2012-12-01_Agenda Packet--Dossier de l'ordre du jourr
i
City of Saint John
Common Council Meeting
AGENDA
Saturday, December 1, 2012
9:00 am
Council Chamber
Si vous avez besoin des services en francais pour une reunion de Conseil Communal, veuillez contacter le
bureau de la greffiere communale au 658 -2862.
1. Call to Order
1.1 City Manager: Expectations and Outcomes
1.2 Service Area Presentations
1.2.1 Transportation & Environment Services (Roads and Sidewalks)
1.2.2 Recreation & Community Development
1.2.3 Growth and Development Services
1.2.4 Saint John Transit Commission
1.2.5 Fire Services
1.2.6 Policing Services
1.3 Core Service Review: Opportunities for Service Efficiencies and Improvements
1.4 Council Direction
1.5 City Wrap -Up
2. Approval of Minutes
3. Approval of Agenda
Powered By:
1
Pages
1 -15
16 -22
23-28
29-35
36-49
50 -58
59 -70
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
Disclosures of Conflict of Interest
Consent Agenda
Members Comments
Proclamation
Delegations / Presentations
Public Hearings
Consideration of By -laws
Submissions by Council Members
Business Matters - Municipal Officers
Committee Reports
Consideration of Issues Separated from Consent Agenda
General Correspondence
Supplemental Agenda
Committee of the Whole
Adjournment
2
The City of Saint John
S6ance du conseil communal
Le samedi I" d6cembre 2012
9 h Salle du conseil
Si vous avez besoin des services en frangais pour une r6union de Conseil Communal,
veuillez contacter le bureau de la greffiere communale au 658 -2862.
S6ance ordinaire
1. Ouverture de la s6ance
1.1 Directeur g6n6ral : Attentes et r6sultats
1.2 Pr6sentation des services
1.2.1 Services de transport et d'environnement (routes et trottoirs)
1.2.2 D6veloppement des loisirs et d6veloppement communautaire
1.2.3 Services de croissance et de d6veloppement
1.2.4 Commission des transports de Saint John
1.2.5 Services des incendies
1.2.6 Services de police
1.3 Examen des services de base : Occasions d'am6lioration des services et
d'accroissement de leur efficacit6
1.4 Direction du conseil
1.5 Conclusion par le repr6sentant municipal
2. Approbation du proces- verbal
3. Adoption de 1'ordre du jour
4. Divulgations de conflits d'int6rets
5. Questions soumises a 1'approbation du conseil
6. Commentaires pr6sent6s par les membres
7. Proclamation
8. D616gations et pr6sentations
9. Audiences publiques
10. Etude des arretes municipaux
11. Interventions des membres du conseil
12. Affaires municipales evoquees par les fonctionnaires municipaux
13. Rapports deposes par les comites
14. Etude des sujets ecartes des questions soumises a 1'approbation du conseil
15. Correspondance generale
16. Ordre du jour supplementaire
17. Comite plenier
18. Levee de la seance
Serving mobility and environmental needs
r Ale
Roadway Maintenance
$1311581400
$1315615415
$403,015
Sidewalk Maintenance
$1,319,948
$1,410,489
$90,541
Pedestrian & Traffic
$1,620,138
$1,684,801
$64,663
Stormwater Management
$3,324,138
$35366,348
$42,210
Solid Waste Management
$3,965,640
$3,568,529
($397)111)
Transportation Engineering
$459,351
$5417450
$82,099
Parks & City Landscapes
$2,6087817
$256547267
$45,450
Sports & Recreation Facilities
$3,395,542
$3,711,512
$315,970
Service Total
$295959,862
$30,498,812
$5387950
SAINT JOHN
F Ale
Providing motorists and cyclists with safe, functional roads and
maintaining accessibility of these roads through all seasons
Street Cleaning
Snow and Ice Control
Surface Maintenance
Total
$1,783,921
$4,433,349
$6,941,130
$137158,400
3
$1,749,414
$5,000,889
$6,811,112
$13,5611415
SAINT JOHN
F Ale
100
85
U 70
a
d
rn
L
d
a 55
40
25
10
Total Average Pavement Condition (PCI)
for all City of Saint John Streets (asphalt surface only)
� PCI 70 PCI Target
F11
d
c
U
a
11 -i„
jr
SAINT JOHN
F Ale
• The Pavement
Condition
Index (PCI) is a
number value
between 0 and
100 and is
used to indicate
the condition of a
pavement
• The PCI is a statistical measure and requires visual
inspection of the pavement surface
• Pavement defects such as cracking, rutting, raveling, utility
reinstatements, etc. decrease the PCI
• The PCI is a widely used and accepted practice in
Transportation Civil Engineering
SAINT JOHN
• Asphalt maintenance of roadway surface to maintain a
network PCI of 70 for 2012
37 lane km of resurfacing $2,327,300
14 lane km of microsurfacing $410,000
7 lane km of chip sealing $130,000
20,000 lineal metres of crack sealing $1001000
4,500 square metres of area patching $200,000
Total $3,167,300
SAINT JOHN
r A&
M
Funding Level
Lane Kms Completed
Pavement Condition Index
$27737,300
51
73.700
$2,987,300
74.645
An adjustment in funding in increments of $250,000 results
in +/- 3.98 lane kilometres of asphalt resurfacing
The effect on the PCI is +/- 0.945
3.98 lane kilometres is the approximate length
of Dever Road or Prince Street
SAINT JOHN
F Ale
Objectives
• Current PCI objective is 70 ($3,100,000)
• To maintain a PCI of 80 the following funding would be
required:
— Operating budget 2013 and beyond $4,404,500 (2012 - $3,100,000)
— Capital asphalt resurfacing $1,500,000 (2012 - $0)
— Operating curb and sidewalk $150,000 ($1505000)
— Capital curb and sidewalk $2,100,000 ($500,000)
• This allows gradual removal of local streets from palliative
SAINT JOHN
W
• Repair potholes, asphalt damage and shoulder drop -offs
within the timelines set, after becoming aware of the fact,
80% of the time
— 1,400 potholes (average)
— 300 other various types of asphalt repairs (water roll, asphalt
sidewalks, curbing)
— 1,400 metres of road shouldering (average)
SAINT JOHN
rA
Funding Level
Lane Kms Completed
$750,000
28.75
$9007000
34.50
An adjustment in funding in increments of $150,000
results in +/- 5.75 lane kilometres
10
SAINT JOHN
F Ale
• Plow
all streets of snow
within
the City's road network to
meet
service objectives
after a
storm event 100% of the time
Priority 1 8 hours — bare travel lanes
SAINT JOHN
2
days —
bare curb to curb
Priority 2
8
hours —
bare centre line
2
days —
bare travel lanes
Priority 3
12 hours
— bare centre line
3
days —
bare travel lanes
Priority 4
12 hours
— accessible /packed
4
days —
bare centre line
SAINT JOHN
F Ale
Providing pedestrians with safe and functional sidewalks,
walkways and access ramps
Sidewalk Maintenance
Snow and Ice Control
Total
$557,746
$762,202
$1,3199948
12
$517,232
$893,257
$1,410,489
SAINT JOHN
W
• Plow 61 % of the sidewalks in the City to the standards set
out below 95% of the time
— Plow a pedestrian passage
• Priority 1 within 12 hours
• Priority 2 and 3 within 24 hours
• Priority 4 within 72 hours
— Plow to a walking surface with traction standard
• Priority 1 within 2 days
• Priority 2 and 3 within 3 days
• Priority 4 within 4 days
13 rte-
SAINT JOHN
r A&
Funding Level $762,202
$785,302
% of Sidewalks Completed 61% 66%
An adjustment in funding in increments of $23,100
results in +/- 5% of sidewalks plowed.
Option A would result in capital cost increase to
purchase new unit (Trackless - $100,000)
14 r4 -)-
SAINT JOHN
rA
• Community Expectations
• PlanSJ Alignment
• Snow Plowing Contract?
• Property Owner Participation
• Contractor Practices
15 rte-
SAINT JOHN
Recreation & Community Development
W
Growth & Planning
Services
• Policy and Current
Planning (land -use,
transportation, recreation,
infrastructure)
• Heritage Conservation
• Development Engineering
Permitting &
Inspection Services
• Permitting and Inspection
• By -Law Enforcement
Development
Support
Geographic
Information Systems
City of Saint John Service Alignment
• Fleet Management
Solid Waste Water & Sanitary Real Estate
Collection Engineering Faci ities Management
Purchasing and Materials
h1 I
Transportation & Envir- anagement / nsurance
onment Engineering
C ks and Public Spaces nd City Landscape ion and Sports 7
s
Human
Resources
Corporate
Planning
Policy Analysis and
Development
• Service -Based Budget
Planning
Intergovernmental
Affairs
Corporate
Communications
Information Technology
Systems
Neighbourho
Roadway
Drinking
Financial
Improvement
Maintenance
Water
Management
• Accounting
Recreation and
Sidewalk
Industrial
Treasury
uRural Programmin
Maintenance
Water
Payrol
Fire and Rescue
Pedestrian and Traffic
Pension
Services
Management
Wastewater
Administration
Emergency
Stormwater
Utility Business
Asset
Management
Management
Management
Management
• Fleet Management
Solid Waste Water & Sanitary Real Estate
Collection Engineering Faci ities Management
Purchasing and Materials
h1 I
Transportation & Envir- anagement / nsurance
onment Engineering
C ks and Public Spaces nd City Landscape ion and Sports 7
s
Human
Resources
Corporate
Planning
Policy Analysis and
Development
• Service -Based Budget
Planning
Intergovernmental
Affairs
Corporate
Communications
Information Technology
Systems
r Ale
• Service objectives
— Deliver programs (direct) inclusive of arts, culture and recreation
— Manage community -based indirect programming agreements
— Facilitate delivery of special programs in partnership with community -
organizations
— Community development through partnerships and guidance
— Administer community grants program
• Budget and resource requirements (2013 projected)
— Recreation Programming - $1,241,593 (4.45 FTE / 27 part -time)
— Neighbourhood Improvement Service — $655,692
• Community Development - $545,276 ( 3.05 FTE)
• PRO Kids - $110,416 (1 FTE)
18
SAINT JOHN
Council Priorities: Community of Choice
— Implement policies that create a livable community, one that has vibrant
neighbourhoods and provides diverse and accessible opportunities to
engage in arts, culture and recreation in a safe and caring environment.
— Implement a city -wide strategic recreation plan that 'right- sizes' the delivery
of recreation programs and facilities for our diverse population.
Community
— Community Development: Build community capacity to respond to
opportunities, issues, and concerns at the neighbourhood level. Programs
and services aligned to meet neighbourhood needs. Sustaining
neighbourhoods and community.
— Ensuring all citizens have access to inclusive recreation and leisure
opportunities that meet the diverse needs of our community.
19
SAINT JOHN
rA
• Revised service objectives
- Community centres shall provide a "free" recreation program component for a
minimum of 31 weeks
- Improved staff - participant ratios for higher quality programming
- Improvement in quality and quantity of community partnerships
• Increase in Service Levels (for consideration)
- Improved skill set of staff resources and staffing to strengthen recreation
programming and community development $70,000
- ONE Change Proposal to Operate the C.E. Nick Nicolle Community Centre
$59,270 ($29,365 (2013) / $29,365 (2014)
- Enhancing Youth Participation: Staff Ratio (Current 15:1 to 10:1) - $72,500
- Supporting Free Based Programs at MCC /FGCC (Operated by YMCA) $60,000
- Lifeguards - Extend Coverage from Aug 18 to Sep 2 - $30,000 (+ $118,000 base)
- Increasing community development grants to leverage support - $75,000
20
SAINT JOHN
W
• PLAY SJ: Recommendation to change role of Recreation Programming
Service from direct program provider to facilitator.
— Impact: Greater focus on community engagement and empowerment / less
focus on direct programming.
— Impact: Redirect existing budget that supports direct programming to
community development service which supports neighbourhood
organizations in program development , delivery and sustainability.
• Eliminate funding, define alternative service delivery or initiate closure of
Somerset Community Centre (discussions with YMCA)
• Possible loss of corporate knowledge in the next 3 - 5 years through
staff retirement
• Risk of additional fees being levied by the School District for use of
space for Community Centre operations (gym & rooms). Joint Use
Agreements must be revised and updated through an Interagency tea
(Anglophone South School Distridand City of Saint John staff) 4*10-
SAINT JOHN
rA
• Focus on quality over quantity —right - sizing (Council
Priority)
• Improve operational efficiency for parks and sportsfield
maintenance with strategic placement of service `depots'
• Rationalize operation of City arenas based on utilization
(particularly Monday to Friday) —needs additional analysis
22 rte-
SAINT JOHN
Development Approval Process and
Vacant and Dangerous Building Program
23
r Ale
The GOAL is a "One Stop Shop" for citizens and developers.
Creating a service that:
Provides dramatically improved customer and developer
service;
Results in obvious improvement in development quality;
Facilitates comprehensively planned development that:
• Implements PlanSJ on the ground;
• Improves quality of life for our residents;
• Enhances the profitability of businesses in our community; and
• Reduces future costs for the City of Saint John that arise from haphazard
development.
24
SAINT JOHN
rA
A substantial body of work must be completed before
this goal can be accomplished:
— Council and the community need to decide what type of process they
want.
— A number of bylaws need to be developed or rewritten:
• Zoning By -law (required by provincial legislation);
• Building By -law (required by provincial legislation);
• Subdivision By -law;
• Water and Sewer By -law;
• Storm Water Management By -law; and
• Streets and Sidewalks By -law.
— Infrastructure Development Guidelines need to be prepared.
— The desired development process needs to be designed and
implemented with citizen and deyploper input.
SAINT JOHN
Council has other ambitious goals that impact services provided
by Growth and Development including:
— The development of a neighbourhood planning framework
and the preparation of neighbourhood plans.
— A more collaborative relationship with the development
community.
— Very likely, substantial changes to the delivery of the
heritage conservation service.
26
SAINT JOHN
rA
0
Scenario
Scenario # 1 — Existing
Staffing,
Implementation of One
Stop Shop 2017
Scenario # 2 — Full
Staffing,
Implementation of One
Stop Shop 2016
Scenario # 3 —
Enhanced Staffing,
Implementation of One
Stop Shop 2015
Budget and Staffing
Total Budget $2,722,842
FTE 22.5 (3 Planning vacancies + loss of
0.5 FTE in Infrastructure Development)
Vacancies not filled except for
Commissioner
* *Department will be under budget due to
vacancies
Total Budget $2,722,842
FTE 22.5 (Planning vacancies filled a loss
of 0.5 FTE in Infrastructure Development)
* *Vacancies will not be filled January 1St
Total Budget $2,902,842
FTE 24.5
+2 FTE contract /temporary (1 each in
Infrastructure Development and B @Ading
Inspection
2013 Output
Building By -law - 25% complete
Zoning By -law - 75% complete
Infrastructure Guidelines - 25% complete
Neighbourhood planning does not begin in 2013.
Building By -law - 75% complete
Zoning By -law - 100% complete
Infrastructure Guidelines - 25% complete
Subdivision By -law - 25% complete
A modest beginning to neighbourhood planning
happens in 2013.
Building By -law - 100% complete
Zoning By -law - 100 % complete
Infrastructure Guidelines - 100% complete
Subdivision By -law - 25% complete
Stormwater Management By -law - 25% complete
Water & Sewer amendments - 25% complete
rA
Note: The service level enhancement is essentially a full restoration of the 2011
level of service.
2s
SAINT JOHN
Current Service
Service Level
Enhancement
Number of Cases
8 / year minimum
20 / year minimum
Budget
$135,693
$3407693
Extra costs are salary, legal
and title searches, and
additional demolition costs
Staffing
1.35 FTE
2.35 FTE
Cases Resolved
36 (Based on 2012
67 (Based on 2011
Experience)
Experience)
Note: The service level enhancement is essentially a full restoration of the 2011
level of service.
2s
SAINT JOHN
� Saint John Transit
Commission
2013 Budget Considerations
• • Saint John Common Council
December 1st, 2012
1.
2.
3.
Ej
5.
2009 Service
PPPPP"- Standards
119,427 Service Hours Required to Meet
Following Standards
Service within 500 m of 85% of city residents
Service on main lines from Gam to 12pm
1. Every 20 minutes during peak
2. Every 30 minutes off peak
Service on feeder routes from 6am to 10pm
1. Every 30 minutes during peak
2. Every 60 minutes off peak
Suburban service within City Monday to Friday;
1. 3 trips in the morning and 3 trips in the evening
Comex Service (as requested) at net financial benefit to City
30
SAINT JOHN TRANSIT
2012 Current Service Level
96,318 Service Hours
Represents a 19% reduction in service hours
and a 15% reduction in staff from 2009
Resulting ridership decline of approximately
4 passengers from 2009 ( -15%)
31
lc=7!
SAINT JOHN TRANSIT
2013 Service Objective
• To maintain a minimum of 2012 Service
hours
• Operational Budget required to meet this
objective:
$4,800,000.00
32
SAINT J OHN TRANSIT
ervice level Alternatives for Consideration
• For every $100,000 in additional
operational funding Saint John Transit can
add 2,000 service hours to the 2012 service
level.
• For every $100,000 decrease in funding.,
Saint John Transit will need to reduce
service by another 2,000 service hours.
33
SAINT JOHN TRANSIT
Changes to be Considered
• Decreases:
Route Elimination
• Increases:
1) Earlier morning Startup
2) Re- instate evening service to 10 pm
3) Improve frequency from West to Hosp /UNB
34
SAINT J OHN TRANSIT
Jon Service Revenues for 2012
Januaryl to October 31, 2012
Charters 105,075.00
Cruise Ship tours 49,541.00
School Board 331,819.00
Space Rental 35,093.00
Bus Advertising 49,550.00
35
SAINT JOHN TRANSIT
December 1, 2012
Kill
rA
Fire Services
Fire Rescue and Suppression Service
Medical First Responder
Technical Rescue
Hazardous Materials Emergency Response
Fire Prevention - Code Enforcement
Fire Investigation
2012 Budget 2013 Budget 2013 Revenue
$19,446,868 $191428,400
$71,640
$55,981
$115,413
$918,761
$20,600
Annual Budget $20,629,263
$86,000
$63,607
$121,427
$963,498
$21,055
$20,683,987
$193,650
$100,000
$4,000
$297,650
37 rte-
SAINT JOHN
F Ale
FIRST APPARATUS ON SCENE:
The 1991 Ernst and Young Report recommended a response time
objective (for 1St arriving company) of 5 minutes and 30 seconds
90% of the time (turnout and travel times combined).
The 5 minute and 30 second first apparatus response time is
consistent with the Core Service Review Peer Comparables
• The response time objective is met 72% of the time
84% of all fire service calls and 94% of all fire calls are within the
Primary Development Area (PDA) (2010 to 2012 data).
38 rte-
SAINT JOHN
rA
SAINT JOHN
r Ale
100.0%
90.0%
80.0%
70.0%
60.0%
0
no 50.0%
c
a
u
a 40.0%
30.0%
20.0%
10.0%
0.0%
Response Times Chart (turnout and travel times)
OLpy Loy `o�y so3 LQA• Loh• Lob• LO1'• LQ�• Logo• `tiy.
SP ov
40
2010
—2011
—2012
01- 7„
SAINT JOHN
i
i
i
i
y Response Objective: First Fire Company to arrive on scene
within 5' 30" ninety percent of the time,
from the completion of dispatch (i.e.
turnout and travel time).
Measured Outcome: On average, the first Fire Company is
arriving on scene within 5' 30" only 72% —
of the time.
On average, the 90 percentile result for _
the first arriving company is not
achieved until about the 8 minute mark
(i.e. turnout and travel time).
i
OLpy Loy `o�y so3 LQA• Loh• Lob• LO1'• LQ�• Logo• `tiy.
SP ov
40
2010
—2011
—2012
01- 7„
SAINT JOHN
r Ale
FULL RESPONSE:
• The service level objective for an urban fire response is 4
companies (on scene) within 8 minutes travel time (1991 Ernst &
Young).
• The Full Response service level is consistent with the Core Service
Review Peer Comparables
• The service level objective is achievable for 8% of the PDA and 2%
of the city.
• Our Fire Stations are all located within the PDA and are part of the
urban fire service .
41 rte-
SAINT JOHN
r Ale
A
2012 Service Level — The pink shaded area represents that portion of the PDA and the
city which can be covered by a full response (4 companies) within 8 minutes travel time.
This represents a low hazard occupancy response for an urban fire department.
Fire Service Response-Four Company- Eight Min Travel Time
C11Y Fire 511,11n Cily
-L—ju
—rlr_
Saint John Fire Deaprtment
Current 2012 State
NFPA 1720 Urban Standard
4 Company Response
Fire Station
8 Min Reponse Zone
Primary Development Area
Plan SJ
.� & r-
TIV
SAINT JOHN
W
In the 2009 - Fire Chief's Report, over 20 options were explored,
included the following:
• Elimination of a fire company
• Elimination of a fire station and redeploy of the company to
another station
• Elimination of a fire station and fire company
• 2012 reduced one fire apparatus 16 people
• Impact of further reduction
43 rte-
SAINT JOHN
3
-' J �M�/"2 + �, �(� / ��(� •J 0 <'�1 +���� .. III s i L` /
II I
2013 Service Level Reduced — The pink shaded area represents that portion of the
PDA and city which can be covered by a full response (4 companies) within 8 minutes
travel time. This is for a low hazard occupancy response for an urban fire department.
Fire Service Response 2013 -Four Company- Eight Min Travel Time
Ury�re Servke Area
PM Fire 6eMie Are9 [iP,241655 GII PoInIS GIy FIre Servke Glls DA Fire SeM<..11, BMMIm.OYrypbolbm
P. 1pe1i4Mi° or.ral 1,1911on0ms P 6,3i61tt '0 11' �
2009 -2031 2009 -2011
Rt
JL
Mt
Saint John Fire Deaprtment
Proposed 2013 State
NFPA 1720 Urban Standard
4 Company Response
Fire Station
8 Min Reponse Zone
Primary Development Area
Plan SJ
SAINT JOHN
W
• Under a reduced service level model, the portion of the PDA that
can be covered by a full response reduces to 4 %. City wide
reduces to 1%.
• Evidence Based Date:
- The longer it takes for a full response, the longer it takes to initiate a
full attack.
- Time equates to fire growth and fire growth equates to fire lose.
- We will lose in ability to contain some fires to their area of origin,
which could result in fire spread throughout the building or to adjacent
buildings.
45 rte-
SAINT JOHN
Fire Service Supports Council Priorities:
• Public Safety
• Tax Base
• Industrial Development
• Heritage Development
46 rte-
SAINT JOHN
W
• Three consecutive IPSOS Reid surveys stated that the citizens place a
high level of importance and are highly satisfied with the fire service.
• Service SJ workshops message was to review the tiered EMS response.
• A further reduction
in fire
response
capabilities will have an
impact on
fire response and
could
contribute
to a tax
base
loss within
our
community.
47 rte-
SAINT JOHN
F Ale
• Implement a staffing formula to provide effective response for the PDA
and rural areas of City that aligns with comparable jurisdictions.
• Consider reduction of instances of multi -level emergency response.
• Implement permit and fees for structures that present fire risk on
properties (i.e. fire pits). BY -LAW
• Review and implement increases to inspection fees or fines for non-
compliance to support cost recovery. BY -LAW
• Investigate opportunities to generate revenues through the skills that fire
personnel require to service industry (training) - valid certification
48 rte-
SAINT JOHN
r Ale
• Investigate alternative sources of revenue via charging for services
rendered by Fire Department (i.e. Point Lepreau)
• Investigate cost recovery mechanisms for response requiring technical
rescue service. BY -LAW
• Investigate EMS delivery in the region
• Develop strategy around addressing false alarms and cost recovery. BY-
LAW
• Investigate opportunity for regional fire services
• Investigate fleet maintenance opportunities
49 rte-
SAINT JOHN
Saint John Police Force
50
r Ale
the Police Force is committed to the City Growth agenda
• Economic Health: "Deliver an integrated approach
to economic development." = Security of Investment
• Community of Choice: "Implement policies to create
a livable community..." = Quality of rife
• Community of Choice: "Implement policies to create
a livable community... in a safe and caring
environment." = Public Safety
51 rte-
SAINT JOHN
1
• 2010 Report prepared for Board of Police Commissioners.
• Demonstrates that investment in Crime Reduction
is returned almost 10x in public and victim savings.
• Also demonstrates that a focus on Crime Reduction
also increases community Quality of Life in that
Fear of Crime is reduced, empowerment and
engagement is increased, and victimization is reduced.
• Presented to and favourably received locally (e.g. BoT),
Provincially, and Nationally (Cdn Assoc. of Police
Boards.)
52 r4 -)-
SAINT JOHN
F Ale
• Service Objectives
• Crime Reduction
• Priority Neighbourhoods
• Residential Quality of Life
• 2012 Service Adjustments
• Administrative Support Sgt reassigned to Platoons
• 3 dedicated Traffic Officers reassigned to Platoons
• Reduction one officer Community Services Unit
• Court Unit officer reassigned to Platoons
• Major Crime investigation reassigned to Platoons
• Staff Sergeant position left vacant
• Public Information Officer & Professional Standards merged
• Two Civilian positions 53
SAINT JOHN
rA
• No- layoff clause in Collective Agreement
• Low turnover rate (low attrition)
• Civilianization is ' /2 national average
• Negotiating next Collective Agreement
• Compulsory practices surpass discretionary practices
• Compulsory training and certification
• Compulsory technology and process upgrades
• Major Crimes are not typically predictable
54 r4 -)-
SAINT JOHN
• Direction (T or + in resource allocation)
— Service Level Alternative + decrease from 2012 Budget
• Revised service objectives
— 2012 Objectives:
• Crime Reduction;
• Priority Neighbourhoods;
• Residential Quality of Life
— Alternative 2013+ Objectives:
• Crime Reduction.
55 rte-
SAINT JOHN
• Council Priorities Service Impacts
— Reduced Priority Neighbourhood programming;
— Reduced QoL interventions.
• Community Service Impacts
— A partial shift from predictive /preventive to reactive
policing.
— Less support to vulnerable neighbourhoods (Priority
Neighbourhoods) and vulnerable populations.
56 rte-
SAINT JOHN
F Ale
• Wrap - around strategies where possible with other
public services and NGOs, to mitigate reduced
police presence and initiatives.
• Reduced expectations regarding Saint John Police
participation in PlanSJ and True Growth 2.0.
• Communicate service reductions to affected
communities, so those with organizational capacity
and resources can compensate.
57 r4 -)-
SAINT JOHN
rA
• Perivale- Taylor Report: The 1996 comprehensive review of the
governance, management and operations of the Saint John Police
Force.
• New Brunswick Policing Standards: Mandatory standards that
prescribe the best professional requirements and practices for police
services in New Brunswick.
• Ipso -Reid Public Opinion Survey: Survey reflecting public
satisfaction with performance of Saint John Police.
• Service Drivers: Such as community expectations, calls for service,
serious crime in progress ...from City Service Profiles.
• Strategic Plan: defines the major strategies to achieve our
community's vision for public safety.
58 rte-
SAINT JOHN
Core Service Review - Opportunities for service efficiencies and improvements
Annual Savings
Potential annual amount that could be saved or
> $1,000,000
> $500,000
<$500,000
realized
Revenue Generation
Non tax revenue generation potential
>$100,000
>$50,000
<$50,000
Strategic Alignment
Supports the achievement of the Community
Aligns
Somewhat aligns
Does not align
Vision, Council's Priorities and PlanSJ directions
Process Improvement
Opportunity focuses on process improvement
High
Medium
Low
to support quality customer service and realize
longer -term efficiencies
Public Expectation
Public support for change as part of the recent
Supports
Moderate support
Do not support
public engagement program including
community workshops, on -line consultation
and Ipsos Reid citizen survey or other public
engagement initiatives that support other
strategic planning initiatives (e.g., PlaySJ,
PlanSJ)
Citizen Impact
Impact (assume adverse impact) of
Minimal Impact
Some Impact
High Impact
implementation to citizens (number and
severity)
Opportunity Readiness
Analysis or recent reviews have been
Review or analysis
Review or analysis in
No review or analysis
completed to support the implementation of
completed and supports
progress
the opportunity during Council's term
opportunity
Implementation Challenges
Barriers, issues or obstacles to implementing
Low - no or minimal
Medium - some barriers
High - barriers that
the opportunity - such as political, legal, labour
barriers that can be
that may require time to
would take significant
and contractual obligations and or
easily overcome to
over come
effort or resources to
capital /operational cost investment required
implementation
overcome
Note: If a criteria does not apply to a particular opportunity, leave the space blank.
59
Page 1 of 12
One time
Cost Recovery
Not Applicable
No information available
Not Applicable
Council previously
rejected
No information available
Core Service Review - Opportunities for service efficiencies and improvements
2013 budget •■
Potential for high to moderate annual cost savings or revenue generation or process improvement
•
Aligns with strategic direction of Council and the Community
•■
Public support (through consultation) for implementation
•■
Minimal to some impact to citizens
•
Opportunity (initiative) is ready to implement with previous review or supporting analysis complete
•
Low barriers to implementation
2 -3 Years A •■
Potential for high to moderate annual cost savings, revenue generation or process improvement
•
Aligns with strategic direction of Council and the Community
• ■
Minimal to some impact to citizens
•
Public support (through consultation) for implementation
■
Opportunity needs more review or analysis to be ready for implementation
■
Medium barriers to implementation
3+ Year's ■♦
Potential for moderate annual or one time cost savings, revenue generation or process improvement
■
Somewhat aligns with strategic direction of Council and the Community
■
Some impact to citizens
♦
Limited public support (through consultation) for implementation
♦
Opportunity needs significant review or analysis to be ready for implementation
■♦
Medium to high barriers to implementation
Do not do ♦ O Limited potential for annual cost savings or one time, revenue generation or process improvement
♦ Does not align with strategic direction of Council and the Community
L ♦ High impact to citizens
♦ Limited or no public support (through consultation) for implementation
♦ Opportunity needs significant review or analysis to be ready for implementation
♦ High barriers to implementation
In determining priority, all of the criteria outlined for a specific priority option should be met. There will be cases
where the evaluation of criteria does not match up well with the guidelines provided. Based on familiarity with the
opportunity, judgement should be used to select the best priority option.
60
Page 2 of 12
Core Service Review - Opportunities for service efficiencies and improvements
1 Focus development in the intensification areas as outlined in PlanSJ - Planning ♦ ♦ • ■ ♦ • • ♦ 3+ Years Council priority supported by public consultation results; need
consider incentives to attract investment into these areas financial resources for incentives
2 Develop different standards according to priority or intensification zones Growth & Dev't/ ♦ ■ ■ • ■ • • • 3+ Years Idea generated as part of core service review discussions; supported
Corporate by Council's priorities
Planning /Finance
3 Investigate possibility of developers absorbing the costs of infrastructure Dev't Support ♦ ■ • • • ■ ■ 2 -3 Years
required to support development such as street light installations for
subdivisions, traffic lights
Development approval process review (streamline)
4 Implement clear and consistent internal processes to facilitate investment Planning/ ♦ ♦ • • • • ♦ ■ 2 -3 Years Process improvement opportunity identified as one of Council's
and development in Saint John while maintaining City standards that align Permitting/ priorities and supported by public consultation; Limited staff
with PlanSJ - including better support to applicants and one stop shop for Engineering resources in implement in 2013, but can start preparatory work
development
5 Regionalize service to realize cost efficiencies and capitalize on revenue Planning ♦ ♦ ♦ ♦ ♦ ♦ ♦ ♦ Do Not Do Provincially mandated regional service commission recently hired
generating opportunities planner - therefore limited potential for revenue generation
6 Review heritage service - determine community outcomes in consultation
with stakeholders
7 Consider non - regulatory - incentive based system to govern heritage
areas (less regulatory)
8 Eliminate heritage granting program
9 Rationalize heritage conservation area - no new adds or consider
condensing area
10 Investigate fees for inspections not core to the permitting service
11 Investigate fee for advisory /consulting activities not core to the service
delivery (e.g., permitting, traffic counts)
12 Investigate fee for continued by -law non - compliance
Page 3 of 12
Heritage
♦
♦
■
•
•
■
■
♦
2013 Necessary. Lack of human resources is a barrier.
Heritage
♦
♦
■
•
■
■
♦
♦
2013 Desirable. Requires human resources to move forward.
Heritage
♦
♦
♦
•
■
■
O
•
Do Not Do Presented in Plan D Budget preparation
Heritage
♦
♦
■
•
•
■
♦
■
2 -3 Years Staffing capacity issue to complete rationalization
Permitting ♦ ♦ ■ ■ ■ ■ ♦ ■ 2 -3 Years
Permitting /Traffic ♦ ♦ ■ ■ ■ ■ ♦ ■ 2 -3 Years
By- Law /Legal ♦ ♦ ■ ■ ■ ■ ♦ ■ 2 -3 Years
61
Core Service Review - Opportunities for service efficiencies and improvements
Gi
bn
aj
v
v
O C O C L
UJ E C 6 V
M C v 0 M
= N C O _ K O
CC
n o U N Q " E x c
t �n w E 7 °'
no +
O N N N O N
C j VO -0 N Q Q
' • dim For.T.T.UMMM
Service Area
v
n
a
d
V
O
E
13 Investigate amending bylaws to include more voluntary payments for non-
By- Law /Legal
♦
♦
■
■
■
■
♦
■
compliance
14 Investigate increasing permit fees (for work started without appropriate
Permitting
♦
♦
■
■
■
■
♦
■
permits)
15 Investigate by -law mandating regular fee increases to keep up with
Permitting /Legal
♦
♦
■
♦
■
■
♦
■
inflation and growth of programming
16 Investigate by -law amendments for development - focused on better cost
Permitting; By -law;
♦
♦
■
■
■
■
♦
■
recovery for inspections
Engineering
62
Page 4 of 12
Priority
2 -3+ Years Legal issues
2 -3+ Years
2 -3 Years
2 -3 Years
Core Service Review - Opportunities for service efficiencies and improvements
17 Review service level agreements to determine expectations focused on Economic Dev't ■ ♦ ♦ ■ • • ■ • 2 -3+ Years Involvement of Enterprise Saint John
results where City plays a governance role
18 Investigate shared administrative costs for economic development Dev't Support ♦ ♦ ♦ ■ • • ■ • 2013 Budget Idea generated during 2012 budget discussions; supports Council's
agencies priorities of a coordinated approach
63
Page 5 of 12
Core Service Review - Opportunities for service efficiencies and improvements
1 Seek revenue generating opportunities related to recreation
programming and emergency management via new regional service
commission
2 Transition from Direct Delivery to Community Development; changing
role to program facilitator providing grants for community development
and ensuring that quality standards are identified for all services
delivered
3 Develop a Community Grants Program
PENN* _tw
N �
i
o C i
v
E 0 a U
Z E a) 4
m � o
C N .°_n Q N M > N
M U' Q E CL °'
E
7 N N�? N O N
Service a s ; a a p
Rec & Culture Prgm; ■ • • • • •
Emergency Mgmt
Neighborhood; Rec ♦ ♦ • ■ ■ ■ ■ ■
& Cultural Prgm
Priority
2 -3 Years Ideas presented as part of 2013 budget expectations (McKenzie);
need to breakdown opportunities; police and emergency
management already identified as part of Regional Services
Commission / need to understand mandate of new commission for
opportunities
2 -3 Years Idea presented as part of PlaySJ (Parks and Recreation Strategic Plan);
requires preparation and analysis
Neighborhood; Rec ♦ ♦ • ■ ■ ■ • 2 -3 Years Idea presented as part of PlanSJ (Parks and Recreation Strategic
& Cultural Prgm Plan); required investment to implement
4 Eliminate funding, define alternative service delivery or initiate closure of Rec & Culture Prgm ♦ • ■ ■ • • ■ 2013 Budget Idea identified as part of 2012 budget deliberations; can prepare for
Somerset Community Centre Prep closure and discussions with YMCA
5 Implement a staffing formula to provide effective response for the PDA Fire ? ? • • ■ ■ ♦ • 2 -3 Years Idea presented as part of Core Service Review efficiencies
and rural areas of City that aligns with comparable jurisdictions (benchmarking); on -going evaluation
6 Consider reduction of instances of multi -level emergency response
7 Implement permit and fees for structures that present fire risk on
properties (e.g., fire pits) as part of a new Fire Service By -Law
8 Review and implement increases to inspection fees or fines for non-
compliance to support cost recovery as part of a new Fire Service By -Law
Fire ♦ ■ • • ■ ■ • Budget 2013 Idea presented as part of Core Service Review efficiencies
(benchmarking); alignment with other jurisdictions; deeply tied to
level of service of Ambulance NB.
Fire ♦ ? ■ • ■ ■ ■ 2 -3 Years Idea presented though discussions with the Fire Service; requires fire
service by -law (drafting in progress)
Fire ♦ ? ■ • ■ ■ ■ 2 -3 Years Idea presented during public consultation; requires by -law
amendments /drafting; resources for enforcement
9 Investigate opportunities to generate revenues through the skills that fire Fire ■ • ■ • ■ • ■ • Budget 2013 On -going efforts; potential up -front costs
personnel require to service industry (training) - valid certification
10 Investigate alternative sources of revenue via charging for services Fire ♦ • ■ • ■ • • • Budget 2013 Idea presented as part of 2012 budget discussions
rendered by Fire Department (i.e. Point Lepreau)
11 Investigate cost recovery mechanisms for response requiring technical Fire ♦ • ■ • ■ ■ ■ 2 -3 Years Idea presented during discussions with Fire Service; requires
rescue service (i.e., through insurance companies for vehicle extrication) preparation and analysis
12 Take over EMS service in the region Fire ? ? ■ ? ? • ♦ • 5 Years Intergovernmental cooperation with Province; other jurisdictions
combine service delivery
64
Page 6 of 12
Core Service Review - Opportunities for service efficiencies and improvements
13 Develop strategy around addressing false alarms and cost recovery
14 Investigate opportunity for regional policy and fire services (Feasibility
study)
15 Furthering review of criminal record checks and checks for people
working with vulnerable people (financial)
16 Seek revenue generating and efficiencies on a provincial basis including
right - valuing level of service /infrastructure / equipment that Saint John
provides to the rest of the region
17 Enhance certified instruction and expand existing training /valid
certification
18 Investigate and support fleet maintenance opportunities
Page 7 of 12
PENN* _tw
N �
i
0 C i
v
E 0 a U
ca E v 4
� v � o m � o
S v .°_p Q v m > —fa M U' Q E CL °'
E
7 N N �O .L, N o N
o
Service a cc ; a a U p E Priority
Fire; Police ? ? ■ • ■ ■ O ■ 2013 Budget Idea presented during public consultation; up front costs required
Fire; Police • • • • ? ? ♦ ♦ 5 Years Needs to be political will; savings and efficiencies can be realized
STUDY
Police ♦ ■ ■ ■ ■ ■ ■ • 2 -3 Years Increased to $25 (determine value for money)
Police ♦ ■ ■ • • ♦ ? ■ 2013 Budget On -going efforts - implement ready opportunities as part of 2013
budget. The City is well- served to more strategically equate the
actual cost of sharing its services /infrastructure /
equipment /expertise with neighbouring communities.
Police ? • • ♦ ♦ 2 -3 Years Limited market; will require up -front costs
Fire; Police; Fleet • ■ ♦ ♦ 2 -3 Years One potential area is an emergency vehicle technician hired in -house
65
Core Service Review - Opportunities for service efficiencies and improvements
1 Improve quality of contracted road work - introducing performance
penalties for delays and work that does not meet standards
2 Lowering service expectations in response time to storms for lower
priority streets
3 Road user surcharge, particularly for heavy truck, transports and buses
4 Contract out road repair and maintenance work with the expectation of
cost - saving and quality that meets established City standards
5 Contract out roadway winter maintenance
6 Continue to examine on- street parking regulations, as there are too many
vehicles parked along streets which interfere with snow plowing and
removal efficiencies
7 Charges for the use of municipal rights -of -ways and introduce fines for
inappropriate and unauthorized use (e.g., commercial signage)
8 Rationalize service area for sidewalk winter maintenance - focused on
CBD (uptown, school, bus routes, City properties); no new sidewalks
added
9 Introduce by -law that requires property owners to provide winter and
greenspaces (summer) maintenance along property frontage with fines
for non - compliance - may consider options for those property owners
with challenges
10 Contact out sidewalk winter maintenance
.....� O
N �
4+ N _
C � � fC
O + N L
ac E c o u
E a) MC:
v c o "1 o
C 00 N u U
a O N y
l7 ¢ E a ° N
E c
L u N W
7 bD
c ar o
C j .p y CL fl
Service a ,V, a Q' U O Priority
Roads • ■ • • ♦ ♦ 2 -3 Years
Roads ♦ ♦ ♦ ♦ ♦ • ■
Roads ♦ ■ ♦ ■ • ♦ ♦ 3+ Years
Roads
Roads
Roads /Legal
Roads; Sidewalks
? • •
•
■
♦
3+ Years
? •
•
♦
♦
3+ Years
♦ ♦ ■ ■ ■ ■ ■ ■ 2 -3 Years
■ ■ ■ ■ ♦ 2 -3 Years
Sidewalks ♦ ■ ■ ■ ■ ■ ■ 2 -3 Years
Sidewalks /Legal ♦ ♦ ♦ ■ ♦ ♦ ♦ 3+ Years
Sidewalks ? • • ♦ ♦ 3+ Years
66
Page 8 of 12
Idea presented during public consultation; introduction of penalties
into contracts may result in higher unit costs; investigation required
Taxation Review Committee
Idea presented to the Taxation Review Committee (2010);
investigation needed to determine if surcharge can be applied (PSAB)
and to Transit and double dipping of registration fees for heavy truck -
investigate more money from Province
Idea presented during public consultation; need to complete a
business case analysis to determine savings /costs; need to address
collective agreement limitations (293)
Idea presented during public consultation; need to complete a
business case analysis to determine savings /costs; need to address
collective agreement limitations (293)
Idea presented to the Taxation Review Committee (2010); requires by-
law amendments, some of which have been completed and is a
matter of implementing more changes; considerable effort in
preparing for court and high risk of going to court and losing (past
experience)
Idea presented to the Taxation Review Committee; need to create a
new Streets and Sidewalks By -Law with consolidation of related by-
laws; enforcement resources required
Idea presented during public consultation; currently receive many
calls for the 40% of s/w not serviced (currently 72 request for adding
s/w to the winter maintenance inventory); total cost of service is
currently $380,000
Idea presented during public consultation; new by -law required
(takes time and impacts current organization capacity); additional
resources required for enforcement; City properties need to be
services; collective agreement challenges (293)
Idea presented during public consultation; need to complete a
business case analysis to determine savings /costs; need to address
collective agreement limitations (293)
Core Service Review - Opportunities for service efficiencies and improvements
11 Seek revenue generating opportunities for line painting
12 Continue to improve technology used in line painting for efficiency (e.g.,
recent improvements have results in painting twice as many cross walks
in the same amount of time)
13 Investigate thermoplastics for line painting material with potential for
efficiencies by not having to paint same lines each year
14 Implement fee for advisory /consulting activities (e.g., traffic counts for
developers)
15 Introduce requirement for developers to pay for any transportation
infrastructure required as a result of development (particularly traffic
related requirements)
16 Establish a west depot location to improve cost - effectiveness of service
delivery
17 Charges for lateral connections to municipal storm water system
18 Charges for installation of new driveway - culverts
19 Introduce a requirement to provide analysis for TSS and hydrocarbons for
stormwater surcharge with a focus of reducing maintenance costs and
increasing the life -cycle of stormwater infrastructure
20 Investigate converting to a user pay system for solid waste collection
21 Seek revenue generating opportunities for solid waste collection
Page 9 of 12
Service
Traffic
Traffic
Traffic
Traffic
Traffic
MENE N r
v
C C N N
O a-' a) C S
N O U
fL0 E UJ (0 C:
pp Ul C p fa 2
C 00 U U
U O N N CL
y N
(gyp Q E: cu E E C
Ln a) u N W
7 pp
c ar
C j o .p y Q a
z v a a' U O E Priority
■ ■ ■ • ■ ♦ 2 -3 Years Idea presented as part of budget expectations 2013 (McKenzie);
already have had success with taking on work of PNB with increased
revenue; better utilization of resources (when weather is foggy in City
may be sunny in neighbouring communities)
♦ ■ • ■ • ■ • 2013 Budget Need investment in equipment
♦ • • • • ■ • 2013 Budget Need investment in materials /equipment
STUDY
♦ ■ • • • 2013 Budget
♦ ■ • • ♦ ■ 2 -3 Years
Transportation ♦ ■ • • • ■ ♦ 2 -3 Years Savings in fuel and more responsive service delivery; one time savings
Services from closing Boars Head location to offset capital cost of moving
operation west; proposing a phased approach of $175,000 annually in
capital costs - total $600,000); legal and real estate requirements
Stormwater
O ■
■
•
■
■
2 -3 Years
Idea presented to Taxation Review Committee; need to focus on cost
recovery; need investigation on how to implement
Stormwater
O ■
■
•
■
■
2 -3 Years
Need to focus on cost recovery; need investigation on how to
implement
Stormwater
♦ ■
■
•
♦
■
3+ years
Requires development of a stormwater by -law
Solid Waste
? O
■ ■
■
■
♦
2 -3 Years
Idea presented as part of 2012 Budget Discussions; need
STUDY
investigation into feasibility of implementation and determination of
savings /costs; administrative requirements expected to increase
Solid Waste • ■ ■ • ■ ♦ 2 -3 Years Idea presented as part of budget expectations 2013 (McKenzie);
requires capital investment for equipment
67
Core Service Review - Opportunities for service efficiencies and improvements
22 Introduce a bag limit to reduce tipping fees and operational costs
23 Contract out solid waste collection service
24 Introduce fines for not recycling or composting
25 Better enforcement of the Solid Waste By -Law and collection of fines for
non - compliance (specifically illegal dumping)
26 Divest LPP as appropriate
27 Set up a grants and endowments program for community -based parks
and recreation facilities projects
28 Develop comprehensive user fee and subsidy policy with a restructuring
of rates that focus on regional considerations
29 Complete facilities right- sizing exercise ensuring that facilities meet need
and is affordable
30 Develop a regional recreation facilities model for that coordinates service
delivery (scheduling)
31 Complete a community school facility review and develop mutual use
agreements
32 Investigate opportunity to privatize local arenas
33 Work with Provincial government to introduce contributions to the public
transit service that aligns with other provincial jurisdictions across Canada
34 Increase on- street parking meter areas
35 Increase hours of operation of parking (e.g., additional hours per day, flat
rates on weekend evenings)
Page 10 of 12
ENNO
N v
Solid Waste ♦ ♦ ■ ■ ■ ■
Priority
2 -3 Years Idea presented during public consultation; some savings in tipping
fees anticipated but need analysis to determine impact; need
additional enforcement (tagging and illegal dumping) and
administration resources
Do not do Idea presented during public consultation; business case analysis
completed recommending in -house service delivery; post 293
collective agreement would need to conduct analysis to determine
savings /costs
2 -3 Years Idea presented during public consultation; by -law amendments
required; additional enforcement /administrative resources required
Solid Waste ♦ ♦ ■ ■ • • ■ ♦ 2 -3 Years Ideas presented during public consultation; by -law amendments
required; additional enforcement /administrative resources required
Parks
Parks;
Rec Facilities
Rec Facilities
♦ ■ • ♦ ■ 2 -3 Years Evaluation required of appropriate land to divest and mechanism for
divesting; legal and real estate requirements
♦ ♦ ■ ■ ■ ■ ♦ 2 -3 Years
♦ • ■ ■ ♦ ■
Rec Facilities ♦ ♦ • ■ ■ ■ ■
Rec Facilities ■ ♦ • • ■ ■ ♦ •
Rec Facilities ♦ ♦ • ■ ♦ ■ ♦ ■
Rec Facilities • ■ •
Transit /IGA • • • • •
2 -3 Years Requires investigation and consultation to determine appropriate
rates and /or subsidies
2 -3 Years Need to be completed as part of PlaySJ recommendations;
considerable resource required to divert or decommission recreation
facility assets
2 -3 Years Will depend on mandate of Provincial Regional Services Commission;
Web- booking feasibility
2 -3 Years Current agreements outdated; time required to negotiate with the
Province; legal requirements
2 -3 Years 2012 Budget Discussions; trend in arena management
2 -3 Years Requires intergovernmental coordination
Parking ■ ■ ■ ■ ■ 2013 Budget Requires by -law amendments (minimal); need to consult with
business community; revenue realized mid year
Parking ■ ■ ■ ■ ■ 2013 Budget Requires by -law amendments (minimal); need to consult with
business community; revenue realized mid year
•:
C
a)
O
2
C
U
C
E
v
C
0
C
O
D
t
V
t0
C
N
C
O
_
�J
O
M
In
v
0
N
.°p
Q
�'
a
E
v
a
W
a
3
c
N
O
C
no
4J
N
. V
N
+
O
OJ
C
Service Q
>
V)
p
a
-0
d
Y
Q
0
Q
Solid Waste ?
?
■
■
■
■
Solid Waste
•
•
•
Solid Waste ♦ ♦ ■ ■ ■ ■
Priority
2 -3 Years Idea presented during public consultation; some savings in tipping
fees anticipated but need analysis to determine impact; need
additional enforcement (tagging and illegal dumping) and
administration resources
Do not do Idea presented during public consultation; business case analysis
completed recommending in -house service delivery; post 293
collective agreement would need to conduct analysis to determine
savings /costs
2 -3 Years Idea presented during public consultation; by -law amendments
required; additional enforcement /administrative resources required
Solid Waste ♦ ♦ ■ ■ • • ■ ♦ 2 -3 Years Ideas presented during public consultation; by -law amendments
required; additional enforcement /administrative resources required
Parks
Parks;
Rec Facilities
Rec Facilities
♦ ■ • ♦ ■ 2 -3 Years Evaluation required of appropriate land to divest and mechanism for
divesting; legal and real estate requirements
♦ ♦ ■ ■ ■ ■ ♦ 2 -3 Years
♦ • ■ ■ ♦ ■
Rec Facilities ♦ ♦ • ■ ■ ■ ■
Rec Facilities ■ ♦ • • ■ ■ ♦ •
Rec Facilities ♦ ♦ • ■ ♦ ■ ♦ ■
Rec Facilities • ■ •
Transit /IGA • • • • •
2 -3 Years Requires investigation and consultation to determine appropriate
rates and /or subsidies
2 -3 Years Need to be completed as part of PlaySJ recommendations;
considerable resource required to divert or decommission recreation
facility assets
2 -3 Years Will depend on mandate of Provincial Regional Services Commission;
Web- booking feasibility
2 -3 Years Current agreements outdated; time required to negotiate with the
Province; legal requirements
2 -3 Years 2012 Budget Discussions; trend in arena management
2 -3 Years Requires intergovernmental coordination
Parking ■ ■ ■ ■ ■ 2013 Budget Requires by -law amendments (minimal); need to consult with
business community; revenue realized mid year
Parking ■ ■ ■ ■ ■ 2013 Budget Requires by -law amendments (minimal); need to consult with
business community; revenue realized mid year
•:
Core Service Review - Opportunities for service efficiencies and improvements
36 Increase cost of residential parking permit for temporary and commercial
use (currently $5 per week)
37 Increase area of parking enforcement
38 Investigate program that generates triggers for people who do not pay
multiple parking tickets for more efficient service delivery in terms of the
effort to work through the process (court)
39 Change current summons and court process for parking tickets to make it
more efficient
Page 11 of 12
Service
Parking
Parking
Parking
Parking ♦ • ■ ■ ■ ♦ 2 -3 Years Study feasibility of placing tickets against drivers license or vehicle
registration - tickets must be paid in order to renew;
intergovernmental cooperation with the Province to implement
••
MENE
N
r_
v
C
O
i
+
N
E
N
�
N
E
a
C
O
N
�
C
O
N
_
fC
S
V
C
C
.
U
�
2
Ln
U
l7
00
¢
u
O
E
u
N
c
N
°
y
E
N
c
C
Ul
7
Vf
W
C
c
j
aj
M
u0
.p
y
Q
a
z
a
a'
U
v,
O
Priority
■
■
■
■
•
2013 Budget Requires by -law amendments (minimal); need to consult with
business community; revenue realized mid year
♦
■
■
♦
■
2 -3 Years Requires by -law amendments
♦
■
■
■
♦
♦
2 -3 Years Requires study
STUDY
Parking ♦ • ■ ■ ■ ♦ 2 -3 Years Study feasibility of placing tickets against drivers license or vehicle
registration - tickets must be paid in order to renew;
intergovernmental cooperation with the Province to implement
••
Core Service Review - Opportunities for service efficiencies and improvements
1 Increasing responsibilities to eliminate or reduce overtime including
service level policy review and working alone policy
2 Introduce universal metering to ensure users pay for the water that is
consumed to support better leak detection and repair and automated
meter reading - consider requirement for new construction to install
water meter to support universal metering
3 Review rates to ensure they are affordable and that there is equity among
rate payers, particularly among heavy users
4 Evaluate a Public- Private Partnership (P3) model to deliver quality
drinking water
5 Introduce fire line standby charges back in to the Water & Sewer By -Law.
This will require an inventory of sprinkler lines and an amendment to the
by -law
6 Full cost recovery for special customer services (e.g., installation of new
services, thawing frozen services, water testing, permitting, disinfection
including overhead costs)
7 Implement computerized maintenance management system software
8 Recreate Saint John Water as a separate entity
9 Review delinquent account policy (recover revenue in a timely, equitable
manner)
10 Investigate immediate rate increases to begin long term financing of safe,
clean drinking water program
11 Eliminating fluoride in the City's water
12 Increase service fee on large meters
Page 12 of 12
Qj
v
C
c
v
C C N V
O N c t
U E c O U
a E v o a C
m v c p Y = o
C N d N Q > o
�n ai U E x E c
7
V LU C t E
7 C N U N 0 N
c j p
Service Stream a z LA d d U p E
SJW ♦ • • O ♦ ♦ ■
Priority
2 -3 Years Idea presented as part of 2012 budget discussions
SJW 0 0 0 ■ ■ ♦ ■ 2 -3 Years / Idea presented during public consultation; review timing to better
Automation support quality drinking water program; Consider automatic meter
2013 Budget reading in 2013 (analysis complete)
SJW O • • O • • ♦ ■ 2 -3 Years Idea presented during public consultation
SJW ? • O • • ■ ♦ 2013 Budget Idea presented during public consultation; evaluation in progress
STUDY
SJW ■ • O O • ♦ ■ 2 -3 Years SJW revenue generating /cost saving ideas submitted as part of the
core service review; requirement for by -law changes and business
case analysis
SJW • • • O • ■ ■ 2 -3 Years Requires analysis and by -law amendments
SJW ♦ • • O • ■ ■ 2013 Budget Requires costs to implement resulting in long -term cost savings in life -
cycle management of infrastructure
SJW ♦ • • O • ♦ ♦ 3+ Years
SJW ♦ • • O • ♦ ■ 2 -3 Years
SJW; Finance • • O ♦ ♦ • ♦ 2013 Budget
Drinking Water ♦ O • • ♦ ■ 2013 Budget Idea presented as part of 2012 budget discussions; likely resistance
from Dental Association; Provincial mandate with recent
implementation of a dental program
Drinking Water ♦ • O O • ■ • 2 -3 Years SJW revenue generating /cost saving ideas submitted as part of the
core service review
70