Loading...
2013-01-21_Supplemental Agenda Packet--Dossier de l'ordre du jour supplémentaireCity of Saint John Common Council Meeting SUPPLEMENTAL AGENDA Monday, January 21, 2013 6:00 pm Council Chamber Si vous avez besoin des services en francais pour une reunion de Conseil Communal, veuillez contacter le bureau de la greffiere communale au 658 -2862. Pages 16. Supplemental Agenda 16.10 City Manager. DRAFT 2013 General Capital Budget 1 - 16 17. Committee of the Whole 17.1 Committee of the Whole: Proposed Plumbing By -Law Amendment 17- 18 Powered By: S' � i)E- 1 City of Saint John Common Council Meeting Monday January 17, 2013 Committee of the Whole 1. Call to Order Si vous avez besoin des services en frangais pour une r6union de Conseil Communal, veuillez contacter le bureau de la greffi6re communale au 658 -2862. Each of the following items, either in whole or in part, is able to be discussed in private pursuant to the provisions of section 10 of the Municipalities Act and Council / Committee will make a decision(s) in that respect in Open Session: 4:30 p.m. 8t" Floor Boardroom City Hall 1.1 Approval of Minutes 10.2(4) 1.2 Legal Matter 10.2(4)(f) 1.3 Personal Matter 10.2(4)(b) 1.4 Land Matter 10.2(4)(d) REPORT TO COMMON COUNCIL January 21, 2013 His Worship Mayor Mel Norton and Members of Common Council Your Worship and Councillors: SUBJECT: 2013 General Capital Budget INTRODUCTION Attached is the proposed 2013 Capital Budget for the General Fund. This budget has been prepared in support of the priorities adopted by Common Council, P1anSJ, and the need to invest in the City's capital assets. Each year, the proposed budget is the culmination of a number of months of work from staff in nearly all City departments to ensure that appropriate investments are made in the community's infrastructure. The General Capital Budget is separate and apart from the capital budget in the Utility fund so does not include water and sanitary sewer work. The budget includes important investments in: • Our transportation system; • Storm water management infrastructure; • Municipal facilities and buildings; • Information technology; • Fleet vehicles: • Our recreation facilities; and • Other municipal assets. This infrastructure enables and enhances the quality of life of our citizens and contributes to our economic prosperity. The net cost of capital expenditures incurred by a City is financed by way of formal debt obligations and contributions from other funding sources such as the Gas Tax Fund. The annual payments on these debt instruments are made through the operating budget and financed through the tax rate. Current global and local economic conditions have a very real impact on the City's ability to invest in its assets. The desire for a stable the tax rate, the need to maintain services and the importance of retaining an acceptable debt ratio serve to limit the City's borrowing capacity. Staff have prepared this budget on the basis that new debt should be kept in the range of $11,000,000. This does not include projects that are funded from other sources nor does it 1 2 include carry over projects from the approved 2011 and 2012 capital budgets. This level of expenditure is much better aligned with the fiscal capacity of the City of Saint John. Establishing the 2013 General Capital Program Staff followed a similar process to arrive at this proposed budget for the General Capital Fund as was pursued in 2012. Departments followed a process of submitting necessary projects for consideration which included the scope of work, a set of evaluation criteria, and the projected cost of the work. All of the funding requests from City departments, agencies, boards, and commissions were collated and a small team consisting of senior staff from Finance and Administrative Services and Growth and Development Services prepared the proposed budget with input from the City Manager. It should be noted that funding requests from various community groups were considered in the budget process for 2013 as well. In the instructions provided to City departments for the capital budget process, the following information had to accompany each request for funding: • Project Description • Funds Required: • City Share • Other Share (Province, Federal Government, Other) • An assessment of the relative significance of the project in terms o£ • Public or occupational health and safety; • An existing contractual requirement; • Whether the project is an identified Council priority; • Whether co- funding or cost sharing is available; • Whether the investment will increase municipal revenues or reduce City operating expenses; • Improved efficiency or effectiveness; • Whether the investment protects City assets; • An examination of whether the project implements the City's municipal plan and is consistent with the vision, directions, and policies of Plan SJ. • Whether the project is linked to a project identified for funding in the Utility Capital Fund or is linked to another capital investment (for example: a transportation project that is linked to a storm water or sanitary sewer project). As was the case in 2012, the number and value of capital funding requests for 2013 far exceeds the amount of money available in the budget. As a result, though many important projects were put forward it was necessary to prioritize the requests. The Proposed 2013 General Capital Fund Budget (Appendix A) Transportation and Storm Water (Drainage) Infrastructure Renewal Consistent with Council's priorities and the input received from citizens, the largest capital investments will be made in our roads and sidewalks and the ongoing efforts to address the drainage issues in the community. 2 3 Ongoing storm water management will be a significant component of the implementation of P1anSJ. Encouraging more compact and higher density development in the Primary Development Area means that our underground systems have to be able to handle the resulting storm water flows. Storm water management projects will be funded in the Boars Head Rd, Douglas Ave, Lower West Side, Loch Lomond Rd and University Ave areas in 2013. In addition to the increased funding commitment for asphalt renewal in the annual operating budget the 2013 Capital budget makes an additional $13M provision for curb and sidewalk renewal and $ I.OM for asphalt and road repairs through the Gas Tax Funding agreements. Reconstruction of Somerset St, and reconstruction of portions of Duke St, Loch Lomond Rd, Westmorland Rd are identified, as well as funding for preliminary design work for needed improvements to Hillcrest Dr and Prince William St. Economic Development The emphasis in the 2013 budget is on making targeted investments that will spur additional economic activity in our region. Provision is made to move forward with the Barge Terminal project in the Lorneville Industrial area in order to create new business opportunities for the manufacturing sector in our community. There is also an allocation to allow for the acquisition of additional property in the McAllister Industrial site in order to continue to be able to provide development ready sites for new or expanding businesses. The City will also invest in the extension of road infrastructure in the North End in order to facilitate a new multi - residential development in the area. As well, a significant investment is proposed for needed upgrades to the Trade and Convention Centre in order to encourage additional meeting and convention activity in the City. Recreation, Parks and Public Spaces Recreation and Leisure infrastructure play a key role in establishing the quality of life in a community. The largest single investment in 2013 will be in Phase 2 of the renewal of the Nick Nicole Community Centre in the North End. This project is consistent with the direction of P1anSJ and the Council's commitment to invest in our priority neighbourhoods. It is also proposed that the City begin a multi -year program of investments in the Canada Games Aquatic Centre. This facility is now almost 30 years old and in need of sustained renewal. The Aquatic Centre is an anchor facility in the Urban Core and enhances the attractiveness of the community as a place to live, work and invest. In addition, needed investments will be made in Harbour Station (chiller, fire alarms) and Mispec Park (Walkway to Beach). A $250,000 envelope has been provided to maintain a range of recreation infrastructure. The outcome of the PlaySJ deliberations will influence the nature of the particular investments in sportsfields, playgrounds and other assets in 2013 as well as capital planning in future years. 3 FAR Public Safety Recurring investments in safety equipment for the Fire Service (Gas Detection, Bunker Gear, Extrication Tools), a modern radio communication system for the Police Service and continued implementation of the SJEMO preparedness initiatives (Evacuation Signage, Public Notification System) are included in the 2013 budget. In addition, the City will purchase a new fire pumper to replace a vehicle in Station #1 as part of a planned replacement schedule. Engine 1 is a front line Fire Apparatus positioned on Leinster Street that was scheduled to be replaced last year. It is one of the busiest pieces of apparatus with its primary role being fire suppression throughout the Primary Development Area — Uptown, North, East and West. As anticipated, the apparatus has depreciated to a point where there are significant repair issues pending. The broad nature of the industrial and residential fire risks in Saint John dictates that our firefighters be equipped with a diverse set of emergency response skills. These skills need to be acquired and maintained on a regular basis in order for firefighters to safely and competently respond to our community's hazards as and when required. The standards, regulators, and community expect that our responders are fully competent to perform the task and role that they are being asked to perform. An appropriately designed fire training tower will enable first responders the opportunity to train on the diverse nature of the hazards within the Saint John Community. Technology and Communications The City's information technology hardware and software tools have become backbone infrastructure in the delivery of emergency services, financial administration, safe water, recreation and a host of other services. Annual investments are required to maintain the system and to assure its functionality. A portion of the annual cost is funded through the City's replacement reserve fund. Fleet Replacement Effective and efficient road maintenance, sidewalk clearing, and servicing water lines are dependent on the availability of proper equipment that functions well. The City uses a life -cycle approach to managing these assets with a view to determining the optimal replacement point and avoiding wasteful expenditures on maintenance for vehicles that have exceeded their useful life. The purchase of these assets is to be funded entirely through the internal replacement reserve. A detailed list of the proposed vehicles will be provided to Council prior to proceeding to tender. The proposed capital budget also includes the purchase of one additional Handi -bus for the Transit Commission in order to ensure that those most in need of public transportation benefit from the service. 4 5 Waterfront Development The City has invested heavily in various waterfront development projects and these have proven to be successful community attractions. These investments are also in keeping with the principles of PlanSJ that encourage strategic investment in the primary development area. Minor capital expenditures in 2013 will focus on maintaining the existing infrastructure (Boardwalk, Harbour Passage, Loyalist Plaza). It is hoped that the largest single investment will come from the private sector on the Fundy Quay site. The City completed acquisition of the Coast Guard property in 2012 and proposals have now been solicited from the development community. This is a prime site in the heart of the Uptown and the City should be insisting on a signature development that will be a source of pride in the community. The City will be responsible for environmental, legal, engineering and other services as part of the development process and funds are provided accordingly. Other Considerations There are a number of projects at various stages of development that are worthy of consideration. Exhibition Project — This is a major regional project that requires a substantial public investment in order to proceed. The Exhibition Association is pursuing this development and is seeking funding contributions from all three levels of government. The previous Council supported a funding commitment contingent on the project sponsors securing the full funding for the project and an understanding that the City would not be called upon to fund operations. This Council may want to consider a similar conditional approach in order to provide the Exhibition Association with some leverage when dealing with other partners however the project cannot be seen to interfere with Council's priority commitment to Safe Clean Drinking Water. Mispec Building — The Province and the City are committed to making additional investments in the walkway to the beach and providing ongoing summer maintenance. The existing on site building is beyond its useful life and the lack of change rooms and washrooms limits the enjoyment of the park. A major investment in canteen facilities is not warranted by the City however staff are investigating the installation of temporary washroom facilities and will be reporting back to Council. Trade Convention Centre — This facility generates business opportunities for hotels, restaurants, taxis and a range of other service providers. The City has a multi -year contract with the Hilton organization to operate the Trade Centre and with that an obligation to properly maintain the facility in order to ensure its competitiveness. It is anticipated that the allocation in 2013 will be the first in a multi -year commitment to restore the centre. Aquatic Centre — The Canada Games Aquatic Centre is approaching 30 years of service. This is unique facility is a core piece of public infrastructure and is ideally situated to support the direction of P1anSJ. The facility is however in need of modernization. The budget makes provision for some essential work on building systems but also provides funding for the City to develop a multi -year renewal program to guide future capital investments. 5 C*1 Market Tower Renovations — The City has applied under the Canada Infrastructure Improvement Fund to cost share needed upgrades to this building. The amount of work to be carried out will depend on the level of available funding. Development Incentives — There is a small envelope to honour `existing' commitments for residential incentives. Eligibility for funding under these former programs expires early in 2014. It is considered more important at this time to invest in our public infrastructure (storm drainage, roads, recreation) to encourage additional development than to provide development incentives. Development incentives that are tied to the implementation of neighbourhood plans could be considered in future capital budgets. Private Sector Participation — Discussions have been held with private sector partners interested in cost sharing various municipal projects. These are matters of negotiation and Council should be prepared to take advantage of these opportunities should mutually beneficial arrangements be concluded. Gas Tax Funding — The increased investments in roads and curbs is to be funded through the Gas Tax program. An amendment to the existing project list will be required and a new multi -year program will have to be submitted for the years 2014 and beyond. Carry -over projects — It often takes longer than one construction season to complete infrastructure projects. Likewise, delays in tender awards or property acquisition or other issues can sometimes mean that projects funded in one year are completed in a subsequent year. There are a number of capital projects already approved in the 2012 capital program that are currently underway or will be proceeding in the coming months. (Appendix B) CONCLUSION With limited resources the City must make hard decisions on the best use of public funds. A balanced approach guided by PlanSJ and Council's priorities that sees needed investments in our roads and transportations systems, provides the tools and equipment necessary to deliver services in an effective and efficient manner, makes strategic investments in our recreation infrastructure, supports redevelopment of our priority neighbourhoods, continues to address the challenging drainage issues across the community and encourages additional economic development in our City is proposed. The overall capital program is to be funded by internal reserves ($3,468,000), other agencies ($1,777,300), Gas Tax Funding ($3,225,000) and borrowing ($11,636,600). The projected borrowing is in line with our fiscal capacity and will allow the City to maintain a sound debt ratio. There are a number of additional capital investment opportunities open to the City however these are contingent on the outcome of other events and the availability of additional capital funds. The City should be prepared to act on these projects should the opportunity arise. 7 RECOMMENDATION That Common Council approve the 2013 Capital Budget for the General Fund in the amount of $20,106,900 (gross) with contributions from other sources of $8,470,300 yielding a capital budget in the amount of $11,636,600 (net) as set out in Appendix A. Respectfully submitted, J. Patrick Woods CGA City Manager ►l APPENDIX A 2013 GENERAL CAPITAL FUND BUDGET Page 1 of 5 BUDGET - OTHER BUDGET - CITY Project # CATEGORY DEPARTMENT DESCRIPTION SHARE SHARE Curb & Sidewalk Renewal - Neighbourhoods - Various locations. Transportation & Renewal of concrete curb and sidewalk including drainage 1 Transportation Environment 1,100,000 200,000 control and landscaping in conjunction with the annual asphalt Services roadway maintenance and rehabilitation program. GTF Transportation & 2 Transportation Environment Main /Chesley Intersection (traffic lights, poles, base, etc.) 200,000 Services Somerset Street - (RDH) - Wellesley Avenue to Samuel Davis Transportation & Drive. Street reconstruction (storm sewer, excavation, backfill, 3 Transportation Environment curb, sidewalk, landscaping), including design and construction 1,300,000 Services management services. (Pre- approved for 2013 as per M &C 2012- 207) Transportation & 4 Transportation Environment Hillcrest Drive - Manawagonish Road to Fenton Drive - Design Services 70,000 Transportation & 5 Transportation Environment Prince William Street - Design Services 80,000 Transportation & 6 Transportation Environment Asphalt roadway resurfacing - GTF 1,000,000 Services Transportation & Duke Street - Wentworth Street to Crown Street. Storm sewer, 7 Transportation Environment curb, sidewalk, landscaping, asphalt cold milling, paving, Services including design and construction management services 405,000 Loch Lomond Road - Saint Catherine Street to Westmorland Road including Westmorland Road Intersection. Road Transportation & reconstruction (excavation, backfill, curb, sidewalk, utilities, 8 Transportation Environment traffic lights, landscaping, paving) in conjunction with road 855,000 Services realignment as part of the One Mile Interchange project; including land acquisition and construction management services. Will seek to tender as part of D.O.T. contract Westmorland Road - At Loch Lomond Road intersection. Transportation & Intersection reconstruction to be done in conjunction with 9 Transportation Environment construction of One -Mile House Interchange including land 250,000 Services acquisition, design and construction management services. Will seek to tender as part of D.O.T. contract. Storm Water Management - Brentwood - Boars Head Road. Transportation & Construction of stormwater detention pond on Caledonia Brook 10 Storm Environment - High Pond "B ", including land acquisition, design and 1,125,000 500,000 Services construction management services. Subject to environmental approvals. Project to be funded under G.T.F. Page 1 of 5 APPENDIX A 2013 GENERAL CAPITAL FUND BUDGET Page 2 of 5 BUDGET - OTHER BUDGET - CITY Project # CATEGORY DEPARTMENT DESCRIPTION SHARE SHARE Transportation & Douglas Avenue - Civic #228 to Bentley Street. Install approx. 11 Storm Environment 300m of new 300mm storm sewer for separation, including 370,000 Services design and construction management services Storm Water Management - Brentwood - Various locations. Transportation & Supplemental funding for property acquisition for construction 12 Storm Environment - 250,000 of stormwater detention ponds in various locations in Services Millidgeville. Boars Head Road - Near Caledonia Brook. Construction of a Transportation & detention swale along Boars Head Road at the Aliant building, 13 Storm Environment installation of inlet control devices and a new storm sewer 375,000 Services outfall to Caledonia Brook from Boars Head Road, including design and construction management services. Transportation & Duke Street West - Watson Street to Ludlow Street. Installation 14 Storm Environment of approx. 140m of new storm sewer, including design and 250,000 Services construction management services. Loch Lomond Road - Russell Street to Westmorland Road; Transportation & Atlantic Avenue. Renewal of existing sections of storm sewer in 15 Storm Environment conjunction with road realignment as part of the One Mile 210,000 Services Interchange project; includes construction management services. Will seek to tender as part of D.O.T. contract University Avenue - Near Millidge Avenue Intersection. Removal Transportation & of catch basins from the University Avenue sanitary sewer and 16 Storm Environment - 55,000 connection to storm sewer, including design and construction Services management services. 17 Economic 600,000 Development SJ Industrial Parks Development Initiatives - Unallocated 18 Economic 1,500,000 Development SJ Industrial Parks Barge Terminal- Infrastructure Asset 19 Economic Environmental Delineation and Forst Mgmt Plan Lorneville Ind. 50,000 Development Si Industrial Parks Site 51 Trade & Change Carpet, Wall covering, new window treatment, new 20 Municipally owned Convention doors, hardware, install electronic key lock system, sign package 406,000 Facilities Centre and FF &E package Transportation & 21 Economic Environment Freedom Court - Street, Curb, Sidewalk, Landscape 100,000 Development Services 22 Economic 100,000 Development Planning Dept Development Incentive Program Page 2 of 5 APPENDIX A 2013 GENERAL CAPITAL FUND BUDGET 10 Page 3 of 5 BUDGET -OTHER BUDGET - CITY Project# CATEGORY DEPARTMENT DESCRIPTION SHARE SHARE Facility Renewal Fund - Various. Includes for the replacement and renewal of existing infrastructure such as sportfield assets, Transportation & playground, tennis courts and other facilities. Expenditures on 23 Parks &Public Spaces Environment - 250,000 neighbourhood level playgrounds will be dependant on the Services adoption of PlaySJ and the implementation of the'Adopt -a- park' strategy. 24 Real Estate & Facility Facility Building Renewal Program - Phase 1: Renovations & Additions, 140,000 Management Management North End Community Centre 25 Real Estate & Facility Facility Building Renewal Program - Phase 2: Interior /M &E /Life Safety, 1,300,000 Management Management North End Community Centre 26 Real Estate & Facility Facility 200,000 Management Management Building Repairs - Multiple locations 27 Municipally owned Canada Games 100,000 facilities Aquatic Centre Study for renewal of the Canada Games Aquatic Centre 28 Municipally owned Canada Games 133,000 facilities Aquatic Centre Capital improvement for Canada Games Aquatic Centre 29 Municipally owned Canada Games 70,000 facilities Aquatic Centre Boiler Replacement 30 Municipally owned 20,000 Facilities Harbour Station Fire Alarm Panel Upgrade 31 Municipally owned 120,000 Facilities Harbour Station Ammonia Chiller Replacement 32 Municipally owned Rockwood Park 25,000 facilities Golf Course Rockwood Park Golf Course capital contribution 33 Municipally owned SJ Free Public 45,000 Facilities Library HVAC replacement at West Branch Library (2013) 34 Municipally owned SJ Free Public 5,000 Facilities Library Floor surface replacement (2013 -2017) - Central 35 Real Estate & Facility Facility 227,300 29,600 Management Management Walkway to Beach and Shoreline Remediation, Mispec Park 36 Replacement (Bunker Gear, extrication tools, gas detection 183,000 Safety Fire equipment, rescue kits, etc.) 37 780,000 Safety Fire Fire Training Tower replacement 38 360,000 Fleet Fleet 1 Fire Truck 39 Police 50,000 Safety Commission Integrated Radio System - consultants 40 25,000 Safety SJEMO Implement Phase 2 of the Evacuation Sign Project - Part 1 (2013) 41 45,000 Safety SJEMO Public Notification System Development Project (2013) 10 Page 3 of 5 APPENDIX A 2013 GENERAL CAPITAL FUND BUDGET TOTAL CONDITIONAL LISTING 11 Page 4 of 5 8,470,300 $ 11,636,600 BUDGET -OTHER BUDGET - CITY Project# CATEGORY DEPARTMENT DESCRIPTION SHARE SHARE 42 Information 20,000 Corporate Technology Data Center 43 Information 30,000 Corporate Technology Security Audit - Full penetration audit (virtual and physical). 44 Information Applications and Systems (upgrades and implementation of 45,000 Corporate Technology ERP) 45 Information 15,000 Corporate Technology CGAC Network Upgrade 46 Information 25,000 Corporate Technology Camera (Web and CCTV) 47 Information 200,000 Corporate Technology Server Infrastructure Replacement 48 Information 468,000 Corporate Technology Computers funded through replacement reserve 49 3,000,000 Fleet replacement Fleet Fleet replacement 50 75,000 Transit Saint John Transit Garage Tools & Equipment 51 100,000 Transit Saint John Transit 1 Handi Bus 52 Economic Waterfront 105,000 Development Development Expansion Joint #2 - Smythe Street 53 Economic Waterfront 50,000 Development Development Harbour Passage Repairs /replacement 54 Economic Waterfront 15,000 Development Development Boardwalk Area refurbishment 55 Economic Waterfront 90,000 Development Development Fundy Quay re- development 56 Economic Waterfront 50,000 Development Development Loyalist Plaza & NM Slip refurbishment 57 Economic Waterfront 60,000 Development Development Eco -Hub infrastructure development 58 10,000 Corporate Clerk Purchase shelving for records centre/ archives 59 Capture records and information in one application, the 140,000 Corporate Clerk Laserfiche- Sharepoint Integration. 60 Facility 50,000 Energy Management Management Energy Management 61 Facility 50,000 Street Lighting Management Street lights 62 Parking 50,000 Parking lCommission I Parking Meter Replacement TOTAL CONDITIONAL LISTING 11 Page 4 of 5 8,470,300 $ 11,636,600 APPENDIX A 2013 GENERAL CAPITAL FUND BUDGET 12 Page 5 of 5 BUDGET - OTHER BUDGET - CITY Project# CATEGORY DEPARTMENT DESCRIPTION SHARE SHARE Real Estate & Facility Facility 63 Management Management Office Tower Renovations - Phase 1 (Building Envelope) 200,000 200,000 64 Exhibition Association 3,000,000 12 Page 5 of 5 APPENDIX B CARRY FORWARD PROJECTS 210 5985 Harbour front Condominium Plaza Economic Dev Energy 210 4153 Management Canada Games Aquatic Centre 1 Pumper Truck Fleet Fleet Management System IT Storm Water Management - Brentwood Storm Beach Crescent /Meadowbank Drainage Basin Storm 210 3630 210 1652 re 2013 carry -over I 2013 carry -over Type 50,000 18,700 Underway 260,000 42,200 Underway 956,798 930,000 Underway 150,000 3,600 Underway 235,000 225,700 Underway 25,000 22,000 Underway 350,000 50,000 Underway 71,450 35,000 Underway 500,000 560,000 Not Yet Started 140,000 140,000 Not Yet Started 210 Building - 357,000 Underway 210 210 1730 175,000 175,000 Management Street lighting - Upgrade and New Installation Building 210 7930 Management Rothesay Ave. Fleet Garage -New Fire Alarm System Building 210 7960 Management NECC, Building Renewal Phase 1: Additions and Renovations Building 210 7980 Management City Market NECC - Building Renewal Phase 2: Interior Building Renovations, M &E, Life Safety (Design Management 210 7978 Consulting and Construction Services ONLY) Building 210 7979 Management Loch Lomond Community Centre - Site Drainage Improvements 210 5985 Harbour front Condominium Plaza Economic Dev Energy 210 4153 Management Canada Games Aquatic Centre 1 Pumper Truck Fleet Fleet Management System IT Storm Water Management - Brentwood Storm Beach Crescent /Meadowbank Drainage Basin Storm 210 3630 210 1652 re 2013 carry -over I 2013 carry -over Type 50,000 18,700 Underway 260,000 42,200 Underway 956,798 930,000 Underway 150,000 3,600 Underway 235,000 225,700 Underway 25,000 22,000 Underway 350,000 50,000 Underway 71,450 35,000 Underway 500,000 560,000 Not Yet Started 140,000 140,000 Not Yet Started 210 3916 1,000,000 - 357,000 Underway 210 3927 - 175,000 175,000 Underway 13 Page 1 of 4 Honeysuckle, Sherbrooke Street Drainage I Dept /Div I Other Share City Share Storm Basin - HADD 210 Honeysuckle, Sherbrooke Street Drainage 220,000 215,000 Storm Basin - Ontario Street Underway Honeysuckle, Sherbrooke Street Drainage Storm Basin - Bleury Street Honeysuckle, Sherbrooke Street Drainage Storm Basin - Culvert #2 Honeysuckle, Sherbrooke Street Drainage Storm Basin - Molson Avenue Honeysuckle, Sherbrooke Street Drainage Storm Basin - Fundy Heights Honeysuckle, Sherbrooke Street Drainage Storm Basin - Lancaster Avenue Honeysuckle, Sherbrooke Street Drainage Storm Basin - Lancaster Mall Area Honeysuckle, Sherbrooke Street Drainage Storm Basin - Beaver Court Milford Drainage Basin - Balmoral Storm Crescent Rodney Terminal Storm APPENDIX B CARRY FORWARD PROJECTS :und I Dept /Div I Other Share City Share 2013 carry -over I 2013 carry -over Type 210 3928 220,000 215,000 Underway 210 3929 145,000 140,000 Underway 210 3930 375,000 25,000 Underway 210 3931 50,000 45,000 Underwayi 210 3932 - 185,000 10,000 Underway 210 3933 725,000 700,000 1,405,000 Underway 210 3934 - 495,000 485,000 Underway 210 3935 845,000 - 835,000 Underway 210 3936 - 145,000 140,000 Underway 210 3939 515,000 - 515,000 Underway 210 3941 860,000 975,000 900,000 Underway Loch Lomond Road Storm 210 3942 14 Page 2 of 4 21,000 21,000 Underway APPENDIX B CARRY FORWARD PROJECTS Project Work Type Fund Dept /Div Other Share City Share 2013 carry -over 2013 carry -over Type Frederick Street Storm 210 3943 60,000 40,000 Underway Seaton Street Storm 210 3944 50,000 40,000 Underway Allison Street Storm 210 3945 140,000 21,000 Underway Storm Water Management - Brentwood Storm 210 3946 150,000 150,000 Not Yet Started Storm Water Management - Brentwood Storm 210 3947 1,140,000 1,140,000 Not Yet Started 210 4151 1,100,000 32,000 Underway Transit shelters Transportation Loch Lomond Road Transportation 210 6985 25,000 10,000 Underway Rothesay Avenue Transportation 210 7210 50,000 80,000 71,000 Underway Bleury Street Transportation 210 7218 - 450,000 25,000 Underway Simpson Drive Transportation 210 7219 105,000 105,000 Underway Garden Street Transportation 210 7220 225,000 210,000 Underway Simms Corner/ Bridge Street Transportation 210 7225 400,000 375,000 Underway Westmorland Road Transportation 210 7226 25,000 25,000 Underway 15 Page 3 of 4 APPENDIX B CARRY FORWARD PROJECTS Project Work Type I Fund Dept /Div Other Share City Share 2013 carry -over 2013 carry -over Type - 80,000 80,000 Underway Loch Lomond Road Transportation 210 7227 Somerset Street Transportation 210 7228 350,000 1,100,000 1,100,000 Underway - 150,000 145,000 Underway Frederick Street Transportation 210 7229 Seaton Street Transportation 210 7230 - 140,000 f 140,000 Underway Frederick & Seaton Street Transportation 210 7232 300,000 - 50,000 Underway Harbour Passage Waterfront Dev 210 5959 100,000 70,000 Underway Coast Guard Site Waterfront Dev 210 5986 200,000 37,000 Underway Smythe Street Rehabilitation Waterfront Dev 210 5989 160,000 130,000 Underway Eco Hub -Fundy Quay Phase III Waterfront Dev 210 5988 40,000 40,000 Not Yet Started Harbour Passage - Fundy Quay Phase III Waterfront Dev 210 5959 100,000 10,000 Not Yet Started SJ Free Public Library Library 210 4154 45,000 2,000 Underway TOTAL 11,343,200 16 Page 4 of 4 A BY -LAW TO AMEND A BY -LAW RESPECTING PLUMBING IN THE CITY OF SAINT JOHN ARRETE MODIFIANT L'ARRETE RELATIF A LA PLOMBERIE DANS THE CITY OF SAINT JOHN Be it enacted by the Common Council of Lors d'une rdunion du conseil municipal, The City of Saint John as follows: The City of Saint John a ddcrdte ce qui suit : A By -law of The City of Saint John entitled "A By -law Respecting plumbing in the City of Saint John ", enacted on the 106' day of April, A.D. 2012, is hereby amended as follows: 1 Paragraph 5(2)(e) is amended by deleting the words "application fee" and replacing them with "permit fee ". Par les presentes, Farretd de The City of Saint John intituld « Arretd relatif a la plomberie dans The City of Saint John >>, ddcrdtd le 10 avril 2012, est modifid comme suit: 1 L'alinda 5(2)(e) est modifid par la suppression des mots « droits de demande » et leur remplacement par «frais de permis >>. 2 Subsections 9(2) and 9(3) are repealed and 2 Les paragraphes 9(2) et 9(3) sont abrogds et replaced with the following: remplacds par ce qui suit: "9(2) The Plumbing Inspector may, if the conditions leading to the permit revocation are subsequently corrected, reinstate the permit." IN WITNESS WHEREOF the City of Saint John has caused the Corporate Common Seal of the said City to be affixed to this by -law the day of , A.D. 2012 signed by: Mayor /Maire «L'inspecteur plombier peut retablir la permis si la situation it l'origine de la revocation est ultdrieurement corrigde. » EN FOI DE QUOI, The City of Saint John a fait apposer son sceau municipal sur le prdsent arrdtd le 2012, avec les signatures suivantes : Common Clerk/greffiere communale First Reading - Premidre lecture Second Reading - Deuxieme lecture Third Reading Troisieme lecture IN