placemaking Phase Re- imagining Main Street - brought forth a p edestr option for Simonds Street to connect Harbour Pass( Fort Howe. de rations for Pedestri Consi an S Howwillitim act businesses and traffic flow ( VehicleandPedes How will it impact existing pedestrian areas - Boardwalk Is it sustainable; are there sufficient resources and programming success •:- Does it enhance and leverage uptown activities and businesses •:- Can the some thing be accomplished without a street closure •:- Can we develop a streamlined repeatable process for multiple ev locations Recommendations Build on our current successes: Market Square Continue to incorporate best practices in planning that encourage 1 street animation and placemaking Neighbourhood Plan Process - Premature to make permanent street closure or investment Explore the opportunity of a temporary event - drivel `Festival Street' Explored ❖ As a pilot project start with temporary street closure for well organized events ❖ Prince William Street has the biggest potential Recommended Action Consult and work with businesses on Prince William to establish times and days that will positively impact business traffic (evenings and weekends, etc.) Council to direct City Manager to assign appropriate city staff to review and make recommendations on Prince WIIIIl7i'1') S1"i"PP1" !7S !7 ""FPS1"ll /!7I S1"i"PP1"" 17 fir. ' ��► - � � 'l . J • . �'. FL a+. • f WOO- Amok Thank you Uptown Saint John — Pedestrian Street Recommendations Background In the fall of 2013, Saint John Common council referred the following motion to Uptown Sal John for a recommendation: "Establish for a trial period, the duration, commencement and location of which is to be determined by Uptown Saint John, a pedestrian street or streets. That such pilot project start no later than the spring of 2014 That at the conclusion of the pilot project, and by not later than the fall of 2014, Uptown Sa John report to Common Council as to the advisability of establishing a permanent pedestri street or streets and, if advisable, the location and implementation steps for the same." Depending on the goal of the pedestrian street, there are different types of pedestrian stre( could be developed in uptown Saint John. They can be permanent or temporary in nature , can involve varying levels of investment. They can come in the form of pedestrian corridor: connect valuable public spaces and provide safe engaging pathways for pedestrians or the be pedestrian malls or zones that leverage current business activity on the street and are r successful with regular and consistent programming. We currently have a pedestrian street in the form of the Market Square Boardwalk. It is a permanently closed street that segues to the abutting businesses and requires regular eve programming to consistently attract people to fully use the space. It provides a variety of ac (patios, events, volleyball, boat docking) that creates a more dynamic space for people to i with. PlanSJ includes policy on continuing to develop this area. PlanSJ Policy CF -21: Exf opportunities to better utilize the Market Square Boardwalk in ways that engage vari age groups and cultures to better connect them to the Uptown. Waterfront DevelopmE currently undergoing the public "Talk the Walk" consultation as it explores the potential of t boardwalk area. Opportunities • In 1984, the Mott Myles, Chatwin study recommended "Princess Park" as a perma pedestrian park at the foot of Princess Street. Princess Park would require a perm street closure and an investment in infrastructure to form a public space at the fool Princess Street. As put forth by the Kurt Peacock Telegraph Journal story with Ro Boyce (one of the authors), the landscape that existed at the time this report was c has not changed significantly and the Princess Park Plan could certainly be review see what opportunities it could provide the uptown. (see visual on page 5) Uptown Saint John — Pedestrian Street Recommendations • King Street itself could be further pedestrianized to solidify the street anchors of Ki Square and Loyalist Plaza and the investments that have happened and are propc happen in those public spaces. • A past study detailed a plan for the development of South Market Street. To succE implement this project would require investment by the city (for the city market and streetscape) as well as investment by building owners on King Street to open up tl• sides of their buildings for activity. Given the current economic climate and the larg vacancy already at the top of King Street from the former Bargain Shop site, it wou ambitious to presume building owners would be prepared to develop the backside: their buildings without a concrete plan outlining returns on investment. This does p an opportunity to implement a temporary pedestrian street on South Market Street bring attention to this area and perhaps act as a catalyst for future development. • Prince William Street — Over the years the concept of converting Prince William Sti a pedestrian street has been explored. With the restaurant district centered down Princess Street and along Prince William Street, this would appear, at first glance, fit. A harder look at Prince William Street highlights the continued requirement for traffic on a day to day basis to service the existing businesses and clients. It is important to note that animating a street to attract people need not require the closure street. Amenities and programming can also be added to existing streetscapes to create sl that attract people and investment. It is helpful to look at streets like homes. The goal is tc create living rooms where people want to stay as opposed to just hallways where people tr Like in a home, elements can be added to a space to encourage human interaction and ati people to linger in a space. For a city to invite walking, every street needs to be easy to cross, all the sidewalks need t( good condition, and the streetscape needs to be pleasant and feel safe. Active uses on the ground floors of building and building design are also important; buildings that are oriented sidewalk and passing pedestrians invite people to walk. Elements such as benches, trash cans, appropriate scale lighting, and bus shelters are iml for pedestrians. Bicycle parking, which is not always considered as a pedestrian amenity, is important; too often, cyclists are not accommodated and are forced to attach their bikes to whatever street furniture there is and may end up blocking the sidewalk. PIanSJ The city's new municipal plan incorporates best practices in planning that encourage walke and street animation. (See PlanSJ Policies UD -6 (c, d, e, p), UD -11 (b, j, 1), TM -21, 4.1 (2, Drilling these policies down further into neighbourhood plans will further embed these pedE friendly concepts into the uptown streets and serve to identify key corridors that might benE from a thoughtful execution of pedestrian friendly elements and investment. Considerations for pedestrian streets Uptown Saint John — Pedestrian Street Recommendations When evaluating potential success of a pedestrian street (either permanent or temporary) i helpful to ask: ❖ How will it impact businesses and traffic flow (Vehicle and Pedestrian) ❖ How will it impact existing pedestrian areas — i.e., Market Square Boardwalk ❖ Is it sustainable; are there sufficient resources and programming to ensure succes ❖ Does it enhance and leverage uptown activities and businesses ❖ Can the same thing be accomplished without a street closure ❖ Can we develop a streamlined repeatable process for multiple events and location ❖ Will such spaces promote residential densification (infill) Using these criteria on the pedestrian street opportunities, Uptown Saint John puts forth th following recommendations for Council's consideration. Recommendations: 1. Build on our current successes: - Market Square — continue to build on the success of the Market Square Boardwalk per PlanSJ policy CF -21: Explore opportunities to better A the Market Square Boardwalk in ways that engage various age group cultures to better connect them to the Uptown. - Continue to incorporate best practices in planning that encourage walkabil street animation and placemaking PlanSJ is full of policy that enables pe6 friendly streets and we wholly support these concepts. 2. Neighbourhood Plan Process It would be premature for Uptown Saint John to recommend large infrastructure investmen permanent traffic changes in advance of giving it thoughtful analysis through the forthcomir neighbourhood plan process. But, we look forward to thoroughly exploring opportunities fol type of investment within the neighbourhood plan context. 3. Explore the opportunity of a temporary event - driven pedestrian street (Festit Street) There is an opportunity to convert an uptown street to an event driven Pedestrian Street or temporary basis on weekends or evenings (which could serve as a pilot project to inform neighbourhood planning). This type of Pedestrian Street for events is supported through R Policy CF -32: Promote periodic community use of streets for such events as block p festivals and farmers markets. Pop -up elements and streamlined policy could be made available to quickly convert street; "Festival Street" (or some other such working name). Prince William Street provides the best opportunity for a temporary pedestrian street pilot F Uptown Saint John — Pedestrian Street Recommendations Festival Street (This is a street designation only; no streets are to be renamed) The concept of Festival Street is geared to provide a one - stop -shop for popping up an eves ready streetscape. The Festival Street package would include readily accessible seating, planters, trash cans quickly convert the street to a more interactive space. Programming would be key and it is recommended that a streamlined process for vendor event licensing, security provisioning and notifications for street closure be implemented. k an event could fill out a form and, providing they meet given criteria, attain access to all rec elements to convert the street to Festival Street. The street recommended for Festival Street might be painted for the summer months to id( as Festival Street. The street painting would need to be sensitive to the historic nature of tl' street and should not detract from the assets of any heritage detail. The street painting col also be used to "direct traffic" so -to -speak on Festival Street. Lighting (like that added to Ki Square last summer) could be provided on Festival Street for summer months. Elements c as simple or as elaborate as resources allow. The key is in highlighting the space as a pla where people gather to celebrate. Convenient but discreet electrical hookups would be required on the street to enable a full of activities. Banners detailing summer programmed events for Festival Street could be added. Programming might include a farmers market, a street eat, a car show, a block party, or a multicultural festival. The key is to streamline the process to "pop -up" Festival Street to m� attractive to event organizers. Any pop -up infrastructure investment would, ideally, also be transferrable to animate vacar to help the community and investors envision potential uses for the space and to maintain ; interactive streetscape. The same template of people attracting features and community protecting policy could be easily transferred as required. Implementation It is recommended that there be thorough consultation with Prince William Street building business owners to ensure times and features would enhance and not hinder current activi levels. Many partnerships would be required to successfully implement Festival Street. Traffic engineering (to ensure any street closure does not negatively impact traffic patterns), Saini Police (to streamline security requirements and street closures), Heritage board (to ensure does not detract from heritage assets), Waterfront Development (to pursue opportunities tc connect with development and events on the boardwalk), Destination Saint John (to align � their efforts to attracts festivals and events), and the Placemaking champions of True Groin Uptown Saint John — Pedestrian Street Recommendations streets on a pilot project basis and for further examination within the context of neighbourh, plans. rn It p � I� + r F-11504-1 l W KOD IN 14, e_5 U �� flyII�iN!I 'Y < p I N N U NI � Inky N IJ F I E' 1 i I, F ` W 1 a a i r 4 W 0 H I, F ` W t w '� t7 w a a W t w '� t7 Sustainable Servi( M 1. Orientation to our Service 2. 2014 Service Plan 3. Background: the last five years 4. Future Challenges 5. Service Scenarios /Impacts 6. Conclusions ,_ MA Supporting sustainable growth; Renewing places to live, work and invest; Ensuring safe &healthy communities; Building strong, connected communities; Providing access to recreation & culture; Improving the quality of life and Council's Priorities ✓ Economic Health ✓ Community of Choi ✓ Sustainable Infrastr ✓ Citizen Focused Ser Growth &Community Development Services: • Regulatory: deliver standards that benefit community as a whole • Beneficiary: deliver economic benefits & reduces tax burden (User pay) • Impact Quality of Life: add value for citizens Community Planning & Development Service Heritage Conservation Service Infrastructure Development Permitting & Inspection Service Geographic Information Systems (GIS) By -Law Enforcement Service Economic Development Support Total GCD 2014 Staffing Total GCD 2014 Operating Budget Projected 2014 Revenues 47 FTE $6,935,622 $1,440,100 Building and Development • Permitting & Inspections • By -law Enforcement • Infrastructure Development • Heritage Conservation Community Planning and Enrichment • Community Planning • Economic Support • GIS • Neiehbourhood Improvement Building &Development Services 11% 15% 37% 37% Service Impact Health and safety compliance with National Building Code and related By -laws. Safe and healthy community focus on life safety issues. Goal is voluntary compliance. Conserves the built heritage of Sah John Develonment infrastructure review Permitting & Permits issued with 10 days Inspections j 80% of the time By -law 20 dangerous building EnforcementA cases per year Dangerous buildings Minimum standards Other Bylaws Heritage Conservatio Infrastructu Developmei Complaints are checked within 5 days 80% of time 1200 building permits 225 plumbing permits 40 demolition permits 40 -60 cases Administer Heritage By -law 80 -100 heritage permits & grants for 11 heritage areas, 580 properties Ensures proposed infrastructure meets City 90 k grants 3073 Infrastructure locates. 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Percentage of Bu 10 Bu: 2010 201: Community Planning &Enrichment."., Service Impact • ' • • = Implement Statutory Plans (PlanSJ) 17% Planning approvals are aligned with Plar 39% Deliver backbone mapping in systems & cix - . addressing program 36% Access to recreation and culture to prorr 66i 8 / active living and community well being o •• Tools to build resilient, healthy Community 150 planning applications Planning & One -Stop Development Shop: ZoneSJ, Subdivision By- Development law Transportation Plan, Neighbourhood Plans, True Growth 2.0 Geographic Maintains 200 core data sets,. Web mapping Information Service Spatial analysis support PlanSJ,ZoneSJ Recreation, Parks Support 6 Major Community Centres & Boys & Girls Cultural Club Programming Support 11 Playground Programs 20 Community Events 0support community arts & culture: 35K grants, 14 Arts Exhibits Neighbourhood 700 placements PRO Kids,700 youth connections M Ln it 4 f Percentage of citizens satisfi quality of recreation 100% 80% 60% 40% v a • New Department realigned in 2012 to support growth & delivE • Five year budget trends shows service level increases /decreasf • Need sustainable levels to advance change initiatives Service Enhancements •Planning •One -Stop Development Shop • Heritage • Dangerous Buildings • Recreation programming • Neighbourhood improvement Service Reductions . D l n v-% %; r% rT 3000 2500 2000 1500 1000 500 x Permit Volume 2004 -13 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 Value of Construction 2004 -13 2013 Permit G _, - 2013 Buildin g Permits SAINT JOHN H 0 a g° 0 O O ° J U O °9 00 ° O ° %G r 6° e c o v �1 °a .6:1 ° op °� ° �^ C 00) C O -Iwv O o� 0 0 0 J SSUU 0 8�� ° ° 0 a ° k O 0 wo o i o �o0 U 0 Outside PDA 896 • • t •o 0 � ej• U � O C O ° I A 1 Outside PDA 1296 Inside PDA 88% 1,058 Permits Construction Values (Number of Permits) Inside PDA: $79,762.705 (930) Outside PDA: S6,639 ° $1 - $100,000 (704) ° $1 - $100,000 (9£ • Capacity to support Economic Growth — One -Stop Development shop is a three year coma (2016 implementation) — Development support for major applications: wai industrial &energy related projects • Provincial Legislative reforms will create new opportunities — Potential new powers, requirements &tools — Regional Planning • PlanSJ & PlaySJ implementation will require PlanSJ: Towards A More Sustainable Smart Growth City of Saint John � Municipal Plan Core Reinvestmer Complete Communi s Economic Pros p eri • Long term commitment to Planning • Zoning • Buildin • Stormv • Launch • ComplE years • Transpc • Linked Neighb C 70"011 016 W6 "Transforming our service to achieve a customer approach to facilitate development that moves us community's vision for a more sustainable Sain Project objectives • Integrated development service: planning, building & infrastructurE together • Defined service delivery process: clear, predictable & timely outcon • Improved customer service: facilitators & regulators • Leadership in best practices: innovative new development tools & r • Effective enforcement of by -laws • Education & Communication Now underway npfinPrl cPrxiirP mndpl hXi -la \A/ rPx /iPXnic 7nnina RXi -In%A/ ndrinti Re Principles: • Quality vs. Quantity linked to PIanSJ • Regional /District Hubs — Parks &Playgrounds — Multi -use /sport facilities 1 111 !1 _ N^ v OL • Program Focus on Active, Healthy Living • Community Development Partnership Model �.0 — Focus for our service area is to support transition from direct programming to facilitation (partnerships) 1. MAINTAIN SERVICE: BASELINE COSTS TO DELIVER CURRENT PROGI 2. REDUCE SERVICE: 2% OVER 2014 BUDGET 3. REDUCE SERVICE: 0% OVER 2014 BUDGET 1. Maintain Service Level Maintain Current Service Level in both 2015 and 2016 2015 Resource Requirements $7,311,631 2016 Resource Requirements $7,p 265 239 2. Service Reduction: 2 % Increase in both 2015 and 2016 Proposed Budget - - • - 2015 $7,074,355 - • , 2016 1 $7,215,822 Assumptions: 2% Increas( • No change to core regulatory approvals services • One -Stop Development Shop funding remains, some funding for 201 implementation • Reductions in discretionary services: neighbourhood planning & recri 3. Service Reduction: 0% Increase 0% Increase in both 2015 and 2016 Proposed Budget 2015 $6,935,623 2016 1 $6,935,623 Assumptions: • No change to core regulatory approvals services • One -Stop Development Shop funding remains, some funding for 2016 implementation w w • • p• m • . • • • ■ a 0 2 . • Service Revenues • Recover 1.4 million annually • 20% of service delivery costs • Most from permit & application fees • Fee Increases in 2012 • Highly subsidized services: recreation, heritage, leverage community $183,000.00 $1,022,500 • Stay the course on strategic initiatives - PIanSJ, One Development shop - to yield long term benefits • Maintain development service levels /fees at currer — Implement service level changes in 2016 as part of deliver Development Shop — Development fees review in conjunction with service level improvements; focus on fees for non core services & new r opportunities — Retain heritage grants to stimulate core investment • Focus on partnerships to support PIaySJ — Facilitation &grants will enable community partnerships tc right sizing — Capitalize on community grants review process to evaluate investment Approved DeCE Table of Contents ServiceAlignment ............................................................................................................................................ ............................... 2014 Service -Based Budget Summary ............................................................................................................. ............................... Growth & Community Development Services ................................................................................................ ............................... PublicSafety Services ...................................................................................................................................... ............................... Transportation & Environment Services ......................................................................................................... ............................... Finance & Administrative Services .................................................................................................................. ............................... StrategicServices ............................................................................................................................................ ............................... LegislatedServices .......................................................................................................................................... ............................... City of Saint John Service Alignment Community Planning & Development Heritage Conservation Infrastructure Develop- ment Engineering Geographic Information Systems Permitting & Inspection By -Law Enforcement Economic Develop- ment Support Neighbourhood Improvement Fire and Rescue Suppression Technical Rescue Hazardous Materials Response Fire Prevention & Code Enforcement Fire Investigation Medical First Responder Emergency Management Roadway Maintenance Sidewalk Maintenance Pedestrian & Traffic Management Stormwater Management Solid Waste Collection Engineering Parks & City Landscape Sport & Recreation Facilities Drinking Water Industrial Water Wastewater Financial Management Pension Administration Asset Management Services Human Resources Corporate Planning Intergovernmental Affairs Corporate Communications Information Technology Systems City of Saint John: 2014 Service -Based Budget Summary Community Planning & Development Service Infrastructure Development (Engineering) Service Geographic Information Systems Service Heritage Conservation Service Permitting & Inspection Service By -Law Enforcement Service Economic Development Related Services Tourism Service (Discover Saint John) Economic Development Service (Enterprise Saint John) 1,586,837 361,523 311,563 300,994 993,679 953,885 845,000 2,333,231 1,648,084 400,608 324,060 309,971 998,311 997,122 925,000 2,404,021 Urban Development Service (Waterfront Development) 2,553,352 2,606,226 Industrial Parks Development Service (SJ Industrial Parks) 300,000 300,000 Neighbourhood Improvement Service 705,692 715,389 Community Development Service Grants 666,765 903,130 Recreation and Cultural Programming Service 1,513,071 1,542,077 Arts & Culture Grants & Other Funding 560,861 590,993 Total Growth & Community Development Services Public Safety Services Fire Rescue and Suppression Service $13,986,453 2013 Approved 18,906,109 $14,664,992 2014 Proposed 20,348,550 Medical First Responder (Fire) Service 86,000 81,500 Hazardous Materials Emergency Response Service 120,767 128,231 Technical Rescue Service 62,947 58,494 Fire Prevention Service 927,111 942,912 Fire Investigation Service 21,055 74,879 Water Supply and Hydrants 2,270,000 2,340,000 Emergency Management Service 325,421 264,945 Police Services (including Public Safety Communications) 25,269,695 26,052,841 Street Lighting 1,075,350 1,096,857 Total Public Safety Services $49,064,455 $51,389,209 City of Saint John: 2014 Service -Based Budget Summary Roadway Maintenance Service Sidewalk Maintenance Service Pedestrian & Traffic Management Service Stormwater Management Service Solid Waste Management Service Engineering Parks & City Landscape Service Sports and Recreation Facilities Service Parking Service (Administration Support) Transit Service Total Environment & Transportation Services Financial Management Service Asset Management Total Administrative Services Strategic Services Human Resources 14,861,415 1,560,490 1,684,800 3,366,348 3,568,529 541,451 2,729,268 3,659,644 560,379 6,867,991 $39,400,315 3,247,518 13,163,078 1,493,801 2,345,317 3,165,539 3,547,444 499,369 2,969,395 3,809,404 560,379 6,886,723 $38,440,449 3,124,669 6,641,116 6,925,147 $9,888,634 $10,049,816 1,428,037 1,528,054 Corporate Planning 499,585 462,531 Intergovernmental Affairs 148,658 155,547 Corporate Communications 521,505 531,754 Information Technology 2,087,058 2,138,707 Total Strategic Services 4,684,843 4,816,593 City of Saint John: 2014 Service -Based Budget Summary Corporate Services (formerly Legislated Services) City Manager Regional Service Commission Lega Common Clerk 401,268 529,045 42,054 53,226 703,834 735,400 746,755 664,517 Mayor & Council 585,785 588,445 Total Legislated Services $2,468,341 $2,581,988 Other Charges Fiscal Charges 15,938,984 15,652,875 LTD Payments 1,780,743 1,672,243 LTD Premiums 681,610 0 Pension 10,020,080 9,504,015 Total Other Charges $28,421,417 $26,829,133 Growth & Community Development Services Overview '�W' The Growth and Community Development Services team delivers services that support the community in Wevel achieving its long -term vision of having a diverse, vibrant, resilient, and environmentally sound economy and a vibrant and livable community. Services include providing guidance, direction and support for development that enhances quality of life for our residents by working to create new and renewed places Comrr where people want to live, work and invest and through partnerships, building strong and healthy Deve communities where people feel safe and connected. Heritz Organizational Goals To establish the City of Saint John as a service - based, results oriented, high performance public service organization. Permit Service Based Results Oriented High Performance • Considering the needs of the • Creating more complete • Collaborative, strategically minded Geogr, community as a whole neighbourhoods and workforce S • Creating opportunities for citizen communities • Culture focused on contributing feedback and input • Increasing quality of life and the to community goals through By -Lz • Responding effectively and attractiveness of the City service delivery efficiently to address community • Ensuring communities are safe • Resource conscious and Econoi needs and healthy accountable for results • Ensuring access to diverse recreation and cultural NE opportunities Imprc Growth & Community Development Services Financial Summary Total Neighbourhood Improvement Service Recreation and Cultural Programming Service Recreation Programming Cultural Affairs Total Service 705,692 1,404,094 108,977 715,389 14,700 1,423,760 118,317 1,513,071 1,542,077 22,000 22,000 3.80 4.20 1.00 5.20 Projected Expen 2015 201E Approved 2014 2013 Expenditures Revenue FTE Community Planning & Development Service 1,586,837 1,648,084 120,000 *13.50 Heritage Conservation Service 300,994 309,971 2.00 Infrastructure Development 361,523 400,608 40,400 3.50 Permitting & Inspection Service 993,679 998,311 1,022,500 9.85 Geographic Information Systems 311,563 324,060 37,500 2.50 By -Law Enforcement Service Dangerous and Vacant Building Program 476,692 422,225 * *183,000 2.15 Minimum Property Standards Program 237,671 297,119 2.95 Other By -Laws 156,779 195,035 2.05 Animal Control 82,743 82,743 Total Service 953,885 997,122 183,000 7.15 Neighbourhood Improvement Service Community Development 595,276 603,473 2.80 P.R.O. Kids 110,416 111,916 14,700 (Contract) 1.00 Total Neighbourhood Improvement Service Recreation and Cultural Programming Service Recreation Programming Cultural Affairs Total Service 705,692 1,404,094 108,977 715,389 14,700 1,423,760 118,317 1,513,071 1,542,077 22,000 22,000 3.80 4.20 1.00 5.20 Projected Expen 2015 201E Budget Allocations For City Delivered Services Growth & Community Development Services N Community Planning & Development ® Heritage Conservation W Infrastructure Development W Permitting & Inspection o Geographic Information Systems N By -law Enforcement U Neighbourhood Improvement U Recreation & Culture Programming Summary Continued... Approved 2014 Projected Expen 2013 Expenditures Revenue FTE 2015 2016 Grants: Community Development /Improvement Pavilion Cup 2,500 2,500 Cherry Brook Zoo 60,035 60,000 Library 456,230 458,130 Seniors Citizen Centre Rent 41,000 41,000 Human Development Council 35,000 35,000 Human Development Council Rent 16,000 16,000 PRUDE Rent 52,000 52,000 Seafarer's Mission 1,000 1,000 Senior Resource Center 3,000 3,000 Saint John Hotel Association - 50,000 Living Sl - 15,000 Clean Cart Program - 20,000 Non - Profit Housing Conference - 1,500 YMCA Permit Fees - 148,000 Total Grants - Community Development /Improv 666,765 903,130 Grants/ Other Funding - Arts & Culture Imperial Theatre 337,039 339,322 Saint John Arts Center 74,822 85,171 Arts and Culture Board 35,000 35,000 Public Art - Maintenance and Repair Budget 15,000 10,000 Fundy Fringe Festival 5,000 5,000 Jazz and Blues Festival -Salty Jam 20,000 20,000 Saint John Theatre Arts 10,000 10,000 Festival de la Baie Francois 4,000 4,000 New Year /Canada Day Celebrations 15,000 15,000 Remembrance Day Ceremonies 2,000 2,000 NB Historical Society - Loyalist House 10,000 10,000 Ilncnar-ifi.-H (,rnntc ?R nnn ?:t nnn Summary Continued... Economic Development City Market* Enterprise Saint John Saint John Trade & Convention Centre Harbour Station Total Service Industrial Park Development Service Saint John Industrial Parks Total Service Tourism Service Destination Marketing Organization (DMO) Total Service Urban Redevelopment Saint John Development Corporation Waterfront Development Corporation Waterfront Development — Property Tax Market Square — Common Area Total Service Growth & Community Development Services Budget Approved 2013 Expenditures 937,265 943,036 475,000 475,000 536,576 534,367 384,390 451,618 2,333,231 2,404,021 300,000 300,000 300,000 300,000 2014 Projected Expen Revenue FTE 2015 201E 633,200 (1 contract) 5.00 633,200 5.00 845,000 925,000 845,000 925,000 160,000 175,000 293,000 120,000 105,000 - 20,000 2,273,352 2,306,226 933,800 1.00 1.00 2,553,352 2,606,226 1,226,800 13,986,453 14,664,992 3,300,100 53.5 *City Market managed through Facility Management within Finance and Administrative Services Table of Contents — 2014 Service Plans Community Planning and Development Approval Service ................................................................ ............................... HeritageConservation Service ........................................................................................................... ............................... InfrastructureDevelopment .............................................................................................................. ............................... Permitting& Inspection Service ........................................................................................................ ............................... Geographic Information Systems ( G. I. S.) ........................................................................................... ............................... By -Law Enforcement Service ............................................................................................................ ............................... Neighbourhood Improvement Service ............................................................................................. ............................... Recreation and Cultural Programming Service ................................................................................... ............................... Community Planning and Development Approval Service The Community Planning and Development Approval Service supports economic, social and environmentally sustainable development in the City of Saint John in keeping with community values. This involves using various means of public involvement to prepare statutory plans, bylaws, policies, studies and guidelines for development and land use. The service is responsible for providing advice and working with developers and property owners to ensure that development in the community is consistent with the City's municipal plan and related by -laws. The Service also plays a significant role in shaping all municipal service delivery and infrastructure development. The service aims to create land use and development that contributes to quality of life and our citizens' health while being efficient and financially viable. Need for community economic development Continued need to update Saint John's planning polio Changing demographics and socio- economic trends Increased emphasis on community sustainability Requirements of Provincial legislation Focus on environmental sustainability and conservati Community's expectation that Plan SJ will be implem Demand for more public engagement in the planning 2013 Community Planning and Development - Service Accomplishments and Performance • Implementation of PlanSJ, the City's first new municipal plan, which will drive all land use and municipal investment decisic community for the next 25 years. Key successes include: delivery of a comprehensive new Zoning Bylaw for public review a number of strategic plans that support delivery of PlanSJ: the PlaySJ Strategic Plan, the community led True Growth 2.0 E AdvanceSJ, the City's new Corporate Strategic Plan. • Continued external recognition of PlanSJ nationally as an innovative and leading edge planning document. In 2013 PlanSJ v practice in various national publications including "Suburban Nation Study', Queens University, "Suburban Sprawl: exposin Identifying Innovations ", University of Ottawa, and the new edition of Canadian planning text "Planning Canadian Commur videos were showcased at the 2013 national planning conference in Vancouver as an innovative community engagement t profiled at the 2013 Cities NB conference and was showcased as a community innovator during the 2013 Global Entrepren hosted by Enterprise Saint John. • Progress on Golden Mile Corridor Plan, a plan to maximize the community benefits resulting from intensified commercial development on the West Side, with recommendations to be implemented as part of the new draft Zoning By -law. • Significant progress on the implementation of a one stop shop for Development Approvals identified as part of the core service review implementation including creation of a dedicated project team, engagement of development industry stakeholders and publication of the first development bulletin. • Processed more than 94 applications (YTD to November 22 2013) for rezoning, subdivision approval, and variances pursuant to the Community Planning Act, down from levels in 2012. • Completion of Development Approvals Guide to support a major waterfront redevelopment on the Coast Guard site. • Investment of human resources to ensure the City's interests are advanced in the Province's effort to modernize Local Governance. 250 200 150 100 50 0 Number of Planning Applicatio 2014 Initiatives, Major Projects and Community Planning and Development Approval Service Highlights • Complete ZoneSJ adoption process • Deliver staff training programs to support implementation of new Zoning By -law • Complete the review of the subdivision by -law for the City to align with PlanSJ • Develop the neighbourhood planning framework so that work on the first neighbourhood plan pursuant to PIanSJ can beg Continue to support the delivery of service plans and special projects. • Continued implementation of reforms to the development process to improve the quality of development in the commun process more predictable for the developers and the public. • Continued investment of human resources to ensure the City's interests are advanced in the Province's effort to moderni2 Governance. • Development support for major waterfront projects including the Coast Guard redevelopment plans and plans to redesigr • Collaboration with Enterprise Saint John to ensure service area commitments support implementation of True Growth 2.0 priorities. • Project support for Transportation Master Plan, new Strategic Plan to implement PlanSJ directions to promote more choic Community Planning and Development - Service Levels and Resources Prepare statutory plans, policies, studies and guidelines for the development and use of land in the city. Provide advice and work with developers and property owners through various planning approval processes to ensure that development in the community is consistent with the City's municipal plan and related by -laws. • Complete adoption of the City's Zoning Bylaw and commence review of the Subdivision Bylaw • Periodic updating and amendment of the City's planning by -laws • Delivery of recommended framework for neighbourhood planning to implement PIanSJ • Continue providing advice and information to property owners and residents respecting land use and planning matters. This function consumes about 10% of total planning staff resources • Due to a comprehensive new Zoning Bylaw and the current economic climate, 2014 is anticipated to continue to be a lower than average year in terms of case volume with about 100 current planning applications expected including rezoning, subdivisions, and variances However, a number of complex planning applications are anticipated to require senior staff resources over the course of 2014. • Provide zoning certificates in support of property transactions in the City. The staff complement for this service is impacted by having a vacant Planner position and significant demands in managing ZoneSJ delivery for adoption early in 2014. The recruitment process to fill vacant position will impact delivery of neighbourhood planning framework. Special project team for the implementation of the "One -Stop Shop" was resourced in 2013 with a goal of project completion in 2016. Contract Legal resources are required to support timely delivery of bylaw modernization efforts. Elimination of a planning summer intern results in reduced support to Neighbourhood Planning, workplan (potential impact on timeframe). However, there is a potential to offset impacts with vacant Planner (timeframe to recruit is 3 months). Reduced capacity for supporting analysis for major planning applications (i.e., industrial risk studies /waterfront urban design) as a result of less funds allocated for professional services. Wages & Benefits Goods & Services PlanSJ Implementz Total Expenditure Revenue Full Time Equivale Management Professional — Plar Professional — spec Inside Workers Total FTE Part -Time Positior Administrative / C • GIS — analysis an • IT — support tecV • Legal — legal revi • Common Clerk - • Communication! communication processes Heritage Conservation Service The Heritage Conservation Service is a public service provided to developers, property- owners, merchants, citizens and the general public The service offers a process to have an area designated a Heritage Conservation Area under the Heritage Conservation Areas By -Law. If an area is designated, changes or work done to the exterior of properties in Heritage Conservation areas is regulated and subject to permit. The service also provides architectural, technical conservation and design advice on existing and proposed new construction and provides incentives including grants and other financial assistance to encourage and assist in the rehabilitation and development of heritage buildings. Providing information and education to promote and raise awareness of the social and economic benefits of heritage conservation to Saint John is another key deliverable. Requirements of new Provincial heritage legislation New Municipal Plan for Saint John Implementation of a heritage service review Desire for growth in the community New development incentive programs delivered by tl Adherence to heritage conservation practices and pry Community's objectives and expectations with respe 2013 Heritage Conservation - Service Accomplishments and Performance • Permit volume declined moderately in 2013 from the previous year (69 from historic levels of 100) corresponding to reduc support and lower development activity levels overall. • A lack of human resources due to staffing issues was a significant barrier to improving the Heritage Conservation Service in reduced levels of service in place for most of the year. Recruitment of new heritage officer in 2013 improved staffing and p achieve full staffing in 2014. • Award of 37 grants (20 Conservation Grants, 14 Maintenance Grants, and 3 Conservation Plan Grants) for a total funding c� $65,000 in grant funding to heritage property owners; Full heritage grant funding of $90,000 was not committed to proper lower levels of heritage development activity and changes to criteria for the Heritage Grant program. • Implemented improvements to Heritage Grants program to streamline and add clarity to current process. • Independent review of the Heritage Grants Program Criteria and Process was completed to improve financial accountabilit program. • Implemented ServiceNB Land gazette tool to improve awareness of the heritage conservation program. 2014 Initiatives, Major Projects and Heritage Conservation Service Delivery Highlights • Achieve full staffing for the Service and provide the training required to deliver the service efficiently and effectively. • Transition to digital permit tracking tool for better internal reporting and case management. • Phased implementation of Heritage Grant reforms recommended in the grant review. • Continued Heritage awareness and recognition. • When staffing permits, commence a work plan to review of the Saint John Heritage Conservations Area Bylaw in coordinat shop implementation and Neighbourhood Planning (delivery in 2015). Heritage Conservation - Service Levels and Resources Administer process to have an area designated a Heritage Conservation Area under the Heritage Conservation Areas By -Law. Process applications for Certificates of Appropriateness to regulate any changes or work done to the exterior of prop- erties in Heritage Conservation areas. Process heritage grant applications and offer financial assistance to encourage and assist in the rehabilitation and development of heritage buildings. Provide architectural, technical conservation and design advice on existing and proposed new construction • 11 Heritage Conservation Areas at present, 770 civic addresses (580 properties) designated • The current number of Conservation Areas and number of properties designated is a major challenge given the limited staff resources and high level of effort required to administer the current Bylaw. • An average year of activity is forecast in 2014 with approximately 80 applications expected. • $90,000 in grant funding is proposed to be available in 2014. • Staff meets with clients in the office and on -site to provide information and expertise with respect to projects impacting heritage buildings. This consumes significant resources and normal demand for this service is forecast for 2014 but staffing issues will make this a major challenge to deliver service effectively for first half of 2014. Provide information and education to • Various pieces of print materials The service encourages the retention of the existing building stock to contribute to the overall sustainability of Saint John • Provide a unique image for Saint John as a place well connected to traditional values and steeped in a proud history; building on our past while developing for a prosperous and dynamic future. • Contribute to a prosperous future by working to rehabilitate heritage buildings and integrate modern development in heritage conservation areas to attract new residents and support the tourism industry. The 2014 budget is a status quo budget but successful delivery of the service at the desired level will be dependent on timely recruitment of a new Heritage Planner. Funding for the Heritage Grant programs is proposed to remain at $90,000 with no application fees for service. Reduced heritage research and analysis support with reduction to allocation of funds for professional services. Wages & Benefits Goods & Services Total Expenditure Revenue Full Time Equivale Professional — Her Inside Workers — F Total FTE Administrative / C • GIS — database r • Legal —Heritage • By -law Enforcen enforcement Infrastructure Development Infrastructure Development is responsible for engineering and servicing Service Drivers made necessary by new development. The objective of the Service is to Need to facilitate good development in Saint John th ensure that development is undertaken in a sustainable manner in environmentally sustainable and improves quality of accordance with municipal, community and neighbourhood plans, and the strategic directions and policies of the City. The Service includes reviewing and approving plans and drawings for new infrastructure and also ensuring that what is constructed in the community meets City standards. The Service also plays a key role in ensuring that infrastructure issues are appropriately addressed as part of the building permit and planning processes. Staff also liaises with those who operate and maintain the City's infrastructure to ensure coordination. Expectation to protect public health, welfare, and sal Adherence to sound engineering practice in the devf infrastructure Expectation of an efficient and informed community and permitting process Coordination between services within the City corpoi infrastructure that is proposed and under constructic responsible for the operation of existing infrastructui 2013 Infrastructure Development - Service Accomplishments and Performance • Provided engineering information and advice to the development community and Community Planning and Building InspE of the development approval process. • Reviewed and issued approvals for Excavation Permits and Water and Sewerage Permits and provided field inspections. • Reviewed and issued approvals for Natural Gas Permits within the municipal right -of -way and provided field reviews and I • Successfully closed the file on a number of outstanding developer- initiated infrastructure projects. • Initiated the process to formalize development guidelines for the City of Saint John. • Working with Bell Aliant, Rogers, and Saint John Energy to formalize access agreements for their use of public rights -of -wz • Assisted in the development of new street lighting guidelines and standards. • The Service area actively participated in the initial stages of the Development Approval Process review project with staff it • Processed (Infrastructure Development review, YTD November 27, 2013) Building Permits; Excavation Permits; Water & S1 and performed infrastructure locates in the field. The following graphs illustrate yearly trends: 500 400 300 200 100 0 250 200 150 100 50 Building Permits - Infrastructure Development Review 2009 2010 2011 2012 2013 Water & Sewerage Permits 50 40 30 20 10 0 3500 3000 2500 2000 1500 1000 rnn Excavation (Streets) Permits Revised By -1 Aug 2010 2009 2010 2011 2012 Infrastructure Locates 2014 Initiatives, Major Projects and Infrastructure Development Service Delivery Highlights • Initiate major reforms to the development process to improve the quality of development in the community and make the predictable for the developers and the public. • In support of the effort to improve the development process, complete the work to prepare development guidelines for tl John. • Conclude the process to develop access agreements with Bell Aliant, Rogers, and Saint John Energy to work within public r • Commence the process to develop new municipal by -laws for storm drainage and storm water management for new devE • Prepare revisions to the Excavation By -law (minor revisions). • Provide input into the revisions to the City's Subdivision By -law. • The Service area will actively participate in the Development Process Review project to improve and streamline approval process. • Initiate and track service target deliverables for infrastructure locates. Following receipt of an infrastructure locate reque� provide locates within 2 business days while emergency locates response are to be completed within 2 hours. • Provide training for new staffing to deliver the Service efficiently and effectively. Infrastructure Development - Service Levels and Resources PERMITS Applications, Review, Approval, Inspection REQUESTS FOR SERVICE /INFORMATION PAC Memo Review /Comments; Utility Reviews /approvals; Service Information requests; Testing- approving, coordinating; Field locate /layouts of municipal infrastructure. Following receipt of an infrastructure locate request, the goal is to provide locates within 2 business days while emergency locates response are to be completed within 2 hours. • W &S Connection Permits - 99 • Excavation Permits - 35 • Building Permits (Engineering Review) - 263 • Natural Gas: Service Permits —17; Main Line Permits - 5 • An average year of activity is projected for 2014. • Tender Packages -120 • Record Information Request (technologist)- 6,580 • General Inquiry from Public, Consultants, Legal, Planning, etc.- 950 (professional staff) • Customer Inquiry follow -up (field technologists) — 500 • PAC & Real Estate Memo Reviews —125 • Infrastructure Locates (Call Before You Dig) — 2,983 • Street light installation requests — new development - 15. • An average year of activity is projected for 2014. DEVELOPMENT • Active Subdivisions (various stages) - 25 • Plan reviews for various submissions - naXni dp% /P1nnmant carvirina• ctnrMXA1ntar Although resourced for 2013, due to a long recruitment process to backfill an engineering position (finalized in Nov. 2013), this resource will require significant training and guidance to acquire experience that in the short term impacts the ability of Infrastructure Development to improve the processes in place to: • Improve the permitting process and process integration with Community Planning and Building Inspection; • Document the City's requirements, standards, and processes; and • Develop processes around site drainage and storm water management to address flooding issues. Wages & Benefits Goods & Services Total Expenditure! Revenues Full Time Equivale Management Professional Inside Workers Total FTE Administrative / C • Information Tec other support. • City Solicitor- SL Easements; ByA Municipal Agree • Finance- Permit Permitting & Inspection Service The Inspection and Enforcement Service is a public service offered to those engaging in a construction, renovation, demolition, or change of occupancy project within City limits. Permitting processes determine if the proposed design, construction and occupancy of new buildings; the renovation, demolition and occupancy of existing buildings; or other proposed activity meets minimum acceptable standards as established by building and plumbing codes and related by -laws. Inspection processes determine if the work related to the design approved during the permitting process is being completed in accordance with established standards. The City works with individuals to achieve compliance with these standards before more corrective actions are determined to be required. Service Drivers I Regulatory and legislative requirements; new legislat Penalties available to encourage compliance with by- Projected growth in the community Organizational capacity Public expectations related to permitting, inspection, 2013 Permitting & Inspection - Service Accomplishments and Performance • For the last year and a half, the City of Saint John has been taking advantage of a relatively new Service New Brunswick pr Gazette. It is an information repository of land- related notices, restrictions, and other information about land parcels. It ; find out essential information, such as if requirements set out in municipal by -laws were met by a property owner /builder will also flag when properties are subject to particular by -laws, such as if the property is in the Flood Risk Area, the Herita€ Areas, or if it is a vacant building that is subject to the Unsightly Premises and Dangerous Buildings and Structures By -law. John's use of the Land Gazette has been implemented in a phased approach and will continue into 2014. The service area positive outcomes as a result of the use of the Land Gazette. In 2013, 15 notices were added to the Land Gazette for this those have been complied with and have since been removed from the Land Gazette. • Staff attended training related to the Barrier Free aspects of construction as defined by the National Building Code and the standards awaiting regulatory approval. Staff continues to attend relevant training as it becomes available so as to be aw; technologies, products and methods. Staff also continues to formally meet regularly to discuss and resolve Code and enfc and to ensure consistent application of Codes and by -law provisions. • The Service area continued process improvements to deliver service that meets the community's needs. Permit valuation regularly with value and fee adjustments made as necessary to ensure an accurate reflection of actual construction valueE • Investment of human resources to ensure the City's interests are advanced in the Province's effort to modernize Local Go, 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% )ercentage of Building Permits Issued in 10 Business Days 84% Q o 76% 0 2010 2011 2012 2013 The percentage of permits that are issued in 10 business days after tl complete permit application is shown (left). Given the various degre associated with permit applications, the goal is to issue permits in 10 of the time after receipt of a complete application. In 2013, this was percent of the time, 9 points below the established target. Although improvements, such as parallel and streamlined processing were in r contributed to exceeding the target in 2012, the target was not met mainly due to unplanned staffing shortages in the permitting and ins experienced for the majority of the year. It is also worthy to note th< measures the permit processing time once a complete application is cases incomplete applications are still being submitted, resulting in a time while staff and the applicants work toward a complete submissi complete applications were submitted, it is likely that the target wog 2013. The development approval process review intends to address outlining submission requirements and improving communications b requirements. Review of permit processing and resource allocations continue in 2014 so that the target will be met in more instances, wr Enforcement of Building Permit Violations e 300 ■ 200 100 — 0 First Second 2011 Third Final 2012 X2013 The graph (left) depicts the level of by -law compliance when initial er were utilized (violation notices). Effective by -law enforcement will rE trend in the number of enforcement actions required. If compliance achieved with enforcement notices, formal Orders may be issued, fol application, if necessary. It is expected, and the results indicate, that developers, builders or owners will comply after receiving a first or s( notice. Very few violations persist to the third and final notice stage the graph. This continual and significant decrease between the progi shows that enforcement efforts are working to achieve by -law compl to notices, the Service New Brunswick's Land Gazette is another tool compliance. 2014 Initiatives, Major Projects and Permitting & Inspection Service Delivery • Staff from the Service area will finalize its review and amendment of the Building By -Law so that it is ready to be adopted Brunswick Building Code Act and associated regulations are proclaimed by the Government of New Brunswick. • An "Alternative Solutions" process will be implemented in early 2014 for applicants that apply for approval under the Obj( section of the National Building Code of Canada, enhancing service delivery and flexibility to citizens, builders, and design( • The Service area will continue its improvement efforts of providing quality service to the users of the permitting and inspE • The next phase of Land Gazette implementation will continue into 2014, increasing the number of notifications available t owners and the general public. • The Service area will actively participate in the Development Process Review project to improve and streamline permit pr( enforcement activities. • Continue with investment of human resources to ensure the City's interests are advanced in the Province's effort to modE C;nvarnnnra Permitting & Inspection - Service Levels and Resources Building permits are issued within ten Projected for 2014: The goal of the Permitting and Inspection (10) business days after receipt of a • 1,200 building permits program is to ensure that the public is complete application eighty (80 %) of the • 225 plumbing permits protected in that buildings and properties time. • 40 demolition permits are safe, healthy, and accessible. • 100 "other" permits and licenses Staffing shortages in 2013 and the result of the elimination of two inspector positions in 2012 impacted the service area in 2013, particularly in meeting efficiency targets and the inspection and enforcement of non -life safety matters. The rate of by -law compliance with Projected for 2014: progressive enforcement actions. • 11,000 inspections Compliance increases with enforcement • 550 violation letters actions. Wages & Benefits Goods & Services Total Expenditure'. Revenues Full Time Equivale Management / Prc Inside Workers — T Inside Workers — A Total FTE Administrative / 4 • Legal — support E property owners Orders to Compl court and at hea • Fleet — equipme inspectors • IT — support soft inspections, recc results, and reps Geographic Information Systems (GIS) The Geographic Information Systems Service is responsible for creating and maintaining all mapping and associated geographic information for the City of Saint John. The GIS service is also the official source for civic addressing and street names within the City of Saint John. Other responsibilities include coordinating spatial information collection projects for City Service areas, maintaining the City's Enterprise GIS for employee use and the Web- Service Drivers A J Security eb- Security and protection the City's geo- referenced 6 Demand for useful geographic information from the community Demand for useful applications for citizens to obtaii information Mapping application for public use, producing maps for City departments, Demand for data from all City service areas and responding to public and employee enquiries regarding mapping and Need to utilize data in accordance with the requirer geographic information. provider such as Service NB 2013 GIS Service Accomplishments and Performance • Successfully completed the bi- annual process to acquire aerial photography for the Greater Saint John area; • Participated and contributed to the PSAB -3150 Tangible Capital Assets project; • Participated in and contributed to the Customer Relation Management project; • Upgraded the SDE geodatabase; • Upgraded the Maps & Air Photos section of the City web site; • Developed and deployed a new public web - mapping GIS Viewer accessible through the City website; • Created a new City tourist map; • Mapped all city sidewalks; • Organized the Geomatics Atlantic 2013 conference; • Developed an interactive mapping application for ZoneSJ, accessible through the City website; • Participated in the New Brunswick Road Network Municipal Outreach project; • Performed various spatial analysis; and • Reviewed the provincial wetlands dataset as part of the provincial wetlands improved mapping program. 2014 Initiatives, Major Projects and GIS Service Delivery Highlights • Switch -over of the current web - mapping software for the public to access through the City's web site; • Oblique aerial photography acquisition; • Upgrade the GIS Viewer software and SDE geodatabase; • Final mapping to support adoption of a new Zoning By -law. • Develop service - specific mapping applications for internal and external clients; • Manage the bi- annual regional orthophotography acquisition project; • Update the City tourist map; and • Upgrade the internal GIS Viewer software. GIS - Service Levels and Resources Creating and maintaining all mapping • Provides and maintains the core • The Planning Technician position in and associated geographic information information that is required for many Community Planning is divided between for The City of Saint John. of the City's information systems the Community Planning Service (0.5 including the maintenance of FTE) and the GIS Service (0.5 FTE) to approximately 200 different datasets maximize the use of this human Coordinating spatial information collection projects for City departments. Assigning all civic addresses and street names within the City of Saint John. • Perform spatial analysis and produce resource. maps for City departments • Reconcile Provincial property information with civic addressing on a monthly basis. This is the core of the Municipal Information System. • Assist and guide City departments in data collection or mapping projects by recommending software, hardware, designing data models and training staff. • Spatial information is now a required part in many other systems, such as MIS, 311, AVL, Document Management, Pavement Management, and Asset Management. GIS Staff provide guidance in the selection and implementation of these systems. • Ensure that street names and civic addresses are assigned based on NB911 standards and guidelines, and respect the "By -law Respecting the Wages & Benefits Goods & Services Total Expenditure Revenue Full Time Equivale Professional Inside Workers Total FTE Administrative / C • Information Tec other support. GIS - Service Levels and Resources Continued Maintaining the City's Enterprise GIS for employee use and the Web- Mapping application for public use. • Maintain, update and publish web services; • Ensure that sensitive or third -party use - restricted data is only available to City staff; and • Provide tools to enable City staff to perform their required spatial queries Handling data sales and dissemination to • Geographic data is crucial in major external organizations. development projects. The City's GIS Division is the source for the highest quality geographic data available for areas within the city boundaries. Responding to public and employee enquiries regarding mapping and geographic information. • The number of data sales and dissemination is closely tied to and fluctuates based on the amount of development happening in the City. • The GIS Division encourages self - service by providing useful tools and information either through the GIS viewer or the City's website. The "Maps & Air Photos " - is one of the most popular sections of the website with the public. By -law Enforcement Service The By -Law Enforcement Service is a public service offered to citizens, property owners, occupants and neighbourhood resit enforcement of City by -laws related to the maintenance and usage of properties, animal control, and licensing requireme properties and investigation of complaints are conducted to ensure standards established in related by -laws are met. In cas( violation of a by -law, the City works actively for voluntary compliance with the appropriate by -law before more corrective acti Service Delivery The Service area supports ensuring that Saint John is a safe and healthy community with an enhanced quality of life. T identifies each of these programs and the percentage of funds allocated to them to deliver a defined level of service for 2014. ® Dangerous and Vacant Buildings * Minimum Property Standards * Other By -Laws Legislation that supports more effective enforcemerr Penalties available to encourage compliance with by- Economic climate affects owner / developer ability tc Organizational capacity Public expectations related to permitting, inspection, 2013 By -law Enforcement - Service Accomplishments and Performance • In 2013, Council provided additional funding to the Dangerous and Vacant Building Program which saw an increase in the t of resolved cases from 8 to 20 per year. The program had a very successful year, particularly since an additional staff persc May 2013. With a greater focus on enforcement of the Dangerous and Vacant Building Program, voluntary compliance ha! substantially, with 40 buildings being repaired and /or reoccupied, and 15 buildings demolished by property owners. The 2 for grass seeding vacant lots after a City- initiated demolition resulted in 2 properties being seeded. Resolved Cases 60 Notices to Comply 11 Demolitions 20 City- initiated demolitions 5 Property owner demolitions 15 Repairs / Reoccupy 40 • The Minimum Property Standards Program, despite experiencing staffing shortages in 2013, issued 6 Notices to Comply, r and laid one information in Provincial Court. • For the last year and a half, the City of Saint John has been taking advantage of a relatively new Service New Brunswick pr Gazette. It is an information repository of land- related notices, restrictions, and other information about land parcels. It find out essential information, such as if requirements set out in municipal by -laws were met by a property owner /builder will also flag when properties are subject to particular by -laws, such as if the property is in the Flood Risk Area, the Herita Areas, or if it is a vacant building that is subject to the Unsightly Premises and Dangerous Buildings and Structures By -law. John's use of the Land Gazette has been implemented in a phased approach and will continue into 2014. In 2013, 89 notic the Land Gazette for this Service Area; 2 of those have been complied with and have since been removed from the Land G 100% 90% 80% 70% 60% 50% 40% 30% 20% 10% 0% Percentage of time complaints are initially checked within five business days (2013 YTD Results) Case Type ■ Minimum Property Standards Cases (MINS) ■ Dangerous and Hazardous Buildings (DAND) Unsightly Premises (DANU) ■ Zoning (ZONE) The Service area measures how quickl external complaints; the target is an it complaint within 5 business days, 809/c response generally means an initial in with a property owner or complainant results (chart left) indicate that the tar met for these by -laws, with a significai response times to Minimum Property complaints from the 2012 result of 59 decline can be attributed to a number shortages in 2013 at the technical and levels that were not backfilled for a nL Significant improvement in this area is results will depend on continued full s program area. The response time for the Dangerous Buildings program did not meet the target in 2013, mainly due to staffing shortages and the enhanced enforcement program that was implemented earlier in 2013. It is anticipated that the response time for this pr, target in 2014, as enhanced staffing is now in place. Staffing shortages in both the technical and administrative staffing areas are the main reasons why the response times have n Unsightly Premises and Zoning By -law enforcement programs. Long -term staffing shortages in addition to the resulting capac budget cuts in 2012 has resulted in increased response times and a lower service level for non -life safety enforcement cases, <_ Premises and Zoning infractions. There is room for continuous improvement to meet these targets, regardless of staffing levels. There are opportunities to mo procedures to improve response times for all by -law complaints. Process changes are being considered and will be implemen. on a regular basis to make necessary resource adjustments if required. It is worthy to note that further analysis of the data sl The graphs (below) depict the level of by -law compliance when initial enforcement actions were utilized (violation notices). E enforcement will see a decreasing trend in the number of enforcement actions required. If compliance has not been achievec notices, formal Orders may be issued, followed by a court appearance, if necessary. It is expected, and the results indicate, th property owners comply after receiving a first or second violation notice. Very few violations persist to the third and final not seen in the graphs. This continual and significant decrease between the progressive notices shows that enforcement efforts a achieve voluntary by -law compliance. When compliance has not been achieved by the final notice stage, cases proceed to le€ prioritized basis. 120 100 80 60 40 20 0 Minimum Property Standards By -law 2010 --*- 2011 --0-2012 X2013 First Notice Second Notice Third Notice Legal Actions This graph indicates that compliance is usually achieved after the issuance of a third notice. Typically, the trend of notices issued should show a decrease as the higher levels of enforcements actions are applied. In 2012 and 2013, this expected trend did not occur, due mainly to the way in which case data is recorded. Review of the statistics and case monitoring system indicate that changes must be made to the manner in %A /hlrh rintn is nArnrHaH to mnra nrriirntnki roflort the rmmnlinnro tronrlc 140 120 100 80 60 40 20 0 Dangerous Buildings and Struct —L 2011 2012 20 First Notice Second Notice Final NoticE The graph above depicting compliance with Unsightly Prerr Buildings and Structures By -law (concerning dangerous bui indicates that the greatest percentage of compliance is ach a first notice. Subsequent notices achieve further compliar remaining cases requiring legal action (which includes the i 80 70 60 50 40 30 20 10 0 Unsightly Premises 2011 2012 2013 First Notice Second Notice Final Notice Legal Actions The graph above depicting compliance with the Unsightly Premises and Dangerous Buildings and Structures By -law (for unsightly premises) indicates that the greatest percentage of compliance is achieved after the issuance of a first notice. Subsequent notices achieve further compliance, with very few remaining cases requiring legal action (which includes the issuance of a Notice to Comply and /or Court proceedings). Zoning By -law 2010 —&- I First Notice Second Notice Final Notice As expected, the compliance rate for Zoning By -law infracti number of violation notices sent, with the highest rate of a after the first notice. Very few require enforcement action stage. Volumes of complaints /cases and compliance rates I steady over the past five years. It is worthy to note that en Zoning By -law is based on complaints received from the pu It is expected that with the anticipated adoption of a new Z an increase in complaints concerning the Zoning By -law ma have an increased awareness and higher expectations of Zc compliance. 2014 Initiatives, Major Projects and By -Law Enforcement Service Delivery Highlights • Due to the increase in resources for the Dangerous and Vacant Building Program in 2013, it is anticipated that 2014 will bE year, as the program capitalizes on momentum gained over the past few years and the increasing rates of voluntary comp Seeding Pilot Program for the Dangerous and Vacant Buildings Program will continue into 2014; more lots will be seeded initiated demolition, and staff will continue to monitor those lots that were seeded in 2013. The Program area will also dE inspection program that will outline the frequency of inspections required depending on the condition and priority of the to use resources more effectively. • As the Service area is responsible for enforcement of the Zoning By -law, it will actively participate in the finalization of the law. Staff will participate in training and awareness programs in anticipation of adoption of the new Zoning By -law. • Staff from the Service area will continue to actively participate in the review of the Building By -Law. • The next phases of Land Gazette implementation will continue into 2014, increasing the number of notifications available owners and the general public. • The Service area will develop a priority setting matrix system to triage non -life safety by -law enforcement cases once all achieving voluntary compliance has not resulted in compliance. • Statistics tracking will be modified, particularly for the Zoning By -law enforcement program, to provide more accurate infc enforcement activities. • Continue with investment of human resources to ensure the City's interests are advanced in the Province's effort to modE Governance. Dangerous and Vacant Buildings Program - Service Levels and Resources Resolve 20 cases per year • 20 cases resolved annually The goal of the Dangerous and Vacant Buildings program is to ensure the public and property are protected against safety hazards caused by vacant, dilapidated and structurally unsound buildings. Budget increases in 2013 resulted in a return to an enhanced service level target of 20 cases resolved per year. Legislation enhancements and momentum gained in 2011 to rid the municipality of dangerous and vacant buildings has resulted in a trend of increased voluntary compliance by property owners. Although approximately 50 new cases are added each year, with increasing owner compliance rates, and City actions, the number of cases resolved in the past two years is 45 -60. The City's costs to demolish buildings in the case of non - compliance are typically reimbursed by the Province of New Brunswick. Demolition costs for 2014 are expected to be $146,000. Wages & Benefits Goods & Services Total Expenditure Revenues (From di Total Revenues Full Time Equivale Management / Prc Inside Workers —Ti Inside Workers — A Total FTE Administrative / C • Legal — support E property owners Orders to Compl court and at hea • Fleet — equipme • IT — support soft inspections, recc results, and repc Minimum Property Standards Program - Service Levels and Resources Work to achieve by -law compliance using Projected for 2014: The objectives of the Minimum Property progressive enforcement actions. • 75 new cases Standards Program are: Compliance increases with enforcement • 250 active cases 1. To adopt and establish standards actions. • 500 inspections governing the condition, occupancy and maintenance of residential property; and 2. To provide safeguards for the safety, health and welfare of the general public and of the occupiers and users of residential property. Complaints are initially checked within 55 complaints from external sources five (5) business days eighty (80) percent (varies annually) of the time. Reductions in building inspection staff in 2012 have impacted the delivery of this program in 2012 and 2013 as Minimum Property Standards inspectors have been required to backfill or carry out additional building inspection duties during staffing shortages or peak periods in the Permitting and Inspection Service area. Staffing shortages in 2013 also negatively affected the service area, resulting in the initial response target being met only 32 percent of the time. Wages & Benefits Goods & Services Total Expenditure Full Time Equivale Management / Prc Inside Workers —Ti Inside Workers — A Total FTE Administrative / C • Legal — support E property owners Orders to Compl court and at hea • Fleet — equipme inspectors • IT — support soft inspections, recc results, and reps Other By -Laws Program Service Levels and Resources Work to achieve by -law compliance using progressive enforcement actions. Compliance increases with enforcement actions. Includes enforcement of the Zoning By- Law, Flood Risk Area By -law, Mobile Home Park By -law, Unsightly Premises for those cases which are impacting public health and safety, Dog Control By -Law and the issuance of a variety of licenses. The Dog Control service is contracted to the SPCA Animal Rescue and focuses on dog control and a very limited cat control service. Complaints are initially checked within five (5) business days eighty (80) percent of the time. Projected for 2014: The goal of enforcing the Other By -laws Wages & Benefits • 55 new Zoning By -law cases Programs is to support a healthy and safe Goods & Services • 125 Zoning By -law violation letters community, protect property values, Total Expenditure • 5 Flood Risk Area By -law cases support an enhanced quality of life, and • 5 Mobile Home Parks By -law cases promote a sense of community pride. Full Time Equivale • 100 Unsightly Premises cases Management / Prc • 10 Heritage Conservation Areas By -law Departmental staffing reductions in 2012 Inside Workers — T cases and staffing shortages in 2013 impacted Inside Workers - A this area, as staff focus is on life safety Total FTE issues first. Less serious by -law enforcement cases are prioritized at a Administrative / C lower level, resulting in fewer resources • Legal — support E utilized in this area. This approach will property owners continue in 2014 as required. Orders to Compl court and at hea • Fleet — equipme inspectors • IT — support soft inspections, recc results, and reps Neighbourhood Improvement Service The Neighbourhood Improvement Service provides neighbourhood residents with tools and support to build resilient, healthy promotes and delivers community based projects and programs that contribute to sustainable neighbourhoods and healthy a through facilitation, partnerships and use of City facilities. The service works with neighbourhood groups and associations to appropriate funding required ensuring that a variety of opportunities are accessible and inclusive for all citizens. Service Delivery In supporting resilient, healthy neighbourhoods in Saint John, the City delivers several programs. The following chart identifie programs and the percentage of funds allocated to them to deliver a defined level of service for 2014. Neighbourhood Improvement Programs ® Community Development L1 P.R.O. Kids Growth and diversity in population (age, culture, disability and Diversity of needs among various neighbourhoods Changes in family unit Economic uncertainty, inflation, and supply and cost of service Focus on sustainable communities Organizational capacity; support from other services (e.g., parks Expectations for sustainable partnerships with community groul 2013 Neighbourhood Improvement Service Accomplishments and Performance Community Engagement • 70+ organizations with 800 staff engagement occurrences. Community Development — Park Projects • Latimore Lake Recreation Association — Park Improvement Project. o Repurposed the neighbourhood tennis court into a mini -skate park. Two skating elements in addition to fence rel brush and clean -up of the playground area were completed. • Anglin Drive: Phase 3 Developing Active Play Area. o Working with the Anglin Drive Neighbourhood Improvement Committee supported and completed the installatioi basketball area to complement the existing playground. • New signage program for Jervis Bay -Ross Memorial Park. o The historical research piece for new interpretive signage for the park was completed. The target date for installal 2014. • Official Opening of the Private David Greenslade Peace Park — Final improvements were made including the memorial entr memorial stones of each soldier, and the Royal Canadian Regiment flag installed. On June 1, 2013 a memorial service was N officially being named and dedicated in the memory of the six soldiers who made the ultimate sacrifice for their country. 1 through a collaborative effort between the neighbourhood committee, Royal Canadian Legion, Base Gagetown, the City of community volunteers. • Glen Road Playground Development Project - Installed new playground swings and armour rock perimeter. • Rothesay Netherwood School International Leadership & Volunteerism Program — Outcomes included trail enhancements converting a soccer field into an outdoor learning classroom at the Glen Falls Elementary School, painting and minor repair sports field complex, and the beautification with installation of raised garden beds at a vacant lot in the North End in conju Middle School. • Supported the newly established Red Head Community Association Community Clean -up Day held at the Red Head playgrc Drive subdivision. • Supported the Lower South End Neighbourhood Clean —up of the Barrack Green Armoury Green Space. • Supported expansion and enhancements of various community gardens throughout the city. • Expansion of the Crescent Valley Community Tenants Association Community Garden. • Shamrock Park Community Garden was at full capacity in only the second year of operation. A garden expansion projec- of 2013 to double the size of the gardens. In the spring of 2014 the expansion will be completed with additional garden the Old North End neighbourhood. • Market Place West Community Gardens — Supported the neighbourhood committee with the development of Commun Official opening to take place in the spring of 2014. • Enhancements to the Rainbow Park Community Garden. • On -going support to Greater Saint John Community Garden. • Supported creation of the Rainbow Park Memorial Garden Project in partnership with PULSE. The official dedication of the is scheduled for the spring of 2014. • Marigolds on Market Place - St. Patrick's School. • Marigolds on Main Street — Centennial, Lorne, Princess Elizabeth and Millidgeville North Schools. The City of Saint John rec the Guinness Book of World Records for planting the most marigolds by the most people at one time. Community Development — Partnerships • Active member of the Fundy Wellness Network (third year). • Westside Food Bank at Carleton Community Centre — 6,000 visitations. • Wellness Centres - Partnership with Horizon Health o Market Place Wellness Centre at Carleton Community Centre — 8,000 visitations. Community Development — Neighbourhood Development • Priority Neighbourhoods supported through the Neighbourhood Development Stimulation Grant Program (Vibrant Comm Block Neighbourhood Newspaper, Waterloo Village Association, Teen Resource Centre, East Side Motivators, O.N.E. Chang Resource Centre, People United in the Lower South End (PULSE), Westside PACT). • Supported Anglin Drive Tenants Association Story Tent summer program. • Supported the Christopher Leadership Program delivery to the five priority neighbourhoods for the purpose of building lea and confidence (10 participants in the program with all five priority neighbourhood represented). • Collaborated with the west side community in the creation of the "Red Shirt" neighbourhood volunteers responsible for su monitoring the newly installed Market Place playground and mini skate park. Community Development — Special Events / Program Support • Organizational support of Crescent Valley Days, Market Place West Family Fun Days, Old North End Days. • Served an active role with the Vibrant Communities Priority Neighbourhoods "Learn & Go" Program. • 24th Annual Disability Awareness Week — Partnership with 10 Disability Organizations (Partnership Sustainability). P.R. O. Kids • Youth placements in recreational and cultural programs. [2013] - 650 to 700 placements projected [2012] -796 placements [2011] - 1093 placements [2010] - 929 placements [2009] -762 placements • [2013] Funds raised at $150,000 • Canadian Tire Jump Start Program —Year three • 100+ sponsors of the program including: corporate, service clubs, grants, community organizations and personal donation 2014 Initiatives, Major Projects and Neighbourhood Improvement Service Delivery Highlights Community Development • Community Grants Program: Develop a new model for managing all community grants that the City of Saint John provides. and process that ensures a consistent approach to accepting applications, recommendation for grants and an evaluation / framework. • Implement a Civic Pride / Adopt a Park Beautification Program: The intent of this program is to coordinate and formalize b of community based clean -up and improvement efforts. The program will be staged in coordination with Environment WE another high profile community event to achieve maximum community exposure and impact. To support this program an( clean -up initiatives the purchase of a landscape maintenance trailer is recommended. This trailer will be equipped with lar supplies, and will be available to community groups for litter and debris clean -up, graffiti removal and park beautification K • Latimore Lake Park Improvement Project — Develop an action plan for the repurposing of the outdoor recreational space i the Latimore Lake Recreation Association. • Silver Falls — Assist Silver Falls in mobilizing and forming a neighbourhood group to undertake the planning and implement< repurposing the under - utilized ball field within the neighbourhood. • East Saint John - Explore repurposing opportunities of the East Saint John ball field through neighbourhood consultation ar • Anglin Drive: Phase 4 — Support the Anglin Drive neighbourhood in repurposing the Thornborough ball field into a commur ..8INIT, • Maintain PRO Kids at 700+ youth placements. • Develop a framework and guidelines that will provide an equitable parental pay responsibility for placing youth for PRO Ki • Design and implement a new fundraising program (Arena Signage Advertising) that will benefit PRO Kids. Community Development Program Service Levels and Resources Encourage community -based organizations to be empowered to meet the needs of their neighbourhoods through forming partnerships and providing guidance, information and other available resources. Administer grants that community -based organizations may be able to leverage support from businesses and other levels of government for neighbourhood improvement initiatives. Provide planning assistance and advice to neighbourhood organizations; support implementation of community -based • 70+ community partnerships & relationships maintained • 700+ engagements with community groups, associations and agencies • *$152,250 Neighbourhood Development Stimulation Grants (Crescent Valley, Lower Westside, Waterloo Village, Lower South End, Old North End, East Saint John) • *$50,000 Community Development • *$75,450 External Community Centre Facility Assistance Grants (KBM, Martinon, Lorneville, Loch Lomond HOPE Centre, Latimore Lake, Milford, Randolph) • *$1,523 in support of the Ability Advisory Committee • * *PIaySJ —Community Driven Grants (Passport to Parks / Adopt a Park) • Support of 10 neighbourhood / community special events annually (e.e.. Crescent Vallev Days. Canada Build community capacity to respond to opportunities, issues and concerns at the neighbourhood level. Programs and services aligned to meet neighbourhood needs. Strong inter - neighbourhood relationships and community networking; promoting partnerships that encourage information sharing and collaboration that strengthens groups and inclusion. Neighbourhood development funds support: • Sustainable neighbourhood groups, facilities and services, and effective leveraging of other sources of funding • Building leadership capacity resulting in a higher level of neighbourhood engagement. • Celebration and promotion of neighbourhood achievements. Neighbourhood and community spirit, collaboration, participation and involvement. Wages & Benefits Goods & Services Community Grants PIaySJ Grants ** Total Expenditures Full Time Equivalen Management Inside Workers Total FTE Administrative / Ot • Legal — agreemen • Communications media relations • Parks /Landscape Facilities — suppo and community d projects. • Planning / Real E ownership identif Zoning, By -laws • Roadway Mainte support (equipmE sweeping) • Police/ Fire —ad neighbourhood si P.R.O. Kids Program Service Levels and Resources Placement of children (age 18 and under) into sport, recreation or cultural opportunities suited to their interest including assisting with the purchase of equipment and supplies when needed, and consulting with families on transportation needs. Form partnerships with community recreation, sport and cultural organizations that donate program spaces. Raising funds to purchase additional program spaces, equipment and transportation. • 700+ placements • Regional participation extending the program to include families in Quispamsis, Rothesay and Grand -Bay Westfield • Connecting 700+ youth with approximately 100 program partners Target Range for 2014: $150,000 - $200,000 P.R.O. Kids is a non - profit program that Wages & Benefits provides opportunities for disadvantaged Goods & Services youth participating in positive healthy Total Expenditures recreational, sport and cultural activities. Providing a safe place for youth to play, Revenue learn and be engaged. Improving self- esteem of Greater Saint Contract Position John youth. Part -Time Positions Corporate and community pride in offering youth positive life experiences & opportunities. Diverse programs meeting the various needs & interests of youth. Increase program opportunities by reducing barriers to participation. Administration costs are covered by the participating municipalities, allowing 100% of the funds received through donations, grants and fundraisers to go directly to placing children and youth in programs. Substantial increases in registration fees for youth activities and programs. Poor economic climate impacts the level of parental contribution resulting in an increased level of support from P.R.O. Kids. Administrative / Ot • Communications media relations Recreation and Cultural Programming Service The Recreation and Cultural Programming Service provides access to recreation, sport and cultural opportunities that allow oL active, enjoy life in their leisure time, and connect with other members of the community. Through innovative leadership, the service that promotes community well -being and enhances the quality of life of citizens to produce a healthy, vibrant, positivE community. Service is focused on meeting the diverse recreation, cultural and leisure needs of our citizens. Service Delivery In providing access to diverse set of recreation and cultural programming opportunities, the City delivers several programs. TI identifies each of these programs and the percentage of funds allocated to them to deliver a defined level of service for 2014. Recreation and Cultural Programming Programs M Recreation Programming W Cultural Affairs Growth and diversity in population (age, culture, disability & acc Diversity of needs among various neighbourhoods Changes in family unit Economic uncertainty, inflation, and supply and cost of service Focus on sustainable communities Organizational capacity; support from other services (e.g., parks Expectations for better partnerships with community groups 2013 Recreation and Cultural Programming Service Accomplishments and Performance Special Events Support • Active partner with the organization of the 3rd Annual All American Soap Box Derby in Rockwood Park. • Active partner in the development of the PALS Passport to Fitness Rockwood Park Program. • 2013 Winterfest in partnership with the Fundy Wellness Network, Greater Saint John Municipalities and Neighbourhood Groups. • Active partner with the organization of the 5th Annual Pavilion Cup Pond Hockey Tournament. • Organized 3rd Annual City of Saint John Volunteer Recognition Dinner (160 attendees). • Continued Partnership with Horizon Health in provision of wellness programs at the HOPE Centre & Market Place Wellness Centre. • 3rd Annual International Trails Day at Rockwood Park — Volunteers working to enhance trails. • City of Saint John support to the 191h Annual Marathon by the Sea. • 4th Annual Canaport Volleyball Tournament — Proceeds went to support youth programs at the Carleton Community Centre. • Tim Hortons '3 -on -3' Street Hockey Championships in Support of Mind Care — Event Planning Partner and Scheduling Service. • Active partner with Community Special Events including Canada Day, New Percentage of citizens satisfied with 1 and quality of recreation program 100% 80% V) 60% Q) 40% Q) 20% 0% 2009 2010 2 Percentage of citizens that think the good job supporting arts and 100% 80% Ln 60% Ln Q) 40% 20% 0% • Supported these special events held in Saint John: Triathlon by the Bay, Kids of Steel Triathlon, Anglophone South School D Country Running Events, Safe Kids Week, Community Autism Walk, Strides for Change, & Terry Fox Run. Senior Programs • Senior Friendship Games including activities such as golf, timed -walk, washer toss, badminton, cards, and opening & closin participants). • Seniors' Quarterly Special Events Partnership with Lily Lake Pavilion. • Senior programs developed in partnership with NB Housing at Stephenson Towers, and Horizon Health Network at the HOI • Support of Senior Wellness Fairs at Loch Lomond Villa and Stephenson Towers. • Seniors' Springfest and Fallfest at Exhibition Park. • Seniors' Summer Shuffleboard Program at the Peter Murray Arena. Inclusive Recreation Programs • Recreation Your Way (Inclusive Recreation Opportunities for Persons with a Disability) — Recognized Canada wide as a best • Disability Access Awareness Week (DAW Opening Ceremonies, DAW Basketball Challenge, DAW Luncheon). • Program Partnership with Abilities NB providing weekly sport and recreation opportunities for people with disabilities (box bocce ball, goal ball, tennis, and athletics). Youth Programs • Sustained the summer playground program at 15 sites through acquisition of Federal and Provincial student employment € neighbourhood association partnerships. Special Events included Magic Mountain Trip, Dominion Park Beach Day, Soccer Skate Day at the Hilton Belyea Arena. Securing grants through other sources is critical in the sustainability of this level of se • Carleton Community Centre Cheerleading Program at 205 participants and attendance to an international competition in R • Re- established free youth programs at Millidgeville and Forest Glen Community Centres in collaboration with the YMCA wi by Common Council. • Increased staff supervision and quality of programming at Somerset, Carleton, and C.E. Nick Nicolle Community Centre, ou playground programs. Youth to staff ratios were improved. • Community Centre Youth Arts Awards with 150 attendees. Recreation Program Partnerships • C.E. Nick Nicolle Community Centre — Focus as the Community Hub for the North End with O.N.E. Change expanding its role & Neighbours Working Together Community Partnership. The O.N.E. change assumed the responsibility for program and sE the North End neighbourhood in September of 2013. Throughout the phase 2 renovation period (September 2013 to May Nicolle Community Centre the O.N.E. Change will provide recreational and other opportunities at partnering neighbourhoc Lorne Middle School, Centennial School and the Main Street Baptist Church. Cultural Affairs • Responsible for coordinating the maintenance and repair of the City's public artworks and the installation of the 225th anni "Shards of Time" along Harbour Passage (to be officially unveiled in May 2014). • Awarded $30,000 in small grants for new arts and culture projects. • Ongoing annual coordination of seven art exhibitions at the City of Saint John Gallery and another seven at the Millennium Library). • Plans the scheduling of promotional signage at King's Square for not - for - profit organizations. • Planned and organized the Saint John Arts Summit III held Friday, November 1, 2013, with over 75 stakeholders attending. • Edits and approves all entries to the online City's Events Calendar and promotes events on social media. Following of over, 2014 Major Initiatives, Major Projects and Recreation and Cultural Program Service Delivery Highlights Recreational Programming • Organize a new special event in the summer of 2014 called "Passport to Parks ". The purpose of this program is to showcas citizen's awareness of the City's signature parks such as Rockwood Park, Dominion Park, and Little River Reservoir amongst Saint John Communication Service and Recreation Programming Service will work together on this initiative. • PlaySJ Implementation: Design a new recreation programming service delivery model in the Crescent Valley Community th eventual decommissioning of the Somerset Community Centre as the construction of the new YMCA proceeds. Cultural Affairs Programming • Work with the Saint John Arts Board to development a plan for moving forward the priorities identified at the Saint John A • Saint John Arts Awards — The Originals, a biennial recognition and celebration event to be held at Imperial Theatre in early • Saint John Remembrance Day Service, Harbour Station, November 11. • 2nd Biennial Sculpture Saint John, August & September. • 100th anniversary of the Signals Corps (Exercising the Freedom of the City), March. • Organizing seven new exhibitions at City of Saint John Gallery & Millennium Artplace. • Research and statistics related to funding of the arts in Saint John from federal and provincial agencies. • Secretary & staff support to Saint John Community Arts Board. • Unveiling of Saint John 225 legacy public artwork "Shards of Time" at Harbour Passage, May. • Ongoing maintenance and repair of City's public art Recreation Program - Service Levels and Resources Deliver programs (direct programming) that provide a wide range of artistic, cultural, social, educational and recreational opportunities that meet the interests of all ages, regardless of physical limitation or ability to pay. Manage contract agreements for community -based organizations to deliver recreation programs (indirect programming) on the City's behalf. Facilitate the delivery of special recreation, social and cultural programs in partnership with various organizations. • Operate and manage 2 Community Centres (SCC, CCC) each offering nightly and weekend program opportunities - 32 weeks • 15+ senior programs • 15+ inclusive /disability specific programs • 6+ direct programmed playground sites • 5+ playground sites supported through partnerships • 1 instructional junior tennis program in partnership with the local tennis club. • Contract agreements* with the YMCA, Boys & Girls Club, and ONE Change for 4 Community Centres (FGCC, MCC, SECC, NNCC) - 52 weeks • Integrated Day Camp at FGCC • Summer Camps at MCC • Playground Program at SECC & NNCC • Support 20+ community special events (e.g., SJ Sports Hall of Fame, Pavilion Cup, Winterfest, Soap Box Derby, Running Events) • 1 volunteer recognition event Ensure all citizens have access to inclusive recreation and leisure opportunities that meet the diverse needs of our community Benefits include: • Healthier citizens (physically, mentally, emotionally and socially); healthy communities and a healthy lifestyle • Investment in the future of our young people • Fostering cooperation and good citizenship • Positive behaviours • Involved community; developing leadership skill as well as developing physical, creative and social skills • Fun and enjoyment • Reduced crime • Stronger families • Connected community • Community pride and engagement • Celebration of community pride Current staff vacancies must be filled to attain service output targets; Staffing delay expected C.E. Nick Nicolle Community centre capital improvements impacts the full Wages & Benefits Goods & Services Grants PlaySJ Grants Total Expenditure Revenue Full Time Equivale Management Inside Workers Total FTE Part Time Position • Community Cer at 2 centres for • Playground Prol employees for 9 Critical Internal Su • Fleet — vehicles • Purchasing — as • Insurance —risk • Communication • Legal — agreemE providers • Parks /Landscai Facilities — prov functional park, farilitipe ra�nur Cultural Affairs Program — Service Levels and Resources Act as a point -of- contact with arts, cultural and multicultural community - based organization to promote awareness and support activities. Promote arts and culture events through social media outlets, web -based applications and signage. Provide support and /or facilitate various festivals and events annually. • 55 arts organizations • 24 cultural and multi - cultural organizations • 5,500 arts and cultural events posted in the Cyber - Calendar • Weekly bookings for signage in King's Square. • 12 events annual average Administer grant applications for the • $35,000 in grant funding available Saint John Community Arts Funding • 40 applications on average annually Program (small project oriented funding for festival ideas and new initiatives). Facilitate maintenance of public art and • 1 project annually (1% Public Art administration of the public art policy. Policy) • Number of maintenance projects varies annually Coordinate exhibits for showing at • 7 formal exhibits @ Art Gallery galleries. • 7 informal exhibits @ Millennium Art Place • Cultural Affairs program promotes broad community awareness of access to, and education, in the arts and culture sector. The service provides assistance and information services, as well as opportunities and support to artists and arts and cultural organizations; fosters cross - cultural understanding; and supports economic development of tourism, especially in the uptown core. It also works to increase awareness of the role and contribution arts, culture and heritage make to the City's economy and quality of life. Wages & Benefits Goods & Services Total Expenditures Full Time Equivalen Inside Workers Total FTE REPORT TO COMMON COUNCIL April 28, 2014 I a O FORlU M His Worship Mel Norton and Members of Common Council city of Your Worship and Councillors: SUBJECT: Sustainable Service Review — Growth & Community Development Sc BACKGROUND: Mandate Growth and Community Development services position the City for sustainable g enriched quality of life by creating new and renewed places where people want to live invest; and building strong communities where people feel safe and connected. Realigned in 2013, Growth and Community Development Services, position the organ the strategic delivery of services to implement P1anSJ - the City's award winning new Plan. P1anSJ is a 25 year plan to achieve the community's vision to transform Saint J more sustainable and liveable city by focusing growth and investment in areas where investments have been made to benefit the community as a whole. Adopted in 201: embedded in Council's priorities and the corporate strategic plan, PlanSJ is a h( integrated plan, setting direction for the City's growth and development and servic across the organization. A major objective of the alignment was to create a "one stop shop" for development t development approvals functions under one roof (previously three separate del positioning the City to better support and facilitate economic growth. The realigr positions the City for leadership in the strategic delivery of P1aySJ, the City's new- parks and recreation strategic plan. What services we deliver and why • Permitting and Inspection; • By law Enforcement; • Heritage Conservation; and • Infrastructure Development. 2. Community Planning and Enrichment Services which include the long range c planning and development approvals functions which support implementation and the recreation, culture and community development services. These servic( • Community Planning; • Economic Support — link to City's economic development agencies; • Geographic Information Systems; • Recreation & Cultural Programming; and • Neighbourhood Improvement. Growth and Community Development is a public facing service area that delivers services that are: • Regulatory — deliver community standards to ensure a safe and liveable comm] Department administers building and related bylaws which uphold nat provincial building codes and regulation to protect the safety of citizens a minimum standards and dangerous building programs to further enhance qualit our community. The Community Planning service prepares and develop; community land use plans to ensures growth and development is directed to s community's vision for sustainable growth. While municipal planning is not a service, if a municipality adopts a municipal plan it is required to implement zoning and subdivision bylaws and related development approvals proc regularly monitor and review its municipal plan. • Beneficiary — offer benefits to certain user groups which support economic p can reduce the City's tax burden through user pay models to recover costs delivery. Examples include: the building permitting and inspections servicf funded through permit fees paid by recipients of the service, building and cc industry, which in turn offsets the City's tax burden. Approximately 2( Departmental budget is offset by revenue generation. • Drivers for Quality of Life — many of our services while not legislative, are hig by our citizens — recreation and culture programming and neighbourhood imf enrich the quality of life of our residents and promote a healthy and livable c where people feel connected. City's overall operating budget. The Service area employs 47 staff with about operating budget from salary related costs. The Departmental Service based budget (attached to this report) reflects the focus ai Department. The Department delivers core operational services related to admini . regulatory approvals for development, heritage conservation, and bylaw enforcers Department also plays a key role in delivery of strategic initiatives (PIanSJ, P1aySJ result the departmental budget fluctuates to support delivery of these major programs project initiatives. Key focus areas for the Department in 2014: • Economic development support: In recognition of Council's priority for development and the unique role the City's development processes play in supportive environment for economic investment, the Department has prio delivery of a One Stop Development shop project. This is a three year coma deliver an integrated development model which will improve customer s development approvals, modernize bylaws and redesign processes to improve predictability for industry and facilitate economic investment in the City's grc There is also a significant focus on providing development and planning al support for major projects on the horizon to support economic prosperity of our • Enhanced By -law enforcement: continued focus on the momentum and succ dangerous building program to improve liveability and public safety an( reinvestment in our core neighbourhoods. Importantly this focused effort is results with the dangerous building program exceeding its targets. • Plan SJ implementation: In addition to new development bylaws to support I Community Planning team is targeting the delivery of a neighbourhood framework to Council by end of 2014. This framework will recommend a deliver neighbourhood planning to support reinvestment in growth areas id P1anSJ including priorities, staging and required resources to deliver a neig] planning program over the next five to ten years. The Department also leads a major strategic plans intended to support PIanSJ and will play a key role in sup] Transportation Master Plan. • PIaySJ implementation: With Council's approval of PIaySJ in 2013, a major the Department will be the transition to community development staffing mod, from direct programming to community partnership model to support long tern right size the community's recreational infrastructure and improve service to targetted for growth in PIanSJ. The Department is moving forward with The Last Five years: Departmental Service Improvement / Efficiency Efforts The Department remains committed to an ongoing program of continuous im initiatives that contribute to improving the overall effectiveness and efficiency of c Although the current structure of the Growth and Community Development Service number of initiatives have been advanced to improve service levels or implement effi the past five years: • PlanSJ support: In 2009, Council bolstered community planning resources I major rewrite of the City's Municipal Plan which was nearly 40 years out of d,, of step with the community's vision for a more sustainable Saint John. Historic John had been a leader in Community Planning; the City was one of the i country to develop a comprehensive plan when the Province of New Brunsw: nation in adopting the first Planning Act. Notwithstanding that early lead many decades the City focused its planning service on development appro` expense of its long range community planning program; a major consequer short term focus is the legacy of urban sprawl which continues to undo sustainability of our City. In 2009 a major course change was set by Council planning with positions added (3) and project resources established to enable effort to deliver a leading edge new municipal plan by 2012. During the 2C process Council renewed its commitment to advance PlanSJ implementatic 2014 Service based budget continues momentum on PlanSJ with updated de bylaws and delivery of a framework to support launch of the neighbourhoo( 2015. Going forward, this focus on PlanSJ is vital for the sustainability and prosperity of our community. • Core Service Review (2012): This broader corporate service review recc implementation of a "One Stop Development Shop" to realize the benefits of I Service alignment and to integrate development processes to bring our bu development service in line with best practices. The development approvals pi given a bronze ranking reflecting the need for improvement, specifically, coordination in the development process and need to bring more clarity and pr( to the City's process and bylaws. Council has made a three year commitrr implementation of the One Stop Development Shop with enhanced resource; until 2016 to move this forward. • Dangerous Building Program: In 2007 the City sought new legislative tool Province to introduce a new "Dangerous and Vacant Buildings Program" i address a significant issue with the condition of buildings in the City cau,, inspections service, diminishing the capacity and service response in this an three positions). • Planning Fees Review (2010): As a result of a comprehensive review ol application fees completed in 2010, two successive increases have occurred 2012 to improve the cost recovery for planning applications and better align ou peer municipalities in New Brunswick. Prior to 2012 fees recovered only If costs to process these applications. These fee increases were coordinated wi improvements to streamline routine development approvals with delegation o: making for routine applications to staff rather than the Planning Advisory C Building permit fees also were increased at this time. • Heritage Service Grants Review: Earlier this year a review of the City's Herit program was completed, to improve and streamline the heritage grant pro( ensure better accountability for these funds. These process improvements will in to allow the grant funds to better support heritage conservation outcomes. also seeking new tools that can benefit heritage and urban redevelopment as Province's Local Governance Reform initiative. • PIaySJ: A new Parks and Recreation Strategic Plan was adopted by Council guide delivery of recreation programs, facilities and services and ensure decision making over the next 10 -15 years aligns with the Municipal Plan ob promote sustainable growth and more complete communities. A significant P1aySJ is to right size our community recreational infrastructure to ensure the the recreation is enhanced in key areas targeted for growth in PlanSJ. The G Community Development Service will support delivery of the community p,- needed to move the City away from direct recreation program delivery to a c development partnership model. Looking forward: Future Considerations • Economic Growth: Although not a direct service provider, the Growth and C Development service plays a supportive role in the City's economic developmi through the Department's role as a facilitator of development process, ensuri and development meets the community's standards. A significant focus for C the Department moving forward will be the development and implementation c stop Development shop project which will deliver recommendations in 2016 engagement with Council the community and development industry. improvements will bring clarity and predictability to our processes, strea remove barriers for investments in the areas targeted for growth in PlanSJ After a five year decrease in building permit activity (since 2008), permit lever and beginning to rebound. The first quarter of 2014 is showing positive r significant economic activity is anticipated in our region over the course of the years with anticipated waterfront development, industrial investments and enei developments on the horizon related to the potential for the energy east pipeli Importantly, a significant share of development activity (about 90% of permits of construction) is occurring with the City's Primary Development Area to growth in PlanSJ. The Department is positioned to play a supportive role in these major projects, ensuring support and alignment with PlanSJ and de bylaws. As these projects move forward, it will be critical to ensure adequ; levels in the core development services to support timely and effective suppc major applications. • Legislative reform: The City is advocating for changes to the New Municipalities Act and Community Planning Act and various fiscal reforms as Province's Local Governance Reform initiatives. These reforms will c requirements for the City (new regulation, services and training) that the City M address in its service delivery in the Growth and Community Development Se example, requirements in the Building Code Act and regulations related to 1: access and energy efficiency will necessitate staff training programs. anticipated that the Province will continue to advance local government co: through the development of regional land use plans for regional service areas. Community expectations regarding enforcement of the City's developme continues to increase in particular as new bylaws are adopted (ZoneSJ) that wi bar on community standards. Re- aligning appropriate service levels to suf effective enforcement and ensuring adequate tools are place to support an enhai on this area will be an important consideration for the One -stop Develops project. • Demand for Planning Services long term: PlanSJ is a 25 year pla: implementation will be ongoing and involve: • Updating of development bylaws (zoning, subdivision, building, infrasti • Neighbourhood /Structure Plans in the areas targeted for growth in Plar • Service Plans to enable alignment of City services to support PlanS Transportation Master plan), • Delivery of a capital budget that supports PlanSJ outcomes, and • Plan monitoring which requires regular review and comprehensive reviews during the life of PlanSJ. community partnerships (One Change, YMCA) yield benefits to the communil of enhanced services and some cost savings, however, enabling these p, requires up -front investment of staff and financial support through facili capacity- building and a competitive grants process. To realize the full bene new model, the City will need to continue its investments in this area. ANALYSIS Maintain Service Level The continuation of delivery of Growth and Community Development programs an will require commitments of over seven million dollars in 2015 and 2016. These co required to maintain services delivery at current levels as well as supporting the c strategic programs including the development service review to implement a development shop model and program costs to support the launch of neighborhood p 2015. Service Reduction Scenarios As directed by Council, the Growth and Community Development Service has pre scenarios for discussion purposes to guide Council's consideration of service level opti of these scenarios involve service level reductions for the Department. Given Couni on economic development, both scenarios assume no reductions to the building and de related services that are core to our Department and the continuation of the service im initiative to implement a One -stop Development shop. The financial impact of the 2% scenario on the Growth and Community Development reflected in Table 1 and would result in a budget reduction of $237,000 in 2015. For purposes, it is proposed that this reduction be managed by deferral of the neigl planning program until the completion of the One Stop Development shop in 20 closing the Somerset Community Centre in conjunction with the YMCA opening in th Valley area, a direction supported by PlaySJ (facility savings of 30K). In this additional programming reductions may also be required to reduce of the amou recreational programs available in this area. Table 1: Financial Impacts of 2% Scenario- A 2% increase to 2015 & 2016 budges Budget Year Budget Allocation Resource Impact Potential Service Reductions 2015/ 2015 $71074,335 -237k • Neighbourhood plans delayed The 0% Scenario involves holding the line on 2014 costs for 2015 and 2016. T financial impact of this scenario would be a reduction of $380,000 from the G Community Development Service in 2015 (refer to Table 2). The reduction in this sa require more significant service level reductions in discretionary services with the neighbourhood planning until at least 2017, the closure of the Somerset Community potential elimination of free programming in Crescent Valley area, reduction of th playground program (from 6 sites to 2 sites), and reduction in discretionary c development funding and /or heritage grants. Table 2: Financial Impacts of 0% Scenario — No increase to 2015 & 2016 budgets Budget Year Budget Allocation Resource Impact Potential Service Reductions 2015/ 2015 $6,935,623 -376k . Neighbourhood plans delayed 2017(200K) 2016 $61935,623 -330k • Closure of Somerset Center it (30K) & reduction /eliminatio: free recreation programming at the Centre (70K) • Reduction of playground prod (50k) • Reduction of community development or heritage grans 45k) Service Level Impacts The reduction will require that the Department re -focus on core services related to prc regulatory approvals and reduce the delivery of discretionary, community valued including: • Neighbourhood Planning; • Recreation Programming; • Heritage /community development grants; For discussion purposes a number of service level options are identified to manage impacts: Potential Service Reduction Cost Savings Impact Closure of Somerset 30K Supported by PIaySJ, but potentially a Community centre in re- directed to support outreach partner coordination with YMCA opening /reduction in 70K Reduced access to recreational opporth: programming (free programming) in Crescent Valley Reduce Playground 50K Reduced access to programing; from 6 programming Reduce community 50K Loss of leveraging to support PIaySJ development grants implementation Reduce Heritage Grants 50% equals Loss of leveraged private sector invest. 45K the core area to support renewal of her assets One of the options to mitigate the service level impacts to other programs would b launch of neighbourhood planning until mid -year 2016 when the One -stop Develop project implementation is complete. This option while manageable from an perspective, has potential to delay private sector reinvestment in the growth areas and the momentum of PlanSJ. Of the recreation reductions, the closure the Somerset community Centre does align A can be supported by staff, however, Council has an option to reinvest these resource community based recreational service delivery partnerships. Staff recommends redii program funds for Somerset Centre to other programming opportunities in the Cresc community to ensure appropriate access to these important recreational programs. profile of our community (high poverty rates), the City does offer a significant amoun to free programming in its community centres and playgrounds, and over time, st" reviewing opportunities to better deliver these services to support directions in Pla community development fund (50K) although a new initiative is valuable in terms of community partnerships to support right sizing strategy laid out in PIaySJ. The Heritage grants program has been significantly reduced over the past five years (fi to 90k) and while discretionary, leverages significant private investment (and tax bas( in the City's urban core. The City through the City Manager's office is currently reviewing the City's conti community grants to ensure alignment with Council and corporate priorities, evaluatf on investment and ensure accountability for funds. The City would be best serve( funding levels for the Growth and Community Development grant programs until thi; Revenue Generation The Department generates approximately 1.4 million dollars annually in revenues. Re derived from a numbers of sources including: • Building permits; • Planning applications (subdivisions, variances, rezonings, section 39 agreerr amendments); • Recovery of demolition costs for dangerous building program; • Gas easements & licensing fees; • GIS fees to recover costs of data; • Recreational programming; and • PRO Kids funding contribution. A significant proportion of the Department's service costs are funded by developer i other user groups who benefit directly from the service being provided. The majo departmental revenues are derived from building permit fees which are serviced reflect the costs of provided the permitting and inspections service. Other GI Development services are subsidized or provide lower levels of subsidy by the tax example, Planning applications are subsidized given the market conditions and th support economic growth. Since 2010 the City has increased its cost recovery of applications from 15 to 30 %. Although the City provides a significant subsidy for tr we are in line with our NB peers (Moncton and Fredericton). The Heritage service impose an application fee and provides 100% subsidy for this service. Although increasing fees is an option, Council would be better served by holding t development service fees to enable review in the context of the service improvement ol come forward as part of the One Stop shop project in 2016. Staff would recommend th consider options related to increasing fees for noncore services (other bylaws), oppo increasing fees for non - compliance and graduated fee increases on a regular/ annu; reflect increasing costs. The City offers a significant amount of free recreational programming. Although the opportunities to recovery some costs for delivery of programs, the revenues wot adequate to cover shortfalls anticipated in either of the two reduction scenarios an carefully weighed against potential to create access barriers for our recreational prograi CONCLUSION New investment and new growth are essential for the long -term sustainability of our a Growth and Community Development Services play an important role in supportin investment and creating a positive environment for economic investment in our c. and implement these long term continuous improvement projects. RECOMMENDATION It is recommended that Common Council receive and file this report on the GY Community Development Service as an input into the 2015 budget process. Respectfully submitted, Jacqueline Hamilton, MCIP, RPP Commissioner, Growth & Community Development Services J. Patrick Woods, CGA City Manager Appendix A: Service Based Budget Breakdown of Growth & Development Servic Service Based Budget Breakdown of Growth & Community Developmel 2014 Expenditures Grants Revenui City /Departmental GCD Services Economic Development Service (Enterprise Saint John) 2,404,021 Community Planning & Development Service 1,648,084 2, 606,226 120,0 Heritage Conservation Service 309,971 300,000 Infrastructure Development 400,608 1 6,235,247 40,4 Permitting & Inspection Service 1,000,433 1,022,5 Geographic Information Systems 324,060 37,5 By -Law Enforcement Service Dangerous and Vacant Building Program 419,221 183,0 Minimum Property Standards Program 297,868 Other By -Laws 195,168 Animal Control 82,743 Total By -Law Enforcement Service 995,000 183,0 Neighbourhood Improvement Service Community Development 299,250 Recreational Centres (External) 30,450 HOPE Centre (Loch Lomond CC) 45,000 Neighbourhood Development Stimulation Grant 152,250 Community Development Fund 50,000 SJ Ability Advisory Committee 1,523 PIaySJ Neighbourhood Improvement 25,000 P.R.O. Kids 111,916 14,7 Total Neighbourhood Improvement Service 411,166 304,223 14,7 Recreation and Cultural Programming Service Recreation Programming 955,369 22,0 Boys & Girls Club 126,100 YMCA -FGCC /MCC 169,097 ONE Change -NNCC 158,194 PIaySJ- Recreation Programming 15,000 Cultural Affairs 118,317 Total Recreation and Cultural Programming Service 1,073,686 468,391 22,0 Total Operating Budget GCD Services 6,163,008 772,614 1,440,11 Net Service Budget Including Grants for GCD 6,935,622 Services Economic Development Related Services Tourism Service (Discover Saint John) 925,000 Economic Development Service (Enterprise Saint John) 2,404,021 633,2 Urban Redevelopment Service (Waterfront Development) 2, 606,226 1,226,8 Industrial Parks Development Service (SJ Industrial Parks) 300,000 Total Economic Development Related Services 1 6,235,247 1 1 1,860,0